ML16020A367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Hon, Andrew Sent: Wednesday, January 20, 2016 2:03 PM To:Caves, John (John.Ca ves@duke-energy.com)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                             Hon, Andrew Sent:                             Wednesday, January 20, 2016 2:03 PM To:                               Caves, John (John.Caves@duke-energy.com)
Cc:Barillas, Martha; Forsaty, Fred; Billerbeck, John; Mazumdar, Subinoy; Beasley, Benjamin
Cc:                               Barillas, Martha; Forsaty, Fred; Billerbeck, John; Mazumdar, Subinoy; Beasley, Benjamin


==Subject:==
==Subject:==
Accepted for Review of License Amendment R equest to revises the as-found lift setting tolerance for main steam line code safety va lves (MSSVs) in TS 3.7.1.1 at Harris (CAC MF7195)ADAMSAccessionNumber:
Accepted for Review of License Amendment Request to revises the as-found lift setting tolerance for main steam line code safety valves (MSSVs) in TS 3.7.1.1 at Harris (CAC MF7195)
ML15089A127 ADAMSVersionSeriesId:
ADAMSAccessionNumber:             ML15089A127 ADAMSVersionSeriesId:             {5C2EF156-CCF4-4015-AAB4-08E860EAD61B}
{5C2EF156-CCF4-4015-AAB4-08E860EAD61B}
By letter dated December 17, 2015 (ADAMS Accession No. ML15362A169), Duke Energy (the licensee) submitted a license amendment request (LAR) for the Shearon Harris Nuclear Power Plant, Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
By letter dated December 17, 2015 (ADAMS Accession No. ML15362A169), Duke Energy (the licensee) submitted a license amendment request (LAR) for the Shearon Harris Nuclear Power Plant, Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the  
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
 
plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
 
If you have any questions, please contact me.
If you have any questions, please contact me.
Andy Hon , PE Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN O8H19 Mail Stop O8G-9a  
Andy Hon, PE Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN O8H19 Mail Stop O8G-9a andrew.hon@nrc.gov 1
 
andrew.hon@nrc.gov


Hearing Identifier: NRR_PMDA Email Number: 2607   Mail Envelope Properties   (Andrew.Hon@nrc.gov20160120140300)
Hearing Identifier:     NRR_PMDA Email Number:           2607 Mail Envelope Properties       (Andrew.Hon@nrc.gov20160120140300)


==Subject:==
==Subject:==
Accepted for Review of License Amendment Request to revises the as-found lift setting tolerance for main steam line code safety valves (MSSVs) in TS 3.7.1.1 at Harris (CAC MF7195) Sent Date:   1/20/2016 2:03:11 PM Received Date: 1/20/2016 2:03:00 PM From:   Hon, Andrew Created By:   Andrew.Hon@nrc.gov Recipients:     "Barillas, Martha" <Martha.Barillas@nrc.gov> Tracking Status: None "Forsaty, Fred" <Fred.Forsaty@nrc.gov> Tracking Status: None "Billerbeck, John" <John.Billerbeck@nrc.gov> Tracking Status: None "Mazumdar, Subinoy" <Subinoy.Mazumdar@nrc.gov> Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov> Tracking Status: None "Caves, John (John.Caves@duke-energy.com)" <John.Caves@duke-energy.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   1776     1/20/2016 2:03:00 PM
Accepted for Review of License Amendment Request to revises the as-found lift setting tolerance for main steam line code safety valves (MSSVs) in TS 3.7.1.1 at Harris (CAC MF7195)
 
Sent Date:               1/20/2016 2:03:11 PM Received Date:           1/20/2016 2:03:00 PM From:                   Hon, Andrew Created By:             Andrew.Hon@nrc.gov Recipients:
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
"Barillas, Martha" <Martha.Barillas@nrc.gov>
Tracking Status: None "Forsaty, Fred" <Fred.Forsaty@nrc.gov>
Tracking Status: None "Billerbeck, John" <John.Billerbeck@nrc.gov>
Tracking Status: None "Mazumdar, Subinoy" <Subinoy.Mazumdar@nrc.gov>
Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>
Tracking Status: None "Caves, John (John.Caves@duke-energy.com)" <John.Caves@duke-energy.com>
Tracking Status: None Post Office:
Files                           Size                     Date & Time MESSAGE                           1776                     1/20/2016 2:03:00 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Revision as of 01:57, 31 October 2019

Accepted for Review of License Amendment Request to Revises the as-found Lift Setting Tolerance for Main Steam Line Code Safety Valves (Mssvs) in TS 3.7.1.1 at Harris
ML16020A367
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/20/2016
From: Andrew Hon
Plant Licensing Branch II
To: Caves J
Duke Energy Corp
References
MF7195
Download: ML16020A367 (2)


Text

NRR-PMDAPEm Resource From: Hon, Andrew Sent: Wednesday, January 20, 2016 2:03 PM To: Caves, John (John.Caves@duke-energy.com)

Cc: Barillas, Martha; Forsaty, Fred; Billerbeck, John; Mazumdar, Subinoy; Beasley, Benjamin

Subject:

Accepted for Review of License Amendment Request to revises the as-found lift setting tolerance for main steam line code safety valves (MSSVs) in TS 3.7.1.1 at Harris (CAC MF7195)

ADAMSAccessionNumber: ML15089A127 ADAMSVersionSeriesId: {5C2EF156-CCF4-4015-AAB4-08E860EAD61B}

By letter dated December 17, 2015 (ADAMS Accession No. ML15362A169), Duke Energy (the licensee) submitted a license amendment request (LAR) for the Shearon Harris Nuclear Power Plant, Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Andy Hon, PE Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN O8H19 Mail Stop O8G-9a andrew.hon@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2607 Mail Envelope Properties (Andrew.Hon@nrc.gov20160120140300)

Subject:

Accepted for Review of License Amendment Request to revises the as-found lift setting tolerance for main steam line code safety valves (MSSVs) in TS 3.7.1.1 at Harris (CAC MF7195)

Sent Date: 1/20/2016 2:03:11 PM Received Date: 1/20/2016 2:03:00 PM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients:

"Barillas, Martha" <Martha.Barillas@nrc.gov>

Tracking Status: None "Forsaty, Fred" <Fred.Forsaty@nrc.gov>

Tracking Status: None "Billerbeck, John" <John.Billerbeck@nrc.gov>

Tracking Status: None "Mazumdar, Subinoy" <Subinoy.Mazumdar@nrc.gov>

Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>

Tracking Status: None "Caves, John (John.Caves@duke-energy.com)" <John.Caves@duke-energy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1776 1/20/2016 2:03:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: