| title = Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23
| title = Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23
| author name = Gellrich G H
| author name = Gellrich G
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:IAN M George GellrichExelon Generation Site Vice President Calvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, MD 20657410 495 5200 Office717 497 3463 Mobilewww.exeloncorp.com george.gellrich@exeloncorp.com 10 CFR 72.70January 7, 2015U. S. Nuclear Regulatory Commission ATTN: Document Control DeskDirector, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555Calvert Cliffs Nuclear Power PlantIndependent Spent Fuel Storage Installation, License No. SNM-2505NRC Docket No. 72-8
{{#Wiki_filter:IAN M Exelon Generation George Gellrich Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5200 Office 717 497 3463 Mobile www.exeloncorp.com george.gellrich@exeloncorp.com 10 CFR 72.70 January 7, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, License No. SNM-2505 NRC Docket No. 72-8


==Subject:==
==Subject:==
Submittal of Updated Safety Analysis Report, Revision 23
Submittal of Updated Safety Analysis Report, Revision 23


==Reference:==
==Reference:==
: 1. Letter from M. M. Sampson (NMSS) to G. H. Gellrich (CCNPP),
: 1. Letter from M. M. Sampson (NMSS) to G. H. Gellrich (CCNPP), dated October 23, 2014, Issuance of Renewed Materials License No. SNM-205 for the Calvert Cliffs Site Specific Independent Spent Fuel Storage Installation (TAC NO. L24475)
datedOctober 23, 2014, Issuance of Renewed Materials License No. SNM-205 forthe Calvert Cliffs Site Specific Independent Spent Fuel Storage Installation (TAC NO. L24475)Reference 1 issued a renewed Materials License No. SNM-2505 for Calvert Cliffs NuclearPower Plant Independent Spent Fuel Storage Installation.
Reference 1 issued a renewed Materials License No. SNM-2505 for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation. As required by License Condition 18 of renewed Materials License No. SNM-2505, enclosed is a copy (CD) of the Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23.
As required by License Condition 18of renewed Materials License No. SNM-2505, enclosed is a copy (CD) of the Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23.The List of Effective pages are included.
The List of Effective pages are included. This electronic copy is a complete revision.
This electronic copy is a complete revision.
There are no regulatory commitments contained in this correspondence.
There are no regulatory commitments contained in this correspondence.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at(410) 495-5219.
Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.
Respectfully, George H. GellrichSite Vice President Document Control DeskJanuary 7, 2015Page 2CERTIFICATION:
Respectfully, George H. Gellrich Site Vice President
I, George H. Gellrich, certify that I am Vice President-Calvert Cliffs Nuclear Power Plant and thatthe information contained in this submittal accurately presents changes made since the previoussubmittal, necessary to reflect information and analyses submitted to the Commission orprepared pursuant to Commission requirement.
 
Document Control Desk January 7, 2015 Page 2 CERTIFICATION:
I, George H. Gellrich, certify that I am Vice President-Calvert Cliffs Nuclear Power Plant and that the information contained in this submittal accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.
GHG/KLG/bjd
GHG/KLG/bjd


==Enclosure:==
==Enclosure:==
 
Updated Safety Analysis Report, Revision 23 (CD) cc:     Without Enclosure NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs S. Gray, MD-DNR NMSS Director J. M. Goshen, NMSS}}
Updated Safety Analysis Report, Revision 23 (CD)cc: Without Enclosure NRC Project Manager, Calvert CliffsNRC Regional Administrator, Region INRC Resident Inspector, Calvert CliffsS. Gray, MD-DNRNMSS DirectorJ. M. Goshen, NMSS}}

Latest revision as of 17:44, 31 October 2019

Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23
ML15023A472
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/07/2015
From: George Gellrich
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML15023A514 List: ... further results
References
Download: ML15023A472 (2)


Text

IAN M Exelon Generation George Gellrich Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5200 Office 717 497 3463 Mobile www.exeloncorp.com george.gellrich@exeloncorp.com 10 CFR 72.70 January 7, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555 Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, License No. SNM-2505 NRC Docket No. 72-8

Subject:

Submittal of Updated Safety Analysis Report, Revision 23

Reference:

1. Letter from M. M. Sampson (NMSS) to G. H. Gellrich (CCNPP), dated October 23, 2014, Issuance of Renewed Materials License No. SNM-205 for the Calvert Cliffs Site Specific Independent Spent Fuel Storage Installation (TAC NO. L24475)

Reference 1 issued a renewed Materials License No. SNM-2505 for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation. As required by License Condition 18 of renewed Materials License No. SNM-2505, enclosed is a copy (CD) of the Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23.

The List of Effective pages are included. This electronic copy is a complete revision.

There are no regulatory commitments contained in this correspondence.

Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.

Respectfully, George H. Gellrich Site Vice President

Document Control Desk January 7, 2015 Page 2 CERTIFICATION:

I, George H. Gellrich, certify that I am Vice President-Calvert Cliffs Nuclear Power Plant and that the information contained in this submittal accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.

GHG/KLG/bjd

Enclosure:

Updated Safety Analysis Report, Revision 23 (CD) cc: Without Enclosure NRC Project Manager, Calvert Cliffs NRC Regional Administrator, Region I NRC Resident Inspector, Calvert Cliffs S. Gray, MD-DNR NMSS Director J. M. Goshen, NMSS