NOC-AE-16003380, Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937): Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Nuclear Operating Company South Texas Project Electric Generating Station P.O. Bax 289 Wadsworth.
{{#Wiki_filter:Nuclear Operating Company South Texas Project Electric Generating Station P.O. Bax 289 Wadsworth. Texas 77483 May 19, 2016 NOC-AE-16003380 10 CFR 54 File No. G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 I South Texas Project I       Units 1 and 2 Dock~t Nos. STN 50-498, STN 50-499 Request       fqr Additional Information Set 35 for the Review of 4he South Texas Project, Units 1 and 2, License Renewal /Application (TAC Nos. ME4936 and ME4937)
Texas 77483 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001 I South Texas Project I Units 1 and 2 May 19, 2016 NOC-AE-16003380 10 CFR 54 File No. G25 Nos. STN 50-498, STN 50-499 Request fqr Additional Information Set 35 for the Review of 4he South Texas Project, Units 1 and 2, License Renewal /Application (TAC Nos. ME4936 and ME4937)  


==References:==
==References:==
 
I
I 1. Letter; G. T. Powell to Document Control Desk; "License Renewal Application;" NOC-AE-10002607; dated October 25, 2010 (ML103010257) j 2. Letter; G. T. Powell to USNRC Document Control Desk; "Response to Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application-Set 27," NOC-AE-14003141; dated June 3, 2014(ML14163A020)
: 1. Letter; G. T. Powell to US~RC Document Control Desk; "License Renewal Application;"
NOC-AE-10002607; dated October 25, 2010 (ML103010257) j
: 2. Letter; G. T. Powell to USNRC Document Control Desk; "Response to Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application-Set 27," NOC-AE-14003141; dated June 3, 2014(ML14163A020)
: 3. Letter; G. T. Powell to USNRC Document Control Desk; "2014 Annual Update to the South Texas Project License Renewal Application;" NOC-AE-14003180; dated October 22, 2014(ML14308A073)
: 3. Letter; G. T. Powell to USNRC Document Control Desk; "2014 Annual Update to the South Texas Project License Renewal Application;" NOC-AE-14003180; dated October 22, 2014(ML14308A073)
: 4. Letter from NRC, Lois James to STP G.T. Powell; "Request for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application," dated April 22, 2016(ML16104A352)
: 4. Letter from NRC, Lois James to STP G.T. Powell; "Request for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application," dated April 22, 2016(ML16104A352)
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a License Renewal Application (LRA). By Reference 2, STPNOC provided a response to questions related to LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation.
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a License Renewal Application (LRA). By Reference 2, STPNOC provided a response to questions related to LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. By Reference 3, Table 3.3.2-19 referenced notes were updated. By Reference 4, Request for Additional Information (RAI) requested further clarification of STPNOC's management regarding reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation. STPNOC's response to RAI Set 35 is provided in Enclosure 1, and changes to LRA pages are depicted as line-in/line-out pages provided in Enclosure 2.
By Reference 3, Table 3.3.2-19 referenced notes were updated. By Reference 4, Request for Additional Information (RAI) requested further clarification of STPNOC's management regarding reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation.
Regulatory commitment item 13 in LRA Table A4-1 has been revised as provided in . There are no other commitments in this letter.
STPNOC's response to RAI Set 35 is provided in Enclosure 1, and changes to LRA pages are depicted as line-in/line-out pages provided in Enclosure
STI: 34317752
: 2. Regulatory commitment item 13 in LRA Table A4-1 has been revised as provided in Enclosure
 
: 3. There are no other commitments in this letter. STI: 34317752 NOC-AE-16003380 Page 2 of 3 If there are any questions, please contact Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243 or Rafael Gonzales, STP License Renewal Project regulatory contact, at (361) 972-4779.
NOC-AE-16003380 Page 2 of 3 If there are any questions, please contact Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243 or Rafael Gonzales, STP License Renewal Project regulatory point-of-contact, at (361) 972-4779.
I declare under penalty of perjury that the foregoing is true and correct. Executed on Jn'jf /'?, 6 DatE? -
I declare under penalty of perjury that the foregoing is true and correct.
/ James W. Connolly Site Vice President rjg  
Executed on             /'?, ~/6 Jn'jfDatE?             -
                                                    /             f[j~r James W. Connolly Site Vice President rjg


==Enclosures:==
==Enclosures:==
: 1. STPNOC's response to RAI Set 35 2. STPNOC LRA Changes with Line-in/Line-out Annotations
: 1. STPNOC's response to RAI Set 35
: 3. STPNOC Revision of Regulatory Commitment Item 13 cc: (paper copy) Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A) 11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77 483 Lois James License Renewal Project Manager (Safety) One White Flint North (MS 011-F1) U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Tam Tran License Renewal Project Manager (Environmental)
: 2. STPNOC LRA Changes with Line-in/Line-out Annotations
One White Flint North (MS 011 F01) U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 (electronic copy) Morgan, Lewis & Bockius LLP Steve Frantz NOC-AE-16003380 Page 3 of 3 U.S. Nuclear Regulatory Commission Lisa M. Regner Lois James Tam Tran NRG South Texas LP Chris O'Hara Jim van Suski! Skip Zahn CPS Energy Kevin Pollo Cris Eugster L. D. Blaylock Crain Caton & James, P.C. Peter Nemeth City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Helen Watkins Robert Free NOC-AE-16003380 Enclosure 1 STPNOC's response to the RAI Set 35 RAI 3.0.3-1 c  
: 3. STPNOC Revision of Regulatory Commitment Item 13
 
NOC-AE-16003380 Page 3 of 3 cc:
(paper copy)                             (electronic copy)
Regional Administrator, Region IV       Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission       Steve Frantz 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner                           Lois James Senior Project Manager                   Tam Tran U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A)         NRG South Texas LP 11555 Rockville Pike                     Chris O'Hara Rockville, MD 20852                     Jim van Suski!
Skip Zahn NRC Resident Inspector U. S. Nuclear Regulatory Commission     CPS Energy P. 0. Box 289, Mail Code: MN116         Kevin Pollo Wadsworth, TX 77483                      Cris Eugster L. D. Blaylock Lois James License Renewal Project Manager (Safety) Crain Caton & James, P.C.
One White Flint North (MS 011-F1)       Peter Nemeth U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 City of Austin Elaina Ball Tam Tran                                 John Wester License Renewal Project Manager (Environmental)
One White Flint North (MS 011 F01)       Texas Dept. of State Health Services U. S. Nuclear Regulatory Commission     Helen Watkins Washington, DC 20555-0001               Robert Free
 
NOC-AE-16003380 Enclosure 1 STPNOC's response to the RAI Set 35
 
NOC-AE-16003380 Enclosure 1-Page 1 of 6 RAI 3.0.3-1 c


==Background:==
==Background:==


NOC-AE-16003380 Enclosure 1-Page 1 of 6 By letter dated October 22, 2014, license renewal application (LRA) Table 3.3.2-19, "Auxiliary Systems -Summary of Aging Management Evaluation  
By letter dated October 22, 2014, license renewal application (LRA) Table 3.3.2-19, "Auxiliary Systems - Summary of Aging Management Evaluation - Chemical and Volume Control System,"
-Chemical and Volume Control System," states that fiberglass insulation exposed to plant indoor air (external) has no aging effect requiring management (AERM) and no aging management program (AMP). In addition, the line item cites a plant specific note 5, but there is no description of the note. By letter dated June 3, 2014, the same line item entry in LRA Table 3.3.2-19 states that the AERM is reduced thermal insulation resistance due to moisture intrusion and the AMP is the External Surface Monitoring Program. Issue: LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation," Table 3.3-1, item 3.3.1-64 recommends that reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation be managed by Chapter Xl.M36, "External Surfaces Monitoring of Mechanical Components." No basis was provided for not being consistent with line item 3.3.1-64.
states that fiberglass insulation exposed to plant indoor air (external) has no aging effect requiring management (AERM) and no aging management program (AMP). In addition, the line item cites a plant specific note 5, but there is no description of the note. By letter dated June 3, 2014, the same line item entry in LRA Table 3.3.2-19 states that the AERM is reduced thermal insulation resistance due to moisture intrusion and the AMP is the External Surface Monitoring Program.
In addition, the description of the plant-specific note 5 is not clear to the staff. Request: 1. State the basis for not citing reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation.
Issue:
LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation," Table 3.3-1, item 3.3.1-64 recommends that reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation be managed by Chapter Xl.M36, "External Surfaces Monitoring of Mechanical Components." No basis was provided for not being consistent with line item 3.3.1-64. In addition, the description of the plant-specific note 5 is not clear to the staff.
Request:
: 1. State the basis for not citing reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation.
: 2. Provide a description of the plant-specific note 5 listed in Table 3.3.2-19.
: 2. Provide a description of the plant-specific note 5 listed in Table 3.3.2-19.
STPNOC Response:
STPNOC Response:
: 1. LRA Table 3.3.2-19 is updated to include the aging effect of reduced thermal insulation resistance due to moisture intrusion for fiberglass insulation.
: 1. LRA Table 3.3.2-19 is updated to include the aging effect of reduced thermal insulation resistance due to moisture intrusion for fiberglass insulation.
Enclosure 2 provides the line-in/line-out revision to LRA Table 3.3.2-19.
Enclosure 2 provides the line-in/line-out revision to LRA Table 3.3.2-19.
: 2. Description of plant specific note 5 listed in Table 3.3.2-19 was previously updated per correspondence NOC-AE-15003236, dated March 24, 2015(ML15097A013) to reflect the correct Appendix C Item Vlll.l.S-403.
: 2. Description of plant specific note 5 listed in Table 3.3.2-19 was previously updated per correspondence NOC-AE-15003236, dated March 24, 2015(ML15097A013) to reflect the correct Appendix C Item Vlll.l.S-403. See enclosure 2 for the current LRA Table 3.3.2-19.
See enclosure 2 for the current LRA Table 3.3.2-19.
 
RAI 82.1.18-6  
NOC-AE-16003380 Enclosure 1 Page 2 of 6 RAI 82.1.18-6


==Background:==
==Background:==


NOC-AE-16003380 Enclosure 1 Page 2 of 6 On February 4, 2016, the staff issued the final version of LR-ISG-2015-01, "Changes to Buried and Underground Piping and Tank Recommendations." The ISG replaces aging management program (AMP) Xl.M41, "Buried and Underground Piping and Tanks," and the associated Updated Final Safety Analysis Report (UFSAR) Summary Description issued in LR-ISG-2011-03, "Changes to the Generic Aging Lessons Learned (GALL) Report, Revision 2, Aging Management Program (AMP) Xl.M41, 'Buried and Underground Piping and Tanks'." As amended by letter dated June 26, 2014, LRA Section B2.1.18, "Buried Piping and Tanks Inspection Program," and LRA Section A 1.18 (associated UFSAR Summary Description) were revised to address the changes to AMP Xl.M41 and the UFSAR Summar)i Description in ISG-2011-03.
On February 4, 2016, the staff issued the final version of LR-ISG-2015-01, "Changes to Buried and Underground Piping and Tank Recommendations." The ISG replaces aging management program (AMP) Xl.M41, "Buried and Underground Piping and Tanks," and the associated Updated Final Safety Analysis Report (UFSAR) Summary Description issued in LR-ISG-2011-03, "Changes to the Generic Aging Lessons Learned (GALL) Report, Revision 2, Aging Management Program (AMP) Xl.M41, 'Buried and Underground Piping and Tanks'."
Issue: The existing Buried Piping and Tanks Inspection Program and associated UFSAR Summary Description have not been evaluated against the changes to AMP Xl.M41 and the UFSAR Summary Description issued in LR-ISG-2015-01.
As amended by letter dated June 26, 2014, LRA Section B2.1.18, "Buried Piping and Tanks Inspection Program," and LRA Section A 1.18 (associated UFSAR Summary Description) were revised to address the changes to AMP Xl.M41 and the UFSAR Summar)i Description in LR-ISG-2011-03.
Request: Compare the existing Buried Piping and Tanks Inspection Program to AMP Xl.M41 and the associated UFSAR Summary Description issued in LR-ISG-2015-01.
Issue:
State any changes to LRA Sections B2.1.18 and Section A 1.18 necessary to be consistent with LR-ISG-2015-01.
The existing Buried Piping and Tanks Inspection Program and associated UFSAR Summary Description have not been evaluated against the changes to AMP Xl.M41 and the UFSAR Summary Description issued in LR-ISG-2015-01.
As necessary, state and justify exception(s) to recommendations that will not be incorporated into the existing Buried Piping and Tanks Inspection Program. STPNOC Response:
Request:
LRA Appendix A1.18, Appendix B2.1.18, Table A4-1 and LR Basis Document AMP Xl.M34, Buried Piping and Tanks Inspection, are updated to the requirements of LR-ISG-2015-01.
Compare the existing Buried Piping and Tanks Inspection Program to AMP Xl.M41 and the associated UFSAR Summary Description issued in LR-ISG-2015-01. State any changes       to LRA Sections B2.1.18 and Section A 1.18 necessary to be consistent with LR-ISG-2015-01. As necessary, state and justify exception(s) to recommendations that will not be incorporated into the existing Buried Piping and Tanks Inspection Program.
The following is a summary of the gap analysis performed.
STPNOC Response:
All applicable LR-ISG-2012-01 recommendations are incorporated into the LR Basis Document AMP Xl.M34, Buried Piping and Tanks Inspection.
LRA Appendix A1.18, Appendix B2.1.18, Table A4-1 and LR Basis Document AMP Xl.M34, Buried Piping and Tanks Inspection, are updated to the requirements of LR-ISG-2015-01. The following is a summary of the gap analysis performed. All applicable LR-ISG-2012-01 recommendations are incorporated into the LR Basis Document AMP Xl.M34, Buried Piping and Tanks Inspection. The following provides a summary of the LR-ISG-2015-01 changes with regards to the changes made in the LR Basis Document.
The following provides a summary of the LR-ISG-2015-01 changes with regards to the changes made in the LR Basis Document.
Scope of Program (Element 1) added; scope to           There are no buried polymeric or cementitious include buried and underground piping and tanks       components within scope of license renewal at constructed of any material, including metallic,       STP.
Scope of Program (Element 1) added; scope to include buried and underground piping and tanks constructed of any material, including metallic, polymeric, and cementitious materials and includes aging effects such as loss of material, cracking, and changes in material properties (for cementitious piping only). There are no buried polymeric or cementitious components within scope of license renewal at STP.
polymeric, and cementitious materials and includes aging effects such as loss of material, cracking, and changes in material properties (for cementitious piping only).
NOC-AE-16003380 Enclosure 1 Page 3 of 6 Scope of Program (Element 1) added; The existing LR Basis Document AMP Xl.M34 The program also manages loss of material due to* corrosion of piping system bolting within scope of this program. Preventive Actions (Element 2 a.) added; manages loss of material and loose or missing fasteners.
 
The AMP is revised to state; a. For buried stainless steel or cementitious Soil samples have shown that the uncoated piping or tanks, coatings are provided based on the stainless buried piping is not subject to environmental conditions.
NOC-AE-16003380 Enclosure 1 Page 3 of 6 Scope of Program (Element 1) added;                   The existing LR Basis Document AMP Xl.M34 manages loss of material and loose or missing The program also manages loss of material due to*     fasteners.
environments that contains chloride.
corrosion of piping system bolting within scope of this program.
Preventive Actions (Element 2 b.) added; b. For buried steel, copper alloy, and aluminum alloy piping and tanks, and underground steel and copper alloy piping and tanks, coatings are in accordance with Table 1 of NACE SP0169-2007 or Section 3.4 of NACE RP0285-2002.
Preventive Actions (Element 2 a.) added;               The AMP is revised to state;
Preventive Actions (Element 2 c.) added; c. The system monitoring interval discussed in Section 10.3 of NACE SP0169-2007 may not be extended beyond one year. Preventive Actions (Element 2 e.i.) added; e.i. To prevent damage to the coating, the limiting critical potential should not be more negative than 1200 mV. Parameters Monitored or Inspected (Element 3 b.ii,, 3.b.ii., 3.b.iii., 3.b.iv.) added; b. Visual inspections of buried or underground piping or tanks, or their coatings, are performed to monitor for; ii. loss of material due to wear for polymeric materials.
: a. For buried stainless steel or cementitious         Soil samples have shown that the uncoated piping or tanks, coatings are provided based on the   stainless buried piping is not subject to environmental conditions.                             environments that contains chloride.
iii. Cracking, spalling, and corrosion or exposure' of rebar for asbestos cement pipe, and concrete pipe. iv. Cracking, blistering, change in color due to water absorption for high-density polyethylene (HOPE) and fiberglass components.
There are no buried cementitious components within scope of license renewal at STP.
There are no buried cementitious components within scope of license renewal at STP. Copper alloy and steel piping within the scope of license renewal at STP is coated. STP does not have any aluminum alloy piping and there are no buried tanks within the scope of license renewal. LR Appendix A 1.18 states; An annual cathodic protection survey is performed consistent with NACE SP0169-2007. The AMP is revised to state use of excessive cathodic protection polarized potential on coated piping should be avoided. The limiting critical potential should not be more negative than 1200 mV relative to a copper/copper sulfate reference electrode (CSE). There are no buried polymeric or cementitious components within scope of license renewal at STP.
Preventive Actions (Element 2 b.) added;               Copper alloy and steel piping within the scope of license renewal at STP is coated. STP does
: b. For buried steel, copper alloy, and aluminum       not have any aluminum alloy piping and there alloy piping and tanks, and underground steel and     are no buried tanks within the scope of license copper alloy piping and tanks, coatings are in         renewal.
accordance with Table 1 of NACE SP0169-2007 or Section 3.4 of NACE RP0285-2002.
Preventive Actions (Element 2 c.) added;               LR Appendix A 1.18 states;
: c. The system monitoring interval discussed in         An annual cathodic protection survey is Section 10.3 of NACE SP0169-2007 may not be           performed consistent with NACE SP0169-extended beyond one year.                             2007.
Preventive Actions (Element 2 e.i.) added;             The AMP is revised to state use of excessive cathodic protection polarized potential on e.i. To prevent damage to the coating, the limiting    coated piping should be avoided. The limiting critical potential should not be more negative than   critical potential should not be more negative 1200 mV.                                               than 1200 mV relative to a copper/copper sulfate reference electrode (CSE).
Parameters Monitored or Inspected (Element 3           There are no buried polymeric or cementitious b.ii,, 3.b.ii., 3.b.iii., 3.b.iv.) added;             components within scope of license renewal at STP.
: b. Visual inspections of buried or underground piping or tanks, or their coatings, are performed to monitor for; ii. loss of material due to wear for polymeric materials.
iii. Cracking, spalling, and corrosion or exposure' of rebar for asbestos cement pipe, and concrete pipe.
iv. Cracking, blistering, change in color due to water absorption for high-density polyethylene (HOPE) and fiberglass components.
 
