ML15026A563
From kanterella
Jump to navigation
Jump to search
ML15026A563 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 01/07/2015 |
From: | Exelon Generation Co |
To: | Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML15023A514 | List:
|
References | |
Download: ML15026A563 (1) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Drawing
MONTHYEARML21278A1522021-09-0707 September 2021
[Table view]2 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5E, Figures ML22115A0472021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted ML21278A1512021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Figures ML22115A0482021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted ML21278A2352021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Figures ML21278A1982021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 7, Figures ML21278A1102021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 4, Figures ML21257A3052021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 3, Figures ML22115A0422021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted ML21278A1302021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Figures ML21278A1832021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 6, Figures ML21278A2112021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 8, Figures ML15077A1032015-04-16016 April 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15026A5952015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 2.3-2, Revision 15 ML15026A5632015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 1.3-2, Rev. 15, Nuhoms On-Site Transfer Cask ML15026A5612015-01-0707 January 2015 Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Figure 1.3-1, NUHOMS-24P Dry Shielded Canister Assembly Components ML13319A8182013-11-15015 November 2013 Drawing, 1130CCCHEM, Chemical Effects Head Loss Loop, Vertical LOOP Water Elevation ML13319A7732013-10-0808 October 2013 Drawing, 1130CCHEM Chemical Head Loss Loop, Pipe Schematic, T-6 ML12275A2332012-09-18018 September 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Drawing 69346, Rev. 10, USAR Figure 2.4-1, ISFSI Yard Area Topography. ML12275A2322012-08-0101 August 2012 Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21 - Drawing 87113SH0012, Rev. 1, USAR Figure 2.3-3, Primary Meteorological Instrumentation System Information. ML1107002802011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 1 of 2 ML1107002812011-02-0101 February 2011 Independent Spent Fuel Storage Installation - Drawing No. Erpip 3.0, Immediate Actions, Attachment 1 Emergency Action Level Criteria Rev 0XX00, Page 2 of 2 ML1015902162010-06-0303 June 2010 Independent Spent Fuel Storage Installation, Informal Consultation Preparation for License Renewal Application ML0719804152007-06-19019 June 2007 Drawing 60731SH0002, Rev. 45, Safety Injection & Containment Spray Systems. ML0719901132007-06-0505 June 2007 Drawing 62730SH0001, Rev 79, Chemical & Volume Control System. ML0719705092007-06-0505 June 2007 Drawing 60730SH0001, Rev. 83, Chemical and Volume Control System. ML0719705142007-06-0505 June 2007 Drawing 60731SH0001, Rev. 79, Safety Injection & Containment Spray Systems. ML0719702082007-04-17017 April 2007 Drawing 60708SH0002, Rev. 104, Circulating Salt Water Cooling System. ML0719804692007-04-17017 April 2007 Drawing 60747, Rev. 29, Hydraulic Schematic Main Steam Isolation Valves 11 & 12. ML0719900752007-04-17017 April 2007 Drawing 62583SH0001, Rev. 56, Auxiliary Feedwater System (Steam). ML0719901272007-04-17017 April 2007 Drawing 62747, Rev 28, Diagram Hydraulic Schematic Main Steam Isolation Valves 21 & 22. ML0719900992007-04-12012 April 2007 Drawing 62708SH0002, Rev. 104, Circulating Water Cooling System. ML0719901112007-04-11011 April 2007 Drawing 62729SH0001, Rev 96, Reactor Coolant System. ML0719901242007-04-10010 April 2007 Drawing 62731SH0003, Rev 26, Safety Injection & Containment Spray Systems. ML0719702452007-03-14014 March 2007 Drawing 60727SH0003, Rev. 53, Diesel Generator Cooling Water, Starting Air, Fuel, Lube Oil Diesel Generator No. 2B. ML0719804732007-02-20020 February 2007 Drawing 60761, Rev. 51, Steam Generator Blowdown Recovery System. ML0719702362007-02-19019 February 2007 Drawing 60724SH0001, Rev. 57, Reactor Coolant & Waste Process Sample System Post Accident Sampling System. ML0719804682007-01-31031 January 2007 Drawing 60746SH0003, Rev. 36, Plant Water & Air Service System. ML0719702152007-01-30030 January 2007 Drawing 60712SH0003, Rev. 104, Compressed Air System Instrument Air & Plant Air. ML0719702142007-01-30030 January 2007 Drawing 60712SH0001, Rev. 65, Compressed Air System Instrument Air and Plant Air. ML0719804612006-10-30030 October 2006 Drawing 60738SH0001, Rev. 69, Area & Process Radiation Monitoring System. ML0719705062006-10-13013 October 2006 Drawing 60729SH0001, Rev. 77, Reactor Coolant System. ML0719701972006-08-25025 August 2006 Drawing 60583SH0001, Rev. 61, Auxiliary Feedwater System (Steam). ML0719900862006-08-25025 August 2006 Drawing 62702SH0004, Rev. 45, Condensate & Feedwater System. ML0719705102006-08-0202 August 2006 Drawing 60730SH0002, Rev. 70, Chemical and Volume Control System. ML0719804512006-06-28028 June 2006 Drawing 60734SH0003, Rev. 43, Reactor Coolant Waste Processing System. ML0719702252006-06-20020 June 2006 Drawing 60717SH0001, Rev. 96, Well Water, Pretreated Water, Demineralized Water and Condensate Storage System. ML0719901102006-06-20020 June 2006 Drawing 62712SH0003, Rev 110, Compressed Air System Plant & Instrument Air. ML0719901152006-05-25025 May 2006 Drawing 62730SH0002, Rev 61, Chemical & Volume Control System. ML0719701982006-05-0909 May 2006 Drawing 60583SH0002, Rev. 1, Auxiliary Feedwater System (Condensate). 2021-09-07 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML21278A2832021-09-0707 September 2021
