ML17313A661: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/24/1998 | | issue date = 10/24/1998 | ||
| title = LER 98-008-00:on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements | | title = LER 98-008-00:on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements | ||
| author name = | | author name = Marks D | ||
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | | author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:LICENSEE EVENT REPORT (LER) | {{#Wiki_filter:LICENSEE EVENT REPORT (LER) | ||
50.73( | ACILITYNAME (1) DOCKET N VIIBER (2) PAGE (3) | ||
Palo Verde Unit 1 0 5 0 0 0 5 2 8 1OFO 6 (a) | |||
This Voluntary LER identifies that CE Qualification reports used to qualify Litton-Veam (LV)electrical connectors (CIR series models)for In-Core Instrumentation (ICI)used in Combustion Engineering (CE)plants may not adequately demonstrate appropriate equipment qualification. | Equipment Qualification Of Electrical Connectors May Not Be Adequately Demonstrated EVENT DATE d LER NUMBER 6 OTHER FACIUTIES INVOLVED 6 YEAR SEQUENllAL REVISION | ||
Qualification testing of LV connectors by CE did not represent the installed configuration at Palo Verde.Qualification reports from LV do support equipment qualification for the installed configuration provided that replacement of the silicone seal in the connector is performed each time the connector is cycled.No previous similar events have been reported pursuant to 10 CFR 50.73 in the last three years.9810300331 98i024 PDR ADDCX OSaOOms 8 PDR C II Ck LICENSEE EVENT REPORT (LER)TEXT CONTINUATION | - 0 0 8 - 0 0 05000529' 0 7 2 9 9 8 9 8 1 0 2 4 9 8 Palo Verde Unit 3 5 0 0 0 5 3 0 OPERATUIG IS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CF R C (Check one or more of the foaorseo) (11) | ||
This voluntary LER 528/98-008-00 is being submitted to report a condition related to equipment qualification that does not meet the criteria contained in 10 CFR 50.73(a)for submitting a LER, but might prove useful and be of generic interest to the nuclear industry.In addition to this report, APS submitted an operating experience report (OE9201)to INPO for posting on Nuclear Network.Specifically, on July 29, 1998, at approximately 1600 MST, Palo Verde Units 1, 2, and 3 were in Mode 1 (POWER OPERATION), operating at approximately 100 percent power when Engineering personnel determined that a condition related to equipment qualification that did not meet the criteria contained in 10 CFR 50.73(a)might be of generic interest to other licensees. | MODE (9) 20.4Q(b) 20.<<5(c) 50.73(aX2XN) 73.71(b) | ||
Specifically, engineering personnel determined that Combustion Engineering (CE)Qualification reports used to qualify Litton-Veam (LV)electrical connectors (CIR series models)(CON) for In-Core Instrumentation (ICI)(IG)('JC) used in CE plants, may not adequately demonstrate appropriate environmental qualification. | POWER 20.405(aXIXS 50.36(cX1) 50.73(aX2Xv) 73.71(c) 50.73(aX2Xn) OTHER LEvEL(to) 1 p p 20.45(aXI)Qi 50.36(cX2) X 20.45(aX1XE) 50.73(aX2)gi 50.73(aX2Xva~ below and ln Text, NRC Form 20.45(aX1 Xlv) 50.73(aX2XI) 50.73(aX2Xve&B) 366A) 20.45(aX1Xv) 5073(aX2)W 50.73(aX2Xx) VOLUNTARY LICENSEE CONTACT FOR THIS LER (12) | ||
Qualification testing of LV connectors by CE did not represent the installed configuration at Palo Verde.Qualification reports from LV do support equipment qualification for the installed configuration provided that replacement of the silicone seal in the connectors is performed each time the connector is cycled.2.EVENT DESCRIPTION: | LEPHONE NUMBER CODE Daniel G. Marks, Section Leader, Regulatory Affairs 6 0 2 3 9 3 - 6 4 9 2 COMPLETE ONE UNE FOR EACH COMPONENT FIULURE OESCRNEO IN THIS REPORT (13) | ||
The CE qualification tests (CE NPSD-230-P and CE NPSD-240-P) for CE's Fixed ICI design containing the neutron detectors (DET)(IG)and core exit thermocouples (CETs)(JC) resulted in moisture entering the LV connector during the design basis event test.The CE tests were conducted with only a CET (2-wire thermocouple) circuit connected to a single LV connector. | SYSTEM COMPONENT REPORTABLE SYSTEM COMPONENT MANUFAC- REPORTABLE TO NPRDS TURER TO NPRDS D J CCONN L 2 3 2 N SUPPLEMENTAL REPORT EXPECTED (Ie) MONTH OAY YEAR SUBMISSION YES (lfyes, complete EXPECTED SUBMISSION DATE) DATE (15) | ||
PVNGS uses circuits configured with both one LV connector and two LV connectors. | TRAOT (Lsna to t coo spaces, te. approximately feeen seoteepace tfpewraten lees) (16) | ||
PVNGS also uses more than one circuit connected to a LV connector. | ~ | ||
