Rev. 20 10A.1-1 MAIN STEAM SYSTEM
Rev.18 10A.1-2 HIGH ENERGY MAIN STEAM SYSTEM ROUTING PLAN - FLOOR EL. 27'0"
Rev.0 10A.1-3 ENCAPSULATION DETAILS MAIN STEAM SYSTEM
Rev.0 10A.1-4 HIGH ENERGY PIPE WHIP RESTRAINT
Rev.0 10A.1-5 MATHEMATICAL MODEL FOR PIPE WHIP RESTRAINT
Rev.0 10A.1-7 VENT STACK FROM MAIN STEAM COMPARTMENT
Rev.0 10A.1-8 BLOWDOWN MODEL
Rev.0 10A.1-9 EFFECT OF PIPE FRICTION OF STEAM-WATER
Rev.0 10A.1-10 EFFECT OF AREA RESTRICTION ON STEAM WATER
Rev.0 10A.1-11 STAGNATION PRESSURE - ASYMPTOTIC JET PRESSURE
Rev.0 10A.1-12 STAGNATION PRESSURE - JET ASYMPTOTIC AREA
Rev.0 10A.1-13 TYP. JET IMPINGEMENT BARRIER FOR CABLE TRAYS
Rev.0 10A.1-14 HIGH ENERGY AUX. FEED PUMP ROOM AND SERVICE WTR PUMP ROOM VENTILATION SYSTEMS
Rev.0 10A.1-15 6" STEAM LINE BREAK - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F
Rev.0 10A.1-16 6" STEAM LINE BREAK - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F
Rev.0 10A.1-17 BREAK OF ENCAPSULATED STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F
Rev.0 10A.1-18 BREAK OF ENCAPSULATED STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F
Rev.0 10A.1-19 CRITICAL CRACK IN MAIN STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE
= 160F
Rev.0 10A.1-20 CRITICAL CRACK IN MAIN STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE
= 160F
Rev.20 10A.2-1 MAIN STEAM TO AUX. STEAM GEN. FEED PUMP TURBINE
Rev. 15 10A.2-2 HIGH ENERGY MAIN STEAM TO AUX. FEED PUMP TURBINE ROUTING PLAN - FLOOR EL. 27'0"
Rev.15 10A.2-2A MAIN STEAM TO AFW TURBINE - BREAK LOCATIONS
Rev.15 10A.2-2B MAIN STEAM TO AFW TURBINE - SMALL PIPE LOCATIONS
Rev.6 10A.2-3 HIGH ENERGY MAIN STEAM TO AUX. FEED PUMP TURBINE ROUTING PLAN - FLOOR EL. 5'0"
Rev.24 10A.3-1 STEAM GENERATOR BLOWDOWN
Rev.20 10A.3-2 HIGH ENERGY STEAM GENERATOR BLOWDOWN SYSTEM ROUTING PLAN - FLOOR EL. 27'0"
Revision 46 FIGURE 10A.3-3 HIGH ENERGY STEAM GENERATOR BLOWDOWN SYSTEM ROUTING PLAN - FLOOR EL. 450
Rev.0 10A.3-4 STEAM GENERATOR BLOWDOWN LINE BREAK - EAST PIPING PENETRATION ROOM - INITIAL TEMPERATURE = 160F
Rev.0 10A.3-5 STEAM GENERATOR BLOWDOWN LINE BREAK - ELEVATION 45' - INITIAL TEMPERATURE = 160F
Rev.18 10A.4-1 MAIN FEEDWATER SYSTEM
Rev.0 10A.4-2 HIGH ENERGY MAIN FEEDWATER ROUTING PLAN - FLOOR EL. 27'0"
Rev.6 10A.4-3 HIGH ENERGY MAIN FEEDWATER ROUTING PLAN - FLOOR EL. 5'0"
Rev.18 10A.4-4 FEEDWATER TO HP HEATERS
Rev.18 10A.4-5 FEEDWATER HEATER DRAIN TO CONDENSER
Rev.0 10A.4-6 HIGH ENERGY MAIN FEEDWATER AND HEATER DRAIN SYSTEM ROUTING PLAN - TURB BLDG. FLR EL.
12'0"
Rev.5 10A.4-7 PIPE SLEEVE DETAILS MAIN FEEDWATER SYSTEM UNIT NO. 1
Rev.20 10A.5-1 AUX. FEEDWATER SYSTEM
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
Rev.15 10A.5-5 POSTULATED PIPE CRACK TARGETS - AUX. FEEDWATER SYSTEM UNITS 1 AND 2
Rev.20 10A.7-1 CVC SYSTEM REACTOR COOL. CHARGING LINE
Rev.0 10A.7-2 HIGH ENERGY R.C. CHARGING LINE - ROUTING PARTIAL PLANS - @ FLOOR EL. 5'0" AND (-)10'0"
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
Rev.20 10A.7-4 CVC SYSTEM REACTOR COOLANT LETDOWN LINE
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
Rev.20 10A.8-1 STEAM GEN. AND REACTOR COOL. SAMPLING SYSTEMS
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
Rev.18 10A.9-1 AUX. STEAM TO WASTE EVAPORATORS
SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390
Rev.0 10A.9-3 HIGH ENERGY AUXILIARY STEAM ROUTING PLAN - FLOOR EL. 270