{{#Wiki_filter:June 1981 Tendon Surveillance Program Robert E.Ginna Nuclear Power Station April 27, 1981 1 JUNE 1981 SURVEILLANCE PROGRAM  
{{#Wiki_filter:June 1981 Tendon Surveillance Program Robert E. Ginna Nuclear Power Station April 27, 1981
 
1 JUNE   1981 SURVEILLANCE PROGRAM


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==


The June 1981 tendon surveillance program is presented in detail.The program includes the liftoff of fourteen (14)tendons including the four (4)tendons with load cells.The data collection system required will not only confirm the liftoff data, but it will also obtain data needed to continue the investigation into the larger than predicted tendon losses.The inspection and selection process discussed in the Proposed Revision 3 to USNRC Regulatory Guide 1.35 are followed.The measured force for each tendon will be evaluated with respect to its predicted lower limit force discussed in this guide.These predicted lower limit forces are obtained using the loss calculation methodology described in the Proposed USNRC Regulatory Guide 1.35 Position l.2.0 OB JECTIVES, The June, 1981 surveillance program is required to verify that the tendon forces are within the technical specifications and to provide further information as to why tendons have experienced prestress losses in excess of their predicted values.This surveillance program as outlined herein has four objectives:
The June 1981 tendon     surveillance program is presented in detail.
1~To measure lift-off forces in selected tendons.2.To compare lift-off forces with those predicted, using either the existing relaxation data and/or retensioned wire data from the testing currently underway at Lehigh University.
The program includes the liftoff of fourteen (14) tendons including the four (4) tendons with load cells. The data collection system required will not only confirm the liftoff data, but       it will also obtain data needed to continue the investigation into the larger than predicted tendon losses. The inspection and selection process discussed in the Proposed Revision 3 to USNRC Regulatory Guide 1.35 are followed. The measured force for each tendon will be evaluated with respect to its predicted lower limit force discussed in this guide. These predicted lower limit forces are obtained using the loss calculation methodology described in the Proposed USNRC Regulatory Guide 1.35 Position l.
3.To compare the two force measuring systems: a.Strain gaged stressing rod.
2.0 OB JECTIVES, The June,   1981 surveillance program is required to verify that the tendon forces are within the technical specifications and to provide further information as to why tendons have experienced prestress losses in excess of their predicted values. This surveillance program as outlined herein has four objectives:
1 W b.Pressure gauge and effective ram area.4.To test the 6%overstress effect.The following surveillance program is intended for use only in June'1981.It is expected that the detail data gathering proposed will not be necessary on subsequent surveillances.
1 ~   To measure lift-offforces    in selected tendons.
3.0 TENDON SELECTION 3.1 The tendon selection process will: 1.Verify that tendon force losses have stabilized.
: 2. To compare lift-off forces   with those predicted, using either the existing relaxation data and/or retensioned wire data from the testing currently underway at Lehigh University.
.2.Survey enough tendons to extend present data base.3.Include all four tendons with load cells.4.Include tendons retensioned at 1000 hours after initial stressing.
: 3. To compare the two force measuring systems:
5.Include tendons from each tendon mark category.3.2 Table 1 contains the complete list of selected tendons.3~3 To verify that the tendon force loss has stabilized,-tendons 62 and 76 are selected because they experienced large losses during the first eleven (ll)years.Tendon 51 is selected as an average loss tendon and 155 as a minimal loss tendon.3.4 To extend the data base, tendons 17 and 84 are selected because they each have four (4)recorded data points.3.5 Load cells are present under tendons 13, 53, 93, and 133, therefore, these are selected for surveillance.
: a. Strain gaged   stressing rod.
Tendons 133 and 13 will be used to evaluate the 6/overstress effect.
 