Typically, the circuits connected to an ICI LV connector consist of a CET (2-wire thermocouple), five rhodium detectors (1 wire each), a background wire, a ground reference wire, and a second LV connector approximately 30 feet from the ICI LV connector. | On July 29, 1998, at approximately 1600 MST, Palo Verde Uni.ts 1, 2, and 3 were in Mode 1 (POWER OPERATION), operating at approximately 100 percent power when Engineering personnel determined that a condition related to equipment qualification that did not 'meet the criteria contained in 10 CFR 50.73(a) might be of generic interest to other licensees. This Voluntary LER identifies that CE Qualification reports used to qualify Litton-Veam (LV) electrical connectors (CIR series models) for In-Core Instrumentation (ICI) used in Combustion Engineering (CE) plants may not adequately demonstrate appropriate equipment qualification. Qualification testing of LV connectors by CE did not represent the installed configuration at Palo Verde. | ||
Combustion Engineering Standard Safety Analysis Report (CESSAR)Section 7.7.1.1.8 and Appendix B Section II.F.2, Item 2.1.3 also state that an ICI assembly contains a CET and five Rhodium detectors. | Qualification reports from LV do support equipment qualification for the installed configuration provided that replacement of the silicone seal in the connector is performed each time the connector is cycled. | ||
The two LV connectors connected in series to an ICI will have contact to plant ground (outside the connector) when wetted.CE has not analyzed or tested to determine the effect these other circuits and two connectors may have on the CET Il II l t LICENSEE EVENT REPORT (LER)TEXT CONTINUATION | No previous similar events have been reported pursuant to 10 CFR 50.73 in the last three years. | ||
The various potential current leakage paths may result in insufficient or excessive CET signal current outputs (i.e., beyond the accuracy range)and could result in misleading control room indications of the post-accident core exit temperatures. | 9810300331 98i024 PDR ADDCX OSaOOms 8 PDR | ||
Moisture in-leakage and seal degradation of LV connectors was previously identified in NRC Information Notice (IN)89-23,"Environmental Qualification of Litton Veam CIR Series Electrical Connectors." Leakage concerns were also identified in NRC IN 98-21,"Potential Deficiency of Electrical Cable/Connection Systems." However, neither the CE qualification tests, nor the NRC IN's indicate that other electrical circuits and additional connectors may be configured as in the CE ICI connector design at PVNGS.The CE ICI design configuration with the LV connectors could present other current leakage pathways and other sources (e.g., plant grounds, rhodium detectors, etc.)which may effect the CET signal current.The basis for NRC IN 89-23 was NRC Inspection Report 99900401/88-01, dated 1/26/89.This NRC inspection of CE facilities focused on moisture.effects on the environmental qualification of LV connectors used for CETs and Reactor Vessel Level Monitoring Systems (RVLMS)supplied by CE.The inspection report concluded that the CE documentation | |||
"...does-not establish LOCA qualification of unclamped Litton-Veam connectors for any application other than very low voltage CET circuits.Further, the connector. | C II Ck | ||
behavior during the LOCA tests indicates unsuitability for any other use requiring LOCA qualification." The inspection report's conclusion was based on CE quali.fication report (NPSD-230-P, dated 4/83)and on additional information provided by CE.The conclusions from the inspection did not address: The effect on CETs with moisture (boron spray)ingress (failed moisture seal)in the LV connector from the ICI circuits (including plant ground and rhodium detectors) and multiple connectors actually used in the CE fixed ICI design installed in CE plants, or The effects on the signal (i.e., defined the uncertainties and accuracy range)at higher core exit temperatures due to multiple ground current paths created by the moisture ingress when two connectors are used in series as in typical installations. | |||
Ci\ | LICENSEE EVENT REPORT (LER) TEXT CONTINUATION DOCKET NUMBER LER NUMBER PAGE SEQUENTIAL REWSION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 0 2 of 0 6 | ||
LICENSEE EVENT REPORT (LER)TEXT CONTINUATION | : 1. REPORTING REQUIREMENT: | ||