[Table view]2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.18, Fuel Handling Incident ML21278A2602021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Post-Refueling Startup Event ML21278A2692021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Loss-of-Coolant Flow Event ML21278A3042021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and System ML22115A0432021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 02, Section 2.2, Population and Land Use_Redacted ML22115A0462021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.1 Through 9.30_Redacted ML21278A3022021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.5, References ML21278A2932021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.22, Waste Gas Incident ML21278A2962021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.4, 10 CFR 54.67(B) Update ML21278A3032021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Evaluation of Time-Limited Aging Analyses ML22115A0472021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted ML21278A2852021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.21, Deleted ML21278A2872021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.15, Steam Generator Tube Rupture Event ML21278A2912021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.26, Feedline Break Event ML21278A2552021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Organization and Methodology ML21278A2762021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents ML21278A2802021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents ML21278A2842021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.16, Seized Rotor Event ML21278A2922021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.23, Waste Processing System Incident ML21278A2712021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Excess Feedwater Heat Removal Event ML21278A2742021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.12, Asymmetric Steam Generator Event ML21278A2672021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Loss-Of-Non-Emergency AC Power ML21278A2622021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Figures, Deleted ML21278A2642021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Loss of Feedwater Flow Event ML21278A2682021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Reactor Coolant System Depressurization ML21278A2752021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Control Element Assembly Withdrawal Event ML21278A2612021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.14, Steam Line Break Event ML21278A2772021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents ML21278A2532021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Loss of Load Event ML21278A2522021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Radiation Safety ML22115A0482021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted ML21278A2892021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.24, Maximum Hypothetical Accident ML21278A2572021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation, Table of Contents ML21278A2662021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.0, Initial Tests and Operation ML21278A2992021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Introduction ML22115A0422021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted ML21278A2822021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14 Section 14.25, Excessive Charging Event ML21278A2862021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10 ML21278A2702021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Review and Audit of Operations ML21278A2542021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11, Control Element Assembly Drop Event ML21278A2562021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning ML21278A2722021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Control Element Assembly Ejection ML22115A0442021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 2, Section 2.10, Other Design Considerations: Redacted ML21278A2942021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.19, Turbine-Generator Overspeed Incident ML21278A2982021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Aging Management Programs and Activities ML22115A0452021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted ML21278A2882021-09-0707 September 2021 2 to Updated Safety Analysis Report, Chapter 14, Section 14.20, Containment Response ML21278A2782021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Excess Load Event ML21278A2812021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Section 15.0, Technical Requirements Manual ML21278A2902021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant Accident 2021-09-07 |
Text
SOUO NEUTRON SHIELD TOP COVER PLATE LIFTING LUG CASK CAVITY AUXILIARY PORT UPPER LIFTING TRUNNfON INNER LINER LEAD GAMMA SHIELD STRUCTIJRAL SHELL SOLID NEUTRON SHfELD OUTER SHELL RAM ACCESS PENETRATION LOWER TILTlNG TRUNNION CASK CAVITY DRAIN RAM ACCESS PENETRATION SOLID NEUTRON COVER PLATE ASSEMBLY SHIELD Calvert Cliffs Nuclear USAR Power Plant, Independent Figure 1.3-2 Spent Fuel Storage NUHOMS ON-SITE TRANSFER CASK Installation Revision 15
Retrieved from "https://kanterella.com/w/index.php?title=ML15026A563&oldid=2038777"