{{#Wiki_filter:10 CFR 50.55a Qaps Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 102-06828-TNW/RKR/CJS January 24, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50.55a Qaps                                                                               Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-06828-TNW/RKR/CJS                                                            Mail Station 7636 Tel: (623) 393-5764 January 24, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 3, Docket No. STN 50-530 Third 10-Year Interval, Second Period: Owner's Activity Report Number U3R17 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-i) for Unit 3 refueling outage 17 (U3R17). The outage ended on November 26, 2013.No commitments are being made to the NRC information regarding this submittal, please Section Leader, at (623)393-5241.
Palo Verde Nuclear Generating Station (PVNGS)
by this letter. Should you need further contact Robert K. Roehler, Licensing Sincerely, CL,, /pq W6ý0 ( t, (Thomas N. Weber Department Leader, Regulatory Affairs TNW/RKR/CJS/hsc
Unit 3, Docket No. STN 50-530 Third 10-Year Interval, Second Period:
Owner's Activity Report Number U3R17 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-i) for Unit 3 refueling outage 17 (U3R17). The outage ended on November 26, 2013.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Robert K. Roehler, Licensing Section Leader, at (623)393-5241.
Sincerely, CL,,       /pqW6ý0 (t,                 (
Thomas N. Weber Department Leader, Regulatory Affairs TNW/RKR/CJS/hsc


==Enclosure:==
==Enclosure:==
Unit 3 Seventeenth Refueling Outage Owner's Activity Report, Report U3R17 cc:    M. L. Dapas          NRC  Region IV Regional Administrator J. K. Rankin          NRC  NRR Project Manager (electronic and hard copy)
A. E. George          NRC  NRR Project Manager (electronic and hard copy)
M. A. Brown          NRC  Senior Resident Inspector for PVNGS A member of the STARS    (Strategic Teaming and Resource Sharing) Alliance pql Callaway 0 Comanche Peak
* Diablo Canyon
* Palo Verde 0 Wolf Creek


Unit 3 Seventeenth Refueling Outage Owner's Activity Report, Report U3R17 cc: M. L. Dapas J. K. Rankin A. E. George M. A. Brown NRC Region IV Regional Administrator NRC NRR Project Manager (electronic and hard copy)NRC NRR Project Manager (electronic and hard copy)NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak
ENCLOSURE Unit 3 Seventeenth Refueling Outage Owner's Activity Report Report U3R17
* Diablo Canyon
 
