ML17037C335: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17037C335
| number = ML17037C335
| issue date = 06/18/1971
| issue date = 06/18/1971
| title = Nine Mile Point Unit 1 - Letter Responding to the April 14, 1971 Letter Regarding Change No. 4 to the Technical Specifications and Enclosing a New Printing with Changes No. 1 and 3 and a Number of Additional Changes
| title = Letter Responding to the April 14, 1971 Letter Regarding Change No. 4 to the Technical Specifications and Enclosing a New Printing with Changes No. 1 and 3 and a Number of Additional Changes
| author name = Brosnan T J
| author name = Brosnan T
| author affiliation = Niagara Mohawk Power Corp
| author affiliation = Niagara Mohawk Power Corp
| addressee name = Morris P A
| addressee name = Morris P
| addressee affiliation = US Atomic Energy Commission (AEC)
| addressee affiliation = US Atomic Energy Commission (AEC)
| docket = 05000220
| docket = 05000220
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:FROM:NiagaraIIRbamlcPe'.erCorpoSyracuBQ,-;-Vi-TiJ.BrosanLTRMEMO:REPORTIDATEOFDOCUMKNT:DATERECENO..67623OTHE'O:NorrisORIG,:'.l.OTHERACTIONNECESSARYQCONCURRENCKPDATEANSWERED:NOACTIONNECESSARYQ'OMMENTQSV:CLASSIF;POSTOFFICEREG.NO'.FILECODE:50220DESCRIPTIONI(MUIIBdUIICI$5$IIItd)JtrtransupdatedTechSpecsSBasestoincludeChange04,withotherchangesKor,approvelENCLOSURESREFERREDTODATEDXSTRXBUTXOM:egXilecy(StPNoreisSchroederShovholtMCZiemann<<23>>Q/3cysforactonRECEIVEDOY0VtDATEIIREMARIISIIICoayletedi5tvtl1bemadeuponsubmittaloEPoranlTechsecsoU.S.ATOMICENERGYCOMMISSIONQU,S.GOVERNMENTPRINTINGOFFICE".I970400974MAILCONTROLFORMFDRMAEosESsISSOI t<<f'7Et(4PEPJ A,NIAGARAMOHAWKPOWERCORPORATIONNIAGARAMOHAWK3OOERICBOULEVARDWESTSYRACUSE,N.Y.I3202JuneI8,197I'Cf/Pp~.8t4Zlu9Ec@/4'lOPOYg~P'lg/n~~ell~~Dr.PeterA.Morris,DirectorDivisionofReactorLicensingU.S.AtomicEnergyCorlnlsslonWashington,D.C.20545
{{#Wiki_filter:DATE OF DOCUMKNT:            DATE RECE            NO..
FROM:
Niagara      IIRbamlc      Pe'.er    Corp o SyracuBQ,;-Vi-                                           6      7                  6 23 LTR                  MEMO:            REPORTI TiJ. Bros an                                                                                                    OTHE'O:
ORIG,:                                 OTHER Norris
                                                                      '. l .
ACTION NECESSARY    Q      CONCURRENCK      P    DATE ANSWERED:
NO ACTION NECESSARY  Q    'OMMENT            Q    SV:
CLASS IF;                             POST OFFICE              FILE CODE:
REG. NO'.                                       50 220 DESCRIP TIONI (MUIIBd UIICI$5$ IIItd)                                     REFERRED TO            DATE        RECEIVED OY                DATE J  tr trans        updated          Tech    Specs    S                    Ziemann                  <<23>>
Bases      to include Change other changes Kor,approve                    l 0 4,    with                Q/3 cys      for  act  on DXSTRXBUTXOM:
eg Xile cy (StP ENCLOSURES i
Nore s Schroe der Shovholt MC 0Vt II REMARIISI II  Coaylete        di5t      vtl1      be    made upon      submittal        oE      Poranl      Tech secs      o U.S. ATOMIC ENERGY COMMISSION                MAILCONTROL FORM            FDRM AEosESs IS SOI Q U,S. GOVERNMENT PRINTING OFFICE". I 9 7 0        40 0  97 4


