ML17310B347: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION UNIT 1 CYCLE 5 REVISION 1 9406i40205 900602 PDR ADOCK 05000528 P PDR  
{{#Wiki_filter:ENCLOSURE   1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION UNIT 1 CYCLE 5 REVISION 1 9406i40205 900602 PDR ADOCK 05000528 P             PDR
'f CORE OPERATING LIMITS REPORT (COLR)PVNGS Unit 3 Cycle 5, Revision 1 Insertion Instructions 1.Remove title page (Page 1)and Pages 3, 10, and 24 from the Unit 1 Cycle 5, Revision 0 COLR.2.Insert enclosed Revision 1 title page (Page 1)and Pages 3, 10, and 24 into the Unit 1 Cycle 5 COLR.
CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)UNIT 1 CYCLE 5 Revision I


Revision 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)UNIT 1 CYCLE 5 REVISION HISTORY~Revi i n~Dte 10/26/93 05'/i 8/e Y~Pa Issue for Vse (24 Total Pages)Replaced Pages 1,3,10,24 (24 Total Pages)Page 3 of24 0.5 0 (0%, 0.5)ech.Spec.3.1.1.3 aximum Upper imit (100%, 0.0)(50%, 0.0)(100%,-0.2)-0.5-1-1,5-2-2.5-8-8.5 (0%,-8.1)MTC AREA OF ACCEPTABLE OPERATION Beginning of Cycle limit End of Cycle limit (100%,-8.8)g 0 0 g 0-4.0 0 10 I I I I I 20 80 40 50 60 70 80 CORE POWER LEVEL,%OF RATED THERMAL POWER 90 100 I
'f CORE OPERATING LIMITS REPORT (COLR)
PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS, REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 OPERATIONAL MODE Number of Operating Charging Pumps 4 not on SCS 5 not on SCS 4 8c 5 on SCS 6(>4000ppm) 6 ((4000 ppm)8 hours 24 hours 2 hours 8 hours 24 hours 2 hours 12 hours 6 hours 12 hours 6 hours 8 hours'hours 2.5 hours 1.5 hours 3 hours 1.5 hours 3 hours 1.5 hours 1 hour 0.5 hours 4 hours 2 hours 0.5 hours ONA Rev.1 Notes: SCS=Shutdown Cooling System ONA=Operation not allowed Rev.1 Page 24 of 24 ENCLOSURE 2 CORE OPERATING LIMITS REPORT'ALO VERDE NUCLEAR GENERATING STATION UNIT 2 CYCLE 5 REVISION 2 t)I CORE OPERATING LIMITS REPORT (COLR)PVNGS Unit 2 Cycle 5, Revision 2 Insertion Instructions 1.Remove title page (Page 1)and Pages 3, 10, and 24 from the Unit 2 Cycle 5, Revision 1 COLR.2.Insert enclosed Revision 2 title page (Page 1)and Pages 3, 10, and 24 into the Unit 2 Cycle 5 COLR.
PVNGS Unit       3 Cycle 5, Revision     1 Insertion Instructions
U Coax or zmxrxC, r,nvrnS azr om PALO VERDE NUCLEAR GENERATING STATION (PVNGS)UNIT 2 CYCLE 5 Revision 2 Revision 2 CORE OPERATING LIMITS REPORT PALO VERDE NUCLE<AR GENERATING STATION (PVNGS)UNIT 2 GYCLE 5.-=REVISION HISTORY R~vi ioo Date 03/16/93 03/23/93 03/10/94<</i~A<Pres Issue for Review (24 Total Pages)Issue for Use (24 Total Pages)1, 3, and 5.Linear Heat Rate Reduced due to LOCA results.(24 Total Pages)Replaced pages 1, 3, 10, 24 (24 Total Pages)Page 3 of24 j
: 1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit   1 Cycle 5, Revision 0 COLR.
Revision 2 , PVNGS UNIT 2 CYCLE 5 CORE OPERATING LIMITS REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTION DETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K ff 5 0.95 OPERATIONAL MODE Number of Operating Charging Pumps 0 1 4 not on SCS 5 not on SCS 4&5onSCS 6 (>4000 ppm)6 (<4000 ppm)8 hours 8 hours 24 hours 6 hours 2 hours 8 hours 24 hours 2 hours 12 hours 6 hours 12 hours 6 hours 2.5 hours 1.5 hours 3 hours 1.5 hours 3 hours 1.5 hours 1 hour 0.5 hours 4 hours 2 hours 0.5 hours ONA H,ev.2 Notes: SCS=Shutdown Cooling System ONA=Operation not allowed Rev.2 Page 24 of 24
: 2. Insert enclosed Revision 1 title page (Page 1) and Pages 3, 10, and 24 into the Unit 1 Cycle 5 COLR.


