| issue date = 04/16/1999
| issue date = 04/16/1999
| title = Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed
| title = Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed
| author name = RENCHECK M W
| author name = Rencheck M
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1IACCESSION NBR-FACIL:50-315 AUTH;X'TAME
{{#Wiki_filter:CATEGORY 1 I                                REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
'ENCHECK,M.W.
ACCESSION NBR- 9904290045                    DOC.DATE: 99/04/16 NOTARIZED: NO            DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH;X'TAME                     AUTHOR AFFILIATION
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)9904290045 DOC.DATE:
                  'ENCHECK,M.W.
99/04/16NOTARIZED:
Indiana Michigan Power Co.
NODOCKETDonaldC.CookNuclearPowerPlant,Unit1,IndianaM05000315AUTHORAFFILIATION IndianaMichiganPowerCo.RECIPIENT AFFILIATION RecordsManagement Branch(Document ControlDesk)
RECIP.NAME                       RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
ForwardsLER99-006-00, "FuelCraneLoadsLiftedOverSFPCouldImpackEnergiesGreaterThanTSLimits,"IAW10CFR50.73,Submittal wasdelayedtoallowforresolution ofquestions.
Forwards LER                  99-006-00, "Fuel Crane Loads Lifted Over SFP Could Impack Energies Greater Than TS Limits," IAW 10CFR50.73,Submittal was delayed to allow for resolution of questions. Commitment made by licensee, listed.
Commitment madebylicensee, listed.DISTRIBUTION CODE:IE22TCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidenRpt,etc.NOTES:RECIPIENT IDCODE/NAME LPD3-1PDINTERNAL:
DISTRIBUTION CODE: IE22T                  COPIES RECEIVED:LTR     ENCL    SIZE:
AEOD/SPD/RRAB NRR/DIPM/IOLB NRR/DRIP/REXB RES/DET/EIB EXTERNAL:
TITLE: 50.73/50.9 Licensee Event Report (LER), Inciden                    Rpt, etc.
LSTLOBBYWARDNOACPOORE,W.NRCPDRCOPIESLTTRENCL1111111,111111111RECIPIENT IDCODE/NAME STANG,JFILECNRR/DIPM/IQMB NRR/DSSA/SPLB RGN3FILE01LMITCOMARSHALLNOACQUEENER,DS NUDOCSFULLTXTCOPIESLTTRENCL11111111111.,11111NOTETOALL"RIDS"RECIPIENTS:
NOTES:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISORREDUCETHENUMBEROFCOPZESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTRDESK(DCD)ONEXTENSION 415-2083FULLTEXTCONVERSION REQUIREDTOTALNUMBEROFCOPIESREQUIRED:
RECIPIENT                  COPIES          RECIPIENT         COPIES ID            CODE/NAME       LTTR ENCL    ID  CODE/NAME    LTTR ENCL LPD3-1              PD            1    1    STANG,J              1    1 INTERNAL: AEOD/SPD/RRAB                       1    1    FILE  C              1    1 NRR/DIPM/IOLB                     1    1    NRR/DIPM/IQMB        1    1 NRR/DRIP/REXB                     1,    1    NRR/DSSA/SPLB        1    1 RES/DET/EIB                       1    1    RGN3    FILE  01    1    1 EXTERNAL: L ST LOBBY WARD                      1    1    LMITCO MARSHALL      1  ., 1 NOAC POORE,W.                     1    1    NOAC QUEENER,DS       1    1 NRC PDR                            1    1    NUDOCS FULL TXT      1    1 NOTE TO  ALL "RIDS" RECIPIENTS:
LTTR16ENCL16 IndianaMichiganPowerCompanyCookNtdoatPiattrOneCookPiataeridyttlt.
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR                    16  ENCL    16
Ml491066164655901INDIANANICHIGAMIaOMfKRApril16,1999UnitedStatesNuclearRegulatory Commission DocumentControlDeskWashington, DC20555Operating LicenseDPR-58DocketNo.50-315DocumentControlManager:Inaccordance withthecriteriaestablished by10CFR50.73entitledLicenseeEventReort~Sstem,thefottowtng reportisbeingsubmitted:
 