==DearDr.Morris:==
                    '7 t
YourletterofApriIl4,l97ItransmittedchangeNo.4toth'BNineMilePointNuclearStationTechnicalSpecificationswhichwehavenoWincorporatedintheenclosednewprintingofthesespecifications.ThisprintingalsoincorporateschangesNo.Ithrough3,previouslydirectedbytheCommission,andanumberofadditionalchanges,Iistedbelow,whichweresuggestedduringthecourseofsubsequentdiscussionswithmembersofyourStaffforthereasonsindicatedduringthesBmeBtings.TechnicalSecificationPg.II,LimitingSafetySystemSetting2.I.2ObjectivePg.33,Bases2.1stparagraph,3rdand5thlinesPg.67,Section4.3.3.e.(4)Pg.74,Bases3rdparagraph,6thIineChangedIst8,2ndlinetoread:"ToprovideautomaticcorrectiveactiontoplBVBntexceedingthefuelcladdingsafetylimits."Changed"High-High"to"High"AddedItem(4)toread:"(4)Themainsteamlineisolationvalvesaretobetestedatapressureof22psigduringeachrefuelingoutage."Changed"High-High"to"High"Pg.76,Bases3rdparagraph,4thlineChanged"0.25'ph"to"0.25inchofwater"
  <<f E
~lI Av"D+~PeterA.Morris~jJune18,l97ITechnicalSecification~ChanePg.88,StackReleaseBases(3)Pg.I09,Table3e6.2.hChangedthefirstsentenceofBases(3)toread:"TheIsolationoftheoff-gassystemisinitiatedbyhighradiationintheoff-gaspiping."Changed"ZOe57Ci/sec>>to"~0.57/ECi/sec>>Pg.42ofchangeNo.4Changed:)Pagell9-lineIOfromtopofpage,change"GroupHead-ReactorEngineering>>to>>StaffEngineer-EnvironmentQtotpageI19-IinesIO-I3,deleteentirely.QAdd:Pagell9-linel4fromtopofpage,change"GroupHead-EnvironmentalEngineering"to"StaffEngineer-Environment"ItIeawaityourapprovaIofthisIatestprintingofTechnicalSpecificationsandBasesbeforesubmittingadditionalcopies.SincereIy,TJB/ksJ.BrosnanVicePresientandChiefEngineer IIf4Iff,4  
t
~PNIAGARAMOHAWKPOWERCORPORATIONNIAGARAMOHAWK2+''2300ERIEeOVLEVARDWESlsYRAcUsE,2Y12222.+'Q[9IQ/IrE~NC5ICBIEIIII>,lfJuly7,1971fang~~~VIICURN,Dr.PeterA.Morris,DirectorDivisionofReactorLicensingU.S.AtomicEnergyCommissionWashington,D.C.20545
(   4 P
E PJ


==DearDr.Morris:==
A, NIAGARA MOHAWK POWER CORPORATION NIAGARA            MOHAWK 3OO ERIC BOULEVARD WEST SYRACUSE, N. Y. I3202
121'I>>I]Weacknowledge'receiptofyourletter'fJune30,21971andaretransmittingthisdateunderseparatecoverthe1rrequested50additionalcopiesof"TechnicalSpecificationsandBasesforNineMilePointNuclearStationOperationat1850ThermalMegawatts".Sincerely,TJ.BrosnanVicePresitandChiefEngineerTJBsncc:ArvinE.Upton,Esq.28S1-4 fIq~II'IPf'~}}
                                                                                        'Cf/Pp8                ~.
J une      I 8, 197 I                  t4        Zlu 9      Ec@/ 4'lOPOY g~P'lg/n~
                                                                                                ~ell~~
Dr. Peter A. Morris, Director Division of Reactor Licensing U. S. Atomic Energy Corlnlsslon Washington, D. C.          20545
 
==Dear Dr. Morris:==
 
Your    letter of  Apri I l4, l97I transmitted change No. 4 to th'B Nine Mile Point Nuclear Station Technical Specifications which we have noW incorporated in the enclosed new printing of these specifications. This printing also incorporates changes No. I through 3, previously directed by the Commission, and a number of additional changes, I isted below, which were suggested during the course of subsequent discussions with members of your Staff for the reasons indicated during thesB meBtings.
Technical  S  eci f ication Pg. II,  Limiting Safety    System  Setting        Changed      Ist 8, 2nd line to read: "To 2.I.2 Objective                                      provide automatic corrective action to plBVBnt exceeding the fuel cladding safety limits."
Pg. 33, Bases 2. 1st paragraph,                      Changed      "High-High" to "High" 3rd and 5th lines Pg. 67, Section    4.3.3.e.(4)                      Added Item (4)        to read: "(4) The main steam      line isolation valves are to be tested at a pressure of 22 psig during each refueling outage."
Pg. 74, Bases 3rd paragraph,                          Changed      "High-High" to "High" 6th  I ine Pg. 76, Bases    3rd paragraph,                      Changed      "0.25'ph" to "0.25      inch    of water" 4th line
 
  ~ l I
 
" Av D+ ~ Peter A. Morris                                                        June  18, l97I
        ~    j Technical  S ecification                                      ~Chan  e Pg. 88, Stack Release        Bases (3)          Changed  the    first sentence    of Bases (3) to read:  "The    Isolation    of the off-gas system is initiated by high radiation in the off-gas piping."
Pg. I09, Table    3e6 .2.h                    Changed  " Z Oe57 Ci/sec>> to " ~ 0.57/E Ci/sec>>
Pg. 42  of  change No. 4                        Changed: )Page ll9-line IO from        top of page, change "Group Head-Reactor Engineering>> to >>Staff Engineer-Envi ronmentQ to tpage I 19-I ines IO-I 3, delete entirely.      Q Add:  Page  ll9-line    l4 from top of page,  change "Group Head-Environmental Engineering" to "Staff Engineer-Environment" ItIe await your approva I of this I atest printing of Technical Speci        f i cations and Bases    before submitting additional copies.
S i ncere I y, J. Brosnan Vice  Presi  ent  and Chief Engineer TJB/ks
 
I If    4 ff, I
4
 
                                                                        ~P NIAGARA MOHAWK POWER CORPORATION NIAGARA          MOHAWK                2+ ''            2 300    ERIE eOVLEVARD WESl sYRAcUsE, 2 Y 12222  .            +      'Q[ 9          /
IQ IrE
                                                                          ~  NC5IC BIEIIII>  ,lf July 7, 1971                                    fang~
                                                                                            ~
                                                                          ~ VIICURN, Dr. Peter A. Morris, Director Division of Reactor Licensing U. S. Atomic Energy Commission Washington, D. C. 20545
 
==Dear Dr. Morris:==
12 1'I letter'f June
                                                      >>I ]
We acknowledge'receipt of your                              30, 2
1971 and are transmitting this date under separate cover the 1
r requested 50 additional copies of "Technical Specifications and Bases for Nine  Mile Point Nuclear Station Operation at 1850 Thermal  Megawatts".
Sincerely, T    J. Brosnan Vice Presi        t and Chief Engineer TJB sn cc: Arvin E. Upton, Esq.
28S1     -4
 
f I  ~
q II
        'I P f'
~}}

Latest revision as of 09:03, 30 October 2019

Letter Responding to the April 14, 1971 Letter Regarding Change No. 4 to the Technical Specifications and Enclosing a New Printing with Changes No. 1 and 3 and a Number of Additional Changes
ML17037C335
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/18/1971
From: Brosnan T
Niagara Mohawk Power Corp
To: Morris P
US Atomic Energy Commission (AEC)
References
Download: ML17037C335 (8)


Text

DATE OF DOCUMKNT: DATE RECE NO..

FROM:

Niagara IIRbamlc Pe'.er Corp o SyracuBQ,;-Vi- 6 7 6 23 LTR MEMO: REPORTI TiJ. Bros an OTHE'O:

ORIG,: OTHER Norris

'. l .

