| {{#Wiki_filter:March 11, 2014 NEXT era POINT BEACH NRC 2014-0017 10 CFR 50.54(f) U.S. Nuclea r Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Date Changes Related to Recommendation 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | | {{#Wiki_filter:NEXTera EN ERGY ~ |
| | POINT BEACH March 11, 2014 NRC 2014-0017 10 CFR 50.54(f) |
| | U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Date Changes Related to Recommendation 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident |
|
| |
|
| ==References:== | | ==References:== |
| | (1) U.S. Nuclear Regulatory Commission, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) |
| | Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident," |
| | March 12, 2012 (ML12053A340) |
| | (2) NextEra Energy Point Beach, LLC letter to NRC, dated May 10, 2012, NextEra Energy Point Beach, LLC's 60-day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident; dated March 12, 2012 (ML12161A664) |
| | (3) NRC letter to NextEra Energy Point Beach, LLC, dated December 11, 2013, Point Beach Nuclear Plant, Unit 1 - Relaxation of the Schedular Requirements of Order EA-12-049 "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events" (ML13322B208) |
| | (4) NextEra Energy Point Beach, LLC letter to NRC, dated October 31, 2012, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 9.3, Emergency Preparedness (ML12305A538) |
| | Via Reference (1 ), the Nuclear Regulatory Commission (NRC) issued a request for information pursuant to 10 CFR 50 .54(f). Enclosure 5 of Reference (1) contains specific Requested Actions and Requested Information associated with Recommendation 9.3 for Emergency Preparedness (EP) programs. NextEra Energy Point Beach, LLC (Point Beach) submitted an alternative course of action, and basis for acceptability of that course of action, to respond to the NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 |
| | |
| | Document Control Desk Page 2 information request (Reference 2). In Reference (2), Point Beach provided an estimated completion date for the Phase 2 staffing assessment of four months prior to the beginning of 1R35 (as used within the context of NRC Order EA-12-049). Refueling Outage 1R35 is currently planned for Fall 2014. |
| | Point Beach was scheduled to complete implementation of the mitigating strategies for Unit 1 prior to startup from the October 2014 refueling outage. The completion date for the Phase 2 staffing assessment was based on the implementation of the mitigating strategies. The Phase 2 staffing assessment, among other tasks, will need to assess staffing needed and time required to operate the mitigating strategy equipment. Point Beach received a relaxation of the scheduler requirements of Order EA-12-049 in a letter from the NRC dated December 11, 2013 (Reference 3) . The requirement of the order for implementation for Point Beach Nuclear Plant, Unit 1, is relaxed until the completion of the May 2016 refueling outage. |
| | Due to the schedule change for the implementation of Unit 1, Unit 2 will be the lead unit for implementation of the mitigating strategies. Point Beach will complete the Phase 2 staffing assessment four months prior to the start of Unit 2's fall outage of 2015 . This is based on the need to have the mitigating strategy equipment available in order to complete the assessment. |
| | In addition to the effect on the Phase 2 staffing assessment; the change in the implementing strategy schedule has impacted a communications related commitment. In Reference (4), Point Beach made the following commitment with a completion date of October 31, 2014: |
| | Provide additional portable generators to power battery chargers for the existing installed batteries that supply power to the radio system, PBX phone system and Gai-Tronics system within the station power block (The same battery supplies both the radio and Gai-Tronics system) . Complete appropriate training and update the applicable procedures . |
| | This commitment date was based on implementing the Unit 1 mitigating strategies in the Fall 2014 refueling outage. Due to the change in the schedule, Point Beach is changing this commitment date to October 31, 2015. There is no change to this commitment other than the completion date change. |
|
| |
|
| (1) (2) (3) (4) U.S. Nuclear Regulatory Commission, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident," March 12, 2012 (ML12053A340)
| |
| NextEra Energy Point Beach, LLC letter to NRC, dated May 10 , 2012, NextEra Energy Point Beach, LLC's 60-day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident; dated March 12, 2012 (ML12161A664)
| |
| NRC letter to NextEra Energy Point Beach, LLC , dated December 11, 2013, Point Beach Nuclear Plant, Unit 1 -Relaxation of the Schedular Requirements of Order EA-12-049 "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events" (ML13322B208)
| |
| NextEra Energy Point Beach, LLC letter to NRC, dated October 31, 2012, Next E ra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 9.3, Emergency Preparedness (ML12305A538)
| |
| Via Reference (1 ), the Nuclear Regulatory Commission (NRC) issued a request for information pursuant to 10 CFR 50.54(f). Enclosure 5 of Reference (1) contains specific Requested Actions and Requested Information associated with Recommendation 9.3 for Emergency Preparedness (EP) programs.
| |
| NextEra Energy Point Beach, LLC (Point Beach) submitted an alternative course of action, and basis for acceptability of that course of action, to respond to the NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 Document Control Desk Page 2 information request (Reference 2). In Reference (2), Point Beach provided an estimated completion date for the Phase 2 staffing assessment of four months prior to the beginning of 1 R35 (as used within the context of NRC Order EA-12-049).
| |
| Refueling Outage 1 R35 is currently planned for Fall 2014. Point Beach was scheduled to complete implementation of the mitigating strategies for Unit 1 prior to startup from the October 2014 refueling outage. The completion date for the Phase 2 staffing assessment was based on the implementation of the mitigating strategies.
| |
| The Phase 2 staffing assessment, among other tasks, will need to assess staffing needed and time required to operate the mitigating strategy equipment.