Based on the CE investigation and a"battery effects" test (CE NPSD-230-P Supplement 1), CE concluded that there were increased temperature uncertainties associated with the CETs and concerns regarding the heater circuit on the RVLMS.CE provided retrofit kits consisting of a clamping mechanism for the LV connectors in the RVLMS applications to preclude moisture ingress into the LV connectors. | This voluntary LER 528/98-008-00 is being submitted to report a condition related to equipment qualification that does not meet the criteria contained in 10 CFR 50.73(a) for submitting a LER, but might prove useful and be of generic interest to the nuclear industry. In addition to this report, APS submitted an operating experience report (OE9201) to INPO for posting on Nuclear Network. | ||
In addition, CE performed the"battery effects" test in an attempt to quantify the signal uncertainty for"wetted" LV connectors in CET applications. | Specifically, on July 29, 1998, at approximately 1600 MST, Palo Verde Units 1, 2, and 3 were in Mode 1 (POWER OPERATION), operating at approximately 100 percent power when Engineering personnel determined that a condition related to equipment qualification that did not meet the criteria contained in 10 CFR 50.73(a) might be of generic interest to other licensees. Specifically, engineering personnel determined that Combustion Engineering (CE) Qualification reports used to qualify Litton-Veam (LV) electrical connectors (CIR series models)(CON) for In-Core Instrumentation (ICI)(IG)('JC) used in CE plants, may not adequately demonstrate appropriate environmental qualification. Qualification testing of LV connectors by CE did not represent the installed configuration at Palo Verde. Qualification reports from LV do support equipment qualification for the installed configuration provided that replacement of the silicone seal in the connectors is performed each time the connector is cycled. | ||
CE notified PVNGS (V-CE-34676, dated 5/21/87)and other commercial nuclear.utilities, that the Qualified Safety Parameter Display System (QSPDS)CET processing algorithm can accommodate the increased CET temperature uncertainty. | : 2. EVENT DESCRIPTION: | ||
CE concluded that the CET processing algorithm would reject the CET signals affected by the"battery effect," therefore, a failed/degraded silicone seal and consequential moisture ingress into the LV connectors, post-DBE, is acceptable. | The CE qualification tests (CE NPSD-230-P and CE NPSD-240-P) for CE's Fixed ICI design containing the neutron detectors (DET)(IG) and core exit thermocouples (CETs)(JC) resulted in moisture entering the LV connector during the design basis event test. The CE tests were conducted with only a CET (2-wire thermocouple) circuit connected to a single LV connector. | ||
However, the CE testing for the postulated core exit temperatures, in Palo Verde's opinion, did not prove this conclusion. | PVNGS uses circuits configured with both one LV connector and two LV connectors. PVNGS also uses more than one circuit connected to a LV connector. Typically, the circuits connected to an ICI LV connector consist of a CET (2-wire thermocouple), five rhodium detectors (1 wire each), a background wire, a ground reference wire, and a second LV connector approximately 30 feet from the ICI LV connector. Combustion Engineering Standard Safety Analysis Report (CESSAR) Section 7.7.1.1.8 and Appendix B Section II.F.2, Item 2.1.3 also state that an ICI assembly contains a CET and five Rhodium detectors. The two LV connectors connected in series to an ICI will have contact to plant ground (outside the connector) when wetted. CE has not analyzed or tested to determine the effect these other circuits and two connectors may have on the CET | ||
Since the CE testing showed moisture leakage into every connector (i.e., common mode failure), it was not clear how the algorithm could provide correct output values.Thus errors of varying magnitude could be introduced into the CET input signals to QSPDS;Palo Verde believes that this qualification testing is not representative of the actual ICI design since the testing did not replicate and/or address the following: | |||
Il II l | |||
The effects on the CET signal due to electrical coupling with plant ground via the boron spray solution through two (2)LV connectors (in series with 30 feet to 40 feet interval between connectors), compounded by the separate, various"battery effects."'he CET signal.at higher post-accident core exit temperatures under the conditions identified in Il a I2.CET signal testing occurred at only the single temperature of 400 degrees Fahrenheit (Regulatory Guide 1.97, Table 2, Type B and C Variables required CET range is 200 degrees Fahrenheit to 2300 degrees Fahrenheit). | t | ||
