{{#Wiki_filter:10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance  Callaway
{{#Wiki_filter:10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-07174-TNW/CJS                                                                 Mail Station 7636 Tel: (623) 393-5764 January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
* Diablo Canyon
* Palo Verde
* Wolf Creek
 
102-07174-TNW/CJS January 15, 2016  
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Dear Sirs:==
==Dear Sirs:==
Line 30: Line 23:
Palo Verde Nuclear Generating Station (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:
Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:
Owner's Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.  
Owners Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.
 
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.  
Sincerely, Weber, Thomas                        Digitally signed by Weber, Thomas N(Z00499)
 
N(Z00499)                            DN: cn=Weber, Thomas N(Z00499)
Sincerely,  
Date: 2016.01.15 17:12:47 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS
 
Thomas N. Weber Department Leader, Regulatory Affairs  
 
TNW/CJS  


==Enclosure:==
==Enclosure:==
Unit 2 Nineteenth Refueling Outage Owner's Activity Report, Report U2R19 cc: M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ENCLOSURE
Unit 2 Nineteenth Refueling Outage Owners Activity Report, Report U2R19 cc:   M. L. Dapas           NRC Region IV Regional Administrator M. M. Watford         NRC NRR Project Manager for PVNGS C. A. Peabody         NRC Senior Resident Inspector for PVNGS A member of the STARS    (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek


Unit 2   Nineteenth Refueling Outage Owner's Activity Report Report U2R19  
ENCLOSURE Unit 2 Nineteenth Refueling Outage Owners Activity Report Report U2R19


PV-E0796 Ver. 1 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ________________________________________________________________________________________________     Plant: ___________________________________________________________________________________________________________     Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________ (if applicable)     Current inspection interval ______________________________________________________________________________________
FORM OAR-1 OWNERS ACTIVITY REPORT 2R19 Report Number: ________________________________________________________________________________________________
(1 st , 2 nd , 3 rd , 4 th, other)   Current inspection period _______________________________________________________________________________________
Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Plant: ___________________________________________________________________________________________________________
(1 st , 2 nd , 3 rd)   Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________     Date and revision of inspection plans ___________________________________________________________________________     Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________ Code Cases used: _____________________________________________________________________________________________
2 Unit No.: ___________                     Commercial service date: ___________________ Sep 19, 1986                                                                19 Refueling Outage No.: ___________________
(if applicable)
IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd Current inspection interval ______________________________________________________________________________________
(1st, 2nd, 3rd, 4th, other)
IWB, IWC, IWD, IWF, IWE = 3rd, IWL = 2nd Current inspection period _______________________________________________________________________________________
(1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________         2001 ed, 2003 ad, IWL 2007 ed 2008 ad ISI = 8/29/13 R4, Press Test = 3/19/14 R4, IWE = 9/22/15 R1, IWL = 1/29/15 R2 Date and revision of inspection plans ___________________________________________________________________________
Edition and Addenda of Section XI applicable to repair/replacement activities, 2001 ed 2003 ad if different than the inspection plans ____________________________________________________________________________
N-532-4 Code Cases used: _____________________________________________________________________________________________
(if applicable)
(if applicable)
CERTIFICATE OF CONFORMANCE       I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _______________ conform to the requirements of Section XI.
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R19
_______________               conform to the requirements of Section XI.
(refueling outage number)
(refueling outage number)
Digitally signed by Lehman, William Lehman, William                                  T(Z60076)
DN: cn=Lehman, William T(Z60076)
T(Z60076)
Signed _________________________________________________________
Signed _________________________________________________________
Date: _____________________________________               CERTIFICATE OF INSERVICE INSPECTION       I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of and employed by of have inspected the items described in this Owner's Activity Report, and state that, to the knowledge and belief, the Owner has performed all activities represented by this report in accordance with the Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shal l be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __________________________________________ Commissions (Inspector's Signature)
Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00'                            Date: _____________________________________
National Board, State, Province, and Endorsements Date: _____________________________________
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of $UL]RQD and employed by 7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\RI&RQQHFWLFXWof
2R19PaloVerdeNuclearGeneratingStation,5801S.WintersburgRoad,Tonopah,Arizona85354-75292Sep19,198619IWB,IWC,IWD,IWF=3rd,IWE,IWL=2ndIWB,IWC,IWD,IWF,IWE=3rd,IWL=2nd2001ed,2003ad,IWL2007ed2008adISI=8/29/13R4,PressTest=3/19/14R4,IWE=9/22/15R1,IWL=1/29/15R22001ed2003ad N-532-4 2R19 Lehman, William T(Z60076)Digitally signed by Lehman, William
+DUWIRUG&RQQHFWLFXW have inspected the items described in this Owners Activity Report, and state that, to the EHVWRIP\
 
