| | number = ML17324B048 | | | number = ML17324B048 |
| | issue date = 12/06/2017 | | | issue date = 12/06/2017 |
| | title = Shearon Harris Nuclear Plant, Unit 1 - Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program (CAC No. MD5802) | | | title = Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program |
| | author name = Galvin D J | | | author name = Galvin D |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Hamilton T | | | addressee name = Hamilton T |
Line 9: |
Line 9: |
| | docket = 05000400 | | | docket = 05000400 |
| | license number = NPF-063 | | | license number = NPF-063 |
| | contact person = Galvin D J DORL/LPL2-2 415-6256 | | | contact person = Galvin D DORL/LPL2-2 415-6256 |
| | case reference number = CAC MD5802 | | | case reference number = CAC MD5802 |
| | package number = ML17340B389 | | | package number = ML17340B389 |
Line 15: |
Line 15: |
| | page count = 6 | | | page count = 6 |
| | project = CAC:MD5802 | | | project = CAC:MD5802 |
| | stage = | | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.DC 20555-0001 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165 December 6, 2017 SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802) Dear Ms. Hamilton: By letter dated June 12, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081430111 ), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment No. 127 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The amendment relocated the lnservice Testing requirements to the administrative section of the Technical Specifications (TSs), removed the lnservice Inspection requirements from the TSs, and established a TSs Bases Control Program. These changes were in response to the Duke Energy Progress, LLC (previously Carolina Power and Light Company) (the licensee) license amendment request dated June 15, 2007, as supplemented by letter dated March 6, 2008 (ADAMS Accession Nos. ML071800018 and ML080720337). This year, while periorming the acceptance review on a license amendment request submitted November 7, 2017, (ADAMS Accession No. ML 17312A362), the NRG staff identified an error on TS pages 6-199 and 6-19h associated with Amendment No. 127. Specifically, the TS pages 6-19g and 6-19h were issued without the applicable headings, "ADMINISTRATIVE CONTROLS" and "PROCEDURES AND PROGRAMS (Continued)." It appears that this error was introduced when the licensee submitted its markup and clean TS pages for Amendment No. 127, and because TS pages 6-19g and 6-19h were new pages to be added to the TS. The licensee submitted the markup pages as "inserts" without headings, while the clean pages were submitted with correct headings that were consistent with the Administrative Controls section of the Harris TS. The NRC inadvertently issued the pages without the headings. The corrected pages are enclosed. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.DC 20555-0001 December 6, 2017 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165 |
| T. Hamilton -2 -If you have any questions, please contact me at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov. Docket No. 50-400 Enclosure: Corrected TS Pages 6-19g and 6-19h cc: Listserv Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages. Remove 6-19g 6-19h Insert 6-19g 6-19h Enclosure ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following: 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows: ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities, 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification. SHEARON HARRIS -UNIT 1 6-19g Amendment No. 127 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications. 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews. 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following: a. A change in the TS incorporated in the license, or b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59. 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e). SHEARON HARRIS -UNIT 1 6-19h Amendment No. 127 T. Hamilton -3 -SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802) DATED DECEMBER 6, 2017 DISTRIBUTION: PUBLIC PM Reading File RidsRgn2MailCenter Resource RidsACRS_MailCTR Resource RidsNrrLABClayton Resource RidsNrrDorllp12-2 Resource RidsNrrPMShearonHarris Resource ADAMS Accession Nos.: Package: ML 173408389 Letter: ML 173248048 Correction Panes: ML 173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA NAME DGalvin BClayton DATE 12/01/17 11/30/17 DORULPL2-2/PM MBarillas 12/04/17 OFFICIAL RECORD COPY DORULPL2 2/BC UShoop PBuckbern for\ 12/05/17 DORL/LPL2 2/PM DGalvin 12/06/17 | | |
| }} | | ==SUBJECT:== |
| | SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802) |
| | |
| | ==Dear Ms. Hamilton:== |
| | |
| | By letter dated June 12, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081430111 ), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment No. 127 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The amendment relocated the lnservice Testing requirements to the administrative section of the Technical Specifications (TSs), |
| | removed the lnservice Inspection requirements from the TSs, and established a TSs Bases Control Program. These changes were in response to the Duke Energy Progress, LLC (previously Carolina Power and Light Company) (the licensee) license amendment request dated June 15, 2007, as supplemented by letter dated March 6, 2008 (ADAMS Accession Nos. |