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION ACILAYNAME DOCKET NUMBER LER NUMBER PAGE gEAR SEOUENTIAL REVISION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 03of 0 6 signal current (and accuracy range) with moisture present outside the connectors and/or inside the connectors due to a failed moisture seal during post-accident conditions. The various potential current leakage paths may result in insufficient or excessive CET signal current outputs (i.e., beyond the accuracy range) and could result in misleading control room indications of the post-accident core exit temperatures. | |||
Moisture in-leakage and seal degradation of LV connectors was previously identified in NRC Information Notice (IN) 89-23, "Environmental Qualification of Litton Veam CIR Series Electrical Connectors." Leakage concerns were also identified in NRC IN 98-21, "Potential Deficiency of Electrical Cable/Connection Systems." However, neither the CE qualification tests, nor the NRC IN's indicate that other electrical circuits and additional connectors may be configured as in the CE ICI connector design at PVNGS. The CE ICI design configuration with the LV connectors could present other current leakage pathways and other sources (e.g., plant grounds, rhodium detectors, etc.) which may effect the CET signal current. | |||
The basis for NRC IN 89-23 was NRC Inspection Report 99900401/88-01, dated 1/26/89. This NRC inspection of CE facilities focused on moisture. | |||
effects on the environmental qualification of LV connectors used for CETs and Reactor Vessel Level Monitoring Systems (RVLMS) supplied by CE. | |||
The inspection report concluded that the CE documentation " . . .does-not establish LOCA qualification of unclamped Litton-Veam connectors for any application other than very low voltage CET circuits. Further, the connector. behavior during the LOCA tests indicates unsuitability for any other use requiring LOCA qualification." The inspection report's conclusion was based on CE quali.fication report (NPSD-230-P, dated 4/83) and on additional information provided by CE. The conclusions from the inspection did not address: | |||
The effect on CETs with moisture (boron spray) ingress (failed moisture seal) in the LV connector from the ICI circuits (including plant ground and rhodium detectors) and multiple connectors actually used in the CE fixed ICI design installed in CE plants, or The effects on the signal (i.e., defined the uncertainties and accuracy range) at higher core exit temperatures due to multiple ground current paths created by the moisture ingress when two connectors are used in series as in typical installations. | |||
Ci | |||
\ | |||
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION DOCKET NUMBER LER NUMBER PAGE SEOUENTIAL REVISION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 0 4 of 0 6 Concerns regarding separation of class 1E and non-1E circuits with moisture in the connector. | |||
Based on the CE investigation and a "battery effects" test (CE NPSD-230-P Supplement 1), CE concluded that there were increased temperature uncertainties associated with the CETs and concerns regarding the heater circuit on the RVLMS. CE provided retrofit kits consisting of a clamping mechanism for the LV connectors in the RVLMS applications to preclude moisture ingress into the LV connectors. In addition, CE performed the "battery effects" test in an attempt to quantify the signal uncertainty for "wetted" LV connectors in CET applications. CE notified PVNGS (V-CE-34676, dated 5/21/87) and other commercial nuclear . | |||
utilities, that the Qualified Safety Parameter Display System (QSPDS) | |||
CET processing algorithm can accommodate the increased CET temperature uncertainty. CE concluded that the CET processing algorithm would reject the CET signals affected by the "battery effect," therefore, a failed/degraded silicone seal and consequential moisture ingress into the LV connectors, post-DBE, is acceptable. However, the CE testing for the postulated core exit temperatures, in Palo Verde's opinion, did not prove this conclusion. Since the CE testing showed moisture leakage into every connector (i.e., common mode failure), it was not clear how the algorithm could provide correct output values. Thus errors of varying magnitude could be introduced into the CET input signals to QSPDS; Palo Verde believes that this qualification testing is not representative of the actual ICI design since the testing did not replicate and/or address the following: | |||
CET signal with the other ICI circuits present in the "wetted" LV connector. | |||
: 2) The effects on the CET signal due to electrical coupling with plant ground via the boron spray solution through two (2) LV connectors (in series with 30 feet to 40 feet interval between connectors), compounded by the separate, various "battery effects." | |||
