ML17080A149: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17080A149
| number = ML17080A149
| issue date = 03/23/2017
| issue date = 03/23/2017
| title = Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule (CAC No. MF9294)
| title = Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule
| author name = Rankin J K
| author name = Rankin J
| author affiliation = NRC/NRR/DORL/LPLIII
| author affiliation = NRC/NRR/DORL/LPLIII
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000255
| docket = 05000255
| license number = DPR-020
| license number = DPR-020
| contact person = Rankin J K, NRR/DORL/LPL3, 415-1530
| contact person = Rankin J, NRR/DORL/LPL3, 415-1530
| case reference number = CAC MF9294
| case reference number = CAC MF9294
| document type = Meeting Summary
| document type = Meeting Summary
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:LICENSEES: FACILITIES:  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 23, 2017 LICENSEES:         Entergy Nuclear Operations, Inc.
FACILITIES:         Palisades Nuclear Plant


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 23, 2017 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant SUMMARY OF MARCH 20, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING THE CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE (CAC NO. MF9294) On March 20, 2017, a Category 1 public teleconference meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO). The purpose of the meeting was to discuss a proposed license amendment request (LAR) to change the Milestone 8 full implementation date of the cyber security plan for Palisades Nuclear Plant (PNP). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17053A629. The licensee presented information on the background, basis, and content of the proposed application, which is available at ADAMS Accession No. ML 17080A 178. The licensee plans to submit a LAR to change the CSP Milestone 8 implementation date from December 15, 2017 to May 31, 2020. This supports the PNP decommissioning schedule where the licenses plans to permanently cease power operations on October 1, 2018. ENO also described the technical basis for the change and the status of Milestones 1 through 7. ENO plans to submit the LAR by the end of March 2017. There were no public comments made at this meeting and no public meeting meeting feedback forms were received. A list of meeting attendees is enclosed. Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov. Docket No. 50-255  
 
==SUMMARY==
OF MARCH 20, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING THE CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE (CAC NO. MF9294)
On March 20, 2017, a Category 1 public teleconference meeting was held between the U.S.
Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO). The purpose of the meeting was to discuss a proposed license amendment request (LAR) to change the Milestone 8 full implementation date of the cyber security plan for Palisades Nuclear Plant (PNP). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17053A629.
The licensee presented information on the background, basis, and content of the proposed application, which is available at ADAMS Accession No. ML17080A178.
The licensee plans to submit a LAR to change the CSP Milestone 8 implementation date from December 15, 2017 to May 31, 2020. This supports the PNP decommissioning schedule where the licenses plans to permanently cease power operations on October 1, 2018. ENO also described the technical basis for the change and the status of Milestones 1 through 7. ENO plans to submit the LAR by the end of March 2017.
There were no public comments made at this meeting and no public meeting meeting feedback forms were received.
A list of meeting attendees is enclosed.
 
Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.
                                            ~~nager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255


==Enclosure:==
==Enclosure:==
List of Attendees cc w/encl: Distribution via Listserv Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES MARCH 20. 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS. INC. CYBER SECUIRTY PLAN MILESTONE 8 IMPLEMENTATION PALISADES NUCLEAR PLANT Licensee Attendees Jeffery Hardy, Regulatory Assurance Manager -Palisades Nuclear Plant (PNP) Robert Bees, IT Manager -PNP Jim Miksa, Regulatory Assurance Engineer -PNP George Dahl, Regulatory Assurance Engineer-Indian Point Energy Center (IPEC) Bob Walpole, Regulatory Assurance Manager -IPEC Jared Williams, IT Consultant -IPEC Steve Manzione, IT Supervisor-IPEC Sparky (Khaled) Soudah, Sr. IT Manager -OT Nuclear Nacy Mille, IT PMO Program Manager Anthony Holmes, IT Program Manager Sr. Staff -Nuclear Cyber Security Dewey Coulon, OT Engineer Sr. Staff -Nuclear Cyber Security Robert Byrne, Regulatory Assurance Engineer -Pilgrim Nuclear Power Station (Pilgrim) Franco Pasquale, IT Manager -Pilgrim Matt Boucher, IT Specialist -Pilgrim Chris Wilson, IT Consultant -Pilgrim U.S. Nuclear Regulatory Commission John Rycyna, NSIR/DSO Shyrl Coker, NSIR/DSO Jennie Rankin, NRR/DORL Enclosure 


==SUBJECT:==
List of Attendees cc w/encl: Distribution via Listserv
SUMMARY OF MARCH 20, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING THE CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE (CAC NO. MF9294) DATED MARCH 23, 2017 DISTRIBUTION: PUBLIC LPL3 Reading RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorlLpl3 Resource RidsNrrLASRohrer Resource RidsNrrPMPalisades Resource RidsRgn3MailCenter Resource TWertz, NRR TClark, EDO JRycyna, NSIR SCoker, NSI R ANguyen, Rill ADAMS Accession Nos. Meeting Summary M L1 080A1 9 7 4 Sl"d ML1 080A1 8 I e 7 7 OFFICE N RR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3 NRR/DORL/LPL3/PM NAME JRankin JRohrer DWrona JRankin (RKuntz for) DATE 3/23/2017 3/23/2017 3/23/2017 3/23/2017 OFFICIAL RECORD COPY 
 
