ML18096A677: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'At
{{#Wiki_filter:1~--
      'At
* Public Service Electric and Gas Company
* Public Service Electric and Gas Company
* Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President  
* Stanley LaBruna                       Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations
-Nuclear Operations  
                                        - I.                         *- 7 *'~,,- ~AY 0 't 1992 .
-I. 0 't 1992 . NLR-N92045 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
NLR-N92045 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
INSERVICE INSPECTION PROGRAM SECOND TEN-YEAR INTERVAL SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 Pursuant to 10CFR50.55a(q)
INSERVICE INSPECTION PROGRAM SECOND TEN-YEAR INTERVAL SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 Pursuant to 10CFR50.55a(q) (4) (ii), Public Service Electric &
(4) (ii), Public Service Electric & Gas Company (PSE&G) hereby submits a copy of the Salem Unit 2 Inservice Inspection (ISI) Program , Revision o, for the second ten-year inspection interval.
Gas Company (PSE&G) hereby submits a copy of the Salem Unit 2 Inservice Inspection (ISI) Program , Revision o, for the second ten-year inspection interval. The second ten-year ISI interval is to begin upon completion of the current ten-year outage, presently scheduled to conclude May 4, 1992.
The second ten-year ISI interval is to begin upon completion of the current ten-year outage, presently scheduled to conclude May 4, 1992. The revised ISI Program adopts the 1986 Edition of the ASME Boiler and Pressure Vessel Code. Adoption of this more rec<<?nt. edition of the Code involves no conflict with Salem Unit 2 Technical Specification requirements.
The revised ISI Program adopts the 1986 Edition of the ASME Boiler and Pressure Vessel Code. Adoption of this more rec<<?nt.
Requests for relief from certain ASME code requirements are included in the attached submittal.
edition of the Code involves no conflict with Salem Unit 2 Technical Specification requirements.
Some of these requests were included in the Salem Unit 2 ISI Program for the first ten-year interval.
Requests for relief from certain ASME code requirements are included in the attached submittal. Some of these requests were included in the Salem Unit 2 ISI Program for the first ten-year interval. The attached submittal also includes relief requests which are being submitted for the first time.
The attached submittal also includes relief requests which are being submitted for the first time. Should there be any questions with regard to this submittal, please do not hesitate to contact us. Your cooperation in this matter is appreciated.
Should there be any questions with regard to this submittal, please do not hesitate to contact us. Your cooperation in this matter is appreciated.
Sincerely, --
Sincerely,
__ QJ; / 9205080168-9-20504--
          -- ~-n.S2_CtL1 _ QJ;
PDR ADOCK 05000311 G PDR F-----1 I -,f' * * -:./ '/ Document .Control NLR-N92045 All without enc.losure c Mr. J. c. stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector 2 Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Mr. Emanuel J. Mossa New Jersey Department of Labor and Industry PO Box 1503, Labor and Industry Building Trenton, NJ 08625 PSE&G VOLUME D Yh* Enere People SALEM GENERATING STATION UNIT 2 INSERVICE INSPECTION PROGRAM (2ND INSPECTION INTERVAL)
        /       9205080168-9-20504--
LONG TERM PLAN DATE: 03/28/92 REVISION:
PDR         ADOCK 05000311 G                           PDR
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
 
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL PLAN STATUS * *
F-----
1 I - ~ ,f'
                          *
                          -:./
Document .Control
                            '/
De~k        2
* NLR-N92045 All without enc.losure c   Mr. J. c. stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Mr. Emanuel J. Mossa New Jersey Department of Labor and Industry PO Box 1503, Labor and Industry Building Trenton, NJ 08625
 
PSE&G Yh* Enere People VOLUME D SALEM GENERATING STATION UNIT 2 INSERVICE INSPECTION PROGRAM (2ND INSPECTION INTERVAL)
LONG TERM PLAN
 
DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                                 PAGJ;:
REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL-                PLAN STATUS
* COMPONENT COOLING SYSTEM                                     FIRST      SECOND      THIRD  ,I ASME                  PERIOD    PERIOD      PERIOD  I SEC. XI            ----------- ----------- ----------- I


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION
EXAMINATION AREA               CATGY NOE          - - - - - - 0 UT AGE - - - - - - I    INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH      1 2 3      1 2 3      1 2 3      I **CALIBRATION BLOCK**
------------------------------
          ------------------------------ ------- -.. -- - ----------- ----------- ----------- -
24-2-CC-32 720000 2-CCH-59 SUPPORT 16-2-CC-31 720010 2-CCH-60 SUPPORT 16-2-CC-30 720020 2-CCG-61 SUPPORT 720030 2-CCA-62 SUPPORT 720035 2-CCA-62 CFIG NO CC-2-2/1) (FIG NO CC-2-2/1) (FIG NO CC-2-2/1)
24-2-CC-32 CFIG NO CC-2-2/1) 720000  2-CCH-59                      F-A      VT-3 1 -     - -
INTEGRAL ATTACHMENT 16-2-CC-29 (FIG NO cc-2-2/1) 720040 2-CCG-63 SUPPORT -FIRST SECOND ASME PERIOD PERIOD SEC. XI -----------
SUPPORT                        F1.30            2 -
-----------
3 -
CATGY NOE ------0 U T A G E ITEM NO METH 1 2 3 --------.. --------------
4 -
F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 x 3 D-B VT-3 1 -02.20 2 x 3 F-A VT-3 1 -F1.30 2 ------4 ---1 2 3 -----------
16-2-CC-31 (FIG NO CC-2-2/1) 720010  2-CCH-60                      F-A     VT-3   1 -
THIRD PERIOD -----------------1 2 3 -----------, I I I I I -PAGJ;: INSTRUCTIONS
SUPPORT                        F1.30           2 -
**CALIBRATION BLOCK** 
3 -
* *
4 -
* DATE: 03/28/92 REVISION:
16-2-CC-30 (FIG NO CC-2-2/1)
0 SALEM NUCLEAR STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
* 720020  2-CCG-61                      F-A     VT-3   1 -
_____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD SEC. XI -----------
SUPPORT                        F1.30           2 -
-----------
3 -
-----------
4 -
720030  2-CCA-62                      F-A     VT-3   1 - - -
SUPPORT                        F1.30           2 x 3 -
4 -
720035  2-CCA-62                      D-B     VT-3   1 - - -
INTEGRAL ATTACHMENT            02.20           2x 3 -
4 -
16-2-CC-29 (FIG NO cc-2-2/1) 720040  2-CCG-63                      F-A      VT-3    1 -
SUPPORT                        F1.30            2 -
3 -
4 - - -
* DATE: 03/28/92                                 SALEM NUCLEAR PO~ER STATION UNIT 2                             PAGE: 2 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME                 PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 16-2-CC-29 CFIG NO CC-2-2/1) 720050 2-CCS-64 F-A VT-3 1 -SUPPORT F1.30 2 ---3 16-2-CC-28 (FIG NO cc-2-2/1) 720060 2-CCG-65 F-A VT-3 1 ---SUPPORT F1 .30 2 4 -720070 2-CCA-66 F-A VT-3 1 -SUPPORT F1.30 2 x 3 720075 2-CCA-66 0".B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 x 3 12-2-CC-27 (FIG NO CC-2-2/1) 720080 2-CCH-67 F-A VT-3 1 -SUPPORT F1.30 2 --4 2-CC-13 CFIG NO CC-2-2/1) 720090 2-CCG-68 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
16-2-CC-29 CFIG NO CC-2-2/1) 720050 2-CCS-64                       F-A     VT-3 1   -
**CALIBRATION BLOCK** 2 DATE: 03/28/92 REVISION:
SUPPORT                       F1.30         2 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL_
4  -
PLAN STATUS. ____ _ * *
16-2-CC-28 (FIG NO cc-2-2/1) 720060 2-CCG-65                       F-A     VT-3 1 -   - -
SUPPORT                       F1 .30         2 -
3 -
4 -
720070 2-CCA-66                       F-A     VT-3 1   -
SUPPORT                       F1.30         2 x
* 3 -
4  -
720075 2-CCA-66                       0".B     VT-3 1   -
INTEGRAL ATTACHMENT           02.20         2 x 3 -
4  -
12-2-CC-27 (FIG NO CC-2-2/1) 720080 2-CCH-67                       F-A     VT-3   1 -
SUPPORT                       F1.30         2 -
- - -
4 -
12-2-CC-13 CFIG NO CC-2-2/1) 720090 2-CCG-68                       F-A     VT-3 1   -
SUPPORT                       F1.30         2 -
3  -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                                 PAGE: 3 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS._ _ _ __
* COMPONENT COOLING SYSTEM                                    FIRST      SECOND      THIRD    ' I ASME                PERIOD    PERIOD      PERIOD    I SEC. XI          ----------- ----------- -----------  I


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 12-2-CC-12R CFIG NO CC-2-2/1) 720100 2-CCA-7 SUPPORT 720105 2-CCA-7 INTEGRAL ATTACHMENT 12-2-CC-11 CFIG NO CC-2-2/1) 720110 2-CCG-6 SUPPORT 12-2-cc-10 (FIG NO CC-2-2/1) 720120 2-CCA-5 SUPPORT 720125 2-CCA-5 INTEGRAL ATTACHMENT 12-2-CC-9 CFIG NO CC-2-2/1) 720130 2-CCA-3B SUPPORT FIRST SECOND THIRD ' I ASME PERIOD PERIOD PERIOD I SEC. XI -----------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 u T AGE - - - - - -    I INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH      1 2 3      1 2 3      1 2 3        I **CALIBRATION BLOCK**
-----------
12-2-CC-12R CFIG NO CC-2-2/1) 720100 2-CCA-7                         F-A      VT-3  1 -
-----------
SUPPORT                       F1.30          2X -    -
I CATGY NOE ------0 u T A G E ------
3 -
I ITEM NO METH 1 2 3 1 2 3 1 2 3 I F-A VT-3 1 -F1.30 2 X --3 0-B ' VT-3 1 -02.20 2 x 3 F-A VT-3 1 -F1.30 2 4 -F-Al VT-3 1 -F1.30 2 X 3 D-B VT-3 1 -02.20 2 x 3 --F-A VT-3 1 -F1.30 2 4 -PAGE: INSTRUCTIONS
4 -
**CALIBRATION BLOCK** 3 
720105 2-CCA-7                       0-B    ' VT-3 1 -
'\ DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT           02.20          2x 3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL_
12-2-CC-11 CFIG NO CC-2-2/1) 720110 2-CCG-6                       F-A      VT-1 -
_ ____ PLAN STATUS ____ _ * *
SUPPORT                       F1.30          2 -
* 3 -
4 -
12-2-cc-10 (FIG NO CC-2-2/1) 720120 2-CCA-5                        F-Al      VT-3 1 -
SUPPORT                        F1.30           2 X 3 -
4 -
720125  2-CCA-5                        D-B       VT-3 1 -
INTEGRAL ATTACHMENT            02.20           2 x 3 -
4 -  -  -
12-2-CC-9 CFIG NO CC-2-2/1) 720130 2-CCA-3B                        F-A       VT-3 1 -
SUPPORT                        F1.30           2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 4 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 12-2-CC-9 (FIG NO CC-2-2/1) 720135 2-CCA-3B INTEGRAL ATTACHMENT 12-2-CC-7 (FIG NO CC-2-2/1) 720140 2-CCG-2 SUPPORT 720145 2-CCG-2 INTEGRAL ATTACHMENT 720150 2-CCH-1 SUPPORT 720155 2-CCH-1 INTEGRAL ATTACHMENT 12-2-cc-1 (FIG NO CC-2-2/1) . 720160 2-CCH-8 SUPPORT FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI CATGY NDE ITEM NO METH ------0 U T A G E ------1 2 3 1 2 3 1 2 3 D-B VT-3 1 -D2.20 2 4 -F-A VT-3 1 -F1.30 2 x 3 D-B VT-3 1 -D2.20 2 x 3 F-A VT-3 1 -F1 .30 2 x 3 D-B VT-3 1 -D2.40 2 x 3 F-A VT-3 1 -F1 .30 2 4 -----------PAGE: INSTRUCTIONS
EXAMINATION AREA               CATGY NDE        - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 4
12-2-CC-9 (FIG NO CC-2-2/1) 720135 2-CCA-3B                       D-B      VT-3 1 -
* DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT            D2.20          2 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
3 - - -
_ ____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
4 - - -
12-2-CC-7 (FIG NO CC-2-2/1) 720140 2-CCG-2                        F-A     VT-3  1 -
SUPPORT                        F1.30          2 x 3 -
4 -
720145  2-CCG-2                       D-B     VT-3 1 -
INTEGRAL ATTACHMENT            D2.20         2x
* 3 -
4 -
'\
720150 2-CCH-1                        F-A     VT-3 1 -
SUPPORT                        F1 .30         2 x - -
3 -
4 -  - -
720155  2-CCH-1                        D-B     VT-3 1 -
INTEGRAL ATTACHMENT            D2.40          2 x 3 -
4 -
12-2-cc-1 (FIG NO CC-2-2/1)
                .
720160 2-CCH-8                        F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE:
REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-1 CFIG NO CC-2-2/1) 720165 2-CCH-8 INTEGRAL ATTACHMENT 720170 2-CCA-3A SUPPORT 720175 2-CCA-3A INTEGRAL ATTACHMENT D-B VT-3 1 -. 02.40 2 4 -F-A VT-3 1 -F1 .30 2 4 -D-B VT-3 1 -02.20 2 4
12-2-CC-1 CFIG NO CC-2-2/1) 720165 2-CCH-8                       D-B     VT-3 1 -.
* 720180 2-CCS-10 SUPPORT F-A F1.30 VT-3 1 3 4 2-cc-2 (FIG NO CC-2-2/1) 720190 2-CCA-12 F-A VT-3 1 -SUPPORT F1.30 2 x 3 --720195 2-CCA-12 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 x 3 12-2-CC-3 CFIG NO CC-2-2/1) 720200 2-CCG-13 F-A VT-3 1 -SUPPORT F1 .30 2 4 -* PAGE: INSTRUCTIONS
INTEGRAL ATTACHMENT            02.40         2 -
**CALIBRATION BLOCK** 
3 -
* *
4 -
* DATE: 03/28/92 REVISION:
720170 2-CCA-3A                        F-A     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                        F1 .30         2 -
_____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD SEC. XI -----------
3 -
-----------
4 -
-----------
720175  2-CCA-3A                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 -
3 -
4
* 720180 2-CCS-10                       F-A     VT-3  1 -
SUPPORT                        F1.30         2 -
3 4 -
12-2-cc-2 (FIG NO CC-2-2/1) 720190 2-CCA-12                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 x 3 -
4 - - -
720195 2-CCA-12                       D-B     VT-3 1 - - -
INTEGRAL ATTACHMENT           02.20         2 x 3 -
4 -
12-2-CC-3 CFIG NO CC-2-2/1) 720200 2-CCG-13                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 6 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-4 (FIG NO CC-2-2/1) 720210 2-CCG-14 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-CC-5R (FIG NO CC-2-2/1) 720220 2-CCA-15 F-A VT-3 1 -SUPPORT F1 .30 2 x 3 720223 2-CCA-15 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 --4 2-CC-3 (FIG NO CC-2-2/1) 720225 2-CCG-13 F-A VT-3 1 -SUPPORT F1.30 2 x 3 --12-2-CC-6 (FIG NO CC-2-2/1) 720230 2-CCG-55 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-33 (FIG NO CC-2-2/1) 720240 2-CCH-54 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
12-2-CC-4 (FIG NO CC-2-2/1) 720210 2-CCG-14                       F-A     VT-3 1 -
**CALIBRATION BLOCK** 6 
SUPPORT                       F1 .30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
12-2-CC-5R (FIG NO CC-2-2/1) 720220 2-CCA-15                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 x 3 -
4 -
720223 2-CCA-15                       D-B     VT-3 1 - - -
INTEGRAL ATTACHMENT           02.20         2 -
* 3 -  - -
4 -
12-2-CC-3 (FIG NO CC-2-2/1) 720225 2-CCG-13                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 x 3 -
4 -  - -
12-2-CC-6 (FIG NO CC-2-2/1) 720230 2-CCG-55                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
12-2-CC-33 (FIG NO CC-2-2/1) 720240 2-CCH-54                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 7 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-33 (FIG NO cc-2-2/1) 720250 2-CCG-53 F-A VT-3 1 -SUPPORT F1.30 2 4 ---12-2-CC-34 (FIG NO CC-2-2/1) 720260 2-CCA-52 F-A VT-3 1 -SUPPORT F1 .30 2 x --3 720265 2-CCA-52 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 x 3 12-2-CC-35RW (FIG NO CC-2-2/1) 720270 2-CCS-51 F-A VT-3 1 -SUPPORT F1 .30 2 4 -720280 2-CCH-49 F-A VT-3 1 ---SUPPORT F1.30 2 4 2-CC-41 (FIG. NO CC-2-2/1) 720290 2-CCG-709 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 PAGE: INSTRUCTIONS
12-2-CC-33 (FIG NO cc-2-2/1) 720250 2-CCG-53                       F-A     VT-3 1 -
**CALIBRATION BLOCK** 7 
SUPPORT                         F1.30         2 -
----------------------------------
3 -
DATE: 03/28/92 REVISION:
4 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
12-2-CC-34 (FIG NO CC-2-2/1) 720260 2-CCA-52                       F-A     VT-3 1 -
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ SECOND FIRST THIRD *
SUPPORT                         F1 .30         2 x - -
* ASME SEC. XI PERIOD PERIOD PERIOD
3 -
4 -
720265 2-CCA-52                       D-B     VT-3 1 -
INTEGRAL ATTACHMENT             02.20         2 x
* 3 -
4 -
12-2-CC-35RW (FIG NO CC-2-2/1) 720270 2-CCS-51                       F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
720280 2-CCH-49                       F-A     VT-3 1 - - -
SUPPORT                         F1.30         2 -
3 -
4 -
12-2-CC-41 (FIG. NO CC-2-2/1) 720290 2-CCG-709                       F-A     VT-3 1 -
SUPPORT                         F1 .30         2 - - -
3 -
4 -
*
 
