|
|
(7 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 04/17/2017 | | | issue date = 04/17/2017 |
| | title = Update to Wolf Creek Generating Station (WCGS) Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) | | | title = Update to Wolf Creek Generating Station (WCGS) Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) |
| | author name = Stull A F | | | author name = Stull A |
| | author affiliation = Wolf Creek Nuclear Operating Corp | | | author affiliation = Wolf Creek Nuclear Operating Corp |
| | addressee name = | | | addressee name = |
Line 13: |
Line 13: |
| | document type = Financial Assurance Document, Letter | | | document type = Financial Assurance Document, Letter |
| | page count = 3 | | | page count = 3 |
| | revision = 0
| |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter::.\ |
| | ~LFCREEK ., NUCLEAR OPERATING CORPORATION April 17, 2017 Annette F. Stull Vice President and Chief Administrative Officer co 17-0005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 |
| | |
| | ==Reference:== |
| | Letter CO 17-0003, dated March 30, 2017, from AF. Stull, WCNOC, to USN RC |
| | |
| | ==Subject:== |
| | Docket No. 50-482: Update to Wolf Creek Generating Station (WCGS) |
| | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) |
| | To Whom It May Concern: |
| | Subsequent to the submission of the Reference, there was a material change to the Kansas Electric Power Cooperative (KEPCo) trust agreement. Effective April 1, 2017, KEPCo entered into a new trust agreement for their Decommissioning Trust Fund with Country Club Trust Company of Kansas City, Missouri. |
| | The Enclosure of this letter provides the complete replacement of Enclosure I of the Reference. |
| | Enclosure I has been updated to reflect the material change in trust agreement that went into effect on April 1, 2017. |
| | This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4004, or Cynthia R. Hafenstine (620) 364-4204. |
| | Sincerely, Annette F. Stull AFS/rlt |
| | |
| | ==Enclosure:== |
| | Wolf Creek Nuclear Operating Corporation Decommissioning Funding Status Report as of 4/01/17 cc: K. M. Kennedy (NRC), w/e B. K. Singal (NRC), w/e N. H. Taylor (NRC), w/e Senior Resident Inspector (NRC), w/e P.O. Box 411 /Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET |
| | |
| | Wolf Creek Nuclear Operating Corporation Decommissioning Funding Status Report as of 4/01/17 (1 page) |
| | |
| | Wolf Creek Nuclear Operating Corporation Decommissioning Funding Status Report as of 4/01/17 Owned by Kansas Gas & Electric (KGE), Kansas City Power and Light (KCPL) and Kansas Electric Power Cooperative (KEPCo) |
| | Westar Energy Great Plains Energy (KGE, 47% ownership) (KCPL, 47% ownership) KEPCo, 6% ownership TOTAL 10 CFR 50.75(f)(1l Reauirement |
| | : 1) NRC minimum decommissioning estimate pursuant to 10 CFR 50.75( b) and ( c) Dollars in Millions. $231.16 $231.16 $29.50 $491.82 |
| | : 2) The amo.unt of accumulated funds at the end of the calendar year preceding the date of the report for items |
| | $200.12 $222.89 $21.66 $444.68 included in 10 CFR 50.75 ( b) and ( c ). Dollars in Millions. |
| | : 3) A schedule of the annual amounts to be collected; for items in 10 CFR 50.75 ( b) and ( c ). Dollars in Millions. |
| | $164.02 $93.71 $17.24 $274.97 See Attached Schedules |
| | : 4) The assumptions used regarding: |
| | (a) Rates of escalation in d~commissioning costs; Kansas 3.15% 3.15% 3.15% |
| | Missouri N/A 3.22% N/A (b) Rates of earning on decommissioning funds; Variable. See attached Variable. See attached Variable. See attached (c) Rates of other factors used in funding projections; and 0.00% 0.00% 0.00% |
| | (d) Real rate of return (2016 - 2025) rate reduces in - |
| | subsequent years; Kansas 2.45% 3.14% 3.59% |
| | Missouri NIA 2.59% N/A |
| | : 5) Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v)? None None None |
| | : 6) Any modifications to a licensee's current method of providing financial assurance occurring since the last None None None submitted report? |