| |
| Point Beach received a relaxation of the scheduler requirements of Order EA-12-049 in a letter from the NRC dated December 11, 2013 (Reference 3). The requirement of the order for implementation for Point Beach Nuclear Plant , Unit 1, is relaxed until the completion of the May 2016 refueling outage. Due to the schedule change for the implementation of Unit 1, Unit 2 will be the lead unit for implementation of the mitigating strategies.
| |
| Point Beach will complete the Phase 2 staffing assessment four months prior to the start of Unit 2's fall outage of 2015. This is based on the need to have the mitigating strategy equipment available in order to complete the assessment.
| |
| In addition to the effect on the Phase 2 staffing assessment; the change in the implementing strategy schedule has impacted a communications related commitment.
| |
| In Reference (4), Point Beach made the following commitment with a completion date of October 31, 2014: Provide additional portable generators to power battery chargers for the existing installed batteries that supply power to the radio system, PBX phone system and Gai-Tronics system within the station power block (The same battery supplies both the radio and Gai-Tronics system). Complete appropriate training and update the applicable procedures. This commitment date was based on implementing the Unit 1 mitigating strategies in the Fall 2014 refueling outage. Due to the change in the schedule, Point Beach is changing this commitment date to October 31, 2015. There is no change to this commitment other than the completion date change.
| |
| Document Control Desk Page 3 This letter contains no new Regulatory Commitments. | | Document Control Desk Page 3 This letter contains no new Regulatory Commitments. |
| If you have any questions, please contact Mr. Michael Millen, Licensing Manager, at 920/755-7 427. I declare under penalty of perjury that the foregoing is true and correct. Executed on March 11, 2014 Very truly yours, NextEra Energy Point Beach, LLC Eric McCartney Site Vice President Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Director of Office of Nuclear Reactor Regulation, USNRC}} | | If you have any questions, please contact Mr. Michael Millen, Licensing Manager, at 920/755-7427. |
| | I declare under penalty of perjury that the foregoing is true and correct. |
| | Executed on March 11, 2014 Very truly yours, NextEra Energy Point Beach, LLC Eric McCartney Site Vice President Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Director of Office of Nuclear Reactor Regulation, USNRC}} |
|
---|
Category:Letter type:NRC
MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18
[Table view] |
Text
NEXTera EN ERGY ~
POINT BEACH March 11, 2014 NRC 2014-0017 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Date Changes Related to Recommendation 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident
References:
(1) U.S. Nuclear Regulatory Commission, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident,"
March 12, 2012 (ML12053A340)
(2) NextEra Energy Point Beach, LLC letter to NRC, dated May 10, 2012, NextEra Energy Point Beach, LLC's 60-day Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident; dated March 12, 2012 (ML12161A664)
(3) NRC letter to NextEra Energy Point Beach, LLC, dated December 11, 2013, Point Beach Nuclear Plant, Unit 1 - Relaxation of the Schedular Requirements of Order EA-12-049 "Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events" (ML13322B208)
(4) NextEra Energy Point Beach, LLC letter to NRC, dated October 31, 2012, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 9.3, Emergency Preparedness (ML12305A538)
Via Reference (1 ), the Nuclear Regulatory Commission (NRC) issued a request for information pursuant to 10 CFR 50 .54(f). Enclosure 5 of Reference (1) contains specific Requested Actions and Requested Information associated with Recommendation 9.3 for Emergency Preparedness (EP) programs. NextEra Energy Point Beach, LLC (Point Beach) submitted an alternative course of action, and basis for acceptability of that course of action, to respond to the NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 information request (Reference 2). In Reference (2), Point Beach provided an estimated completion date for the Phase 2 staffing assessment of four months prior to the beginning of 1R35 (as used within the context of NRC Order EA-12-049). Refueling Outage 1R35 is currently planned for Fall 2014.
Point Beach was scheduled to complete implementation of the mitigating strategies for Unit 1 prior to startup from the October 2014 refueling outage. The completion date for the Phase 2 staffing assessment was based on the implementation of the mitigating strategies. The Phase 2 staffing assessment, among other tasks, will need to assess staffing needed and time required to operate the mitigating strategy equipment. Point Beach received a relaxation of the scheduler requirements of Order EA-12-049 in a letter from the NRC dated December 11, 2013 (Reference 3) . The requirement of the order for implementation for Point Beach Nuclear Plant, Unit 1, is relaxed until the completion of the May 2016 refueling outage.
Due to the schedule change for the implementation of Unit 1, Unit 2 will be the lead unit for implementation of the mitigating strategies. Point Beach will complete the Phase 2 staffing assessment four months prior to the start of Unit 2's fall outage of 2015 . This is based on the need to have the mitigating strategy equipment available in order to complete the assessment.
In addition to the effect on the Phase 2 staffing assessment; the change in the implementing strategy schedule has impacted a communications related commitment. In Reference (4), Point Beach made the following commitment with a completion date of October 31, 2014:
Provide additional portable generators to power battery chargers for the existing installed batteries that supply power to the radio system, PBX phone system and Gai-Tronics system within the station power block (The same battery supplies both the radio and Gai-Tronics system) . Complete appropriate training and update the applicable procedures .
This commitment date was based on implementing the Unit 1 mitigating strategies in the Fall 2014 refueling outage. Due to the change in the schedule, Point Beach is changing this commitment date to October 31, 2015. There is no change to this commitment other than the completion date change.
Document Control Desk Page 3 This letter contains no new Regulatory Commitments.
If you have any questions, please contact Mr. Michael Millen, Licensing Manager, at 920/755-7427.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 11, 2014 Very truly yours, NextEra Energy Point Beach, LLC Eric McCartney Site Vice President Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Director of Office of Nuclear Reactor Regulation, USNRC