: 3) 'he CET signal .at higher post-accident core exit temperatures under the conditions identified in Il a I2. CET signal testing occurred at only the single temperature of 400 degrees Fahrenheit (Regulatory Guide 1.97, Table 2, Type B and C Variables required CET range is 200 degrees Fahrenheit to 2300 degrees Fahrenheit). | |||
With moisture in-leakage, CET signal errors will vary depending on the core exit temperatures post-accident. | With moisture in-leakage, CET signal errors will vary depending on the core exit temperatures post-accident. | ||
Accuracy of temperature output values provided by the CET QSPDS processing algorithm with moisture intrusion present in all connectors creating multiple common mode failures in the CET circuits with varying magnitudes of error. | Accuracy of temperature output values provided by the CET QSPDS processing algorithm with moisture intrusion present in all connectors creating multiple common mode failures in the CET circuits with varying magnitudes of error. | ||
0 Il LICENSEE EVENT REPORT (LER)TEXT CONTINUATION | |||
'As such, Palo Verde believes that the installed ICI configuration is not supported by the conclusions from the CE qualification report, the NRC inspection report, and/or NRC IN.Therefore, the frequency of replacing the silicone seals in order to maintain appropriate environmental qualification of LV electrical connectors cannot be based on these documents. | 0 Il LICENSEE EVENT REPORT (LER) TEXT CONTINUATION | ||
3.ASSESSMENT OF THE SAFETY CONSEQUENCES AND IMPLICATIONS OF THIS EVENT: The silicone seal (square o-ring)is the critical component to preclude moisture ingress at the mated connector interface. | 'DOCKETNUMBER LER NUMBER PAGE SEQUENTIAL RENSION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 050f06 | ||
A LV sponsored qualification test (Report$558-1657A) successfully tested LV CIR Series connectors without evidence of moisture in-leakage. | : 5) Concerns regarding separation of class lE and non-1E circuits with moisture in the connector. | ||
The LV test conditions and results appropriately envelope the environmental qualification of the PVNGS installed connectors when the silicone seal is replaced each time the LV connector is cycled (e.g., connected/disconnected). | 'As such, Palo Verde believes that the installed ICI configuration is not supported by the conclusions from the CE qualification report, the NRC inspection report, and/or NRC IN. Therefore, the frequency of replacing the silicone seals in order to maintain appropriate environmental qualification of LV electrical connectors cannot be based on these documents. | ||
STRUCTURES g SYSTEMS g OR COMPONENTS INFORMATION: | : 3. ASSESSMENT OF THE SAFETY CONSEQUENCES AND IMPLICATIONS OF THIS EVENT: | ||
Litton-Veam (LV)electrical connectors (CIR series models)5.CAUSE OF THE'VENTS: | The silicone seal (square o-ring) is the critical component to preclude moisture ingress at the mated connector interface. A LV sponsored qualification test (Report $ 558-1657A) successfully tested LV CIR Series connectors without evidence of moisture in-leakage. The LV test conditions and results appropriately envelope the environmental qualification of the PVNGS installed connectors when the silicone seal is replaced each time the LV connector is cycled (e.g., | ||
The CE qualification tests (CE NPSD-230-P and CE NPSD-240-P) for the ICIs resulted in moisture in-leakage during the design basis event.The test was conducted with only a single LV connector, a CET (2-wire thermocouple circuit), and without fully ranged inputs (i.e., signal uncertainties change as the CET mV output increases/decreases). | connected/disconnected). | ||
There are also other circuits configured in the LV connector at PVNGS, which were not simulated in the CE qualification testing.6.CORRECTIVE ACTIONS TO PREVENT RECURRENCE: | STRUCTURES g SYSTEMS g OR COMPONENTS INFORMATION: | ||
In February 1997 the Palo Verde equipment qualification requirements were revised to require replacement of the silicone seal each time the LV 0 II 4 LICENSEE EVENT REPORT (LER)TEXT CONTINUATION AGILITY NAME | Litton-Veam (LV) electrical connectors (CIR series models) | ||
The silicone seals have been replaced in all three units and the maintenance procedure requires that the seals be replaced prior to reassembly of the connector. | : 5. CAUSE OF THE'VENTS: | ||