}}
LIST OF ATTENDEES MARCH 20. 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS. INC.
CYBER SECUIRTY PLAN MILESTONE 8 IMPLEMENTATION PALISADES NUCLEAR PLANT Licensee Attendees Jeffery Hardy, Regulatory Assurance Manager - Palisades Nuclear Plant (PNP)
Robert Bees, IT Manager - PNP Jim Miksa, Regulatory Assurance Engineer - PNP George Dahl, Regulatory Assurance Engineer- Indian Point Energy Center (IPEC)
Bob Walpole, Regulatory Assurance Manager - IPEC Jared Williams, IT Consultant - IPEC Steve Manzione, IT Supervisor- IPEC Sparky (Khaled) Soudah, Sr. IT Manager - OT Nuclear Nacy Mille, IT PMO Program Manager Anthony Holmes, IT Program Manager Sr. Staff - Nuclear Cyber Security Dewey Coulon, OT Engineer Sr. Staff - Nuclear Cyber Security Robert Byrne, Regulatory Assurance Engineer - Pilgrim Nuclear Power Station (Pilgrim)
Franco Pasquale, IT Manager - Pilgrim Matt Boucher, IT Specialist - Pilgrim Chris Wilson, IT Consultant - Pilgrim U.S. Nuclear Regulatory Commission John Rycyna, NSIR/DSO Shyrl Coker, NSIR/DSO Jennie Rankin, NRR/DORL Enclosure
 
Meeting Summary ML17080A149    Sl"d I e ML17080A178 OFFICE N RR/DORL/LPL3/PM       NRR/DORL/LPL3/LA     NRR/DORL/LPL3           NRR/DORL/LPL3/PM NAME   JRankin               JRohrer             DWrona                 JRankin (RKuntz for)
DATE   3/23/2017             3/23/2017           3/23/2017               3/23/2017}}

Latest revision as of 06:34, 30 October 2019

Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule
ML17080A149
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/23/2017
From: Jennivine Rankin
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Rankin J, NRR/DORL/LPL3, 415-1530
References
CAC MF9294
Download: ML17080A149 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 23, 2017 LICENSEES: Entergy Nuclear Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF MARCH 20, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING THE CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE (CAC NO. MF9294)

On March 20, 2017, a Category 1 public teleconference meeting was held between the U.S.

Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO). The purpose of the meeting was to discuss a proposed license amendment request (LAR) to change the Milestone 8 full implementation date of the cyber security plan for Palisades Nuclear Plant (PNP). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17053A629.

The licensee presented information on the background, basis, and content of the proposed application, which is available at ADAMS Accession No. ML17080A178.

The licensee plans to submit a LAR to change the CSP Milestone 8 implementation date from December 15, 2017 to May 31, 2020. This supports the PNP decommissioning schedule where the licenses plans to permanently cease power operations on October 1, 2018. ENO also described the technical basis for the change and the status of Milestones 1 through 7. ENO plans to submit the LAR by the end of March 2017.

There were no public comments made at this meeting and no public meeting meeting feedback forms were received.

A list of meeting attendees is enclosed.

Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.

~~nager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES MARCH 20. 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS. INC.

CYBER SECUIRTY PLAN MILESTONE 8 IMPLEMENTATION PALISADES NUCLEAR PLANT Licensee Attendees Jeffery Hardy, Regulatory Assurance Manager - Palisades Nuclear Plant (PNP)

Robert Bees, IT Manager - PNP Jim Miksa, Regulatory Assurance Engineer - PNP George Dahl, Regulatory Assurance Engineer- Indian Point Energy Center (IPEC)

Bob Walpole, Regulatory Assurance Manager - IPEC Jared Williams, IT Consultant - IPEC Steve Manzione, IT Supervisor- IPEC Sparky (Khaled) Soudah, Sr. IT Manager - OT Nuclear Nacy Mille, IT PMO Program Manager Anthony Holmes, IT Program Manager Sr. Staff - Nuclear Cyber Security Dewey Coulon, OT Engineer Sr. Staff - Nuclear Cyber Security Robert Byrne, Regulatory Assurance Engineer - Pilgrim Nuclear Power Station (Pilgrim)

Franco Pasquale, IT Manager - Pilgrim Matt Boucher, IT Specialist - Pilgrim Chris Wilson, IT Consultant - Pilgrim U.S. Nuclear Regulatory Commission John Rycyna, NSIR/DSO Shyrl Coker, NSIR/DSO Jennie Rankin, NRR/DORL Enclosure

Meeting Summary ML17080A149 Sl"d I e ML17080A178 OFFICE N RR/DORL/LPL3/PM NRR/DORL/LPL3/LA NRR/DORL/LPL3 NRR/DORL/LPL3/PM NAME JRankin JRohrer DWrona JRankin (RKuntz for)

DATE 3/23/2017 3/23/2017 3/23/2017 3/23/2017