                                                                ----
DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 8 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* COMPONENT COOLING SYSTEM                                   FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-41 (FIG NO CC-2-2/1) 720300 2-CCH-704 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-42 (FIG NO CC-2-2/1) 720310 2-CCS-57 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-CC-42 (FIG NO cc-2-2/1) 720320 2-CCH-58 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-54 (FIG NO CC-2-2/1) 720330 2-CCS-44 F-A VT-3 1 -SUPPORT F1.30 2 --4 -720340 2-CCH-214 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-53 (FIG NO CC-2-2/1) 720350 2-CCS-56 F-A VT-3 1 -SUPPORT F1.30 2 x --3 ---4 -PAGE: INSTRUCTIONS
12-2-CC-41 (FIG NO CC-2-2/1) 720300 2-CCH-704                     F-A     VT-3 1 -
**CALIBRATION BLOCK** 8 
SUPPORT                       F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS 1.NSPECTION INTERVAL_
12-2-CC-42 (FIG NO CC-2-2/1) 720310 2-CCS-57                       F-A     VT-3 1 -
_____ .PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME XI FIRST PERIOD SECOND PERIOD THIRD PERIOD EXAMINATION AREA CATGY NOE * -* * --0 U T A G E --
SUPPORT                       F1 .30         2 -
* * --NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 \ 12-2-CC-53 CFIG NO CC-2*2/1) 720355 2-CCS-56 INTEGRAL ATTACHMENT 12-2-CC-36 CFIG NO cc-2-2/1) 720360 2-CCS-50 SUPPORT 720365 2-ccs-50 INTEGRAL ATTACHMENT 12-2-CC-14 (FIG NO CC-2-2/2) 720370 2-CCH-22 SUPPORT 720375 2-CCH-22 INTEGRAL ATTACHMENT 720380 2*CCA-23A SUPPORT D*B VT-3 1 -02.40 2 x 3 F*A VT-3 1
3 -
* F1.30 2 D*B D2.40 4 ---VT-3 1 3 F*A VT-3 1 -F1.30 2 4 -D*B VT-3 1 -02.40 2 4 -F-A VT-3 1 * * -F1.30 2 4 -x x --x x PAGE: INSTRUCTIONS
4 -
**CALIBRATION BLOCK** 9 
16-2-CC-42 (FIG NO cc-2-2/1)
* *
* 720320 2-CCH-58                       F-A     VT-3 1 -
* DATE: 03/28/92 REVISION:
SUPPORT                       F1.30         2 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
3 -
4 -
12-2-CC-54 (FIG NO CC-2-2/1) 720330 2-CCS-44                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -  - -
4 -
720340 2-CCH-214                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
12-2-CC-53 (FIG NO CC-2-2/1) 720350 2-CCS-56                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 x - -
3 - - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 9 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
* COMPONENT COOLING SYSTEM
  ~UMMARY NUMBER EXAMINATION AREA IDENTIFICATION
            \
1.NSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
ASME SEC~ XI CATGY NOE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD
                                                          * - * * - - 0 UT A GE - - * * - -
1 2 3       1 2 3       1 2 3 INSTRUCTIONS
                                                                                            **CALIBRATION BLOCK**
12-2-CC-53 CFIG NO CC-2*2/1) 720355 2-CCS-56                       D*B      VT-3 1 -
INTEGRAL ATTACHMENT             02.40          2 x 3 -
4 -
12-2-CC-36 CFIG NO cc-2-2/1) 720360 2-CCS-50                         F*A      VT-3 1
* SUPPORT                         F1.30          2 -          x 3 -
4 - - -
720365 2-ccs-50                       D*B      VT-3  1 -
INTEGRAL ATTACHMENT             D2.40          2 -          x - -
* 3 -
4 -
12-2-CC-14 (FIG NO CC-2-2/2) 720370 2-CCH-22                         F*A     VT-3 1 -
SUPPORT                        F1.30         2 -           x 3 -
4 -
720375  2-CCH-22                        D*B     VT-3 1 -
INTEGRAL ATTACHMENT            02.40         2 -          x 3 -
4 -
720380 2*CCA-23A                        F-A     VT-3 1 * * -
SUPPORT                        F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 10 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-14 (FIG NO CC-2-2/2) 720385 2-CCA-23A D-8 VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -' 720390 2-CCS-24 F-A VT-3 1 -SUPPORT F1.30 2 --4 2-CC-15 CFIG NO CC-2-2/2) 720400 2-CCA-26 F-A VT-3 1 -SUPPORT F1 .30 2 4 -720405 2-CCA-26 D-8 VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-CC-17 CFIG NO CC-2-2/2) 720410 2-CCG-27 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-18R CFIG NO CC-2-2/2) 720420 2-CCA-28 F-A VT-3 1 -SUPPORT F1.30 2 -x --3 PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** 10 
12-2-CC-14 (FIG NO CC-2-2/2) 720385 2-CCA-23A                     D-8     VT-3 1 -
* *
INTEGRAL ATTACHMENT           02.20         2 -
* DATE: 03/28/92 REVISION:
3 -                      -  '
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
                                                                                        -
_ ____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM  
4 -
720390 2-CCS-24                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 - - -
4 -
12-2-CC-15 CFIG NO CC-2-2/2) 720400 2-CCA-26                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
* 3 -
4 -
720405 2-CCA-26                       D-8     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -
3 -
4 -
12-2-CC-17 CFIG NO CC-2-2/2) 720410 2-CCG-27                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
12-2-CC-18R CFIG NO CC-2-2/2) 720420 2-CCA-28                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -           x - -
3 -
4 -
* DATE: 03/28/92                                   SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 11 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                     FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 12-2-CC-18R (FIG NO CC-2-2/2) 720425 2-CCA-28 INTEGRAL ATTACHMENT 720430 2-CCG-29 SUPPORT 12-2-CC-62 (FIG NO CC-2-2/2) 720440 2-CCH-30 SUPPORT 12-2-CC-61 720450 2-CCA-31 SUPPORT 720455 2-CCA-31 NO CC-2-2&#xa3;22 INTEGRAL ATTACHMENT 720460 2-CCG-32 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH D-B VT-3 02.20 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3
EXAMINATION AREA                 CATGY NOE        - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH    1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
* F1 .30 D-B VT-3 02.20 F-A VT-3 F1.30 FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------1 2 3 1 2 3 1 2 3 1 x 3 ---4 -" 3 1 3 1 x 3 1 x 3 --1 3 PAGE: INSTRUCTIONS
12-2-CC-18R (FIG NO CC-2-2/2) 720425 2-CCA-28                         D-B      VT-3  1 -
**CALIBRATION BLOCK** 11 
INTEGRAL ATTACHMENT             02.20          2 -          x 3 -  - -
* *
4 -
* DATE: 03/28/92 REVISION:
720430 2-CCG-29                         F-A      VT-3  1 -                      -  "  -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                         F1.30          2 -
_____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME FIRST PERIOD SECOND PERICO THIRD PERIOD SEC. XI ----------------------
3 -
-----------
4 -
12-2-CC-62 (FIG NO CC-2-2/2) 720440 2-CCH-30                         F-A      VT-3  1 -
SUPPORT                         F1.30          2 -
* 3 -
4 -
12-2-CC-61 ~FIG  NO CC-2-2&#xa3;22 720450 2-CCA-31                          F-A     VT-3 1 -
SUPPORT
* F1 .30         2 -           x 3 -
4 -
720455  2-CCA-31                        D-B     VT-3 1 -
INTEGRAL ATTACHMENT              02.20         2 -           x 3 -
4 - - -
720460 2-CCG-32                          F-A     VT-3 1 -
SUPPORT                          F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 12 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME               PERIOD     PERICO       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-60 (FIG NO cc-2-2/2) 720470 2-CCG-33 SUPPORT 12-2-CC-59 CFIG NO cc-2-2/2) 72048,0 2-CCS-34 SUPPORT 12-2-CC-58 CFIG NO CC-2-2/2) 720490 2-CCG-35 SUPPORT 720500 2-CCA-36 SUPPORT 720505 2-CCA-36 INTEGRAL ATTACHMENT 12-2-CC-57 CFIG NO CC-2-2/2) 720510 2-CCH-37 SUPPORT F-A VT-3 1 -F1.30* 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -D-B VT-3 1 -02.20 2 4 -F-A VT-3 1 -F1.30 2 --4 ---x x PAGE: INSTRUCTIONS
12-2-CC-60 (FIG NO cc-2-2/2) 720470 2-CCG-33                       F-A      VT-3  1 -
**CALIBRATION BLOCK** 12 
SUPPORT                       F1.30*        2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM  
12-2-CC-59 CFIG NO cc-2-2/2) 72048,0 2-CCS-34                       F-A      VT-3  1 -
SUPPORT                       F1 .30        2 -
3 -
4 -
12-2-CC-58 CFIG NO CC-2-2/2)
* 720490  2-CCG-35                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
720500 2-CCA-36                        F-A     VT-3 1 -
SUPPORT                        F1.30         2 -           x 3 -
4 -
720505  2-CCA-36                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 -          x 3 -  - -
4 -
12-2-CC-57 CFIG NO CC-2-2/2) 720510 2-CCH-37                        F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 - -   -
* DATE: 03/28/92                                 SALEM NUCLEAR PO~ER STATION UNIT 2                             PAGE: 13 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 12-2-CC-56 (FIG NO cc-2-2/2) 720520 2-CCS-38 SUPPORT 720525 2-CCS-38 INTEGRAL ATTACHMENT 12-2-CC-48 (FIG NO CC-2-2/2) 720530 2-CCS-39 SUPPORT 720535 2-CCS-39 INTEGRAL ATTACHMENT 16-2-CC-49 (FIG NO CC-2-2/2) 720540 2-CCH-45 SUPPORT 16-2-CC-51 (FIG NO CC-2-2/2) 720550 2-CCH-46 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 D-B VT-3 02.40 F-A VT-3 F1.30 D-B VT-3 02.40 F-A VT-3 F1 .30 F-A VT-3 F1.30 FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH      123        123        123        **CALIBRATION BLOCK**
123 123 123 1 x --3 1 x --3 --1 3 1 3 1 3 1 3 4 ---PAGE: INSTRUCTIONS
12-2-CC-56 (FIG NO cc-2-2/2) 720520 2-CCS-38                       F-A      VT-3  1  -
**CALIBRATION BLOCK** 13 
SUPPORT                       F1.30          2  -          x  - -
* *
3  -
* DATE: 03/28/92 REVISION:
4  -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM  
720525 2-CCS-38                       D-B      VT-3  1  -
INTEGRAL ATTACHMENT           02.40          2  -          x  - -
3  -
4  -  - -
12-2-CC-48 (FIG NO CC-2-2/2) 720530 2-CCS-39                       F-A      VT-3  1 -
SUPPORT                       F1.30          2  -
* 3  -
4  -
720535 2-CCS-39                       D-B      VT-3  1 -
INTEGRAL ATTACHMENT           02.40          2 -
3 -
4 -
16-2-CC-49 (FIG NO CC-2-2/2) 720540 2-CCH-45                       F-A      VT-3  1 -
SUPPORT                       F1 .30          2 -
3  -
4  -
16-2-CC-51 (FIG NO CC-2-2/2) 720550 2-CCH-46                       F-A     VT-3   1 -
SUPPORT                        F1.30           2 -
3 4 -   - -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 14 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 16-2-CC-51 CFIG NO CC-2-2/2) 720555 2-CCH-46 INTEGRAL ATTACHMENT 16-2-CC-43 (FIG NO CC-2-2/2) 720560 2-CCH-703 . SUPPORT 720570 2-CCG-41 SUPPORT 720575 2-CCG-41 INTEGRAL ATTACHMENT 16-2-CC-45 CFIG NO CC-2-2/2) 720580 2-CCS-40 SUPPORT 720585 2-CCS-40 INTEGRAL ATTACHMENT ASME SEC. XI CATGY NOE ITEM NO METH D-B VT-3 02.40 F-A VT-3 F1.30 F-A VT-3 F1.30 D-B VT-3 02.20 \ F-A VT-3 F1.30 D-B VT-3 D2.40 FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    123        123        123        **CALIBRATION BLOCK**
123 123 123 1 ---2 4 2 4 2 -x 3 1 x 3 1 x 3 1 x 3 PAGE: INSTRUCTIONS
16-2-CC-51 CFIG NO CC-2-2/2) 720555 2-CCH-46                       D-B      VT-3  1 -  - -
**CALIBRATION BLOCK** 14 
INTEGRAL ATTACHMENT           02.40          2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FlRST SECOND THIRD PERIOD PERIOD PERIOD  
16-2-CC-43 (FIG NO CC-2-2/2) 720560 2-CCH-703 .                     F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -
4 -
720570 2-CCG-41                       F-A      VT-3  1 -
SUPPORT                       F1.30          2 -          x
* 3 -
4 -
720575 2-CCG-41                       D-B      VT-3  1 -
INTEGRAL ATTACHMENT           02.20          2 -          x 3 -
                                              \        4 -
16-2-CC-45 CFIG NO CC-2-2/2) 720580 2-CCS-40                       F-A     VT-3 1 -
SUPPORT                        F1.30         2 -           x 3 -
4 -
720585  2-CCS-40                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT            D2.40         2 -           x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 15 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                   FlRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-38 (FIG NO cc-2-2/2) 720590 2-CCS-48 F-A VT-3 1 -SUPPORT F1.30 2 -x --3 ---4 -720595 2-CCS-48 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.40 2 -x --3 --12-2-CC-39 CFIG NO CC-2-2/2) 720600 2-CCH-47 F-A VT-3 1 ---SUPPORT F1.30 2 4 2-CC-39 CFIG NO CC-2-2/2) 720610 2-CCH-42 F-A VT-3 1 -SUPPORT F1.30 2 4 ---720615 2-CCH-702 F-A VT-3 1 -SUPPORT F1.30 2 ---3 16-2-CC-40 CFIG NO CC-2-2/2) 720620 2-CCH-43 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
12-2-CC-38 (FIG NO cc-2-2/2) 720590 2-CCS-48                       F-A     VT-3 1 -
**CALIBRATION BLOCK** 15 
SUPPORT                       F1.30         2 -           x - -
* *
3 - - -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD SEC. XI -----------
720595 2-CCS-48                       D-B     VT-3 1 -
-----------
INTEGRAL ATTACHMENT           02.40         2 -           x - -
-----------
3 -
4 -  - -
12-2-CC-39 CFIG NO CC-2-2/2) 720600 2-CCH-47                       F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 -
* 3 -
4 -
16-2-CC-39 CFIG NO CC-2-2/2) 720610 2-CCH-42                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 - - -
720615 2-CCH-702                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 - - -
3 -
4 -
16-2-CC-40 CFIG NO CC-2-2/2) 720620 2-CCH-43                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 16 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME                 PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 UT AGE --*----NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - -*- - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
------------------------------
          ------------------------------ ------- ---- - ----------- ----------- ----------- -
-----------------------
16-2-CC-68 (FIG NO CC-2-2/2) 720630 2-CCH-69                       F-A     VT-3 1 - -   -
-----------
SUPPORT                       F1.30         2 -   -   -   x - -
----------- 2-CC-68 (FIG NO CC-2-2/2) 720630 2-CCH-69 F-A VT-3 1 ---SUPPORT F1.30 2 ---x --3 ---4 ---720635 2-CCH-69 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.40 2 ---XI --3 ---4 ---16-2-CC-67 (FIG NO cc-2-2/2) 720640 2-CCH-70 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---720650 2-CCG-71 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---16-2-CC-66 (FIG NO CC-2-2/2) 720660 2-CCG-72 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---720670 2-CCS-73 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---PAGE: INSTRUCTIONS
3 -   -   -
**CALIBRATION BLOCK** 16 
4 -   -   -
* *
720635 2-CCH-69                       D-B     VT-3   1 - -   -
* DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT           02.40         2 -   -   -   XI -   -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ .PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD  
3 -   -   -
4 - -   -
16-2-CC-67 (FIG NO cc-2-2/2) 720640 2-CCH-70                         F-A     VT-3   1 - -   -
SUPPORT                         F1.30         2 - -   -
3 - -     -
* 720650 2-CCG-71 SUPPORT F-A F1.30 VT-3 4 - -
1 - -
2 -
3 -
                                                              -
                                                              -
                                                                  -
                                                                  -
                                                                  -
                                                                  -
                                                                  -
4 - -
16-2-CC-66 (FIG NO CC-2-2/2) 720660 2-CCG-72                         F-A     VT-3 1 - -   -
SUPPORT                         F1.30         2 - -   -
3 - -   -
4 - -   -
720670 2-CCS-73                         F-A     VT-3 1 - -   -
SUPPORT                         F1.30         2 - -   -
3 - -   -
4 - -   -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 17 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       ~ERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3*    **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3
16-2-CC-65 CFIG NO CC-2-2/2) 720680 2-CCG-74                       F-A     VT-3 1 -
* 16-2-CC-65 CFIG NO CC-2-2/2) 720680 2-CCG-74 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 16-2-CC-64 (FIG NO CC-2-2/2) 720690 2-CCG-75 F-A VT-3 1 -SUPPORT F1.30 2 4 -720700 2-CCA-76 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 --720705 2-CCA-76 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x 3 16-2-CC-63 CFIG NO CC-2-2/2) 720710 2-CCH-77 F-A VT-3 1 -SUPPORT F1.30 2 4 ---12-2-CC-26 (FIG NO CC-2-2/2) 720720 2-CCG-78 F-A VT-3 1 -SUPPORT F1.30 2 --4 -PAGE: INSTRUCTIONS
SUPPORT                       F1 .30         2 - - -
**CALIBRATION BLOCK** 17 
3 -
* *
4 -
* DATE: 03/28/92 REVISION:
16-2-CC-64 (FIG NO CC-2-2/2) 720690 2-CCG-75                       F-A     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                       F1.30         2 -
_____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI  
3 -
4 -
720700 2-CCA-76                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -                       x
* 3 -
4 -  - -
720705 2-CCA-76                       D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -                       x 3 -
4 -
16-2-CC-63 CFIG NO CC-2-2/2) 720710 2-CCH-77                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 - - -
12-2-CC-26 (FIG NO CC-2-2/2) 720720 2-CCG-78                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 - - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 18 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE NUMBER IDENTIFICATION ITEM NO METH 12-2-CC-25R (FIG NO CC-2-2/2) 720730 2-CCA-21 F-A VT-3 SUPPORT F1.30 720735 2-CCA-21 D-B VT-3 INTEGRAL ATTACHMENT 02.20 12-2-CC-24 (FIG NO CC-2-2/2) 720740 2-CCG-20 F-A VT-3 SUPPORT F1 .30 12-2-CC-23 (FIG NO CC-2-2/2) 720750 2-CCA-19 F-A VT-3 SUPPORT F1 .30 720755 2-CCA-19 D-B VT-3 INTEGRAL ATTACHMENT 02.20 12-2-CC-22 (FIG NO cc-2-2/2) 720760 2-CCS-18 F-A VT-3 SUPPORT F1.30 FIRST SECOND THIRD PERIOD PERIOD PERIOD -----0 U T A G E 123 123 1 2 3 1 x 3 1 ---2 -x 3 1 3 ---4 2 4 --2 4 --2 4 -PAGE: INSTRUCT IONS **CALIBRATION BLOCK** 18 DATE: 03/28/92 REVISION:
EXAMINATION AREA               CATGY NOE       - ~ - - - - 0 U T A G E          INSTRUCT IONS NUMBER IDENTIFICATION                 ITEM NO METH     123        123        1 2 3    **CALIBRATION BLOCK**
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
12-2-CC-25R (FIG NO CC-2-2/2) 720730 2-CCA-21                       F-A     VT-3 1  -
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL_
SUPPORT                       F1.30         2 -                      x 3 -
_____ PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
4 -
* ASME SEC. XI PERIOD PERIOD
720735 2-CCA-21                       D-B     VT-3 1 -  - -
INTEGRAL ATTACHMENT           02.20         2 -                      x 3 -
4 -
12-2-CC-24 (FIG NO CC-2-2/2) 720740 2-CCG-20                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
* 3 -  - -
4 -
12-2-CC-23 (FIG NO CC-2-2/2) 720750 2-CCA-19                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
720755 2-CCA-19                       D-B     VT-3 1 -  - -
INTEGRAL ATTACHMENT           02.20         2 -
3 -
4 -
12-2-CC-22 (FIG NO cc-2-2/2) 720760 2-CCS-18                       F-A     VT-3 1 -  - -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 19 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-22 (FIG NO CC-2-2/2) 720770 2-CCA-23B SUPPORT 720775 2-CCA-23B INTEGRAL ATTACHMENT 12-2-cc-20 (FIG NO CC-2-2/2) 720780 2-CCG-17 SUPPORT 720785 2-CCG-17 INTEGRAL ATTACHMENT 720790 2-CCH-16 SUPPORT 720795 2-CCH-16 INTEGRAL ATTACHMENT 8-2-CC-303 (FIG NO CC-2-2/3) 720800 2A-CCA-260 SUPPORT F-A VT-3 1 -F1.30 2 4 -D-B VT-3 1 -02.20 2 4 -F-A VT-3 1 -F1 .30 2 -3 4 -D-B VT-3 1 -02.20 2 4 -F-A VT-3 1 -F1 .30 2 4 -D-B VT-3 1 -02.40 2 4 -F-A VT-3 1 -F1.30 2 4 ---x x x x PAGE: INSTRUCTIONS
12-2-CC-22 (FIG NO CC-2-2/2) 720770 2-CCA-23B                     F-A      VT-3  1 -
**CALIBRATION BLOCK** 19 .n ( !
SUPPORT                        F1.30          2 -
DATE: 03/28/92 SALEM NUCLEAR STATION UNIT 2 PAGE: 20 REVISION:
3 -
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* INSPECTION INTERVAL -PLAN STATUS COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
720775  2-CCA-23B                      D-B      VT-3 1  -
-----------
INTEGRAL ATTACHMENT           02.20          2 -
-----------
3 -
4 -
12-2-cc-20 (FIG NO CC-2-2/2) 720780  2-CCG-17                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -  - -                  x
* 3 4 -                                                               .n 720785  2-CCG-17                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 -                      x 3 -
4 -
720790  2-CCH-16                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -                       x 3 -
4 -
720795  2-CCH-16                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.40          2 -                       x 3 -
4 -
8-2-CC-303 (FIG NO CC-2-2/3) 720800  2A-CCA-260                    F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
*                                                                                                                       (   !
 