This ensures that the internals of the LV connector will remain dry, resolving. | The CE qualification tests (CE NPSD-230-P and CE NPSD-240-P) for the ICIs resulted in moisture in-leakage during the design basis event. The test was conducted with only a single LV connector, a CET (2-wire thermocouple circuit), and without fully ranged inputs (i.e., signal uncertainties change as the CET mV output increases/decreases). There are also other circuits configured in the LV connector at PVNGS, which were not simulated in the CE qualification testing. | ||
the concerns identified in this LER.7.PREVIOUS SIMILAR EVENTS: No other previous events have been reported, pursuant.to 10 CFR 50.73 in the last three years. | : 6. CORRECTIVE ACTIONS TO PREVENT RECURRENCE: | ||
II Cl I'}} | In February 1997 the Palo Verde equipment qualification requirements were revised to require replacement of the silicone seal each time the LV | ||
0 II 4 | |||
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AGILITY NAME DOCKETNUMBER LER NUMBER PAGE SEQUENTIAL REVISION NUMBER NUMBER Palo Verde Unit 1 | |||
.05000528 98-008-0 006of06 connector is connected/disconnected. The silicone seals have been replaced in all three units and the maintenance procedure requires that the seals be replaced prior to reassembly of the connector. This ensures that the internals of the LV connector will remain dry, resolving. the concerns identified in this LER. | |||
: 7. PREVIOUS SIMILAR EVENTS: | |||
No other previous events have been reported, pursuant .to 10 CFR 50.73 in the last three years. | |||
II Cl I'}} |
Latest revision as of 08:39, 29 October 2019
ML17313A661 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 10/24/1998 |
From: | Marks D ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | |
Shared Package | |
ML17313A660 | List: |
References | |
LER-98-008, LER-98-8, NUDOCS 9810300331 | |
Download: ML17313A661 (12) | |
Text
LICENSEE EVENT REPORT (LER)
ACILITYNAME (1) DOCKET N VIIBER (2) PAGE (3)
Palo Verde Unit 1 0 5 0 0 0 5 2 8 1OFO 6 (a)
Equipment Qualification Of Electrical Connectors May Not Be Adequately Demonstrated EVENT DATE d LER NUMBER 6 OTHER FACIUTIES INVOLVED 6 YEAR SEQUENllAL REVISION
- 0 0 8 - 0 0 05000529' 0 7 2 9 9 8 9 8 1 0 2 4 9 8 Palo Verde Unit 3 5 0 0 0 5 3 0 OPERATUIG IS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CF R C (Check one or more of the foaorseo) (11)
MODE (9) 20.4Q(b) 20.<<5(c) 50.73(aX2XN) 73.71(b)
POWER 20.405(aXIXS 50.36(cX1) 50.73(aX2Xv) 73.71(c) 50.73(aX2Xn) OTHER LEvEL(to) 1 p p 20.45(aXI)Qi 50.36(cX2) X 20.45(aX1XE) 50.73(aX2)gi 50.73(aX2Xva~ below and ln Text, NRC Form 20.45(aX1 Xlv) 50.73(aX2XI) 50.73(aX2Xve&B) 366A) 20.45(aX1Xv) 5073(aX2)W 50.73(aX2Xx) VOLUNTARY LICENSEE CONTACT FOR THIS LER (12)
LEPHONE NUMBER CODE Daniel G. Marks, Section Leader, Regulatory Affairs 6 0 2 3 9 3 - 6 4 9 2 COMPLETE ONE UNE FOR EACH COMPONENT FIULURE OESCRNEO IN THIS REPORT (13)
SYSTEM COMPONENT REPORTABLE SYSTEM COMPONENT MANUFAC- REPORTABLE TO NPRDS TURER TO NPRDS D J CCONN L 2 3 2 N SUPPLEMENTAL REPORT EXPECTED (Ie) MONTH OAY YEAR SUBMISSION YES (lfyes, complete EXPECTED SUBMISSION DATE) DATE (15)
TRAOT (Lsna to t coo spaces, te. approximately feeen seoteepace tfpewraten lees) (16)
~
On July 29, 1998, at approximately 1600 MST, Palo Verde Uni.ts 1, 2, and 3 were in Mode 1 (POWER OPERATION), operating at approximately 100 percent power when Engineering personnel determined that a condition related to equipment qualification that did not 'meet the criteria contained in 10 CFR 50.73(a) might be of generic interest to other licensees. This Voluntary LER identifies that CE Qualification reports used to qualify Litton-Veam (LV) electrical connectors (CIR series models) for In-Core Instrumentation (ICI) used in Combustion Engineering (CE) plants may not adequately demonstrate appropriate equipment qualification. Qualification testing of LV connectors by CE did not represent the installed configuration at Palo Verde.
Qualification reports from LV do support equipment qualification for the installed configuration provided that replacement of the silicone seal in the connector is performed each time the connector is cycled.
No previous similar events have been reported pursuant to 10 CFR 50.73 in the last three years.
9810300331 98i024 PDR ADDCX OSaOOms 8 PDR
C II Ck
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION DOCKET NUMBER LER NUMBER PAGE SEQUENTIAL REWSION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 0 2 of 0 6
- 1. REPORTING REQUIREMENT:
This voluntary LER 528/98-008-00 is being submitted to report a condition related to equipment qualification that does not meet the criteria contained in 10 CFR 50.73(a) for submitting a LER, but might prove useful and be of generic interest to the nuclear industry. In addition to this report, APS submitted an operating experience report (OE9201) to INPO for posting on Nuclear Network.
