UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 17, 2015 Mr. Peter Orphanos Vice President Nine Mile Point Exelon Generation Company, LLC Nine Mile Point Nuclear Station, LLC P. 0. Box 63 Lycoming, NY 13093

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT 1 - CORRECTION LETTER TO AMENDMENT NO. 217 RE: DIESEL GENERATOR INITIATION-DEGRADED VOLTAGE TIME DELAY SETTING CHANGE (TAC NO. MF1022)

Dear Mr. Orphanos:

By letter dated March 12, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15043A270), the Commission issued Amendment No. 217 to Facility Operating License No. DPR-63 for Nine Mile Point, Unit No. 1 (NMP1 ).

The amendment to the NMP1 Renewed Facility Operating License DPR-63 modified Technical Specification Table 3.6.2i, "Diesel Generator Initiation," by revising the existing 4.16kV Power Board (PB) 102/103 Emergency Bus Undervoltage (Degraded Voltage) Operating Time value and updating the Set Point heading title. In addition, subsequent to the issuance of the proposed amendment by the U.S. Nuclear Regulatory Commission, the NMP1 Updated Final Safety Analysis Report (UFSAR) Table XV-9, "Significant Input Parameters to the Loss-Of-Coolant Accident (LOCA) Analysis," should be revised based on the issued amendment, to add a note regarding maximum allowable delay time from initiating signal to rated pump speed settings, to address the scenario of degraded grid voltage coincident with a LOCA.

Your staff recently informed the Nuclear Regulatory Commission of an inadvertent typographical error on Page 3 of the license. The error was an incorrectly entered amendment number in paragraph C(2).

P. M. Orphanos A corrected Page 3 of the Renewed Facility Operating License is enclosed. Please feel free to contact me at 301-415-3308 if you have any questions.

Sincerely,

  • ~~~

,---,.,-:~-" ~

Bhalchandra Vaidya, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-220

Enclosures:

Amendment No. 217 to DPR-63 cc w/encls: Distribution via Listserv

ENCLOSURE - CORRECTION LETTER FOR AMENDMENT NO. 217 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-63 EXELON GENERATION COMPANY. LLC NINE MILE POINT NUCLEAR STATION. LLC NINE MILE POINT NUCLEAR STATION UNIT NO. 1 CNMP1)

DOCKET NO. 50-220

(2) Exelon Generation pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3) Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4) Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument and equipment calibration or associated with radioactive apparatus or components.

(5) Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed operating license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I:

Part 20, Section 30.34 of Part 30; Section 40.41 of Part 40; Section 50.54 and 50.59 of Part 50; and Section 70.32 of Part 70. This renewed license is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect and is also subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 1850 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendix A, which is attached hereto, as revised through Amendment No. 217 is hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.

(3) Deleted Renewed License No. DPR-63 Amendment No. 191through210, 21~.213, 214, 215, 216, 217 Correction better Dated August 7, 2012 Correction Letter Dated March 17, 2015

ML15075A159 OFFICE LPL 1-1\PM LPL1-1\LA LPL 1-1/BC LPL 1-1/PM NAME BVaidva KGoldstein BBeasley BVaidya DATE 3/17/2015 03/17/2015 03/17/2015 3/17/2015