DATE: 03/28/92                                 SALEM NUCLEAR PO~ER STATION UNIT 2                             PAGE:   20 REVISION:     0                             INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL                 PLAN STATUS COMPONENT COOLING SYSTEM
                                                      -      FIRST     SECOND       THIRD ASME                 PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------I NSTRUCTI CNS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT A GE - - - - - -   I NSTRUCTI CNS NUMBER !DENT! Fl CATION               ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
**CALIBRATION BLOCK** -------------------------------------
  ------- ------------------------------ ------- ---- - ----------- ----------- ----------- - ------------------------------
---------------------------------------------
8-2-CC-304 (FIG NO CC-2-2/3) 720810 2A-CCG-488                     F-A     VT-3   1 -
-------------------------------
SUPPORT                       F1 .30         2 -
8-2-CC-304 (FIG NO CC-2-2/3) 720810 2A-CCG-488 F-A VT-3 1 -SUPPORT F1 .30 2 --4 -720820 2A-CCG-489 F-A VT-3 1 -SUPPORT F1.30 2 --4 ---8-2-CC-305 (FIG NO CC-2-2/3) 720830 2A-CCH-537 F-A VT-3 1 -SUPPORT F1 .30 2
3 -   - -
* 4 2-CC-314 (FIG NO CC-2-2/3) 720840 2A-CCH-536 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-78 (FIG NO CC-2-2/3) 720850 2-CCA-88 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 720855 2-CCA-88 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x 3 *
4 -
* * * ( DATE: 03/28/92 REVISION:
720820 2A-CCG-489                     F-A     VT-3   1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ COMPONENT COOLING SYSTEM  
SUPPORT                       F1.30           2 -
3 -   - -
4 -   - -
8-2-CC-305 (FIG NO CC-2-2/3) 720830 2A-CCH-537                     F-A     VT-3   1 -
SUPPORT                       F1 .30         2 -
* 3 -
4 -
8-2-CC-314 (FIG NO CC-2-2/3) 720840 2A-CCH-536                     F-A     VT-3 1   -
SUPPORT                       F1.30           2 -
3 -
4 -
12-2-CC-78 (FIG NO CC-2-2/3) 720850 2-CCA-88                       F-A     VT-3   1 -
SUPPORT                       F1.30         2 -                       x 3 -
4 -
720855 2-CCA-88                       D-B     VT-3   1 -
INTEGRAL ATTACHMENT           02.20         2 -                       x 3 -
4 -
*
 
(
DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 21 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST    SECOND      THIRD ASME
* PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION  
EXAMINATION AREA               CATGY NOE        * - - - * - 0 UT AGE - - - - - -    INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
------------------------------
          ------------------------------ ------- ---- - ----------- ----------- ----------- -
12-2-CC-78 (FIG NO CC-2-2/3) 720860 2-CCG-89 SUPPORT 12*2-CC-79 (FIG NO cc-2-2/3) 720870 2*CCG-90 SUPPORT 8*2-CC-79 (FIG NO CC-2-2/3) 720880 2-CCS-91 SUPPORT 8-2-CC-80 (FIG NO CC-2-2/3) 720890 2-CCH-92 SUPPORT 8-2-CC-81 (FIG NO CC-2-2/3) 720900 2-CCA-93 SUPPORT 720905 2-CCA*93 INTEGRAL ATTACHMENT ASME SEC. XI CATGY NOE ITEM NO METH -----------F-A VT-3 F1.30 F-A VT*3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 D-B VT-3 02.20 FIRST
12-2-CC-78 (FIG NO CC-2-2/3) 720860 2-CCG-89                       F-A      VT-3  1 -
* PERIOD SECOND PERIOD THIRD PERIOD * ---* -0 U T A G E ------1 2 3 1 2 3 1 2 3
SUPPORT                       F1.30          2 -
------------
3 -
-----------
4 -
-----------
12*2-CC-79 (FIG NO cc-2-2/3) 720870 2*CCG-90                       F-A      VT*3  1 .
1 3 1 . 2 . --3 . 4 . 1 3 1 3 1 x 3 --1 --x --3 -PAGE: INSTRUCTIONS
SUPPORT                       F1.30          2 .  - -
**CALIBRATION BLOCK** 21 
3 .
* *
4 .
* DATE: 03/28/92 REVISION:
8*2-CC-79 (FIG NO CC-2-2/3)
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_  
* 720880 2-CCS-91                       F-A      VT-3  1 -
-----'PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                       F1.30          2 -
3 -
4 -
8-2-CC-80 (FIG NO CC-2-2/3) 720890 2-CCH-92                       F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -
4 -
8-2-CC-81 (FIG NO CC-2-2/3) 720900 2-CCA-93                       F-A     VT-3 1 -
SUPPORT                        F1.30         2 -                       x 3 -
4 -   - -
720905  2-CCA*93                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 -   - -                 x - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 22 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ -----'PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-CC-81 (FIG NO CC-2-2/3) 720910 2-CCH-94 F-A VT-3 1 -SUPPORT F1 .30 2 x 3 8-2-CC-82R (FIG NO cc-2-2/3) 720920 2-CCG-95 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 720925 2-CCG-95 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x --3 ---4 2-CC-130 (FIG NO CC-2-2/3) 720930 2-CCH-128 F-A VT-3 1 -SUPPORT F1 .30 2 --4 -720940 2-CCG-130 F-A VT-3 1 -SUPPORT F1.30 2 ---3 6-2-CC-315 CFIG NO CC-2-2/3) 720950 2A-CCA-284 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
8-2-CC-81 (FIG NO CC-2-2/3) 720910 2-CCH-94                       F-A     VT-3 1 -
**CALIBRATION BLOCK** 22 
SUPPORT                       F1 .30         2 x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
8-2-CC-82R (FIG NO cc-2-2/3) 720920 2-CCG-95                       F-A     VT-3 1 -
0 COMPONENT COOLING SYSTEM SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                       F1.30         2 -                       x 3 -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI _____ ............  
4 -
......................  
720925 2-CCG-95                       D-B     VT-3 1 -
-----------
INTEGRAL ATTACHMENT           02.20         2 -                       x - -
* 3 - - -
4 -
6-2-CC-130 (FIG NO CC-2-2/3) 720930 2-CCH-128                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -  - -
4 -
720940 2-CCG-130                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 - - -
3 -
4 -
6-2-CC-315 CFIG NO CC-2-2/3) 720950 2A-CCA-284                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                                                 PAGE: 23 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_                     PLAN STATUS COMPONENT COOLING SYSTEM                                  FIRST               SECOND               THIRD ASME                PERIOD             PERIOD               PERIOD
_____ ............ ......................
SEC. XI                                                    -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 u T A G E ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u TAGE - - - - - -                       INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3             1 2 3                 1 2 3         **CALIBRATION BLOCK**
------------
                                                        - ----------- ----------- -----------                   -
-----------
6-2-CC-315 (FIG NO CC-2-2/3) 720955 2A-CCA-284                     0-B     VT-3 1 -
-----------
INTEGRAL ATTACHMENT           02.20         2 -
6-2-CC-315 (FIG NO CC-2-2/3) 720955 2A-CCA-284 0-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 --4 2-CC-316 (FIG NO CC-2-2/3) 720960 2A-CCG-458 F-A VT-3 1 -SUPPORT F1 .30 2 3 6-2-CC-317 (FIG NO CC-2-2/3) 720970 2A-CCA-459 F-A VT-3 1 -SUPPORT F1.30 2 4 -720975 2A-CCA-459 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-CC-69 (FIG NO CC-2-2/3) 720980 2-CCH-79 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-70 (FIG NO CC-2-2/3) 720990 2-CCH-80 F-A VT-3 1 -SUPPORT F1.30 2 4 --PAGE: INSTRUCTIONS
3 -  - -
**CALIBRATION BLOCK** 23 DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 24 REVISION:
4 -
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
6-2-CC-316 (FIG NO CC-2-2/3) 720960 2A-CCG-458                     F-A     VT-3 1 -
* INSPECTION INTERVAL -PLAN STATUS COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
SUPPORT                       F1 .30         2 3 -
-----------
4 -
-----------
6-2-CC-317 (FIG NO CC-2-2/3)
* 720970 2A-CCA-459                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
720975 2A-CCA-459                     D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -
3 -
4 -
16-2-CC-69 (FIG NO CC-2-2/3) 720980 2-CCH-79                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
16-2-CC-70 (FIG NO CC-2-2/3) 720990 2-CCH-80                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE:   24 REVISION:     0                             INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
* COMPONENT COOLING SYSTEM


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------OUTAGE ------INSTRUCTIONS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK** ------------------------------
EXAMINATION AREA NUMBER !DENT! Fl CATION INSPECTION INTERVAL ASME SEC. XI CATGY NOE ITEM NO METH
-----------------------
                                                      -      FIRST PERIOD
-----------
                                                          ------
-----------
1  2 3 PLAN STATUS SECOND PERIOD THIRD PERIOD
-------------------------------
                                                          ----------- ----------- -----------
16-2-CC-71 (FIG NO CC-2-2/3) 721000 2-CCH-81 F-A VT-3 1 -SUPPORT F1 .30 2 4 ---721010 2-CCSN-100 F-A VT-3 1 -SUPPORT F1 .30 2 4 ---721020 2-CCH-706 F-A VT-3 SUPPORT F1 .30 2 4 -* 16-2-CC-72 (FIG NO CC-2-2/3) 721030 2"CCH-82 F-A VT-3 1 -SUPPORT F1.30 2 ---3 12-2-CC-73 (FIG NO CC-2-2/3) 721040 2-CCH-83 F-A VT-3 1 -SUPPORT F1.30 2 --4 2-CC-75 (FIG NO CC-2-2/3) 721050 2-CCA-84 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 ---4 -
OUTAGE - - - - - -
* *
1 2 3       1 2 3 INSTRUCTIONS
* DATE: 03/28/92 REVISION:
                                                                                              **CALIBRATION BLOCK**
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
          ------------------------------ ------- ---- - ----------- ----------- ----------- - ------------------------------
_____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
16-2-CC-71 (FIG NO CC-2-2/3) 721000 2-CCH-81                       F-A     VT-3   1 -
SUPPORT                       F1 .30         2 -
3 -
4 -   - -
721010 2-CCSN-100                     F-A     VT-3   1 -
SUPPORT                       F1 .30         2 -
3 -
4 - - -
721020 2-CCH-706                     F-A     VT-3 SUPPORT                       F1 .30         2 -
3 -
4 -
* 16-2-CC-72 (FIG NO CC-2-2/3) 721030 2"CCH-82 SUPPORT F-A F1.30 VT-3   1 -
2 -
3 -
4 -
                                                              - -
12-2-CC-73 (FIG NO CC-2-2/3) 721040 2-CCH-83                       F-A     VT-3   1 -
SUPPORT                       F1.30           2 -
3 - - -
4 -
12-2-CC-75 (FIG NO CC-2-2/3) 721050 2-CCA-84                       F-A     VT-3   1 -
SUPPORT                         F1.30         2 -                       x 3 - - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 25 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-CC-75 (FIG NO CC-2-2/3) 721055 2-CCA-84 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x 3 ---4 -721060 2-CCH-85 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-76 (FIG NO CC-2-2/3) 721070 2-CCG-86 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-77 (FIG NO CC-2-2/3) 721080 2-CCG-87 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-135 (FIG NO CC-2-2/3) 721090 2-CCH-121 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-136 (FIG NO CC-2-2/3) 721100 2-CCG-123 F-A VT-3 1 -SUPPORT F1.30 2 4 ---PAGE: INSTRUCTIONS
12-2-CC-75 (FIG NO CC-2-2/3) 721055 2-CCA-84                       D-B     VT-3 1 -
**CALIBRATION BLOCK** 25 
INTEGRAL ATTACHMENT           02.20         2 -                       x 3 - - -
* *
4 -
* DATE: 03/28/92 REVISION:
721060 2-CCH-85                       F-A     VT-3 1 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS-INSPECTION INTERVAL_
SUPPORT                       F1.30         2 -
PLAN STATUS COMPONENT COOLING SYSTEM  
3 -
4 -
12-2-CC-76 (FIG NO CC-2-2/3) 721070 2-CCG-86                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 -
12-2-CC-77 (FIG NO CC-2-2/3) 721080 2-CCG-87                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-CC-135 (FIG NO CC-2-2/3) 721090 2-CCH-121                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-CC-136 (FIG NO CC-2-2/3) 721100 2-CCG-123                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 - - -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                                         PAGE: 26 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS-INSPECTION INTERVAL_                         PLAN STATUS COMPONENT COOLING SYSTEM                                       FIRST              SECOND      THIRD ASME                  PERIOD            PERIOD      PERIOD SEC. XI          ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 6-2-CC-136 NO CC-2-2[32 721110 2-CCA-124 SUPPORT 721115 2-CCA-124 INTEGRAL ATTACHMENT 6-2-CC-137 (FIG NO CC-2-2[3) 721120 2-CCG-125 SUPPORT 721130 2-CCS-126 SUPPORT 6-2-CC-138 (FIG NO CC-2-2[3) 721140 2P-CCA-368 SUPPORT ANCHOR 721145 2P-CCA-368 INTEGRAL ATTACHMENT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 D-B VT-3 02.20 F-A VT-3 F1 .30 F-A VT-3 F1 .30 F-A VT-3 F1.30 D-B VT-3 02.20 FIRST PERIOD -----------------1 2 3 -...................... 1 3 1 3 1 3 1 3 1 3 1 3 ---4 -SECOND THIRD PERIOD PERIOD ----------------------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 u TAGE - - - - - -                INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH    1 2 3                  1 2 3      1 2 3        **CALIBRATION BLOCK**
0 u T A G E ------1 2 3 1 2 3 ----------------------
                                                        - ...................... ----------- ----------- -
x x -PAGE: INSTRUCTIONS
6-2-CC-136 ~FIG  NO CC-2-2[32 721110 2-CCA-124                       F-A      VT-3  1 -
**CALIBRATION BLOCK** 26 DATE: 03/28/92 REVISION:
SUPPORT                         F1.30          2 -                                  x 3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL_
721115 2-CCA-124                       D-B      VT-3  1 -
_____ PLAN STATUS ____ _ SECOND FIRST THIRD *
INTEGRAL ATTACHMENT             02.20          2 -                                  x 3 -
* ASME SEC. XI PERIOD PERIOD PERIOD
4 -
6-2-CC-137 (FIG NO CC-2-2[3) 721120 2-CCG-125                       F-A      VT-3  1 -
SUPPORT                         F1 .30        2 -
* 3 -
4 -
721130 2-CCS-126                       F-A      VT-3  1 -
SUPPORT                         F1 .30        2 -
3 -
4 -
6-2-CC-138 (FIG NO CC-2-2[3) 721140 2P-CCA-368                     F-A     VT-3 1 -
SUPPORT ANCHOR                  F1.30         2 -
3 -
4 -
721145  2P-CCA-368                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 -
3 -     - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 27 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* COMPONENT COOLING SYSTEM                                   FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 16-2-CC-99 (FIG NO CC-2-2/5) 721150 2-CCG-103 F-A VT-3 1 -SUPPORT F1.30 2 4 -721160 2-CCS-104 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-98 (FIG NO CC-2-2/5) 721170 2-CCS-105 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 721180 2-CCH-106 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-CC-131 (FIG NO cc-2-2/5) 721190 2-CCH-127 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-132 (FIG NO CC-2-2/5) 721200 2-CCG-129 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** 27 
16-2-CC-99 (FIG NO CC-2-2/5) 721150 2-CCG-103                     F-A     VT-3 1 -
* *
SUPPORT                       F1.30         2 -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
4 -
721160 2-CCS-104                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
8-2-CC-98 (FIG NO CC-2-2/5) 721170 2-CCS-105                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 - - -
* 3 -
4 -
721180 2-CCH-106                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
6-2-CC-131 (FIG NO cc-2-2/5) 721190 2-CCH-127                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-CC-132 (FIG NO CC-2-2/5) 721200 2-CCG-129                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 28 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   INSTRUCT IONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-CC-325 (FIG NO CC-2-2/5) 721210 2A-CCA-275 F-A VT-3 1 -SUPPORT F1.30 2 4 -721215 2A-CCA-275 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-CC-324 (FIG NO CC-2-2/5) 721220 2A-CCG-457 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-324A (FIG NO CC-2-2/5) 721230 2A-CCG-460 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-323 (FIG NO cc-2-2/5) 721240 2A-CCS-461 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-CC-321A (FIG NO CC-2-2/5) 721250 2A-CCA-462 F-A VT-3 1 -SUPPORT F1.30 2 --4 -PAGE: INSTRUCT IONS **CALIBRATION BLOCK** 28 DATE: 03/28/92 REVISION:
6-2-CC-325 (FIG NO CC-2-2/5) 721210 2A-CCA-275                     F-A     VT-3 1 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                       F1.30         2 -
* COMPONENT COOL I NG SYSTEM INSPECTION INTERVAL_
3 -
_____ PLAN STATUS. ____ _ * *
4 -
721215 2A-CCA-275                     D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -
3 -
4 -
6-2-CC-324 (FIG NO CC-2-2/5) 721220 2A-CCG-457                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 -
6-2-CC-324A (FIG NO CC-2-2/5) 721230 2A-CCG-460                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-CC-323 (FIG NO cc-2-2/5) 721240 2A-CCS-461                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
6-2-CC-321A (FIG NO CC-2-2/5) 721250 2A-CCA-462                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -  - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 29 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* COMPONENT COOL I NG SYSTEM                                   FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 6-2-CC-142 (FIG NO CC-2-2/5) 721260 2P-CCA-367 SUPPORT 721265 2P-CCA-367 INTEGRAL ATTACHMENT 6-2-CC-141 (FIG NO CC-2-2/5) 721270 . 2-ccs-120 SUPPORT 721280 2-CCG-119 SUPPORT \ 6-2-CC-140 (FIG NO CC-2-2/5) 721290 2-CCA-118 SUPPORT 721295 2-CCA-118 INTEGRAL ATTACHMENT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 D-B VT-3 02.20 F-A VT-3 F1.30 F-A VT-3 F1 .30 F-A VT-3 F1.30 D-B VT-3 02.20 FIRST SECOND PERIOD PERIOD THIRD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH      123        123        123      **CALIBRATION BLOCK**
123 123 123 1 3 1 3 1 3 1 3 1 -2 x 3 1 x 3 PAGE: INSTRUCTIONS
6-2-CC-142 (FIG NO CC-2-2/5) 721260 2P-CCA-367                       F-A      VT-3  1  -
**CALIBRATION BLOCK** 29  
SUPPORT                       F1.30          2  -
* *
3  -
* DATE: 03/28/92 REVISION:
4  -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
721265   2P-CCA-367                     D-B      VT-3  1  -
PLAN STATUS ____ _ COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
INTEGRAL ATTACHMENT           02.20          2  -
-----------
3  -
-----------
4  -
6-2-CC-141 (FIG NO CC-2-2/5) 721270 . 2-ccs-120                     F-A      VT-3  1  -
SUPPORT                       F1.30          2  -
* 3  -
4  -
721280 2-CCG-119                       F-A      VT-3  1  -
SUPPORT                       F1 .30        2  -
3  -
        \
4  -
6-2-CC-140 (FIG NO CC-2-2/5) 721290 2-CCA-118                       F-A     VT-3   1 -
SUPPORT                        F1.30         2                        x 3 -
4 -
721295  2-CCA-118                      D-B     VT-3   1 -
INTEGRAL ATTACHMENT            02.20         2  -                     x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                             PAGE: 30 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-CC-140 (FIG NO CC-2-2/5) 721300 2-CCG-117 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-139 (FIG NO CC-2-2/5) 721310 2-CCH-116 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-306 (FIG NO CC-2-2/5) 721320 2A-CCH-484 F-A VT-3 1 -SUPPORT F1 .30 2 4 -721330 2A-CCG-538 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-CC-309 (FIG NO CC-2-2/5) 721340 2A-CCS-485 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-CC-310 (FIG NO CC-2-2/5) 721350 2A-CCH-483 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
6-2-CC-140 (FIG NO CC-2-2/5) 721300 2-CCG-117                     F-A     VT-3 1 -
**CALIBRATION BLOCK** 30 
SUPPORT                       F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
6-2-CC-139 (FIG NO CC-2-2/5) 721310 2-CCH-116                     F-A     VT-3 1 -
_____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD SEC. XI -----------
SUPPORT                       F1.30         2 -
-----------
3 -
-----------
4 -
6-2-CC-306 (FIG NO CC-2-2/5)
* 721320 2A-CCH-484                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
721330 2A-CCG-538                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
8-2-CC-309 (FIG NO CC-2-2/5) 721340 2A-CCS-485                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
8-2-CC-310 (FIG NO CC-2-2/5) 721350 2A-CCH-483                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                             PAGE: 31 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-CC-310 (FIG NO CC-2-2/5) 721360 2A-CCG-482 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-311 (FIG NO CC-2-2/5) 721370 2A-CCS-481 F-A VT-3 1 -SUPPORT F1 .30 2 4 -721380 2A-CCG-480 F-A VT-3 1 ---SUPPORT F1.30 2 4 2-CC-312 (FIG NO CC-2-2/5) 721390 2A-CCH-479 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-313 (FIG NO CC-2-2/5) 721400 2A-CCG-478 F-A VT-3 1 -SUPPORT F1.30 2 4 -721410 2A-CCA-261 F-A VT-3 1 -SUPPORT F1.30 2 ---3 PAGE: INSTRUCTIONS
8-2-CC-310 (FIG NO CC-2-2/5) 721360 2A-CCG-482                     F-A     VT-3 1 -
**CALIBRATION BLOCK** 31 DATE: 03/28/92 REVISION:
SUPPORT                       F1.30         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* COMPONENT COOL I NG SYSTEM INSPECTION INTERVAL PLAN STATUS * *
4 -
8-2-CC-311 (FIG NO CC-2-2/5) 721370 2A-CCS-481                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
721380 2A-CCG-480                     F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 -
* 3 -
4 -
8-2-CC-312 (FIG NO CC-2-2/5) 721390 2A-CCH-479                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
8-2-CC-313 (FIG NO CC-2-2/5) 721400 2A-CCG-478                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
721410 2A-CCA-261                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 32 REVISION:      0                            INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL                PLAN STATUS
                                                      -
* COMPONENT COOL I NG SYSTEM                                 FIRST      SECOND      THIRD    I ASME                PERIOD    PERIOD      PERIOD  I SEC. XI          ----------- ----------- ----------- I


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 8-2-CC-313 (FIG NO CC-2-2/5) 721413 2A-CCA-261 INTEGRAL ATTACHMENT 721415 2:ccG-708 SUPPORT 10-2-CC-107 (FIG NO cc-2-2/5) 721420 2-CCH-98 SUPPORT 10-2-CC-106 (FIG NO CC-2-2/5) 721430 2-CCH-99 SUPPORT 10-2-CC-103 721440 2-CCG-10Q SUPPORT (FIG NO CC-2-2/5) 10-2-CC-102 (FIG NO CC-2-2/5) 721450 2-CCG-101 SUPPORT -FIRST SECOND ASME PERIOD PERIOD SEC. XI -----------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A G E ------ I      INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH      1 2 3      1 2 3      1 2 3      r **CALIBRATION BLOCK**
-----------
8-2-CC-313 (FIG NO CC-2-2/5) 721413 2A-CCA-261                     D-B      VT-3 1 -
CATGY NOE ------0 U T A G E ITEM NO METH 1 D-B VT-3 1 -02.20 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -2 3 F-A VT-3 1 ---F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -FL30 2 4 -1 2 3 THIRD PERIOD -----------
INTEGRAL ATTACHMENT           02.20          2 -
------1 2 3 I I I I r PAGE: INSTRUCTIONS
3 -
**CALIBRATION BLOCK** 32 DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
721415 2:ccG-708                     F-A      VT-3 1 -
* COMPONENT COOL I NG SYSTEM INSPECTION INTERVAL _ _______ PLAN STATUS. ____ _ * *
SUPPORT                       F1.30          2 -
3 -
4 -
10-2-CC-107 (FIG NO cc-2-2/5) 721420 2-CCH-98                       F-A      VT-3 1 -
SUPPORT                       F1.30          2 -
* 3 -
4 -
10-2-CC-106 (FIG NO CC-2-2/5) 721430 2-CCH-99                       F-A      VT-3 1 -   - -
SUPPORT                       F1.30          2 -
3 -
4 -
10-2-CC-103 (FIG NO CC-2-2/5) 721440 2-CCG-10Q                      F-A     VT-3 1   -
SUPPORT                        F1.30           2 -
3 -
4 -
10-2-CC-102 (FIG NO CC-2-2/5)
                                                                                                          *~
721450 2-CCG-101                      F-A     VT-3   1 -
SUPPORT                        FL30           2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 33 REVISION:      0                            INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _______PLAN STATUS._ _ _ __
* COMPONENT COOL I NG SYSTEM                             I FIRST          SECOND      THIRD ASME            I PERIOD        PERIOD      PERIOD SEC. XI        I. ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 8-2-CC-92 (FIG NO cc-2-2/6) 721460 2-CCA-107 SUPPORT 721465 2-CCA-107 INTEGRAL ATTACHMENT 721470 2-CCG-711 SUPPORT 6-2-CC-96 CFIG NO CC-2-2/6) 721480 2-CCG-110 SUPPORT 721490 2-CCH-109 SUPPORT 6-2-CC-95 (FIG NO CC-2-2/6) 721500 2-CCG-108 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 D-8 VT-3 02.20 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 I FIRST SECOND THIRD I PERIOD PERIOD PERIOD I. ----------------------
EXAMINATION AREA               CATGY NOE      1 - - - - - - 0 U T A GE - - - - - -  INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH 1,123            123        123        **CALIBRATION BLOCK**
-----------
8-2-CC-92 (FIG NO cc-2-2/6) 721460 2-CCA-107                       F-A      VT-3 1    -
1 ------0 U T A G E ------
SUPPORT                       F1.30          2  -                      x 3  - -/ -
1,123 123 123 1 x 3 --/ --1 x 3 ---4 2 4 2 4 2 4 ---1 3 PAGE: INSTRUCTIONS
4  - - -
**CALIBRATION BLOCK** 33 
721465 2-CCA-107                     D-8      VT-3  1  -
INTEGRAL ATTACHMENT           02.20          2   -                      x 3  -  - -
-
721470 2-CCG-711                      F-A      VT-3  1  -
SUPPORT                       F1.30          2   -
3  -
-
* 6-2-CC-96 CFIG NO CC-2-2/6) 721480 2-CCG-110 SUPPORT F-A F1.30 VT-3 1 2
3 4
                                                            -
                                                            -
                                                            -
                                                            -
721490 2-CCH-109                      F-A     VT-3   1  -
SUPPORT                        F1.30         2  -
-
- - -
6-2-CC-95 (FIG NO CC-2-2/6) 721500 2-CCG-108                        F-A    VT-3  1  -
SUPPORT                        F1.30          2  -
3   -
4   -
*


DATE: 03/28/92 REVISION:
  ---------~-----------------------------------------
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 34 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL_
* COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI
_____ PLAN STATUS ____ _ * *