k I' 3.6 To include tendons retensioned at 1000 hours, four are selected;two surveyed previously (36 and 111)and two not surveyed (33 and 116).4.0 TEST PROCEDURE FOR LIFT-OFF 4.1 Initial Conditions 1.Plant may be in any phase of operation.
1 W
2.Pressure gauge has been calibrated.
: b. Pressure gauge and     effective   ram area.
3.Hydraulic ram area has been calibrated.
: 4. To test the   6% overstress effect.
4.Hydraulic pump and ram are functional and ready for operation.
The following surveillance program is intended for use only in June '1981. It is expected that the detail data gathering proposed will not be necessary on subsequent surveillances.
5.Load cells and stressing rod have been calibrated.
3.0 TENDON SELECTION 3.1 The tendon   selection process   will:
6.All tendons to be stressed have been inspected for broken wires and corrosion.
: 1. Verify that tendon force losses       have   stabilized.
7.Containment structure has been inspected for cracks, spalling, etc.4.2 Precautions 1.Observe all RGB safety rules and regulations.
    .2. Survey enough tendons to extend present data base.
2.Do not exceed 6560 psi gauge pressure for jack and tendons.3.Whenever hydraulic pump is operating, the reservoir vent valve must be open.4.Do not extend ram more than 8 inches.
: 3. Include   all four   tendons with load   cells.
4.3 General Instructions 1.Fill in line 1-4 on the data sheet (See Appendix I)and record comments from the visual inspection on line 5.2.Move assembled hydraulic jack to position for coupling to the anchor head and place the pump in a convenient location for operation.
: 4. Include tendons retensioned at       1000 hours   after initial stressing.
a.Carefully thread stressing adaptor onto tendon anchor head.Note: Leave a minimum of one thread and maximum of three threads on tendon anchor exposed below the lower edge of the stressing adaptor.b.Place jack assembly, on tendon base plate.c.Center jack chair carefully over tendon head and thread stressing rod into stressing adaptor.d.Center compression shims and tighten jack rod nut at top (ram)end of jack being careful not to damage strain gaged area and the electrical connector on top of the, jack rod.3.Make the appropriate strain gage connections and check for malfunctions.
: 5. Include tendons from each tendon mark category.
4.Before attaching hoses to jack for the first tendon, check pump and hoses by performing the following:
3.2 Table 1 contains the complete     list of selected tendons.
a.Set valves to pump position.b.Start pump at the same time depress the ball valve.
3 3
c.Pump slowly to fill hose with oil until it comes out of the hose free of bubbles.d.Release ball valve and start pumping again.Continue pumping;hose will become stiff;gauge pressure will rise rapidly and then hold constant.5.Reduce pressure and connect hoses to jack.6.Record all initial readings in the appropriate columns on the data sheet.7.Start pump and increase pressure to 2,000 psi.a.Record stressing rod reading in column 3a on data sheet.b.Record load'ell reading in column 4a on the data sheet if tendon has load cell.c.Record ram position in inches in column 5 on data sheet.d.Calculate and record force values for the stressing rod, pressure gauge and load cell.8.Increase pressure up to 4,000 psi and hold.a.Inspect for leakage of hydraulic fluid and note if leakage is excessive.
  ~ To verify that the   tendon force loss has stabilized,-tendons 62 and 76 are selected because they experienced large losses during the first eleven (ll) years. Tendon 51 is selected as an average loss tendon and 155 as a minimal loss tendon.
b.Record stressing rod and load cell (if tendon has load cell)-readings in the appropriate columns on the data sheet.c.Calculate and record force for the stressing rod, pressure gauge and load cell.
3.4 To extend   the data base, tendons 17 and 84 are selected because they each have four (4) recorded data points.
9.Increase pressure until a 0.035 (1/32)inch thick feeler shim can be inserted into the shim stack at two equally spaced positions around the shim stack.10.Reduce ram pressure 1000 psi or until the feeler shims cannot be removed.Increase pressure until both feeler shims can be removed.Note in the comment section if there is a large difference in the load at which each feeler shim can be removed.This is defined as liftoff.a.Record the pressure gauge reading on the data sheet in column 2a.b.Record the stressing rod reading on the data sheet in column 3a.c.Record the load cell reading for load cell tendons in column 4a.d.Record the ram position in column 5 of the data sheet.e.Calculate and record force values.11.Stress tendons 13 and 133 an additional 6%over recorded liftoff pressure.a.Record computed 6/overstress pressure on data sheet in column 2a.b.Increase pressure to computed 6/over stressing pressure and record stressing rod reading, load cell reading and ram position on the data sheet.c.Place two.035 (1/32)inch thick feeler shims in the shim pack and reduce ram pressure to approximately 2900 psi.
3.5 Load cells are present under tendons       13, 53, 93, and 133, therefore, these are selected for surveillance.         Tendons 133 and 13 will be used to evaluate the 6/ overstress effect.
l' d.Slowly increase pressure until the feeler shims can be withdrawn from shim stack.This is defined as liftoff.Record load cell, pressure gauge, strain gage and ram position on data sheet.e.Calculate and record force values on data sheet.12..Decrease pressure to approximately 4,000 psi.a.Record stressing rod reading, load cell and ram position on the data sheet.b.Calculate and record force values on data sheet.13.Decrease pressure to approximately 2,000 psi.a.Record stressing rod reading, load'cell reading and ram position on the data sheet.b.Calculate and record force values on the data sheet.14.Decrease pressure until all load is removed from jack rod.a.Record stressing rod reading, load cell reading and ram position on the data sheet.15.Remove jack assembly from tendon.a.Disconnect strain gage equipment.
 