NOC-AE-16003380 Enclosure 1 Page 4 of 6
NOC-AE-16003380 Enclosure 1 Page 4 of 6
:Z::<5/*,**'::;  
~f{;l&sect;:t'.~-2Q;~s~o1:,.c1J'.~ij'g~:,*;;, \:;;!;\;~;.:::: :Z::<5/*,**'::; ** ': 1Bas1$,iO.<!ciJmf:i'iJ1*.(AIVJP.)J)i$po~iti90~~:~!:;.~1F.2L~+;:,:
** ':
Parameters Monitored or Inspected (Element 3 d.)                               The AMP does not include any components added;                                                                         with cracking as an aging effect.
Parameters Monitored or Inspected (Element 3 d.) The AMP does not include any components added; with cracking as an aging effect. d. Inspections for cracking utilize a method that has been demonstrated to be capable of detecting cracking.
: d. Inspections for cracking utilize a method that                               The AMP is revised to state "Soil samples has been demonstrated to be capable of detecting                               have shown that the uncoated stainless buried cracking. Intact coatings do not have to be                                     piping is not subject to environments that removed to inspect for potential cracking.                                     contains chloride."
Intact coatings do not have to be removed to inspect for potential cracking.
There are no buried aluminum alloy within scope of license renewal at STP Detection of Aging Effects (Element 4) added;                                   The AMP is revised to require inspections be distributed evenly among the units.
Detection of Aging Effects (Element 4) added; For multi-unit sites the inspections are distributed evenly among the units Detection of Aging Effects (Element 4 Table Xl.M41-2) revised; Preventive Action Category C to require the smaller of 0.5% of the piping length or 1 inspection.
For multi-unit sites the inspections are distributed evenly among the units Detection of Aging Effects (Element 4 Table                                     The existing AMP states; Xl.M41-2) revised; Category C inspections are 0.5 percent Not-to-Preventive Action Category C to require the                                     Exceed (NTE) two inspections of that piping smaller of 0.5% of the piping length or 1 inspection.                          per inspection period.
Detection of Aging Effects (Element 4 Table Xl.M41-2) revised; Preventive Action Category E to require the smaller of 5% of the piping length or 3 inspections.
Detection of Aging Effects (Element 4 Table                                     The AMP is revised to require 5 percent NTE 5 Xl.M41-2) revised;                                                             inspections.
Detection of Aging Effects (Element 4 Table Xl.M41-2 note E. a.) added; a. An analysis, conducted in accordance with the "preventive actions" program element of this AMP, has demonstrated that installation or operation of a cathodic protection system is impractical; or Detection of Aging Effects (Element 4 Table Xl.M41-2) revised; Preventive Action Category F of the program to require the smaller of 10% of the piping length or 6 inspections.
Preventive Action Category E to require the smaller of 5% of the piping length or 3 inspections.
The AMP is revised to state "Soil samples have shown that the uncoated stainless buried piping is not subject to environments that contains chloride." There are no buried aluminum alloy within scope of license renewal at STP The AMP is revised to require inspections be distributed evenly among the units. The existing AMP states; Category C inspections are 0.5 percent Exceed (NTE) two inspections of that piping per inspection period. The AMP is revised to require 5 percent NTE 5 inspections.
Detection of Aging Effects (Element 4 Table                                     The existing AMP states where Category E Xl.M41-2 note E. a.) added;                                                     inspections are used, STP will demonstrate that soil is not corrosive using the following.
The existing AMP states where Category E inspections are used, STP will demonstrate that soil is not corrosive using the following.
: a. An analysis, conducted in accordance with the                               STP is committed to providing cathodic "preventive actions" program element of this AMP,                               protection that meets the acceptance criteria.
STP is committed to providing cathodic protection that meets the acceptance criteria.
has demonstrated that installation or operation of a cathodic protection system is impractical; or                                   See STP's response to RAI 82.1.18-5 in letter dated June 11, 2015 (ML15175A198).
See STP's response to RAI 82.1.18-5 in letter dated June 11, 2015 (ML15175A198). The AMP is revised to state inspection scope for piping that does not meet Category C or E inspection schedule requirements is 10 percent, NTE 9 inspections.
Detection of Aging Effects (Element 4 Table                                    The AMP is revised to state inspection scope Xl.M41-2) revised;                                                              for piping that does not meet Category C or E inspection schedule requirements is 10 Preventive Action Category F of the program to                                  percent, NTE 9 inspections.
NOC-AE-16003380 Enclosure 1 Page 5 of 6 Detection of Aging Effects (Element 4 a.) added; The AMP is revised to state if a transition from Transitioning to a higher number of inspections Detection of Aging Effects (Element 4 b.i.) added; Where piping constructed of steel, copper alloy, or aluminum alloy has been coated with the same' coating system and the backfill has the same requirements, the total inspections for this piping may be combined to satisfy the recommended inspection quantity.
require the smaller of 10% of the piping length or 6 inspections.
Detection of Aging Effects (Element 4 b.ii.) added; For buried piping, inspections may be reduced to one-half the number of inspections indicated in Table Xl.M41-2 when performance of the indicated inspections necessitates excavation of piping that has been fully backfilled using controlled low strength material.
 
Acceptance Criteria (Element 6 f.) added; Backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component (if not coated). Acceptance Criteria (Element 6 Table Xl.M41-3) revised the cathodic protection acceptance criteria; Steel: -850 mV relative to a CSE, instant off Copper alloy: 100 mV minimum polarization Acceptance Criteria (Element 6 m.) added; Alternatives to the -850 mV criterion for steel piping. Category C to Category E or from Category E to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function.
NOC-AE-16003380 Enclosure 1 Page 5 of 6 Detection of Aging Effects (Element 4 a.) added;     The AMP is revised to state if a transition from Category C to Category E or from Category E Transitioning to a higher number of inspections      to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function. In all cases, the examinations are completed within 4 years after the end of the particular 10-year interval.
In all cases, the examinations are completed within 4 years after the end of the particular 10-year interval.
These additional inspections conducted in an inspection interval cannot be credited towards the base number of inspections required for the 10-year interval.
These additional inspections conducted in an inspection interval cannot be credited towards the base number of inspections required for the 10-year interval.
The AMP is revised to state where steel or copper alloy piping has been coated with the same coating system and the backfill has the same requirements, the total inspections for this piping may be combined to satisfy the recommended inspection quantity.
Detection of Aging Effects (Element 4 b.i.) added;  The AMP is revised to state where steel or copper alloy piping has been coated with the Where piping constructed of steel, copper alloy, or  same coating system and the backfill has the aluminum alloy has been coated with the same'        same requirements, the total inspections for coating system and the backfill has the same        this piping may be combined to satisfy the requirements, the total inspections for this piping  recommended inspection quantity. For may be combined to satisfy the recommended          example, for Category F, 10 percent of the inspection quantity.                                total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.
For example, for Category F, 10 percent of the total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.
Detection of Aging Effects (Element 4 b.ii.) added;  STP does not use controlled low strength material for backfill of the buried piping.
STP does not use controlled low strength material for backfill of the buried piping. The AMP is revised to state backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component.
For buried piping, inspections may be reduced to one-half the number of inspections indicated in Table Xl.M41-2 when performance of the indicated inspections necessitates excavation of piping that has been fully backfilled using controlled low strength material.
The AMP is revised to state the cathodic protection system pipe-to-soil potential when using a saturated copper/copper sulfate reference electrode must be between at least -850 mV instant off for steel piping. 100 mV minimum polarization is required for copper alloy piping. The AMP is revised to allow the use of alternative acceptance criteria for steel piping.
Acceptance Criteria (Element 6 f.) added;            The AMP is revised to state backfill is acceptable if the inspections do not reveal Backfill is acceptable if the inspections do not    evidence that the backfill caused damage to reveal evidence that the backfill caused damage to  the component's coatings or the surface of the the component's coatings or the surface of the      component.
NOC-AE-16003380 Enclosure 1 Page 6 of 6 Corrective Actions (Element 7 a.) added; The AMP is revised to state where damage to Where damage to the coating has been evaluated as significant and the damage was caused by conforming backfill, an extent of condition evaluation is conducted to ensure that the as-left condition of backfill in the vicinity of the observed damage will not lead to further degradation.
component (if not coated).
Corrective Actions (Element 7 b.) added; If coated or uncoated metallic piping or tanks show evidence of corrosion, the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.
Acceptance Criteria (Element 6 Table Xl.M41-3)      The AMP is revised to state the cathodic revised the cathodic protection acceptance criteria; protection system pipe-to-soil potential when using a saturated copper/copper sulfate Steel:    -850 mV relative to a CSE, instant off    reference electrode must be between at least
Corrective Actions (Element 7 c.) added; Where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced.
                                                    -850 mV instant off for steel piping. 100 mV Copper alloy:    100 mV minimum polarization        minimum polarization is required for copper alloy piping.
In addition, an expansion of sample size is conducted.
Acceptance Criteria (Element 6 m.) added;           The AMP is revised to allow the use of alternative acceptance criteria for steel piping.
The number of inspections within the affected piping categories are doubled or increased by 5, whichever is smaller the coating has been evaluated as significant and the damage was caused by conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
Alternatives to the -850 mV criterion for steel piping.
The AMP is revised to state if coated or uncoated metallic piping show evidence of corrosion, the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.
 
The AMP is revised to state where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced.
NOC-AE-16003380 Enclosure 1 Page 6 of 6 Corrective Actions (Element 7 a.) added;                  The AMP is revised to state where damage to the coating has been evaluated as significant Where damage to the coating has been evaluated            and the damage was caused by non-as significant and the damage was caused by non-          conforming backfill, an extent of condition conforming backfill, an extent of condition               evaluation should be conducted to ensure that evaluation is conducted to ensure that the as-left        the as-left condition of backfill in the vicinity of condition of backfill in the vicinity of the observed     observed damage will not lead to further damage will not lead to further degradation.              degradation.
The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. Enclosure 2 provides the line-in/line-out revision to LRA Appendix A 1.18 and Appendix 82.1.18. Enclosure 3 provides the line-in/line-out revision to LRA Table A4-1.
Corrective Actions (Element 7 b.) added;                  The AMP is revised to state if coated or uncoated metallic piping show evidence of If coated or uncoated metallic piping or tanks show      corrosion, the remaining wall thickness in the evidence of corrosion, the remaining wall thickness      affected area is determined to ensure that the in the affected area is determined to ensure that        minimum wall thickness is maintained.
NOC-AE-16003380 Enclosure 2 STPNOC LRA Changes with Line-in/Line-out Annotations Affected LRA Section Table 3.3.2-19 Appendix A 1.18 Appendix 82.1.18 NOC-AE-16003380 Enclosure 2 Page 1 of 15 Table 3.3.2-19 ement Evaluation  
the minimum wall thickness is maintained.
-Chemical and Volume Control S stem  
Corrective Actions (Element 7 c.) added;                  The AMP is revised to state where the coatings, backfill, or the condition of exposed Where the coatings, backfill, or the condition of        piping does not meet acceptance criteria, the exposed piping does not meet acceptance criteria,         degraded condition is repaired or the affected the degraded condition is repaired or the affected       component is replaced. The number of component is replaced. In addition, an expansion          inspections within the affected piping of sample size is conducted. The number of                categories is doubled or increased by 5, inspections within the affected piping categories        whichever is smaller.
*..
are doubled or increased by 5, whichever is smaller Enclosure 2 provides the line-in/line-out revision to LRA Appendix A 1.18 and Appendix 82.1.18.
* "';A.,** Insulation INS Aluminum Plant Indoor Air Ext None None V.F-2 3.2.1.50 C Insulation INS Insulation INS Insulation Plant Indoor Calcium Silicate Air (Ext) Insulation Fiberglass Plant Indoor Air (Ext) Reduced thermal External Surfaces insulation Monitoring Program resistance due to (B2.1.20) moisture intrusion Nooe Nooe Reduced thermal External Surfaces insulation Monitoring Program resistance due to (B2.1.20) moisture intrusion Orifice PB, TH Stainless Steel Borated Water None None Leakage Ext Notes for Table 3.3.2-19:
Enclosure 3 provides the line-in/line-out revision to LRA Table A4-1.
Standard Notes: None None H,5 None None H,5 VI 1.J-16 3.3.1 .99 A A Consistent with NUREG-1801 item for component, material, environment, and aging effect. AMP is consistent with NUREG-1801 AMP. B Consistent with NUREG-1801 item for component, material, environment, and aging effect. AMP takes some exceptions to NUREG-1801 AMP. C Component is different, but consistent with NUREG-1801 item for material, environment, and aging effect. AMP is consistent with NUREG-1801 AMP. D Component is different, but consistent with NUREG-1801 item for material, environment, and aging effect. AMP takes some exceptions to NUREG-1801 AMP. E Consistent with NUREG-1801 for material, environment, and aging effect, but a different aging management program is credited or NUREG-1801 identifies a plant-specific aging management program. F Material not in NUREG-1801 for this component.
 
G Environment not in NUREG-1801 for this component and material.
NOC-AE-16003380 Enclosure 2 STPNOC LRA Changes with Line-in/Line-out Annotations Affected LRA Section Table 3.3.2-19 Appendix A 1.18 Appendix 82.1.18
H. Aging effect not in NUREG-1801 for this component, material, and environment combination.
 
J Neither the component nor the material and environment combination is evaluated.in NUREG-1801.
NOC-AE-16003380 Enclosure 2 Page 1 of 15 Table 3.3.2-19                                                                           ement Evaluation - Chemical and Volume Control S stem
Plant Specific Notes: NOC-AE-16003380 Enclosure 2 Page 2of15 1 NUREG-1801 does not address the aging effect of nickel-alloys in borated water leakage. Nickel-alloys subject to an air with borated water leakage environment are similar to stainless steel in a borated water leakage environment and do not experience aging effects due to borated water leakage. 2 The Water Chemistry program (82.1.2) and the One-Time Inspection program (82.1.16) manage loss of material due to pitting and crevice corrosion and cracking due to stress corrosion cracking.
::~~~.t?:~~~n,t}~f~:~~1 ~~~~*~g~~:
The One-Time Inspection program (82.1.16) includes selected components at susceptible locations.
~;;:!+~~~~:.{S:;/itl *.. c/,,'~,v>vv    * "';A.,**
3 Non-inhibited copper alloy> 15% zinc SSCs with surfaces exposed to ventilation atmosphere (internal) or plant indoor air (internal) are subject to wetting due to condensation and thus are subject to loss of material due to selective leaching.
Insulation                         INS           Aluminum         Plant Indoor None             None               V.F-2     3.2.1.50     C Air Ext Insulation                         INS           Insulation       Plant Indoor Reduced thermal  External Surfaces  None      None        H,5 Calcium Silicate Air (Ext)     insulation       Monitoring Program resistance due to (B2.1.20) moisture intrusion Insulation                          INS            Insulation      Plant Indoor  Nooe              Nooe                None      None        H,5 Fiberglass      Air (Ext)    Reduced thermal   External Surfaces insulation       Monitoring Program resistance due to (B2.1.20) moisture intrusion Orifice                             PB, TH         Stainless Steel Borated Water None             None               VI 1.J-16 3.3.1 .99    A Leakage Ext Notes for Table 3.3.2-19:
4 The reduction of heat transfer aging effect is not identified in NUREG-1801 for this component, material, and environment combination.
Standard Notes:
Reduction of heat transfer is not expected in heat exchangers with reactor coolant or treated borated water environments as long as water chemistry is maintained.
A            Consistent with NUREG-1801 item for component, material, environment, and aging effect. AMP is consistent with NUREG-1801 AMP.
Reduction of heat transfer is managed with Water Chemistry (82.1.2) and One Time Inspection (82.1.16).
B           Consistent with NUREG-1801 item for component, material, environment, and aging effect. AMP takes some exceptions to NUREG-1801 AMP.
5 The aging effect of reduced thermal insulation resistance due to moisture intrusion is managed by AMP 82.1.20, External Surfaces Monitoring Program. Reference LR-ISG-2012-02 Appendix C Item Vlll.l.S-403.
C           Component is different, but consistent with NUREG-1801 item for material, environment, and aging effect. AMP is consistent with NUREG-1801 AMP.
6 The External Surfaces Monitoring program (82.1.20) is used to monitor insulated stainless steel components exposed to plant indoor air for loss of material.
D           Component is different, but consistent with NUREG-1801 item for material, environment, and aging effect. AMP takes some exceptions to NUREG-1801 AMP.
Reference LR-ISG-2012-02 Appendix C Line Vll.A2.A-405 A1.18 Buried Piping and Tanks Inspection NOC-AE-16003380 Enclosure 2 Page 3of15 The Buried Piping and Tanks Inspection program manages the loss of material on external surfaces of buried and underground components.
E           Consistent with NUREG-1801 for material, environment, and aging effect, but a different aging management program is credited or NUREG-1801 identifies a plant-specific aging management program.
Preventive and mitigative measures, including verification of coatings quality, backfill requirements, and cathodic protection, are employed to manage aging of buried components.
F           Material not in NUREG-1801 for this component.
Underground components are protectively coated where required.
G           Environment not in NUREG-1801 for this component and material.
The cathodic protection system is operated consistent with the guidance of NACE SP0169-2007 for piping and is monitored to ensure that protection is being provided.
H.           Aging effect not in NUREG-1801 for this component, material, and environment combination.
The cathodic protection system is operational (available) at least 85 percent of the time and provides effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment.
J           Neither the component nor the material and environment combination is evaluated.in NUREG-1801.
whichever is shorter. An annual cathodic protection survey is performed consistent with NACE SP0169-2007.
 
If the cathodic protection system fails to meet the acceptance criteria of -850 mV relative to copper/copper sulfate reference electrode (CSE) instant off for steel components alternatives of-750 mVor-650 mV may be used, means to verify the effectiveness of the protection are used, loss of material rates are measured and soil testing will be conducted at a minimum of once in each 10-year period starting 10 years prior to the period of extended operation.
NOC-AE-16003380 Enclosure 2 Page 2of15 Plant Specific Notes:
The acceptance criterion for copper components is 100 mV minimum polarization.
1       NUREG-1801 does not address the aging effect of nickel-alloys in borated water leakage. Nickel-alloys subject to an air with borated water leakage environment are similar to stainless steel in a borated water leakage environment and do not experience aging effects due to borated water leakage.
2       The Water Chemistry program (82.1.2) and the One-Time Inspection program (82.1.16) manage loss of material due to pitting and crevice corrosion and cracking due to stress corrosion cracking. The One-Time Inspection program (82.1.16) includes selected components at susceptible locations.
3       Non-inhibited copper alloy> 15% zinc SSCs with surfaces exposed to ventilation atmosphere (internal) or plant indoor air (internal) are subject to wetting due to condensation and thus are subject to loss of material due to selective leaching.
4       The reduction of heat transfer aging effect is not identified in NUREG-1801 for this component, material, and environment combination.
Reduction of heat transfer is not expected in heat exchangers with reactor coolant or treated borated water environments as long as water chemistry is maintained. Reduction of heat transfer is managed with Water Chemistry (82.1.2) and One Time Inspection (82.1.16).
5       The aging effect of reduced thermal insulation resistance due to moisture intrusion is managed by AMP 82.1.20, External Surfaces Monitoring Program. Reference LR-ISG-2012-02 Appendix C Item Vlll.l.S-403.
6       The External Surfaces Monitoring program (82.1.20) is used to monitor insulated stainless steel components exposed to plant indoor air for loss of material. Reference LR-ISG-2012-02 Appendix C Line Vll.A2.A-405
 
NOC-AE-16003380 Enclosure 2 Page 3of15 A1.18           Buried Piping and Tanks Inspection The Buried Piping and Tanks Inspection program manages the loss of material on external surfaces of buried and underground components. Preventive and mitigative measures, including verification of coatings quality, backfill requirements, and cathodic protection, are employed to manage aging of buried components. Underground components are protectively coated where required.
The cathodic protection system is operated consistent with the guidance of NACE SP0169-2007 for piping and is monitored to ensure that protection is being provided. The cathodic protection system is operational (available) at least 85 percent of the time and provides effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment. whichever is shorter. An annual cathodic protection survey is performed consistent with NACE SP0169-2007. If the cathodic protection system fails to meet the acceptance criteria of -850 mV relative to copper/copper sulfate reference electrode (CSE) instant off for steel components alternatives of-750 mVor-650 mV may be used, means to verify the effectiveness of the protection are used, loss of material rates are measured and soil testing will be conducted at a minimum of once in each 10-year period starting 10 years prior to the period of extended operation. The acceptance criterion for copper components is 100 mV minimum polarization.
Opportunistic and directed visual inspections will monitor the condition of external surfaces, protective coatings and wrappings found on steel, stainless steel and copper alloy components.
Opportunistic and directed visual inspections will monitor the condition of external surfaces, protective coatings and wrappings found on steel, stainless steel and copper alloy components.
Any evidence of damaged wrapping or coating defects will be an indicator of possible corrosion damage to the external surface of the components.
Any evidence of damaged wrapping or coating defects will be an indicator of possible corrosion damage to the external surface of the components. Inspections are conducted by qualified individuals.
Inspections are conducted by qualified individuals.
Where coatings, backfill, or the condition of exposed piping that does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced. In addition, an expansion of sample size is conducted.
Where coatings, backfill, or the condition of exposed piping that does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced.
Hydrostatic tests of 25 percent of the subject piping will be performed on an interval not to exceed 5 years, or an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness every 10 years may be perf0rmed as an alternate to directed inspections. Flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition is credited in lieu of visual inspections.
In addition, an expansion of sample size is conducted.
 
