ML18052B295

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 4.2.1, Min Frequencies for Sampling Tests, Deleting Item 5 Footnote Re Performance of Sample Tests of Safety Injection Tank T-82B
ML18052B295
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/11/1987
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18052B293 List:
References
NUDOCS 8709170049
Download: ML18052B295 (2)


Text

ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST September 11, 1987 87 09110049 e~6l>~~ 5 ,

PDR ADOC~ O PDR

"\ 1 Page p - CJ.*

TSP0987-0155-NL04

~r 1* *' ;...

TABLE 4.2.l Minimum Frequencies for Sampling Tests FSAR Section Test Frequency Reference

1. Reactor Coolant Gross Activity Deter- 3 Times/7 days with a None Samples mination maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> be-tween samples (T avg

~

greater than 500°F). dO Gross Gamma by Fission Continuous when T avg is None J>

Product Monitor greater thant 500°F(l). 0..

Isotopic analysis 1/14 days during power for dose equivalent operation I-131 concentration Radio chemical for 1/6 months. (2)

E determination Isotopic analysis a) Once/4 hours, whenever for iodine, including dose equivalent I-131 I-131, 133, 135. exceeds 1.0 µCI/gram, and b) One sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> follow-ing a thermal power change exceeding 15%

of rated thermal power within a one hour period.

Chemistry (Cl and 02) 3 times/7 days with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples (T avg greater than 210°F).

Chemistry (Fl) Once/30 days and follow-ing modifications or repair to the primary coolant system involving welding.

2. Reactor Coolant Boron Concentration Twice/Week None Boron
3. SIRW Tank Water Boron Concentration Monthly None Sample
4. Concentrated Boron Concentration Monthly None Boric Acid Tanks
5. SI Tanks Boron Concentration Monthly 6 .1. 2 4-14 Proposed TSP0987-0155-NL04