ML17261A107: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/06/1979
| issue date = 03/06/1979
| title = LER 79-005/03L-0 on 790206:containment Recirculation Sump Failed to Reopen After Hydro Testing.Caused by Flexibility of Long Extension Rod Between Limitorque SMB-00 Operator & Valve.Valve Stroked Monthly & Timed Quarterly
| title = LER 79-005/03L-0 on 790206:containment Recirculation Sump Failed to Reopen After Hydro Testing.Caused by Flexibility of Long Extension Rod Between Limitorque SMB-00 Operator & Valve.Valve Stroked Monthly & Timed Quarterly
| author name = SPECTOR S
| author name = Spector S
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:U.S.NUCLEAR REGULATORY COMMISSION NRC a~lRM 366 tu-'r7)-15 79-005/03L-0 LICENSEE EVENT REPORT I (CAR 1209)~O 7 8 CON'T~OT 7 8 Qi (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 0 0 0 0 0-0 OQ24 1 1 1 1QE~QE LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58 CONTROL BLOCK: 1 NYREG1Q200 9 LICENSEE CODE 14 15~LQB 0 5 0 0 0 2 4 4 Q7 0 2 0 6 7 9 Qs 0 3 0 6 7 9 QB 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES IO After RHR system hydro test containment recirc sump outlet MOV 851B failed'to re-open (T.S.5.9.2.b2)Its redundant counterpart had been successfully cycled and returned to the normal open position.As discussed in Cause Description, MOV 851B was~OS closed for the test only and operated properly on the second attempt.This was moni-tored by maintenance personnel after they had examined conditions and found no apparent reason for failure.~OS 7 8 9 80~OB 7 8 SYSTEM CAUSE CAUSE COMP.VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE~>>QTT E Q" L~JO>>V A I.V 0 F Q14~AQ75~ZQ75 9 10 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LEAIAO EVENT YEAR REPORT NO.CODE TYPE NO.Q17 REPQRT~79+~00 5+~~03+L 0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPAD.4 PRIME COMP.COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER
{{#Wiki_filter:NRC a~lRM 366                                                                                                                      U. S. NUCLEAR REGULATORY COMMISSION tu-'r7) -15                                                                           79-005/03L-0 LICENSEE EVENT REPORT I                       (CAR 1209)
~ZQPR~ZQPR~ZQEO~ZQ>>0 0 0 0~NQ22~NQ24~NQ25 L 2 0 0 Qss 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 Flexibility of long extension rod between Limitorque SMB-00 operator and valve possibly allowed valve to close tighter than required.First attempted opening stopped on overtorque but relieved overtorque condition permitting proper opening on second further problems.80 7 8 9 FACILITY STATUS'¹POWER OTHER STATUS Q E 0 8 8 NA METHOD OF DISCOVEAY DISCOVERY DESCRIPTION Q32~BQ31 Performing RHR Hydro 44 45 46 5 Q25~Q25 7 8 9 10 12 13 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY Q~6~Z Q33 Z Q34 NA 7 8 9 10 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q30~OO O Q27~ZQRR NA 7 8 9 11 12 13 PERSONNEL INJURIES 7 8 9 11 12 LOSS OF OR DAMAGE TO FACILITY Q43 TYPE DESCRIPTION 5~ZQ42 NA 7 8 9 10 PUBI.ICITY 7 8 9 10 80 LOCATION OF RELEASE Q36 NA 80 45 44 80 80 80 NRC USE ONLY>908 1800-'I'68 69 80 45 PHDNE 7 1 6 54 6-2 700, ext~2 9 1-2 1 5 S.Spector NAME OF PREPARER 3 attempt~.Va lve wi 1 1 continu e to be stroked monthly and timed quarterly to identify any}}
CONTROL BLOCK:                                                Qi                 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1                                  6
  ~O 7        8    9 NYREG1Q200 LICENSEE CODE              14      15 0     0     0   0 LICENSE NUMBER 0     0       OQ24 25      26 1     1 LICENSE TYPE 1     1QE~QE 30   57 CAT 58 CON'T
  ~OT                              ~LQB           0   5       0     0   0     2     4   4   Q7     0     2   0   6     7     9 Qs         0     3     0   6   7   9   QB 7        8                      60           61               DOCKET NUMBER               68     69       EVENT DATE             74       75       REPORT DATE         80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES                               IO After RHR system hydro test containment recirc sump outlet MOV 851B failed'to re-open (T.S. 5.9.2.b2)                   Its redundant counterpart had been successfully cycled and returned to the normal open position. As discussed in Cause Description, MOV 851B was
  ~OS               closed for the test only and operated properly on the second attempt.                                                                     This was moni-tored by maintenance personnel after they had examined conditions and found no apparent reason for failure.
  ~OS 7         8 9                                                                                                                                                                         80 SYSTEM             CAUSE         CAUSE                                                         COMP.           VALVE CODE               CODE       SUBCODE                   COMPONENT CODE                     SUBCODE           SUBCODE
  ~OB                                ~>>QTT     10 E Q"       L~JO>>             V A         I. V     0   F     Q14       ~AQ75           ~ZQ75 7        8                        9                                     12             13                               18           19               20 SEQUENTIAL                         OCCURRENCE             REPORT                       REVISION Q17 LEAIAO REPQRT ACTION FUTURE EVENT YEAR
                                        ~79 21        22 EFFECT
                                                              +23 SHUTDOWN
                                                                            ~00 24 REPORT NO.
5 26
                                                                                                      +~
27
                                                                                                                    ~03 28 ATTACHMENT CODE 29 NPAD.4 TYPE
                                                                                                                                            +L 30 PRIME COMP.
31 NO.
32 0
COMPONENT TAKEN ACTION                   ON PLANT           METHOD                   HOURS Q22         SUBMITTED         FORM SUB.         SUPPLIER           MANUFACTURER
                  ~ZQPR ~ZQPR                   ~ZQEO             ~ZQ>>               0   0     0     0       ~NQ22             ~NQ24             ~NQ25             L   2   0     0   Qss 33         34                 35                 36             37                   40     41               42                 43             44                 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 Flexibility of long extension                             rod between Limitorque SMB-00 operator and valve attempt possibly allowed valve to close tighter than required. First attempted opening stopped on overtorque but relieved overtorque condition permitting proper opening on second 3
                                    . Va lve      wi1 1 continu e to be stroked monthly and timed quarterly to identify any further problems.
7         8     9                                                                                                                                                                       80 FACILITY
                                    '¹ POWER                                         Q        METHOD OF 7
5 8
STATUS 9
E   Q25    ~Q25 10 0 8 8 12      13 OTHER STATUS NA 44 DISCOVEAY
                                                                                                  ~BQ31 45        46 Performing RHR Hydro DISCOVERY DESCRIPTION Q32 80 ACTIVITY CONTENT
~6 RELEASED OF RELEASE
                ~Z      Q33      Z AMOUNT OF ACTIVITY NA Q                                       NA LOCATION OF RELEASE Q36 Q34 7         8   9               10                                                       44            45                                                                              80 PERSONNEL EXPOSURES NUMBER               TYPE       DESCRIPTION Q30
                ~OO             O Q27     ~ZQRR               NA 7         8   9               11       12         13                                                                                                                               80 PERSONNEL INJURIES 7         8   9               11       12                                                                                                                                           80 LOSS OF OR DAMAGE TO FACILITY TYPE         DESCRIPTION                   Q43 5       ~ZQ42                                           NA 7         8     9           10                                                                                                                                                         80 PUBI.ICITY
                                                                                                >   908 1800-'I'                                                 NRC USE ONLY 7        8    9          10                                                                                                                    68   69                             80   45 NAME OF PREPARER                            S. Spector                                                PHDNE 7 1 6         54 6-2 700, ext       ~ 2 9 1 -2 1 5}}

