{{#Wiki_filter:ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST 87 09110049 , PDR O PDR p -CJ.* TSP0987-0155-NL04 September 11, 1987 "\ 1 Page 1* *' ;... TABLE 4.2.l Minimum Frequencies for Sampling Tests 1. Reactor Coolant Samples 2. Reactor Coolant Boron 3. SIRW Tank Water Sample Test Gross Activity mination Gross Gamma by Fission Product Monitor Isotopic analysis for dose equivalent I-131 concentration Radio chemical for E determination Isotopic analysis for iodine, including I-131, 133, 135. Chemistry (Cl and 02) Chemistry (Fl) Boron Concentration Boron Concentration
{{#Wiki_filter:ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST September 11, 1987 87 09110049 e~6l>~~ 5 ,
: 4. Concentrated Boron Concentration Boric Acid Tanks 5. SI Tanks Boron Concentration 4-14 TSP0987-0155-NL04 Frequency 3 Times/7 days with a maximum of 72 hours tween samples (T avg greater than 500°F). Continuous when T avg is greater thant 500°F(l).
PDR ADOC~ O       PDR
1/14 days during power operation 1/6 months. (2) a) Once/4 hours, whenever dose equivalent I-131 exceeds 1.0 µCI/gram, and b) One sample between 2 and 6 hours ing a thermal power change exceeding 15% of rated thermal power within a one hour period. 3 times/7 days with a maximum of 72 hours between samples (T avg greater than 210°F). Once/30 days and ing modifications or repair to the primary coolant system involving welding. Twice/Week Monthly Monthly Monthly FSAR Section Reference None dO J> None 0.. None None None 6 .1. 2 Proposed}}
                              "\        1 Page p                 - CJ.*
TSP0987-0155-NL04
 
~r 1* *' ;...
TABLE 4.2.l Minimum Frequencies for Sampling Tests FSAR Section Test                      Frequency        Reference
: 1. Reactor Coolant Gross Activity Deter-     3 Times/7 days with a     None Samples          mination                  maximum of 72 hours be-tween samples (T avg
                                                                                            ~
greater than 500°F).           dO Gross Gamma by Fission    Continuous when T avg is   None J>
Product Monitor          greater thant 500°F(l).      0..
Isotopic analysis        1/14 days during power for dose equivalent      operation I-131 concentration Radio chemical for        1/6 months. (2)
E determination Isotopic analysis        a) Once/4 hours, whenever for iodine, including        dose equivalent I-131 I-131, 133, 135.            exceeds 1.0 µCI/gram, and b) One sample between 2 and 6 hours follow-ing a thermal power change exceeding 15%
of rated thermal power within a one hour period.
Chemistry (Cl and 02)    3 times/7 days with a maximum of 72 hours between samples (T avg greater than 210°F).
Chemistry (Fl)            Once/30 days and follow-ing modifications or repair to the primary coolant system involving welding.
: 2. Reactor Coolant  Boron Concentration      Twice/Week                 None Boron
: 3. SIRW Tank Water  Boron Concentration      Monthly                   None Sample
: 4. Concentrated    Boron Concentration      Monthly                   None Boric Acid Tanks
: 5. SI Tanks        Boron Concentration      Monthly                    6 .1. 2 4-14 Proposed TSP0987-0155-NL04}}

Latest revision as of 20:28, 21 October 2019

Proposed Tech Spec Table 4.2.1, Min Frequencies for Sampling Tests, Deleting Item 5 Footnote Re Performance of Sample Tests of Safety Injection Tank T-82B
ML18052B295
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/11/1987
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18052B293 List:
References
NUDOCS 8709170049
Download: ML18052B295 (2)


Text

ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST September 11, 1987 87 09110049 e~6l>~~ 5 ,

PDR ADOC~ O PDR

"\ 1 Page p - CJ.*

TSP0987-0155-NL04

~r 1* *' ;...

TABLE 4.2.l Minimum Frequencies for Sampling Tests FSAR Section Test Frequency Reference

1. Reactor Coolant Gross Activity Deter- 3 Times/7 days with a None Samples mination maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> be-tween samples (T avg

~

greater than 500°F). dO Gross Gamma by Fission Continuous when T avg is None J>

Product Monitor greater thant 500°F(l). 0..

Isotopic analysis 1/14 days during power for dose equivalent operation I-131 concentration Radio chemical for 1/6 months. (2)

E determination Isotopic analysis a) Once/4 hours, whenever for iodine, including dose equivalent I-131 I-131, 133, 135. exceeds 1.0 µCI/gram, and b) One sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> follow-ing a thermal power change exceeding 15%

of rated thermal power within a one hour period.

Chemistry (Cl and 02) 3 times/7 days with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples (T avg greater than 210°F).

Chemistry (Fl) Once/30 days and follow-ing modifications or repair to the primary coolant system involving welding.

2. Reactor Coolant Boron Concentration Twice/Week None Boron
3. SIRW Tank Water Boron Concentration Monthly None Sample
4. Concentrated Boron Concentration Monthly None Boric Acid Tanks
5. SI Tanks Boron Concentration Monthly 6 .1. 2 4-14 Proposed TSP0987-0155-NL04