0.5 (0%, 0.5)ech.Syec.3.1.1.3 aximum Uyyer imit (100%, 0.0)0-0.5-1-1.5-2.5-3-3.5 (0%,-3.1)MTC AREA OF ACCEPTABLE OPERATION (50%, 0.0)(1oo%,-o.2)Beginning of Cycle limit End of Cycle limit (100%,-3.8)Q M R D o~Q g-4.0 0 10 I I I I I 20 30 40 50 60 70 80 COBE POWER LEVEL,%OF BATED THERMAL POWER 90 100}}
CORE OPERATING LIMITSREPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT 1 CYCLE 5 Revision I
 
Revision 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT 1 CYCLE 5 REVISION HISTORY
~Revi i n                ~Dte                    ~Pa 10/26/93                Issue for Vse (24 Total Pages) 05'/i 8/e Y              Replaced Pages 1,3,10,24 (24 Total Pages)
Page 3  of24
 
0.5 ech. Spec. 3.1.1.3   aximum Upper        imit (0%, 0.5)                                                                        (100%, 0.0) 0 (50%, 0.0)
(100%, -0.2)
-0.5 Beginning of Cycle limit g
  -1
-1,5                            MTC AREA OF ACCEPTABLE OPERATION
  -2                                                                                                    0
-2.5 0
g
  -8    (0%, -8.1)                                            End of Cycle limit                      0
-8.5 (100%, -8.8)
-4.0                I        I                            I        I          I 0          10  20      80      40        50      60        70        80        90        100 CORE POWER LEVEL,% OF RATED THERMALPOWER
 
I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours      6 hours    2.5 hours  1.5 hours 4 not on SCS              12 hours      6 hours    3 hours    1.5 hours
                                      '
5 not on SCS              8 hours          hours    3 hours    1.5 hours 4 8c 5 on SCS            8 hours        2 hours    1 hour    0.5 hours 6(>4000ppm)              24 hours      8 hours    4 hours    2 hours Rev. 1 6 (( 4000 ppm)            24 hours      2 hours    0.5 hours  ONA Notes:  SCS = Shutdown Cooling System ONA = Operation not allowed                                      Rev. 1 Page 24  of 24
 
ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION
                            'ALO UNIT 2 CYCLE 5 REVISION 2
 
t
)I
 
CORE OPERATING LIMITS REPORT (COLR)
PVNGS Unit 2 Cycle 5, Revision 2 Insertion Instructions
: 1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit 2 Cycle 5, Revision 1 COLR.
: 2. Insert enclosed Revision 2 title page (Page 1) and Pages 3, 10, and 24 into the Unit 2 Cycle 5 COLR.
 
U Coax or zmxrxC, r,nvrnS azr om PALO VERDE NUCLEAR GENERATING STATION (PVNGS)
UNIT 2 CYCLE 5 Revision 2
 
Revision 2 CORE OPERATING LIMITSREPORT PALO VERDE NUCLE<AR GENERATING STATION (PVNGS)
UNIT 2 GYCLE 5 .- =
REVISION HISTORY R~vi ioo                Date                  Pres 03/16/93            Issue for Review (24 Total Pages) 03/23/93            Issue for Use (24 Total Pages) 03/10/94            1, 3, and 5. Linear Heat Rate Reduced due to LOCA results.
(24 Total Pages)
                        <</i~A<              Replaced pages 1, 3, 10, 24 (24 Total Pages)
Page 3 of24
 
j Revision 2
,  PVNGS UNIT 2 CYCLE 5 CORE OPERATING LIMITSREPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K ff5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE                        0            1 12 hours      6 hours    2.5 hours  1.5 hours 4 not on SCS              12 hours      6 hours    3 hours    1.5 hours 5 not on SCS              8 hours      6 hours    3 hours    1.5 hours 4&5onSCS                  8 hours      2 hours      1 hour    0.5 hours 6 ( > 4000 ppm)          24 hours      8 hours    4 hours    2 hours H,ev. 2 6 (< 4000 ppm)            24 hours      2 hours    0.5 hours  ONA Notes:    SCS = Shutdown Cooling System Rev. 2 ONA = Operation not allowed Page 24 of 24
 
0.5 ech. Syec.3.1.1.3    aximum Uyyer imit (0%, 0.5)                                                                    (100%, 0.0) 0 Q
(50%, 0.0)
(1oo%, -o.2)
-0.5                                                                                                  M Beginning of Cycle limit R
D
  -1
-1.5                          MTC AREA OF ACCEPTABLE OPERATION o
                                                                                                      ~Q
-2.5 g
  -3    (0%, -3.1)                                          End of Cycle limit
-3.5 (100%, -3.8)
-4.0                 I       I                           I       I         I 0          10  20       30     40       50       60         70       80       90        100 COBE POWER LEVEL,% OF BATED THERMALPOWER}}

