IR 05000483/2015405: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES ust 10, 2015 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Line 24: | Line 24: | ||
==Dear Mr. Diya:== | ==Dear Mr. Diya:== | ||
On July 17, 2015, the U.S. Nuclear | On July 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Callaway Plant. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2015, with you and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Line 32: | Line 32: | ||
Based on the results of this inspection, no findings were identified. | Based on the results of this inspection, no findings were identified. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
Line 40: | Line 40: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Heather J. Gepford, Chief | Heather J. Gepford, Chief Plant Support Branch 2 Division of Reactor Safety Docket: 50-483 License: NPF-30 Nonpublic Enclosure: | ||
NRC Inspection Report 05000483/2010405 w/Attachment: Supplemental Information cc: w/enclosure: | |||
Plant Support Branch 2 | Mr. Eric Olson Manager, Security Callaway Plant, Unit 1 5 Miles North of Hwy 94 Portland, MO 65067 cc w/o encl: | ||
Electronic Distribution for Callaway Plant ML15222B305 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: MJP Yes No Non-Sensitive Publicly Available NRC-002 OFFICE HP/PSB2 C: | |||
Division of Reactor Safety Docket: 50-483 License: NPF-30 | NAME JODonnell HGepford/MJP for/ | ||
SIGNATURE /RA/ /RA/ | |||
Nonpublic Enclosure: | DATE 7/6/15 8/10/15 Letter to Fadi Diya from Heather Gepford, dated August 10, 2015 SUBJECT: CALLAWAY PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2015405 Distribution w/o enclosure: | ||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
NRC Inspection Report 05000483/2010405 w/Attachment: Supplemental Information | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
cc: w/enclosure: | |||
Mr. Eric Olson | |||
Manager, Security Callaway Plant, Unit 1 5 Miles North of Hwy 94 | |||
Portland, MO 65067 | |||
cc w/o encl: | |||
Electronic Distribution for Callaway Plant | |||
ML15222B305 SUNSI Review By: MJP | |||
Distribution w/o enclosure | |||
DRP Director (Troy.Pruett@nrc.gov) | DRP Director (Troy.Pruett@nrc.gov) | ||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | DRP Deputy Director (Ryan.Lantz@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Resident Inspector (Michael.Langelier@nrc.gov) | DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Resident Inspector (Michael.Langelier@nrc.gov) | |||
Branch Chief, DRP/B (Andrew. Rosebrook@nrc.gov) | Branch Chief, DRP/B (Andrew. Rosebrook@nrc.gov) | ||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | ||
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) | Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) | ||
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Project Manager (John.Klos@nrc.gov) | Project Manager (John.Klos@nrc.gov) | ||
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov RITS Coordinator (Marisa.Herrera@nrc.gov) | Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | ||
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) | |||
}} | }} |
Latest revision as of 08:10, 31 October 2019
ML15222B305 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 08/10/2015 |
From: | Heather Gepford Division of Reactor Safety IV |
To: | Diya F Union Electric Co |
J. O'Donnell | |
References | |
IR 2015405 | |
Download: ML15222B305 (4) | |
Text
UNITED STATES ust 10, 2015
SUBJECT:
CALLAWAY PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2015405
Dear Mr. Diya:
On July 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Callaway Plant. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2015, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Heather J. Gepford, Chief Plant Support Branch 2 Division of Reactor Safety Docket: 50-483 License: NPF-30 Nonpublic Enclosure:
NRC Inspection Report 05000483/2010405 w/Attachment: Supplemental Information cc: w/enclosure:
Mr. Eric Olson Manager, Security Callaway Plant, Unit 1 5 Miles North of Hwy 94 Portland, MO 65067 cc w/o encl:
Electronic Distribution for Callaway Plant ML15222B305 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: MJP Yes No Non-Sensitive Publicly Available NRC-002 OFFICE HP/PSB2 C:
NAME JODonnell HGepford/MJP for/
SIGNATURE /RA/ /RA/
DATE 7/6/15 8/10/15 Letter to Fadi Diya from Heather Gepford, dated August 10, 2015 SUBJECT: CALLAWAY PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2015405 Distribution w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Andrew. Rosebrook@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)