* Palo Verde 0 Wolf Creek pql ENCLOSURE Unit 3 Seventeenth Refueling Outage Owner's Activity Report Report U3R17 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 3R17 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 3 Commercial service date: Jan 8, 1988 (if appilcable)
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 3R17 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 3                               Commercial service date:                 Jan 8, 1988             Refueling Outage No.: 17 (if appilcable)
Current inspection interval IWB,IWC,IWD,IWF  
Current inspection interval IWB,IWC,IWD,IWF = 3rd,                               IWE,IWL = 2nd (11'.2", 3'. 4'. other)
= 3rd, IWE,IWL = 2nd (11'. 2", 3'. 4'. other)Refueling Outage No.: 17 Current inspection period IWB,IWC,IWD,IWF, IWE =2nd IWL = 1st ( i V, 2W, 31d)Edition and Addenda of Section Xl applicable to the inspection plans 2001 ed, 2003 Ad, IWL + 2007 ed 2008 ad Date and revision of inspection plans SI = 8/29/13 R3, Press Test = 7/20/12 R3, IWE = 4/2/09 RO, IWL = 11/8/12 Ri Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans 2001 ed 2003 ad Code Cases used: N-532-4, N-638-4 (if applliable)
Current inspection period                     IWB,IWC,IWD,IWF, IWE =2nd                 IWL = 1st (i V,2W,31d)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 3R17 conform to the requirements of Section XI.(refueling outage number)Lehman, William Signed T(Z60076)Digitally signed by Lehman, William T(Z60076)DN: cn=Lehman, William T(Z60076)Date; 2014.Qjap.
Edition and Addenda of Section Xl applicable to the inspection plans 2001 ed, 2003 Ad, IWL + 2007 ed 2008 ad Date and revision of inspection plans                             SI = 8/29/13 R3, Press Test = 7/20/12 R3, IWE = 4/2/09 RO, IWL = 11/8/12 Ri Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans 2001 ed 2003 ad Code Cases used: N-532-4, N-638-4 (ifapplliable)
12:16:46 -07'00'CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB Global Standards of Hartford, Ct have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. " By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be.liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 3R17                         conform to the requirements of Section XI.
Digitally signed by Hogsrlom.Hogstrom, Robert (YH2450)Robert (YH2450) DN=Hogtrom Robert (Yi2450)Commissions N.B, 9685"IS,A,I,N,C" (tnspector's Signature)
(refueling outage number)
National Board, Slate. Province, end Endorsements Date: Jan 22, 2014 PV-E0796 Ver. 1 Palo Verde Nuclear Generating Station Owners Activity Report -Unit 3 Refueling Outage 17 Table I Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation.Category Number of Work Description
Digitally signed by Lehman, William Lehman, William                                                         T(Z60076)
..... 0 1 None ......2 Palo Verde Nuclear Generating Station Owners Activity Report -Unit 3 Refueling Outage 17 Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Glass --rintinn of Work Completed Plan Number 3 3MDGBE01B'imeruxjuiv,--tal corrosion weld repair 6112/2012 3548294 3 3MEWBE01 base metal corrosion weld repair 11/212013 3576438 3 3MDGBE05 JW cooler base metal corrosion weld repair 6/12/2012 3576447.3 3MDGBE04 LO cooler base metal corrosion weld repair 6/12/2012 3576451 2 3PSGEL005 Replace piping for FAC 11/23/2013 3596293 3 3MDGAE01A intercooler base metal corrosion weld repair 5/25/2012 4169457 3 3MDGBE01B intercooler base metal corrosion weld repair 11/212013 4174589 3 3MDGBE01A intercooler base metal corrosion weld repair 11/4/2013 4180677 3 3PSPBL106 base metal corrosion weld repair 1.1/2/2013 4180932 3 3MDGAEO5.
DN: cn=Lehman, William T(Z60076)
3PSPAL100 and 3PSPAL098 base metal corrosion weld repair 8/30/2013 4183562 3 3MDGAE04 LO cooler base metal corrosion weld repair 8/30/2013 4183563 3 3MDGBE04 LO cooler base metal corrosion weld repair 11/2/2013 4198517 3 3MDGBE05 JW cooler base metal corrosion weld repair 1112/2013 4198599 2 3MEWAE01 base metal corrosion weld repair 11128/2012 4286091 3 3MEWAE01 base metal corrosion weld repair 11/28/2012 4287085 1 _ 3MRCEX01 Repair of BMI nozzle 3 11/23/2013 4464771 I 3MRCEX01 Remove boat sample BMI nozzle 3 11/12/2013 4465641 2 3PSGEL100 Blend out of indication near UV183 11/23/2013 4466381 3}}
Signed              T(Z60076)                                                                Date; 2014.Qjap. 12:16:46 -07'00' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                     Arizona                 and employed by               HSB Global Standards             of Hartford, Ct                             have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.                                         "
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be.
liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.
Digitally signed by Hogsrlom.
Hogstrom,                           Robert (YH2450)
Robert (YH2450)                     DN=Hogtrom Robert     (Yi2450)
Commissions N.B, 9685"IS,A,I,N,C" (tnspector's Signature)                                                               National Board, Slate. Province, end Endorsements Date:                       Jan 22, 2014 PV-E0796 Ver. 1
 
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 3 Refueling Outage 17 Table I Items with flaws or relevant conditions that required evaluation for continued service Examination Item                       Description                   Evaluation
  .Category Number                       of Work                       Description 0
            ..... 1                       None                           ......
2
 
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 3 Refueling Outage 17 Table 2 Abstract of repair/replacement activities required for continued service Item                                 Description                         Date   Repair/Replacement Code Glass             -- rintinn                                 of Work                       Completed     Plan Number 3           3MDGBE01B'imeruxjuiv,--tal                       corrosion weld repair           6112/2012       3548294 3                 3MEWBE01                     base metal corrosion weld repair             11/212013       3576438 3             3MDGBE05 JW cooler                 base metal corrosion weld repair             6/12/2012       3576447
  .3             3MDGBE04 LO cooler                 base metal corrosion weld repair             6/12/2012       3576451 2                 3PSGEL005                           Replace piping for FAC               11/23/2013       3596293 3           3MDGAE01A intercooler               base metal corrosion weld repair             5/25/2012       4169457 3           3MDGBE01B intercooler               base metal corrosion weld repair             11/212013       4174589 3           3MDGBE01A intercooler               base metal corrosion weld repair             11/4/2013       4180677 3                 3PSPBL106                     base metal corrosion weld repair             1.1/2/2013     4180932 3     3MDGAEO5. 3PSPAL100 and 3PSPAL098         base metal corrosion weld repair             8/30/2013       4183562 3             3MDGAE04 LO cooler                 base metal corrosion weld repair             8/30/2013       4183563 3             3MDGBE04 LO cooler                 base metal corrosion weld repair             11/2/2013       4198517 3             3MDGBE05 JW cooler                 base metal corrosion weld repair             1112/2013       4198599 2                 3MEWAE01                     base metal corrosion weld repair           11128/2012       4286091 3                 3MEWAE01                     base metal corrosion weld repair           11/28/2012       4287085 1 _               3MRCEX01                           Repair of BMI nozzle 3               11/23/2013       4464771 I                 3MRCEX01                     Remove boat sample BMI nozzle 3             11/12/2013       4465641 2                 3PSGEL100                     Blend out of indication near UV183           11/23/2013       4466381 3}}

