LER 96-001-00:on 960621,inaccurate Gas Calculations for Post Accident Sampling Sys Occurred.Caused by Surveillance Test Worksheet Errors.Independent Investigation of Event Being conducted.W/960717 Ltr
ML17312A864
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/17/1996
From: Grabo B, James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00975-JML-B, 192-975-JML-B, LER-96-001-02, LER-96-1-2, NUDOCS 9607240241
Download: ML17312A864 (12)


Text

CATEGORY 1g

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9607240241 DOC.DATE: 96/07/17 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION GRABO,B.A. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 96-001-00:on 960621,inaccurate gas calculations for post accident sampling sys occurred. Caused by surveillance test worksheet errors. Independent investigation of event being conducted.W/960717 ltr.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR t ENCL t SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc. E NOTES:Standardized plant. 05000530 G RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J. 1 1 INTERNAL: ACRS 1 1 RAB 2 2 AEOD/SPD/RRAB 1 1 1 1 NRR/DE/ECGB 1 1 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 D RES/DSIR/EIB 1 1 RGN4 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCEPJ H 2 2 NOAC MURPHY,G.A 1 1 NOAC POOREEW. 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 N

NOTE TO ALL "RIDS" RECIPIENTS:

". PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: L '"R 26 ENCL 26

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX. ARIZONA85072-2034 192-00975- JML/BAG/DRL JAMES M. LEVINE July 17, 1996 VICE PRESIDENT NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS) 3 'nit Docket No. STN 50-530 License No. NPF-74 Licensee Event Report 96-001-00 Attached please find Licensee Event Report (LER)96-001 prepared arid submitted pursuant to 10CFR50.73. This LER reports a Technical Specification (TS) violation of 3.3.3.1 due to an oversight by both the Surveillance Test (ST) preparer and reviewer in calculating gas concentrations for the Post Accident Sampling System (PASS) on three (3) different occasions during 1995.

In accordance with 10CFR50.73(d), a copy of this LER is being forwarded to the Regional Administrator, NRC Region IV. If you have any questions, please contact Burton A. Grabo, Section Leader, Nuclear Regulatory Affairs, at (602) 393-6492.

Sincerely, JML/BAG/DRL/pv I

Attachment cc: L. J. Callan (all with attachment)

K. E. Perkins K. E. Johnston INPO Records Center 960724024i 9607i7 PDR ADOCK 05000530 S PDR

LICENSEE EVENT REPORT (LER)

FACILITYNAME ('I) DOCKET NUMBER (2) PAGE (3)

Palo Verde Unit 3 0 5 0 0 0 5 3 0 1oF0 4 TLE (4)

Inaccurate Gas Calculations For The Post Accident Sampling System (PASS)

EVENT DATE (6) LER NUMBER 6) REPORT DATE 7 OTHER FACILITIES INVOLVED(8)

MONTH DAY YEAR SEQUENTIAL ',c'4 'EVISION MONTH OAY YEAR FACILIIYNAMES KET NUMBERS NUMBER k@c NUMBER NA 0 5 0 0 0 0 6 2 1 9 6 9 6 0 0 1 0 0 0 7 1 7 9 6 NA 0 5 0 0 0 OPERATING HIS REPORT IS SUBMITTED FURS UANT TO THE RED UIREMEN Ts oF 10 c FR L; (check one or more of the Ioaornnp) (11)

MODE (0) 20.402(b) 20.405(c) 50.73(sX2XN) 73,71(b)

POWER 20.405(aX I Xi) 50.36(cX I) 50.73(a)(2Xv) 73.71(c) 20.405(sXI Xs) 50.36(cX2) 50.73(sX2Xvii) OTHER (Specrfy )n Abstract LEYEL(10) 1 0 0 20.405(sXI Xii) 5(L73(a)(2XI) 50.73(sX2XviiiXA) beiow snd in Text, NRC Form 20.405(a X I Xiv) 50.73(sX2Xii) 50.73(sX2XviiiXB) 366A)

'x." 20.405(sX I Xv) 50.73(aX2Xn) 50.73(aX2Xx) at':~ra&r .>'vAk:~a:

LICENSEE CONTACT FOR THIS LER (12)

'tAME ELEPHONE NUMBER EA CODE Burton A. Grabo, Section Leader, Nuclear Regulatory Affairs 6 0 2 3 9 3 - 6 4 9 2 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