Latest revision as of 18:08, 29 October 2019

LER 79-005/03L-0 on 790206:containment Recirculation Sump Failed to Reopen After Hydro Testing.Caused by Flexibility of Long Extension Rod Between Limitorque SMB-00 Operator & Valve.Valve Stroked Monthly & Timed Quarterly
ML17261A107
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/06/1979
From: Spector S
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17244A394 List:
References
LER-79-005-03L, LER-79-5-3L, NUDOCS 7903120294
Download: ML17261A107 (2)


Text

NRC a~lRM 366 U. S. NUCLEAR REGULATORY COMMISSION tu-'r7) -15 79-005/03L-0 LICENSEE EVENT REPORT I (CAR 1209)

CONTROL BLOCK: Qi (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

~O 7 8 9 NYREG1Q200 LICENSEE CODE 14 15 0 0 0 0 LICENSE NUMBER 0 0 OQ24 25 26 1 1 LICENSE TYPE 1 1QE~QE 30 57 CAT 58 CON'T

~OT ~LQB 0 5 0 0 0 2 4 4 Q7 0 2 0 6 7 9 Qs 0 3 0 6 7 9 QB 7 8 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES IO After RHR system hydro test containment recirc sump outlet MOV 851B failed'to re-open (T.S. 5.9.2.b2) Its redundant counterpart had been successfully cycled and returned to the normal open position. As discussed in Cause Description, MOV 851B was

~OS closed for the test only and operated properly on the second attempt. This was moni-tored by maintenance personnel after they had examined conditions and found no apparent reason for failure.

~OS 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE

~OB ~>>QTT 10 E Q" L~JO>> V A I. V 0 F Q14 ~AQ75 ~ZQ75 7 8 9 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION Q17 LEAIAO REPQRT ACTION FUTURE EVENT YEAR

~79 21 22 EFFECT

+23 SHUTDOWN

~00 24 REPORT NO.

5 26

+~

27

~03 28 ATTACHMENT CODE 29 NPAD.4 TYPE

+L 30 PRIME COMP.

31 NO.

32 0

COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER

~ZQPR ~ZQPR ~ZQEO ~ZQ>> 0 0 0 0 ~NQ22 ~NQ24 ~NQ25 L 2 0 0 Qss 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 Flexibility of long extension rod between Limitorque SMB-00 operator and valve attempt possibly allowed valve to close tighter than required. First attempted opening stopped on overtorque but relieved overtorque condition permitting proper opening on second 3

. Va lve wi1 1 continu e to be stroked monthly and timed quarterly to identify any further problems.

7 8 9 80 FACILITY

'¹ POWER Q METHOD OF 7

5 8

STATUS 9

E Q25 ~Q25 10 0 8 8 12 13 OTHER STATUS NA 44 DISCOVEAY

~BQ31 45 46 Performing RHR Hydro DISCOVERY DESCRIPTION Q32 80 ACTIVITY CONTENT

~6 RELEASED OF RELEASE

~Z Q33 Z AMOUNT OF ACTIVITY NA Q NA LOCATION OF RELEASE Q36 Q34 7 8 9 10 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q30

~OO O Q27 ~ZQRR NA 7 8 9 11 12 13 80 PERSONNEL INJURIES 7 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRIPTION Q43 5 ~ZQ42 NA 7 8 9 10 80 PUBI.ICITY

> 908 1800-'I' NRC USE ONLY 7 8 9 10 68 69 80 45 NAME OF PREPARER S. Spector PHDNE 7 1 6 54 6-2 700, ext ~ 2 9 1 -2 1 5