| | ML071800018 and ML080720337). |
| | This year, while periorming the acceptance review on a license amendment request submitted November 7, 2017, (ADAMS Accession No. ML17312A362), the NRG staff identified an error on TS pages 6-199 and 6-19h associated with Amendment No. 127. Specifically, the TS pages 6-19g and 6-19h were issued without the applicable headings, "ADMINISTRATIVE CONTROLS" and "PROCEDURES AND PROGRAMS (Continued)." |
| | It appears that this error was introduced when the licensee submitted its markup and clean TS pages for Amendment No. 127, and because TS pages 6-19g and 6-19h were new pages to be added to the TS. The licensee submitted the markup pages as "inserts" without headings, while the clean pages were submitted with correct headings that were consistent with the Administrative Controls section of the Harris TS. The NRC inadvertently issued the pages without the headings. The corrected pages are enclosed. |
| | |
| | T. Hamilton If you have any questions, please contact me at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov. |
| | Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 |
| | |
| | ==Enclosure:== |
| | |
| | Corrected TS Pages 6-19g and 6-19h cc: Listserv |
| | |
| | CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages. |
| | Remove Insert 6-19g 6-19g 6-19h 6-19h Enclosure |
| | |
| | ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) |
| | : m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following: |
| | : 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows: |
| | ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda Required Frequencies for terminology for inservice testing performing inservice testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days |
| | : 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities, |
| | : 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and |
| | : 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification. |
| | SHEARON HARRIS - UNIT 1 6-19g Amendment No. 127 |
| | |
| | ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) |
| | : n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications. |
| | : 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews. |
| | : 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following: |
| | : a. A change in the TS incorporated in the license, or |
| | : b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59. |
| | : 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR |
| | : 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e). |
| | SHEARON HARRIS - UNIT 1 6-19h Amendment No. 127 |
| | |
| | Package: ML173408389 Letter: ML173248048 Correction Panes: ML173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA DORULPL2-2/PM DORULPL2 2/BC DORL/LPL2 2/PM NAME DGalvin BClayton MBarillas UShoop PBuckbern for\ DGalvin DATE 12/01/17 11/30/17 12/04/17 12/05/17 12/06/17}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML17324B1292017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a TS Bases Control Program (CAC No. MD5802) - Corrected TS Pages Project stage: Other ML17324B0482017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program Project stage: Other 2017-12-06
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition 2024-09-10
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 ML22161B0332022-07-28028 July 2022 Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 ML21351A4722022-02-10010 February 2022 Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency ML21320A0012022-01-20020 January 2022 Issuance of Amendment No. 189 to Regarding Administrative Change to Reflect Development of a Technical Requirements Manual ML21316A2482022-01-19019 January 2022 Issuance of Amendment No. 188, Regarding Revision of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22012A4192022-01-18018 January 2022 Correction to Amendment to Revise the Technical Specification for Engineered Safety Feature Actuation System Instrumentation ML21224A1012021-10-0707 October 2021 Issuance of Amendments to Revise the Technical Specification for Engineered Safety Feature Actuation System Instrumentation ML21155A2132021-08-26026 August 2021 Plant ML21116A2072021-05-0404 May 2021 Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B ML21047A4702021-04-0808 April 2021 Issuance of Amendment No. 185 Regarding Reduction of Reactor Coolant System Minimum Flow Rate and Update to the Core Operating Limits Report References ML21047A3142021-04-0202 April 2021 Issuance of Amendment No. 184 Regarding Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B ML21033B0072021-03-22022 March 2021 Issuance of Amendment No, 183 to Correct Non-Conservative Technical Specification Related to Reactor Coolant System Pressure/Temperature Limits ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation ML20259A5122020-12-0808 December 2020 Issuance of Amendment No. 181 Regarding Adoption of 10 CFR Part 50, Appendix J, Option B, for Type B and C Testing and for Permanent Extension of Type a, B, and C Leak Rate Testing Frequencies(L-2019-LLA-0256) ML20281A2792020-10-13013 October 2020 Correction Letter to Amendment No. 179 Regarding Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML20273A0232020-10-0909 October 2020 Correction Letter to Amendment No. 180 Issued September 4, 2020 