{{#Wiki_filter:Cal laway Plant MISSOURI March 28, 2016 ULNRC-06289 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54(w)(3)
{{#Wiki_filter:Cal laway Plant MISSOURI March 28, 2016 ULNRC-06289 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54(w)(3)
Ladies and Gentlemen:
Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 Cf R 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.This letter does not contain new commitments.
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 CfR 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.
This letter does not contain new commitments.
If there are any questions concerning this letter, contact Roger Wink at 573-676-8719.
If there are any questions concerning this letter, contact Roger Wink at 573-676-8719.
Sincerely,/Roger Wink,.7 Regulatory Affairs Manager DRB/nls Enclosure P0 Box 620 Fulton, P0 65251?\rnerenPissouri.con, STARS Alliance ULNRC-06289 March 28, 2016 Page 2 cc: Mr.Marc L.Dapas Regional Administrator U.S.Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S.Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr.L.John Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001 ULNRC-062$9 March 28, 2016 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy: Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Sincerely,
                                                              /     Roger Wink,
                                                            .7       Regulatory Affairs Manager DRB/nls Enclosure P0 Box 620     Fulton, P0 65251 ?\rnerenPissouri.con, STARS       Alliance
 
ULNRC-06289 March 28, 2016 Page 2 cc:   Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001
 
ULNRC-062$9 March 28, 2016 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
F.M.Diya T.E.Herrmann S.P.Banker B.L.Cox M.A.McLachlan R.C.Wink T.B.Elwood Corporate Communications N$RB Secretary Mr.Greg Voss, REP Manager ($EMA)STARS Regulatory Affairs Mr.John O?Neill (Pillsbury Winthrop Shaw Pittman LLP)Ms.Leanne Tippett-Mosby (DNR)
F. M. Diya T. E. Herrmann S. P. Banker B. L. Cox M. A. McLachlan R. C. Wink T. B. Elwood Corporate Communications N$RB Secretary Mr. Greg Voss, REP Manager ($EMA)
March 24, 2016 Mr.I.B.Flwood: Re: Nuclear Property Insurance NRC Property Rule 10 CfR 50.54 (W)Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.Attached is a schedule I have prepared for the current year's filing.I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure.
STARS Regulatory Affairs Mr. John O?Neill (Pillsbury Winthrop Shaw Pittman LLP)
Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.rk E.Blair MEB'sag Attachment cc with attachment:
Ms. Leanne Tippett-Mosby (DNR)
D.R.Brownawell UNION ELECTRIC COMPANY-CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE-April 1, 2016 1OCfR 50.54(W)REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements
 
[10 CFR 50.54(W)], this is to advise that on April 1, 2016, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.Non Nuclear Nuclear Events Events 1.Primary Nuclear Property Insurance a.Nuclear Electric Insurance, Ltd.$1,500,000,000
March 24, 2016 Mr. I. B. Flwood:
$1,500,000,000 2.Excess Nuclear Property Insurance a.Nuclear Electric Insurance, Ltd.1,250,000,000 b.NEIL Specialty Insurance Co.750,000,000 c.European Mutual Association for Nuclear Insurance 450,000,000 450,000,000 d.NEIL Specialty Insurance Co.50,000,000 Grand Total$3,200,000,000
Re: Nuclear Property Insurance NRC Property Rule 10 CfR 50.54 (W)
$2,750,000,000 Mark E.Blair Director Risk Management MEB sag Cal laway Plant MISSOURI March 28, 2016 ULNRC-06289 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54(w)(3)
Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.
Attached is a schedule I have prepared for the current years filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.
rk E. Blair MEBsag Attachment cc with attachment:
D. R. Brownawell
 
UNION ELECTRIC COMPANY CALLAWAY PLANT
                                                          -
NUCLEAR PROPERTY INSURANCE April 1, 2016 -
1OCfR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [10 CFR 50.54(W)], this is to advise that on April 1, 2016, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.
Non Nuclear Nuclear Events           Events
: 1. Primary Nuclear Property Insurance
: a. Nuclear Electric Insurance, Ltd.         $1,500,000,000       $1,500,000,000
: 2. Excess Nuclear Property Insurance
: a. Nuclear Electric Insurance, Ltd.           1,250,000,000
: b. NEIL Specialty Insurance Co.                                       750,000,000
: c. European Mutual Association for Nuclear Insurance                     450,000,000         450,000,000
: d. NEIL Specialty Insurance Co.                                       50,000,000 Grand Total                             $3,200,000,000       $2,750,000,000 Mark E. Blair Director Risk Management MEB sag
 