| | : 7) Any material changes to trust agreements? |
| | Yes, effective 4/1/17, KEPCo has entered into a new trust agreement for their None None Decommissioning Trust Fund, with Country Club Trust Company of Kansas City Missouri. |
| | Other information; estimated corporate tax rate 20.00% 20.00% Non-taxable}} |
|
---|
Category:Financial Assurance Document
MONTHYEARML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24030A5312024-01-27027 January 2024 Marsh USA, LLC - Certificate of Liability Insurance WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WO 23-0009, Financial Protection Levels2023-03-31031 March 2023 Financial Protection Levels ML22116A2612022-04-26026 April 2022 Operating Corp - Transmittal of 2021 Annual Financial Reports WO 22-0011, Operating Corp., Financial Protection Levels2022-03-29029 March 2022 Operating Corp., Financial Protection Levels ML21127A2482021-05-0707 May 2021 Operating Corp - Transmittal of 2020 Annual Financial Reports WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums2021-05-0707 May 2021 Operating Corp - Guarantee of Payment of Deferred Premiums WM 21-0003, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2021-03-31031 March 2021 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WO 20-0047, Guarantee of Payment of Deferred Premiums2020-05-0707 May 2020 Guarantee of Payment of Deferred Premiums WM 19-0008, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2019-04-10010 April 2019 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WO 19-0011, Financial Protection Levels2019-03-27027 March 2019 Financial Protection Levels ML18142A4362018-05-16016 May 2018 Transmittal of 2017 Annual Financial Reports ET 18-0011, (WCGS) - Guarantee of Payment of Deferred Premiums2018-04-30030 April 2018 (WCGS) - Guarantee of Payment of Deferred Premiums WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2018-04-0505 April 2018 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML17132A1722017-05-0303 May 2017 Transmittal of 2016 Annual Financial Reports ML17129A6012017-05-0202 May 2017 Guarantee of Payment of Deferred Premiums ML17116A0542017-04-17017 April 2017 Update to Wolf Creek Generating Station (WCGS) Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML17095A9182017-03-30030 March 2017 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML16133A3342016-05-0505 May 2016 Guarantee of Payment of Deferred Premiums ML16069A0302016-03-0202 March 2016 Financial Protection Levels ML15098A5002015-03-30030 March 2015 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10CFR50.75(f)(1) ML15076A0232015-03-0404 March 2015 Financial Protection Levels ML14139A0092014-05-0808 May 2014 Guarantee of Payment of Deferred Premiums, 10 CFR 140.21 ML14094A0092014-03-27027 March 2014 Operating Corporation, Financial Protection Levels ML13213A4022013-05-0707 May 2013 Guarantee of Payment of Deferred Premiums, 10CFR140.21 ML13102A3012013-03-29029 March 2013 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(0)(1) ML13142A1912013-03-25025 March 2013 Operating Corporation - Financial Protection Levels ML13151A2752012-12-31031 December 2012 Westar Energy, 2012 Annual Report ML13151A2742012-12-31031 December 2012 Kansas Electric Power Cooperative, Inc., 2012 Annual Report ML13151A2732012-12-13013 December 2012 Great Plains Energy 2012 Annual Report ML12130A2602012-05-0101 May 2012 Guarantee of Payment of Deferred Premiums ML12088A0792012-03-15015 March 2012 Financial Insurance Protection Levels for On-Site Property Damage ML1123800242011-11-14014 November 2011 2010 DFS Report Analysis for Wolf Creek Generating Station ML11133A3482011-05-0808 May 2011 Great Plains Energy, Inc. and Kansas Electric Power Cooperative, Inc. - Item 8. Financial Statemnts and Supplemental Data ML11111A1382011-04-14014 April 2011 Operating Corp., Submittal of Guarantee of Payment of Deferred Premiums 10 CFR 140.21 ML1108100702011-03-0404 March 2011 Financial Protection Levels Wolf Creek Generating Station ML1015804512010-04-29029 