knowledge and belief, the Owner has performed all activities represented by this report in accordance with the UHTXLUHPHQWVRI Section XI.
T(Z60076)
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Digitally signed by Hogstrom, Hogstrom,                              Robert (YH2450)
DN: cn=Hogstrom, Robert Robert          (YH2450)              (YH2450)
__________________________________________
Date: 2016.01.07 16:30:40 -07'00'      Commissions1%$]$1,&
(Inspectors Signature)                                                   National Board, State, Province, and Endorsements Date: _____________________________________
PV-E0796 Ver. 1


DN: cn=Lehman, William T(Z60076)
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination  Item                      Description                    Evaluation Category  Number                      of Work                        Description F-A      F1.20                    2SG002H013                      EWR 4708973 2


Reason: I am the author of this document
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19_
Table 2 Abstract of repair/replacement activities required for continued service Item                                  Description                          Date  Repair/Replacement Code Class        Description                                of Work                        Completed    Plan Number 1            2RC009H00E                              Replace Snubber                    10/29/2015      4709821 2            2SG005H014                              Replace Snubber                    10/26/2015      4531986 2            2SG008H007                              Replace Snubber                    10/21/2015      4531988 2            2SG011H014                              Replace Snubber                    10/31/2015      4531991 2            2SI159H003                              Replace Snubber                    10/20/2015      4532016 2            2SI174H005                              Replace Snubber                    10/24/2015      4532017 2            2PSGEL011                          weld repair for corrosion              11/13/2015      4564327 3            2MDGAE01A                      Replace Fastners for corrosion              10/6/2015      4591571 3            2MDGAE01B                      Replace Fastners for corrosion              10/4/2015      4591572 3          2PSPAL009 spool 2                      weld repair for corrosion              10/4/2015      4591572 3            2MDGBE05                            weld repair for corrosion              2/17/2015      4614411 3      2MDGAE01A/B spools 6,7 and 8              weld repair for corrosion              10/4/2015      4637019 3            2MDGAE01A                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE01B                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE04                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE05                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE05                            weld repair for corrosion              6/10/2015      3687682 3            2MDGAE04                            weld repair for corrosion              6/10/2015      4296113 3            2MDGAE01B                            weld repair for corrosion              6/10/2015      4296175 3            2MDGAE01A                      Replace Fastners for corrosion              6/10/2015      4305271 3            2MDGAE01A                            weld repair for corrosion              6/10/2015      4305271 3            2MEWBE01                            weld repair for corrosion              10/24/2015      4551380 3


Date: 2016.01.07 15:47:42 -07'00'
10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-07174-TNW/CJS                                                                 Mail Station 7636 Tel: (623) 393-5764 January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
: Hogstrom, Robert (YH2450)
Digitally signed by Hogstrom, Robert (YH2450)
 