Revision as of 09:24, 29 October 2019

Rev 1 to COLR PVNGS for Units 1 & 2 Cycle 5.
ML17310B347
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/02/1994
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17310B345 List:
References
NUDOCS 9406140205
Download: ML17310B347 (20)


Text

ENCLOSURE 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION UNIT 1 CYCLE 5 REVISION 1 9406i40205 900602 PDR ADOCK 05000528 P PDR

'f CORE OPERATING LIMITS REPORT (COLR)

PVNGS Unit 3 Cycle 5, Revision 1 Insertion Instructions

1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit 1 Cycle 5, Revision 0 COLR.
2. Insert enclosed Revision 1 title page (Page 1) and Pages 3, 10, and 24 into the Unit 1 Cycle 5 COLR.

CORE OPERATING LIMITSREPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 1 CYCLE 5 Revision I

Revision 1 CORE OPERATING LIMITS REPORT PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 1 CYCLE 5 REVISION HISTORY

~Revi i n ~Dte ~Pa 10/26/93 Issue for Vse (24 Total Pages) 05'/i 8/e Y Replaced Pages 1,3,10,24 (24 Total Pages)

Page 3 of24

0.5 ech. Spec. 3.1.1.3 aximum Upper imit (0%, 0.5) (100%, 0.0) 0 (50%, 0.0)

(100%, -0.2)

-0.5 Beginning of Cycle limit g

-1

-1,5 MTC AREA OF ACCEPTABLE OPERATION

-2 0

-2.5 0

g

-8 (0%, -8.1) End of Cycle limit 0

-8.5 (100%, -8.8)

-4.0 I I I I I 0 10 20 80 40 50 60 70 80 90 100 CORE POWER LEVEL,% OF RATED THERMALPOWER

I PVNGS UNIT 1 CYCLE 5 CORE OPERATING LIMITS,REPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K g 5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />

'

5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> hours 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 8c 5 on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6(>4000ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Rev. 1 6 (( 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Notes: SCS = Shutdown Cooling System ONA = Operation not allowed Rev. 1 Page 24 of 24

ENCLOSURE 2 CORE OPERATING LIMITS REPORT VERDE NUCLEAR GENERATING STATION

'ALO UNIT 2 CYCLE 5 REVISION 2

t

)I

CORE OPERATING LIMITS REPORT (COLR)

PVNGS Unit 2 Cycle 5, Revision 2 Insertion Instructions

1. Remove title page (Page 1) and Pages 3, 10, and 24 from the Unit 2 Cycle 5, Revision 1 COLR.
2. Insert enclosed Revision 2 title page (Page 1) and Pages 3, 10, and 24 into the Unit 2 Cycle 5 COLR.

U Coax or zmxrxC, r,nvrnS azr om PALO VERDE NUCLEAR GENERATING STATION (PVNGS)

UNIT 2 CYCLE 5 Revision 2

Revision 2 CORE OPERATING LIMITSREPORT PALO VERDE NUCLE<AR GENERATING STATION (PVNGS)

UNIT 2 GYCLE 5 .- =

REVISION HISTORY R~vi ioo Date Pres 03/16/93 Issue for Review (24 Total Pages) 03/23/93 Issue for Use (24 Total Pages) 03/10/94 1, 3, and 5. Linear Heat Rate Reduced due to LOCA results.

(24 Total Pages)

<</i~A< Replaced pages 1, 3, 10, 24 (24 Total Pages)

Page 3 of24

j Revision 2

, PVNGS UNIT 2 CYCLE 5 CORE OPERATING LIMITSREPORT TABLE 5 REQUIRED MONITORING FREQUENCIES FOR BACKUP BORON DILUTIONDETECTION AS A FUNCTION OF OPERATING CHARGING PUMPS AND PLANT OPERATIONAL MODES FOR K ff5 0.95 Number of Operating Charging Pumps OPERATIONAL MODE 0 1 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4 not on SCS 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 5 not on SCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 4&5onSCS 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 6 ( > 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> H,ev. 2 6 (< 4000 ppm) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> ONA Notes: SCS = Shutdown Cooling System Rev. 2 ONA = Operation not allowed Page 24 of 24

0.5 ech. Syec.3.1.1.3 aximum Uyyer imit (0%, 0.5) (100%, 0.0) 0 Q

(50%, 0.0)

(1oo%, -o.2)

-0.5 M Beginning of Cycle limit R

D

-1

-1.5 MTC AREA OF ACCEPTABLE OPERATION o

~Q

-2.5 g

-3 (0%, -3.1) End of Cycle limit

-3.5 (100%, -3.8)

-4.0 I I I I I 0 10 20 30 40 50 60 70 80 90 100 COBE POWER LEVEL,% OF BATED THERMALPOWER