Specifically, on July 29, 1998, at approximately 1600 MST, Palo Verde Units 1, 2, and 3 were in Mode 1 (POWER OPERATION), operating at approximately 100 percent power when Engineering personnel determined that a condition related to equipment qualification that did not meet the criteria contained in 10 CFR 50.73(a) might be of generic interest to other licensees. Specifically, engineering personnel determined that Combustion Engineering (CE) Qualification reports used to qualify Litton-Veam (LV) electrical connectors (CIR series models)(CON) for In-Core Instrumentation (ICI)(IG)('JC) used in CE plants, may not adequately demonstrate appropriate environmental qualification. Qualification testing of LV connectors by CE did not represent the installed configuration at Palo Verde. Qualification reports from LV do support equipment qualification for the installed configuration provided that replacement of the silicone seal in the connectors is performed each time the connector is cycled.
- 2. EVENT DESCRIPTION:
The CE qualification tests (CE NPSD-230-P and CE NPSD-240-P) for CE's Fixed ICI design containing the neutron detectors (DET)(IG) and core exit thermocouples (CETs)(JC) resulted in moisture entering the LV connector during the design basis event test. The CE tests were conducted with only a CET (2-wire thermocouple) circuit connected to a single LV connector.
PVNGS uses circuits configured with both one LV connector and two LV connectors. PVNGS also uses more than one circuit connected to a LV connector. Typically, the circuits connected to an ICI LV connector consist of a CET (2-wire thermocouple), five rhodium detectors (1 wire each), a background wire, a ground reference wire, and a second LV connector approximately 30 feet from the ICI LV connector. Combustion Engineering Standard Safety Analysis Report (CESSAR) Section 7.7.1.1.8 and Appendix B Section II.F.2, Item 2.1.3 also state that an ICI assembly contains a CET and five Rhodium detectors. The two LV connectors connected in series to an ICI will have contact to plant ground (outside the connector) when wetted. CE has not analyzed or tested to determine the effect these other circuits and two connectors may have on the CET
Il II l
t
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION ACILAYNAME DOCKET NUMBER LER NUMBER PAGE gEAR SEOUENTIAL REVISION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 03of 0 6 signal current (and accuracy range) with moisture present outside the connectors and/or inside the connectors due to a failed moisture seal during post-accident conditions. The various potential current leakage paths may result in insufficient or excessive CET signal current outputs (i.e., beyond the accuracy range) and could result in misleading control room indications of the post-accident core exit temperatures.
Moisture in-leakage and seal degradation of LV connectors was previously identified in NRC Information Notice (IN) 89-23, "Environmental Qualification of Litton Veam CIR Series Electrical Connectors." Leakage concerns were also identified in NRC IN 98-21, "Potential Deficiency of Electrical Cable/Connection Systems." However, neither the CE qualification tests, nor the NRC IN's indicate that other electrical circuits and additional connectors may be configured as in the CE ICI connector design at PVNGS. The CE ICI design configuration with the LV connectors could present other current leakage pathways and other sources (e.g., plant grounds, rhodium detectors, etc.) which may effect the CET signal current.
The basis for NRC IN 89-23 was NRC Inspection Report 99900401/88-01, dated 1/26/89. This NRC inspection of CE facilities focused on moisture.
effects on the environmental qualification of LV connectors used for CETs and Reactor Vessel Level Monitoring Systems (RVLMS) supplied by CE.
The inspection report concluded that the CE documentation " . . .does-not establish LOCA qualification of unclamped Litton-Veam connectors for any application other than very low voltage CET circuits. Further, the connector. behavior during the LOCA tests indicates unsuitability for any other use requiring LOCA qualification." The inspection report's conclusion was based on CE quali.fication report (NPSD-230-P, dated 4/83) and on additional information provided by CE. The conclusions from the inspection did not address:
The effect on CETs with moisture (boron spray) ingress (failed moisture seal) in the LV connector from the ICI circuits (including plant ground and rhodium detectors) and multiple connectors actually used in the CE fixed ICI design installed in CE plants, or The effects on the signal (i.e., defined the uncertainties and accuracy range) at higher core exit temperatures due to multiple ground current paths created by the moisture ingress when two connectors are used in series as in typical installations.
Ci
\
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION DOCKET NUMBER LER NUMBER PAGE SEOUENTIAL REVISION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 0 4 of 0 6 Concerns regarding separation of class 1E and non-1E circuits with moisture in the connector.