ML20212L5942020-09-29029 September 2020 Issuance of Amendment No. 179 Regarding Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20099F5052020-06-29029 June 2020 Issuance of Amendment No. 177 Regarding Elimination of Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML19225C0692019-09-19019 September 2019 Issuance of Amendment No. 175 Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints ML19192A0122019-09-17017 September 2019 Issuance of Amendment No. 174 Adopt Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components ML19108A1732019-07-18018 July 2019 Issuance of Amendment No. 173 Regarding Emergency Plan Emergency Action Level Scheme Change ML18288A1392019-04-29029 April 2019 Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18347A3852019-03-29029 March 2019 Issuance of Amendment No. 169, Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18262A3032018-11-19019 November 2018 Issuance of Amendment No. 168 Regarding License Amendment Request for Rod Control Movable Assemblies Technical Specifications Changes ML18204A2862018-10-22022 October 2018 Issuance of Amendment No. 167 Regarding (CAC MF9996; EPID 2017-LLA-0303) ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses ML18060A4012018-04-10010 April 2018 Redacted Issuance of Amendments Revising TSs for Methodology Reports DPC-NE-3008-P, Revision 0, and DPC-NE-3009-P, Revision 0) (CAC Nos. MF8439 and MF8440; EPID L-2016-LLA-0012) ML17324B0482017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17074A6722017-05-25025 May 2017 Issuance of Amendment Relocation of Explosion Gas Monitoring Program Technical Specifications ML17048A1842017-05-24024 May 2017 Issuance of Amendment on Changes to Technical Specifications Section 3.8, Electrical Power Systems and Section 6.8. Procedures and Programs ML17102A9232017-05-18018 May 2017 Nonproprietary Issuance of Amendments Revising Technical Specifications for Methodology Reports DPC Ne 1008 P Revision 0, DPC Nf 2010 Revision 3 and DPC Ne 2011 P Revision 2 (CAC Nos. MF6648, MF6649, MF7693/MF7694) ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17066A2992017-03-28028 March 2017 2nd Correction to License Amendment No. 154 Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program ML16200A2852016-11-29029 November 2016 Shearon Harris Nuclear Power Plant, Unit 1 - Issuance of Amendments Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program (CAC No. MF6583) 2024-08-02
[Table view] Category:Technical Specifications
MONTHYEARML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 ML21316A2482022-01-19019 January 2022 Issuance of Amendment No. 188, Regarding Revision of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation RA-20-0321, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Comple2020-11-11011 November 2020 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completi ML20183A4082020-07-0909 July 2020 Correction to Amendment No. 177 Regarding Elimination of Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML19225C0692019-09-19019 September 2019 Issuance of Amendment No. 175 Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints RA-18-0201, Corrected Technical Specification Page Regarding License Amendment Request to Self Perform Core Reload Design and Safety Analyses2018-10-15015 October 2018 Corrected Technical Specification Page Regarding License Amendment Request to Self Perform Core Reload Design and Safety Analyses ML17324B1292017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a TS Bases Control Program (CAC No. MD5802) - Corrected TS Pages ML17324B0482017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17074A6722017-05-25025 May 2017 Issuance of Amendment Relocation of Explosion Gas Monitoring Program Technical Specifications ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16155A1242016-07-25025 July 2016 Issuance of Amendment on Main Steam Safety Valve Lift Setting Tolerance, Nominal Reactor Trip Setpoint on Pressurizer Water Level, and Pressurizer Water Level Span in Technical Specifications RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.2015-11-19019 November 2015 Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis. RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors.2015-08-19019 August 2015 Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors. HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2015-08-18018 August 2015 Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML15163A0562015-06-30030 June 2015 Issuance of Amendment to Revised Technical Specifications Table 3.3-4, Engineered Safety Features Actuation System Instrumentation ML15075A2122014-11-30030 November 2014 Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data RA-15-000, Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data2014-11-30030 November 2014 Attachment 8 - DPC-NE-2005 Appendix H Robinson Plant Specific Data ML15075A2132014-11-30030 November 2014 Attachment 9 - DPC-NE-2005 Appendix I Harris Plant Specific Data ML12339A0672012-12-18018 December 2012 Issuance of License Amendments Regarding Cyber Security HNP-12-116, License Amendment Request to Revise Technical Specification Table 3.3-4 Re Degraded Voltage Time Delay Values2012-11-29029 November 2012 License Amendment Request to Revise Technical Specification Table 3.3-4 Re Degraded Voltage Time Delay Values HNP-12-098, Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-10-22022 