ML17212A923: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17212A923 | | number = ML17212A923 | ||
| issue date = 07/31/2017 | | issue date = 07/31/2017 | ||
| title = | | title = NRC Security Inspection Report 05000482/2017404 | ||
| author name = Groom J | | author name = Groom J | ||
| author affiliation = NRC/RGN-IV | | author affiliation = NRC/RGN-IV | ||
| addressee name = Heflin A | | addressee name = Heflin A | ||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | | addressee affiliation = Wolf Creek Nuclear Operating Corp | ||
| docket = 05000482 | | docket = 05000482 | ||
| license number = NPF-042 | | license number = NPF-042 | ||
| contact person = Groom J | | contact person = Groom J | ||
| document report number = IR 2017404 | | document report number = IR 2017404 | ||
| document type = Letter | | document type = Letter | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000482/2017404]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:OFFICIAL USE ONLY | {{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | ||
- SECURITY-RELATED INFORMATION | UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
- | 1600 E. LAMAR BLVD. | ||
ARLINGTON, TX 76011-4511 | |||
July 31, 2017 | |||
Mr. Adam C. Heflin, President and | |||
Chief Executive Officer | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | P.O. Box 411 | ||
Burlington, KS 66839 | |||
SUBJECT: WOLF CREEK GENERATING STATION - NRC SECURITY INSPECTION | |||
- NRC SECURITY INSPECTION REPORT 05000482/ | REPORT 05000482/2017404 | ||
Dear Mr. Heflin: | Dear Mr. Heflin: | ||
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security | |||
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station. | inspection at the Wolf Creek Generating Station. The NRC inspectors discussed the results of | ||
this inspection with Mr. C. Reasoner, Site Vice President and other members of your staff. The | |||
inspectors documented the results of this inspection in the enclosed inspection report. | |||
One self-revealed finding was identified during this inspection. The NRC is treating this violation | |||
as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | |||
If you contest this violation or significance of this non-cited violation, you should provide a | |||
response within 30 days of the date of this inspection report, with the basis for your denial, | |||
-0001; and the NRC resident inspector at the Wolf Creek Generating Station. | to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, | ||
DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of | |||
A cross-cutting aspect is assigned to this finding in the area of human performance, procedures in that station personnel failed to follow procedures | Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the | ||
(H.8). | NRC resident inspector at the Wolf Creek Generating Station. | ||
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: | A cross-cutting aspect is assigned to this finding in the area of human performance, procedures | ||
-0001; with copies to the Regional Administrator, Region IV, and the NRC Resident Inspectors at the Wolf Creek Generating Station. | in that station personnel failed to follow procedures (H.8). If you disagree with a cross-cutting | ||
aspect assignment in this report, you should provide a response within 30 days of the date of | |||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading | this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory | ||
-rm/adams.html | Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the | ||
Regional Administrator, Region IV, and the NRC Resident Inspectors at the Wolf Creek | |||
Generating Station. | |||
This letter will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | |||
accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for | |||
Withholding. | |||
OFFICIAL USE ONLY | Enclosure transmitted herewith | ||
- SECURITY-RELATED INFORMATION | contains SUNSI. When separated | ||
from enclosure, this transmittal | |||
- SECURITY-RELATED INFORMATION | document is decontrolled. | ||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
-Related Information, so the enclosed report will not be made publically available in accordance with 10 | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
-Related Information, please mark your entire response | A. Heflin 2 | ||
-Related Information | However, the enclosed report contains Security-Related Information, so the enclosed report will | ||
- Withhold from Public Disclosure under 10 CFR 2.390 | not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to | ||
provide a response that contains Security-Related Information, please mark your entire | |||
response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 | |||
10 CFR 2.390(b)(1). | in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in | ||
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in | |||
accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA/ | |||
Jeremy R. Groom | |||
Chief, Plant Support Branch 1 | |||
Division of Reactor Safety | |||
Docket No. 50-482 | |||
-482 License No. NPF | License No. NPF-42 | ||
-42 | |||
Non-public Enclosure: | Non-public Enclosure: | ||
NRC Inspection Report 05000482/2017404 | |||
w/Attachment: Supplemental Information | |||
cc w/enclosure: | |||
Mr. Mike Skiles | |||
Security Manager | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | P.O. Box 411 | ||
Burlington, KS 66839 | |||
cc w/o enclosure: Electronic Distribution | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | ML17212A830 | ||
Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 | |||
ADAMS ACCESSION NUMBER: ML17212A923 | |||
Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: | |||
SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 | |||
OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1 | |||
NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom | |||
SIGNATURE /RA/ /RA/ email /RA/ /RA/ /RA/ /RA/ | |||
DATE 07/18/2017 07/18/2017 07/24/2017 7/26/2017 07/31/2017 07/31/2017 | |||
}} | }} |
Latest revision as of 00:41, 30 October 2019
ML17212A923 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 07/31/2017 |
From: | Jeremy Groom NRC Region 4 |
To: | Heflin A Wolf Creek |
Groom J | |
References | |
IR 2017404 | |
Download: ML17212A923 (3) | |
See also: IR 05000482/2017404
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
July 31, 2017
Mr. Adam C. Heflin, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION - NRC SECURITY INSPECTION
REPORT 05000482/2017404
Dear Mr. Heflin:
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security
inspection at the Wolf Creek Generating Station. The NRC inspectors discussed the results of
this inspection with Mr. C. Reasoner, Site Vice President and other members of your staff. The
inspectors documented the results of this inspection in the enclosed inspection report.
One self-revealed finding was identified during this inspection. The NRC is treating this violation
as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest this violation or significance of this non-cited violation, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial,
to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington,
DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of
Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the
NRC resident inspector at the Wolf Creek Generating Station.
A cross-cutting aspect is assigned to this finding in the area of human performance, procedures
in that station personnel failed to follow procedures (H.8). If you disagree with a cross-cutting
aspect assignment in this report, you should provide a response within 30 days of the date of
this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory
Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the
Regional Administrator, Region IV, and the NRC Resident Inspectors at the Wolf Creek
Generating Station.
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for
Withholding.
Enclosure transmitted herewith
contains SUNSI. When separated
from enclosure, this transmittal
document is decontrolled.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
A. Heflin 2
However, the enclosed report contains Security-Related Information, so the enclosed report will
not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to
provide a response that contains Security-Related Information, please mark your entire
response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390
in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in
accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Jeremy R. Groom
Chief, Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-482
License No. NPF-42
Non-public Enclosure:
NRC Inspection Report 05000482/2017404
w/Attachment: Supplemental Information
cc w/enclosure:
Mr. Mike Skiles
Security Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
cc w/o enclosure: Electronic Distribution
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3
ADAMS ACCESSION NUMBER: ML17212A923
Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: Yes No Publicly Available Sensitive NRC-002
OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1
NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom
SIGNATURE /RA/ /RA/ email /RA/ /RA/ /RA/ /RA/
DATE 07/18/2017 07/18/2017 07/24/2017 7/26/2017 07/31/2017 07/31/2017