Hydrostatic tests of 25 percent of the subject piping will be performed on an interval not to exceed 5 years, or an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness every 10 years may be perf0rmed as an alternate to directed inspections.
NOC-AE-16003380 Enclosure 2 Page 4 of 15 82.1.18               Buried Piping and Tanks Inspection Program Description The Buried Piping and Tanks Inspection program manages the loss of material on external surfaces of buried and underground components.
Flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition is credited in lieu of visual inspections.
_The Buried Piping and Tanks Inspection program includes inspections or flow testing of buried steel, stainless steel, copper alloy piping, underground steel, stainless steel piping within the Auxiliary Feedwater System, the Lighting Diesel Generator System, the Essential Cooling Water (ECW) and ECW Screen Wash System, the Fire Protection System, and the Oily Waste System (OW).
82.1.18 Buried Piping and Tanks Inspection Program Description NOC-AE-16003380 Enclosure 2 Page 4 of 15 The Buried Piping and Tanks Inspection program manages the loss of material on external surfaces of buried and underground components.
Preventive and mitigative actions are taken to ensure the piping is coated, backfilled and cathodically protected. The buried steel and copper alloy piping managed by this program is cathodically protected. The cathodic protection system is designed in accordance with NACE RP-01-69 1972. The performance of the cathodic protection system is consistent with the guidelines of NACE SP0169-2007. An annual survey ensures that the pipe-to-soil potential is acceptable. If the cathodic protection system fails to meet the acceptance criteria of at least -850 mV relative to a CSE instant off for steel components the following alternatives may be used.
_The Buried Piping and Tanks Inspection program includes inspections or flow testing of buried steel, stainless steel, copper alloy piping, underground steel, stainless steel piping within the Auxiliary Feedwater System, the Lighting Diesel Generator System, the Essential Cooling Water (ECW) and ECW Screen Wash System, the Fire Protection System, and the Oily Waste System (OW). Preventive and mitigative actions are taken to ensure the piping is coated, backfilled and cathodically protected.
* 100 mV minimum polarization
The buried steel and copper alloy piping managed by this program is cathodically protected.
    *   -750 mV relative to a CSE, instant off where soil resistivity is greater than 10,000 ohm-cm to less than 100,000 ohm-cm
The cathodic protection system is designed in accordance with NACE RP-01-69 1972. The performance of the cathodic protection system is consistent with the guidelines of NACE SP0169-2007.
    *   -650 mV relative to a CSE. instant off where soil resistivity is greater than 100,000 ohm-cm
An annual survey ensures that the pipe-to-soil potential is acceptable.
If the cathodic protection system fails to meet the acceptance criteria of at least -850 mV relative to a CSE instant off for steel components the following alternatives may be used.
* 100 mV minimum polarization  
* -750 mV relative to a CSE, instant off where soil resistivity is greater than 10,000 cm to less than 100,000 ohm-cm * -650 mV relative to a CSE. instant off where soil resistivity is greater than 100,000 cm
* Verify less than 1 mil/year (mpy) loss of material.
* Verify less than 1 mil/year (mpy) loss of material.
Means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:
Means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:
* Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate.
* Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate.
* Every 2 years when using the 100 mV minimum polarization.
* Every 2 years when using the 100 mV minimum polarization.
* Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years. When electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist.
* Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years.
Additionally, the impact of significant site features (e.g., large cathodic protection current collectors.
When electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist. Additionally, the impact of significant site features (e.g., large cathodic protection current collectors. shielding due to large objects located in the vicinity of the protected piping) and local soil conditions will be factored into placement of the probes and use of probe data.
shielding due to large objects located in the vicinity of the protected piping) and local soil conditions will be factored into placement of the probes and use of probe data. Cathodic protection is operational (available) at least 85 percent of the time from either 10 years prior to the period of extended operation or from installation or refurbishment, whichever is shorter. Cathodic protection is effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
Cathodic protection is operational (available) at least 85 percent of the time from either 10 years prior to the period of extended operation or from installation or refurbishment, whichever is shorter. Cathodic protection is effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
 
NOC-AE-16003380 Enclosure 2 Page 5of15 Opportunistic and directed visual inspections monitor the condition of the external surfaces, backfill, protective coatings and wrappings of steel, and copper alloy buried components.
NOC-AE-16003380 Enclosure 2 Page 5of15 Opportunistic and directed visual inspections monitor the condition of the external surfaces, backfill, protective coatings and wrappings of steel, and copper alloy buried components.
Inspection locations are selected based on susceptibility to degradation and consequences of failure. A minimum of 10 feet of pipe of each material type is inspected.
Inspection locations are selected based on susceptibility to degradation and consequences of failure. A minimum of 10 feet of pipe of each material type is inspected. The inspections consist of a 100 percent visual inspection of the exposed pipe. Inspections are conducted by qualified individuals.
The inspections consist of a 100 percent visual inspection of the exposed pipe. Inspections are conducted by qualified individuals.
Inspection of piping shared between STP Units 1 and 2 may be credited towards the required inspections. Inspection quantities are increased by 50 percent as STP has two units and inspections are distributed evenly among the units.
Inspection of piping shared between STP Units 1 and 2 may be credited towards the required inspections.
Category C inspections are used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria. Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period.
Inspection quantities are increased by 50 percent as STP has two units and inspections are distributed evenly among the units. Category C inspections are used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria.
Category E inspections are used when the cathodic protection system has been installed but portions of the piping covered by that system fail to meet the acceptance criteria. Category E inspections are 5 percent, NTE 4-:t-.Q inspections, in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. Where Category E inspections are used, STP will demonstrate that soil is not corrosive using the following""~
Category C inspections are 0.5 percent to-Exceed (NTE) two inspections of that piping per inspection period. Category E inspections are used when the cathodic protection system has been installed but portions of the piping covered by that system fail to meet the acceptance criteria.
Category E inspections are 5 percent, NTE 4-:t-.Q inspections, in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. Where Category E inspections are used, STP will demonstrate that soil is not corrosive using the
* A minimum of three sets of soil samples will be obtained in the vicinity where the cathodic protection system fails to meet the acceptance criteria.
* A minimum of three sets of soil samples will be obtained in the vicinity where the cathodic protection system fails to meet the acceptance criteria.
* The soil will be tested for soil resistivity, corrosion accelerating bacteria, pH, moisture, chlorides, sulfates, and redox potential.
* The soil will be tested for soil resistivity, corrosion accelerating bacteria, pH, moisture, chlorides, sulfates, and redox potential.
* The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
* The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
* If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10-year period starting at the time when it was determined that the cathodic protection system failed to meet the acceptance.
* If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10-year period starting at the time when it was determined that the cathodic protection system failed to meet the acceptance.
The Auxiliary Feedwater system has stainless steel pipe underground in a vault outside of the Auxiliary Feedwater Storage tank. This stainless steel pipe will undergo two-directed visual inspections each 10-year inspection period. The OW system has steel pipe underground in sumps located in the yard. This underground pipe will undergo 2% NTE directed visual inspection each 10-year inspection period. In lieu of visual inspections of the fire protection system, STP credits flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition. Inspections will begin during the 10-year period prior to entering the period of extended operation.
The Auxiliary Feedwater system has stainless steel pipe underground in a vault outside of the Auxiliary Feedwater Storage tank. This stainless steel pipe will undergo two-directed visual inspections each 10-year inspection period.
Upon entering the period of extended operation, inspections will occur every 10 years. Visual inspections of metallic components are supplemented  
The OW system has steel pipe underground in sumps located in the yard. This underground pipe will undergo 2% NTE ~4 directed visual inspection each 10-year inspection period.
\Vith surface or volumetric nondestructive testing (NOT) if significant indications are observed to determine local area *.vall thickness.
In lieu of visual inspections of the fire protection system, STP credits flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition.
If adverse indications are detected, inspection sample sizes within the affected NOC-AE-16003380 Enclosure 2 Page 6of15 piping categories are doubled. If adverse indications are found in the expanded sample, further increases in inspection sample size is based on an analysis of extent of cause and extent of condition.
Inspections will begin during the 10-year period prior to entering the period of extended operation. Upon entering the period of extended operation, inspections will occur every 10 years.
Visual inspections of metallic components are supplemented \Vith surface or volumetric nondestructive testing (NOT) if significant indications are observed to determine local area *.vall thickness. If adverse indications are detected, inspection sample sizes within the affected
 
NOC-AE-16003380 Enclosure 2 Page 6of15 piping categories are doubled. If adverse indications are found in the expanded sample, further increases in inspection sample size is based on an analysis of extent of cause and extent of condition.
Hydrostatic test of 25 percent of the subject piping on an interval is not to exceed 5 years, or internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness every 10 years may be performed as an alternate to directed inspections.
Hydrostatic test of 25 percent of the subject piping on an interval is not to exceed 5 years, or internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness every 10 years may be performed as an alternate to directed inspections.
There are no components fabricated with polymeric, cementitious, or concrete materials within the scope of license renewal that credit this program for aging management.  
There are no components fabricated with polymeric, cementitious, or concrete materials within the scope of license renewal that credit this program for aging management. .,---There are no buried or underground tanks within the scope of license renewal.
.,---There are no buried or underground tanks within the scope of license renewal. Any evidence of aging effects, such as loss of material, or changes in material properties, requires initiation of corrective actions. Visual inspections of metallic components are supplemented with surface or volumetric nondestructive testing (NOT) if significant indications are observed to determine local area wall thickness.
Any evidence of aging effects, such as loss of material, or changes in material properties, requires initiation of corrective actions.
If adverse indications are detected, an expansion of the sample size is conducted.
Visual inspections of metallic components are supplemented with surface or volumetric nondestructive testing (NOT) if significant indications are observed to determine local area wall thickness. If adverse indications are detected, an expansion of the sample size is conducted.
The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. The expanded sample inspection is completed within the 10-year interval in which the original inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval.
The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. The expanded sample inspection is completed within the 10-year interval in which the original inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval.
Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation is conducted to ensure that the left condition of backfill in the vicinity of the observed damage will not lead to further degradation.  
Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation is conducted to ensure that the as-left condition of backfill in the vicinity of the observed damage will not lead to further degradation.                     '
' Where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria.
Where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria. the degraded condition is repaired or the affected component is replaced.
the degraded condition is repaired or the affected component is replaced.
Aging management of the internal surfaces of buried and underground piping is accomplished through the use of the Open-Cycle Cooling Water System program (B2.1.9), Closed-Cycle Cooling Water System program (82.1.10), Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (B2.1.22), Fuel Oil Chemistry program (B2.1.14 ), Fire Water System program (B2.1.13) and Water Chemistry program (82.1.2). Selective leaching of buried or underground components is managed by the Selective Leaching of Materials program (B2.1.17) or the Selective Leaching of Aluminum Bronze program (B2.1.37).
Aging management of the internal surfaces of buried and underground piping is accomplished through the use of the Open-Cycle Cooling Water System program (B2.1.9), Closed-Cycle Cooling Water System program (82.1.10), Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (B2.1.22), Fuel Oil Chemistry program (B2.1.14 ), Fire Water System program (B2.1.13) and Water Chemistry program (82.1.2).
Selective leaching of buried or underground components is managed by the Selective Leaching of Materials program (B2.1.17) or the Selective Leaching of Aluminum Bronze program (B2.1.37).
NUREG-1801 Consistency The Buried Piping and Tanks Inspection program is an existing program that, following enhancement, will be consistent with exception to NUREG-1801, Section Xl.M41, Buried and Underground Piping and Tanks.
NUREG-1801 Consistency The Buried Piping and Tanks Inspection program is an existing program that, following enhancement, will be consistent with exception to NUREG-1801, Section Xl.M41, Buried and Underground Piping and Tanks.
Exceptions to NUREG-1801 Preventive Actions (Element 2) NOC-AE-16003380 Enclosure 2 Page 7of15 Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires the backfill to be consistent with NACE SP0169 Section 5.2.3. NACE SP0169 Section 5.2.3.5 states that pipe should be lowered carefully into the ditch to avoid external coating damage. The original installation specification does not include this practice.
 
However the subgrade of the trench was prepared by removing all debris and unsuitable material, and the subgrade consists of fine clay and sand that makes up the natural soil or backfill.
NOC-AE-16003380 Enclosure 2 Page 7of15 Exceptions to NUREG-1801 Preventive Actions (Element 2)
The backfill used is consistent with the ASTM D 448-08 size 67 standard.
Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires the backfill to be consistent with NACE SP0169 Section 5.2.3. NACE SP0169 Section 5.2.3.5 states that pipe should be lowered carefully into the ditch to avoid external coating damage. The original installation specification does not include this practice. However the subgrade of the trench was prepared by removing all debris and unsuitable material, and the subgrade consists of fine clay and sand that makes up the natural soil or backfill. The backfill used is consistent with the ASTM D 448-08 size 67 standard. The subgrade preparation, and small grain size backfill used in the original installation, which provide soft bedding for piping set into the trench, are not expected to have damaged the coating of the piping. Plant procedures will be enhanced to ensure that the piping is lowered carefully into a trench to avoid damage to the external coatings.
The subgrade preparation, and small grain size backfill used in the original installation, which provide soft bedding for piping set into the trench, are not expected to have damaged the coating of the piping. Plant procedures will be enhanced to ensure that the piping is lowered carefully into a trench to avoid damage to the external coatings.
Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires that backfill be consistent with NACE SP0169 Section 5.2.3. NACE SP0169 Section 5.2.3.6 states that care should be taken during backfilling so that rocks and debris do not strike and damage the pipe coating. The original installation specification for backfilling piping does not include this practice, with the exception of the ECW piping. However a fine grain size backfill was used that met the ASTM D 448-08 size 67 standard. The use of this backfill during backfilling is not expected to damage the pipe coating. Plant procedures will be enhanced so that, during backfill repair or replacement, care is taken to avoid damage to pipe coatings while backfilling the trench.
Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires that backfill be consistent with NACE SP0169 Section 5.2.3. NACE SP0169 Section 5.2.3.6 states that care should be taken during backfilling so that rocks and debris do not strike and damage the pipe coating. The original installation specification for backfilling piping does not include this practice, with the exception of the ECW piping. However a fine grain size backfill was used that met the ASTM D 448-08 size 67 standard.
Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires coating of pipe in accordance with NACE SP0169-2007, Table 1. Table 1 recommends that coal tar coatings are in accordance with AWWA C-203, and that prefabricated films are in accordance with AWWA C-214 or C-209. These standards were not referenced in STP installation specifications.
The use of this backfill during backfilling is not expected to damage the pipe coating. Plant procedures will be enhanced so that, during backfill repair or replacement, care is taken to avoid damage to pipe coatings while backfilling the trench. Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires coating of pipe in accordance with NACE SP0169-2007, Table 1. Table 1 recommends that coal tar coatings are in accordance with AWWA C-203, and that prefabricated films are in accordance with AWWA C-214 or C-209. These standards were not referenced in STP installation specifications.
However, the coatings were applied in accordance with plant-defined specifications. Plant specifications are consistent with the intent of the AWWA coating standards called out in NACE SP 0169-2007. Installation specifications ensure that any defects in the coatings were repaired prior to backfilling over the pipe.
However, the coatings were applied in accordance with plant-defined specifications.
Enhancements Prior to the period of extended operation, the following enhancements will be implemented in the following program elements:
Plant specifications are consistent with the intent of the AWWA coating standards called out in NACE SP 0169-2007.
Preventive Actions (Element 2)
Installation specifications ensure that any defects in the coatings were repaired prior to backfilling over the pipe. Enhancements Prior to the period of extended operation, the following enhancements will be implemented in the following program elements:
Plant specifications will be enhanced to include the following:
Preventive Actions (Element 2) Plant specifications will be enhanced to include the following:
Indicate that pipe should be lowered carefully into the ditch to avoid external coating damage.
Indicate that pipe should be lowered carefully into the ditch to avoid external coating damage. Proper storage and handling must be used to prevent damage to pipe coating prior to installation.
Proper storage and handling must be used to prevent damage to pipe coating prior to installation. These practices include padded storage, use of proper slings for installation and ultraviolet light-resistant topcoats.
These practices include padded storage, use of proper slings for installation and ultraviolet light-resistant topcoats.
Over-excavate trenches and use qualified backfill for bedding piping. Take care during backfilling to prevent rocks and debris from striking and damaging the pipe coating.
Over-excavate trenches and use qualified backfill for bedding piping. Take care during backfilling to prevent rocks and debris from striking and damaging the pipe coating.
NOC-AE-16003380 Enclosure 2 Page 8of15 Include the coating used for copper alloy buried piping in the coating database.
 
The coating system must be in accordance with NACE SP0169-2007, Table 1, and will be used for repair or for new coatings of the buried copper alloy piping in the essential cooling water system. Indicate that the portion of the essential cooling water system copper alloy piping directly embedded in backfill or directly encased in concrete must be coated, extending the coating 2 feet or more above grade. Plant procedures will be enhanced to include the following:
NOC-AE-16003380 Enclosure 2 Page 8of15 Include the coating used for copper alloy buried piping in the coating database. The coating system must be in accordance with NACE SP0169-2007, Table 1, and will be used for repair or for new coatings of the buried copper alloy piping in the essential cooling water system.
In lieu of visual inspections of the fire protection system (FP), this program credits flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition. Backfill that is located within 6 inches of the pipe that is consistent with ASTM D 448-08 size number 67 is considered acceptable.
Indicate that the portion of the essential cooling water system copper alloy piping directly embedded in backfill or directly encased in concrete must be coated, extending the coating 2 feet or more above grade.
Backfill quality is determined through examination during the inspections conducted by this program. Backfill that does not meet the ASTM criteria during the initial and subsequent inspections of this program is considered acceptable if the inspections of buried piping do not reveal evidence of mechanical damage to the pipe coatings due to the backfill.
Plant procedures will be enhanced to include the following:
* The cathodic protection system engineer is responsible for ensuring the cathodic protection system survey is performed annually, and the rectifier current is checked and recorded every 2 months. Monitor cathodic protection system rectifier output every 2 months. The measured current at each rectifier is recorded and compared against a target value. Following completion of the plant yard cathodic protection system annual survey, record the current of the rectifier used to achieve an acceptable pipe/soil potential.
In lieu of visual inspections of the fire protection system (FP), this program credits flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition.
That current will be the target current for the rectifier.
Backfill that is located within 6 inches of the pipe that is consistent with ASTM D 448-08 size number 67 is considered acceptable. Backfill quality is determined through examination during the inspections conducted by this program. Backfill that does not meet the ASTM criteria during the initial and subsequent inspections of this program is considered acceptable if the inspections of buried piping do not reveal evidence of mechanical damage to the pipe coatings due to the backfill.
If the current measured at the rectifier during th(3 bimonthly monitoring deviates significantly from the target value, a condition report should be created. The rectifier current should be adjusted to an acceptable value. The results of the survey will be documented and trended to identify degrading conditions.
* The cathodic protection system engineer is responsible for ensuring the cathodic protection system survey is performed annually, and the rectifier current is checked and recorded every 2 months.
When degraded rectifier performance is identified, corrective actions are required to be initiated.
Monitor cathodic protection system rectifier output every 2 months. The measured current at each rectifier is recorded and compared against a target value. Following completion of the plant yard cathodic protection system annual survey, record the current of the rectifier used to achieve an acceptable pipe/soil potential. That current will be the target current for the rectifier. If the current measured at the rectifier during th(3 bimonthly monitoring deviates significantly from the target value, a condition report should be created. The rectifier current should be adjusted to an acceptable value. The results of the survey will be documented and trended to identify degrading conditions.
The system should not be operated outside of established acceptable limits for longer than 90 days. During the plant yard cathodic protection system annual survey, evaluate the effectiveness of isolating fittings, continuity bonds and casing isolation.
When degraded rectifier performance is identified, corrective actions are required to be initiated. The system should not be operated outside of established acceptable limits for longer than 90 days.
This may be accomplished through electrical measurements (NACE SP016-2007, Section 10.4.4). The personnel performing the plant yard cathodic protection system annual survey must be NACE-certified, certified by a site-approved training procedure consistent with the NACE requirements, or supervised by a NACE-certified inspector.
During the plant yard cathodic protection system annual survey, evaluate the effectiveness of isolating fittings, continuity bonds and casing isolation. This may be accomplished through electrical measurements (NACE SP016-2007, Section 10.4.4).
The personnel performing the plant yard cathodic protection system annual survey must be NACE-certified, certified by a site-approved training procedure consistent with the NACE requirements, or supervised by a NACE-certified inspector.
Use of excessive cathodic protection polarized potential on coated piping should be avoided. The limiting critical potential should not be more negative than 1200 mV relative to a CSE.
Use of excessive cathodic protection polarized potential on coated piping should be avoided. The limiting critical potential should not be more negative than 1200 mV relative to a CSE.
NOC-AE-16003380 Enclosure 2 Page 9of15 Parameters Monitored/Inspected (Element 3) and Detection of Aging Effects (Element 4)
NOC-AE-16003380 Enclosure 2 Page 9of15 Parameters Monitored/Inspected (Element 3) and Detection of Aging Effects (Element 4)
* Plant procedures will be enhanced to indicate that piping in this program is inspected using visual inspections and, if significant indications of degradation are observed, the visual inspections are supplemented by surface and/or volumetric non-destructive testing. Detection of Aging Effects (Element 4) Plant procedures will be enhanced to include the following:
* Plant procedures will be enhanced to indicate that piping in this program is inspected using visual inspections and, if significant indications of degradation are observed, the visual inspections are supplemented by surface and/or volumetric non-destructive testing.
Detection of Aging Effects (Element 4)
Plant procedures will be enhanced to include the following:
The inspections of this program are conducted every 10 years, beginning in the 10 year interval prior to the beginning of the period of extended operation.
The inspections of this program are conducted every 10 years, beginning in the 10 year interval prior to the beginning of the period of extended operation.
Buried and underground piping inspection locations are to be selected based on risk, considering susceptibility to degradation and consequences of failure. The risk ranking for buried piping should consider characteristics such as coating type, coating condition, cathodic protection efficiency, backfill charaderistics, soil resistivity, pipe contents, and pipe function.
Buried and underground piping inspection locations are to be selected based on risk, considering susceptibility to degradation and consequences of failure.
The risk ranking for underground piping should consider characteristics such as coating type, coating condition, exact external environment, pipe contents, pipe function, and flow characteristics within the pipe. The risk ranking should generally give piping systems that are backfilled using compacted aggregate a higher inspection priority than comparable systems that are completely backfilled using controlled low strength material.
The risk ranking for buried piping should consider characteristics such as coating type, coating condition, cathodic protection efficiency, backfill charaderistics, soil resistivity, pipe contents, and pipe function.
* External Corrosion Direct Assessment, as described in NACE Standard Practice SP0502-2010, is recommended for use in identifying inspection locations.
The risk ranking for underground piping should consider characteristics such as coating type, coating condition, exact external environment, pipe contents, pipe function, and flow characteristics within the pipe.
It has been demonstrated to be an effective method for identification of pipe locations that merit further inspection.
The risk ranking should generally give piping systems that are backfilled using compacted aggregate a higher inspection priority than comparable systems that are completely backfilled using controlled low strength material.
* External Corrosion Direct Assessment, as described in NACE Standard Practice SP0502-2010, is recommended for use in identifying inspection locations. It has been demonstrated to be an effective method for identification of pipe locations that merit further inspection.
Opportunistic examinations of non-leaking pipes may be credited toward the required examinations, if they meet the risk-ranking selection criteria.
Opportunistic examinations of non-leaking pipes may be credited toward the required examinations, if they meet the risk-ranking selection criteria.
Guided wave ultrasonic techniques or other advanced inspection techniques should be used, if practical, for determining piping locations that should be inspected.
Guided wave ultrasonic techniques or other advanced inspection techniques should be used, if practical, for determining piping locations that should be inspected. However, these inspections may not be used as substitutes for inspections required by this program.
However, these inspections may not be used as substitutes for inspections required by this program. An inspection of piping shared between Units 1 and 2 may be credited toward the required inspections.
An inspection of piping shared between Units 1 and 2 may be credited toward the required inspections. Inspection quantities are increased by 50 percent as STP has two units and inspections are distributed evenly among the units.
Inspection quantities are increased by 50 percent as STP has two units and inspections are distributed evenly among the units. Any piping, valves, or closure bolting exposed during inspections should be examined.
Any piping, valves, or closure bolting exposed during inspections should be examined.
Examine bolting for loss of material and loose or missing fasteners.
Examine bolting for loss of material and loose or missing fasteners.
There are two alternatives to directed inspections of the buried or underground piping that is within the scope of license renewal. The first alternative is a hydrostatic test of 25 percent of the subject piping to 110 percent of the design pressure of any component NOC-AE-16003380 . Enclosure 2 Page 10 of 15 within the boundary with test pressure being held for eight hours on an interval not to exceed 5 years. The second is an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness.
There are two alternatives to directed inspections of the buried or underground piping that is within the scope of license renewal. The first alternative is a hydrostatic test of 25 percent of the subject piping to 110 percent of the design pressure of any component
The inspection must also include methods capable of detecting both general and pitting corrosion, and must be qualified by the plant, and approved by the NRC. UT examinations can be considered approved by the NRC. Guided wave inspection does not currently satisfy these inspection technique requirements.
 
