Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21278A2837 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.18, Fuel Handling Incident
ML21278A2607 September 20212 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Post-Refueling Startup EventAnticipated operational occurrence
ML21278A2697 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Loss-of-Coolant Flow EventCoast down
ML21278A3047 September 20212 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and SystemBoric Acid
Fire Barrier
Coatings
Aging Management
ML22115A0437 September 20212 to Updated Final Safety Analysis Report, Chapter 02, Section 2.2, Population and Land Use_Redacted
ML22115A0467 September 20212 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.1 Through 9.30_Redacted
ML21278A3027 September 20212 to Updated Final Safety Analysis Report, Chapter 16, Section 16.5, ReferencesBoric Acid
Coatings
License Renewal
ML21278A2937 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.22, Waste Gas Incident
ML21278A2967 September 20212 to Updated Final Safety Analysis Report, Chapter 16, Section 16.4, 10 CFR 54.67(B) UpdateAging Management
ML21278A3037 September 20212 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Evaluation of Time-Limited Aging Analyses
ML22115A0477 September 20212 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted
ML21278A2857 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.21, Deleted
ML21278A2877 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.15, Steam Generator Tube Rupture Event
ML21278A2917 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.26, Feedline Break EventCoast down
ML21278A2557 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Organization and MethodologyBoric Acid
Shutdown Margin
Anticipated operational occurrence
Fuel cladding
Overspeed trip
ML21278A2767 September 20212 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents
ML21278A2807 September 20212 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents
ML21278A2847 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.16, Seized Rotor Event
ML21278A2927 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.23, Waste Processing System Incident
ML21278A2717 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Excess Feedwater Heat Removal Event
ML21278A2747 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.12, Asymmetric Steam Generator Event
ML21278A2677 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Loss-Of-Non-Emergency AC PowerSafe Shutdown
Coast down
ML21278A2627 September 20212 to Updated Final Safety Analysis Report, Chapter 12, Figures, Deleted
ML21278A2647 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Loss of Feedwater Flow Event
ML21278A2687 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Reactor Coolant System Depressurization
ML21278A2757 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Control Element Assembly Withdrawal EventShutdown Margin
ML21278A2617 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.14, Steam Line Break EventBoric Acid
Power change
Coast down
ML21278A2777 September 20212 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of ContentsAnticipated operational occurrence
Overspeed trip
ML21278A2537 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Loss of Load EventStroke time
ML21278A2527 September 20212 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Radiation Safety
ML22115A0487 September 20212 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted
ML21278A2897 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.24, Maximum Hypothetical Accident
ML21278A2577 September 20212 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation, Table of Contents
ML21278A2667 September 20212 to Updated Final Safety Analysis Report, Chapter 13, Section 13.0, Initial Tests and Operation
ML21278A2997 September 20212 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, IntroductionAging Management
License Renewal
ML22115A0427 September 20212 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted
ML21278A2827 September 20212 to Updated Final Safety Analysis Report, Chapter 14 Section 14.25, Excessive Charging Event
ML21278A2867 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10
ML21278A2707 September 20212 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Review and Audit of Operations
ML21278A2547 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11, Control Element Assembly Drop Event
ML21278A2567 September 20212 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning
ML21278A2727 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Control Element Assembly Ejection
ML22115A0447 September 20212 to Updated Final Safety Analysis Report, Chapter 2, Section 2.10, Other Design Considerations: Redacted
ML21278A2947 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.19, Turbine-Generator Overspeed IncidentOverspeed trip
ML21278A2987 September 20212 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Aging Management Programs and ActivitiesSafe Shutdown
Boric Acid
Non-Destructive Examination
Fire Barrier
Coatings
Aging Management
License Renewal
Control of Heavy Loads
EVT-1
ML22115A0457 September 20212 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - RedactedTornado Missile
Safe Shutdown Earthquake
Tornado Generated Missile
Design basis earthquake
Earthquake
ML21278A2887 September 20212 to Updated Safety Analysis Report, Chapter 14, Section 14.20, Containment ResponseStroke time
Coast down
GOTHIC
ML21278A2787 September 20212 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Excess Load EventShutdown Margin
ML21278A2817 September 20212 to Updated Final Safety Analysis Report, Chapter 15, Section 15.0, Technical Requirements ManualFire Barrier
Condition Adverse to Quality
Operability Determination
ML21278A2907 September 20212 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant AccidentLoop seal
Fuel cladding
Accident Tolerant Fuel