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 6-2-CC-93 CFIG NO CC-2-2/6) 721510 2-CCS-710 SUPPORT 6-2-CC-146 (FIG NO CC-2-3/1) 721520 2P-CCG-322 SUPPORT 6-2-CC-147 CFIG NO CC-2-3/1) 721530 2P-CCG-324 SUPPORT 6-2-CC-148 (FIG NO CC-2-3/1) 721540 2P*CCG*326 SUPPORT 6-2-CC-152 (FIG NO CC-2*3/1) 721550 2C-CCH-121 SUPPORT 6*2-CC-153 CFIG NO CC-2-3/1) 721560 2C*CCG*122 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 F-A VT-3 F1 .30 F-A VT-3 F1.30 F*A VT-3 F1.30 F*A VT-3 F1 .30 F*A VT-3 F1 .30 FIRST SECOND THIRD PERIOD PERIOD PERIOD * -* -*
EXAMINATION AREA               CATGY NOE        * - * - *
* 0 U T A G E ------1 2 3 1 2 3 1 2 3 1 3 ---4 ---1 3 1 ---2 4 2 --4 2 4 2 4 -PAGE: INSTRUCTIONS
* 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 34 
6-2-CC-93 CFIG NO CC-2-2/6) 721510 2-CCS-710                       F-A      VT-3  1 -
--* '-*
SUPPORT                       F1.30          2 -
* DATE: 03/28/92 REVISION:
3 -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 All STATUS COMPONENTS INSPECTION INTERVAL_
4 -  - -
_____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI
6-2-CC-146 (FIG NO CC-2-3/1) 721520 2P-CCG-322                     F-A      VT-3  1 -
SUPPORT                       F1 .30        2 -
3 -
4 -
6-2-CC-147 CFIG NO CC-2-3/1)
* 721530 2P-CCG-324                     F-A      VT-3  1 -  - -
SUPPORT                       F1.30          2 -
3 -
4 -
6-2-CC-148 (FIG NO CC-2-3/1) 721540 2P*CCG*326                     F*A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -  - -
4 -
6-2-CC-152 (FIG NO CC-2*3/1) 721550 2C-CCH-121                     F*A      VT-3  1 -
SUPPORT                       F1 .30        2 -
3 -
4 -
6*2-CC-153 CFIG NO CC-2-3/1) 721560 2C*CCG*122                     F*A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 35 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
--*    COMPONENT COOLING SYSTEM


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE -----0 U T A G E ------
EXAMINATION AREA ASME SEC. XI CATGY NOE CLASS 3 All STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-CC-153 (FIG NO cc-2-3/1) 721570 2C-CCA-59 F-A VT-3 1 -SUPPORT F1.30 2 4 ----6-2-CC-232 NO cc-2-3l22 721580 2C-CCS-29  
FIRST PERIOD SECOND PERIOD THIRD PERIOD
'--. F-A VT-3 1 -SUPPORT F1 .30 2 4 -721590 2C-CCS-32 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-233 (FIG NO cc-2-3l22 721600 F-A VT-3 1 -SUPPORT F1 .30 2 4 -721610 2C-CCS-39 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-234 (FIG NO CC-2-3l22 721620 2C-CCG-42 F-A VT-3 1 -SUPPORT F1 .30 2 4 -J PAGE: INSTRUCTIONS
                                                                - - ~ - - - 0 UT AGE - - - - - -
**CALIBRATION BLOCK** 35 
J INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
* *
    '-        6-2-CC-153 (FIG NO cc-2-3/1) 721570 2C-CCA-59                       F-A     VT-3 1 -
* DATE: 03/28/92 REVISION:
SUPPORT                         F1.30         2 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ COMPONENT COOLING SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
3 -
4 -                       - - -
6-2-CC-232 ~FIG  NO cc-2-3l22 721580 2C-CCS-29 '--.                   F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
721590 2C-CCS-32                       F-A     VT-3 1 -
SUPPORT                         F1.30         2 -
* 3 -
4 -
6-2-CC-233 (FIG NO cc-2-3l22 721600 2c-ccs~36                      F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
721610 2C-CCS-39                       F-A     VT-3 1 -
SUPPORT                         F1.30         2 -
3 -
4 -
6-2-CC-234 (FIG NO CC-2-3l22 721620 2C-CCG-42                       F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 36 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
 
EX~MINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
AREA CATGY NOE ------0 U T A G E ------
6-2-CC-235 CFIG NO CC-2-3/2) 721630 2C-CCA-46                       F-A     VT-3 1 -
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-CC-235 CFIG NO CC-2-3/2) 721630 2C-CCA-46 F-A VT-3 1 -SUPPORT F1.30 2 4 -721640 2C-CCS-49 F-A VT-3 1 -SUPPORT F1.30 2 --' 4 2-CC-236 (FIG NO CC-2-3/2) 721650 2C-CCS-53 F-A VT-3 1 -SUPPORT F1.30 2 --4 ---721660 2C-CCS-56 F-A VT-3 1 -SUPPORT F1.30 2 4 2-CC-207 (FIG NO CC-2-3/3) 721670 2C-CCS-55B F-A VT-3 1 -SUPPORT F1.30 2 4 -721680 2C-CCS-52 F-A VT-3 1 -SUPPORT F1 .30 2 4 -PAGE: INSTRUCTIONS
SUPPORT                       F1.30         2 -
**CALIBRATION BLOCK** 36 
3 -
* *
4 -
* DATE: 03/28/92 REVISION:
721640 2C-CCS-49                       F-A     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                       F1.30         2 -
PLAN STATUS COMPONENT COOLING SYSTEM  
3 -          - -   '
4 -
6-2-CC-236 (FIG NO CC-2-3/2) 721650 2C-CCS-53                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -  - -
4 - - -
721660 2C-CCS-56                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-CC-207 (FIG NO CC-2-3/3) 721670 2C-CCS-55B                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
721680 2C-CCS-52                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 37 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS COMPONENT COOLING SYSTEM                                   FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI          ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA ASME SEC. XI CATGY NOE NUMBER IDENTIFICATION ITEM NO METH ------------------------------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 u T A GE - - - - - -    INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3      1 2 3      1 2 3        **CALIBRATION BLOCK**
\ 6-2-CC-208 (FIG NO cc-2-3/3) 721690 2C-CCS-48 F-A VT-3 SUPPORT F1.30 721700 2C-CCA-45 F-A VT-3 SUPPORT F1.30 721705 2C-CCS-48 F-A VT-3 SUPPORT F1.30 6-2-CC-209 (FIG NO CC-2-3/3) 721710 2C-CCG-41 F-A VT-3 SUPPORT F1.30 6-2-CC-210 (FIG NO CC-2-3/3) 721720 2C-CCS-38 F-A VT-3 SUPPORT F1.30 721730 2C-CCS-35 F-A VT-3 SUPPORT F1.30 FIRST SECOND THIRD PERIOD PERIOD PERIOD -----------
          ------------------------------              \ - -----------  ----------- ----------- -
-----------
6-2-CC-208 (FIG NO cc-2-3/3) 721690 2C-CCS-48                       F-A     VT-3 1  -
-----------------0 u T A G E ------1 2 3 1 2 3 1 2 3 ------------
SUPPORT                       F1.30         2  -
-----------
3  -
-----------1 3 2 3 1 3 --1 3 1 --3 --1 3 -PAGE: INSTRUCTIONS
4  -
**CALIBRATION BLOCK** 37 DATE: 03/28/92 REVISION:
721700 2C-CCA-45                       F-A     VT-3 SUPPORT                       F1.30         2 3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* COMPONENT COOLING SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ ASME SEC. XI FIRST SECOND PERIOD PERIOD THIRD PERIOD  
721705 2C-CCS-48                     F-A     VT-3 1  -
SUPPORT                       F1.30         2  -
3  -
4  -  - -
* 6-2-CC-209 (FIG NO CC-2-3/3) 721710 2C-CCG-41 SUPPORT F-A F1.30 VT-3 2
3 1 -
                                                          -
                                                          -
4  -
6-2-CC-210 (FIG NO CC-2-3/3) 721720 2C-CCS-38                       F-A     VT-3   1 -
SUPPORT                       F1.30         2  - - -
3 -
- - -
721730 2C-CCS-35                      F-A     VT-3   1 -
SUPPORT                        F1.30        2  -
3 -
-
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 38 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* COMPONENT COOLING SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-CC-187 (FIG NO CC-2-3/5) 721740 2C-CCA-60 SUPPORT 721750 2C-CCG-270 SUPPORT 721760 2C-CCH-271 SUPPORT
6-2-CC-187 (FIG NO CC-2-3/5) 721740 2C-CCA-60                       F-A      VT-3  1 -
* 721770 2C-CCG-272 SUPPORT 6-2-CC-190 721780 2P-CCS-334 SUPPORT 6-2-CC-192 721790 2P-CCG-333 SUPPORT * (FIG NO CC-2-3/5) (FIG NO CC-2-3/5)
SUPPORT                       F1 .30        2 -
F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 4 ---PAGE: INSTRUCTIONS
3 -
**CALIBRATION BLOCK** 38 
4 -
* *
721750 2C-CCG-270                     F-A      VT-3  1 -
* DATE: 03/28/92 REVISION:
SUPPORT                       F1.30          2 -
0 COMPONENT COOLING SYSTEM SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
3 -
PLAN STATUS FIRST SECOND ASME PERIOD PERIOD THIRD PERIOD SEC. XI CATGY NOE --------*--
4 -
-----------
721760 2C-CCH-271                     F-A      VT-3  1 -
-----------
SUPPORT                       F1 .30        2 -
3 -
4 -
* 721770 2C-CCG-272                     F-A      VT-3  1 - - -
SUPPORT                       F1.30          2 -
3 -
4 -
6-2-CC-190 (FIG NO CC-2-3/5) 721780 2P-CCS-334                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
6-2-CC-192 (FIG NO CC-2-3/5) 721790 2P-CCG-333                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 39 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS COMPONENT COOLING SYSTEM                                    FIRST     SECOND       THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         --------*-- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA ------0 u T A G E ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 ------------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 u T AGE - - - - - -     INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3         **CALIBRATION BLOCK**
------------
                                                        - ----------- ------------ ----------- -
-----------
6-2-CC-192 CFIG NO CC-2-3/5) 721800 2P-CCG-325                       F*A     VT-3 1 - - -
6-2-CC-192 CFIG NO CC-2-3/5) 721800 2P-CCG-325 F*A VT-3 1 ---SUPPORT F1 .30 2 4 2-CC-193 CFIG NO CC-2-3/5) 721810 2P-CCG-323 F*A VT-3 1 -SUPPORT F1.30 2 4 -SYSTEM INSERVICE TEST (FIG NO cc-2-3/5) 721814 CC SYSTEM COMPONENTS D-B VT-2 1 -PRESSURE RETAINING COMPONENTS 02.10 2 x x x 3 SYSTEM HYDROSTATIC TEST (FIG NO CC-2-3/5) 721818 CC SYSTEM COMPONENTS D-B VT-2 1 -PRESSURE RETAINING COMPONENTS 02.10 2 ----x 4 --PAGE: INSTRUCTIONS
SUPPORT                         F1 .30         2 -
**CALIBRATION BLOCK** 39 
3 -
4 -
6-2-CC-193 CFIG NO CC-2-3/5) 721810 2P-CCG-323                     F*A     VT-3 1 -
SUPPORT                         F1.30         2 -
3 -
4 -
SYSTEM INSERVICE TEST (FIG NO cc-2-3/5)
* 721814 CC SYSTEM COMPONENTS             D-B     VT-2 1 -
PRESSURE RETAINING COMPONENTS 02.10           2 x           x           x 3 -
4 -
SYSTEM HYDROSTATIC TEST (FIG NO CC-2-3/5) 721818 CC SYSTEM COMPONENTS             D-B     VT-2 1 -
PRESSURE RETAINING COMPONENTS 02.10           2 - - -                   - x -
3 -
4 -
*