Internal inspections are to be conducted every 10 years beginning 10 years prior to the period of extended operation.
NOC-AE-16003380 .
Enclosure 2 Page 10 of 15 within the boundary with test pressure being held for eight hours on an interval not to exceed 5 years. The second is an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness. The inspection must also include methods capable of detecting both general and pitting corrosion, and must be qualified by the plant, and approved by the NRC. UT examinations can be considered approved by the NRC. Guided wave inspection does not currently satisfy these inspection technique requirements. Internal inspections are to be conducted every 10 years beginning 10 years prior to the period of extended operation.
In lieu of visual inspection of the fire protection system, this program relies on flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition to detect degradation of the buried pipe.
In lieu of visual inspection of the fire protection system, this program relies on flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition to detect degradation of the buried pipe.
* Each inspection will examine either the entire length of a run of pipe, or a minimum of 1 O feet. If the entire run of pipe of that material type is less than 10 feet in total length, then the entire run of pipe should be inspected.
* Each inspection will examine either the entire length of a run of pipe, or a minimum of 1O feet. If the entire run of pipe of that material type is less than 10 feet in total length, then the entire run of pipe should be inspected. The inspection consists of a 100 percent visual inspection of the exposed pipe.
The inspection consists of a 100 percent visual inspection of the exposed pipe. If a transition from Category C to Category E or from Category E to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function.
If a transition from Category C to Category E or from Category E to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function. In all cases, the examinations are completed within 4 years after the end of the particular 10-year interval. These additional inspections conducted in an inspection interval cannot be credited towards the base number of inspections required for the 10-year interval.
In all cases, the examinations are completed within 4 years after the end of the particular 10-year interval.
Where steel or copper alloy piping has been coated with the same coating system and the backfill has the same requirements. the total inspections for this piping may be combined to satisfy the recommended inspection quantity. For example, for Category F, 10 percent of the total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.
These additional inspections conducted in an inspection interval cannot be credited towards the base number of inspections required for the 10-year interval.
* Category C inspections are used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria. Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period are performed.
Where steel or copper alloy piping has been coated with the same coating system and the backfill has the same requirements.
the total inspections for this piping may be combined to satisfy the recommended inspection quantity.
For example, for Category F, 10 percent of the total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.
* Category C inspections are used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria.
Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period are performed.
* Category E inspections are used when the cathodic protection system has been installed but the portions of the piping covered by that system fail to meet the acceptance criteria.
* Category E inspections are used when the cathodic protection system has been installed but the portions of the piping covered by that system fail to meet the acceptance criteria.
Category E inspections are 5 percent, NTE in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. The following condition must be present. a) Coatings and backfill are provided in accordance with STP backfill specification.
Category E inspections are 5 percent, NTE ~&sect;.inspections. in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. The following condition must be present.
b) There have been no leaks in buried piping due to external corrosion and no significant coating degradation or metal loss in more than 10 percent of inspections conducted.
a)   Coatings and backfill are provided in accordance with STP backfill specification.
c) Soil has been demonstrated to be not corrosive for the material type.
b)   There have been no leaks in buried piping due to external corrosion and no significant coating degradation or metal loss in more than 10 percent of inspections conducted.
c)   Soil has been demonstrated to be not corrosive for the material type.
 
NOC-AE-16003380 Enclosure 2 Page 11 of 15 Where Category E inspections are used, STP will demonstrate that soil is not corrosive using the following.
NOC-AE-16003380 Enclosure 2 Page 11 of 15 Where Category E inspections are used, STP will demonstrate that soil is not corrosive using the following.
o A minimum of three sets of soil samples will be obtained in the vicinity where the cathodic protection system fails to meet the acceptance criteria.
o A minimum of three sets of soil samples will be obtained in the vicinity where the cathodic protection system fails to meet the acceptance criteria.
Line 231: Line 262:
o The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
o The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
o If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10-year period starting at the time when it was determined that the cathodic protection system failed to meet the acceptance.
o If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10-year period starting at the time when it was determined that the cathodic protection system failed to meet the acceptance.
The inspection scope for piping that does not meet Category C or E inspection schedule requirements is 10 percent, NTE in years 30 to 40; 12 percent, NTE 30 inspections, in years 40 to 50; and 15 percent, NTE 38 inspections, in years 50 to 60.
The inspection scope for piping that does not meet Category C or E inspection schedule requirements is 10 percent, NTE ~Q_inspections, in years 30 to 40; 12 percent, NTE 30 inspections, in years 40 to 50; and 15 percent, NTE 38 inspections, in years 50 to 60.
* The AF system underground stainless steel piping located in a vault will undergo_two inspections each 10-year inspection period. The OW system underground piping will undergo 2% NTE inspection each 10-year inspection period. Cathodic protection shall be operational (available) at least 85 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter. Cathodic protection shall provide effective protection for buried piping at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter. As found results of annual surveys are to be used to demonstrate locations within the plant's population of buried pipe where cathodic protection acceptance criteria have, or have not, been met. Indicate that adverse indications discovered during the monitoring of the cathodic protection system may warrant increased monitoring of the cathodic protection system and/or additional inspections.
* The AF system underground stainless steel piping located in a vault will undergo_two inspections each 10-year inspection period.
Include examples of adverse indications discovered during piping inspections including leaks, material thickness less than minimum, and general or local degradation of coatings that exposes the base material.
The OW system underground piping will undergo 2% NTE ~4 inspection each 10-year inspection period.
The presence of coarse backfill within 6 inches of a coated pipe or tank, with accompanying coating degradation, is considered an adverse condition.
Cathodic protection shall be operational (available) at least 85 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
Cathodic protection shall provide effective protection for buried piping at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
As found results of annual surveys are to be used to demonstrate locations within the plant's population of buried pipe where cathodic protection acceptance criteria have, or have not, been met.
Indicate that adverse indications discovered during the monitoring of the cathodic protection system may warrant increased monitoring of the cathodic protection system and/or additional inspections.
Include examples of adverse indications discovered during piping inspections including leaks, material thickness less than minimum, and general or local degradation of coatings that exposes the base material. The presence of coarse backfill within 6 inches of a coated pipe or tank, with accompanying coating degradation, is considered an adverse condition.
Adverse indications that fail to meet the acceptance criteria described in this program require corrective actions for the repair or replacement of the affected component.
Adverse indications that fail to meet the acceptance criteria described in this program require corrective actions for the repair or replacement of the affected component.
If adverse indications are detected, an expansion of the sample size is conducted.
If adverse indications are detected, an expansion of the sample size is conducted. The number of inspections within the affected piping categories is doubled or increased by 5,
The number of inspections within the affected piping categories is doubled or increased by 5, NOC-AE-16003380 Enclosure 2 Page 12of15 whichever is smaller. inspection sample sizes within the affected piping categories are doubled. If adverse indications are found in the expanded sample, an analysis is conducted to determine the extent of condition and extent of cause. The size of the follow-on inspections will be determined based on the extent of condition and extent of cause. The timing of the additional examinations should be based on the severity of the degradation identified and should be commensurate with the consequences of a leak or loss of function:.,-btit However, in all cases, the expanded sample inspections should be completed within the 10-year interval in which the original adverse condition was identified inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval.
 
Expansion of the sample size may be limited by the extent of piping subject to the observed degradation mechanism.
NOC-AE-16003380 Enclosure 2 Page 12of15 whichever is smaller. inspection sample sizes within the affected piping categories are doubled. If adverse indications are found in the expanded sample, an analysis is conducted to determine the extent of condition and extent of cause. The size of the follow-on inspections will be determined based on the extent of condition and extent of cause. The timing of the additional examinations should be based on the severity of the degradation identified and should be commensurate with the consequences of a leak or loss of function:.,-btit However, in all cases, the expanded sample inspections should be completed within the 10-year interval in which the original adverse condition was identified inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. Expansion of the sample size may be limited by the extent of piping subject to the observed degradation mechanism. If adverse conditions are extensive within the 10-year interval in which the inspections were conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval, inspections may be halted in an area of concern that is planned for replacement, provided continued operation does not pose a significant hazard.
If adverse conditions are extensive within the 10-year interval in which the inspections were conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval, inspections may be halted in an area of concern that is planned for replacement, provided continued operation does not pose a significant hazard. During the inspection of buried piping, observe for brittle failure at flanges, connections, and joints due to frost heaving, soil stresses, or ground water effects. Monitoring and Trending (Element 5) Plant procedures will be enhanced to include the following Direct the cathodic protection system engineer to trend results of the plant yard Gathodic protection system annual surveys, so that changes in the effectiveness of the cathodic protection system and coating of buried piping can be verified.
During the inspection of buried piping, observe for brittle failure at flanges, connections, and joints due to frost heaving, soil stresses, or ground water effects.
Monitoring and Trending (Element 5)
Plant procedures will be enhanced to include the following Direct the cathodic protection system engineer to trend results of the plant yard Gathodic protection system annual surveys, so that changes in the effectiveness of the cathodic protection system and coating of buried piping can be verified.
* Where wall thickness measurements are conducted, the results should be trended if follow-up examinations are conducted.
* Where wall thickness measurements are conducted, the results should be trended if follow-up examinations are conducted.
Acceptance Criteria (Element 6) Plant procedures will be enhanced to include the following:
Acceptance Criteria (Element 6)
* The cathodic protection system pipe-to-soil potential when using a saturated copper/copper sulfate reference electrode must be beP.veen at least -850 mV instant off and 1200 mV for steel piping. 100 mV minimum polarization is required for copper alloy .Pfillog.
Plant procedures will be enhanced to include the following:
The cathodic protection system is operational (available) at least 85 percent of the time and provides effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter. If the cathodic protection system fails to meet the acceptance criteria of at least -850 mV relative to a CSE instant off for steel components the following alternatives may be used.
* The cathodic protection system pipe-to-soil potential when using a saturated copper/copper sulfate reference electrode must be beP.veen at least -850 mV instant off and 1200 mV for steel piping. 100 mV minimum polarization is required for copper alloy
* 100 mV minimum polarization  
      .Pfillog. The cathodic protection system is operational (available) at least 85 percent of the time and provides effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
* -750 mV relative to a CSE, instant off where soil resistivity is greater than 10,000 ohm-cm to less than 100,000 ohm-cm * -650 mV relative to a CSE, instant off where soil resistivity is greater than 100,000 ohm-cm
If the cathodic protection system fails to meet the acceptance criteria of at least -850 mV relative to a CSE instant off for steel components the following alternatives may be used.
* 100 mV minimum polarization
            * -750 mV relative to a CSE, instant off where soil resistivity is greater than 10,000 ohm-cm to less than 100,000 ohm-cm
            * -650 mV relative to a CSE, instant off where soil resistivity is greater than 100,000 ohm-cm
* Verify less than 1 mpy loss of material.
* Verify less than 1 mpy loss of material.
NOC-AE-16003380 Enclosure 2 Page 13of15 Means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:
NOC-AE-16003380 Enclosure 2 Page 13of15 Means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:
* Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate.
* Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate.
* Every 2 years when using the 100 mV minimum polarization.
* Every 2 years when using the 100 mV minimum polarization.
* Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years. When electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist.
* Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years.
When electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist.
The impact of significant site features (e.g., large cathodic protection current collectors.
The impact of significant site features (e.g., large cathodic protection current collectors.
shielding due to large objects located in the vicinity of the protected piping) and local soil conditions will be factored into placement of the probes and use of probe data.
shielding due to large objects located in the vicinity of the protected piping) and local soil conditions will be factored into placement of the probes and use of probe data.
* For coated piping, there should be no evidence of coating degradation.
* For coated piping, there should be no evidence of coating degradation. If coating degradation is present, it may be considered acceptable if it is determined to be insignificant by an individual possessing a NACE Coating Inspector Program Level 2 or 3 inspector qualification, or an individual has attended the Electric Power Research Institute (EPRI) Comprehensive Coatings Course and completed the EPRI Buried Pipe Condition Assessment and Repair Training Computer Based Training Course.
If coating degradation is present, it may be considered acceptable if it is determined to be insignificant by an individual possessing a NACE Coating Inspector Program Level 2 or 3 inspector qualification, or an individual has attended the Electric Power Research Institute (EPRI) Comprehensive Coatings Course and completed the EPRI Buried Pipe Condition Assessment and Repair Training Computer Based Training Course. Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
Backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component.
Backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component. Backfill is acceptable if it is consistent with SP0169 2007 Section 5.2.3. Backfill that is located within 6 inches of steel pipe that meets ASTM D 448 08 size number 67 is consistent with the ob:jectives of SP0169 2007.
Backfill is acceptable if it is consistent with SP0169 2007 Section 5.2.3. Backfill that is located within 6 inches of steel pipe that meets ASTM D 448 08 size number 67 is consistent with the ob:jectives of SP0169 2007.
* For any hydrostatic tests credited by this program, the condition acceptance criteria is no visible indications of leakage and no drop in pressure within the isolated portion of the piping that is not accounted for by a temperature change in the test media or quantified leakage across test boundary valves.
* For any hydrostatic tests credited by this program, the condition acceptance criteria is no visible indications of leakage and no drop in pressure within the isolated portion of the piping that is not accounted for by a temperature change in the test media or quantified leakage across test boundary valves. Corrective Actions (Element 7) Plant procedures will be enhanced to include the following:
Corrective Actions (Element 7)
Plant procedures will be enhanced to include the following:
Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
If coated or uncoated metallic piping show evidence of corrosion, the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.
If coated or uncoated metallic piping show evidence of corrosion, the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.
NOC-AE-16003380 Enclosure 2 Page 14of15 If the wall thickness meets minimum wall thickness requirements, recommendations for expansion of sample size do not apply. Where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced.
 
The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. If the acceptance criteria are not met in any of the expanded samples. an analysis is conducted to determine the extent of condition and extent of cause. The number of the follow-on inspections is determined based on the extent of condition and extent of cause.
NOC-AE-16003380 Enclosure 2 Page 14of15 If the wall thickness meets minimum wall thickness requirements, recommendations for expansion of sample size do not apply.
Where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced. The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller.
If the acceptance criteria are not met in any of the expanded samples. an analysis is conducted to determine the extent of condition and extent of cause. The number of the follow-on inspections is determined based on the extent of condition and extent of cause.
* The timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function.
* The timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function.
However, in all cases, the expanded sample inspection is completed within the 10-year interval in which the original inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval.
However, in all cases, the expanded sample inspection is completed within the 10-year interval in which the original inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. The number of inspections may be limited by the extent of piping subject to the observed degradation mechanism.
The number of inspections may be limited by the extent of piping subject to the observed degradation mechanism.
The expansion of sample inspections may be halted in a piping system or portion of system that will be replaced within the 10-year interval in which the inspections were conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval.
The expansion of sample inspections may be halted in a piping system or portion of system that will be replaced within the 10-year interval in which the inspections were conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval.
Operating Experience A 10-year review of plant operating experience shows 30 events which were associated with buried piping. Nirie of these events were related to systems or components in scope of license renewal. All of these events were leaks shown to not be a result of corrosion of materials, making them not relevant to this program. The program includes availability, reliability, maintainability, and capacity measurement analyses, published in bi-annual Health Reports. The events described in the Health Reports are all attributed to causes other than corrosion due to contact with an aggressive environment (most leaks were associated with mechanical joints). The need to enhance the STP Buried Piping program was initially identified by INPO as an area for improvement.
Operating Experience A 10-year review of plant operating experience shows 30 events which were associated with buried piping. Nirie of these events were related to systems or components in scope of license renewal. All of these events were leaks shown to not be a result of corrosion of materials, making them not relevant to this program. The program includes availability, reliability, maintainability, and capacity measurement analyses, published in bi-annual Health Reports.
Since that time, involvement with the industry has identified areas for program enhancement.
The events described in the Health Reports are all attributed to causes other than corrosion due to contact with an aggressive environment (most leaks were associated with mechanical joints).
Enhancement of the program is ongoing, utilizing guidance from NEI 09-14 Revision 1, Guideline for the Management of Buried Piping Integrity, and industry operating experience.
The need to enhance the STP Buried Piping program was initially identified by INPO as an area for improvement. Since that time, involvement with the industry has identified areas for program enhancement. Enhancement of the program is ongoing, utilizing guidance from NEI 09-14 Revision 1, Guideline for the Management of Buried Piping Integrity, and industry operating experience.
The following industry operating experience was reviewed to identify aging effects applicable to STP. In February 2005, a leak was detected in a 4-inch condensate storage supply line. The cause of the leak was microbiologically influenced corrosion
The following industry operating experience was reviewed to identify aging effects applicable to STP.
{MIC) or under deposit corrosion.
In February 2005, a leak was detected in a 4-inch condensate storage supply line. The cause of the leak was microbiologically influenced corrosion {MIC) or under deposit corrosion. MIC and under deposit corrosion are typically internal corrosion, and managed by the Water Chemistry program (B2.1.2) and verified with the One-Time Inspection program {B2.1.16).
MIC and under deposit corrosion are typically internal corrosion, and managed by the Water Chemistry program (B2.1.2) and verified with the One-Time Inspection program {B2.1.16).
 