b.Unthread stressing rod from coupler.c.Remove jack chair and stressing rod assembly.d.Remove adapter from tendon head.
k I'
16.Record any comments concerning liftoff on the data sheet.17.Move to next tendon.5.0 DATA COLLECTION PROCEDURES 5.1 Test Data-Record all data as required in 4.0, Test Procedure for Liftoff 5.2 Data sheet-The proposed data sheet is presented in Appendix I.5.3 Strip chart recordings of force from load cell tendons will begin when the jack assembly is moved from that tendon and continue for 500 hours.6.0 TENDON SURVEILLANCE SEQUENCE The schedule is presented in Table 2.7.0 ACCEPTANCE CRITERIA The measured liftoff.forces will be evaluated in accordance with the present"Ginna Technical Specifications."
 
Table 1 TENDON SELECTION Tendon Number Tendon Mark Comments 13 17'33 36 51 53 62 76 84 93 111 116 133 155 A C GS HT A A A B A A A2 ER A A Load cell Maximum recorded data Retensioned at 1000 hours Retensioned at 1000 hours Average ll year loss Ioad cell Large ll year loss Large 11 year loss Maximum recorded data Ioad'cell Retensioned at 1000 hours Retensioned at 1000 hours Load cell Small 11 year loss 10 Table 2 TENDON SURVEILLANCE SE(}UENCE Sequence Number Tendon Number S ecial Instructions 9 10 ll 12 13 14 13 17 33 36 51 53 62 76 84 93 111 116 133 155 I,oad cell and 6/overstressing Load cell Load cell Ioad cell and 6/overstressing.
3.6 To include tendons retensioned at 1000 hours, four are selected; two surveyed previously (36 and 111) and two not surveyed (33 and 116).
Appendix I Data Sheet-June 1981 Tendon Surveillance 12 DATA SHEET 1-JUNE, 1981 TENDONSURVEILLANCE RG&E GINNA NUCLEAR POWER STATION ROCHESTER GAS AND ELECTRIC CORPORATION 1)Date 2)Hydraulic Jack No.3)Hydraulic Pump No.4)Load Cell Factor--Tendon No.Ram Area"=Pressure Gauge No.Shim Stack Thickness Stressing Rod Gage Factor~'~5)Tendon Inspection Comments 1 Condition 2 Pressure Gau e 3 Stressin Rod 4 I.oad Cell 5 Ram Position 6 Comments Initial Increasing Increading Liftoff a (b Pressure Force" (si)(lbs)2000 4000 a Strain (m in/in)b Force---(lbs)b Strain Force""" (m in/in)(lbs)inches Liftoff+6g (Tendons 13&133)Liftoff Decreasing Decreasing Decreasin 4000 2000 0 13 DATA SHEET 1 (Cont'd)Notes: (-)Ram area to be used to calculate ram force in column 2b: Force=Ram Area x Pressure Load Cell Factor to be used to calculate force in column 4b: Force=Load Cell Factor x (Strain'Reading-Initial Strain Reading)Stressing Rod Gage Factor to be used to calculate force in rod in column 3b: Force=Stressing Rod Gage Factor x (Strain-Initial Strain Reading)}}
4.0 TEST PROCEDURE FOR LIFT-OFF 4.1 Initial Conditions
: 1. Plant may be   in any phase of operation.
: 2. Pressure   gauge has been   calibrated.
: 3. Hydraulic   ram area has been   calibrated.
: 4. Hydraulic   pump and ram   are functional and ready   for operation.
: 5. Load cells and   stressing rod have been calibrated.
: 6. All tendons to     be stressed have been inspected   for broken wires and corrosion.
: 7. Containment structure has been inspected       for cracks, spalling, etc.
4.2 Precautions
: 1. Observe all RGB   safety rules and regulations.
: 2. Do not exceed 6560 psi gauge pressure for jack and tendons.
: 3. Whenever hydraulic   pump is operating, the reservoir vent valve must be open.
: 4. Do not extend   ram more than 8   inches.
 
4.3 General Instructions