October 2012 Application for Technical Specification Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process ML12080A2172012-03-20020 March 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages HNP-12-040, Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages2012-03-20020 March 2012 Application for Revision to Technical Specification 5.3.1 and Core Operating Limits Report References for M5 Cladding Revised Technical Specification Pages HNP-11-067, License Amendment Request for Revision to Technical Specification Core Operating Limits Report References for Realistic Large Break LOCA Analysis2011-08-22022 August 2011 License Amendment Request for Revision to Technical Specification Core Operating Limits Report References for Realistic Large Break LOCA Analysis HNP-11-053, Transmittal of Technical Specifications Bases Revisions2011-05-0505 May 2011 Transmittal of Technical Specifications Bases Revisions ML1023707682010-08-16016 August 2010 Response to Second Request for Additional Information Regarding Amendment to Remove Credit for Boraflex in Boiling Water Reactor Spent Fuel Pool Storage Racks ML0926402472009-10-14014 October 2009 Issuance of Amendment Regarding Lowering the Minimum Allowed Level of the Ultimate Heat Sink Main Reservoir ML0923203862009-08-25025 August 2009 Correction to Operating License and Technical Specification Page Issued with Amendment No. 131 Issued on July 2, 2009 ML0923102232009-08-25025 August 2009 Correction to Operating License and Technical Specification Page Issued with Amendment No. 131 Issued on July 2, 2009 ML0923102862009-08-20020 August 2009 Letter & Technical Specifications - Corrections to Technical Specification Pages Issued with Amendment No. 128 Issued on January 29, 2009 HNP-08-075, Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks2008-09-29029 September 2008 Request for License Amendment Technical Specifications 5.6.1.3.a and 5.6.1.3.b - Incorporation of Updated Criticality Analyses to Reflect Removal of Credit for Boraflex in BWR Spent Fuel Pool Storage Racks ML0814301512008-06-12012 June 2008 Technical Specifications, Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program HNP-08-049, Request for License Amendment Technical Specification 3.7.5a2008-04-30030 April 2008 Request for License Amendment Technical Specification 3.7.5a ML0726003592007-09-19019 September 2007 Technical Specification Page Correction Issued with Amendment No. 125 Issued on July 23, 2007 HNP-07-127, Correction to Technical Specification Page in Amendment 1252007-09-13013 September 2007 Correction to Technical Specification Page in Amendment 125 ML0724707482007-08-31031 August 2007 Technical Specification, Issuance of Amendment to Revise Steam Generator Water Level Trip Setpoint Values HNP-07-005, Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.52007-06-15015 June 2007 Request for License Amendment to Relocate and Revise Technical Specifications Surveillance Requirement 4.0.5 ML0622003982006-08-0202 August 2006 Request for License Amendment to Revise Values Associated with the Steam Generator Water Level Trip Setpoints ML0622004022006-08-0202 August 2006 Request for License Amendment HNP Calculation HNP-I/INST-1010 HNP-06-060, License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity2006-05-23023 May 2006 License Amendment Request Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0606803122006-03-0808 March 2006 Tech Spec Pages for Amendment 120 Regarding Temperature Limit for Dissolved Oxygen in Reactor Coolant System HNP-05-143, Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools2005-12-22022 December 2005 Supplement to Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools HNP-05-002, Supplemental Information to the Proposed License Amendment Request to Technical Specification (TS) 6.8.4.k and TS Surveillance Requirement (SR) 4.6.1.6.12005-12-0909 December 2005 Supplemental Information to the Proposed License Amendment Request to Technical Specification (TS) 6.8.4.k and TS Surveillance Requirement (SR) 4.6.1.6.1 ML0525105022005-09-0101 September 2005 Request for License Amendment to Credit Soluble Boron for Fuel Storage Pools 2024-08-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON.DC 20555-0001 December 6, 2017 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant Duke Energy 5413 Shearon Harris Road New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - CORRECTION TO LICENSE AMENDMENT NO. 127 REGARDING CHANGES TO THE INSERVICE INSPECTION AND TESTING REQUIREMENTS AND ESTABLISHMENT OF A TECHNICAL SPECIFICATIONS BASES CONTROL PROGRAM (CAC NO. MD5802)
Dear Ms. Hamilton:
By letter dated June 12, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML081430111 ), the U.S. Nuclear Regulatory Commission (NRG) issued Amendment No. 127 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1 (Harris). The amendment relocated the lnservice Testing requirements to the administrative section of the Technical Specifications (TSs),
removed the lnservice Inspection requirements from the TSs, and established a TSs Bases Control Program. These changes were in response to the Duke Energy Progress, LLC (previously Carolina Power and Light Company) (the licensee) license amendment request dated June 15, 2007, as supplemented by letter dated March 6, 2008 (ADAMS Accession Nos.