NOC-AE-16003380 Enclosure 2 Page 15of15 In September 2005, a service water leak was discovered in a buried service water header. The header had been in service for 38 years. The cause of the leak was either failure of the external coating or damage caused by improper backfill.
NOC-AE-16003380 Enclosure 2 Page 15of15 In September 2005, a service water leak was discovered in a buried service water header. The header had been in service for 38 years. The cause of the leak was either failure of the external coating or damage caused by improper backfill. STP has a very fine grain of the natural soil, and the installation specifications for backfilling require a backfill that is consistent with ASTM D-448 08 size number 67. Considering this, there is a low probability that pipe coatings have sustained damage due to backfill. The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event of coating degradation or failure.
STP has a very fine grain of the natural soil, and the installation specifications for backfilling require a backfill that is consistent with ASTM D-448 08 size number 67. Considering this, there is a low probability that pipe coatings have sustained damage due to backfill.
In October 2007, degradation of essential service water piping was reported. The riser pipe leak was caused by a loss of pipe wall thickness due to external corrosion induced by the wet environment surrounding the unprotected carbon steel pipe. This degradation is not expected at STP, as all steel and copper alloy piping managed by this program are coated and cathodically protected.
The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event of coating degradation or failure. In October 2007, degradation of essential service water piping was reported.
*In February 2009, a leak was discovered on the return line to the condensate storage tank. The cause of the leak was coating degradation, probably due to the installation specification not containing restrictions on the type of backfill, allowing rocks in the backfill. STP has a very fine grain of the natural soil, and the installation specifications for backfilling require a backfill that is consistent with ASTM D-448 08 size number 67. Considering this, there is a low probability that pipe coatings have sustained damage due to backfill. Plant specifications will be enhanced to prevent rocks and debris from striking the pipe coatings during the backfill of piping. The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event'of coating degradation or failure.
The riser pipe leak was caused by a loss of pipe wall thickness due to external corrosion induced by the wet environment surrounding the unprotected carbon steel pipe. This degradation is not expected at STP, as all steel and copper alloy piping managed by this program are coated and cathodically protected.  
In April 2009, a leak was discovered in an aluminum pipe where it went through a concrete wall.
*In February 2009, a leak was discovered on the return line to the condensate storage tank. The cause of the leak was coating degradation, probably due to the installation specification not containing restrictions on the type of backfill, allowing rocks in the backfill.
This leak is not relevant to STP, as the plant has no buried aluminum piping that requires management by this program.
STP has a very fine grain of the natural soil, and the installation specifications for backfilling require a backfill that is consistent with ASTM D-448 08 size number 67. Considering this, there is a low probability that pipe coatings have sustained damage due to backfill.
In June 2009, an active leak was discovered in buried piping associated with the condensate storage tank. The leak was discovered because elevated levels of tritium were detected. The cause of the through-wall leak was determined to be degradation of the protective moisture barrier wrap, which allowed moisture to come in contact with the piping, resulting in external corrosion. STP inspected pipe coatings during installation, and verified an acceptable condition of wrap as it was installed. The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event of coating degradation or failure. The inspection of high risk piping by this program can be used to verify that this degradation is unlikely at STP.
Plant specifications will be enhanced to prevent rocks and debris from striking the pipe coatings during the backfill of piping. The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event'of coating degradation or failure. In April 2009, a leak was discovered in an aluminum pipe where it went through a concrete wall. This leak is not relevant to STP, as the plant has no buried aluminum piping that requires management by this program. In June 2009, an active leak was discovered in buried piping associated with the condensate storage tank. The leak was discovered because elevated levels of tritium were detected.
The Buried Piping and Tanks Inspection program requires review of plant and industry operating experiences for impacts to the program. This program ensures long-term strategies to address Buried Piping and Tank Inspection are developed and implemented.
The cause of the through-wall leak was determined to be degradation of the protective moisture barrier wrap, which allowed moisture to come in contact with the piping, resulting in external corrosion.
STP inspected pipe coatings during installation, and verified an acceptable condition of wrap as it was installed.
The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event of coating degradation or failure. The inspection of high risk piping by this program can be used to verify that this degradation is unlikely at STP. The Buried Piping and Tanks Inspection program requires review of plant and industry operating experiences for impacts to the program. This program ensures long-term strategies to address Buried Piping and Tank Inspection are developed and implemented.
Conclusion The continued implementation of the Buried Piping and Tanks Inspection program provides reasonable assurance that aging effects are managed such that the systems and components within the scope of this program will continue to perform their intended functions consistent with the current licensing basis for the period of extended operation.
Conclusion The continued implementation of the Buried Piping and Tanks Inspection program provides reasonable assurance that aging effects are managed such that the systems and components within the scope of this program will continue to perform their intended functions consistent with the current licensing basis for the period of extended operation.
NOC-AE-16003380 Enclosure 3 STPNOC Revision of Regulatory Commitment Item 13 Table A4-1 License Renewal Commitments  
 
'2-'.-<';:j, . .... ',:
NOC-AE-16003380 Enclosure 3 STPNOC Revision of Regulatory Commitment Item 13
F*.-i*,7 13 Enhance plant specifications to:
 
* Lower coated piping carefully into a trench to avoid external coating damage.
NOC-AE-16003380 Enclosure 3 Page 1 of 7 Table A4-1                 License Renewal Commitments f:'.LR.6.*
* Use proper storage and handling practices to prevent damage to pipe coating prior to installation.
                                                                                                                                        .
These practices include padded storage, use of proper slings for installation and ultraviolet light resistant topcoats.
      '2-'.-<';:j,
* Over excavate trenches and use qualified backfill for bedding piping. Take care during backfilling to prevent rocks and debris from striking and damaging the pipe coating.
. ~- .... ',:
* Include the coating used for copper alloy buried piping in the coating database.
z~ ,_:,.:.:'~, ~>:~::"~.2-                                                                                                    *s~ctierl F*.-i*,7 13                     Enhance plant specifications to:                                                                   B2.1.18 Start implementation
The coating system must be in accordance with NACE SP0169-2007, and will be used for repair or for new coatings of the buried copper alloy piping in the essential cooling water system.
* Lower coated piping carefully into a trench to avoid external coating damage.                           during the 10 years
* Coat the portion of the essential cooling water system copper alloy piping directly embedded in backfill or directly encased in concrete, extending the coating 2 feet or more above grade. Enhance the Buried Piping and Tanks Inspection program procedures to:
* Use proper storage and handling practices to prevent damage to pipe coating prior to                     prior to the period of installation. These practices include padded storage, use of proper slings for                           extended operation.
installation and ultraviolet light resistant topcoats.
* Over excavate trenches and use qualified backfill for bedding piping. Take care during                   Inspections to be backfilling to prevent rocks and debris from striking and damaging the pipe coating.                     complete no later
* Include the coating used for copper alloy buried piping in the coating database. The                     than six months prior coating system must be in accordance with NACE SP0169-2007, and will be used for                         to the PEO or the repair or for new coatings of the buried copper alloy piping in the essential cooling water             end of the last system.                                                                                                 refueling outage
* Coat the portion of the essential cooling water system copper alloy piping directly                     prior to the PEO, embedded in backfill or directly encased in concrete, extending the coating 2 feet or                   whichever occurs more above grade.                                                                                       later.
Enhance the Buried Piping and Tanks Inspection program procedures to:                                           CR 10-23268
* Specify that In lieu of visual inspections of the fire protection system (FP), this program credits flow testing of the fire mains as described in Section 7.3 of NFPA 25. 2011 Edition.
* Specify that In lieu of visual inspections of the fire protection system (FP), this program credits flow testing of the fire mains as described in Section 7.3 of NFPA 25. 2011 Edition.
* Consider backfill located within 6 inches of the pipe, and consistent with ASTM D 448-08 size number 67, acceptable.
* Consider backfill located within 6 inches of the pipe, and consistent with ASTM D 448-08 size number 67, acceptable. Backfill quality is determined through examination during the inspections conducted by the program. Backfill that does not meet the ASTM criteria, during the initial and subsequent inspections of the program, is considered acceptable if the inspections of buried piping do not reveal evidence of mechanical damage to the pipe coatings due to the backfill.
Backfill quality is determined through examination during the inspections conducted by the program. Backfill that does not meet the ASTM criteria, during the initial and subsequent inspections of the program, is considered acceptable if the inspections of buried piping do not reveal evidence of mechanical damage to the pipe coatings due to the backfill.
* Ensure the cathodic protection system survey is performed annually.
* Ensure the cathodic protection system survey is performed annually.
* Monitor the output of the cathodic protection system rectifiers every 2 months. The measured current at each rectifier is recorded and compared against a target value. Following the completion of the plant yard cathodic protection system annual survey, record the current of the rectifier used to achieve an acceptable pipe/soil potential.
* Monitor the output of the cathodic protection system rectifiers every 2 months. The measured current at each rectifier is recorded and compared against a target value.
That current will be the target current for the rectifier until the next annual survey. If the current measured at the rectifier durin the bimonthl monitorin deviates si nificantl f:'.LR.6.* . B2.1.18 NOC-AE-16003380 Enclosure 3 Page 1 of 7 Start implementation during the 10 years prior to the period of extended operation.
Following the completion of the plant yard cathodic protection system annual survey, record the current of the rectifier used to achieve an acceptable pipe/soil potential. That current will be the target current for the rectifier until the next annual survey. If the current measured at the rectifier durin the bimonthl monitorin deviates si nificantl
Inspections to be complete no later than six months prior to the PEO or the end of the last refueling outage prior to the PEO, whichever occurs later. CR 10-23268 License Renewal Commitments from the target value, a condition report should be created. The rectifier current should be adjusted to an acceptable value. The results of the survey will be documented and trended to identify degrading conditions.
 
When degraded rectifier performance is identified, documentation is required in accordance with the corrective action program. The system should not be operated outside of established acceptable limits for longer than 90 days.
NOC-AE-16003380 Enclosure 3 Page 2 of 7 License Renewal Commitments
                                                                                                  ,.1mp1eQ1~6'tatiorl    * **
* Scll.e'dufo' ; * , *
                                                                                                            ., : >.,:"''
from the target value, a condition report should be created. The rectifier current should be adjusted to an acceptable value. The results of the survey will be documented and trended to identify degrading conditions. When degraded rectifier performance is identified, documentation is required in accordance with the corrective action program.
The system should not be operated outside of established acceptable limits for longer than 90 days.
* Recommend increased monitoring of the cathodic protection system and/or additional inspections if adverse indications are discovered during the monitoring of the cathodic protection system.
* Recommend increased monitoring of the cathodic protection system and/or additional inspections if adverse indications are discovered during the monitoring of the cathodic protection system.
* Evaluate the effectiveness of isolating fittings, continuity bonds and casing isolation, during the plant yard cathodic protection system annual survey. This may be accomplished through electrical measurements.
* Evaluate the effectiveness of isolating fittings, continuity bonds and casing isolation, during the plant yard cathodic protection system annual survey. This may be accomplished through electrical measurements.
Line 308: Line 358:
* Define the inspection interval for the program directed inspections as every 10 years, beginning the 10 year interval prior to the period of extended operation.
* Define the inspection interval for the program directed inspections as every 10 years, beginning the 10 year interval prior to the period of extended operation.
* Select the buried and underground piping inspection locations based on risk, considering susceptibility to degradation and consequences of failure.
* Select the buried and underground piping inspection locations based on risk, considering susceptibility to degradation and consequences of failure.
* The risk ranking for buried piping should consider characteristics such as coating type. coating condition.
* The risk ranking for buried piping should consider characteristics such as coating type.
cathodic protection efficiency, backfill characteristics, soil resistivity, pipe contents.
coating condition. cathodic protection efficiency, backfill characteristics, soil resistivity, pipe contents. and pipe function.
and pipe function.
* The risk ranking for underground piping should consider characteristics such as coating type, coating condition, exact external environment, pipe contents, pipe function, and flow characteristics within the pipe.
* The risk ranking for underground piping should consider characteristics such as coating type, coating condition, exact external environment, pipe contents, pipe function, and flow characteristics within the pipe.
* The risk ranking should generally give piping systems that are backfilled using com acted a re ate a hi her ins ection riorit than comparable s stems that are NOC-AE-16003380 Enclosure 3 Page 2 of 7  
* The risk ranking should generally give piping systems that are backfilled using com acted a re ate a hi her ins ection riorit than comparable s stems that are
** **
 
* Scll.e'dufo'  
NOC-AE-16003380 Enclosure 3 Page 3 of 7 License Renewal Commitments
; * , * ., : >.,:"''
                                                                                                                          '  .. ,_.
License Renewal Commitments completely backfilled using controlled low strength material.
                                                                                                .. t~A;i      'Implementation *
                                                                                                . +S~ctiOIJ'.~ *  '
Schedule/
                                                                                                                      , ' .: . .. *.
                                                                                                                            '".:  ,.~ '
completely backfilled using controlled low strength material.
* External Corrosion Direct Assessment, as described in NACE Standard Practice SP0502-2010, will be considered for use in identifying inspection locations.
* External Corrosion Direct Assessment, as described in NACE Standard Practice SP0502-2010, will be considered for use in identifying inspection locations.
* Credit opportunistic examinations of non-leaking pipes toward required examinations, only if they meet the risk ranking selection criteria.
* Credit opportunistic examinations of non-leaking pipes toward required examinations, only if they meet the risk ranking selection criteria.
Line 324: Line 378:
* Examine any piping, valves and closure bolting exposed during inspections.
* Examine any piping, valves and closure bolting exposed during inspections.
* Examine bolting for loss of material and loose or missing fasteners.
* Examine bolting for loss of material and loose or missing fasteners.
* Include two alternatives to directed inspections of the buried or underground piping that is safety-related, hazmat or both. The first alternative is to hydrostatically test 25 percent of the subject piping to 110 percent of the design pressure of any component within the boundary with test pressure being held for eight hours_ on an interval not to exceed 5 years. The second is an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness on an interval of every 10 years.
* Include two alternatives to directed inspections of the buried or underground piping that is safety-related, hazmat or both. The first alternative is to hydrostatically test 25 percent of the subject piping to 110 percent of the design pressure of any component within the boundary with test pressure being held for eight hours_on an interval not to exceed 5 years. The second is an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness on an interval of every 10 years.
* Flow testing of the fire mains, as described in NFPA 25, 2011 Edition, to detect degradation of the buried pipe in lieu of visual inspections of the fire protection system buried and underground piping.
* Flow testing of the fire mains, as described in NFPA 25, 2011 Edition, to detect degradation of the buried pipe in lieu of visual inspections of the fire protection system buried and underground piping.
* Specify that each inspection will examine either the entire length of a run of pipe, or a minimum of 10 feet. If the entire run of pipe of that material type is less than 10 feet in total length, then the entire run of pipe should be inspected.
* Specify that each inspection will examine either the entire length of a run of pipe, or a minimum of 10 feet. If the entire run of pipe of that material type is less than 10 feet in total length, then the entire run of pipe should be inspected. The inspection consists of a 100 percent visual inspection of the exposed pipe.
The inspection consists of a 100 percent visual inspection of the exposed pipe.
* Specify that if a transition from Category C to Category E or from Category E to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function. In all cases. the examinations are completed within 4 years after the end of the particular 10-year interval. These additional inspections conducted in an inspection interval cannot be
* Specify that if a transition from Category C to Category E or from Category E to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function.
 
In all cases. the examinations are completed within 4 years after the end of the particular 10-year interval.
NOC-AE-16003380 Enclosure 3 Page 4 of 7 Table A4-1  License Renewal Commitments
These additional inspections conducted in an inspection interval cannot be .. .
                                                                                                            .*;*IL.RA' ***.
NOC-AE-16003380 Enclosure 3 Page 3 of 7 ' .. ,_. 'Implementation
* hnpiementation; *
*
                                                                                                            *. sediOn,,.
* Schedule/
                                                                                                                ', ,;:-:,.:,-{i'*_''\<<~',
' , ' .: '".: . .. *. '
                                                                                                                                            . Schedule*
Table A4-1 License Renewal Commitments credited towards the base number of inspections required for the 10-year interval.
credited towards the base number of inspections required for the 10-year interval.
* Specify where steel or copper alloy piping has been coated with the same coating system and the backfill has the same requirements.
* Specify where steel or copper alloy piping has been coated with the same coating system and the backfill has the same requirements. the total inspections for this piping may be combined to satisfy the recommended inspection quantity. For example, for Category F, 10 percent of the total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.
the total inspections for this piping may be combined to satisfy the recommended inspection quantity.
* Specify that Category C inspections be used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria. Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period performed.
For example, for Category F, 10 percent of the total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.
* Specify that Category E inspections be used when the cathodic protection system has been installed but the portions of the piping covered by that system fail to meet the acceptance criteria. Category E inspections are 5 percent, NTE .:t-1-&sect;. inspections, in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. The following condition must be present.
* Specify that Category C inspections be used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria.
o Coatings and backfill are provided in accordance with STP backfill specification.
Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period performed.
* Specify that Category E inspections be used when the cathodic protection system has been installed but the portions of the piping covered by that system fail to meet the acceptance criteria.
Category E inspections are 5 percent, NTE .:t-1-&sect;. inspections, in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. The following condition must be present. o Coatings and backfill are provided in accordance with STP backfill specification.
o There have been no leaks in buried piping due to external corrosion and no significant coating degradation or metal loss in more than 10 percent of inspections conducted.
o There have been no leaks in buried piping due to external corrosion and no significant coating degradation or metal loss in more than 10 percent of inspections conducted.
o Soil has been demonstrated to be not corrosive for the material type using the following.
o Soil has been demonstrated to be not corrosive for the material type using the following.
Line 348: Line 399:
* The soil will be tested for soil resistivity, corrosion accelerating bacteria, pH, moisture, chlorides, sulfates, and redox potential.
* The soil will be tested for soil resistivity, corrosion accelerating bacteria, pH, moisture, chlorides, sulfates, and redox potential.
* The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
* The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
* If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10-ear period startin at the time when it was determined that .*;*IL.RA'
* If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10- ear period startin at the time when it was determined that
*** .. * * .. sediOn,,.
 
',
NOC-AE-16003380 Enclosure 3 Page 5 of 7 License Renewal Commitments
NOC-AE-16003380 Enclosure 3 Page 4 of 7 hnpiementation;
                                                                                                    *C~C      ,. . 1mp1ernentati0n ** *
* . Schedule*
                                                                                                ,
License Renewal Commitments the cathodic protection system failed to meet the acceptance.
Section'/
* Specify that inspection scope for piping that does not meet Category C or E inspection schedule requirements is 1 O percent, NTE in years 30 to 40; 12 peroent, NTE 30 inspections, in years 4 0 to 50; and 15 percent, NTE 38 inspections, in years 50 to 60.
* _. A ~
                                                                                                                    . Sthe'd~fo.<
the cathodic protection system failed to meet the acceptance.
* Specify that inspection scope for piping that does not meet Category C or E inspection schedule requirements is 1O percent, NTE ~~inspections, in years 30 to 40; 12 peroent, NTE 30 inspections, in years 40 to 50; and 15 percent, NTE 38 inspections, in years 50 to 60.
* Specify that the AF system underground stainless steel piping located in a vault will undergo two inspections each 10-year inspection period.
* Specify that the AF system underground stainless steel piping located in a vault will undergo two inspections each 10-year inspection period.
* Specify that the OW system underground piping will undergo 2% NTE inspection each 10-year inspection period.
* Specify that the OW system underground piping will undergo 2% NTE 4~ inspection each 10-year inspection period.
* Include acceptance criteria for the cathodic protection to be operational (available) at least 85 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
* Include acceptance criteria for the cathodic protection to be operational (available) at least 85 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
* Include acceptance criteria for the cathodic protection system to provide protection for buried piping at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
* Include acceptance criteria for the cathodic protection system to provide protection for buried piping at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
* Include examples of adverse indications discovered during piping inspections.
* Include examples of adverse indications discovered during piping inspections.
* Repair or replacement of the affected component when adverse indications failing to meet the acceptance criteria described in the program are discovered.
* Repair or replacement of the affected component when adverse indications failing to meet the acceptance criteria described in the program are discovered.
* Specify that if adverse indications are detected.
* Specify that if adverse indications are detected. an expansion of the sample size is conducted. The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. Double inspection sample sizes within the affected piping categories, 'Nhen adverse indications are detected during inspection of
an expansion of the sample size is conducted.
    ~ If adverse indications are found in the expanded sample, an analysis is conducted to determine the extent of condition and extent of cause. The size of the follow-on inspections will be determined based on the extent of condition and extent of cause. The timing of the additional examinations should be based on the severity of the degradation identified and should be commensurate with the consequences of a leak or loss of function~.,..9\:H However. in all cases, the expanded sample inspections should be completed within the 10-year interval in which the original adverse condition was identified inspection was conducted or. if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. If adverse conditions are extensive within the 10-year interval in which the inspections were conducted or. if identified in the latter half of the current 10- ear interval within 4 ears after the end of
The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. Double inspection sample sizes within the affected piping categories, 'Nhen adverse indications are detected during inspection of If adverse indications are found in the expanded sample, an analysis is conducted to determine the extent of condition and extent of cause. The size of the follow-on inspections will be determined based on the extent of condition and extent of cause. The timing of the additional examinations should be based on the severity of the degradation identified and should be commensurate with the consequences of a leak or loss of However. in all cases, the expanded sample inspections should be completed within the 10-year interval in which the original adverse condition was identified inspection was conducted or. if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval.
 