Based on the CE investigation and a "battery effects" test (CE NPSD-230-P Supplement 1), CE concluded that there were increased temperature uncertainties associated with the CETs and concerns regarding the heater circuit on the RVLMS. CE provided retrofit kits consisting of a clamping mechanism for the LV connectors in the RVLMS applications to preclude moisture ingress into the LV connectors. In addition, CE performed the "battery effects" test in an attempt to quantify the signal uncertainty for "wetted" LV connectors in CET applications. CE notified PVNGS (V-CE-34676, dated 5/21/87) and other commercial nuclear .
utilities, that the Qualified Safety Parameter Display System (QSPDS)
CET processing algorithm can accommodate the increased CET temperature uncertainty. CE concluded that the CET processing algorithm would reject the CET signals affected by the "battery effect," therefore, a failed/degraded silicone seal and consequential moisture ingress into the LV connectors, post-DBE, is acceptable. However, the CE testing for the postulated core exit temperatures, in Palo Verde's opinion, did not prove this conclusion. Since the CE testing showed moisture leakage into every connector (i.e., common mode failure), it was not clear how the algorithm could provide correct output values. Thus errors of varying magnitude could be introduced into the CET input signals to QSPDS; Palo Verde believes that this qualification testing is not representative of the actual ICI design since the testing did not replicate and/or address the following:
CET signal with the other ICI circuits present in the "wetted" LV connector.
- 2) The effects on the CET signal due to electrical coupling with plant ground via the boron spray solution through two (2) LV connectors (in series with 30 feet to 40 feet interval between connectors), compounded by the separate, various "battery effects."
- 3) 'he CET signal .at higher post-accident core exit temperatures under the conditions identified in Il a I2. CET signal testing occurred at only the single temperature of 400 degrees Fahrenheit (Regulatory Guide 1.97, Table 2, Type B and C Variables required CET range is 200 degrees Fahrenheit to 2300 degrees Fahrenheit).
With moisture in-leakage, CET signal errors will vary depending on the core exit temperatures post-accident.
Accuracy of temperature output values provided by the CET QSPDS processing algorithm with moisture intrusion present in all connectors creating multiple common mode failures in the CET circuits with varying magnitudes of error.
0 Il LICENSEE EVENT REPORT (LER) TEXT CONTINUATION
'DOCKETNUMBER LER NUMBER PAGE SEQUENTIAL RENSION NUMBER NUMBER Palo Verde Unit 1 0 5 0 0 0 5 2 8 9 8 - 0 0 8 - 0 0 050f06
- 5) Concerns regarding separation of class lE and non-1E circuits with moisture in the connector.
'As such, Palo Verde believes that the installed ICI configuration is not supported by the conclusions from the CE qualification report, the NRC inspection report, and/or NRC IN. Therefore, the frequency of replacing the silicone seals in order to maintain appropriate environmental qualification of LV electrical connectors cannot be based on these documents.
- 3. ASSESSMENT OF THE SAFETY CONSEQUENCES AND IMPLICATIONS OF THIS EVENT:
The silicone seal (square o-ring) is the critical component to preclude moisture ingress at the mated connector interface. A LV sponsored qualification test (Report $ 558-1657A) successfully tested LV CIR Series connectors without evidence of moisture in-leakage. The LV test conditions and results appropriately envelope the environmental qualification of the PVNGS installed connectors when the silicone seal is replaced each time the LV connector is cycled (e.g.,
connected/disconnected).
STRUCTURES g SYSTEMS g OR COMPONENTS INFORMATION:
Litton-Veam (LV) electrical connectors (CIR series models)
- 5. CAUSE OF THE'VENTS:
The CE qualification tests (CE NPSD-230-P and CE NPSD-240-P) for the ICIs resulted in moisture in-leakage during the design basis event. The test was conducted with only a single LV connector, a CET (2-wire thermocouple circuit), and without fully ranged inputs (i.e., signal uncertainties change as the CET mV output increases/decreases). There are also other circuits configured in the LV connector at PVNGS, which were not simulated in the CE qualification testing.
- 6. CORRECTIVE ACTIONS TO PREVENT RECURRENCE:
In February 1997 the Palo Verde equipment qualification requirements were revised to require replacement of the silicone seal each time the LV
0 II 4
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AGILITY NAME DOCKETNUMBER LER NUMBER PAGE SEQUENTIAL REVISION NUMBER NUMBER Palo Verde Unit 1
.05000528 98-008-0 006of06 connector is connected/disconnected. The silicone seals have been replaced in all three units and the maintenance procedure requires that the seals be replaced prior to reassembly of the connector. This ensures that the internals of the LV connector will remain dry, resolving. the concerns identified in this LER.
- 7. PREVIOUS SIMILAR EVENTS:
No other previous events have been reported, pursuant .to 10 CFR 50.73 in the last three years.
II Cl I'