Latest revision as of 09:52, 4 November 2019

Third 10-Year Interval, Second Period: Owner'S Activity Report Number U3R17
ML14034A147
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/24/2014
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06828-TNW/RKR/CJS
Download: ML14034A147 (5)


Text

10 CFR 50.55a Qaps Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-06828-TNW/RKR/CJS Mail Station 7636 Tel: (623) 393-5764 January 24, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3, Docket No. STN 50-530 Third 10-Year Interval, Second Period:

Owner's Activity Report Number U3R17 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-i) for Unit 3 refueling outage 17 (U3R17). The outage ended on November 26, 2013.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact Robert K. Roehler, Licensing Section Leader, at (623)393-5241.

Sincerely, CL,, /pqW6ý0 (t, (

Thomas N. Weber Department Leader, Regulatory Affairs TNW/RKR/CJS/hsc

Enclosure:

Unit 3 Seventeenth Refueling Outage Owner's Activity Report, Report U3R17 cc: M. L. Dapas NRC Region IV Regional Administrator J. K. Rankin NRC NRR Project Manager (electronic and hard copy)

A. E. George NRC NRR Project Manager (electronic and hard copy)

M. A. Brown NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance pql Callaway 0 Comanche Peak

  • Diablo Canyon
  • Palo Verde 0 Wolf Creek

ENCLOSURE Unit 3 Seventeenth Refueling Outage Owner's Activity Report Report U3R17

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: 3R17 Plant: Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Unit No.: 3 Commercial service date: Jan 8, 1988 Refueling Outage No.: 17 (if appilcable)

Current inspection interval IWB,IWC,IWD,IWF = 3rd, IWE,IWL = 2nd (11'.2", 3'. 4'. other)

Current inspection period IWB,IWC,IWD,IWF, IWE =2nd IWL = 1st (i V,2W,31d)

Edition and Addenda of Section Xl applicable to the inspection plans 2001 ed, 2003 Ad, IWL + 2007 ed 2008 ad Date and revision of inspection plans SI = 8/29/13 R3, Press Test = 7/20/12 R3, IWE = 4/2/09 RO, IWL = 11/8/12 Ri Edition and Addenda of Section Xl applicable to repair/replacement activities, if different than the inspection plans 2001 ed 2003 ad Code Cases used: N-532-4, N-638-4 (ifapplliable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 3R17 conform to the requirements of Section XI.

(refueling outage number)

Digitally signed by Lehman, William Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

Signed T(Z60076) Date; 2014.Qjap. 12:16:46 -07'00' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arizona and employed by HSB Global Standards of Hartford, Ct have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. "

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be.

liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

Digitally signed by Hogsrlom.

Hogstrom, Robert (YH2450)

Robert (YH2450) DN=Hogtrom Robert (Yi2450)

Commissions N.B, 9685"IS,A,I,N,C" (tnspector's Signature) National Board, Slate. Province, end Endorsements Date: Jan 22, 2014 PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 3 Refueling Outage 17 Table I Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation

.Category Number of Work Description 0

..... 1 None ......

2

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 3 Refueling Outage 17 Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Glass -- rintinn of Work Completed Plan Number 3 3MDGBE01B'imeruxjuiv,--tal corrosion weld repair 6112/2012 3548294 3 3MEWBE01 base metal corrosion weld repair 11/212013 3576438 3 3MDGBE05 JW cooler base metal corrosion weld repair 6/12/2012 3576447

.3 3MDGBE04 LO cooler base metal corrosion weld repair 6/12/2012 3576451 2 3PSGEL005 Replace piping for FAC 11/23/2013 3596293 3 3MDGAE01A intercooler base metal corrosion weld repair 5/25/2012 4169457 3 3MDGBE01B intercooler base metal corrosion weld repair 11/212013 4174589 3 3MDGBE01A intercooler base metal corrosion weld repair 11/4/2013 4180677 3 3PSPBL106 base metal corrosion weld repair 1.1/2/2013 4180932 3 3MDGAEO5. 3PSPAL100 and 3PSPAL098 base metal corrosion weld repair 8/30/2013 4183562 3 3MDGAE04 LO cooler base metal corrosion weld repair 8/30/2013 4183563 3 3MDGBE04 LO cooler base metal corrosion weld repair 11/2/2013 4198517 3 3MDGBE05 JW cooler base metal corrosion weld repair 1112/2013 4198599 2 3MEWAE01 base metal corrosion weld repair 11128/2012 4286091 3 3MEWAE01 base metal corrosion weld repair 11/28/2012 4287085 1 _ 3MRCEX01 Repair of BMI nozzle 3 11/23/2013 4464771 I 3MRCEX01 Remove boat sample BMI nozzle 3 11/12/2013 4465641 2 3PSGEL100 Blend out of indication near UV183 11/23/2013 4466381 3