: 1. Fill in   line 1-4 on the data sheet (See Appendix   I) and record comments from the visual inspection on line 5.
: 2. Move assembled   hydraulic jack to position for coupling to the anchor head   and place the pump in a convenient location for operation.
: a. Carefully thread stressing adaptor onto tendon anchor head.
Note:       Leave a minimum   of one thread and maximum of three threads on tendon anchor exposed below the lower edge of the stressing adaptor.
: b. Place jack assembly, on tendon base plate.
: c. Center jack chair carefully over tendon head and thread stressing rod into stressing adaptor.
: d. Center compression shims and tighten jack rod nut at top (ram) end of jack being careful not to damage strain gaged area and the electrical connector on top of the, jack rod.
: 3. Make the appropriate strain gage connections and check     for malfunctions.
: 4. Before attaching hoses to jack for the     first tendon, check pump and hoses by performing the following:
: a. Set valves to pump   position.
: b. Start pump at the same time depress the ball valve.
: c. Pump   slowly to   fill hose with   oil until   it comes out of the hose free of bubbles.
: d. Release   ball valve   and start pumping again.     Continue pumping; hose     will become stiff;     gauge pressure   will rise rapidly   and then hold     constant.
: 5. Reduce pressure     and connect hoses   to jack.
: 6. Record   all initial readings in       the appropriate columns on the data sheet.
: 7. Start pump and     increase pressure to 2,000 psi.
: a. Record   stressing rod reading in column       3a on data   sheet.
: b. Record   load'ell   reading in column     4a on the data sheet   if tendon has load     cell.
: c. Record ram     position in inches in     column 5 on data sheet.
: d. Calculate and record force values for the stressing rod, pressure gauge and load cell.
: 8. Increase pressure up to 4,000 psi and hold.
: a. Inspect for leakage of hydraulic         fluid and   note if leakage is excessive.
: b. Record   stressing rod   and load   cell (if tendon has load cell)   -readings   in the appropriate     columns on the data sheet.
: c. Calculate and record force for the stressing rod, pressure gauge and load cell.
: 9. Increase pressure   until a 0.035 (1/32) inch thick feeler shim can be inserted into the shim stack at two equally spaced positions around the shim stack.
: 10. Reduce ram pressure   1000   psi or until the feeler shims cannot be removed. Increase pressure until both feeler shims can be removed. Note in the comment section       if there is a large difference in the load at which each feeler shim can be removed.
This is defined as liftoff.
: a. Record the pressure   gauge reading on the data sheet   in column 2a.
: b. Record the stressing   rod reading on the data sheet   in column 3a.
: c. Record the load cell reading for load cell   tendons in column 4a.
: d. Record the ram position in   column 5 of the data sheet.
: e. Calculate and record force values.
: 11. Stress tendons 13 and   133   an additional 6% over recorded liftoffpressure.
: a. Record computed 6/ overstress   pressure on data sheet in column 2a.
: b. Increase pressure to computed 6/ over stressing pressure and record stressing rod reading, load cell reading and ram position on the data sheet.
: c. Place two .035 (1/32) inch thick feeler shims in the shim pack and reduce ram pressure to approximately 2900 psi.
 
l'
: d. Slowly increase pressure until the feeler shims can be withdrawn from shim stack. This is defined as liftoff.
Record load cell, pressure gauge, strain gage and ram position on data sheet.
: e. Calculate and record force values on data sheet.
: 12. .Decrease   pressure to approximately 4,000 psi.
: a. Record stressing     rod reading, load cell and ram position on the data sheet.
: b. Calculate and record force values on data sheet.
: 13. Decrease pressure     to approximately 2,000 psi.
: a. Record   stressing rod reading, load'cell reading   and ram position on the data sheet.
: b. Calculate and record force values on the data sheet.
: 14. Decrease   pressure   until all load is removed from jack rod.
: a. Record   stressing rod reading, load cell reading     and ram position on the data sheet.
: 15. Remove   jack assembly from tendon.
: a. Disconnect strain gage equipment.
: b. Unthread stressing rod from coupler.
: c. Remove   jack chair   and stressing rod assembly.
: d. Remove   adapter from tendon head.
: 16. Record any comments concerning     liftoff on the data sheet.
: 17. Move to next tendon.
5.0 DATA COLLECTION PROCEDURES 5.1 Test Data - Record   all data as required   in 4.0, Test Procedure for Liftoff 5.2 Data sheet   - The proposed   data sheet is presented in   Appendix I.
5.3 Strip chart recordings of force from load cell tendons will begin when the jack assembly is moved from that tendon and continue for 500 hours.
6.0 TENDON SURVEILLANCE SEQUENCE The schedule   is presented in Table   2.
7.0 ACCEPTANCE CRITERIA The measured   liftoff.forces will be   evaluated in accordance with the present "Ginna Technical Specifications."
 
Table 1 TENDON SELECTION Tendon Tendon Number Mark                           Comments 13     A            Load  cell 17     C            Maximum  recorded data
'33     GS          Retensioned at 1000 hours 36     HT          Retensioned at 1000 hours 51     A            Average  ll year loss 53     A            Ioad cell 62     A            Large  ll  year loss 76    B            Large 11 year loss 84     A            Maximum recorded data 93     A            Ioad 'cell 111   A2          Retensioned at 1000 hours 116   ER          Retensioned at 1000 hours 133   A            Load  cell 155   A           Small  11  year loss
 
10 Table 2 TENDON SURVEILLANCE SE(}UENCE Sequence     Tendon Number     Number                   S ecial Instructions 13           I,oad cell and 6/ overstressing 17 33 36 51 53           Load  cell 62 76 9          84 10          93           Load  cell ll        111 12        116 13        133           Ioad  cell and 6/ overstressing.
14        155
 