CAUSE SYSTEM COMPONENT MANUFAC. REPORTABLE Xa)~"~+a~~jC~Ijstgl: CAUSE SYSTEM COMPONENT MANUFAC- REPORTABLE TURER TO NPRDS 8)<."...ns<hc>'", TURER TO NPRDS SUPPLEMENTAL REPORT EXPECTED (14) EXPECTED MONTH DAY YEAR SUBMISSION YES (It yes, complete EXPECTED SUBMISSION DATE) NO DATE (15)

STRACT (Larxat to lsoo spaces. a.e., spproxarastety t tteen s ngte space typevratten lanes) fast On August 30, 1995, at approximately 1310 MST, Palo Verde Unit 3 was in Mode 1 (POWER OPERATION), operating at approximately 100 percent power when Unit 3 Chemistry personnel, during the monthly performance of 74ST-9SS04, Post Accident Sampling System (PASS)(IP) Functional Test, in accordance with Technical Specification (TS) 4.3.3. 1 and Table 4.3-3, 3, miscalculated the amount of dissolved hydrogen within the Reactor Coolant System (RCS) and indicated that the criteria had been met for test acceptance. 74ST-9SS04 was subsequently performed on September 27, 1995, and 74ST-9SS03, Post Accident Sampling System Surveillance (18 month test) on November 25, 1995, with like results. 74ST-9SS04 was not required during October 1995 because the Unit was in an outage. This issue was originally self-identified on May 29, 1996, while retrieving archived data for PASS hydrogen analyses. Based on subsequent investigation, the PASS was determined to have been administratively inoperable since approximately 1310 MST on August 30, 1995, and to have exceeded the 7 day limit for inoperability per T.S. 3.3.3.1 at 1310 MST on September 6, 1995.

Further, the investigation determined that the PASS was operable when 74ST-9SS04 was satisfactorily completed on December 22, 1995. Therefore, Palo Verde Unit 3 operated for approximately 75 days with PASS inoperable. A preliminary evaluation determined that the apparent cause of the event was surveillance test (ST) worksheet errors attributed to poor written communication and inattention to detail. There have been no previous similar events reported pursuant to 10CFR50.73.

4 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AGILITYNAME DOCKET NUMBER LER NUMBER PAGE YEAR @4,'I SEQUENTIAL EVISIO

.v".':'S NUMBER Nsg'UMBER Palo Verde Unit 3 .~l:N'..s 0 5 0 0 0 5 3 0 9 6 0 0 1 0 0 0 2 of 0 4 EXT

1. REPORTING REQUIREMENT:

This LER 530/96-001-00 is being written to report a condition prohibited by the plant's Technical Specifications (TS) as specified in 10CFR50.73 (a) (2) (i) (B) .

Specifically, at approximately 1310 MST on August 30, 1995, Palo Verde Unit 3 was in Mode 1 (POWER OPERATION), operating at approximately 100 percent power when Unit 3 Chemistry personnel (utility, nonlicensed) during the monthly performance of 74ST-9SS04, Post Accident Sampling System (PASS)(IP) Functional Test, in accordance with Technical Specification (TS) 4.3.3.1 and Table 4.3-3, miscalculated the amount of dissolved hydrogen within the Reactor Coolant System (RCS) and indicated that the criteria had been met for test acceptance. 74ST-9SS04 was subsequently performed on September 27, 1995, and 74ST-9SS03, Post Accident Sampling System Surveillance (18 month test) on November 25, 1995, with like results. 74ST-9SS04 was not required during October 1995 because the Unit was in an outage. This issue was originally identified on May 29, 1996, while retrieving archived data for PASS hydrogen analyses. Based on subsequent investigation, the PASS was determined to have been inoperable administratively (the PASS was fully functional for the entire period) since approximately 1310 MST on August 30, 1995, and to have exceeded the 7 day limit for inoperability per TS 3.3.3.1 at 1310 MST on September 6, 1995. ~

Further, the investigation determined that the PASS was operable when 74ST-9SS04 was satisfactorily completed on December 22, 1995.

EVENT DESCRIPTION:

Prior to the identification of the event, the Post Accident Sampling System (PASS)System Engineering duties had recently changed hands. As a part of system turnover, the new PASS engineer requested that a PASS team be assembled to assess and provide a system baseline from which future actions could be determined.