DN: cn=Hogstrom, Robert (YH2450)
Date: 2016.01.07 16:30:40 -07'00' 2 Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19ExaminationCategoryItemNumberDescriptionof WorkEvaluationDescriptionF-AF1.202SG002H013EWR 4708973Items with flaws or relevant conditions thatTable 1required evaluation for continued service 3Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19_Table 2Abstract of repair/replacement activitiesrequired for continued serviceCode Class ItemDescri ptionDescriptionof Work Date Com p letedRepair/ReplacementPlan Number 1 2RC009H00E Re place Snubber10/29/20154709821 22SG005H014 Re place Snubber10/26/2015 4531986 22SG008H007Re place Snubber 10/21/2015 4531988 22SG011H014 Re place Snubber10/31/2015 453199122SI159H003Re place Snubber10/20/2015 453201622SI174H005Re place Snubber10/24/2015 4532017 22PSGEL011weld re pair for corrosion11/13/2015456432732MDGAE01ARe place Fastners for corrosion10/6/2015 459157132MDGAE01BRe place Fastners for corrosion10/4/20154591572 3 2PSPAL009 s pool 2weld re pair for corrosion10/4/2015459157232MDGBE05weld re pair for corrosion2/17/2015 461441132MDGAE01A/B s pools 6,7 and 8weld re pair for corrosion10/4/2015463701932MDGAE01Aweld re pair for corrosion10/4/2015463701932MDGAE01Bweld re pair for corrosion10/4/2015463701932MDGAE04weld re pair for corrosion10/4/2015463701932MDGAE05weld re pair for corrosion10/4/2015463701932MDGAE05weld re pair for corrosion6/10/20153687682 32MDGAE04weld re pair for corrosion6/10/20154296113 32MDGAE01Bweld re pair for corrosion6/10/20154296175 32MDGAE01A Re place Fastners for corrosion6/10/20154305271 32MDGAE01Aweld re pair for corrosion6/10/2015430527132MEWBE01weld re pair for corrosion10/24/20154551380 10 CFR 50.55a A member of the STARS (Strategic Teaming and Resource Sharing) Alliance  Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek
 
102-07174-TNW/CJS January 15, 2016  
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Dear Sirs:==
==Dear Sirs:==
Line 81: Line 80:
Palo Verde Nuclear Generating Station (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:
Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:
Owner's Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owner's Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.  
Owners Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.
 
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.  
Sincerely, Weber, Thomas                        Digitally signed by Weber, Thomas N(Z00499)
 
N(Z00499)                            DN: cn=Weber, Thomas N(Z00499)
Sincerely,  
Date: 2016.01.15 17:12:47 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS
 
Thomas N. Weber Department Leader, Regulatory Affairs  
 
TNW/CJS  


==Enclosure:==
==Enclosure:==
Unit 2 Nineteenth Refueling Outage Owner's Activity Report, Report U2R19 cc: M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS C. A. Peabody NRC Senior Resident Inspector for PVNGS Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-5764 ENCLOSURE
Unit 2 Nineteenth Refueling Outage Owners Activity Report, Report U2R19 cc:   M. L. Dapas           NRC Region IV Regional Administrator M. M. Watford         NRC NRR Project Manager for PVNGS C. A. Peabody         NRC Senior Resident Inspector for PVNGS A member of the STARS    (Strategic Teaming and Resource Sharing) Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek


Unit 2   Nineteenth Refueling Outage Owner's Activity Report Report U2R19  
ENCLOSURE Unit 2 Nineteenth Refueling Outage Owners Activity Report Report U2R19