LER315/99-006-00, "FuelCraneLoadsLiftedOverSpentFuelPoolCouldImpartImpactEnergiesGreaterthanTechnical Specification Limits"Thefollowing commitment hasbeenidentified inthissubmittal:
Indiana Michigan Power Company Cook Ntdoat Piattr One Cook Piata eridyttlt. Ml491 06 616 465 5901 INDIANA NICHIGAM IaOMfKR April 16, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:
~Therootcauseinvestigation forthiseventhasnotbeencompleted.
In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event Re ort
Basedontheresultsofthisinvestigation, information regarding thesafetysigniTicance ofthiscondition, including additional corrective andpreventive actions,willbeprovidedinanupdatetothisLERuponcompletion oftheinvestigation.
    ~Sstem, the fottowtng report is being submitted:
ThisLERwasoriginally duetobesubmitted onMarch23,1999.Duetouncertainty astotechnical issuesthatdirectlyaffectthereportability ofthisevent,submittal oftheLERwasdelayedto.allowforresolution ofquestions.
LER 315/99-006-00, "Fuel Crane Loads Lifted Over Spent Fuel Pool Could Impart Impact Energies Greater than Technical Specification Limits" The following commitment has been identified in this submittal:
Itisrecognized thatthesubmittal ofthisdocumentexceedsthe30dayrequirement of10.CFR50.73.ACondition Reporthasbeenwrittenandenteredintothecorrective actionprogramtoaddressthisissue.Sincerely, M.W.RencheckVicePresident
    ~   The root cause investigation for this event has not been completed. Based on the results of this investigation, information regarding the safety signiTicance of this condition, including additional corrective and preventive actions, will be provided in an update to this LER upon completion of the investigation.
-NuclearEngineering
This LER was originally due to be submitted on March 23, 1999. Due to uncertainty as to technical issues that directly affect the reportability of this event, submittal of the LER was delayed to.allow for resolution of questions. It is recognized that the submittal of this document exceeds the 30 day requirement of 10.CFR 50.73. A Condition Report has been written and entered into the corrective action program to address this issue.
/mbdAttachment
Sincerely, M. W. Rencheck Vice President Nuclear Engineering
'gi'gi04290045 9904ihPDR,ADQCK050003i5SPDR J.E.Dyer,RegionIIIP.A.BarrettD.F.Kunsemiller R..WhaleD.HahnRecordsCenter,INPONRCResidentInspector}}
    /mbd Attachment
'gi'gi04290045             9904ih PDR, ADQCK                050003i5 S                              PDR
 
J. E. Dyer, Region III P. A. Barrett D. F. Kunsemiller R.. Whale D. Hahn Records Center, INPO NRC Resident Inspector}}

Latest revision as of 05:37, 29 October 2019

Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed
ML17325B556
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/16/1999
From: Rencheck M
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17325B557 List:
References
NUDOCS 9904290045
Download: ML17325B556 (3)


Text

CATEGORY 1 I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR- 9904290045 DOC.DATE: 99/04/16 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH;X'TAME AUTHOR AFFILIATION

'ENCHECK,M.W.

Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards LER 99-006-00, "Fuel Crane Loads Lifted Over SFP Could Impack Energies Greater Than TS Limits," IAW 10CFR50.73,Submittal was delayed to allow for resolution of questions. Commitment made by licensee, listed.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Inciden Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD3-1 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE C 1 1 NRR/DIPM/IOLB 1 1 NRR/DIPM/IQMB 1 1 NRR/DRIP/REXB 1, 1 NRR/DSSA/SPLB 1 1 RES/DET/EIB 1 1 RGN3 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LMITCO MARSHALL 1 ., 1 NOAC POORE,W. 1 1 NOAC QUEENER,DS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 16

Indiana Michigan Power Company Cook Ntdoat Piattr One Cook Piata eridyttlt. Ml491 06 616 465 5901 INDIANA NICHIGAM IaOMfKR April 16, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:

In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event Re ort

~Sstem, the fottowtng report is being submitted:

LER 315/99-006-00, "Fuel Crane Loads Lifted Over Spent Fuel Pool Could Impart Impact Energies Greater than Technical Specification Limits" The following commitment has been identified in this submittal:

~ The root cause investigation for this event has not been completed. Based on the results of this investigation, information regarding the safety signiTicance of this condition, including additional corrective and preventive actions, will be provided in an update to this LER upon completion of the investigation.

This LER was originally due to be submitted on March 23, 1999. Due to uncertainty as to technical issues that directly affect the reportability of this event, submittal of the LER was delayed to.allow for resolution of questions. It is recognized that the submittal of this document exceeds the 30 day requirement of 10.CFR 50.73. A Condition Report has been written and entered into the corrective action program to address this issue.

Sincerely, M. W. Rencheck Vice President Nuclear Engineering

/mbd Attachment

'gi'gi04290045 9904ih PDR, ADQCK 050003i5 S PDR

J. E. Dyer, Region III P. A. Barrett D. F. Kunsemiller R.. Whale D. Hahn Records Center, INPO NRC Resident Inspector