* * \J
--------------------------------------------------------~
* DATE: 03/28/92 REVISION:
DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 40 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
_____ PLAN STATUS ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ---* --0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - * - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-AF-73 (FIG NO AF-2-2/1) 721820 2-AFS-100 SUPPORT 721825 2-AFS-100 INTEGRAL ATTACHMENT 721830 2-AFG-102 SUPPORT 721835 2-AFG-102 INTEGRAL ATTACHMENT 721840 2-AFS-104 SUPPORT 721845 2-AFS-104 INTEGRAL ATTACHMENT 10-2-AF-74 (FIG NO AF-2-2/1) 721850 2-AFG-106 SUPPORT F-A VT-3 1 -F1.30 2 X D-A VT-3 D1.20 F-A VT-3 F1 .30 D-A VT-3 01.20 F-A VT-3 F1.30 D-A VT-3 D1.20 F-A VT-3 F1.30 3 ---4 2 x 3 1 -2 x 3 1 -2 x 3 1 -2 x 3 1 -2 x 3 1 ---2 x 3 --PAGE: INSTRUCTIONS
10-2-AF-73 (FIG NO AF-2-2/1) 721820 2-AFS-100                       F-A      VT-3  1 -
**CALIBRATION BLOCK** 40  
SUPPORT                       F1.30          2X 3 - - -
* *
4 -
* DATE: 03/28/92 REVISION:
721825  2-AFS-100                      D-A      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
INTEGRAL ATTACHMENT            D1.20          2x 3 -
_____ .PLAN STATUS ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
4 -
721830 2-AFG-102                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2x 3 -
4 -
* 721835  2-AFG-102 INTEGRAL ATTACHMENT D-A 01.20 VT-3 1 -
2x 3 -
4 -
721840  2-AFS-104                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 x 3 -
4 -
721845  2-AFS-104                      D-A     VT-3 1 -
INTEGRAL ATTACHMENT            D1.20         2 x 3 -
4 -
  \J        10-2-AF-74 (FIG NO AF-2-2/1) 721850  2-AFG-106                      F-A      VT-3 1 - - -
SUPPORT                        F1.30          2 x 3 -
4 - -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 41 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-AF-74 (FIG NO AF-2-2/1) 721855 2-AFG-106 INTEGRAL ATTACHMENT 721860 2-AFA-108 SUPPORT 721865 2-AFA-108 INTEGRAL ATTACHMENT 10-2-AF-75 (FIG NO AF-2-2/1) 721870 2-AFS-110 SUPPORT 721880 2-AFS-113 SUPPORT 10-2-AF-76 (FIG NO AF-2-2/1) 721890 2-AFH-114 SUPPORT D-A VT-3 1 -01.20 2 x 3 F-A VT-3 1 -F1 .30 2 x 3 D-A VT-3 1 -01 .20 2 x 3 F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 4 -------PAGE: INSTRUCTIONS
10-2-AF-74 (FIG NO AF-2-2/1) 721855 2-AFG-106                     D-A      VT-3  1 -
**CALIBRATION BLOCK** 41 
INTEGRAL ATTACHMENT           01.20          2 x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
721860 2-AFA-108                     F-A      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                       F1 .30        2 x 3 -  - -
_____ .PLAN STATUS ____ _ AUXILIARY FEEDWATER SYSTEM  
4 -
721865  2-AFA-108                      D-A      VT-1 -
INTEGRAL ATTACHMENT            01 .20        2 x 3 -
4 - - -
* 721870 10-2-AF-75 (FIG NO AF-2-2/1) 2-AFS-110 SUPPORT F-A F1.30 VT-3 1 -
2 -
3 -
4 -
721880 2-AFS-113                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 - - -
3 -
4 -
10-2-AF-76 (FIG NO AF-2-2/1) 721890 2-AFH-114                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 42 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 10-2-AF-76 (FIG NO AF-2-2/1) 721900 2-AFG-116 SUPPORT 10-2-AF-77 (FIG NO AF-2-2/1) 721910 2-AFG-118 SUPPORT 721920 2-AFG-120 SUPPORT 721930 2-AFH-122 SUPPORT 10-2-AF-78 (FIG NO AF-2-2/1) 721940 2-AFG-124 SUPPORT 721950 2-AFS-126 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 F-A VT*3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    123        123        123        **CALIBRATION BLOCK**
123 123 123 1 3 ---4 2 ---3 1 3 1 3 1 3 1 3 --PAGE: INSTRUCTIONS
10-2-AF-76 (FIG NO AF-2-2/1) 721900 2-AFG-116                       F-A      VT-3  1 -
**CALIBRATION BLOCK** 42 DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 43 REVISION:
SUPPORT                       F1.30          2 -
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -  - -
* INSPECTION INTERVAL -PLAN STATUS AUXILIARY FEEDYATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
4 -
-----------
10-2-AF-77 (FIG NO AF-2-2/1) 721910 2-AFG-118                     F-A      VT*3 1  -
-----------
SUPPORT                       F1.30          2 -  - -
3 -
4 -
721920 2-AFG-120                       F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
* 3 -
4 -
721930 2-AFH-122                       F-A      VT-3 1  -
SUPPORT                       F1.30          2 -
3 -
4 -
10-2-AF-78 (FIG NO AF-2-2/1) 721940 2-AFG-124                       F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
721950 2-AFS-126                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 - - -
* DATE: 03/28/92                                         SALEM NUCLEAR POYER STATION UNIT 2                               PAGE:   43 REVISION:     0                                     INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL-                       PLAN STATUS AUXILIARY FEEDYATER SYSTEM                                         FIRST     SECOND       THIRD ASME                       PERIOD     PERIOD       PERIOD SEC. XI                 ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------INSTRUCTIONS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
EXAMINATION AREA               CATGY NOE               ------     0 UT AGE    ------       INSTRUCTIONS NUMBER !DENT! Fl CATION               ITEM NO METH             1 2 3       1 2 3       1 2 3         **CALIBRATION BLOCK**
**CALIBRATION BLOCK** ------------------------------
          ------------------------------ ............... ---- - ----------- ----------- ----------- - ------------------------------
...............  
10*2*AF-79 (FIG NO AF-2-2/1) 721960 2-AFG-128                     F-A             VT-3 1 -
----------------
SUPPORT                       F1.30                 2 -
-----------
3 -
-----------
4 -
-------------------------------
721970 2-AFS-130                       F-A             VT-3 1 -
10*2*AF-79 (FIG NO AF-2-2/1) 721960 2-AFG-128 F-A VT-3 1 -SUPPORT F1.30 2 4 -721970 2-AFS-130 F-A VT-3 1 -SUPPORT F1.30 2 4 2-AF-80 (FIG NO AF-2-2/1) 721980 2-AFA-134 F-A VT-3 1 -SUPPORT F1.30 2
SUPPORT                       F1.30                 2 -
* 4 -721985 2-AFA-134 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 -3 4 -721990 2-AFS-136 . F-A VT-3 1 -SUPPORT F1.30 2 4 -722000 2-AFG-138 F-A VT-3 1 -SUPPORT F1.30 2 4 2-AF-81 (FIG NO AF-2-2/1) 722010 2-AFS-140 F-A VT-3 1 -SUPPORT F1.30 2 4 -*
3 -
DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
10-2-AF-80 (FIG NO AF-2-2/1) 721980 2-AFA-134                       F-A             VT-3 1 -
* AUXILIARY FEEDYATER SYSTEM INSPECTION INTERVAL_
SUPPORT                       F1.30                 2 -
_ ____ PLAN STATUS. ____ _ * *
* 3 -
4 -
721985 2-AFA-134                     D-A             VT-3 1 -
INTEGRAL ATTACHMENT           01.20                 2 -
3 4 -
721990 2-AFS-136 .                     F-A             VT-3 1 -
SUPPORT                       F1.30                 2 -
3 -
4 -
722000 2-AFG-138                       F-A             VT-3 1 -
SUPPORT                       F1.30                 2 -
3 -
4 -
10-2-AF-81 (FIG NO AF-2-2/1) 722010 2-AFS-140                     F-A             VT-3 1 -
SUPPORT                       F1.30                 2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 44 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* AUXILIARY FEEDYATER SYSTEM                                FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 10*2*AF*83 CFIG NO AF-2*2/1) 722020 2*AFG*142 SUPPORT 722023 2*AFA*146 SUPPORT 722026 2*AFA*146 INTEGRAL ATTACHMENT 8-2*AF*87 CFIG NO AF*2*2/1) 722030 2-AFG*150A SUPPORT 722040 2*AFH*150 SUPPORT 6*2*AF*89 (FIG NO AF-2-2/1) 722050 2*AFS*154 SUPPORT FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI CATGY NOE ITEM NO METH * * * * *
EXAMINATION AREA               CATGY NOE        * * * * *
* 0 U T A G E * * * * -* 1 2 3 1 2 3 1 2 3 F*A VT-3 1
* 0 U T A GE * * * * -
* F1.30 2
* INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
10*2*AF*83 CFIG NO AF-2*2/1) 722020  2*AFG*142                      F*A     VT-3 1
* SUPPORT                        F1.30         2
* 3
* 3
* 4
* 4
* F*A VT-3 1 . F1.30 '-2 x 3 . 4 . D*A VT-3 1 . 01.20 2 x 3 . 4 . F*A VT-3 1 . F1.30 2
* 722023  2*AFA*146                      F*A     VT-3 1 .
* 3 . 4 . F*A VT-3 1 . F1.30 2 . 3 . 4 . F*A VT-3 1
SUPPORT                        F1.30 '-       2 x 3 .
* F1 .30 2 x 3
4 . - '"
* 4 . -'" . . . . . PAGE: INSTRUCTIONS
722026 2*AFA*146                      D*A     VT-3 1 .
**CALIBRATION BLOCK** 44 
INTEGRAL ATTACHMENT            01.20         2x 3 .
* *
4 .
* DATE: 03/28/92 REVISION:
* 8-2*AF*87 CFIG NO AF*2*2/1) 722030 2-AFG*150A SUPPORT F*A F1.30 VT-3 1 2
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
3 4
_ ____ PLAN STATUS, ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
                                                          .
                                                          *
                                                          .
                                                          .
722040 2*AFH*150                      F*A     VT-3 1 . . .
SUPPORT                        F1.30         2 .
3 .
4 .
6*2*AF*89 (FIG NO AF-2-2/1) 722050 2*AFS*154                      F*A     VT-3 1
* SUPPORT                        F1 .30         2x            . . .
3
* 4 .
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 45 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS,_ _ _ __
AUXILIARY FEEDWATER SYSTEM                                   FIRST     SECOND     THIRD ASME                PERIOD     PERIOD     PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * * * * *
EXAMINATION AREA               CATGY NOE         * * * * *
* 0 U T A G E * * * * *
* 0 UT AGE * * * * *
* NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6*2-AF-89 (FIG NO AF-2*2/1) 722055 2-AFS-154 D*A VT-3 1 -INTEGRAL ATTACHMENT D1.20 2 x 3 6*2-AF-137 (FIG NO AF-2*2/1) 722060 2-AFA-159 F*A VT-3 1 -SUPPORT F1 .30 2 x 3 --722065 2*AFA*159 D*A VT-3 1 ---INTEGRAL ATTACHMENT  
* INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
' D1.20 2 x 3 6*2-AF-136 (FIG NO AF-2-2/1) 722070 2*AFS-158 F*A VT-3 1 -SUPPORT F1 .30 2 -x --3 --722075 2-AFS-158 D*A VT-3 1 -INTEGRAL ATTACHMENT 01.20 . 2 -x --3 6*2*AF*143 CFIG NO AF-2-2/1) 722080 2-AFS-157 F*A VT-3 1 -SUPPORT F1.30 2 -x --3 PAGE: INSTRUCTIONS
6*2-AF-89 (FIG NO AF-2*2/1) 722055 2-AFS-154                       D*A     VT-3 1 -
**CALIBRATION BLOCK** 45  
INTEGRAL ATTACHMENT             D1.20         2x 3 -
* *
4 -
* DATE: 03/28/92 REVISION: . 0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
6*2-AF-137 (FIG NO AF-2*2/1) 722060 2-AFA-159                       F*A     VT-3   1 -
_____ .PLAN STATUS ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                         F1 .30         2x 3 -
4 -  - -
722065 2*AFA*159                       D*A     VT-3   1 - - -
INTEGRAL ATTACHMENT         ' D1.20         2x
* 3 -
4 -
6*2-AF-136 (FIG NO AF-2-2/1) 722070 2*AFS-158                       F*A     VT-3   1 -
SUPPORT                         F1 .30         2 -           x - -
3 -
- - -
722075 2-AFS-158                       D*A     VT-3   1 -
INTEGRAL ATTACHMENT           01.20         .2 -           x - -
3 -
4 -
6*2*AF*143 CFIG NO AF-2-2/1) 722080 2-AFS-157                       F*A     VT-3   1 -
SUPPORT                         F1.30         2 -           x - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 46 REVISION:    .0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NDE ------0 U T A G E ------
EXAMINATION AREA               CATGY NDE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-AF-143 CFIG NO AF-2-2/1) 722085 2-AFS-157 D-A VT-3 1 ---INTEGRAL ATTACHMENT D1.20 2 -x 3 --6-2-AF-142 CFIG NO AF-2-2/1) 722090 2-AFS-156 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 -4 " 722095 2-AFS-156 D-A VT-3 1 -INTEGRAL ATTACHMENT D1.20 2 -x 3 --8-2-AF-86 (FIG NO AF-2-2/1) 722100 2-AFS-155 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 722105 2-AFS-155 D-A VT-3 1 ---INTEGRAL ATTACHMENT D1.20 2 -x 3 8-2-AF-84 CFIG NO AF-2-2/1) 722110 2-AFA-152 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 --PAGE: INSTRUCTIONS
6-2-AF-143 CFIG NO AF-2-2/1) 722085 2-AFS-157                     D-A     VT-3 1 - - -
**CALIBRATION BLOCK** 46 DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT           D1.20         2 -           x 3 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -  - -
* AUXILIARY FEEDYATER SYSTEM INSPECTION INTERVAL_
6-2-AF-142 CFIG NO AF-2-2/1) 722090 2-AFS-156                       F-A     VT-3 1 -
_____ .PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
SUPPORT                       F1.30         2 -           x 3 -
* ASME SEC. XI PERIOD PERIOD
4 "
722095 2-AFS-156                     D-A     VT-3 1 -
INTEGRAL ATTACHMENT           D1.20         2 -           x
* 3 -
4 -  - -
8-2-AF-86 (FIG NO AF-2-2/1) 722100 2-AFS-155                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -           x 3 -
4 -
722105 2-AFS-155                     D-A     VT-3 1 - - -
INTEGRAL ATTACHMENT           D1.20         2 -           x 3 -
4 -
8-2-AF-84 CFIG NO AF-2-2/1) 722110 2-AFA-152                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -           x 3 -
4 -  - -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 47 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
* AUXILIARY FEEDYATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-AF-84 (FIG NO AF-2-2/1) 722115 2-AFA-152 D-A VT-3 INTEGRAL ATTACHMENT 01.20 2 -x 3 -4 6-2-AF-91 (FIG NO AF-2-2/5) 722120 2-AFG-160 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 --722125 2-AFG-160 D-A Vf-3 1 -INTEGRAL ATTACHMENT 01.20 2 -x 3 722130 2-AFS-161 F-A VT-3 1 -SUPPORT F1 .30 2 4 ---722140 2-AFA-162 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 722145 2-AFA-162 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 -x 3 6-2-AF-92 (FIG NO AF-2-2/5) 722150 2-AFS-163 F-A VT-3 1 -SUPPORT F1 .30 2 4 -PAGE: INSTRUCTIONS
8-2-AF-84 (FIG NO AF-2-2/1) 722115 2-AFA-152                     D-A     VT-3 INTEGRAL ATTACHMENT           01.20         2 -           x 3 -
**CALIBRATION BLOCK** 47 DATE: 03/28/92 REVISION:
4 6-2-AF-91 (FIG NO AF-2-2/5) 722120 2-AFG-160                       F-A     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                       F1.30         2 -           x 3 -
* AUXILIARY FEEDWATER SYSTEM FIRST _____ PLAN STATUS. ____ _ SECOND THIRD INSPECTION INTERVAL _ *
4 -  - -
* ASME SEC. XI PERIOD PERIOD PERIOD
722125 2-AFG-160                     D-A     Vf-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -           x
* 3 -
4 -
722130 2-AFS-161                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 - - -
722140 2-AFA-162                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -           x 3 -
4 -
722145 2-AFA-162                     D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -           x 3 -
4 -
6-2-AF-92 (FIG NO AF-2-2/5) 722150 2-AFS-163                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 48 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS._ _ _ __
* AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * * ----0 U T A G E -* ----NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-AF-2 (FIG NO AF-2-2/2) 722160 2-AFSG-3 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 ---4 -722170 2-AFSG-4 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-AF-3 CFIG NO AF-2-2/2) 722180 2-AFSG*S F-A VT-3 1 -SUPPORT F1.30 2 4 2-AF-4 (FIG NO AF-2-2/2) 722190 2-AFSG-6 F-A VT-3 1 -SUPPORT F1.30 2 ---3 722200 2-AFSG-7 F-A VT-3 1 ---SUPPORT F1.30 2 4 ---12-2-AF-5 (FIG NO AF-2-2/2) 722210 2-AFSG-8 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
EXAMINATION AREA               CATGY NOE       * * - - - - 0 UT AGE - * - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 48 
12-2-AF-2 (FIG NO AF-2-2/2) 722160 2-AFSG-3                       F-A     VT-3 1 -
* *
SUPPORT                       F1 .30         2 - - -
* DATE: 03/28/92 REVISION:
3 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_ ____ PLAN STATUS. ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
722170 2-AFSG-4                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
12-2-AF-3 CFIG NO AF-2-2/2) 722180 2-AFSG*S                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 -
12-2-AF-4 (FIG NO AF-2-2/2) 722190 2-AFSG-6                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 - - -
3 -
4 -
722200 2-AFSG-7                       F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 -
3 -
4 - - -
12-2-AF-5 (FIG NO AF-2-2/2) 722210 2-AFSG-8                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 49 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-AF-5 (FIG NO AF-2-2/2) 722220 2-AFSG-9 F-A VT-3 1 -SUPPORT F1.30 2 --4 ---12-2-AF-6 (FIG NO AF-2-2/2) 722230 2-AFSG-10 F-A VT-3 1 -SUPPORT F1.30 2 4 -722240 2-AFSG-11 F-A VT-3 1 -SUPPORT F1.30 2 4 2-AF-7 (FIG NO AF-2-2/2) 722250 F-A VT-3 1 -SUPPORT F1.30 2 4 -722260 2-AFSG-13 F-A VT*3 1 -SUPPORT F1.30 2 4 -12-2-AF-8 (FIG NO AF-2-2/2) 722270 2-AFSA-14 F-A VT-3 1 ---SUPPORT F1 .30 2 -x ---4 -PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** 49 
12-2-AF-5 (FIG NO AF-2-2/2) 722220 2-AFSG-9                       F-A     VT-3 1 -
* *
SUPPORT                       F1.30         2 -
* DATE: 03/28/92 REVISION:
3 -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 - - -
_____ PLAN STATUS ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
12-2-AF-6 (FIG NO AF-2-2/2) 722230 2-AFSG-10                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
722240 2-AFSG-11                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 -
12-2-AF-7 (FIG NO AF-2-2/2) 722250 2-AFSG~12                      F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
722260 2-AFSG-13                     F-A     VT*3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -           7  - -
12-2-AF-8 (FIG NO AF-2-2/2) 722270 2-AFSA-14                     F-A     VT-3 1 - - -
SUPPORT                       F1 .30         2 -           x -   -
                                                        ~ -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 50 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-AF-8 CFIG NO AF-2-2/2) 722275 2-AFSA-14 D-A VT-3 1 ---INTEGRAL ATTACHMENT 01.20 2 -x 3 '-12-2-AF-9 CFIG NO AF-2-2/2) 722280 2-AFSG-15 F-A VT-3 1 -SUPPORT F1.30 2 4 -722290 2-AFSG-16 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 12-2-AF-10 CFIG NO AF-2-2/2) 722300 2-AFSG-17 F-A VT-3 1 -SUPPORT F1.30 2 4 2-AF-11 CFIG NO AF-2-2/2) 722310 *2-AFSG-18 F-A VT-3 1 -SUPPORT F1.30 2 4 -722320 2-AFSG-19 F-A VT-3 1 ---SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
12-2-AF-8 CFIG NO AF-2-2/2) 722275 2-AFSA-14                     D-A     VT-3 1 - - -
**CALIBRATION BLOCK** 50 DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 51 REVISION:
INTEGRAL ATTACHMENT           01.20         2 -           x 3 -
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* INSPECTION INTERVAL -PLAN STATUS AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI --*--------------------
                        '-
-----------
12-2-AF-9 CFIG NO AF-2-2/2) 722280 2-AFSG-15                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
722290 2-AFSG-16                       F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 - - -
* 3 -
4 -
12-2-AF-10 CFIG NO AF-2-2/2) 722300 2-AFSG-17                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
12-2-AF-11 CFIG NO AF-2-2/2) 722310 *2-AFSG-18                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
722320 2-AFSG-19                       F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE:   51 REVISION:     0                             INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL-                 PLAN STATUS AUXILIARY FEEDWATER SYSTEM                                   FIRST     SECOND       THIRD ASME                 PERIOD     PERIOD       PERIOD SEC. XI         --*- -------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK** ------------------------------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A G E ------       INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3         1 2 3       1 2 3       **CALIBRATION BLOCK**
-----------------------
          ------------------------------ ------- ---- - ----------- ----------- ----------- -   ------------------------------
-----------
12-2-AF-12 (FIG NO AF-2-2/2) 722330 2-AFSG-20                     F-A     VT-3 1 -
-----------
SUPPORT                       F1.30         2 -
-------------------------------
3 -
12-2-AF-12 (FIG NO AF-2-2/2) 722330 2-AFSG-20 F-A VT-3 1 -SUPPORT F1.30 2 4 -722340 2-AFSG-21 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-AF-14 (FIG NO AF-2-2/2) 722350 2-AFSS-22 F-A VT-3 SUPPORT F1 .30 2
4 -
* 4 -722360 2-AFSS-23 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 722365 2-AFSS-23 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 -x 3 10-2-AF-14 (FIG NO AF-2-2/2) 722370 2-AFSA-24 F-A VT-3 1 -SUPPORT F1.30 2 --x --3
722340 2-AFSG-21                       F-A     VT-3 1 -
* DATE: 03/28/92 REVISION:
SUPPORT                       F1 .30         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* AUXILIARY FEEDWATER SYSTEM INSPECTION INTERVAL_
4 -
_____ PLAN STATUS ____ _ * *
12-2-AF-14 (FIG NO AF-2-2/2) 722350 2-AFSS-22                       F-A     VT-3 SUPPORT                       F1 .30         2 -
* 3 -
4 -
722360 2-AFSS-23                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -                         x 3 -
4 -
722365 2-AFSS-23                     D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -                         x 3 -
4 -
10-2-AF-14 (FIG NO AF-2-2/2) 722370 2-AFSA-24                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -   -                   x - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 52 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* AUXILIARY FEEDWATER SYSTEM                                 FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 10-2-AF-14 CFIG NO AF-2-2/2) 722375 2-AFSA-24 INTEGRAL ATTACHMENT 8-2-AF-15 CFIG NO AF-2-2/2) 722380 2-AFSG-25 SUPPORT 8-2-AF-19 CFIG NO AF-2-2/2) 722390 2-AFSA-27 SUPPORT 722395 2-AFSA-27 INTEGRAL ATTACHMENT 8-2-AF-18 CFIG NO AF-2-2/2) 722400 2-AFSG-26 SUPPORT 6-2-AF-162A CFIG NO AF-2-2/3) 722410 2-AFS-262 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH D-A VT-3 01.20 F-A VT-3 F1.30 F-A VT-3 F1.30 D-A VT-3 01.20 F-A VT-3 F1.30 F-A VT-3 F1 .30 FIRST SECOND THIRD PERIOD PERIOD PERIOD * -----0 U T A G E -----1 2 3 1 2 3 1 2 3 1 x --3 1 3 1 3 1 ---2 4 2 4 2 -----' 4 -PAGE: INSTRUCTIONS
EXAMINATION AREA               CATGY NOE        * - - - - - 0 U T A GE - - - ~ - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 52 
10-2-AF-14 CFIG NO AF-2-2/2) 722375 2-AFSA-24                     D-A      VT-3 1  -
* *
INTEGRAL ATTACHMENT           01.20          2 -                      x  - -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_____ PLAN STATUS.,.--
8-2-AF-15 CFIG NO AF-2-2/2) 722380 2-AFSG-25                       F-A      VT-3  1 -
___ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                       F1.30          2 -
3 -
4 -
8-2-AF-19 CFIG NO AF-2-2/2)
* 722390 2-AFSA-27                       F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -
4 -
722395 2-AFSA-27                     D-A      VT-3  1 -  - -
INTEGRAL ATTACHMENT           01.20          2 -
3 -
4 -
8-2-AF-18 CFIG NO AF-2-2/2) 722400 2-AFSG-26                       F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -
4 -
6-2-AF-162A CFIG NO AF-2-2/3) 722410 2-AFS-262                       F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 - - -     - - -   '
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 53 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS.,.--_ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-AF-162B (FIG NO AF-2-2/3) 722420 2-AFS-261 SUPPORT 6-2-AF-163 (FIG NO AF-2-2/3) 722430 2-AFS-113A SUPPORT 722440 2-AFS-112 SUPPORT 722450 2-AFA-111 SUPPORT 722455 2-AFA-111 INTEGRAL ATTACHMENT 6-2-AF-164 (FIG NO AF-2-2/3) 722460 2-AFG-109 SUPPORT F-A VT-3 1 -F1 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 -) 3 F-A VT-3 1 -F1.30 2 4 -D-A VT-3 1 -01.20 2 4 -F-A F1.30 VT-3 1 3 x --x x PAGE: INSTRUCTIONS
6-2-AF-162B (FIG NO AF-2-2/3) 722420 2-AFS-261                     F-A      VT-3 1 -
**CALIBRATION BLOCK** 53 DATE: 03/28/92 REVISION:
SUPPORT                       F1 .~30        2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* AUXILIARY FEEDWATER SYSTEM INSPECTION INTERVAL_
4 -
_ ____ PLAN STATUS. ____ _ SECOND FIRST THIRD *
6-2-AF-163 (FIG NO AF-2-2/3) 722430 2-AFS-113A                      F-A     VT-3 1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                        F1.30          2 -
3 -
4 -
722440 2-AFS-112                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
*
                                            )          3 -
4 -
722450 2-AFA-111                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -                       x - -
3 -
4 -
722455  2-AFA-111                      D-A     VT-3 1 -
INTEGRAL ATTACHMENT            01.20         2 -                      x 3 -
4 -
6-2-AF-164 (FIG NO AF-2-2/3) 722460  2-AFG-109                      F-A     VT-3  1 -
SUPPORT                        F1.30         2 -                       x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 54 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __
* AUXILIARY FEEDWATER SYSTEM                                  FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-AF-164 CFIG NO AF-2-2/3) 722465 2-AFG-109 INTEGRAL ATTACHMENT 722470 2-AFG-107 SUPPORT 722475 2-AFG-107 INTEGRAL ATTACHMENT 6-2-AF-165 NO AF-2-2[32 I 722480 2-AFS-105 SUPPORT 722485 2-AFS-105 INTEGRAL ATTACHMENT 722490 2-AFG-103 SUPPORT 722495 2-AFG-103 INTEGRAL ATTACHMENT D-A VT-3 1 -D1.20 2 4 -F-A VT-3 1 -F1.30 2 4 -D-A VT-3 1 -D1.20 2 4 -F-A VT-3 1 -F1.30 2 4 -D-A VT-3 1 -D1.20 2 4 -F-A VT-3 1 -F1 .30 2 4 -D-A VT-3 1 -01.20 2 4 -x --x x --x --x --x ------x PAGE: INSTRUCTIONS
6-2-AF-164 CFIG NO AF-2-2/3) 722465 2-AFG-109                       D-A      VT-3  1 -
**CALIBRATION BLOCK** 54 
INTEGRAL ATTACHMENT             D1.20          2 -                       x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
722470  2-AFG-107                       F-A      VT-3  1 - - -
0 AUXILIARY FEEDWATER SYSTEM SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                         F1.30          2 -                       x 3 -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI -----------
4 -
-----------
722475  2-AFG-107                      D-A     VT-3 1 -
-----------
INTEGRAL ATTACHMENT            D1.20         2 -                       x  - -
3 -
4 -
* 722480 6-2-AF-165 2-AFS-105 SUPPORT
                    ~FIG I
NO AF-2-2[32 F-A F1.30 VT-3 1 -
2 -
3 -
x 4 - - -
722485  2-AFS-105                      D-A     VT-3 1 -
INTEGRAL ATTACHMENT            D1.20         2 -                      x - -
3 -
4 -
722490 2-AFG-103                        F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -                      x 3 -  - -
4 -
722495  2-AFG-103                      D-A     VT-3 1 - - -
INTEGRAL ATTACHMENT            01.20         2 - - -                 x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 55 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS AUXILIARY FEEDWATER SYSTEM                                  FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 ------------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u T A GE - - - - - -    INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3      1 2 3        **CALIBRATION BLOCK**
6-2-AF-165 (FIG NO AF-2-2/3) 722500 SUPPORT 722505 2-AFG-101A INTEGRAL ATTACHMENT 722510 2-AFS-101 SUPPORT 722515 2-AFS-101 INTEGRAL ATTACHMENT F-A VT-3 1 -F1.30 2 4 -D-A VT-3 1 -01.20 2 4 -F-A VT-3 1 -F1 .30 2 4 -D-A VT-3 1 -01.20 2 -3 4 -SYSTEM INSERVICE TEST (FIG NO AF-2-2/3) 722517 AUX. FW SYSTEM COMPONENTS D-A VT-2 1 -PRESSURE RETAINING COMPONENTS 01.10 2 x 3 4 -SYSTEM HYDROSTATIC TEST (FIG NO AF-2-2/3) 722519 AUX. FW SYSTEM COMPONENTS D-A VT-2 1 -PRESSURE RETAINING COMPONENTS 01.10 2 4 -0 u T A G E ------1 2 3 1 2 3 -----------
                                                        - ----------- ----------- ----------- -
-----------
6-2-AF-165 (FIG NO AF-2-2/3) 722500 2-AFG-101A-                     F-A     VT-3 1 -
x x x x x x ---x --PAGE: INSTRUCTIONS
SUPPORT                        F1.30         2 -                      x 3 -
**CALIBRATION BLOCK** 55 __ j
4 -
* *
722505  2-AFG-101A                      D-A     VT-3 1 -
* DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT            01.20         2 -                      x 3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_ ____ PLAN STATUS. ____ _ MAIN STEAM SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
722510 2-AFS-101                        F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -                      x 3 -
4 -
* 722515  2-AFS-101 INTEGRAL ATTACHMENT D-A 01.20 VT-3 1 -
2 -
3 4 -
x SYSTEM INSERVICE TEST (FIG NO AF-2-2/3) 722517 AUX. FW SYSTEM COMPONENTS       D-A     VT-2 1 -
PRESSURE RETAINING COMPONENTS 01.10           2 x           x          x - -
3 4 -
SYSTEM HYDROSTATIC TEST (FIG NO AF-2-2/3) 722519 AUX. FW SYSTEM COMPONENTS       D-A     VT-2 1 -
PRESSURE RETAINING COMPONENTS 01.10           2 -                       - x -
3 -
4 -
* __ j
 
DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 56 REVISION:      0                            INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
MAIN STEAM SYSTEM                                         FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-AMS-15 (FIG NO MS-2-2/3) 722520 2-MSAH-125 SUPPORT F-A VT-3 F1.30 1 --x --3 PAGE: INSTRUCTIONS
6-2-AMS-15 (FIG NO MS-2-2/3) 722520 2-MSAH-125                     F-A     VT-3 1  -
**CALIBRATION BLOCK** 56 
SUPPORT                      F1.30         2 -  - -     x - -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
*
_ ____ PLAN STATUS. ____ _ SERVICE WATER SYSTEM  
* DATE: 03/28/92                                   SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 57 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                         FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 20-2-SW-94 CFIG NO SW-1-7L> 722530 SWPS-14 SUPPORT 722535 SWPS-14 INTEGRAL ATTACHMENT 20-2-SW-95 CF I G NO SW-1-7L> 722540 SWPS-28 SUPPORT 722545 SWPS-28 INTEGRAL ATTACHMENT 20-2-SW-93 (FIG NO SW-1-7L) 722550 SWPS-15 SUPPORT 722555 SWPS-15 INTEGRAL ATTACHMENT ASME SEC. XI CATGY NDE ITEM NO METH F-A VT-3 F1.30 0-B VT-3 02.20 F-A VT-3 F1.30 0-B VT-3 02.20 F-A VT-3 F1.30 0-B VT-3 02.20 FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------123 123 123 1 -2 x 3 --1 -2 x 3 1 -2 x ---3 1 -2 x 3 1 -2 x 3 1 -2 x 3 PAGE: INSTRUCTIONS
EXAMINATION AREA                 CATGY NDE        - - - - - - 0 UT AGE - - - - - -  INSTRUCTIONS NUMBER IDENTIFICATION                     ITEM NO METH    123        123        123      **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 57 DATE: 03/28/92 REVISION:
20-2-SW-94 CFIG NO SW-1-7L>
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
722530 SWPS-14                           F-A      VT-3  1 -
* SERVI CE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ SECOND FIRST THIRD *
SUPPORT                           F1.30          2 x 3 -
* ASME SEC. XI PERIOD PERIOD PERIOD
4 -  - -
722535 SWPS-14                           0-B      VT-3  1 -
INTEGRAL ATTACHMENT               02.20          2 x 3 -
4 -
20-2-SW-95 CF I G NO SW 7L>
722540 SWPS-28                           F-A      VT-3  1 -
SUPPORT                           F1.30          2 x          -  - -
* 3 -
4 -
722545 SWPS-28                           0-B      VT-3  1 -
INTEGRAL ATTACHMENT               02.20          2 x 3 -
4 -
20-2-SW-93 (FIG NO SW-1-7L) 722550 SWPS-15                           F-A     VT-3 1 -
SUPPORT                          F1.30         2 x 3 -
4 -
722555  SWPS-15                          0-B     VT-3 1 -
INTEGRAL ATTACHMENT              02.20         2 x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 58 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* SERVI CE WATER SYSTEM                                       FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * -----0 U T A G E ------
EXAMINATION AREA               CATGY NOE       * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION. BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 20-2-SW-92 CFIG NO SW-1-7L> 722560 SWPS-16 SUPPORT 722565 SWPS-16 INTEGRAL ATTACHMENT 30-2-SW-91 CFIG NO SW-1-7L> 722570 SWPH-59 SUPPORT 722575 SWPH-59 INTEGRAL ATTACHMENT 722580 SWPH-60 SUPPORT 722585 SWPH-60 INTEGRAL ATTACHMENT 30-2-SW-90 (FIG NO SW"1-7L) 722590 SWPG-20 SUPPORT F-A VT-3 1 -F1 .30 2 x 3 D-B VT-3 1 -02.20 2 x 3 F-A VT-3 1 -F1 .30 2 x 3 0-B VT-3 1 -02.20 2 x 3 4 -F-A VT-3 1 -F1 .30 2 x 3 D-B VT-3 1 -02.20 2 x 3 " 4 -F-A VT-3 1 -F1.30 2 X 3 --------PAGE: INSTRUCTIONS
20-2-SW-92 CFIG NO SW-1-7L>
**CALIBRATION.
722560 SWPS-16                         F-A      VT-3  1 -
BLOCK** 58 f ( 
SUPPORT                       F1 .30        2x  - -
* * * , DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_ ___ ....;PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
f
(
722565   SWPS-16                       D-B      VT-3  1 -
INTEGRAL ATTACHMENT           02.20          2 x  - -
3 -
4 -
30-2-SW-91 CFIG NO SW-1-7L>
722570 SWPH-59                         F-A     VT-3 1 -
SUPPORT                        F1 .30         2 x
* 3 -
4 -
722575  SWPH-59                        0-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 x 3 ~  - -
4 -
722580 SWPH-60                          F-A     VT-3 1 -
SUPPORT                        F1 .30         2 x 3 -
4 -
722585  SWPH-60                        D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 x 3 - -
4 -
30-2-SW-90 (FIG NO SW"1-7L) 722590 SWPG-20                         F-A     VT-3 1 -
SUPPORT                        F1.30         2 X 3 -
4 -
*
 
