ML17037C272

From kanterella
Jump to navigation Jump to search
Letter Transmitting Four Proposed Changes to the Technical Specifications Concerning Changes in Plant Organization and Set Points for Reactor Water Levels
ML17037C272
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 01/21/1975
From:
LeBoeuf, Lamb, Leiby & MacRae
To: Case E
Office of Nuclear Reactor Regulation
References
Download: ML17037C272 (14)


Text

AEC DISTRIB ON FOR PART 50 DOCKET MATER (TEMPORARY FORM)

CONTROL NO: 663 A.

FILE' ROM LeBoeu f,Lamb,Leiby&Macr eDATE OF DOC DATE REC'D LTR TWX RPT OTHE R Washington, DC 20036 1-21-75 1-22-75 TO: ORIG CC OTHER SENT AEC PDR Mr Cawe 3 signed SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXXXX 3 50-220 DESCR IPTION: ENCLOSURES:

1) Tech Specs Change...re Bases for the Containment Ltr on behalf of Niagara Mohawk.... Spray Specifications....2)Tech Specs...re Admin-notarized 1-20-75.................. istrative controls section (Fig 6.2-2, Section 6.0$

trans the following: 3) Tech Specs Change....re reactor vessel water levellinstrumentation.......4) Tech Specs Change NOTE: FOR DIST OF ENCL~"l -')3'eLi~" (Enviro) ......re Administrative Controls (Fig 5.2, saM.~<<463 Sec 5eO) e ~ ~ ~ ~ ~ ~ ~ ~

PLANT NAME: Nine Mile Point $51 (40 cys encl rec'd)

FOR ACTION/INFORMATION 1-23-75 ehf BUTLER (L) SCHWENCER (L) Zl EMANN (L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/I Copies f$-- y CLARK (L) STOLZ (L) DICKER (E) LEAR (L)

W/ Copies W/ Copies W/ Copies. ~ WCCop)eeOn~4)

PARR (L) VASSALLO (L) KNIGHTON (E) SPELS W/ Copies W/ Copies W/ Copies W/ Copies KNI EL (L) PURPLE (L) YOUNG B LOOD (E)

W/ Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION

~=G FILE TECH REVIEW BENTON LIC ASST A/T IND

~E SCHROEDER ~RIMES GAMM ILL R. DI GGS (L) BRAITMAN SALTZMAN

~GC, ROOM P-506A MACCARY ESCORT H. GEAR IN (L)

MUNTZ IN G/STAFF KNIGHT ~KASTNER E. GOULBOURNE (L) ABEL CASE =

PAWLICKI ~BALLARD P. KREUTZER (E)

GIAMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STELLO M. MAIGRET (L) MCDONALD MOORE (L) HOUSTON ENVI RO REED (E) CHAPMAN DEYOUNG (L) NOVAK MULLER M. SERVICE (L) ~ DUBE (Ltr)

SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) ~.PETERSON COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E)