One of the items identified at the first meeting held on May 8, 1996 was the need to evaluate the trend of PASS pressurized sample hydrogen drift associated with the monthly performance of surveillance test (ST) procedure 74ST-9SS04, "PASS Functional Test."

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AGILITYNAME DOCKET NUMBER LER NUMBER PAGE YEAR SEQUENTIAL +g~s. REVISIO NUMBER NUMBER Paio Verde Unit 3 0 5 0 0 0 5 3 0 9 6 0 0 1 0 0 030f 0 4 During the evaluation of historical records by Chemistry Support, it was identified that hydrogen data recorded in ST package 74ST-9SS04-3, dated 10/03/95, was inconsistent with typical surveillance data. Further evaluation indicated that the PASS pressurized hydrogen calculation on the data sheet, Appendix "B" of 740P-3SS02, "Operation of the Post Accident Sampling System," was incorrectly performed, and that had the calculation been performed correctly, the ST would have failed.

After identifying the failed ST, a review was conducted to bracket the failure with correctly performed STs. During this review, two (2) additional STs, 74ST-9SS04-3 (monthly functional test) dated 8/30/95 and 74ST-9SS03-3 (18 month test) dated 11/27/95, were found to have similar errors resulting in three (3) consecutive ST failures. These three (3) consecutive failures were verified to be bracketed with correctly performed surveillance tests, 74ST-9SS04-3 dated 08/01/95 and 74ST-9SS04-3 dated 12/22/95.

ASSESSMENT OF THE SAFETY CONSEQUENCES AND THE IMPLICATIONS OF THIS EVENT:

The Bases for the TS SR 4.3.3.1 (Radiation Monitoring Instrumentation)is to ensure that: (1) the radiation levels are continually measured in the areas served by the individual channels and (2) .the alarm or automatic action is initiated when the radiation level trip setpoint is exceeded.

PASS sample points are defined in Regulatory Guide 1.97, "Instrumentation of Light-Water-Cooled Nuclear Power Plants to Assess Plant Conditions During and Following an Accident," as Type E, Category 3. Type E measurements are to aid control room staff and emergency support staff in assessing radiological impact and in minimizing the risk to the public for the long term mitigation of an event. Type E requirements are not required for safe shutdown of the plant. Since the error was administrative in nature, the PASS was always in a condition to allow full function if called upon in an emergency. Therefore, there is no safety function associated with the PASS.

This event did not adversely affect the safe operation of the plant or the health and safety of the public. The event did not result in any challenges to the fission product barriers or result in any releases of radioactive material. Therefore, there were no adverse safety consequences or implications as a result of this event.

P LICENSEE EVENT REPORT (LER) TEXT CONTINUATION AGILITYNAME DOCKET NUMBER LER NUMBER PAGE YEAR SEQUENTIAL EVISIO NUMBER Palo Verde Unit 3 0 5 0 0 0 5 3 0 9 6 0 0 1 0 0 0 4 of04 EXT

4. CAUSE OF THE EVENT:

An independent investigation of this event is being conducted in accordance with the APS Corrective Action Program. As part of the investigation, a root cause is being performed. A preliminary evaluation,,

based on available information, has determined that the apparent cause was ST worksheet errors attributed to poor written communication and inattention to detail (SALP Cause Code A: Personnel Error).

No unusual characteristics of the work location (e.g., noise, heat, poor lighting) directly contributed to this event. If information is developed which would significantly affect the reader's understanding or perception of this event or if the final evaluation results differ from this determination, a supplement to this report will be submitted.

STRUCTURE, SYSTEM, OR COMPONENT INFORMATION:

Although the PASS was inoperable for failure of a surveillance requirement, there were no component or system failures involved in this event. No failures of components with multiple functions were involved.

No failures that rendered a train of a safety system inoperable were involved. There were no safety system responses and none were necessary.

CORRECTIVE ACTIONS To PREVENT RECURRENCE:

An independent investigation of this event is being conducted in accordance with the APS Corrective Action Program. The investigation is expected to be completed by July 21, 1996. Actions to prevent recurrence are being developed based on the results of the investigation and will be tracked to completion under the APS Commitment Action Tracking System (CATS) .

PREVIOUS SIMILAR EVENTS:

Although there have been previous events reported pursuant to 10CFR50.73 in the last three years for TS surveillance requirements not being satisfied,'he causes discussed in the previous events have not been similar to this event. Therefore, the corrective actions of the previous events would not have prevented this event..