| title = RO 335-79-16 on 790523:four Restraints Were Misplaced on 4-inch & 8-inch Component Cooling Water Lines.Four Restraints Will Be Properly Installed Before Startup from Present Refueling Shutdown
| title = RO 335-79-16 on 790523:four Restraints Were Misplaced on 4-inch & 8-inch Component Cooling Water Lines.Four Restraints Will Be Properly Installed Before Startup from Present Refueling Shutdown
| author name = WETHY C M
| author name = Wethy C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:/4.'n*l li v mm/psL Ltr.Sk f 557~~Copies to)C!5f, 388, CAM, AN, RM.Offsite: ADS, JRI, COLt~lfAS, REQ, Rfg ilORIDA PCAZR 4 I.IGnT CQv Be&P, 1979 2:27 PQ+Q~Pl Pl J~To!Mr.J.P.O'Reilly, Director, Region II Office of Inspection and Enforcement 0 S~Nuclear Regulatory ConLnLission htlanta, Ceorgfa 30303 From.Q~Sub)ect, Mr.C H lfethy, Plant Manager St~Lucia Plant DPR 67-'loridm Pcarez 6 Light Coupany Miami, Florida NHiO FOR FACSBfILE TRANSMISSION TO COSFIBN PROtPT REPORTASLg OCCURRENCE 335-79-16 This mano confirms our verbal notification of the sub)ect 14 day reportable occurrence to Mr.E Hi webster oZ your office yesterday Occurrence; On Nay 23 at about 4 p.tn., a report vas received from Ebasco through our Engineeriog Department that a restraint probient had been noted awhile completing as buQt print verification in contain-ment.Tea restraints vere interchanged on tvo 8" Component Cooling Mater (CQ4)lines running parallel about 2 feet apart.Tvo other res-traints vere mistaken)y installed on 4" CCM piping of similar configura-tion bur.at a different, azinLuthal location, This portion of CCM is non-safety relate1 but vas designed to be seismically restrained due to an adjacent 1 fill line for a safety infection tank (accunlulator)
{{#Wiki_filter:4.
~Assuming a seismic event and LOCA the l" line, if ruptured, would have~no significant eff~t an BIT operationp and very little effect on the 8)header it is attached to, Corrective Action The 4 misplaced restraints vt11 be properly insea11ed before'tartup froa the present refueling shutdovn.L P.O'IKllLY Q JL UPRNtHT P D CHENDESh;L'NNA j.tONG.I, 5, JhURPl&.),.T, SuTmamaa~-RM.0AM)00(
/
I~1}}
    'n
* l li
 
v mm/psL Ltr. Sk f   557
                                                                                                    ~ ~
Copies   to)   C!5f, 388, CAM,     AN, RM.
ilORIDAPCAZR 4 I.IGnT CQv Offsite:     ADS, JRI,   COLt~ lfAS, REQ, Rfg Be& P, 1979 To!   Mr. J. P. O'Reilly, Director, Region Office of Inspection and Enforcement II                      PQ 2:27
                                                                                            +Q 0   S ~ Nuclear Regulatory ConLnLission htlanta,     Ceorgfa 30303                                                         ~Pl Pl From. Mr. C H lfethy, Plant Manager                                                   J~
St ~ Lucia Plant         DPR 67                                                   Q ~
Pcarez 6   Light Coupany
                                              -'loridm Miami, Florida Sub)ect,      NHiO FOR FACSBfILE TRANSMISSION TO COSFIBN PROtPT REPORTASLg OCCURRENCE       335-79-16 This mano confirms our verbal notification of the sub)ect 14 day reportable occurrence to Mr. E Hi webster oZ your office yesterday Occurrence;     On Nay 23 at about 4 p.tn., a report vas received from Ebasco through our Engineeriog Department that a restraint probient had been noted awhile completing as buQt print verification in contain-ment. Tea restraints vere interchanged on tvo 8" Component Cooling Mater (CQ4) lines running parallel about 2 feet apart. Tvo other res-traints vere mistaken)y installed on 4" CCM piping of similar configura-tion bur. at a different, azinLuthal location, This portion of CCM is non-safety relate1 but vas designed to be seismically restrained due to an adjacent 1       fill   line for a safety infection tank (accunlulator) ~
Assuming a seismic event and LOCA the               l" line,         iflittle ruptured, would have no significant     eff~t   an BIT operationp and very                           effect on the it is attached
~
: 8) header                         to, Corrective Action The 4 misplaced     restraints vt11 be properly insea11ed before'tartup froa the present refueling shutdovn.
L P. O'IKllLY Q     JL UPRNtHT P   D CHENDESh
                                                                ; L'NNA
: j. tONG.
I, 5, JhURPl&
                                                            .),.T,   SuTmamaa~
                                                          - RM. 0AM
                                                                                          )00(
 
I
  ~ 1}}

Latest revision as of 00:41, 30 October 2019

RO 335-79-16 on 790523:four Restraints Were Misplaced on 4-inch & 8-inch Component Cooling Water Lines.Four Restraints Will Be Properly Installed Before Startup from Present Refueling Shutdown
ML17206A839
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/25/1979
From: Wethy C
FLORIDA POWER & LIGHT CO.
To:
References
NUDOCS 7906140376
Download: ML17206A839 (4)


Text

4.

/

'n

  • l li

v mm/psL Ltr. Sk f 557

~ ~

Copies to) C!5f, 388, CAM, AN, RM.

ilORIDAPCAZR 4 I.IGnT CQv Offsite: ADS, JRI, COLt~ lfAS, REQ, Rfg Be& P, 1979 To! Mr. J. P. O'Reilly, Director, Region Office of Inspection and Enforcement II PQ 2:27

+Q 0 S ~ Nuclear Regulatory ConLnLission htlanta, Ceorgfa 30303 ~Pl Pl From. Mr. C H lfethy, Plant Manager J~

St ~ Lucia Plant DPR 67 Q ~

Pcarez 6 Light Coupany

-'loridm Miami, Florida Sub)ect, NHiO FOR FACSBfILE TRANSMISSION TO COSFIBN PROtPT REPORTASLg OCCURRENCE 335-79-16 This mano confirms our verbal notification of the sub)ect 14 day reportable occurrence to Mr. E Hi webster oZ your office yesterday Occurrence; On Nay 23 at about 4 p.tn., a report vas received from Ebasco through our Engineeriog Department that a restraint probient had been noted awhile completing as buQt print verification in contain-ment. Tea restraints vere interchanged on tvo 8" Component Cooling Mater (CQ4) lines running parallel about 2 feet apart. Tvo other res-traints vere mistaken)y installed on 4" CCM piping of similar configura-tion bur. at a different, azinLuthal location, This portion of CCM is non-safety relate1 but vas designed to be seismically restrained due to an adjacent 1 fill line for a safety infection tank (accunlulator) ~

Assuming a seismic event and LOCA the l" line, iflittle ruptured, would have no significant eff~t an BIT operationp and very effect on the it is attached

~

8) header to, Corrective Action The 4 misplaced restraints vt11 be properly insea11ed before'tartup froa the present refueling shutdovn.