ML15021A129: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15021A129
| number = ML15021A129
| issue date = 01/09/2015
| issue date = 01/09/2015
| title = Millstone, Units 2 & 3, Technical Specifications 2014 Annual Report
| title = Technical Specifications 2014 Annual Report
| author name = Blakeney D B
| author name = Blakeney D
| author affiliation = Dominion, Dominion Nuclear Connecticut, Inc
| author affiliation = Dominion, Dominion Nuclear Connecticut, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~Dominion Dominion Nuclear Connecticut, Inc.Rope Ferry Rd., Waterford, CT 06385 Mailing Address: PO. Box 128 Warerford, CT 06385 domcom JAN 09 2015 Attention:
{{#Wiki_filter:Dominion Nuclear Connecticut, Inc.
Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No.NSS&L/MLC Docket Nos.License Nos.15-010 RO 50-336 50-423 DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS 2014 ANNUAL REPORT In accordance with the referenced Technical Specification (TS) reporting requirements for Millstone Power Station Unit 2 (MPS2) and Millstone Power Station Unit 3 (MPS3), Dominion Nuclear Connecticut, Inc. hereby submits the following information for the period January 1, 2014 through December 31, 2014." MPS2 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.5c)." MPS3 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.2b).
Rope Ferry Rd., Waterford, CT 06385                                         ~Dominion Mailing Address: PO. Box 128 Warerford, CT 06385 domcom JAN 09 2015 Attention: Document Control Desk                                 Serial No.      15-010 U.S. Nuclear Regulatory Commission                               NSS&L/MLC      RO Washington, DC 20555-0001                                       Docket Nos. 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
If you have any further questions, please contact Mr. William D. Bartron at (860) 444-4301.Sincerely, D. B. Blakeney Director, Nuclear Station Safety and Licensing Attachments:
MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS 2014 ANNUAL REPORT In accordance with the referenced Technical Specification (TS) reporting requirements for Millstone Power Station Unit 2 (MPS2) and Millstone Power Station Unit 3 (MPS3), Dominion Nuclear Connecticut, Inc. hereby submits the following information for the period January 1, 2014 through December 31, 2014.
None Commitments made in this letter: None 4 Oo Serial No. 15-010 2014 Annual Report Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 M. C. Thadani Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 B1 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station}}
            "   MPS2 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.5c).
            "   MPS3 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.2b).
If you have any further questions, please contact Mr. William D. Bartron at (860) 444-4301.
Sincerely, D. B. Blakeney Director, Nuclear Station Safety and Licensing Attachments: None Commitments made in this letter: None 4 Oo
 
Serial No. 15-010 2014 Annual Report Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 M. C. Thadani Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 B1 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station}}

Latest revision as of 16:52, 31 October 2019

Technical Specifications 2014 Annual Report
ML15021A129
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/09/2015
From: Blakeney D
Dominion, Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
15-010
Download: ML15021A129 (2)


Text

Dominion Nuclear Connecticut, Inc.

Rope Ferry Rd., Waterford, CT 06385 ~Dominion Mailing Address: PO. Box 128 Warerford, CT 06385 domcom JAN 09 2015 Attention: Document Control Desk Serial No.15-010 U.S. Nuclear Regulatory Commission NSS&L/MLC RO Washington, DC 20555-0001 Docket Nos. 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 TECHNICAL SPECIFICATIONS 2014 ANNUAL REPORT In accordance with the referenced Technical Specification (TS) reporting requirements for Millstone Power Station Unit 2 (MPS2) and Millstone Power Station Unit 3 (MPS3), Dominion Nuclear Connecticut, Inc. hereby submits the following information for the period January 1, 2014 through December 31, 2014.

" MPS2 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.5c).

" MPS3 did not exceed the specific activity limits set forth under TS 3.4.8 (TS 6.9.1.2b).

If you have any further questions, please contact Mr. William D. Bartron at (860) 444-4301.

Sincerely, D. B. Blakeney Director, Nuclear Station Safety and Licensing Attachments: None Commitments made in this letter: None 4 Oo

Serial No.15-010 2014 Annual Report Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 M. C. Thadani Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 B1 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station