{{#Wiki_filter:1 NRR-DMPSPEm Resource From: Regner, Lisa Sent: Thursday, March 01, 2018 10:01 AM To: Coates, Alyson; SCHENK, TIM Cc: Regner, Lisa
{{#Wiki_filter:NRR-DMPSPEm Resource From:                                   Regner, Lisa Sent:                                   Thursday, March 01, 2018 10:01 AM To:                                     Coates, Alyson; SCHENK, TIM Cc:                                     Regner, Lisa


==Subject:==
==Subject:==
Final Request for Additional Information - River Bend CBAC Request (L-2017-LLA-0291)Final Request for Additional Information (EPID L-2017-LLA-0291)
Final Request for Additional Information - River Bend CBAC Request (L-2017-LLA-0291)
On February 16, 2018, the U.S. NRC staff sent River Bend Station (RBS, the licensee) a draft Request for Additional Information (RAI). The RAI questions relate to a license amendment request (LAR) that proposes to increase the allowed outage time and add a new technical specification (TS) for the Control building air conditioning system for RBS.
Final Request for Additional Information (EPID L-2017-LLA-0291)
 
On February 16, 2018, the U.S. NRC staff sent River Bend Station (RBS, the licensee) a draft Request for Additional Information (RAI). The RAI questions relate to a license amendment request (LAR) that proposes to increase the allowed outage time and add a new technical specification (TS) for the Control building air conditioning system for RBS.
On February 27, 2018, the NRC staff held a clarification call with RBS; following the call, the licensee stated that it understood all of the questions and would respond within 30 days of the date of this email. If RBS does not respond by this date, the requested completion date for the LAR may not be met by the NRC.
On February 27, 2018, the NRC staff held a clarification call with RBS; following the call, the licensee stated that it understood all of the questions and would respond within 30 days of the date of this email. If RBS does not respond by this date, the requested completion date for the LAR may not be met by the NRC.
The NRC staff also informed the licensee that a publicly av ailable version of this final RAI would be placed in the NRC's Agencywide Documents Access and Management System (ADAMS).
The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System (ADAMS).
By letter dated September 8, 2017 (ADAMS Accession No. ML17255A463, the Entergy requested an amendment to the Operating License related to a new TS for the control building air conditioning system for RBS. The amendment proposes to add TS 3.7.7 "Control Building Air Conditioning (AC) System," and associated limiting condition for operation and surveillance requirements to allow completion of minor  
By letter dated September 8, 2017 (ADAMS Accession No. ML17255A463, the Entergy requested an amendment to the Operating License related to a new TS for the control building air conditioning system for RBS. The amendment proposes to add TS 3.7.7 Control Building Air Conditioning (AC) System, and associated limiting condition for operation and surveillance requirements to allow completion of minor maintenance activities and reduce the need for plant shutdowns. The NRC staff requires additional information to complete its review of this request as detailed in the attached document.
Lisa M. Regner Senior Project Manager Branch 4, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.gov 301-415-1906 OWFN 9D14 1


maintenance activities and reduce the need for plant s hutdowns. The NRC staff requires additional information to complete its review of this request as detailed in the attached document.
Hearing Identifier:   NRR_DMPS Email Number:         220 Mail Envelope Properties     (SN6PR09MB27201C8E93CBAC59A7121796E5C60)
 
Lisa M. Regner Senior Project Manager Branch 4, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
 
Hearing Identifier: NRR_DMPS Email Number: 220   Mail Envelope Properties   (SN6PR09MB27201C8E93CBAC59A7121796E5C60)


==Subject:==
==Subject:==
Final Request for Additional Information - River Bend CBAC Request (L-2017-LLA-0291) Sent Date:   3/1/2018 10:00:31 AM Received Date: 3/1/2018 10:00:36 AM From:   Regner, Lisa Created By:   Lisa.Regner@nrc.gov Recipients:     "Regner, Lisa" <Lisa.Regner@nrc.gov> Tracking Status: None "Coates, Alyson" <alacey@entergy.com> Tracking Status: None "SCHENK, TIM" <tschenk@entergy.com>
Final Request for Additional Information - River Bend CBAC Request (L-2017-LLA-0291)
Tracking Status: None Post Office:   SN6PR09MB2720.namprd09.prod.outlook.com
Sent Date:             3/1/2018 10:00:31 AM Received Date:         3/1/2018 10:00:36 AM From:                 Regner, Lisa Created By:           Lisa.Regner@nrc.gov Recipients:
 
"Regner, Lisa" <Lisa.Regner@nrc.gov>
Files     Size     Date & Time MESSAGE   1816     3/1/2018 10:00:36 AM
Tracking Status: None "Coates, Alyson" <alacey@entergy.com>
 
Tracking Status: None "SCHENK, TIM" <tschenk@entergy.com>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None Post Office:           SN6PR09MB2720.namprd09.prod.outlook.com Files                         Size                       Date & Time MESSAGE                       1816                       3/1/2018 10:00:36 AM Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Revision as of 18:36, 21 October 2019

Request for Additional Information Concerning New Technical Specification for Control Building Air Conditioning (L-2017-LLA-0291)
ML18060A153
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/01/2018
From: Lisa Regner
Plant Licensing Branch IV
To: Anissa Coates, Schenk T
Entergy Nuclear Operations
References
L-2017-LLA-0291
Download: ML18060A153 (2)


Text

NRR-DMPSPEm Resource From: Regner, Lisa Sent: Thursday, March 01, 2018 10:01 AM To: Coates, Alyson; SCHENK, TIM Cc: Regner, Lisa

Subject:

Final Request for Additional Information - River Bend CBAC Request (L-2017-LLA-0291)

Final Request for Additional Information (EPID L-2017-LLA-0291)

On February 16, 2018, the U.S. NRC staff sent River Bend Station (RBS, the licensee) a draft Request for Additional Information (RAI). The RAI questions relate to a license amendment request (LAR) that proposes to increase the allowed outage time and add a new technical specification (TS) for the Control building air conditioning system for RBS.

On February 27, 2018, the NRC staff held a clarification call with RBS; following the call, the licensee stated that it understood all of the questions and would respond within 30 days of the date of this email. If RBS does not respond by this date, the requested completion date for the LAR may not be met by the NRC.

The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System (ADAMS).

By letter dated September 8, 2017 (ADAMS Accession No. ML17255A463, the Entergy requested an amendment to the Operating License related to a new TS for the control building air conditioning system for RBS. The amendment proposes to add TS 3.7.7 Control Building Air Conditioning (AC) System, and associated limiting condition for operation and surveillance requirements to allow completion of minor maintenance activities and reduce the need for plant shutdowns. The NRC staff requires additional information to complete its review of this request as detailed in the attached document.

Lisa M. Regner Senior Project Manager Branch 4, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Lisa.Regner@NRC.gov 301-415-1906 OWFN 9D14 1

Hearing Identifier: NRR_DMPS Email Number: 220 Mail Envelope Properties (SN6PR09MB27201C8E93CBAC59A7121796E5C60)

Subject:

Final Request for Additional Information - River Bend CBAC Request (L-2017-LLA-0291)

Sent Date: 3/1/2018 10:00:31 AM Received Date: 3/1/2018 10:00:36 AM From: Regner, Lisa Created By: Lisa.Regner@nrc.gov Recipients:

"Regner, Lisa" <Lisa.Regner@nrc.gov>

Tracking Status: None "Coates, Alyson" <alacey@entergy.com>

Tracking Status: None "SCHENK, TIM" <tschenk@entergy.com>

Tracking Status: None Post Office: SN6PR09MB2720.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1816 3/1/2018 10:00:36 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: