ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 PROPOSED TECHNICAL SPECIFICATION CHANGE REQUEST 8709110049 e~6l>~~5,
- CJ.*
TSP0987-0155-NL04 September 11, 1987
"\\
1 Page
~r 1* *'
TABLE 4.2.l Minimum Frequencies for Sampling Tests
- 1.
Reactor Coolant Samples
- 2.
- 3.
SIRW Tank Water Sample Test Gross Activity Deter-mination Gross Gamma by Fission Product Monitor Isotopic analysis for dose equivalent I-131 concentration Radio chemical for E determination Isotopic analysis for iodine, including I-131, 133, 135.
Chemistry (Cl and 02)
Chemistry (Fl)
Boron Concentration Boron Concentration
- 4.
Concentrated Boron Concentration Boric Acid Tanks
- 5.
SI Tanks Boron Concentration 4-14 TSP0987-0155-NL04 Frequency 3 Times/7 days with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> be-tween samples (T avg greater than 500°F).
Continuous when T avg is greater thant 500°F(l).
1/14 days during power operation 1/6 months. (2) a) Once/4 hours, whenever dose equivalent I-131 exceeds 1.0 µCI/gram, and b) One sample between 2 and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> follow-ing a thermal power change exceeding 15%
of rated thermal power within a one hour period.
3 times/7 days with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples (T avg greater than 210°F).
Once/30 days and follow-ing modifications or repair to the primary coolant system involving welding.
Twice/Week Monthly Monthly Monthly FSAR Section Reference None
~
dO J>
None 0..
None None None 6.1. 2 Proposed