Cal laway Plant MISSOURI March 28, 2016 ULNRC-06289 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54(w)(3)
Ladies and Gentlemen:
Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 Cf R 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.This letter does not contain new commitments.
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 CfR 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.
This letter does not contain new commitments.
If there are any questions concerning this letter, contact Roger Wink at 573-676-8719.
If there are any questions concerning this letter, contact Roger Wink at 573-676-8719.
Sincerely,/Roger Wink,.7 Regulatory Affairs Manager DRB/nls Enclosure P0 Box 620 Fulton, P0 65251?\rnerenPissouri.con, STARS Alliance ULNRC-06289 March 28, 2016 Page 2 cc: Mr.Marc L.Dapas Regional Administrator U.S.Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S.Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr.L.John Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001 ULNRC-062$9 March 28, 2016 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy: Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Sincerely,
                                                              /     Roger Wink,
                                                            .7       Regulatory Affairs Manager DRB/nls Enclosure P0 Box 620     Fulton, P0 65251 ?\rnerenPissouri.con, STARS       Alliance
 
ULNRC-06289 March 28, 2016 Page 2 cc:   Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001
 
ULNRC-062$9 March 28, 2016 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
F.M.Diya T.E.Herrmann S.P.Banker B.L.Cox M.A.McLachlan R.C.Wink T.B.Elwood Corporate Communications N$RB Secretary Mr.Greg Voss, REP Manager ($EMA)STARS Regulatory Affairs Mr.John O?Neill (Pillsbury Winthrop Shaw Pittman LLP)Ms.Leanne Tippett-Mosby (DNR)
F. M. Diya T. E. Herrmann S. P. Banker B. L. Cox M. A. McLachlan R. C. Wink T. B. Elwood Corporate Communications N$RB Secretary Mr. Greg Voss, REP Manager ($EMA)
March 24, 2016 Mr.I.B.Flwood: Re: Nuclear Property Insurance NRC Property Rule 10 CfR 50.54 (W)Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.Attached is a schedule I have prepared for the current year's filing.I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure.
STARS Regulatory Affairs Mr. John O?Neill (Pillsbury Winthrop Shaw Pittman LLP)
Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.rk E.Blair MEB'sag Attachment cc with attachment:
Ms. Leanne Tippett-Mosby (DNR)
D.R.Brownawell UNION ELECTRIC COMPANY-CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE-April 1, 2016 1OCfR 50.54(W)REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements
 
[10 CFR 50.54(W)], this is to advise that on April 1, 2016, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.Non Nuclear Nuclear Events Events 1.Primary Nuclear Property Insurance a.Nuclear Electric Insurance, Ltd.$1,500,000,000
March 24, 2016 Mr. I. B. Flwood:
$1,500,000,000 2.Excess Nuclear Property Insurance a.Nuclear Electric Insurance, Ltd.1,250,000,000 b.NEIL Specialty Insurance Co.750,000,000 c.European Mutual Association for Nuclear Insurance 450,000,000 450,000,000 d.NEIL Specialty Insurance Co.50,000,000 Grand Total$3,200,000,000
Re: Nuclear Property Insurance NRC Property Rule 10 CfR 50.54 (W)
$2,750,000,000 Mark E.Blair Director Risk Management MEB sag}}
Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.
Attached is a schedule I have prepared for the current years filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.
rk E. Blair MEBsag Attachment cc with attachment:
D. R. Brownawell
 
UNION ELECTRIC COMPANY CALLAWAY PLANT
                                                          -
NUCLEAR PROPERTY INSURANCE April 1, 2016 -
1OCfR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [10 CFR 50.54(W)], this is to advise that on April 1, 2016, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.
Non Nuclear Nuclear Events           Events
: 1. Primary Nuclear Property Insurance
: a. Nuclear Electric Insurance, Ltd.         $1,500,000,000       $1,500,000,000
: 2. Excess Nuclear Property Insurance
: a. Nuclear Electric Insurance, Ltd.           1,250,000,000
: b. NEIL Specialty Insurance Co.                                       750,000,000
: c. European Mutual Association for Nuclear Insurance                     450,000,000         450,000,000
: d. NEIL Specialty Insurance Co.                                       50,000,000 Grand Total                             $3,200,000,000       $2,750,000,000 Mark E. Blair Director Risk Management MEB sag}}

Revision as of 22:22, 30 October 2019

Nuclear Property Insurance Reporting
ML16089A503
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/28/2016
From: Wink R
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-06289
Download: ML16089A503 (5)


Text

Cal laway Plant MISSOURI March 28, 2016 ULNRC-06289 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54(w)(3)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 CfR 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.