Appendix I Data Sheet - June 1981 Tendon Surveillance
 
12 DATA SHEET 1 - JUNE, 1981 TENDONSURVEILLANCE RG&E GINNA NUCLEAR POWER STATION ROCHESTER GAS AND ELECTRIC CORPORATION
: 1) Date                         Tendon No.                          Shim Stack Thickness
: 2) Hydraulic Jack No.                           Ram Area"=
: 3)  Hydraulic Pump No.                         Pressure  Gauge No.
: 4) Load Cell Factor--                         Stressing   Rod Gage Factor~'~
: 5) Tendon Inspection   Comments 1                       2                       3                        4                  5        6 Condition            Pressure  Gau e         Stressin     Rod           I.oad   Cell     Ram Position Comments a           (b          a            b                          b Pressure       Force"    Strain      Force--      Strain        Force"""    inches
( si)       (lbs)     (m in/in)     -(lbs)     (m in/in)       (lbs)
Initial Increasing        2000 Increading        4000 Liftoff Liftoff+   6g (Tendons 13 & 133)
Liftoff Decreasing       4000 Decreasing       2000 Decreasin             0
 
13 DATA SHEET 1 (Cont'd)
Notes: (-) Ram area to be used to calculate ram force in column 2b: Force = Ram Area x Pressure Load Cell Factor to be used to calculate force in column 4b:   Force = Load Cell Factor x (Strain 'Reading - Initial Strain Reading)
Stressing Rod Gage Factor to be used to calculate force in rod in column 3b: Force =
Stressing Rod Gage Factor x (Strain - Initial Strain Reading)}}

Latest revision as of 18:12, 29 October 2019

June 1981 Tendon Surveillance Program.
ML17258B008
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/27/1981
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17258B007 List:
References
PROC-810630, NUDOCS 8105050455
Download: ML17258B008 (17)


Text

June 1981 Tendon Surveillance Program Robert E. Ginna Nuclear Power Station April 27, 1981

1 JUNE 1981 SURVEILLANCE PROGRAM

1.0 INTRODUCTION

The June 1981 tendon surveillance program is presented in detail.

The program includes the liftoff of fourteen (14) tendons including the four (4) tendons with load cells. The data collection system required will not only confirm the liftoff data, but it will also obtain data needed to continue the investigation into the larger than predicted tendon losses. The inspection and selection process discussed in the Proposed Revision 3 to USNRC Regulatory Guide 1.35 are followed. The measured force for each tendon will be evaluated with respect to its predicted lower limit force discussed in this guide. These predicted lower limit forces are obtained using the loss calculation methodology described in the Proposed USNRC Regulatory Guide 1.35 Position l.

2.0 OB JECTIVES, The June, 1981 surveillance program is required to verify that the tendon forces are within the technical specifications and to provide further information as to why tendons have experienced prestress losses in excess of their predicted values. This surveillance program as outlined herein has four objectives:

1 ~ To measure lift-offforces in selected tendons.

2. To compare lift-off forces with those predicted, using either the existing relaxation data and/or retensioned wire data from the testing currently underway at Lehigh University.
3. To compare the two force measuring systems:
a. Strain gaged stressing rod.

1 W

b. Pressure gauge and effective ram area.
4. To test the 6% overstress effect.

The following surveillance program is intended for use only in June '1981. It is expected that the detail data gathering proposed will not be necessary on subsequent surveillances.

3.0 TENDON SELECTION 3.1 The tendon selection process will:

1. Verify that tendon force losses have stabilized.

.2. Survey enough tendons to extend present data base.

3. Include all four tendons with load cells.
4. Include tendons retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> after initial stressing.
5. Include tendons from each tendon mark category.

3.2 Table 1 contains the complete list of selected tendons.

3 3

~ To verify that the tendon force loss has stabilized,-tendons 62 and 76 are selected because they experienced large losses during the first eleven (ll) years. Tendon 51 is selected as an average loss tendon and 155 as a minimal loss tendon.