April 2010 Guarantee of Payment of Deferred Premiums, 10 CFR 140.21 ML1009700632010-03-29029 March 2010 Providing Report of Financial Protection Levels for On-Site Property Damage Insurance ML0909107082009-03-24024 March 2009 On-Site Property Damage Insurance ML0818405142008-04-25025 April 2008 Guarantee of Payment of Deferred Premiums, 10 CFR 140.21 ML0714402252007-05-14014 May 2007 Transmittal of 2006 Annual Financial Reports ML0712802912007-04-30030 April 2007 Guarantee of Payment of Deferred Premiums, 10 CFR 140.21 ML0607406522006-03-0606 March 2006 Financial Protection Levels ML0308605772003-03-20020 March 2003 Financial Protection Levels 2024-04-29
[Table view] Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
Text
- .\
~LFCREEK ., NUCLEAR OPERATING CORPORATION April 17, 2017 Annette F. Stull Vice President and Chief Administrative Officer co 17-0005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
Letter CO 17-0003, dated March 30, 2017, from AF. Stull, WCNOC, to USN RC
Subject:
Docket No. 50-482: Update to Wolf Creek Generating Station (WCGS)
Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)
To Whom It May Concern:
Subsequent to the submission of the Reference, there was a material change to the Kansas Electric Power Cooperative (KEPCo) trust agreement. Effective April 1, 2017, KEPCo entered into a new trust agreement for their Decommissioning Trust Fund with Country Club Trust Company of Kansas City, Missouri.
The Enclosure of this letter provides the complete replacement of Enclosure I of the Reference.
Enclosure I has been updated to reflect the material change in trust agreement that went into effect on April 1, 2017.
This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4004, or Cynthia R. Hafenstine (620) 364-4204.
Sincerely, Annette F. Stull AFS/rlt
Enclosure:
Wolf Creek Nuclear Operating Corporation Decommissioning Funding Status Report as of 4/01/17 cc: K. M. Kennedy (NRC), w/e B. K. Singal (NRC), w/e N. H. Taylor (NRC), w/e Senior Resident Inspector (NRC), w/e P.O. Box 411 /Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
Wolf Creek Nuclear Operating Corporation Decommissioning Funding Status Report as of 4/01/17 (1 page)
Wolf Creek Nuclear Operating Corporation Decommissioning Funding Status Report as of 4/01/17 Owned by Kansas Gas & Electric (KGE), Kansas City Power and Light (KCPL) and Kansas Electric Power Cooperative (KEPCo)
Westar Energy Great Plains Energy (KGE, 47% ownership) (KCPL, 47% ownership) KEPCo, 6% ownership TOTAL 10 CFR 50.75(f)(1l Reauirement
- 1) NRC minimum decommissioning estimate pursuant to 10 CFR 50.75( b) and ( c) Dollars in Millions. $231.16 $231.16 $29.50 $491.82
- 2) The amo.unt of accumulated funds at the end of the calendar year preceding the date of the report for items
$200.12 $222.89 $21.66 $444.68 included in 10 CFR 50.75 ( b) and ( c ). Dollars in Millions.
- 3) A schedule of the annual amounts to be collected; for items in 10 CFR 50.75 ( b) and ( c ). Dollars in Millions.
$164.02 $93.71 $17.24 $274.97 See Attached Schedules
- 4) The assumptions used regarding:
(a) Rates of escalation in d~commissioning costs; Kansas 3.15% 3.15% 3.15%
Missouri N/A 3.22% N/A (b) Rates of earning on decommissioning funds; Variable. See attached Variable. See attached Variable. See attached (c) Rates of other factors used in funding projections; and 0.00% 0.00% 0.00%
(d) Real rate of return (2016 - 2025) rate reduces in -
subsequent years; Kansas 2.45% 3.14% 3.59%
Missouri NIA 2.59% N/A
- 5) Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v)? None None None
- 6) Any modifications to a licensee's current method of providing financial assurance occurring since the last None None None submitted report?
- 7) Any material changes to trust agreements?
Yes, effective 4/1/17, KEPCo has entered into a new trust agreement for their None None Decommissioning Trust Fund, with Country Club Trust Company of Kansas City Missouri.
Other information; estimated corporate tax rate 20.00% 20.00% Non-taxable