If adverse conditions are extensive within the 10-year interval in which the inspections were conducted or. if identified in the latter half of the current 10-ear interval within 4 ears after the end of NOC-AE-16003380 Enclosure 3 Page 5 of 7  
NOC-AE-16003380 Enclosure 3 Page 6 of 7 Table A4-1   License Renewal Commitments
,. .. 1mp1ernentati0n
                                                .;.:c~?1mit"}.~*~:* .
**
                                                      .~ . .;,"-'v the 10-year interval, inspections may be halted in an area of concern that is planned for replacement, provided continued operation does not pose a significant hazard.
* Section'/ . ,
Expansion of sample size may be limited to the piping subject to the observed degradation mechanism.
* _. A Table A4-1 License Renewal Commitments . . . . .;,"-'v the 10-year interval, inspections may be halted in an area of concern that is planned for replacement, provided continued operation does not pose a significant hazard. Expansion of sample size may be limited to the piping subject to the observed degradation mechanism.
* Observe for brittle failure at flanges, connections, and joints due to frost heaving, soil stresses, or ground water effects during inspection of buried piping.
* Observe for brittle failure at flanges, connections, and joints due to frost heaving, soil stresses, or ground water effects during inspection of buried piping.
* Require trending cathodic protection system annual surveys results.
* Require trending cathodic protection system annual surveys results.
* Where wall thickness measurements are conducted, the results should be trended if follow-up examinations are conducted.
* Where wall thickness measurements are conducted, the results should be trended if follow-up examinations are conducted.
* Specify that the cathodic protection system pipe-to-soil potential when using a saturated copper/copper sulfate reference electrode must be betweenat least -850 mV relative to a CSE, instant off and 1200 mV for steel piping. 100 mV minimum polarization is required for copper alloy piping.
* Specify that the cathodic protection system pipe-to-soil potential when using a saturated copper/copper sulfate reference electrode must be betweenat least -850 mV relative to a CSE, instant off and 1200 mV for steel piping. 100 mV minimum polarization is required for copper alloy piping.
* Specify that If the cathodic protection system fails to meet the acceptance criteria of at least -850 mV relative to a CSE instant off for steel components the following alternatives may be used. o 100 mV minimum polarization o -750 mV relative to a CSE. instant off where soil resistivity is greater than 10.000 ohm-cm to less than 100,000 ohm-cm o -650 mV relative to a CSE. instant off where soil resistivity is greater than 100,000 ohm-cm o Verify less than 1 mil/year (mpy) loss of material.
* Specify that If the cathodic protection system fails to meet the acceptance criteria of at a
* Specify means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by: o Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate. o Every 2 years when using the 100 mV minimum polarization.
least -850 mV relative to CSE instant off for steel components the following alternatives may be used.
o 100 mV minimum polarization o -750 mV relative to a CSE. instant off where soil resistivity is greater than 10.000 ohm-cm to less than 100,000 ohm-cm o -650 mV relative to a CSE. instant off where soil resistivity is greater than 100,000 ohm-cm o Verify less than 1 mil/year (mpy) loss of material.
* Specify means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:
o Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate.
o Every 2 years when using the 100 mV minimum polarization.
o Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years.
o Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years.
* Specify where electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist.
* Specify where electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist.
NOC-AE-16003380 Enclosure 3 Page 6 of 7 Table A4-1 License Renewal Commitments
 
* Require the impact of significant site features (e.g., large cathodic protection current collectors.
NOC-AE-16003380 Enclosure 3 Page 7 of 7 Table A4-1   License Renewal Commitments
shielding due to large objects located in the vicinity of the protected piping) and local soil conditions be factored into placement of the probes and use of probe data.
                                                                                                            ; . "irrip1en)~ntatio'n *
* Indicate that for coated piping, there should be no evidence of coating degradation.
                                                                                                              .* .* sctie~ul~' **
If coating degradation is present, it may be considered acceptable if it is determined to be insignificant by an individual possessing a NACE Coating Inspector Program Level 2 or 3 inspector qualification, or an individual has attended the Electric Power Research Institute (EPRI) Comprehensive Coatings Course and completed the EPRI Buried Pipe Condition Assessment and Repair Training Computer Based Training Course.
* Require the impact of significant site features (e.g., large cathodic protection current collectors. shielding due to large objects located in the vicinity of the protected piping) and local soil conditions be factored into placement of the probes and use of probe data.
* Indicate that for coated piping, there should be no evidence of coating degradation. If coating degradation is present, it may be considered acceptable if it is determined to be insignificant by an individual possessing a NACE Coating Inspector Program Level 2 or 3 inspector qualification, or an individual has attended the Electric Power Research Institute (EPRI) Comprehensive Coatings Course and completed the EPRI Buried Pipe Condition Assessment and Repair Training Computer Based Training Course.
* Specify where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
* Specify where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
* Specify that backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component.
* Specify that backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component.
backfill is acceptable if it is consistent v;ith SP0169 2007 Section 5.2.3. Backfill that is located within 6 inches of steel pipe that meets /\STM D 448 08 size number 67 is consistent  
backfill is acceptable if it is consistent v;ith SP0169 2007 Section 5.2.3. Backfill that is located within 6 inches of steel pipe that meets /\STM D 448 08 size number 67 is consistent 'Nith the objectives of SP0169 2007.
'Nith the objectives of SP0169 2007.
* Indicate that for any hydrostatic tests credited by the program, the condition acceptance criteria is no visible indications of leakage and no drop in pressure within the isolated portion of the piping that is not accounted for by a temperature change in the test media or quantified leakage across test boundary valves.
* Indicate that for any hydrostatic tests credited by the program, the condition acceptance criteria is no visible indications of leakage and no drop in pressure within the isolated portion of the piping that is not accounted for by a temperature change in the test media or quantified leakage across test boundary valves.
* Specify that if coated or uncoated metallic piping show evidence of corrosion.
* Specify that if coated or uncoated metallic piping show evidence of corrosion. the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.
the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.
* Specify where wall thickness meets minimum wall thickness requirements, recommendations for ex ansion of sam le size does not a I .}}
* Specify where wall thickness meets minimum wall thickness requirements, recommendations for ex ansion of sam le size does not a I . NOC-AE-16003380 Enclosure 3 Page 7 of 7 ; .
* .* . *
* *}}

Latest revision as of 19:22, 30 October 2019

Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937)
ML16154A065
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/19/2016
From: Connolly J
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-16003380, TAC ME4936, TAC ME4937
Download: ML16154A065 (34)


Text

{{#Wiki_filter:Nuclear Operating Company South Texas Project Electric Generating Station P.O. Bax 289 Wadsworth. Texas 77483 May 19, 2016 NOC-AE-16003380 10 CFR 54 File No. G25 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 I South Texas Project I Units 1 and 2 Dock~t Nos. STN 50-498, STN 50-499 Request fqr Additional Information Set 35 for the Review of 4he South Texas Project, Units 1 and 2, License Renewal /Application (TAC Nos. ME4936 and ME4937)

References:

I

1. Letter; G. T. Powell to US~RC Document Control Desk; "License Renewal Application;"

NOC-AE-10002607; dated October 25, 2010 (ML103010257) j

2. Letter; G. T. Powell to USNRC Document Control Desk; "Response to Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application-Set 27," NOC-AE-14003141; dated June 3, 2014(ML14163A020)
3. Letter; G. T. Powell to USNRC Document Control Desk; "2014 Annual Update to the South Texas Project License Renewal Application;" NOC-AE-14003180; dated October 22, 2014(ML14308A073)
4. Letter from NRC, Lois James to STP G.T. Powell; "Request for Additional Information Set 35 for the Review of the South Texas Project License Renewal Application," dated April 22, 2016(ML16104A352)

By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a License Renewal Application (LRA). By Reference 2, STPNOC provided a response to questions related to LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation. By Reference 3, Table 3.3.2-19 referenced notes were updated. By Reference 4, Request for Additional Information (RAI) requested further clarification of STPNOC's management regarding reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation. STPNOC's response to RAI Set 35 is provided in Enclosure 1, and changes to LRA pages are depicted as line-in/line-out pages provided in Enclosure 2. Regulatory commitment item 13 in LRA Table A4-1 has been revised as provided in . There are no other commitments in this letter. STI: 34317752

NOC-AE-16003380 Page 2 of 3 If there are any questions, please contact Arden Aldridge, STP License Renewal Project Lead, at (361) 972-8243 or Rafael Gonzales, STP License Renewal Project regulatory point-of-contact, at (361) 972-4779. I declare under penalty of perjury that the foregoing is true and correct. Executed on /'?, ~/6 Jn'jfDatE? -

                                                    /             f[j~r James W. Connolly Site Vice President rjg

Enclosures:

1. STPNOC's response to RAI Set 35
2. STPNOC LRA Changes with Line-in/Line-out Annotations
3. STPNOC Revision of Regulatory Commitment Item 13

NOC-AE-16003380 Page 3 of 3 cc: (paper copy) (electronic copy) Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission Steve Frantz 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner Lois James Senior Project Manager Tam Tran U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A) NRG South Texas LP 11555 Rockville Pike Chris O'Hara Rockville, MD 20852 Jim van Suski! Skip Zahn NRC Resident Inspector U. S. Nuclear Regulatory Commission CPS Energy P. 0. Box 289, Mail Code: MN116 Kevin Pollo Wadsworth, TX 77483 Cris Eugster L. D. Blaylock Lois James License Renewal Project Manager (Safety) Crain Caton & James, P.C. One White Flint North (MS 011-F1) Peter Nemeth U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 City of Austin Elaina Ball Tam Tran John Wester License Renewal Project Manager (Environmental) One White Flint North (MS 011 F01) Texas Dept. of State Health Services U. S. Nuclear Regulatory Commission Helen Watkins Washington, DC 20555-0001 Robert Free

NOC-AE-16003380 Enclosure 1 STPNOC's response to the RAI Set 35

NOC-AE-16003380 Enclosure 1-Page 1 of 6 RAI 3.0.3-1 c

Background:

By letter dated October 22, 2014, license renewal application (LRA) Table 3.3.2-19, "Auxiliary Systems - Summary of Aging Management Evaluation - Chemical and Volume Control System," states that fiberglass insulation exposed to plant indoor air (external) has no aging effect requiring management (AERM) and no aging management program (AMP). In addition, the line item cites a plant specific note 5, but there is no description of the note. By letter dated June 3, 2014, the same line item entry in LRA Table 3.3.2-19 states that the AERM is reduced thermal insulation resistance due to moisture intrusion and the AMP is the External Surface Monitoring Program. Issue: LR-ISG-2012-02, "Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion Under Insulation," Table 3.3-1, item 3.3.1-64 recommends that reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation be managed by Chapter Xl.M36, "External Surfaces Monitoring of Mechanical Components." No basis was provided for not being consistent with line item 3.3.1-64. In addition, the description of the plant-specific note 5 is not clear to the staff. Request:

1. State the basis for not citing reduced thermal insulation resistance due to moisture intrusion for jacketed fiberglass insulation.
2. Provide a description of the plant-specific note 5 listed in Table 3.3.2-19.

STPNOC Response:

1. LRA Table 3.3.2-19 is updated to include the aging effect of reduced thermal insulation resistance due to moisture intrusion for fiberglass insulation.

Enclosure 2 provides the line-in/line-out revision to LRA Table 3.3.2-19.

2. Description of plant specific note 5 listed in Table 3.3.2-19 was previously updated per correspondence NOC-AE-15003236, dated March 24, 2015(ML15097A013) to reflect the correct Appendix C Item Vlll.l.S-403. See enclosure 2 for the current LRA Table 3.3.2-19.

NOC-AE-16003380 Enclosure 1 Page 2 of 6 RAI 82.1.18-6

Background:

On February 4, 2016, the staff issued the final version of LR-ISG-2015-01, "Changes to Buried and Underground Piping and Tank Recommendations." The ISG replaces aging management program (AMP) Xl.M41, "Buried and Underground Piping and Tanks," and the associated Updated Final Safety Analysis Report (UFSAR) Summary Description issued in LR-ISG-2011-03, "Changes to the Generic Aging Lessons Learned (GALL) Report, Revision 2, Aging Management Program (AMP) Xl.M41, 'Buried and Underground Piping and Tanks'." As amended by letter dated June 26, 2014, LRA Section B2.1.18, "Buried Piping and Tanks Inspection Program," and LRA Section A 1.18 (associated UFSAR Summary Description) were revised to address the changes to AMP Xl.M41 and the UFSAR Summar)i Description in LR-ISG-2011-03. Issue: The existing Buried Piping and Tanks Inspection Program and associated UFSAR Summary Description have not been evaluated against the changes to AMP Xl.M41 and the UFSAR Summary Description issued in LR-ISG-2015-01. Request: Compare the existing Buried Piping and Tanks Inspection Program to AMP Xl.M41 and the associated UFSAR Summary Description issued in LR-ISG-2015-01. State any changes to LRA Sections B2.1.18 and Section A 1.18 necessary to be consistent with LR-ISG-2015-01. As necessary, state and justify exception(s) to recommendations that will not be incorporated into the existing Buried Piping and Tanks Inspection Program. STPNOC Response: LRA Appendix A1.18, Appendix B2.1.18, Table A4-1 and LR Basis Document AMP Xl.M34, Buried Piping and Tanks Inspection, are updated to the requirements of LR-ISG-2015-01. The following is a summary of the gap analysis performed. All applicable LR-ISG-2012-01 recommendations are incorporated into the LR Basis Document AMP Xl.M34, Buried Piping and Tanks Inspection. The following provides a summary of the LR-ISG-2015-01 changes with regards to the changes made in the LR Basis Document. Scope of Program (Element 1) added; scope to There are no buried polymeric or cementitious include buried and underground piping and tanks components within scope of license renewal at constructed of any material, including metallic, STP. polymeric, and cementitious materials and includes aging effects such as loss of material, cracking, and changes in material properties (for cementitious piping only).

NOC-AE-16003380 Enclosure 1 Page 3 of 6 Scope of Program (Element 1) added; The existing LR Basis Document AMP Xl.M34 manages loss of material and loose or missing The program also manages loss of material due to* fasteners. corrosion of piping system bolting within scope of this program. Preventive Actions (Element 2 a.) added; The AMP is revised to state;

a. For buried stainless steel or cementitious Soil samples have shown that the uncoated piping or tanks, coatings are provided based on the stainless buried piping is not subject to environmental conditions. environments that contains chloride.

There are no buried cementitious components within scope of license renewal at STP. Preventive Actions (Element 2 b.) added; Copper alloy and steel piping within the scope of license renewal at STP is coated. STP does

b. For buried steel, copper alloy, and aluminum not have any aluminum alloy piping and there alloy piping and tanks, and underground steel and are no buried tanks within the scope of license copper alloy piping and tanks, coatings are in renewal.

accordance with Table 1 of NACE SP0169-2007 or Section 3.4 of NACE RP0285-2002. Preventive Actions (Element 2 c.) added; LR Appendix A 1.18 states;

c. The system monitoring interval discussed in An annual cathodic protection survey is Section 10.3 of NACE SP0169-2007 may not be performed consistent with NACE SP0169-extended beyond one year. 2007.

Preventive Actions (Element 2 e.i.) added; The AMP is revised to state use of excessive cathodic protection polarized potential on e.i. To prevent damage to the coating, the limiting coated piping should be avoided. The limiting critical potential should not be more negative than critical potential should not be more negative 1200 mV. than 1200 mV relative to a copper/copper sulfate reference electrode (CSE). Parameters Monitored or Inspected (Element 3 There are no buried polymeric or cementitious b.ii,, 3.b.ii., 3.b.iii., 3.b.iv.) added; components within scope of license renewal at STP.

b. Visual inspections of buried or underground piping or tanks, or their coatings, are performed to monitor for; ii. loss of material due to wear for polymeric materials.

iii. Cracking, spalling, and corrosion or exposure' of rebar for asbestos cement pipe, and concrete pipe. iv. Cracking, blistering, change in color due to water absorption for high-density polyethylene (HOPE) and fiberglass components.

NOC-AE-16003380 Enclosure 1 Page 4 of 6 ~f{;l§:t'.~-2Q;~s~o1:,.c1J'.~ij'g~:,*;;, \:;;!;\;~;.:::: :Z::<5/*,**'::; ** ': 1Bas1$,iO.<!ciJmf:i'iJ1*.(AIVJP.)J)i$po~iti90~~:~!:;.~1F.2L~+;:,: Parameters Monitored or Inspected (Element 3 d.) The AMP does not include any components added; with cracking as an aging effect.

d. Inspections for cracking utilize a method that The AMP is revised to state "Soil samples has been demonstrated to be capable of detecting have shown that the uncoated stainless buried cracking. Intact coatings do not have to be piping is not subject to environments that removed to inspect for potential cracking. contains chloride."

There are no buried aluminum alloy within scope of license renewal at STP Detection of Aging Effects (Element 4) added; The AMP is revised to require inspections be distributed evenly among the units. For multi-unit sites the inspections are distributed evenly among the units Detection of Aging Effects (Element 4 Table The existing AMP states; Xl.M41-2) revised; Category C inspections are 0.5 percent Not-to-Preventive Action Category C to require the Exceed (NTE) two inspections of that piping smaller of 0.5% of the piping length or 1 inspection. per inspection period. Detection of Aging Effects (Element 4 Table The AMP is revised to require 5 percent NTE 5 Xl.M41-2) revised; inspections. Preventive Action Category E to require the smaller of 5% of the piping length or 3 inspections. Detection of Aging Effects (Element 4 Table The existing AMP states where Category E Xl.M41-2 note E. a.) added; inspections are used, STP will demonstrate that soil is not corrosive using the following.

a. An analysis, conducted in accordance with the STP is committed to providing cathodic "preventive actions" program element of this AMP, protection that meets the acceptance criteria.

has demonstrated that installation or operation of a cathodic protection system is impractical; or See STP's response to RAI 82.1.18-5 in letter dated June 11, 2015 (ML15175A198). Detection of Aging Effects (Element 4 Table The AMP is revised to state inspection scope Xl.M41-2) revised; for piping that does not meet Category C or E inspection schedule requirements is 10 Preventive Action Category F of the program to percent, NTE 9 inspections. require the smaller of 10% of the piping length or 6 inspections.

NOC-AE-16003380 Enclosure 1 Page 5 of 6 Detection of Aging Effects (Element 4 a.) added; The AMP is revised to state if a transition from Category C to Category E or from Category E Transitioning to a higher number of inspections to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function. In all cases, the examinations are completed within 4 years after the end of the particular 10-year interval. These additional inspections conducted in an inspection interval cannot be credited towards the base number of inspections required for the 10-year interval. Detection of Aging Effects (Element 4 b.i.) added; The AMP is revised to state where steel or copper alloy piping has been coated with the Where piping constructed of steel, copper alloy, or same coating system and the backfill has the aluminum alloy has been coated with the same' same requirements, the total inspections for coating system and the backfill has the same this piping may be combined to satisfy the requirements, the total inspections for this piping recommended inspection quantity. For may be combined to satisfy the recommended example, for Category F, 10 percent of the inspection quantity. total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected. Detection of Aging Effects (Element 4 b.ii.) added; STP does not use controlled low strength material for backfill of the buried piping. For buried piping, inspections may be reduced to one-half the number of inspections indicated in Table Xl.M41-2 when performance of the indicated inspections necessitates excavation of piping that has been fully backfilled using controlled low strength material. Acceptance Criteria (Element 6 f.) added; The AMP is revised to state backfill is acceptable if the inspections do not reveal Backfill is acceptable if the inspections do not evidence that the backfill caused damage to reveal evidence that the backfill caused damage to the component's coatings or the surface of the the component's coatings or the surface of the component. component (if not coated). Acceptance Criteria (Element 6 Table Xl.M41-3) The AMP is revised to state the cathodic revised the cathodic protection acceptance criteria; protection system pipe-to-soil potential when using a saturated copper/copper sulfate Steel: -850 mV relative to a CSE, instant off reference electrode must be between at least

                                                    -850 mV instant off for steel piping. 100 mV Copper alloy:    100 mV minimum polarization         minimum polarization is required for copper alloy piping.

Acceptance Criteria (Element 6 m.) added; The AMP is revised to allow the use of alternative acceptance criteria for steel piping. Alternatives to the -850 mV criterion for steel piping.

NOC-AE-16003380 Enclosure 1 Page 6 of 6 Corrective Actions (Element 7 a.) added; The AMP is revised to state where damage to the coating has been evaluated as significant Where damage to the coating has been evaluated and the damage was caused by non-as significant and the damage was caused by non- conforming backfill, an extent of condition conforming backfill, an extent of condition evaluation should be conducted to ensure that evaluation is conducted to ensure that the as-left the as-left condition of backfill in the vicinity of condition of backfill in the vicinity of the observed observed damage will not lead to further damage will not lead to further degradation. degradation. Corrective Actions (Element 7 b.) added; The AMP is revised to state if coated or uncoated metallic piping show evidence of If coated or uncoated metallic piping or tanks show corrosion, the remaining wall thickness in the evidence of corrosion, the remaining wall thickness affected area is determined to ensure that the in the affected area is determined to ensure that minimum wall thickness is maintained. the minimum wall thickness is maintained. Corrective Actions (Element 7 c.) added; The AMP is revised to state where the coatings, backfill, or the condition of exposed Where the coatings, backfill, or the condition of piping does not meet acceptance criteria, the exposed piping does not meet acceptance criteria, degraded condition is repaired or the affected the degraded condition is repaired or the affected component is replaced. The number of component is replaced. In addition, an expansion inspections within the affected piping of sample size is conducted. The number of categories is doubled or increased by 5, inspections within the affected piping categories whichever is smaller. are doubled or increased by 5, whichever is smaller Enclosure 2 provides the line-in/line-out revision to LRA Appendix A 1.18 and Appendix 82.1.18. Enclosure 3 provides the line-in/line-out revision to LRA Table A4-1.

NOC-AE-16003380 Enclosure 2 STPNOC LRA Changes with Line-in/Line-out Annotations Affected LRA Section Table 3.3.2-19 Appendix A 1.18 Appendix 82.1.18

NOC-AE-16003380 Enclosure 2 Page 1 of 15 Table 3.3.2-19 ement Evaluation - Chemical and Volume Control S stem

~~~.t?:~~~n,t}~f~:~~1 ~~~~*~g~~:

~;;:!+~~~~:.{S:;/itl *.. c/,,'~,v>vv * "';A.,** Insulation INS Aluminum Plant Indoor None None V.F-2 3.2.1.50 C Air Ext Insulation INS Insulation Plant Indoor Reduced thermal External Surfaces None None H,5 Calcium Silicate Air (Ext) insulation Monitoring Program resistance due to (B2.1.20) moisture intrusion Insulation INS Insulation Plant Indoor Nooe Nooe None None H,5 Fiberglass Air (Ext) Reduced thermal External Surfaces insulation Monitoring Program resistance due to (B2.1.20) moisture intrusion Orifice PB, TH Stainless Steel Borated Water None None VI 1.J-16 3.3.1 .99 A Leakage Ext Notes for Table 3.3.2-19: Standard Notes: A Consistent with NUREG-1801 item for component, material, environment, and aging effect. AMP is consistent with NUREG-1801 AMP. B Consistent with NUREG-1801 item for component, material, environment, and aging effect. AMP takes some exceptions to NUREG-1801 AMP. C Component is different, but consistent with NUREG-1801 item for material, environment, and aging effect. AMP is consistent with NUREG-1801 AMP. D Component is different, but consistent with NUREG-1801 item for material, environment, and aging effect. AMP takes some exceptions to NUREG-1801 AMP. E Consistent with NUREG-1801 for material, environment, and aging effect, but a different aging management program is credited or NUREG-1801 identifies a plant-specific aging management program. F Material not in NUREG-1801 for this component. G Environment not in NUREG-1801 for this component and material. H. Aging effect not in NUREG-1801 for this component, material, and environment combination. J Neither the component nor the material and environment combination is evaluated.in NUREG-1801.

NOC-AE-16003380 Enclosure 2 Page 2of15 Plant Specific Notes: 1 NUREG-1801 does not address the aging effect of nickel-alloys in borated water leakage. Nickel-alloys subject to an air with borated water leakage environment are similar to stainless steel in a borated water leakage environment and do not experience aging effects due to borated water leakage. 2 The Water Chemistry program (82.1.2) and the One-Time Inspection program (82.1.16) manage loss of material due to pitting and crevice corrosion and cracking due to stress corrosion cracking. The One-Time Inspection program (82.1.16) includes selected components at susceptible locations. 3 Non-inhibited copper alloy> 15% zinc SSCs with surfaces exposed to ventilation atmosphere (internal) or plant indoor air (internal) are subject to wetting due to condensation and thus are subject to loss of material due to selective leaching. 4 The reduction of heat transfer aging effect is not identified in NUREG-1801 for this component, material, and environment combination. Reduction of heat transfer is not expected in heat exchangers with reactor coolant or treated borated water environments as long as water chemistry is maintained. Reduction of heat transfer is managed with Water Chemistry (82.1.2) and One Time Inspection (82.1.16). 5 The aging effect of reduced thermal insulation resistance due to moisture intrusion is managed by AMP 82.1.20, External Surfaces Monitoring Program. Reference LR-ISG-2012-02 Appendix C Item Vlll.l.S-403. 6 The External Surfaces Monitoring program (82.1.20) is used to monitor insulated stainless steel components exposed to plant indoor air for loss of material. Reference LR-ISG-2012-02 Appendix C Line Vll.A2.A-405

NOC-AE-16003380 Enclosure 2 Page 3of15 A1.18 Buried Piping and Tanks Inspection The Buried Piping and Tanks Inspection program manages the loss of material on external surfaces of buried and underground components. Preventive and mitigative measures, including verification of coatings quality, backfill requirements, and cathodic protection, are employed to manage aging of buried components. Underground components are protectively coated where required. The cathodic protection system is operated consistent with the guidance of NACE SP0169-2007 for piping and is monitored to ensure that protection is being provided. The cathodic protection system is operational (available) at least 85 percent of the time and provides effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment. whichever is shorter. An annual cathodic protection survey is performed consistent with NACE SP0169-2007. If the cathodic protection system fails to meet the acceptance criteria of -850 mV relative to copper/copper sulfate reference electrode (CSE) instant off for steel components alternatives of-750 mVor-650 mV may be used, means to verify the effectiveness of the protection are used, loss of material rates are measured and soil testing will be conducted at a minimum of once in each 10-year period starting 10 years prior to the period of extended operation. The acceptance criterion for copper components is 100 mV minimum polarization. Opportunistic and directed visual inspections will monitor the condition of external surfaces, protective coatings and wrappings found on steel, stainless steel and copper alloy components. Any evidence of damaged wrapping or coating defects will be an indicator of possible corrosion damage to the external surface of the components. Inspections are conducted by qualified individuals. Where coatings, backfill, or the condition of exposed piping that does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced. In addition, an expansion of sample size is conducted. Hydrostatic tests of 25 percent of the subject piping will be performed on an interval not to exceed 5 years, or an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness every 10 years may be perf0rmed as an alternate to directed inspections. Flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition is credited in lieu of visual inspections.

NOC-AE-16003380 Enclosure 2 Page 4 of 15 82.1.18 Buried Piping and Tanks Inspection Program Description The Buried Piping and Tanks Inspection program manages the loss of material on external surfaces of buried and underground components. _The Buried Piping and Tanks Inspection program includes inspections or flow testing of buried steel, stainless steel, copper alloy piping, underground steel, stainless steel piping within the Auxiliary Feedwater System, the Lighting Diesel Generator System, the Essential Cooling Water (ECW) and ECW Screen Wash System, the Fire Protection System, and the Oily Waste System (OW). Preventive and mitigative actions are taken to ensure the piping is coated, backfilled and cathodically protected. The buried steel and copper alloy piping managed by this program is cathodically protected. The cathodic protection system is designed in accordance with NACE RP-01-69 1972. The performance of the cathodic protection system is consistent with the guidelines of NACE SP0169-2007. An annual survey ensures that the pipe-to-soil potential is acceptable. If the cathodic protection system fails to meet the acceptance criteria of at least -850 mV relative to a CSE instant off for steel components the following alternatives may be used.

  • 100 mV minimum polarization
    *    -750 mV relative to a CSE, instant off where soil resistivity is greater than 10,000 ohm-cm to less than 100,000 ohm-cm
    *    -650 mV relative to a CSE. instant off where soil resistivity is greater than 100,000 ohm-cm
  • Verify less than 1 mil/year (mpy) loss of material.

Means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:

  • Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate.
  • Every 2 years when using the 100 mV minimum polarization.
  • Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years.

When electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist. Additionally, the impact of significant site features (e.g., large cathodic protection current collectors. shielding due to large objects located in the vicinity of the protected piping) and local soil conditions will be factored into placement of the probes and use of probe data. Cathodic protection is operational (available) at least 85 percent of the time from either 10 years prior to the period of extended operation or from installation or refurbishment, whichever is shorter. Cathodic protection is effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.

NOC-AE-16003380 Enclosure 2 Page 5of15 Opportunistic and directed visual inspections monitor the condition of the external surfaces, backfill, protective coatings and wrappings of steel, and copper alloy buried components. Inspection locations are selected based on susceptibility to degradation and consequences of failure. A minimum of 10 feet of pipe of each material type is inspected. The inspections consist of a 100 percent visual inspection of the exposed pipe. Inspections are conducted by qualified individuals. Inspection of piping shared between STP Units 1 and 2 may be credited towards the required inspections. Inspection quantities are increased by 50 percent as STP has two units and inspections are distributed evenly among the units. Category C inspections are used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria. Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period. Category E inspections are used when the cathodic protection system has been installed but portions of the piping covered by that system fail to meet the acceptance criteria. Category E inspections are 5 percent, NTE 4-:t-.Q inspections, in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. Where Category E inspections are used, STP will demonstrate that soil is not corrosive using the following""~

  • A minimum of three sets of soil samples will be obtained in the vicinity where the cathodic protection system fails to meet the acceptance criteria.
  • The soil will be tested for soil resistivity, corrosion accelerating bacteria, pH, moisture, chlorides, sulfates, and redox potential.
  • The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
  • If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10-year period starting at the time when it was determined that the cathodic protection system failed to meet the acceptance.

The Auxiliary Feedwater system has stainless steel pipe underground in a vault outside of the Auxiliary Feedwater Storage tank. This stainless steel pipe will undergo two-directed visual inspections each 10-year inspection period. The OW system has steel pipe underground in sumps located in the yard. This underground pipe will undergo 2% NTE ~4 directed visual inspection each 10-year inspection period. In lieu of visual inspections of the fire protection system, STP credits flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition. Inspections will begin during the 10-year period prior to entering the period of extended operation. Upon entering the period of extended operation, inspections will occur every 10 years. Visual inspections of metallic components are supplemented \Vith surface or volumetric nondestructive testing (NOT) if significant indications are observed to determine local area *.vall thickness. If adverse indications are detected, inspection sample sizes within the affected

NOC-AE-16003380 Enclosure 2 Page 6of15 piping categories are doubled. If adverse indications are found in the expanded sample, further increases in inspection sample size is based on an analysis of extent of cause and extent of condition. Hydrostatic test of 25 percent of the subject piping on an interval is not to exceed 5 years, or internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness every 10 years may be performed as an alternate to directed inspections. There are no components fabricated with polymeric, cementitious, or concrete materials within the scope of license renewal that credit this program for aging management. .,---There are no buried or underground tanks within the scope of license renewal. Any evidence of aging effects, such as loss of material, or changes in material properties, requires initiation of corrective actions. Visual inspections of metallic components are supplemented with surface or volumetric nondestructive testing (NOT) if significant indications are observed to determine local area wall thickness. If adverse indications are detected, an expansion of the sample size is conducted. The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. The expanded sample inspection is completed within the 10-year interval in which the original inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation is conducted to ensure that the as-left condition of backfill in the vicinity of the observed damage will not lead to further degradation. ' Where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria. the degraded condition is repaired or the affected component is replaced. Aging management of the internal surfaces of buried and underground piping is accomplished through the use of the Open-Cycle Cooling Water System program (B2.1.9), Closed-Cycle Cooling Water System program (82.1.10), Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program (B2.1.22), Fuel Oil Chemistry program (B2.1.14 ), Fire Water System program (B2.1.13) and Water Chemistry program (82.1.2). Selective leaching of buried or underground components is managed by the Selective Leaching of Materials program (B2.1.17) or the Selective Leaching of Aluminum Bronze program (B2.1.37). NUREG-1801 Consistency The Buried Piping and Tanks Inspection program is an existing program that, following enhancement, will be consistent with exception to NUREG-1801, Section Xl.M41, Buried and Underground Piping and Tanks.

NOC-AE-16003380 Enclosure 2 Page 7of15 Exceptions to NUREG-1801 Preventive Actions (Element 2) Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires the backfill to be consistent with NACE SP0169 Section 5.2.3. NACE SP0169 Section 5.2.3.5 states that pipe should be lowered carefully into the ditch to avoid external coating damage. The original installation specification does not include this practice. However the subgrade of the trench was prepared by removing all debris and unsuitable material, and the subgrade consists of fine clay and sand that makes up the natural soil or backfill. The backfill used is consistent with the ASTM D 448-08 size 67 standard. The subgrade preparation, and small grain size backfill used in the original installation, which provide soft bedding for piping set into the trench, are not expected to have damaged the coating of the piping. Plant procedures will be enhanced to ensure that the piping is lowered carefully into a trench to avoid damage to the external coatings. Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires that backfill be consistent with NACE SP0169 Section 5.2.3. NACE SP0169 Section 5.2.3.6 states that care should be taken during backfilling so that rocks and debris do not strike and damage the pipe coating. The original installation specification for backfilling piping does not include this practice, with the exception of the ECW piping. However a fine grain size backfill was used that met the ASTM D 448-08 size 67 standard. The use of this backfill during backfilling is not expected to damage the pipe coating. Plant procedures will be enhanced so that, during backfill repair or replacement, care is taken to avoid damage to pipe coatings while backfilling the trench. Section Xl.M41 Table 2a of NUREG-1801 Revision 2, requires coating of pipe in accordance with NACE SP0169-2007, Table 1. Table 1 recommends that coal tar coatings are in accordance with AWWA C-203, and that prefabricated films are in accordance with AWWA C-214 or C-209. These standards were not referenced in STP installation specifications. However, the coatings were applied in accordance with plant-defined specifications. Plant specifications are consistent with the intent of the AWWA coating standards called out in NACE SP 0169-2007. Installation specifications ensure that any defects in the coatings were repaired prior to backfilling over the pipe. Enhancements Prior to the period of extended operation, the following enhancements will be implemented in the following program elements: Preventive Actions (Element 2) Plant specifications will be enhanced to include the following: Indicate that pipe should be lowered carefully into the ditch to avoid external coating damage. Proper storage and handling must be used to prevent damage to pipe coating prior to installation. These practices include padded storage, use of proper slings for installation and ultraviolet light-resistant topcoats. Over-excavate trenches and use qualified backfill for bedding piping. Take care during backfilling to prevent rocks and debris from striking and damaging the pipe coating.

NOC-AE-16003380 Enclosure 2 Page 8of15 Include the coating used for copper alloy buried piping in the coating database. The coating system must be in accordance with NACE SP0169-2007, Table 1, and will be used for repair or for new coatings of the buried copper alloy piping in the essential cooling water system. Indicate that the portion of the essential cooling water system copper alloy piping directly embedded in backfill or directly encased in concrete must be coated, extending the coating 2 feet or more above grade. Plant procedures will be enhanced to include the following: In lieu of visual inspections of the fire protection system (FP), this program credits flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition. Backfill that is located within 6 inches of the pipe that is consistent with ASTM D 448-08 size number 67 is considered acceptable. Backfill quality is determined through examination during the inspections conducted by this program. Backfill that does not meet the ASTM criteria during the initial and subsequent inspections of this program is considered acceptable if the inspections of buried piping do not reveal evidence of mechanical damage to the pipe coatings due to the backfill.

  • The cathodic protection system engineer is responsible for ensuring the cathodic protection system survey is performed annually, and the rectifier current is checked and recorded every 2 months.

Monitor cathodic protection system rectifier output every 2 months. The measured current at each rectifier is recorded and compared against a target value. Following completion of the plant yard cathodic protection system annual survey, record the current of the rectifier used to achieve an acceptable pipe/soil potential. That current will be the target current for the rectifier. If the current measured at the rectifier during th(3 bimonthly monitoring deviates significantly from the target value, a condition report should be created. The rectifier current should be adjusted to an acceptable value. The results of the survey will be documented and trended to identify degrading conditions. When degraded rectifier performance is identified, corrective actions are required to be initiated. The system should not be operated outside of established acceptable limits for longer than 90 days. During the plant yard cathodic protection system annual survey, evaluate the effectiveness of isolating fittings, continuity bonds and casing isolation. This may be accomplished through electrical measurements (NACE SP016-2007, Section 10.4.4). The personnel performing the plant yard cathodic protection system annual survey must be NACE-certified, certified by a site-approved training procedure consistent with the NACE requirements, or supervised by a NACE-certified inspector. Use of excessive cathodic protection polarized potential on coated piping should be avoided. The limiting critical potential should not be more negative than 1200 mV relative to a CSE.

NOC-AE-16003380 Enclosure 2 Page 9of15 Parameters Monitored/Inspected (Element 3) and Detection of Aging Effects (Element 4)

  • Plant procedures will be enhanced to indicate that piping in this program is inspected using visual inspections and, if significant indications of degradation are observed, the visual inspections are supplemented by surface and/or volumetric non-destructive testing.

Detection of Aging Effects (Element 4) Plant procedures will be enhanced to include the following: The inspections of this program are conducted every 10 years, beginning in the 10 year interval prior to the beginning of the period of extended operation. Buried and underground piping inspection locations are to be selected based on risk, considering susceptibility to degradation and consequences of failure. The risk ranking for buried piping should consider characteristics such as coating type, coating condition, cathodic protection efficiency, backfill charaderistics, soil resistivity, pipe contents, and pipe function. The risk ranking for underground piping should consider characteristics such as coating type, coating condition, exact external environment, pipe contents, pipe function, and flow characteristics within the pipe. The risk ranking should generally give piping systems that are backfilled using compacted aggregate a higher inspection priority than comparable systems that are completely backfilled using controlled low strength material.

  • External Corrosion Direct Assessment, as described in NACE Standard Practice SP0502-2010, is recommended for use in identifying inspection locations. It has been demonstrated to be an effective method for identification of pipe locations that merit further inspection.

Opportunistic examinations of non-leaking pipes may be credited toward the required examinations, if they meet the risk-ranking selection criteria. Guided wave ultrasonic techniques or other advanced inspection techniques should be used, if practical, for determining piping locations that should be inspected. However, these inspections may not be used as substitutes for inspections required by this program. An inspection of piping shared between Units 1 and 2 may be credited toward the required inspections. Inspection quantities are increased by 50 percent as STP has two units and inspections are distributed evenly among the units. Any piping, valves, or closure bolting exposed during inspections should be examined. Examine bolting for loss of material and loose or missing fasteners. There are two alternatives to directed inspections of the buried or underground piping that is within the scope of license renewal. The first alternative is a hydrostatic test of 25 percent of the subject piping to 110 percent of the design pressure of any component

NOC-AE-16003380 . Enclosure 2 Page 10 of 15 within the boundary with test pressure being held for eight hours on an interval not to exceed 5 years. The second is an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness. The inspection must also include methods capable of detecting both general and pitting corrosion, and must be qualified by the plant, and approved by the NRC. UT examinations can be considered approved by the NRC. Guided wave inspection does not currently satisfy these inspection technique requirements. Internal inspections are to be conducted every 10 years beginning 10 years prior to the period of extended operation. In lieu of visual inspection of the fire protection system, this program relies on flow testing of the fire mains as described in Section 7.3 of NFPA 25, 2011 Edition to detect degradation of the buried pipe.

  • Each inspection will examine either the entire length of a run of pipe, or a minimum of 1O feet. If the entire run of pipe of that material type is less than 10 feet in total length, then the entire run of pipe should be inspected. The inspection consists of a 100 percent visual inspection of the exposed pipe.

If a transition from Category C to Category E or from Category E to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function. In all cases, the examinations are completed within 4 years after the end of the particular 10-year interval. These additional inspections conducted in an inspection interval cannot be credited towards the base number of inspections required for the 10-year interval. Where steel or copper alloy piping has been coated with the same coating system and the backfill has the same requirements. the total inspections for this piping may be combined to satisfy the recommended inspection quantity. For example, for Category F, 10 percent of the total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.

  • Category C inspections are used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria. Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period are performed.
  • Category E inspections are used when the cathodic protection system has been installed but the portions of the piping covered by that system fail to meet the acceptance criteria.

Category E inspections are 5 percent, NTE ~§.inspections. in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. The following condition must be present. a) Coatings and backfill are provided in accordance with STP backfill specification. b) There have been no leaks in buried piping due to external corrosion and no significant coating degradation or metal loss in more than 10 percent of inspections conducted. c) Soil has been demonstrated to be not corrosive for the material type.

NOC-AE-16003380 Enclosure 2 Page 11 of 15 Where Category E inspections are used, STP will demonstrate that soil is not corrosive using the following. o A minimum of three sets of soil samples will be obtained in the vicinity where the cathodic protection system fails to meet the acceptance criteria. o The soil will be tested for soil resistivity, corrosion accelerating bacteria, pH, moisture, chlorides, sulfates, and redox potential. o The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined. o If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10-year period starting at the time when it was determined that the cathodic protection system failed to meet the acceptance. The inspection scope for piping that does not meet Category C or E inspection schedule requirements is 10 percent, NTE ~Q_inspections, in years 30 to 40; 12 percent, NTE 30 inspections, in years 40 to 50; and 15 percent, NTE 38 inspections, in years 50 to 60.

  • The AF system underground stainless steel piping located in a vault will undergo_two inspections each 10-year inspection period.

The OW system underground piping will undergo 2% NTE ~4 inspection each 10-year inspection period. Cathodic protection shall be operational (available) at least 85 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter. Cathodic protection shall provide effective protection for buried piping at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter. As found results of annual surveys are to be used to demonstrate locations within the plant's population of buried pipe where cathodic protection acceptance criteria have, or have not, been met. Indicate that adverse indications discovered during the monitoring of the cathodic protection system may warrant increased monitoring of the cathodic protection system and/or additional inspections. Include examples of adverse indications discovered during piping inspections including leaks, material thickness less than minimum, and general or local degradation of coatings that exposes the base material. The presence of coarse backfill within 6 inches of a coated pipe or tank, with accompanying coating degradation, is considered an adverse condition. Adverse indications that fail to meet the acceptance criteria described in this program require corrective actions for the repair or replacement of the affected component. If adverse indications are detected, an expansion of the sample size is conducted. The number of inspections within the affected piping categories is doubled or increased by 5,

NOC-AE-16003380 Enclosure 2 Page 12of15 whichever is smaller. inspection sample sizes within the affected piping categories are doubled. If adverse indications are found in the expanded sample, an analysis is conducted to determine the extent of condition and extent of cause. The size of the follow-on inspections will be determined based on the extent of condition and extent of cause. The timing of the additional examinations should be based on the severity of the degradation identified and should be commensurate with the consequences of a leak or loss of function:.,-btit However, in all cases, the expanded sample inspections should be completed within the 10-year interval in which the original adverse condition was identified inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. Expansion of the sample size may be limited by the extent of piping subject to the observed degradation mechanism. If adverse conditions are extensive within the 10-year interval in which the inspections were conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval, inspections may be halted in an area of concern that is planned for replacement, provided continued operation does not pose a significant hazard. During the inspection of buried piping, observe for brittle failure at flanges, connections, and joints due to frost heaving, soil stresses, or ground water effects. Monitoring and Trending (Element 5) Plant procedures will be enhanced to include the following Direct the cathodic protection system engineer to trend results of the plant yard Gathodic protection system annual surveys, so that changes in the effectiveness of the cathodic protection system and coating of buried piping can be verified.