P. COLLINS ~TE D ) YOUNGBLOOD H. SMITH (L) D. THOMPSON (2)

DENISE LONG REGAN TEETS (L)() "~ ~ KLECKER REG OPR LAINAS PROJECT LDR G. WI LLIAMS (E) EISENHUT

~FILE IE MOR RI S REGION IQ BENAROYA VOLLMER

~~~~a HAR LESS Ca) V. WILSON (L)

~

W I GG INTO N t.". Zohnzon STEE LE EXTERNAL DISTRIBUTION

~1 LOCAL FO R~~

TIC IABERNATHY)+I)IE)H&j NATIONALLABE~&~

P D R-SAN/LA/NY P W. PENNINGTON, Rm E-201 GT 1

BROOKHAVEN NAT LAB 4 NSIC (BUCHANAN) 1 CONSULTANTS 1

G. ULRIKSON, ORNL 1 ASLB 1 1

1 Newton Anderson NEWMARK/B LUME/AGBABIAN 1 AGMED (RUTH GUSSMAN) 1L ACRS H&t~4818ENT Rm 8-127 GT Z.~ teed 1 R. D. MUELLER, Rm E-201 Te GT

~

~ ~ ~

~ ~ ~ ~ k 0 <<

~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ I

~ ~ ~ Ii

~ ~ ~ ~

~ ~ ~ ~ ~ ~

I' ~ 0 ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

LAW OFFICES OF LEBOEUF, LAMB,LEIBY 8I MACRAE l757 N STREET>> N. W.

WAsHINGTQN,D. C. 20036 ARVIN C UPTON ONE CHASE MANHATTAN PLAZA LEONARD M. TROSTCN NEW YORK>>N Y IOOOS WILLIAM O OOUB (ASN. llAllYLANG)

~

January 21, 1975 CUOCNC O. THOMAS>> JR.

HARRY H. VOIGT WASHINGTON TELEPHONE LCX K. LARSON zoz-evz-eeee WASHINGTON PAIITNSRS CAOLE AOORESS CO LALALU>>WASHINGTON D C.

<>>'ir.

'EcEVh Edson G. Case s JAN22$ 76~ 9 ll.L ATClllC El(fllOY Acting Director CCMMISSIOll Office of Nuclear Reactor Pi&~>>IdlII$7 Mall SrtlCI Regulation Nuclear Regulatory Commission PO Washington, D.C. 20555 Re: Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit 1 Docket No. 50-220

Dear Mr. Case:

Pursuant to 10 C.F.R. g 50.90 of the Commission's regulations, transmitted herewith are four proposed changes to the technical specifications for Niagara Mohawk Power Corporation's Nine Mile Point Nuclear Station Unit 1. Two of the proposed modifications reflect changes in plant organization and affect Table 6.1-2 of Appendix A to the operating license for that facility and Figure 5.2 of Ap-pendix B to that license. In addition, proposed changes are submitted to the set points for reactor water levels, as set forth in Sections 2.1.2 and 2.1.1 of Appendix A,

=.and ito:.the. containment spray'ystem", .as descrihedl in Sec-:.-

tions 3.3.7 and 4.3.7 of Appendix A.

Copies of these documents were also served upon those persons listed in the enclosed Certificate of Service.

Very truly yours, LLI ( I '~((l,(

LeBeouf, Lamb, Leiby & MacRae Attorneys for Applicant

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION ~EEV g)

'4NS S>g7g 9 V.S.

plod @

Raausto, aalu~'o lee(

In the Matter of )

)

Niagara Mohawk Power Corporation ) Docket No. 50-220 (Nine Mile Point Unit 1) )

APPLICATION FOR AMENDMENT TO OPERATING LICENSE Niagara Mohawk Power Corporation, Licensee in the above-captioned docket, hereby files an Application for Amendment to its Operating License DPR-63.

This Amendment constitutes changes to Figure 5.2 in Section 5.0 for Administrative Controls for the Station.

With this Application for Amendment, Licensee here'by transmits a document entitled "Proposed Changes to the Environmental Technical Specifica-tions" describing the change and reasons therefore. The proposed changes have been reviewed and approved by the Safety Review and Audi,t Board and the Site Operations Review Committee.

0

'k P

I I

  • I

/ IL 1t ll t I

WHEREFORE, Licensee prays as in its original Application for Licenses.

Respectfully submitted, NIAGARA MOHAWK POWER CORPORATION Philip D. Raymond Vice President-Engineering Subscribed and sworn to before me this ~7 -day of January, 1975.

No ary Public

)hQPL J, CARRtt!K Notary Pebtio trr the Sta!. ct ~New )orL:

QU'i.iIlli'thl Qflkrrr C0i QO. t 'iiVo My Corrrri,l~.>os f apiro~!Vierrh 30,PJ:PC

(i, C

I E

~ i'09 QJ fI>C)'p! ['i; E

'f Il l1

PROPOSED CHANGES TO THE EiV/IRONMENTAL TECHNICAL SPECIFICATIONS A change has been made to Appendix A of the Technical Specifications to reflect recent changes in the Nine Mile Point - James A. FitzPatrick Operating Organization. This change has been submitted as an amendment. A similar organization chart appears in Section 5.0 of Appendix B, Environmental

. Technical Specifications. The attached revised figure reflects the changes made.

awy ~

~ ~

NIAGARA MOHAWK POWER CORPORATION License No. DPR-63 Docket 50-220 PROPOSED CHANGES TO THE ENVIRON>KNTAL TECHNICAL SPECIFICATIONS ITVif LOCATION CHANGE Administrative Controls, Page 82 Change the Titles "Assistant Section 5.0, Figure 5.2 to the Superintendent for Operations" to "Operations Supervisor."

Add: "Assistant 5faintenance Supervisor."

~. ~

GENERAL SUPERItiTENDENT NUCLEAR GENERATION ASSISTANTS TO TIIE SUPERINTEtiDENT NINE NILE POINT NUCLEAR STATIOit AS RE UIRED JANES A. FITZPATRICK NUCLEAR POKER PL2NT TRA I ttl NG tQIHTEIQNCE STATIOtt SUPERIttTEt(DEttT PLANT SUPERlttTENDENT SUPERVISOR SUPERVISOR ASS I STAttT HAINTEIQhCE RESULTS SUPERVIS R OFFICE I ttSTRg ZNT REACTOR RAD IOCI I ENI STRY S COtiTROL AtQLYST AND RADIATION SUPERVISOR SUPERVISOR PROTECTION tp NINTEtQt'CE ASS I STNIT ASS ISTAHT FORES~'~'I 8 INSTRUNENT RADIOCHEHISTRY

& CONTROL A.'tD BADIATIOII SUPERVISOR PROTECTIOtt ASSISTANT HAINTEHANCE ASSISTANT ~ ASSISTANT SUPERVISOR REACTOR FOREST 8 It(S'IRNIEttT RADIOCN ".ISTRY fdtALYST A COttTROL S RAD!ATION SUPERVISOR SUPERVISOR PROTECTION SUPERVISOR OP EPJi T IOUS SUPERVISOR ~ TECHttICO5S TEOtttlCIANS TECHiNICIANS OPERATIOtiS AS RE UIRED AS RE UIRED AS RE Ul ED SUPERVISOR ATION SHIFT NECHANICS AND ELECTRICIANS ~*Senior Operator LIcense SUPERVISOR 5-STATION SHIFT AS REqUIRED 'Operator LIcense SUPERVISOR The noraal station shift co..plenent shall consist of at least five parsons. Including one licensed Senior Reactor Operator and

'4-.

~I:! FT OPEPATING FORENN IEF OPERATOR 8 two licensed Reactor Operators. ~4-SHIFT OPERATING FORENN

'I-RELIEF OPERATOR R

'4-AUXILIARY OPERATOR E-N <<4-AUXILIARY OPiRATOR E-tt

~l-RELIEF OPEPATOR P 'I-RELIEF OPERATOR P 4-AUXILIARY OPERATOR C-N 4-AUXILIARYOPERATOR C-H I-RELIEF OPER'TOR K FIGURE 5.2 1-RELIEF OPERATOR K 4-AUXILIARY OPERATOR 8 NtiJi-JAF NUCLEAR SITE 4-AUXILIARYOPERATOR 8 I-RELIEF OPERATOR 8 OPERATION ORGANIZATION I-RELIEF OPERATOR 8

~ ~

~ ~