| issue date = 02/22/1999
| issue date = 02/22/1999
| title = Forwards Typed TS Pages,Reflecting NRC Approved TS Change 354 Requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation
| title = Forwards Typed TS Pages,Reflecting NRC Approved TS Change 354 Requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation
| author name = ABNEY T E
| author name = Abney T
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =  
| addressee name =  
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULA'1 RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9903090021 DOC.DATE: 99/02/22 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULA'1 RY INFORMATION       DISTRIBUTIO SYSTEM (RIDS)
NO FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.NAME'UTHOR AFFILIATION ABNEY,T.E.
ACCESSION NBR:9903090021           DOC.DATE: 99/02/22 NOTARIZED: NO                     DOCKET  ¹ FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee                       05000260 AUTH. NAME'UTHOR AFFILIATION ABNEY,T.E.           Tennessee   Valley Authority RECIP.NAME           RECIPIENT AFFILIATION Records Management Branch (Document             Control Desk)
Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)DOCKET¹05000260


==SUBJECT:==
==SUBJECT:==
Forwards typed TS pages, reflecting NRC approved TS change 354 requiring oscillation PRM to be integrated into approved power uprate,24-month operating cyc&single recirculation loop operation.
Forwards typed TS pages, reflecting NRC approved TS change 354 requiring oscillation PRM to be integrated into approved power uprate,24-month       operating cyc     &   single recirculation loop operation.
DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR 1 ENCL I SIZE:+TITLE: TVA Facilities
DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR                 1   ENCL I   SIZE:     +
-Routine Correspondence NOTES: RECIPIENT ID CODE/NAME PD2-3 DEAGAZIO,A INTERNAL: ACRS OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 0 RECIPIENT ID CODE/NAME PD2-3-PD ILE CENTER 0 RE DE/SSEB/SES NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D)5CIMEIB~NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: TVA Facilities - Routine Correspondence NOTES:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 8  
RECIPIENT             COPIES              RECIPIENT            COPIES ID  CODE/NAME          LTTR ENCL          ID CODE/NAME       LTTR ENCL PD2-3                             1      PD2-3-PD                  1    1 DEAGAZIO,A                 1      1 INTERNAL: ACRS                       1     1       ILE  CENTER    0        1     1 OGC/HDS3                  1     0       RE   DE/SSEB/SES         1    1 EXTERNAL: NOAC                                      NRC PDR                   1     1 D
                                                    )5CIMEIB~
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 9   ENCL     8


Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609 February 22, 1999 TVA-BFN-TS-354 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609 February 22, 1999 TVA-BFN-TS-354                                                                         10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN:       Document Control Desk Washington,             D.C. 20555 Gentlemen:
10 CFR 50.4 Xn the Matter of Tennessee Valley Authority Docket No.50-260 BROWNS FERRY NUCLEAR PLANT (BFN)-UNIT 2-TECHNICAL SPECIFICATIONS (TS)CHANGE 354-OSCILLATION POWER RANGE MONITOR (OPRM)On September 8, 1998, TVA submitted a change request (TS-354)to the Unit 2 TS for enabling the OPRM system for the next Unit 2 operating cycle which follows the upcoming Spring 1999 refueling outage.The TS-354 changes were submitted based on Unit 2 TS and TS Bases that were in effect at the time of the submittal.
Xn   the Matter of                                                             Docket No. 50-260 Tennessee          Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 2 TECHNICAL SPECIFICATIONS (TS) CHANGE 354 OSCILLATION POWER RANGE MONITOR (OPRM)
Since that time, NRC has approved TS changes for Unit 2 for Power Uprate (TS-384, approved September 8, 1998), 24-Month Operating Cycle (TS-390, approved November 30, 1998), and Single Recirculation Loop Operation (SLO)(TS-387, approved December 23, 1998).The SLO TS have been implemented on Unit 2, and the Power Uprate and 24-Month Operating Cycle TS will be implemented during the Spring 1999 Unit 2 outage.QDSD To facilitate approval of TS-354, NRC requested that TVA provide typed Unit 2 TS pages which@incorporate the TS-354 OPRM changes into the three previously approved TS change packages mentioned above.Accordingly, in the Enclosure are the TS-354 typed TS and TS Bases pages required for OPRM integrated into the approved Power Uprate, 24-Month Operating Cycle and Single Recirculation Loop Operation TS~'tf'tf0309002i 9'tf0222 PDR ADOCK 05000260 P PDRE<
On   September 8, 1998, TVA submitted a change request (TS-354) to the Unit 2 TS for enabling the OPRM system for the next Unit 2 operating cycle which follows the upcoming Spring 1999 refueling outage. The TS-354 changes were submitted based on Unit 2 TS and TS Bases that were in effect at the time of the submittal.
U.S.Nuclear Regulatory Commission Page 2 February 22, 1999 TS Section 3.3.3.1 (Reactor Protection System Instrumentation) and TS 3.4.1 (Recirculation Loops Operating) are affected by the TS-354 OPRM changes.In TS 3.3.3.1, the OPRM changes are a direct lay-over onto the Power Uprate, 24-Month Cycle, and SLO approved TS.For TS 3.4.1, the OPRM changes have been merged into the approved Power Uprate and SLO TS as described below.In LCO 3.4.1 the references to Figure 3.4.1-1 (Thermal Power Versus Core Flow Stability Regions)are deleted since TS-354 deletes the subject Figure.The associated Required Actions are likewise deleted consistent with the TS-354 TS changes.TS-387 (SLO)extended the Completion Time when not meeting LCO 3.4.1 from 12 to 24 hours (Required Action C.l in the currently approved TS).For the OPRM TS, the equivalent Required Action A.1 incorporates the same 24-hour Completion Time.These retyped TS and TS Bases pages are simply the result of accounting for the TS changes approved by NRC subsequent to the original submittal of TS-354.Therefore, no technical changes are being made regarding the TS changes required for OPRM system operation.
Since that time, NRC has approved TS                                     changes for Unit 2 for Power Uprate               (TS-384, approved September 8, 1998), 24-Month Operating Cycle (TS-390, approved November 30, 1998), and Single Recirculation Loop Operation (SLO) (TS-387, approved December 23, 1998).                         The SLO TS have been implemented on Unit 2, and the Power Uprate and 24-Month Operating Cycle TS will be implemented during the Spring 1999 Unit 2 outage.
If you have any questions about these pages, please contact me at (256)729-2636.cerely, T.E.Abne Manager of Lice xng and Industry A fairs Enclosure cc: see page 3 U.S.Nuclear Regulatory Commission Page 3 February 22, 1999 cc (Enclosure):
To facilitate approval of TS-354, NRC requested that TVA provide typed Unit 2 TS pages which@incorporate the TS-354 OPRM changes into the three previously approved TS change packages mentioned above. Accordingly, in the Enclosure are the TS-354 typed TS and TS Bases pages required for OPRM integrated into the approved Power Uprate, 24-Month Operating Cycle and Single Recirculation Loop Operation TS                                       ~
Mr.Paul Fredrickson, Branch Chief U.S.Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr.L.Raghavan, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie,'aryland 20852}}
'tf'tf0309002i 9'tf0222 PDR P
ADOCK 05000260 PDRE<
QDSD
 
U.S. Nuclear Regulatory Commission Page 2 February 22, 1999 TS Section 3.3.3.1 (Reactor Protection System Instrumentation) and TS 3.4.1 (Recirculation Loops Operating) are affected by the TS-354 OPRM changes.       In TS 3.3.3.1, the OPRM changes are a direct lay-over onto the Power Uprate,     24-Month Cycle, and SLO approved TS. For TS 3.4.1, the   OPRM changes have been merged into the approved Power Uprate and SLO TS as described below.
In LCO 3.4.1 the references to Figure 3.4.1-1 (Thermal Power Versus Core Flow     Stability Regions) are deleted since TS-354 deletes the subject Figure. The associated Required Actions are likewise deleted consistent with the TS-354 TS changes.
TS-387 (SLO) extended the Completion Time when not meeting LCO 3.4.1 from 12 to 24 hours (Required Action C.l in the currently approved TS). For the OPRM TS, the equivalent Required Action A.1 incorporates the same 24-hour Completion Time.
These retyped TS and TS Bases pages are simply the result of accounting for the TS changes approved by NRC subsequent to the original submittal of TS-354. Therefore, no technical changes are being made regarding the TS changes required for OPRM   system operation.
If you at have any questions about these pages, please contact me       (256) 729-2636.
cerely, T. E. Abne Manager of Lice xng and Industry A fairs Enclosure cc: see page   3
 
