| number = ML16007A742
| number = ML16007A742
| issue date = 01/06/2016
| issue date = 01/06/2016
| title = Fort Calhoun Station - NRC Emergency Preparedness Annual Inspection Report IR 05000285/2015501
| title = NRC Emergency Preparedness Annual Inspection Report IR 05000285/2015501
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Cortopassi L
| addressee name = Cortopassi L
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES ary 6, 2016
[[Issue date::January 6, 2016]]


Mr. Lou Cortopassi, Vice President
==SUBJECT:==
 
FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2015501
and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550
 
Fort Calhoun, NE 68023-0550
 
SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2015501


==Dear Mr. Cortopassi:==
==Dear Mr. Cortopassi:==
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000285/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003,  
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000285/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.


and 2015-004.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 cc: Electronic Distribution


Sincerely,/RA/
ML16007A742 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
By: PElkmann  Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/
DATE 12/14/15 1/6/16


Docket No. 50-285 License No. DPR-40
Letter to Lou Cortopassi from Mark S. Haire, dated January 6, 2016 SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2015501 DISTRIBUTION:
 
Regional Administrator (Marc.Dapas@nrc.gov)
cc: Electronic Distribution
 
ML16007A742 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Lou Cortopassi from Mark S. Haire, dated January 6, 2016
 
SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2015501  
 
DISTRIBUTION
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)  
Senior Resident Inspector (Max.Schneider@nrc.gov)
 
Resident Inspector (Brian.Cummings@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov) FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov) NRR Project Manager (Fred.Lyon@nrc.gov) Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)  
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)
 
RIV RSLO (Bill.Maier@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
}}
}}

Latest revision as of 03:24, 31 October 2019

NRC Emergency Preparedness Annual Inspection Report IR 05000285/2015501
ML16007A742
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/06/2016
From: Mark Haire
Plant Support Branch-1
To: Cortopassi L
Omaha Public Power District
References
IR 2015501
Download: ML16007A742 (3)


Text

UNITED STATES ary 6, 2016

SUBJECT:

FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2015501

Dear Mr. Cortopassi:

On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000285/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 cc: Electronic Distribution

ML16007A742 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/

DATE 12/14/15 1/6/16

Letter to Lou Cortopassi from Mark S. Haire, dated January 6, 2016 SUBJECT: FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2015501 DISTRIBUTION:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Resident Inspector (Brian.Cummings@nrc.gov)

FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

OEWEB Resource@nrc.gov OEWEB Resource (Sue.Bogle@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)