ACTION NECESSARY Q CONCURRENCK P DATE ANSWERED:

NO ACTION NECESSARY Q 'OMMENT Q SV:

CLASS IF; POST OFFICE FILE CODE:

REG. NO'. 50 220 DESCRIP TIONI (MUIIBd UIICI$5$ IIItd) REFERRED TO DATE RECEIVED OY DATE J tr trans updated Tech Specs S Ziemann <<23>>

Bases to include Change other changes Kor,approve l 0 4, with Q/3 cys for act on DXSTRXBUTXOM:

eg Xile cy (StP ENCLOSURES i

Nore s Schroe der Shovholt MC 0Vt II REMARIISI II Coaylete di5t vtl1 be made upon submittal oE Poranl Tech secs o U.S. ATOMIC ENERGY COMMISSION MAILCONTROL FORM FDRM AEosESs IS SOI Q U,S. GOVERNMENT PRINTING OFFICE". I 9 7 0 40 0 97 4

'7 t

<<f E

t

( 4 P

E PJ

A, NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 3OO ERIC BOULEVARD WEST SYRACUSE, N. Y. I3202

'Cf/Pp8 ~.

J une I 8, 197 I t4 Zlu 9 Ec@/ 4'lOPOY g~P'lg/n~

~ell~~

Dr. Peter A. Morris, Director Division of Reactor Licensing U. S. Atomic Energy Corlnlsslon Washington, D. C. 20545

Dear Dr. Morris:

Your letter of Apri I l4, l97I transmitted change No. 4 to th'B Nine Mile Point Nuclear Station Technical Specifications which we have noW incorporated in the enclosed new printing of these specifications. This printing also incorporates changes No. I through 3, previously directed by the Commission, and a number of additional changes, I isted below, which were suggested during the course of subsequent discussions with members of your Staff for the reasons indicated during thesB meBtings.

Technical S eci f ication Pg. II, Limiting Safety System Setting Changed Ist 8, 2nd line to read: "To 2.I.2 Objective provide automatic corrective action to plBVBnt exceeding the fuel cladding safety limits."

Pg. 33, Bases 2. 1st paragraph, Changed "High-High" to "High" 3rd and 5th lines Pg. 67, Section 4.3.3.e.(4) Added Item (4) to read: "(4) The main steam line isolation valves are to be tested at a pressure of 22 psig during each refueling outage."

Pg. 74, Bases 3rd paragraph, Changed "High-High" to "High" 6th I ine Pg. 76, Bases 3rd paragraph, Changed "0.25'ph" to "0.25 inch of water" 4th line

~ l I

" Av D+ ~ Peter A. Morris June 18, l97I

~ j Technical S ecification ~Chan e Pg. 88, Stack Release Bases (3) Changed the first sentence of Bases (3) to read: "The Isolation of the off-gas system is initiated by high radiation in the off-gas piping."

Pg. I09, Table 3e6 .2.h Changed " Z Oe57 Ci/sec>> to " ~ 0.57/E Ci/sec>>

Pg. 42 of change No. 4 Changed: )Page ll9-line IO from top of page, change "Group Head-Reactor Engineering>> to >>Staff Engineer-Envi ronmentQ to tpage I 19-I ines IO-I 3, delete entirely. Q Add: Page ll9-line l4 from top of page, change "Group Head-Environmental Engineering" to "Staff Engineer-Environment" ItIe await your approva I of this I atest printing of Technical Speci f i cations and Bases before submitting additional copies.

S i ncere I y, J. Brosnan Vice Presi ent and Chief Engineer TJB/ks

I If 4 ff, I

4

~P NIAGARA MOHAWK POWER CORPORATION NIAGARA MOHAWK 2+ 2 300 ERIE eOVLEVARD WESl sYRAcUsE, 2 Y 12222 . + 'Q[ 9 /

IQ IrE

~ NC5IC BIEIIII> ,lf July 7, 1971 fang~

~

~ VIICURN, Dr. Peter A. Morris, Director Division of Reactor Licensing U. S. Atomic Energy Commission Washington, D. C. 20545

Dear Dr. Morris:

12 1'I letter'f June

>>I ]

We acknowledge'receipt of your 30, 2

1971 and are transmitting this date under separate cover the 1

r requested 50 additional copies of "Technical Specifications and Bases for Nine Mile Point Nuclear Station Operation at 1850 Thermal Megawatts".

Sincerely, T J. Brosnan Vice Presi t and Chief Engineer TJB sn cc: Arvin E. Upton, Esq.

28S1 -4

f I ~

q II

'I P f'

~