2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted
ML22115A047
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/07/2021
From:
NRC/NRR/DORL/LPL1
To: Rhoades D
Constellation Energy Generation
Mayer, A
Shared Package
ML21278A102 List: ... further results
References
EPID L-2021-LRO-0074
Download: ML22115A047 (53)


Text

Rev. 20 10A.1-1 MAIN STEAM SYSTEM

Rev.18 10A.1-2 HIGH ENERGY MAIN STEAM SYSTEM ROUTING PLAN - FLOOR EL. 27'0"

Rev.0 10A.1-3 ENCAPSULATION DETAILS MAIN STEAM SYSTEM

Rev.0 10A.1-4 HIGH ENERGY PIPE WHIP RESTRAINT

Rev.0 10A.1-5 MATHEMATICAL MODEL FOR PIPE WHIP RESTRAINT

Rev.0 10A.1-7 VENT STACK FROM MAIN STEAM COMPARTMENT

Rev.0 10A.1-8 BLOWDOWN MODEL

Rev.0 10A.1-9 EFFECT OF PIPE FRICTION OF STEAM-WATER

Rev.0 10A.1-10 EFFECT OF AREA RESTRICTION ON STEAM WATER

Rev.0 10A.1-11 STAGNATION PRESSURE - ASYMPTOTIC JET PRESSURE

Rev.0 10A.1-12 STAGNATION PRESSURE - JET ASYMPTOTIC AREA

Rev.0 10A.1-13 TYP. JET IMPINGEMENT BARRIER FOR CABLE TRAYS

Rev.0 10A.1-14 HIGH ENERGY AUX. FEED PUMP ROOM AND SERVICE WTR PUMP ROOM VENTILATION SYSTEMS

Rev.0 10A.1-15 6" STEAM LINE BREAK - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F

Rev.0 10A.1-16 6" STEAM LINE BREAK - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F

Rev.0 10A.1-17 BREAK OF ENCAPSULATED STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F

Rev.0 10A.1-18 BREAK OF ENCAPSULATED STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE = 160F

Rev.0 10A.1-19 CRITICAL CRACK IN MAIN STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE

= 160F

Rev.0 10A.1-20 CRITICAL CRACK IN MAIN STEAM LINE - MAIN STEAM PENETRATION ROOM - INITIAL TEMPERATURE

= 160F

Rev.20 10A.2-1 MAIN STEAM TO AUX. STEAM GEN. FEED PUMP TURBINE

Rev. 15 10A.2-2 HIGH ENERGY MAIN STEAM TO AUX. FEED PUMP TURBINE ROUTING PLAN - FLOOR EL. 27'0"

Rev.15 10A.2-2A MAIN STEAM TO AFW TURBINE - BREAK LOCATIONS

Rev.15 10A.2-2B MAIN STEAM TO AFW TURBINE - SMALL PIPE LOCATIONS

Rev.6 10A.2-3 HIGH ENERGY MAIN STEAM TO AUX. FEED PUMP TURBINE ROUTING PLAN - FLOOR EL. 5'0"

Rev.24 10A.3-1 STEAM GENERATOR BLOWDOWN

Rev.20 10A.3-2 HIGH ENERGY STEAM GENERATOR BLOWDOWN SYSTEM ROUTING PLAN - FLOOR EL. 27'0"

Revision 46 FIGURE 10A.3-3 HIGH ENERGY STEAM GENERATOR BLOWDOWN SYSTEM ROUTING PLAN - FLOOR EL. 450

Rev.0 10A.3-4 STEAM GENERATOR BLOWDOWN LINE BREAK - EAST PIPING PENETRATION ROOM - INITIAL TEMPERATURE = 160F

Rev.0 10A.3-5 STEAM GENERATOR BLOWDOWN LINE BREAK - ELEVATION 45' - INITIAL TEMPERATURE = 160F

Rev.18 10A.4-1 MAIN FEEDWATER SYSTEM

Rev.0 10A.4-2 HIGH ENERGY MAIN FEEDWATER ROUTING PLAN - FLOOR EL. 27'0"

Rev.6 10A.4-3 HIGH ENERGY MAIN FEEDWATER ROUTING PLAN - FLOOR EL. 5'0"

Rev.18 10A.4-4 FEEDWATER TO HP HEATERS

Rev.18 10A.4-5 FEEDWATER HEATER DRAIN TO CONDENSER

Rev.0 10A.4-6 HIGH ENERGY MAIN FEEDWATER AND HEATER DRAIN SYSTEM ROUTING PLAN - TURB BLDG. FLR EL.

12'0"

Rev.5 10A.4-7 PIPE SLEEVE DETAILS MAIN FEEDWATER SYSTEM UNIT NO. 1

Rev.20 10A.5-1 AUX. FEEDWATER SYSTEM

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

Rev.15 10A.5-5 POSTULATED PIPE CRACK TARGETS - AUX. FEEDWATER SYSTEM UNITS 1 AND 2

Rev.20 10A.7-1 CVC SYSTEM REACTOR COOL. CHARGING LINE

Rev.0 10A.7-2 HIGH ENERGY R.C. CHARGING LINE - ROUTING PARTIAL PLANS - @ FLOOR EL. 5'0" AND (-)10'0"

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

Rev.20 10A.7-4 CVC SYSTEM REACTOR COOLANT LETDOWN LINE

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

Rev.20 10A.8-1 STEAM GEN. AND REACTOR COOL. SAMPLING SYSTEMS

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

Rev.18 10A.9-1 AUX. STEAM TO WASTE EVAPORATORS

SECURITY RELATED INFORMATION WITHHELD UNDER 10 CFR 2.390

Rev.0 10A.9-3 HIGH ENERGY AUXILIARY STEAM ROUTING PLAN - FLOOR EL. 270