3.4 To extend the data base, tendons 17 and 84 are selected because they each have four (4) recorded data points.

3.5 Load cells are present under tendons 13, 53, 93, and 133, therefore, these are selected for surveillance. Tendons 133 and 13 will be used to evaluate the 6/ overstress effect.

k I'

3.6 To include tendons retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, four are selected; two surveyed previously (36 and 111) and two not surveyed (33 and 116).

4.0 TEST PROCEDURE FOR LIFT-OFF 4.1 Initial Conditions

1. Plant may be in any phase of operation.
2. Pressure gauge has been calibrated.
3. Hydraulic ram area has been calibrated.
4. Hydraulic pump and ram are functional and ready for operation.
5. Load cells and stressing rod have been calibrated.
6. All tendons to be stressed have been inspected for broken wires and corrosion.
7. Containment structure has been inspected for cracks, spalling, etc.

4.2 Precautions

1. Observe all RGB safety rules and regulations.
2. Do not exceed 6560 psi gauge pressure for jack and tendons.
3. Whenever hydraulic pump is operating, the reservoir vent valve must be open.
4. Do not extend ram more than 8 inches.

4.3 General Instructions

1. Fill in line 1-4 on the data sheet (See Appendix I) and record comments from the visual inspection on line 5.
2. Move assembled hydraulic jack to position for coupling to the anchor head and place the pump in a convenient location for operation.
a. Carefully thread stressing adaptor onto tendon anchor head.

Note: Leave a minimum of one thread and maximum of three threads on tendon anchor exposed below the lower edge of the stressing adaptor.

b. Place jack assembly, on tendon base plate.
c. Center jack chair carefully over tendon head and thread stressing rod into stressing adaptor.
d. Center compression shims and tighten jack rod nut at top (ram) end of jack being careful not to damage strain gaged area and the electrical connector on top of the, jack rod.
3. Make the appropriate strain gage connections and check for malfunctions.
4. Before attaching hoses to jack for the first tendon, check pump and hoses by performing the following:
a. Set valves to pump position.
b. Start pump at the same time depress the ball valve.
c. Pump slowly to fill hose with oil until it comes out of the hose free of bubbles.
d. Release ball valve and start pumping again. Continue pumping; hose will become stiff; gauge pressure will rise rapidly and then hold constant.
5. Reduce pressure and connect hoses to jack.
6. Record all initial readings in the appropriate columns on the data sheet.
7. Start pump and increase pressure to 2,000 psi.
a. Record stressing rod reading in column 3a on data sheet.
b. Record load'ell reading in column 4a on the data sheet if tendon has load cell.
c. Record ram position in inches in column 5 on data sheet.
d. Calculate and record force values for the stressing rod, pressure gauge and load cell.
8. Increase pressure up to 4,000 psi and hold.
a. Inspect for leakage of hydraulic fluid and note if leakage is excessive.
b. Record stressing rod and load cell (if tendon has load cell) -readings in the appropriate columns on the data sheet.
c. Calculate and record force for the stressing rod, pressure gauge and load cell.
9. Increase pressure until a 0.035 (1/32) inch thick feeler shim can be inserted into the shim stack at two equally spaced positions around the shim stack.
10. Reduce ram pressure 1000 psi or until the feeler shims cannot be removed. Increase pressure until both feeler shims can be removed. Note in the comment section if there is a large difference in the load at which each feeler shim can be removed.

This is defined as liftoff.

a. Record the pressure gauge reading on the data sheet in column 2a.
b. Record the stressing rod reading on the data sheet in column 3a.
c. Record the load cell reading for load cell tendons in column 4a.
d. Record the ram position in column 5 of the data sheet.
e. Calculate and record force values.
11. Stress tendons 13 and 133 an additional 6% over recorded liftoffpressure.
a. Record computed 6/ overstress pressure on data sheet in column 2a.
b. Increase pressure to computed 6/ over stressing pressure and record stressing rod reading, load cell reading and ram position on the data sheet.
c. Place two .035 (1/32) inch thick feeler shims in the shim pack and reduce ram pressure to approximately 2900 psi.

l'

d. Slowly increase pressure until the feeler shims can be withdrawn from shim stack. This is defined as liftoff.