PV-E0796 Ver. 1 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ________________________________________________________________________________________________     Plant: ___________________________________________________________________________________________________________     Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________ (if applicable)    Current inspection interval ______________________________________________________________________________________
FORM OAR-1 OWNERS ACTIVITY REPORT 2R19 Report Number: ________________________________________________________________________________________________
(1 st , 2 nd , 3 rd , 4 th, other)  Current inspection period _______________________________________________________________________________________
Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Plant: ___________________________________________________________________________________________________________
(1 st , 2 nd , 3 rd)  Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________      Date and revision of inspection plans ___________________________________________________________________________      Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________ Code Cases used: _____________________________________________________________________________________________
2 Unit No.: ___________                     Commercial service date: ___________________ Sep 19, 1986                                                                19 Refueling Outage No.: ___________________
(if applicable)
(if applicable)
CERTIFICATE OF CONFORMANCE       I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of _______________ conform to the requirements of Section XI.
IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd Current inspection interval ______________________________________________________________________________________
(1st, 2nd, 3rd, 4th, other)
IWB, IWC, IWD, IWF, IWE = 3rd, IWL = 2nd Current inspection period _______________________________________________________________________________________
(1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________        2001 ed, 2003 ad, IWL 2007 ed 2008 ad ISI = 8/29/13 R4, Press Test = 3/19/14 R4, IWE = 9/22/15 R1, IWL = 1/29/15 R2 Date and revision of inspection plans ___________________________________________________________________________
Edition and Addenda of Section XI applicable to repair/replacement activities, 2001 ed 2003 ad if different than the inspection plans ____________________________________________________________________________
N-532-4 Code Cases used: _____________________________________________________________________________________________
(if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R19
_______________               conform to the requirements of Section XI.
(refueling outage number)
(refueling outage number)
Digitally signed by Lehman, William Lehman, William                                  T(Z60076)
DN: cn=Lehman, William T(Z60076)
T(Z60076)
Signed _________________________________________________________
Signed _________________________________________________________
Date: _____________________________________               CERTIFICATE OF INSERVICE INSPECTION       I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of and employed by of have inspected the items described in this Owner's Activity Report, and state that, to the knowledge and belief, the Owner has performed all activities represented by this report in accordance with the Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shal l be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. __________________________________________ Commissions (Inspector's Signature)
Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00'                            Date: _____________________________________
National Board, State, Province, and Endorsements Date: _____________________________________
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of $UL]RQD and employed by 7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\RI&RQQHFWLFXWof
2R19PaloVerdeNuclearGeneratingStation,5801S.WintersburgRoad,Tonopah,Arizona85354-75292Sep19,198619IWB,IWC,IWD,IWF=3rd,IWE,IWL=2ndIWB,IWC,IWD,IWF,IWE=3rd,IWL=2nd2001ed,2003ad,IWL2007ed2008adISI=8/29/13R4,PressTest=3/19/14R4,IWE=9/22/15R1,IWL=1/29/15R22001ed2003ad N-532-4 2R19 Lehman, William T(Z60076)Digitally signed by Lehman, William
+DUWIRUG&RQQHFWLFXW have inspected the items described in this Owners Activity Report, and state that, to the EHVWRIP\
 
knowledge and belief, the Owner has performed all activities represented by this report in accordance with the UHTXLUHPHQWVRI Section XI.
T(Z60076)
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
 
Digitally signed by Hogstrom, Hogstrom,                              Robert (YH2450)
DN: cn=Lehman, William T(Z60076)
DN: cn=Hogstrom, Robert Robert          (YH2450)              (YH2450)
 
__________________________________________
Reason: I am the author of this document
Date: 2016.01.07 16:30:40 -07'00'      Commissions1%$]$1,&
(Inspectors Signature)                                                   National Board, State, Province, and Endorsements Date: _____________________________________
PV-E0796 Ver. 1


Date: 2016.01.07 15:47:42 -07'00'
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination  Item                      Description                    Evaluation Category  Number                      of Work                        Description F-A      F1.20                    2SG002H013                      EWR 4708973 2
: Hogstrom, Robert (YH2450)
Digitally signed by Hogstrom, Robert (YH2450)