This letter does not contain new commitments.

If there are any questions concerning this letter, contact Roger Wink at 573-676-8719.

Sincerely,

/ Roger Wink,

.7 Regulatory Affairs Manager DRB/nls Enclosure P0 Box 620 Fulton, P0 65251  ?\rnerenPissouri.con, STARS Alliance

ULNRC-06289 March 28, 2016 Page 2 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001

ULNRC-062$9 March 28, 2016 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya T. E. Herrmann S. P. Banker B. L. Cox M. A. McLachlan R. C. Wink T. B. Elwood Corporate Communications N$RB Secretary Mr. Greg Voss, REP Manager ($EMA)

STARS Regulatory Affairs Mr. John O?Neill (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Leanne Tippett-Mosby (DNR)

March 24, 2016 Mr. I. B. Flwood:

Re: Nuclear Property Insurance NRC Property Rule 10 CfR 50.54 (W)

Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.

Attached is a schedule I have prepared for the current years filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.

rk E. Blair MEBsag Attachment cc with attachment:

D. R. Brownawell

UNION ELECTRIC COMPANY CALLAWAY PLANT

-

NUCLEAR PROPERTY INSURANCE April 1, 2016 -

1OCfR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [10 CFR 50.54(W)], this is to advise that on April 1, 2016, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.

Non Nuclear Nuclear Events Events

1. Primary Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. $1,500,000,000 $1,500,000,000
2. Excess Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. 1,250,000,000
b. NEIL Specialty Insurance Co. 750,000,000
c. European Mutual Association for Nuclear Insurance 450,000,000 450,000,000
d. NEIL Specialty Insurance Co. 50,000,000 Grand Total $3,200,000,000 $2,750,000,000 Mark E. Blair Director Risk Management MEB sag

Cal laway Plant MISSOURI March 28, 2016 ULNRC-06289 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54(w)(3)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 CfR 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.

This letter does not contain new commitments.

If there are any questions concerning this letter, contact Roger Wink at 573-676-8719.

Sincerely,

/ Roger Wink,

.7 Regulatory Affairs Manager DRB/nls Enclosure P0 Box 620 Fulton, P0 65251  ?\rnerenPissouri.con, STARS Alliance

ULNRC-06289 March 28, 2016 Page 2 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Kios Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8H4 Washington, DC 20555-0001

ULNRC-062$9 March 28, 2016 Page 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya T. E. Herrmann S. P. Banker B. L. Cox M. A. McLachlan R. C. Wink T. B. Elwood Corporate Communications N$RB Secretary Mr. Greg Voss, REP Manager ($EMA)

STARS Regulatory Affairs Mr. John O?Neill (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Leanne Tippett-Mosby (DNR)

March 24, 2016 Mr. I. B. Flwood:

Re: Nuclear Property Insurance NRC Property Rule 10 CfR 50.54 (W)

Reporting Requirements The subject NRC reporting requirement stipulates that on April 1, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.

Attached is a schedule I have prepared for the current years filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.

rk E. Blair MEBsag Attachment cc with attachment:

D. R. Brownawell

UNION ELECTRIC COMPANY CALLAWAY PLANT

-

NUCLEAR PROPERTY INSURANCE April 1, 2016 -

1OCfR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [10 CFR 50.54(W)], this is to advise that on April 1, 2016, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.

Non Nuclear Nuclear Events Events

1. Primary Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. $1,500,000,000 $1,500,000,000
2. Excess Nuclear Property Insurance
a. Nuclear Electric Insurance, Ltd. 1,250,000,000
b. NEIL Specialty Insurance Co. 750,000,000
c. European Mutual Association for Nuclear Insurance 450,000,000 450,000,000
d. NEIL Specialty Insurance Co. 50,000,000 Grand Total $3,200,000,000 $2,750,000,000 Mark E. Blair Director Risk Management MEB sag