U.S. Nuclear Regulatory Commission Page 3 February 22, 1999 cc (Enclosure):
Mr. Paul Fredrickson, Branch Chief U.S. Nuclear Regulatory Commission Region   II 61 Forsyth Street, S. W.
Suite 23T85 Atlanta, Georgia   30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. L. Raghavan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie,'aryland   20852}}

Latest revision as of 22:04, 21 October 2019

Forwards Typed TS Pages,Reflecting NRC Approved TS Change 354 Requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation
ML18039A697
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/22/1999
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18039A698 List:
References
TVA-BFN-TS-354, NUDOCS 9903090021
Download: ML18039A697 (5)


Text

CATEGORY 1 REGULA'1 RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9903090021 DOC.DATE: 99/02/22 NOTARIZED: NO DOCKET ¹ FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH. NAME'UTHOR AFFILIATION ABNEY,T.E. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards typed TS pages, reflecting NRC approved TS change 354 requiring oscillation PRM to be integrated into approved power uprate,24-month operating cyc & single recirculation loop operation.

DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR 1 ENCL I SIZE: +

TITLE: TVA Facilities - Routine Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 1 PD2-3-PD 1 1 DEAGAZIO,A 1 1 INTERNAL: ACRS 1 1 ILE CENTER 0 1 1 OGC/HDS3 1 0 RE DE/SSEB/SES 1 1 EXTERNAL: NOAC NRC PDR 1 1 D

)5CIMEIB~

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 8

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609 February 22, 1999 TVA-BFN-TS-354 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Xn the Matter of Docket No. 50-260 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 2 TECHNICAL SPECIFICATIONS (TS) CHANGE 354 OSCILLATION POWER RANGE MONITOR (OPRM)

On September 8, 1998, TVA submitted a change request (TS-354) to the Unit 2 TS for enabling the OPRM system for the next Unit 2 operating cycle which follows the upcoming Spring 1999 refueling outage. The TS-354 changes were submitted based on Unit 2 TS and TS Bases that were in effect at the time of the submittal.

Since that time, NRC has approved TS changes for Unit 2 for Power Uprate (TS-384, approved September 8, 1998), 24-Month Operating Cycle (TS-390, approved November 30, 1998), and Single Recirculation Loop Operation (SLO) (TS-387, approved December 23, 1998). The SLO TS have been implemented on Unit 2, and the Power Uprate and 24-Month Operating Cycle TS will be implemented during the Spring 1999 Unit 2 outage.

To facilitate approval of TS-354, NRC requested that TVA provide typed Unit 2 TS pages which@incorporate the TS-354 OPRM changes into the three previously approved TS change packages mentioned above. Accordingly, in the Enclosure are the TS-354 typed TS and TS Bases pages required for OPRM integrated into the approved Power Uprate, 24-Month Operating Cycle and Single Recirculation Loop Operation TS ~

'tf'tf0309002i 9'tf0222 PDR P

ADOCK 05000260 PDRE<

QDSD

U.S. Nuclear Regulatory Commission Page 2 February 22, 1999 TS Section 3.3.3.1 (Reactor Protection System Instrumentation) and TS 3.4.1 (Recirculation Loops Operating) are affected by the TS-354 OPRM changes. In TS 3.3.3.1, the OPRM changes are a direct lay-over onto the Power Uprate, 24-Month Cycle, and SLO approved TS. For TS 3.4.1, the OPRM changes have been merged into the approved Power Uprate and SLO TS as described below.

In LCO 3.4.1 the references to Figure 3.4.1-1 (Thermal Power Versus Core Flow Stability Regions) are deleted since TS-354 deletes the subject Figure. The associated Required Actions are likewise deleted consistent with the TS-354 TS changes.

TS-387 (SLO) extended the Completion Time when not meeting LCO 3.4.1 from 12 to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (Required Action C.l in the currently approved TS). For the OPRM TS, the equivalent Required Action A.1 incorporates the same 24-hour Completion Time.

These retyped TS and TS Bases pages are simply the result of accounting for the TS changes approved by NRC subsequent to the original submittal of TS-354. Therefore, no technical changes are being made regarding the TS changes required for OPRM system operation.

If you at have any questions about these pages, please contact me (256) 729-2636.

cerely, T. E. Abne Manager of Lice xng and Industry A fairs Enclosure cc: see page 3

U.S. Nuclear Regulatory Commission Page 3 February 22, 1999 cc (Enclosure):

Mr. Paul Fredrickson, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S. W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Mr. L. Raghavan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockvi lie,'aryland 20852