DN: cn=Hogstrom, Robert (YH2450)
Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19_
Date: 2016.01.07 16:30:40 -07'00' 2 Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19ExaminationCategoryItemNumberDescriptionof WorkEvaluationDescriptionF-AF1.202SG002H013EWR 4708973Items with flaws or relevant conditions thatTable 1required evaluation for continued service 3Palo Verde Nuclear Generating StationOwners Activity Report - Unit 2 Refueling Outage 19_Table 2Abstract of repair/replacement activitiesrequired for continued serviceCode Class ItemDescri ptionDescriptionof Work Date Com p letedRepair/ReplacementPlan Number 1 2RC009H00E Re place Snubber10/29/20154709821 22SG005H014 Re place Snubber10/26/2015 4531986 22SG008H007Re place Snubber 10/21/2015 4531988 22SG011H014 Re place Snubber10/31/2015 453199122SI159H003Re place Snubber10/20/2015 453201622SI174H005Re place Snubber10/24/2015 4532017 22PSGEL011weld re pair for corrosion11/13/2015456432732MDGAE01ARe place Fastners for corrosion10/6/2015 459157132MDGAE01BRe place Fastners for corrosion10/4/20154591572 3 2PSPAL009 s pool 2weld re pair for corrosion10/4/2015459157232MDGBE05weld re pair for corrosion2/17/2015 461441132MDGAE01A/B s pools 6,7 and 8weld re pair for corrosion10/4/2015463701932MDGAE01Aweld re pair for corrosion10/4/2015463701932MDGAE01Bweld re pair for corrosion10/4/2015463701932MDGAE04weld re pair for corrosion10/4/2015463701932MDGAE05weld re pair for corrosion10/4/2015463701932MDGAE05weld re pair for corrosion6/10/20153687682 32MDGAE04weld re pair for corrosion6/10/20154296113 32MDGAE01Bweld re pair for corrosion6/10/20154296175 32MDGAE01A Re place Fastners for corrosion6/10/20154305271 32MDGAE01Aweld re pair for corrosion6/10/2015430527132MEWBE01weld re pair for corrosion10/24/20154551380}}
Table 2 Abstract of repair/replacement activities required for continued service Item                                  Description                          Date  Repair/Replacement Code Class       Description                                of Work                       Completed    Plan Number 1           2RC009H00E                               Replace Snubber                    10/29/2015      4709821 2            2SG005H014                              Replace Snubber                    10/26/2015     4531986 2            2SG008H007                              Replace Snubber                   10/21/2015     4531988 2            2SG011H014                              Replace Snubber                    10/31/2015     4531991 2            2SI159H003                              Replace Snubber                    10/20/2015     4532016 2            2SI174H005                              Replace Snubber                    10/24/2015     4532017 2            2PSGEL011                          weld repair for corrosion              11/13/2015      4564327 3            2MDGAE01A                      Replace Fastners for corrosion              10/6/2015     4591571 3            2MDGAE01B                      Replace Fastners for corrosion              10/4/2015      4591572 3         2PSPAL009 spool 2                      weld repair for corrosion              10/4/2015      4591572 3            2MDGBE05                            weld repair for corrosion              2/17/2015     4614411 3      2MDGAE01A/B spools 6,7 and 8              weld repair for corrosion              10/4/2015      4637019 3            2MDGAE01A                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE01B                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE04                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE05                            weld repair for corrosion              10/4/2015      4637019 3            2MDGAE05                            weld repair for corrosion              6/10/2015      3687682 3            2MDGAE04                            weld repair for corrosion              6/10/2015      4296113 3            2MDGAE01B                            weld repair for corrosion              6/10/2015      4296175 3            2MDGAE01A                      Replace Fastners for corrosion              6/10/2015      4305271 3            2MDGAE01A                            weld repair for corrosion              6/10/2015      4305271 3            2MEWBE01                            weld repair for corrosion              10/24/2015      4551380 3}}

Revision as of 03:03, 31 October 2019

Submittal of Owner'S Activity Report (Form OAR-1) Refueling Outage 19 (U2R19)
ML16015A454
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/15/2016
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-07174-TNW/CJS
Download: ML16015A454 (5)


Text

10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-07174-TNW/CJS Mail Station 7636 Tel: (623) 393-5764 January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:

Owners Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.

Sincerely, Weber, Thomas Digitally signed by Weber, Thomas N(Z00499)

N(Z00499) DN: cn=Weber, Thomas N(Z00499)

Date: 2016.01.15 17:12:47 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS

Enclosure:

Unit 2 Nineteenth Refueling Outage Owners Activity Report, Report U2R19 cc: M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

ENCLOSURE Unit 2 Nineteenth Refueling Outage Owners Activity Report Report U2R19

FORM OAR-1 OWNERS ACTIVITY REPORT 2R19 Report Number: ________________________________________________________________________________________________

Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Plant: ___________________________________________________________________________________________________________

2 Unit No.: ___________ Commercial service date: ___________________ Sep 19, 1986 19 Refueling Outage No.: ___________________

(if applicable)

IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd Current inspection interval ______________________________________________________________________________________

(1st, 2nd, 3rd, 4th, other)

IWB, IWC, IWD, IWF, IWE = 3rd, IWL = 2nd Current inspection period _______________________________________________________________________________________

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________ 2001 ed, 2003 ad, IWL 2007 ed 2008 ad ISI = 8/29/13 R4, Press Test = 3/19/14 R4, IWE = 9/22/15 R1, IWL = 1/29/15 R2 Date and revision of inspection plans ___________________________________________________________________________

Edition and Addenda of Section XI applicable to repair/replacement activities, 2001 ed 2003 ad if different than the inspection plans ____________________________________________________________________________