Record load cell, pressure gauge, strain gage and ram position on data sheet.

e. Calculate and record force values on data sheet.
12. .Decrease pressure to approximately 4,000 psi.
a. Record stressing rod reading, load cell and ram position on the data sheet.
b. Calculate and record force values on data sheet.
13. Decrease pressure to approximately 2,000 psi.
a. Record stressing rod reading, load'cell reading and ram position on the data sheet.
b. Calculate and record force values on the data sheet.
14. Decrease pressure until all load is removed from jack rod.
a. Record stressing rod reading, load cell reading and ram position on the data sheet.
15. Remove jack assembly from tendon.
a. Disconnect strain gage equipment.
b. Unthread stressing rod from coupler.
c. Remove jack chair and stressing rod assembly.
d. Remove adapter from tendon head.
16. Record any comments concerning liftoff on the data sheet.
17. Move to next tendon.

5.0 DATA COLLECTION PROCEDURES 5.1 Test Data - Record all data as required in 4.0, Test Procedure for Liftoff 5.2 Data sheet - The proposed data sheet is presented in Appendix I.

5.3 Strip chart recordings of force from load cell tendons will begin when the jack assembly is moved from that tendon and continue for 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />.

6.0 TENDON SURVEILLANCE SEQUENCE The schedule is presented in Table 2.

7.0 ACCEPTANCE CRITERIA The measured liftoff.forces will be evaluated in accordance with the present "Ginna Technical Specifications."

Table 1 TENDON SELECTION Tendon Tendon Number Mark Comments 13 A Load cell 17 C Maximum recorded data

'33 GS Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 36 HT Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 51 A Average ll year loss 53 A Ioad cell 62 A Large ll year loss 76 B Large 11 year loss 84 A Maximum recorded data 93 A Ioad 'cell 111 A2 Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 116 ER Retensioned at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> 133 A Load cell 155 A Small 11 year loss

10 Table 2 TENDON SURVEILLANCE SE(}UENCE Sequence Tendon Number Number S ecial Instructions 13 I,oad cell and 6/ overstressing 17 33 36 51 53 Load cell 62 76 9 84 10 93 Load cell ll 111 12 116 13 133 Ioad cell and 6/ overstressing.

14 155

Appendix I Data Sheet - June 1981 Tendon Surveillance

12 DATA SHEET 1 - JUNE, 1981 TENDONSURVEILLANCE RG&E GINNA NUCLEAR POWER STATION ROCHESTER GAS AND ELECTRIC CORPORATION

1) Date Tendon No. Shim Stack Thickness
2) Hydraulic Jack No. Ram Area"=
3) Hydraulic Pump No. Pressure Gauge No.
4) Load Cell Factor-- Stressing Rod Gage Factor~'~
5) Tendon Inspection Comments 1 2 3 4 5 6 Condition Pressure Gau e Stressin Rod I.oad Cell Ram Position Comments a (b a b b Pressure Force" Strain Force-- Strain Force""" inches

( si) (lbs) (m in/in) -(lbs) (m in/in) (lbs)

Initial Increasing 2000 Increading 4000 Liftoff Liftoff+ 6g (Tendons 13 & 133)

Liftoff Decreasing 4000 Decreasing 2000 Decreasin 0

13 DATA SHEET 1 (Cont'd)

Notes: (-) Ram area to be used to calculate ram force in column 2b: Force = Ram Area x Pressure Load Cell Factor to be used to calculate force in column 4b: Force = Load Cell Factor x (Strain 'Reading - Initial Strain Reading)

Stressing Rod Gage Factor to be used to calculate force in rod in column 3b: Force =

Stressing Rod Gage Factor x (Strain - Initial Strain Reading)