  • Where wall thickness measurements are conducted, the results should be trended if follow-up examinations are conducted.

Acceptance Criteria (Element 6) Plant procedures will be enhanced to include the following:

  • The cathodic protection system pipe-to-soil potential when using a saturated copper/copper sulfate reference electrode must be beP.veen at least -850 mV instant off and 1200 mV for steel piping. 100 mV minimum polarization is required for copper alloy
      .Pfillog. The cathodic protection system is operational (available) at least 85 percent of the time and provides effective protection for buried piping as evidenced by meeting the acceptance criteria at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.

If the cathodic protection system fails to meet the acceptance criteria of at least -850 mV relative to a CSE instant off for steel components the following alternatives may be used.

  • 100 mV minimum polarization
            * -750 mV relative to a CSE, instant off where soil resistivity is greater than 10,000 ohm-cm to less than 100,000 ohm-cm
            * -650 mV relative to a CSE, instant off where soil resistivity is greater than 100,000 ohm-cm
  • Verify less than 1 mpy loss of material.

NOC-AE-16003380 Enclosure 2 Page 13of15 Means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:

  • Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate.
  • Every 2 years when using the 100 mV minimum polarization.
  • Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years.

When electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist. The impact of significant site features (e.g., large cathodic protection current collectors. shielding due to large objects located in the vicinity of the protected piping) and local soil conditions will be factored into placement of the probes and use of probe data.

  • For coated piping, there should be no evidence of coating degradation. If coating degradation is present, it may be considered acceptable if it is determined to be insignificant by an individual possessing a NACE Coating Inspector Program Level 2 or 3 inspector qualification, or an individual has attended the Electric Power Research Institute (EPRI) Comprehensive Coatings Course and completed the EPRI Buried Pipe Condition Assessment and Repair Training Computer Based Training Course.

Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation. Backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component. Backfill is acceptable if it is consistent with SP0169 2007 Section 5.2.3. Backfill that is located within 6 inches of steel pipe that meets ASTM D 448 08 size number 67 is consistent with the ob:jectives of SP0169 2007.

  • For any hydrostatic tests credited by this program, the condition acceptance criteria is no visible indications of leakage and no drop in pressure within the isolated portion of the piping that is not accounted for by a temperature change in the test media or quantified leakage across test boundary valves.

Corrective Actions (Element 7) Plant procedures will be enhanced to include the following: Where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation. If coated or uncoated metallic piping show evidence of corrosion, the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.

NOC-AE-16003380 Enclosure 2 Page 14of15 If the wall thickness meets minimum wall thickness requirements, recommendations for expansion of sample size do not apply. Where the coatings, backfill, or the condition of exposed piping does not meet acceptance criteria, the degraded condition is repaired or the affected component is replaced. The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. If the acceptance criteria are not met in any of the expanded samples. an analysis is conducted to determine the extent of condition and extent of cause. The number of the follow-on inspections is determined based on the extent of condition and extent of cause.

  • The timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function.

However, in all cases, the expanded sample inspection is completed within the 10-year interval in which the original inspection was conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. The number of inspections may be limited by the extent of piping subject to the observed degradation mechanism. The expansion of sample inspections may be halted in a piping system or portion of system that will be replaced within the 10-year interval in which the inspections were conducted or, if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. Operating Experience A 10-year review of plant operating experience shows 30 events which were associated with buried piping. Nirie of these events were related to systems or components in scope of license renewal. All of these events were leaks shown to not be a result of corrosion of materials, making them not relevant to this program. The program includes availability, reliability, maintainability, and capacity measurement analyses, published in bi-annual Health Reports. The events described in the Health Reports are all attributed to causes other than corrosion due to contact with an aggressive environment (most leaks were associated with mechanical joints). The need to enhance the STP Buried Piping program was initially identified by INPO as an area for improvement. Since that time, involvement with the industry has identified areas for program enhancement. Enhancement of the program is ongoing, utilizing guidance from NEI 09-14 Revision 1, Guideline for the Management of Buried Piping Integrity, and industry operating experience. The following industry operating experience was reviewed to identify aging effects applicable to STP. In February 2005, a leak was detected in a 4-inch condensate storage supply line. The cause of the leak was microbiologically influenced corrosion {MIC) or under deposit corrosion. MIC and under deposit corrosion are typically internal corrosion, and managed by the Water Chemistry program (B2.1.2) and verified with the One-Time Inspection program {B2.1.16).

NOC-AE-16003380 Enclosure 2 Page 15of15 In September 2005, a service water leak was discovered in a buried service water header. The header had been in service for 38 years. The cause of the leak was either failure of the external coating or damage caused by improper backfill. STP has a very fine grain of the natural soil, and the installation specifications for backfilling require a backfill that is consistent with ASTM D-448 08 size number 67. Considering this, there is a low probability that pipe coatings have sustained damage due to backfill. The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event of coating degradation or failure. In October 2007, degradation of essential service water piping was reported. The riser pipe leak was caused by a loss of pipe wall thickness due to external corrosion induced by the wet environment surrounding the unprotected carbon steel pipe. This degradation is not expected at STP, as all steel and copper alloy piping managed by this program are coated and cathodically protected.

  • In February 2009, a leak was discovered on the return line to the condensate storage tank. The cause of the leak was coating degradation, probably due to the installation specification not containing restrictions on the type of backfill, allowing rocks in the backfill. STP has a very fine grain of the natural soil, and the installation specifications for backfilling require a backfill that is consistent with ASTM D-448 08 size number 67. Considering this, there is a low probability that pipe coatings have sustained damage due to backfill. Plant specifications will be enhanced to prevent rocks and debris from striking the pipe coatings during the backfill of piping. The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event'of coating degradation or failure.

In April 2009, a leak was discovered in an aluminum pipe where it went through a concrete wall. This leak is not relevant to STP, as the plant has no buried aluminum piping that requires management by this program. In June 2009, an active leak was discovered in buried piping associated with the condensate storage tank. The leak was discovered because elevated levels of tritium were detected. The cause of the through-wall leak was determined to be degradation of the protective moisture barrier wrap, which allowed moisture to come in contact with the piping, resulting in external corrosion. STP inspected pipe coatings during installation, and verified an acceptable condition of wrap as it was installed. The cathodic protection system is operated in accordance with NACE SP0169 and will assure that the piping has a low probability of corrosion, even in the event of coating degradation or failure. The inspection of high risk piping by this program can be used to verify that this degradation is unlikely at STP. The Buried Piping and Tanks Inspection program requires review of plant and industry operating experiences for impacts to the program. This program ensures long-term strategies to address Buried Piping and Tank Inspection are developed and implemented. Conclusion The continued implementation of the Buried Piping and Tanks Inspection program provides reasonable assurance that aging effects are managed such that the systems and components within the scope of this program will continue to perform their intended functions consistent with the current licensing basis for the period of extended operation.

NOC-AE-16003380 Enclosure 3 STPNOC Revision of Regulatory Commitment Item 13

NOC-AE-16003380 Enclosure 3 Page 1 of 7 Table A4-1 License Renewal Commitments f:'.LR.6.*

                                                                                                                                        .
     '2-'.-<';:j,

. ~- .... ',: z~ ,_:,.:.:'~, ~>:~::"~.2- *s~ctierl F*.-i*,7 13 Enhance plant specifications to: B2.1.18 Start implementation

  • Lower coated piping carefully into a trench to avoid external coating damage. during the 10 years
  • Use proper storage and handling practices to prevent damage to pipe coating prior to prior to the period of installation. These practices include padded storage, use of proper slings for extended operation.

installation and ultraviolet light resistant topcoats.

  • Over excavate trenches and use qualified backfill for bedding piping. Take care during Inspections to be backfilling to prevent rocks and debris from striking and damaging the pipe coating. complete no later
  • Include the coating used for copper alloy buried piping in the coating database. The than six months prior coating system must be in accordance with NACE SP0169-2007, and will be used for to the PEO or the repair or for new coatings of the buried copper alloy piping in the essential cooling water end of the last system. refueling outage
  • Coat the portion of the essential cooling water system copper alloy piping directly prior to the PEO, embedded in backfill or directly encased in concrete, extending the coating 2 feet or whichever occurs more above grade. later.

Enhance the Buried Piping and Tanks Inspection program procedures to: CR 10-23268

  • Specify that In lieu of visual inspections of the fire protection system (FP), this program credits flow testing of the fire mains as described in Section 7.3 of NFPA 25. 2011 Edition.
  • Consider backfill located within 6 inches of the pipe, and consistent with ASTM D 448-08 size number 67, acceptable. Backfill quality is determined through examination during the inspections conducted by the program. Backfill that does not meet the ASTM criteria, during the initial and subsequent inspections of the program, is considered acceptable if the inspections of buried piping do not reveal evidence of mechanical damage to the pipe coatings due to the backfill.
  • Ensure the cathodic protection system survey is performed annually.
  • Monitor the output of the cathodic protection system rectifiers every 2 months. The measured current at each rectifier is recorded and compared against a target value.

Following the completion of the plant yard cathodic protection system annual survey, record the current of the rectifier used to achieve an acceptable pipe/soil potential. That current will be the target current for the rectifier until the next annual survey. If the current measured at the rectifier durin the bimonthl monitorin deviates si nificantl

NOC-AE-16003380 Enclosure 3 Page 2 of 7 License Renewal Commitments

                                                                                                  ,.1mp1eQ1~6'tatiorl    * **
  • Scll.e'dufo' ; * , *
                                                                                                            ., : >.,:"

from the target value, a condition report should be created. The rectifier current should be adjusted to an acceptable value. The results of the survey will be documented and trended to identify degrading conditions. When degraded rectifier performance is identified, documentation is required in accordance with the corrective action program. The system should not be operated outside of established acceptable limits for longer than 90 days.

  • Recommend increased monitoring of the cathodic protection system and/or additional inspections if adverse indications are discovered during the monitoring of the cathodic protection system.
  • Evaluate the effectiveness of isolating fittings, continuity bonds and casing isolation, during the plant yard cathodic protection system annual survey. This may be accomplished through electrical measurements.
  • The personnel performing the plant yard cathodic protection system annual survey must be NACE-certified, certified by a site-approved training procedure consistent with the NACE requirements, or supervised by a NACE-certified inspector.
  • Use of excessive cathodic protection polarized potential on coated piping should be avoided. The limiting critical potential should not be more negative than 1200 mV relative to a CSE.
  • Visually inspect buried piping and, if significant indications of degradation are observed, the visual inspections are supplemented by surface and/or volumetric non-destructive testing.
  • Define the inspection interval for the program directed inspections as every 10 years, beginning the 10 year interval prior to the period of extended operation.
  • Select the buried and underground piping inspection locations based on risk, considering susceptibility to degradation and consequences of failure.
  • The risk ranking for buried piping should consider characteristics such as coating type.

coating condition. cathodic protection efficiency, backfill characteristics, soil resistivity, pipe contents. and pipe function.

  • The risk ranking for underground piping should consider characteristics such as coating type, coating condition, exact external environment, pipe contents, pipe function, and flow characteristics within the pipe.
  • The risk ranking should generally give piping systems that are backfilled using com acted a re ate a hi her ins ection riorit than comparable s stems that are

NOC-AE-16003380 Enclosure 3 Page 3 of 7 License Renewal Commitments

                                                                                                                         '   .. ,_.
                                                                                                .. t~A;i      'Implementation *
                                                                                               . +S~ctiOIJ'.~ *   '

Schedule/

                                                                                                                     , ' .: . .. *.
                                                                                                                           '".:   ,.~ '

completely backfilled using controlled low strength material.

  • External Corrosion Direct Assessment, as described in NACE Standard Practice SP0502-2010, will be considered for use in identifying inspection locations.
  • Credit opportunistic examinations of non-leaking pipes toward required examinations, only if they meet the risk ranking selection criteria.
  • Guided wave ultrasonic, or other advanced inspection techniques should be used, if practical, for the purpose of determining piping locations that should be inspected.

These inspections may not be used as substitutes for inspections required by the program.

  • Credit an inspection of piping shared between Units 1 and 2 toward the required inspections and inspections are distributed evenly among the units.
  • Examine any piping, valves and closure bolting exposed during inspections.
  • Examine bolting for loss of material and loose or missing fasteners.
  • Include two alternatives to directed inspections of the buried or underground piping that is safety-related, hazmat or both. The first alternative is to hydrostatically test 25 percent of the subject piping to 110 percent of the design pressure of any component within the boundary with test pressure being held for eight hours_on an interval not to exceed 5 years. The second is an internal inspection of 25 percent of the subject piping by a method capable of accurately determining pipe wall thickness on an interval of every 10 years.
  • Flow testing of the fire mains, as described in NFPA 25, 2011 Edition, to detect degradation of the buried pipe in lieu of visual inspections of the fire protection system buried and underground piping.
  • Specify that each inspection will examine either the entire length of a run of pipe, or a minimum of 10 feet. If the entire run of pipe of that material type is less than 10 feet in total length, then the entire run of pipe should be inspected. The inspection consists of a 100 percent visual inspection of the exposed pipe.
  • Specify that if a transition from Category C to Category E or from Category E to Category F occurs in the latter half of the current 10-year interval, the timing of the additional examinations is based on the severity of the degradation identified and is commensurate with the consequences of a leak or loss of function. In all cases. the examinations are completed within 4 years after the end of the particular 10-year interval. These additional inspections conducted in an inspection interval cannot be

NOC-AE-16003380 Enclosure 3 Page 4 of 7 Table A4-1 License Renewal Commitments

                                                                                                            .*;*IL.RA' ***.
  • hnpiementation; *
                                                                                                            *. sediOn,,.
                                                                                                                ', ,;:-:,.:,-{i'*_\<<~',
                                                                                                                                            . Schedule*

credited towards the base number of inspections required for the 10-year interval.

  • Specify where steel or copper alloy piping has been coated with the same coating system and the backfill has the same requirements. the total inspections for this piping may be combined to satisfy the recommended inspection quantity. For example, for Category F, 10 percent of the total of the associated steel or copper alloy is inspected; or 9 10-foot segments of steel or copper alloy piping are inspected.
  • Specify that Category C inspections be used when the external cathodic protection system for buried steel or copper alloy pipe meets the acceptance criteria. Category C inspections are 0.5 percent Not-to-Exceed (NTE) two inspections of that piping per inspection period performed.
  • Specify that Category E inspections be used when the cathodic protection system has been installed but the portions of the piping covered by that system fail to meet the acceptance criteria. Category E inspections are 5 percent, NTE .:t-1-§. inspections, in years 30 to 40; 6 percent, NTE 15 inspections, in years 40 to 50; and 7.5 percent, NTE 18 inspections, in years 50 to 60. The following condition must be present.

o Coatings and backfill are provided in accordance with STP backfill specification. o There have been no leaks in buried piping due to external corrosion and no significant coating degradation or metal loss in more than 10 percent of inspections conducted. o Soil has been demonstrated to be not corrosive for the material type using the following.

  • A minimum of three sets of soil samples will be obtained in the vicinity where the cathodic protection system fails to meet the acceptance criteria.
  • The soil will be tested for soil resistivity, corrosion accelerating bacteria, pH, moisture, chlorides, sulfates, and redox potential.
  • The potential soil corrosivity will be determined for each material type of buried in-scope piping in the vicinity of the failed cathodic protection system. In addition to evaluating each individual parameter, the overall soil corrosivity will be determined.
  • If portions of the installed cathodic protection system fail to meet the acceptance criteria, soil testing will be conducted at a minimum of once in each 10- ear period startin at the time when it was determined that

NOC-AE-16003380 Enclosure 3 Page 5 of 7 License Renewal Commitments

                                                                                                   *C~C      ,. . 1mp1ernentati0n ** *
                                                                                                ,

Section'/

  • _. A ~
                                                                                                                   . Sthe'd~fo.<

the cathodic protection system failed to meet the acceptance.

  • Specify that inspection scope for piping that does not meet Category C or E inspection schedule requirements is 1O percent, NTE ~~inspections, in years 30 to 40; 12 peroent, NTE 30 inspections, in years 40 to 50; and 15 percent, NTE 38 inspections, in years 50 to 60.
  • Specify that the AF system underground stainless steel piping located in a vault will undergo two inspections each 10-year inspection period.
  • Specify that the OW system underground piping will undergo 2% NTE 4~ inspection each 10-year inspection period.
  • Include acceptance criteria for the cathodic protection to be operational (available) at least 85 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
  • Include acceptance criteria for the cathodic protection system to provide protection for buried piping at least 80 percent of the time since either 10 years prior to the period of extended operation or since installation or refurbishment, whichever is shorter.
  • Include examples of adverse indications discovered during piping inspections.
  • Repair or replacement of the affected component when adverse indications failing to meet the acceptance criteria described in the program are discovered.
  • Specify that if adverse indications are detected. an expansion of the sample size is conducted. The number of inspections within the affected piping categories is doubled or increased by 5, whichever is smaller. Double inspection sample sizes within the affected piping categories, 'Nhen adverse indications are detected during inspection of
   ~ If adverse indications are found in the expanded sample, an analysis is conducted to determine the extent of condition and extent of cause. The size of the follow-on inspections will be determined based on the extent of condition and extent of cause. The timing of the additional examinations should be based on the severity of the degradation identified and should be commensurate with the consequences of a leak or loss of function~.,..9\:H However. in all cases, the expanded sample inspections should be completed within the 10-year interval in which the original adverse condition was identified inspection was conducted or. if identified in the latter half of the current 10-year interval, within 4 years after the end of the 10-year interval. If adverse conditions are extensive within the 10-year interval in which the inspections were conducted or. if identified in the latter half of the current 10- ear interval within 4 ears after the end of

NOC-AE-16003380 Enclosure 3 Page 6 of 7 Table A4-1 License Renewal Commitments

                                               .;.:c~?1mit"}.~*~:* .
                                                      .~ . .;,"-'v the 10-year interval, inspections may be halted in an area of concern that is planned for replacement, provided continued operation does not pose a significant hazard.

Expansion of sample size may be limited to the piping subject to the observed degradation mechanism.

  • Observe for brittle failure at flanges, connections, and joints due to frost heaving, soil stresses, or ground water effects during inspection of buried piping.
  • Require trending cathodic protection system annual surveys results.
  • Where wall thickness measurements are conducted, the results should be trended if follow-up examinations are conducted.
  • Specify that the cathodic protection system pipe-to-soil potential when using a saturated copper/copper sulfate reference electrode must be betweenat least -850 mV relative to a CSE, instant off and 1200 mV for steel piping. 100 mV minimum polarization is required for copper alloy piping.
  • Specify that If the cathodic protection system fails to meet the acceptance criteria of at a

least -850 mV relative to CSE instant off for steel components the following alternatives may be used. o 100 mV minimum polarization o -750 mV relative to a CSE. instant off where soil resistivity is greater than 10.000 ohm-cm to less than 100,000 ohm-cm o -650 mV relative to a CSE. instant off where soil resistivity is greater than 100,000 ohm-cm o Verify less than 1 mil/year (mpy) loss of material.

  • Specify means to verify the effectiveness of the protection of the most anodic metal when alternatives are used are incorporated into the program. The external loss of material rate is verified by:

o Every year when verifying the effectiveness of the cathodic protection system by measuring the loss of material rate. o Every 2 years when using the 100 mV minimum polarization. o Every 5 years when using the -750 mV or -650 mV criteria associated with higher resistivity soils. The soil resistivity is verified every 5 years.

  • Specify where electrical resistance corrosion rate probes are used the installation locations of the probes and the methods of use will be determined by qualified NACE CP4 Cathodic Protection Specialist.

NOC-AE-16003380 Enclosure 3 Page 7 of 7 Table A4-1 License Renewal Commitments

                                                                                                           ; . "irrip1en)~ntatio'n *
                                                                                                              .* .* sctie~ul~' **
  • Require the impact of significant site features (e.g., large cathodic protection current collectors. shielding due to large objects located in the vicinity of the protected piping) and local soil conditions be factored into placement of the probes and use of probe data.
  • Indicate that for coated piping, there should be no evidence of coating degradation. If coating degradation is present, it may be considered acceptable if it is determined to be insignificant by an individual possessing a NACE Coating Inspector Program Level 2 or 3 inspector qualification, or an individual has attended the Electric Power Research Institute (EPRI) Comprehensive Coatings Course and completed the EPRI Buried Pipe Condition Assessment and Repair Training Computer Based Training Course.
  • Specify where damage to the coating has been evaluated as significant and the damage was caused by non-conforming backfill, an extent of condition evaluation should be conducted to ensure that the as-left condition of backfill in the vicinity of observed damage will not lead to further degradation.
  • Specify that backfill is acceptable if the inspections do not reveal evidence that the backfill caused damage to the component's coatings or the surface of the component.

backfill is acceptable if it is consistent v;ith SP0169 2007 Section 5.2.3. Backfill that is located within 6 inches of steel pipe that meets /\STM D 448 08 size number 67 is consistent 'Nith the objectives of SP0169 2007.

  • Indicate that for any hydrostatic tests credited by the program, the condition acceptance criteria is no visible indications of leakage and no drop in pressure within the isolated portion of the piping that is not accounted for by a temperature change in the test media or quantified leakage across test boundary valves.
  • Specify that if coated or uncoated metallic piping show evidence of corrosion. the remaining wall thickness in the affected area is determined to ensure that the minimum wall thickness is maintained.
  • Specify where wall thickness meets minimum wall thickness requirements, recommendations for ex ansion of sam le size does not a I .}}