ML16362A449: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16362A449
| number = ML16362A449
| issue date = 12/22/2016
| issue date = 12/22/2016
| title = Waterford Steam Electric Station Acknowledgement of Response to NRC Inspection Report 05000382/2016406 and Denial of Non-Cited Violation 05000382/2016406-01
| title = Acknowledgement of Response to NRC Inspection Report 05000382/2016406 and Denial of Non-Cited Violation 05000382/2016406-01
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Chisum M R
| addressee name = Chisum M
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
Line 15: Line 15:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000382/2016406]]
See also: [[see also::IR 05000382/2016406]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::December 22, 2016]]
                          NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                        1600 E. LAMAR BLVD
                                      ARLINGTON, TX 76011-4511
                                      December 22, 2016
EA-16-276
Mr. Michael R. Chisum
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
              RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
              OF NON-CITED VIOLATION 05000382/2016406-01
Dear Mr. Chisum:
This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in
response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2,
2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a
non-cited violation, NCV 05000382/2016406-01 Failure to Analyze and Identify Site-Specific
Conditions. The non-cited violation enclosed with Inspection Report 05000382/2016406
required you to respond in writing within 30 days if you contest the violation.
On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance
Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is
currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8
of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written
response within 90 days of the receipt of your letter.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room and in the


EA-16-276
M. Chisum                                  -2-
NRCs Agencywide Documents Access and Management System (ADAMS), accessible from
the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
                                            Sincerely,
                                            /RA/
                                            Mark S. Haire, Chief
                                            Plant Support Branch 1
                                            Division of Reactor Safety
Docket No. 50-382
License No. NPF-38


Mr. Michael Site Vice President Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751


SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL OF NON-CITED VIOLATION 05000382/2016406-01
ML16362A449
 
  SUNSI Review          ADAMS         Publicly Available        Non-Sensitive Keyword:
==Dear Mr. Chisum:==
By: ADM                 Yes No     Non-Publicly Available   Sensitive     NRC-002
This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2, 2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a non-cited violation, NCV 05000382/2016406-01 "Failure to Analyze and Identify Site-Specific Conditions." The non-cited violation enclosed with Inspection Report 05000382/2016406 required you to respond in writing within 30 days if you contest the violation. On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8 of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written response within 90 days of the receipt of your letter.
OFFICE       PSI:PSB1   C:PSB1     ACES           C:PBD       C:PSB1
 
NAME         AMeyen     MHaire     CAlldredge     GMiller     MHaire
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room and in the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
SIGNATURE E-mail       E-mail     /RA/           /RA/       /RA/
 
DATE         12/20/16   12/20/16   12/22/16       12/22/16   12/22/16
Sincerely,/RA/
                                 
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38 NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016
 
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
Sincerely,/RA/
              RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38
              OF NON-CITED VIOLATION 05000382/2016406-01
 
Electronic distribution by RIV:
DISTRIBUTION: See next page ADAMS ACCESSION NUMBER: ML16362A449 SUNSI Review By: ADM ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSI:PSB1 C:PSB1 ACES C:PBD C:PSB1 NAME AMeyen MHaire CAlldredge GMiller MHaire SIGNATURE E-mail E-mail /RA/ /RA/ /RA/ DATE 12/20/16 12/20/16 12/22/16 12/22/16 12/22/16 OFFICIAL RECORD COPY Letter to Michael from Mark S. Haire, dated December 22, 2016
Regional Administrator (Kriss.Kennedy@nrc.gov)
 
Deputy Regional Administrator (Scott.Morris@nrc.gov)
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL OF NON-CITED VIOLATION 05000382/2016406-01 Electronic distribution by RIV: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Frances.Ramirez@nrc.gov) Resident Inspector (Chris.Speer@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
Site Administrative Assistant (Amy.Elam@nrc.gov)
Site Administrative Assistant (Amy.Elam@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (April.Pulvirenti@nrc.gov)
Project Manager (April.Pulvirenti@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
}}
}}

Latest revision as of 10:52, 30 October 2019

Acknowledgement of Response to NRC Inspection Report 05000382/2016406 and Denial of Non-Cited Violation 05000382/2016406-01
ML16362A449
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/22/2016
From: Mark Haire
Plant Support Branch-1
To: Chisum M
Entergy Operations
References
EA-16-276 IR 2016406
Download: ML16362A449 (4)


See also: IR 05000382/2016406

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

December 22, 2016

EA-16-276

Mr. Michael R. Chisum

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF

RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL

OF NON-CITED VIOLATION 05000382/2016406-01

Dear Mr. Chisum:

This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in

response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2,

2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a

non-cited violation, NCV 05000382/2016406-01 Failure to Analyze and Identify Site-Specific

Conditions. The non-cited violation enclosed with Inspection Report 05000382/2016406

required you to respond in writing within 30 days if you contest the violation.

On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance

Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is

currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8

of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written

response within 90 days of the receipt of your letter.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room and in the

M. Chisum -2-

NRCs Agencywide Documents Access and Management System (ADAMS), accessible from

the NRC Website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-382

License No. NPF-38

ML16362A449

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: ADM Yes No Non-Publicly Available Sensitive NRC-002

OFFICE PSI:PSB1 C:PSB1 ACES C:PBD C:PSB1

NAME AMeyen MHaire CAlldredge GMiller MHaire

SIGNATURE E-mail E-mail /RA/ /RA/ /RA/

DATE 12/20/16 12/20/16 12/22/16 12/22/16 12/22/16

Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016

SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF

RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL

OF NON-CITED VIOLATION 05000382/2016406-01

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

Site Administrative Assistant (Amy.Elam@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (April.Pulvirenti@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)