ML071800018 and ML080720337).
This year, while periorming the acceptance review on a license amendment request submitted November 7, 2017, (ADAMS Accession No. ML17312A362), the NRG staff identified an error on TS pages 6-199 and 6-19h associated with Amendment No. 127. Specifically, the TS pages 6-19g and 6-19h were issued without the applicable headings, "ADMINISTRATIVE CONTROLS" and "PROCEDURES AND PROGRAMS (Continued)."
It appears that this error was introduced when the licensee submitted its markup and clean TS pages for Amendment No. 127, and because TS pages 6-19g and 6-19h were new pages to be added to the TS. The licensee submitted the markup pages as "inserts" without headings, while the clean pages were submitted with correct headings that were consistent with the Administrative Controls section of the Harris TS. The NRC inadvertently issued the pages without the headings. The corrected pages are enclosed.
T. Hamilton If you have any questions, please contact me at (301) 415-6256 or by e-mail at Dennis.Galvin@nrc.gov.
Sincerely, Dennis J. Galvin, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
Corrected TS Pages 6-19g and 6-19h cc: Listserv
CORRECTION TO LICENSE AMENDMENT NO. 127 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 RENEWED FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the attached corrected pages.
Remove Insert 6-19g 6-19g 6-19h 6-19h Enclosure
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)
- m. lnservice Testing Program This program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
- 1. Testing frequencies specified in the ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda as follows:
ASME Code for Operation and Maintenance of Nuclear Power Plants and applicable Addenda Required Frequencies for terminology for inservice testing performing inservice testing activities activities Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days Biennially or every 2 years At least once per 731 days
- 2. The provisions of SR 4.0.2 are applicable to the above required Frequencies and to other normal and accelerated Frequencies specified as 2 years or less in the lnservice Testing Program for performing inservice testing activities,
- 3. The provisions of SR 4.0.3 are applicable to inservice testing activities, and
- 4. Nothing in the ASME Code for Operation and Maintenance of Nuclear Power Plants shall be construed to supersede the requirements of any Technical Specification.
SHEARON HARRIS - UNIT 1 6-19g Amendment No. 127
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued)
- n. Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
- 1. Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
- 2. Licensees may make changes to Bases without prior NRG approval provided the changes do not require either of the following:
- a. A change in the TS incorporated in the license, or
- b. A change to the FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
- 3. The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the FSAR
- 4. Proposed changes that meet the criteria of Specification 6.8.4.n.2 above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71 (e).
SHEARON HARRIS - UNIT 1 6-19h Amendment No. 127
Package: ML173408389 Letter: ML173248048 Correction Panes: ML173248129 OFFICE DORULPL2-2/PM DORL/LPL2-2/LA DORULPL2-2/PM DORULPL2 2/BC DORL/LPL2 2/PM NAME DGalvin BClayton MBarillas UShoop PBuckbern for\ DGalvin DATE 12/01/17 11/30/17 12/04/17 12/05/17 12/06/17