2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted
ML22115A047
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/07/2021
From:
NRC/NRR/DORL/LPL1
To: Rhoades D
Constellation Energy Generation
Mayer, A
Shared Package
ML21278A102 List: ... further results
References
EPID L-2021-LRO-0074
Download: ML22115A047 (53)


Text

10A.1-1 MAIN STEAM SYSTEM Rev. 20

10A.1-2 HIGH ENERGY MAIN STEAM SYSTEM ROUTING PLAN - FLOOR EL. 27'0" Rev.18

10A.1-3 ENCAPSULATION DETAILS MAIN STEAM SYSTEM Rev.0

10A.1-4 HIGH ENERGY PIPE WHIP RESTRAINT Rev.0

10A.1-5 MATHEMATICAL MODEL FOR PIPE WHIP RESTRAINT Rev.0

10A.1-7 VENT STACK FROM MAIN STEAM COMPARTMENT Rev.0

10A.1-8 BLOWDOWN MODEL Rev.0

10A.1-9 EFFECT OF PIPE FRICTION OF STEAM-WATER Rev.0

10A.1-10 EFFECT OF AREA RESTRICTION ON STEAM WATER Rev.0

10A.1-11 STAGNATION PRESSURE - ASYMPTOTIC JET PRESSURE Rev.0

10A.1-12 STAGNATION PRESSURE - JET ASYMPTOTIC AREA Rev.0

10A.1-13 TYP. JET IMPINGEMENT BARRIER FOR CABLE TRAYS Rev.0

10A.1-14 HIGH ENERGY AUX. FEED PUMP ROOM AND SERVICE WTR PUMP ROOM VENTILATION SYSTEMS Rev.0

10A.1-15 6" STEAM LINE BREAK - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F Rev.0

10A.1-16 6" STEAM LINE BREAK - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F Rev.0

10A.1-17 BREAK OF ENCAPSULATED STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F Rev.0

10A.1-18 BREAK OF ENCAPSULATED STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F Rev.0

10A.1-19 CRITICAL CRACK IN MAIN STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE

= 160F Rev.0

10A.1-20 CRITICAL CRACK IN MAIN STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE

= 160F Rev.0

10A.2-1 MAIN STEAM TO AUX. STEAM GEN. FEED PUMP TURBINE Rev.20

10A.2-2 HIGH ENERGY MAIN STEAM TO AUX. FEED PUMP TURBINE ROUTING PLAN - FLOOR EL. 27'0" Rev. 15

10A.2-2A MAIN STEAM TO AFW TURBINE - BREAK LOCATIONS Rev.15

10A.2-2B MAIN STEAM TO AFW TURBINE - SMALL PIPE LOCATIONS Rev.15

10A.2-3 HIGH ENERGY MAIN STEAM TO AUX. FEED PUMP TURBINE ROUTING PLAN - FLOOR EL. 5'0" Rev.6

10A.3-1 STEAM GENERATOR BLOWDOWN Rev.24

10A.3-2 HIGH ENERGY STEAM GENERATOR BLOWDOWN SYSTEM ROUTING PLAN - FLOOR EL. 27'0" Rev.20

FIGURE 10A.3-3 HIGH ENERGY STEAM GENERATOR BLOWDOWN SYSTEM ROUTING PLAN - FLOOR EL. 450 Revision 46

10A.3-4 STEAM GENERATOR BLOWDOWN LINE BREAK - EAST PIPING PENETRATION ROOM - INITIAL TEMPERATURE = 160F Rev.0

10A.3-5 STEAM GENERATOR BLOWDOWN LINE BREAK - ELEVATION 45' - INITIAL TEMPERATURE = 160F Rev.0

10A.4-1 MAIN FEEDWATER SYSTEM Rev.18

10A.4-2 HIGH ENERGY MAIN FEEDWATER ROUTING PLAN - FLOOR EL. 27'0" Rev.0

10A.4-3 HIGH ENERGY MAIN FEEDWATER ROUTING PLAN - FLOOR EL. 5'0" Rev.6

10A.4-4 FEEDWATER TO HP HEATERS Rev.18

10A.4-5 FEEDWATER HEATER DRAIN TO CONDENSER Rev.18

10A.4-6 HIGH ENERGY MAIN FEEDWATER AND HEATER DRAIN SYSTEM ROUTING PLAN - TURB BLDG. FLR EL.

12'0" Rev.0

10A.4-7 PIPE SLEEVE DETAILS MAIN FEEDWATER SYSTEM UNIT NO. 1 Rev.5

10A.5-1 AUX. FEEDWATER SYSTEM Rev.20

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

10A.5-5 POSTULATED PIPE CRACK TARGETS - AUX. FEEDWATER SYSTEM UNITS 1 AND 2 Rev.15

10A.7-1 CVC SYSTEM REACTOR COOL. CHARGING LINE Rev.20

10A.7-2 HIGH ENERGY R.C. CHARGING LINE - ROUTING PARTIAL PLANS - @ FLOOR EL. 5'0" AND (-)10'0" Rev.0

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

10A.7-4 CVC SYSTEM REACTOR COOLANT LETDOWN LINE Rev.20

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

10A.8-1 STEAM GEN. AND REACTOR COOL. SAMPLING SYSTEMS Rev.20

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

10A.9-1 AUX. STEAM TO WASTE EVAPORATORS Rev.18

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

10A.9-3 HIGH ENERGY AUXILIARY STEAM ROUTING PLAN - FLOOR EL. 270 Rev.0