ML21278A257
Text
CHAPTER 13 INITIAL TESTS AND OPERATION TABLE OF CONTENTS PAGE CALVERT CLIFFS UFSAR 13-i Rev. 49 13.0 INITIAL TESTS AND OPERATION 13.0-1 13.4 POST-REFUELING STARTUP TESTING 13.4-1 13.4.1 HOT FUNCTIONAL TESTING 13.4-1 13.4.1.1 CEDM Performance Testing 13.4-1 13.4.1.2 RCS Flow Verification 13.4-1 13.4.2 INITIAL CRITICALITY 13.4-1 13.4.3 LOW POWER PHYSICS TESTING 13.4-1 13.4.3.1 Deleted 13.4-1 13.4.3.2 Critical Boron Concentration 13.4-1 13.4.3.3 Isothermal Temperature Coefficient 13.4-1 13.4.3.4 CEA Group Worth Measurements 13.4-1 13.4.4 POWER ASCENSION TEST 13.4-1 13.4.5 ACCEPTANCE CRITERIA 13.4-2 13.4.6 ACTION AND REVIEW PLAN 13.4-2
CHAPTER 13 INITIAL TESTS AND OPERATION LIST OF ACRONYMS CALVERT CLIFFS UFSAR 13-ii Rev. 49 CEA Control Element Assembly CEDM Control Element Drive Mechanism RCS Reactor Coolant System