ML17080A178: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17080A178 | | number = ML17080A178 | ||
| issue date = 03/20/2017 | | issue date = 03/20/2017 | ||
| title = 3/20/2017, Meeting Slide | | title = 3/20/2017, Meeting Slide Re. Palisades Nuclear Plant License Amendment Request; Application Meeting Cyber Security Plan Milestone 8 Implementation Schedule Change | ||
| author name = | | author name = | ||
| author affiliation = Entergy Nuclear Operations, Inc | | author affiliation = Entergy Nuclear Operations, Inc | ||
| addressee name = Rankin J | | addressee name = Rankin J | ||
| addressee affiliation = NRC/NRR/DORL/LPLIII | | addressee affiliation = NRC/NRR/DORL/LPLIII | ||
| docket = 05000255 | | docket = 05000255 | ||
| license number = DPR-020 | | license number = DPR-020 | ||
| contact person = Rankin J | | contact person = Rankin J, NRR/DORL/LPL3, 415-1530 | ||
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | | document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs | ||
| page count = 7 | | page count = 7 | ||
| project = | |||
| stage = Meeting | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:Palisades Nuclear Plant (PNP) | |||
License Amendment Request (LAR) | |||
PreApplication Meeting Cyber Security Plan (CSP) | |||
Milestone 8 (MS8) | |||
Implementation Schedule Change March 20, 2017 Slide 1 of 7 1 | |||
Agenda | |||
* Introductions | |||
* Request / Need | |||
* Change Basis | |||
* PNP CSP Status | |||
* License Change / Schedule | |||
* Questions Slide 2 of 7 | |||
Request / Need | |||
* Change CSP MS8 date from December 15, 2017 to May 31, 2020 | |||
* Supports PNP Decommissioning Schedule | |||
- Beyond Permanent Cessation of Power Operations | |||
- Beyond All Fuel Removed from Reactor Vessel | |||
- Beyond Minimal Risk of a Fuel Cladding Zirconium Fire | |||
* Allows prudent use of PNP resources on activities of higher nuclear safety significance Slide 3 of 7 | |||
Change Basis | |||
* Submittal of Certification for Permanent Cessation of Power Operations on October 1, 2018 | |||
* Expect significant reduction in Critical Digital Assets post permanently defueled reactor | |||
* Addresses Cyber Security Directorate Staff Criteria | |||
* Similar to Palisades Amendment 259 CSP M8 Schedule Change to December 15, 2017 Slide 4 of 7 | |||
PNP CSP Status | |||
* CSP Milestones 1 through 7 have been completed | |||
* NRC inspection of Milestones 1 through 7 completed | |||
* Findings in NRC Milestones 1 through 7 inspection report closed by a NRC followup inspection Slide 5 of 7 | |||
License Change / Schedule | |||
* PNP License wording - Proposed Change | |||
- The Palisades CSP was approved by License Amendment 243 as supplemented by changes approved by License Amendment Nos. 248, 253, 259, and XXX. | |||
* PNP LAR Timeline | |||
- Plan to submit on March 30, 2017 | |||
- Request approval by December 15, 2017 Slide 6 of 7 | |||
QUESTIONS? | |||
Slide 7 of 7}} |
Latest revision as of 05:34, 30 October 2019
ML17080A178 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 03/20/2017 |
From: | Entergy Nuclear Operations |
To: | Jennivine Rankin Plant Licensing Branch III |
Rankin J, NRR/DORL/LPL3, 415-1530 | |
References | |
Download: ML17080A178 (7) | |
Text
Palisades Nuclear Plant (PNP)
License Amendment Request (LAR)
PreApplication Meeting Cyber Security Plan (CSP)
Milestone 8 (MS8)
Implementation Schedule Change March 20, 2017 Slide 1 of 7 1
Agenda
- Introductions
- Request / Need
- Change Basis
- PNP CSP Status
- License Change / Schedule
- Questions Slide 2 of 7
Request / Need
- Change CSP MS8 date from December 15, 2017 to May 31, 2020
- Supports PNP Decommissioning Schedule
- Beyond Permanent Cessation of Power Operations
- Beyond All Fuel Removed from Reactor Vessel
- Beyond Minimal Risk of a Fuel Cladding Zirconium Fire
- Allows prudent use of PNP resources on activities of higher nuclear safety significance Slide 3 of 7
Change Basis
- Submittal of Certification for Permanent Cessation of Power Operations on October 1, 2018
- Expect significant reduction in Critical Digital Assets post permanently defueled reactor
- Addresses Cyber Security Directorate Staff Criteria
- Similar to Palisades Amendment 259 CSP M8 Schedule Change to December 15, 2017 Slide 4 of 7
PNP CSP Status
- CSP Milestones 1 through 7 have been completed
- NRC inspection of Milestones 1 through 7 completed
- Findings in NRC Milestones 1 through 7 inspection report closed by a NRC followup inspection Slide 5 of 7
License Change / Schedule
- PNP License wording - Proposed Change
- The Palisades CSP was approved by License Amendment 243 as supplemented by changes approved by License Amendment Nos. 248, 253, 259, and XXX.
- PNP LAR Timeline
- Plan to submit on March 30, 2017
- Request approval by December 15, 2017 Slide 6 of 7
QUESTIONS?
Slide 7 of 7