N-532-4 Code Cases used: _____________________________________________________________________________________________

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R19

_______________ conform to the requirements of Section XI.

(refueling outage number)

Digitally signed by Lehman, William Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

T(Z60076)

Signed _________________________________________________________

Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00' Date: _____________________________________

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of $UL]RQD and employed by 7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\RI&RQQHFWLFXWof

+DUWIRUG&RQQHFWLFXW have inspected the items described in this Owners Activity Report, and state that, to the EHVWRIP\

knowledge and belief, the Owner has performed all activities represented by this report in accordance with the UHTXLUHPHQWVRI Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Digitally signed by Hogstrom, Hogstrom, Robert (YH2450)

DN: cn=Hogstrom, Robert Robert (YH2450) (YH2450)

__________________________________________

Date: 2016.01.07 16:30:40 -07'00' Commissions1%$]$1,&

(Inspectors Signature) National Board, State, Province, and Endorsements Date: _____________________________________

PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description F-A F1.20 2SG002H013 EWR 4708973 2

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19_

Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 1 2RC009H00E Replace Snubber 10/29/2015 4709821 2 2SG005H014 Replace Snubber 10/26/2015 4531986 2 2SG008H007 Replace Snubber 10/21/2015 4531988 2 2SG011H014 Replace Snubber 10/31/2015 4531991 2 2SI159H003 Replace Snubber 10/20/2015 4532016 2 2SI174H005 Replace Snubber 10/24/2015 4532017 2 2PSGEL011 weld repair for corrosion 11/13/2015 4564327 3 2MDGAE01A Replace Fastners for corrosion 10/6/2015 4591571 3 2MDGAE01B Replace Fastners for corrosion 10/4/2015 4591572 3 2PSPAL009 spool 2 weld repair for corrosion 10/4/2015 4591572 3 2MDGBE05 weld repair for corrosion 2/17/2015 4614411 3 2MDGAE01A/B spools 6,7 and 8 weld repair for corrosion 10/4/2015 4637019 3 2MDGAE01A weld repair for corrosion 10/4/2015 4637019 3 2MDGAE01B weld repair for corrosion 10/4/2015 4637019 3 2MDGAE04 weld repair for corrosion 10/4/2015 4637019 3 2MDGAE05 weld repair for corrosion 10/4/2015 4637019 3 2MDGAE05 weld repair for corrosion 6/10/2015 3687682 3 2MDGAE04 weld repair for corrosion 6/10/2015 4296113 3 2MDGAE01B weld repair for corrosion 6/10/2015 4296175 3 2MDGAE01A Replace Fastners for corrosion 6/10/2015 4305271 3 2MDGAE01A weld repair for corrosion 6/10/2015 4305271 3 2MEWBE01 weld repair for corrosion 10/24/2015 4551380 3

10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-07174-TNW/CJS Mail Station 7636 Tel: (623) 393-5764 January 15, 2016 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2, Docket No. STN 50-529 Third 10-Year Interval, Third Period:

Owners Activity Report Number U2R19 Pursuant to 10 CFR 50.55a and in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Case N-532-4, Arizona Public Service Company (APS) hereby submits the Owners Activity Report (Form OAR-1) for Unit 2 refueling outage 19 (U2R19). The outage ended on November 15, 2015.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5764.

Sincerely, Weber, Thomas Digitally signed by Weber, Thomas N(Z00499)

N(Z00499) DN: cn=Weber, Thomas N(Z00499)

Date: 2016.01.15 17:12:47 -07'00' Thomas N. Weber Department Leader, Regulatory Affairs TNW/CJS

Enclosure:

Unit 2 Nineteenth Refueling Outage Owners Activity Report, Report U2R19 cc: M. L. Dapas NRC Region IV Regional Administrator M. M. Watford NRC NRR Project Manager for PVNGS C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

ENCLOSURE Unit 2 Nineteenth Refueling Outage Owners Activity Report Report U2R19

FORM OAR-1 OWNERS ACTIVITY REPORT 2R19 Report Number: ________________________________________________________________________________________________

Palo Verde Nuclear Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Plant: ___________________________________________________________________________________________________________

