ML18052B295

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 4.2.1, Min Frequencies for Sampling Tests, Deleting Item 5 Footnote Re Performance of Sample Tests of Safety Injection Tank T-82B
ML18052B295
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/11/1987
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18052B293 List:
References
NUDOCS 8709170049
Download: ML18052B295 (2)


Text

ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST 8709110049 e~6l>~~5,

PDR ADOC~ O PDR p

- CJ.*

TSP0987-0155-NL04 September 11, 1987

"\\

1 Page

~r 1* *'

TABLE 4.2.l Minimum Frequencies for Sampling Tests

1.

Reactor Coolant Samples

2.

Reactor Coolant Boron

3.

SIRW Tank Water Sample Test Gross Activity Deter-mination Gross Gamma by Fission Product Monitor Isotopic analysis for dose equivalent I-131 concentration Radio chemical for E determination Isotopic analysis for iodine, including I-131, 133, 135.

Chemistry (Cl and 02)

Chemistry (Fl)

Boron Concentration Boron Concentration

4.

Concentrated Boron Concentration Boric Acid Tanks

5.

SI Tanks Boron Concentration 4-14 TSP0987-0155-NL04 Frequency 3 Times/7 days with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> be-tween samples (T avg greater than 500°F).

Continuous when T avg is greater thant 500°F(l).

1/14 days during power operation 1/6 months. (2) a) Once/4 hours, whenever dose equivalent I-131 exceeds 1.0 µCI/gram, and b) One sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> follow-ing a thermal power change exceeding 15%

of rated thermal power within a one hour period.

3 times/7 days with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples (T avg greater than 210°F).

Once/30 days and follow-ing modifications or repair to the primary coolant system involving welding.

Twice/Week Monthly Monthly Monthly FSAR Section Reference None

~

dO J>

None 0..

None None None 6.1. 2 Proposed