2 Unit No.: ___________ Commercial service date: ___________________ Sep 19, 1986 19 Refueling Outage No.: ___________________

(if applicable)

IWB, IWC, IWD, IWF = 3rd, IWE, IWL = 2nd Current inspection interval ______________________________________________________________________________________

(1st, 2nd, 3rd, 4th, other)

IWB, IWC, IWD, IWF, IWE = 3rd, IWL = 2nd Current inspection period _______________________________________________________________________________________

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________ 2001 ed, 2003 ad, IWL 2007 ed 2008 ad ISI = 8/29/13 R4, Press Test = 3/19/14 R4, IWE = 9/22/15 R1, IWL = 1/29/15 R2 Date and revision of inspection plans ___________________________________________________________________________

Edition and Addenda of Section XI applicable to repair/replacement activities, 2001 ed 2003 ad if different than the inspection plans ____________________________________________________________________________

N-532-4 Code Cases used: _____________________________________________________________________________________________

(if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R19

_______________ conform to the requirements of Section XI.

(refueling outage number)

Digitally signed by Lehman, William Lehman, William T(Z60076)

DN: cn=Lehman, William T(Z60076)

T(Z60076)

Signed _________________________________________________________

Reason: I am the author of this document Date: 2016.01.07 15:47:42 -07'00' Date: _____________________________________

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of $UL]RQD and employed by 7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\RI&RQQHFWLFXWof

+DUWIRUG&RQQHFWLFXW have inspected the items described in this Owners Activity Report, and state that, to the EHVWRIP\

knowledge and belief, the Owner has performed all activities represented by this report in accordance with the UHTXLUHPHQWVRI Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Digitally signed by Hogstrom, Hogstrom, Robert (YH2450)

DN: cn=Hogstrom, Robert Robert (YH2450) (YH2450)

__________________________________________

Date: 2016.01.07 16:30:40 -07'00' Commissions1%$]$1,&

(Inspectors Signature) National Board, State, Province, and Endorsements Date: _____________________________________

PV-E0796 Ver. 1

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19 Table 1 Items with flaws or relevant conditions that required evaluation for continued service Examination Item Description Evaluation Category Number of Work Description F-A F1.20 2SG002H013 EWR 4708973 2

Palo Verde Nuclear Generating Station Owners Activity Report - Unit 2 Refueling Outage 19_

Table 2 Abstract of repair/replacement activities required for continued service Item Description Date Repair/Replacement Code Class Description of Work Completed Plan Number 1 2RC009H00E Replace Snubber 10/29/2015 4709821 2 2SG005H014 Replace Snubber 10/26/2015 4531986 2 2SG008H007 Replace Snubber 10/21/2015 4531988 2 2SG011H014 Replace Snubber 10/31/2015 4531991 2 2SI159H003 Replace Snubber 10/20/2015 4532016 2 2SI174H005 Replace Snubber 10/24/2015 4532017 2 2PSGEL011 weld repair for corrosion 11/13/2015 4564327 3 2MDGAE01A Replace Fastners for corrosion 10/6/2015 4591571 3 2MDGAE01B Replace Fastners for corrosion 10/4/2015 4591572 3 2PSPAL009 spool 2 weld repair for corrosion 10/4/2015 4591572 3 2MDGBE05 weld repair for corrosion 2/17/2015 4614411 3 2MDGAE01A/B spools 6,7 and 8 weld repair for corrosion 10/4/2015 4637019 3 2MDGAE01A weld repair for corrosion 10/4/2015 4637019 3 2MDGAE01B weld repair for corrosion 10/4/2015 4637019 3 2MDGAE04 weld repair for corrosion 10/4/2015 4637019 3 2MDGAE05 weld repair for corrosion 10/4/2015 4637019 3 2MDGAE05 weld repair for corrosion 6/10/2015 3687682 3 2MDGAE04 weld repair for corrosion 6/10/2015 4296113 3 2MDGAE01B weld repair for corrosion 6/10/2015 4296175 3 2MDGAE01A Replace Fastners for corrosion 6/10/2015 4305271 3 2MDGAE01A weld repair for corrosion 6/10/2015 4305271 3 2MEWBE01 weld repair for corrosion 10/24/2015 4551380 3