    ,
DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 59 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _....;PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                         FIRST     SECOND     THIRD ASME                PERIOD     PERIOD     PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 30-2-SW-90 (FIG NO SW-1-7L) 722595 SWPG-20 INTEGRAL ATTACHMENT 30-2-SW-89 (FIG NO SW-1-7L) 722600 SWPA-26 SUPPORT 30-2-SW-88 (FIG NO SW-1-7L) 722610 SIJPG-50 SUPPORT 722615 SIJPG-50 INTEGRAL ATTACHMENT 30-2-SW-99 (FIG NO SIJ-1-7L) 722620 SIJPG-21 SUPPORT 722630 SIJPG-21 INTEGRAL ATTACHMENT D-B VT-3 1 -02.20 2 x 3 F-A VT-3 1 -F1.30 2. 4 -F-A VT-3 1 -F1.30 2 x 3 D-B VT-3 1 -02.20 2 x 3 F-A VT-3 1 -F1.30 2 X 3 D-B VT-3 1 -02.20 2 x 3 PAGE: INSTRUCTIONS
30-2-SW-90 (FIG NO SW-1-7L) 722595 SWPG-20                         D-B      VT-3  1 -
**CALIBRATION BLOCK** 59 
INTEGRAL ATTACHMENT             02.20          2x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
30-2-SW-89 (FIG NO SW-1-7L) 722600 SWPA-26                         F-A      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                         F1.30          2. -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI  
3 -
4 -
30-2-SW-88 (FIG NO SW-1-7L)
* 722610 SIJPG-50                         F-A      VT-3 1 -
SUPPORT                         F1.30          2x 3 -
4 -
722615 SIJPG-50                         D-B      VT-3 1 -
INTEGRAL ATTACHMENT             02.20          2x 3 -
4 -
30-2-SW-99 (FIG NO SIJ-1-7L) 722620 SIJPG-21                         F-A     VT-3 1 -
SUPPORT                        F1.30         2X 3 -
4 -
722630 SIJPG-21                        D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 60 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE NUMBER IDENTIFICATION ITEM NO METH 30-2-SW-100 (FIG NO SW-1-7L) 722640 SWPA-24 F-A VT-3 SUPPORT F1.30 30-2-SW-101 (FIG NO SW-1-7L) 722650 SWPG-498 F-A VT-3 SUPPORT F1 .30 24-2-SW-96 (FIG NO SW-1-7L) 722660 SWPS-17 F-A VT-3 SUPPORT F1 .30 722665 SWPS-17 D-B VT-3 INTEGRAL ATTACHMENT 02.20 24-2-SW-97 (FIG NO SW-1-7L) 722670 SWPS-18 F-A VT-3 SUPPORT F1.30 722675 SWPS-18 D-B VT-3 INTEGRAL ATTACHMENT 02.20 FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     123        123        123        **CALIBRATION BLOCK**
123 123 123 1 -2 x 3 1 3 1 -2 x 3 1 -2 x 3 1 -2 x 3 1 -2 x 3 PAGE: INSTRUCTIONS
30-2-SW-100 (FIG NO SW-1-7L) 722640 SWPA-24                         F-A     VT-3 1 -
**CALIBRATION BLOCK** 60 
SUPPORT                         F1.30         2 x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
30-2-SW-101 (FIG NO SW 7L) 722650 SWPG-498                         F-A     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                         F1 .30         2 -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
3 -
4 -
24-2-SW-96 (FIG NO SW-1-7L)
* 722660 SWPS-17                         F-A     VT-3 1 -
SUPPORT                         F1 .30         2 x 3 -
4 -
722665 SWPS-17                         D-B     VT-3 1 -
INTEGRAL ATTACHMENT             02.20         2 x 3 -
4 -
24-2-SW-97 (FIG NO SW-1-7L) 722670 SWPS-18                         F-A     VT-3 1 -
SUPPORT                         F1.30         2x 3 -
4 -
722675 SWPS-18                         D-B     VT-3 1 -
INTEGRAL ATTACHMENT             02.20         2 x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 61 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NDE ------0 U T A G E ------
EXAMINATION AREA               CATGY NDE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 24-2-SW-98 (FIG NO SW-1-7L) 722680 SWPA-19 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-102 (FIG NO SW-1-7M) 722690 SWPA-41 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 30-2-SW-103 CFIG NO SW-1-7M) 722710 SWPG-39 F-A VT-3 1 -SUPPORT F1.30 2 --4 2-SW-83 (FIG NO SW-1-7M) 722720 SWPA-35 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SW-141 CFIG NO SW-1-7M) 722730 SWPS-34 F-A VT-3 1 -SUPPORT F1.30 2 x 3 722735 SWPS-34 D-B VT-3 1 -INTEGRAL ATTACHMENT D2.20 2 x 3 PAGE: INSTRUCTIONS
24-2-SW-98 (FIG NO SW-1-7L) 722680 SWPA-19                         F-A     VT-3 1 -
**CALIBRATION BLOCK** 61 DATE: 03/28/92 REVISION:
SUPPORT                         F1.30         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE:
3 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ FIRST SECOND THIRD PERIOD *
4 -
* ASME SEC. XI PERIOD PERIOD
30-2-SW-102 (FIG NO SW-1-7M) 722690 SWPA-41                         F-A     VT-3 1 -
SUPPORT                         F1 .30         2 - - -
3 -
4 -
30-2-SW-103 CFIG NO SW-1-7M)
* 722710 SWPG-39                         F-A     VT-3 1 -
SUPPORT                         F1.30         2 -
3 - - -
4 -
30-2-SW-83 (FIG NO SW-1-7M) 722720 SWPA-35                         F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
30-2-SW-141 CFIG NO SW-1-7M) 722730 SWPS-34                         F-A     VT-3 1 -
SUPPORT                         F1.30         2x 3 -
4 -
722735 SWPS-34                         D-B     VT-3 1 -
INTEGRAL ATTACHMENT             D2.20         2 x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 62 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _____ PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                      FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - ', INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
', INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
30-2-SW-81RW CFIG NO SW-1-7M) 722740 SWPS-33                         F-A     VT-3 1 -
**CALIBRATION BLOCK** 30-2-SW-81RW CFIG NO SW-1-7M) 722740 SWPS-33 F-A VT-3 1 -SUPPORT F1.30 2 x 3 722745 SWPS-33 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 x 3 30-2-SW-86 CFIG NO SW-1-7M) 722750 SWPG-40 F-A VT-3 1 ---SUPPORT F1 .30 2 x 3 --722755 SWPG-40 D-B VT-3 1 ------INTEGRAL ATTACHMENT 02.20 2 x 3 30-2-SW-87 (FIG NO SW-1-7M) 722760 SWPA-42 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-75 (FIG NO SW-1-7M) 122no SWPH-62 F-A VT-3 1 -SUPPORT F1.30 2 x 3 62 
SUPPORT                       F1.30         2 x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
722745 SWPS-33                       D-B     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
INTEGRAL ATTACHMENT           02.20         2 x 3 -
_ ____ PLAN STATUS. ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
4 -
30-2-SW-86 CFIG NO SW-1-7M) 722750 SWPG-40                         F-A     VT-3 1 - - -
SUPPORT                       F1 .30         2 x
* 3 -
4 -  - -
722755 SWPG-40                       D-B     VT-3 1 - - -     - - -
INTEGRAL ATTACHMENT           02.20         2 x 3 -
4 -
30-2-SW-87 (FIG NO SW-1-7M) 722760 SWPA-42                         F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
30-2-SW-75 (FIG NO SW-1-7M) 122no SWPH-62                         F-A     VT-3 1 -
SUPPORT                       F1.30         2 x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 63 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 30-2-SW-75 (FIG NO SW-1-7M) 722775 SWPH-62 INTEGRAL ATTACHMENT 722780 SWPH-61 SUPPORT 722785 SWPH-61 INTEGRAL ATTACHMENT 24-2-SW-73 (FIG NO SW-1-7M) 722790 SWPA-38 SUPPORT 24-2-SW-74 (FIG NO sw-1-7M) 722800 SWPS-37 SUPPORT 722805 SWPS-37 INTEGRAL ATTACHMENT D-B VT-3 1 -02.20 2 x 3 F-A VT-3 1 -F1 .30 2 x 3 D-B VT-3 1 -02.20 2 x 3 F-A VT-3 1 -F1 .30 2 4 -F-A VT*3 1 -F1.30 2 x 3 D-B VT-3 1 -02.20 2 x 3 --PAGE: INSTRUCTIONS
30-2-SW-75 (FIG NO SW-1-7M) 722775 SWPH-62                       D-B      VT-3  1 -
**CALIBRATION BLOCK** 63 DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT           02.20          2 x 3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ FIRST _____ PLAN STATUS ____ _ SECOND THIRD *
722780 SWPH-61                       F-A      VT-3  1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                       F1 .30        2 x 3 -
4 -
722785 SWPH-61                       D-B      VT-3  1 -
INTEGRAL ATTACHMENT           02.20          2 x 3 -
4 -
* 722790 24-2-SW-73 (FIG NO SW-1-7M)
SWPA-38 SUPPORT F-A F1 .30 VT-3  1 2
3 4
                                                          -
                                                          -
                                                          -
                                                          -
                                                            - -
24-2-SW-74 (FIG NO sw-1-7M) 722800 SWPS-37                       F-A     VT*3 1 -
SUPPORT                        F1.30         2 x 3 -
4 -
722805  SWPS-37                        D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 64 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 24-2-SW-74 (FIG NO SW-1-7M) 722810 SWPS-36 F-A VT-3 1 -SUPPORT F1.30 2 x 3 ---4 -722815 SWPS-36 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 x 3 -( 4 2-SW-76 CFIG NO SW-1-7M) 722820 SWPS-32 F-A VT-3 1 ---SUPPORT F1.30 2 -' x 3 722825 SWPS-32 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x --3 ---' 20-2-SW-79 (FIG NO SW-1-7M) 722830 SWPS-54 F-A VT-3 1 -SUPPORT F1 .30 2 -x 3 722835 SWPS-54 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x 3 PAGE: INSTRUCTIONS
24-2-SW-74 (FIG NO SW-1-7M) 722810 SWPS-36                         F-A     VT-3 1 -
**CALIBRATION BLOCK** 64 
SUPPORT                       F1.30         2x 3 - - -
* *
4 -
* DATE: 03/28/92 REVISION:
722815 SWPS-36                         D-B     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ P.LAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
INTEGRAL ATTACHMENT           02.20         2x 3 -
(                       4 -
20-2-SW-76 CFIG NO SW-1-7M) 722820 SWPS-32                         F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 -         'x
* 3 -
4 -
722825 SWPS-32                         D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -           x - -
3 - - -             ' -
4 -
20-2-SW-79 (FIG NO SW-1-7M) 722830 SWPS-54                         F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -           x 3 -
4 -
722835 SWPS-54                       D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -           x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 65 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _P.LAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCT IONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 20-2-SW-77 (FIG NO SW-1-7M) 722840 SWPS-31 SUPPORT 722845 SWPS-31 INTEGRAL ATTACHMENT 20-2-SW-78 (FIG NO SW-1-7M) 722850 SWPS-30 SUPPORT 722855 SWPS-30 INTEGRAL ATTACHMENT 6-2-SW-957 (FIG NO SW-1-7B/2) 722860 MSWG-42 SUPPORT 722865 MSWG-42 INTEGRAL ATTACHMENT F-A VT-3 1 -F1.30 2 -3 4 -D-B VT-3 1 -02.20 2 4 -F-A VT-3 1 -F1.30 2 4 -D*B VT-3 1 -02.20 2 F-A F1.30 3 VT-3 1 -2 3 D-B VT-3 1 -02.20 2 4 -x x --x x x x PAGE: INSTRUCT IONS **CALIBRATION BLOCK** 65 DATE: 03/28/92 REVISION:
20-2-SW-77 (FIG NO SW-1-7M) 722840 SWPS-31                         F-A      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                       F1.30          2 -          x 3
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
4 -
_____ PLAN STATUS ____ _ SECOND FIRST THIRD *
722845 SWPS-31                         D-B      VT-3  1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
INTEGRAL ATTACHMENT           02.20         2 -           x - -
3 -
4 -
20-2-SW-78 (FIG NO SW-1-7M) 722850 SWPS-30                        F-A     VT-3 1 -
SUPPORT                        F1.30         2 -           x
* 3 -
4 -
722855  SWPS-30                        D*B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2             x 3 -
4 -
6-2-SW-957 (FIG NO SW-1-7B/2) 722860 MSWG-42                        F-A      VT-3 1 -
SUPPORT                        F1.30         2            x 3 -
4 -
722865  MSWG-42                        D-B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20         2 -           x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 66 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-120 722870 MSWG-41A SUPPORT 722880 MSWG-41 SUPPORT 10-2-sw-112 722890 MSWA-23 SUPPORT 6-2-SW-951 722900 MSWG-39 SUPPORT 722905 MSWG-39 (FIG NO SW-1-7B/2) (FIG NO SW-1-7B/2)
6-2-SW-120 (FIG NO SW-1-7B/2) 722870 MSWG-41A                        F-A     VT-3 1 -           -  ~
NO SW-1-7B[22 INTEGRAL ATTACHMENT 6-2-SW-114 (FIG NO SW-1-7B[22 722910 MSWG-38 SUPPORT F-A VT-3 1 -F1.30 2 ---3 ---4 ---F-A VT-3 1 ---F1.30 2 ---3 ---4 ---F-A VT-3 1 ---F1.30 2 --4 ---F-A VT-3 1 -F1 .30 2 ---3 ---4 ---D-B VT-3 1 ---D2.20 2 4 ---F-A VT-3 1 ---F1.30 2 ---3 --x --x --PAGE: INSTRUCTIONS
                                                                              -
**CALIBRATION BLOCK** 66 DATE: 03/28/92 REVISION:
SUPPORT                        F1.30         2 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 - - -
4 - - -
722880 MSWG-41                          F-A     VT-3 1 - -   -
SUPPORT                        F1.30         2 - - -
3 - - -
4 - -  -
10-2-sw-112 (FIG NO SW-1-7B/2) 722890 MSWA-23                          F-A     VT-3 1 - - -
SUPPORT                        F1.30         2 -
* 3 -  - -
4 - - -
6-2-SW-951 ~FIG  NO SW-1-7B[22 722900 MSWG-39                          F-A     VT-3 1 -
SUPPORT                        F1 .30         2 - - -       x  - -
3 - - -
4 - - -
722905  MSWG-39                        D-B     VT-3 1 - - -
INTEGRAL ATTACHMENT            D2.20         2 -          x  - -
3 -
4 - - -
6-2-SW-114 (FIG NO SW-1-7B[22 722910 MSWG-38                          F-A     VT-3 1 - - -
SUPPORT                        F1.30         2 - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 67 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM
* SERVICE WATER SYSTEM
* FIRST _____ PLAN STATUS ____ _ SECOND THIRD INSPECTION INTERVAL _ *
* FIRST       SECOND     THIRD ASME                 PERIOD    PERIOD      PERIOD SEC. XI
* ASME SEC. XI PERIOD PERIOD PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NDE ------0 U T A G E ------
EXAMINATION AREA               CATGY NDE         - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
  ------- ------------------------------ ------- ---- - ----------- ----------- ----------- -
-------------------------------------
6-2-SW-113 (FIG NO SW-1-7B/2) 722920 MSWG-31                         F-A     VT-3   1 - - -
-----------------------
SUPPORT                       F1.30         2 -
-----------
3  -
----------- 2-SW-113 (FIG NO SW-1-7B/2) 722920 MSWG-31 F-A VT-3 1 ---SUPPORT F1.30 2 4 2-SW-113 CFIG NO SW-1-7B/2) 722930 MSWH-26 F-A VT-3 1 -SUPPORT F1.30 2 --4 2-SW-960 (FIG NO SW-1-78/2) 722940 MSWG-49 F-A VT-3 1 -SUPPORT F1.30 2 ---x --3 722945 MSWG-49 D-8 VT-3 1 -INTEGRAL ATTACHMENT D2.20 2 -x --3 6-2-SW-135 (FIG NO SW-1-78/2) 722950 MSWG-48A F-A VT-3 1 -SUPPORT F1.30 2 ---3 722960 MSWG-48 F-A VT-3 1 -SUPPORT F1.30 2 ---3 PAGE: INSTRUCTIONS
4 -
**CALIBRATION BLOCK** 67  
8-2-SW-113 CFIG NO SW-1-7B/2) 722930 MSWH-26                         F-A     VT-3   1 -
* *
SUPPORT                       F1.30           2 -
* DATE: 03/28/92 REVISION:
3 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD
4 -
6-2-SW-960 (FIG NO SW-1-78/2)
* 722940 MSWG-49                         F-A     VT-3   1 -
SUPPORT                       F1.30           2 - - -     x   - -
3 -
4 -
722945   MSWG-49                       D-8       VT-3 1 -
INTEGRAL ATTACHMENT           D2.20           2 -           x   - -
3 -
4 -
6-2-SW-135 (FIG NO SW-1-78/2) 722950 MSWG-48A                         F-A     VT-3 1 -
SUPPORT                         F1.30         2 -   - -
3 -
4  -
722960 MSWG-48                         F-A     VT-3 1 -
SUPPORT                         F1.30         2 - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 68 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
* SERVICE WATER SYSTEM


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
ASME SEC. XI CATGY NOE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD
------------------------------
                                                          - - - - - - 0 UTA GE - - - - - -
--------------------------------------------- 2-SW-127 (FIG NO SW-1-7B/2) 722970 MSWA-21 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---6-2-SW-966 (FIG NO SW-1-7B/2) 722980 MSWG-52 F-A VT-3 1 ---SUPPORT F1 .30 2 ---x --3 ---4 ---722985 MSWG-52 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 ---.x --3 ---4 ---6-2-SW-129 (FIG NO SW-1-7B/2) 722990 MSWG-51 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---723000 MSWH-29 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---8-2-SW-128 (FIG NO SW-1-7B/2) 723010 MSWH-28 F-A VT-3 1 ---SUPPORT F1 .30 2 ---3 ---4 ---PAGE: INSTRUCTIONS
1 2 3       1 2 3     1 2 3 INSTRUCTIONS
**CALIBRATION BLOCK** 68 DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 69 REVISION:
                                                                                              **CALIBRATION BLOCK**
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
          ------------------------------ ------- ---- - ----------- ----------- ----------- -
* INSPECTION INTERVAL -PLAN STATUS SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
10-2-SW-127 (FIG NO SW-1-7B/2) 722970 MSWA-21                         F-A     VT-3   1 - -   -
----------*
SUPPORT                       F1.30         2 -   -   -
-----------
3 -   -   -
4 -   -   -
6-2-SW-966 (FIG NO SW-1-7B/2) 722980 MSWG-52                         F-A     VT-3   1 - -   -
SUPPORT                         F1 .30         2 - -   -   x   - -
3 -   -   -
4 - -   -
722985 MSWG-52                       D-B     VT-3   1 - -   -
INTEGRAL ATTACHMENT           02.20           2 - -   -   .x   - -
* 3 -   -   -
4 - -   -
6-2-SW-129 (FIG NO SW-1-7B/2) 722990 MSWG-51                         F-A     VT-3   1 - -   -
SUPPORT                         F1.30         2 - -   -
3 - -   -
4 - -   -
723000 MSWH-29                         F-A     VT-3 1 - -   -
SUPPORT                         F1.30         2 - -   -
3 - - -
4 - - -
8-2-SW-128 (FIG NO SW-1-7B/2) 723010 MSWH-28                         F-A     VT-3 1 - -   -
SUPPORT                         F1 .30         2 - -   -
3 - -   -
4 - -   -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE:   69 REVISION:     0                             INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
* SERVICE WATER SYSTEM


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------I NSTRUCTI CNS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK** ------------------------------
EXAMINATION AREA NUMBER !DENT! Fl CATION INSPECTION INTERVAL-ASME SEC. XI CATGY NOE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD
-----------------------
                                                          ----------- ----------* -----------
-----------
                                                          - - - - - - 0 UTA GE - - - - - -
-----------
1 2 3       1 2 3     1 2 3 I NSTRUCTI CNS
-------------------------------
                                                                                              **CALIBRATION BLOCK**
6-2-SW-954 (FIG NO SW-1-7B/2) 723020 MSWG-40 F-A VT-3 1 ---SUPPORT F1.30 2 ---x --3 ---4 ---723025 MSWG-40 D-B VT-3 INTEGRAL ATTACHMENT 02.20 2 x --3 4 ---6-2-SW-963 (FIG NO SW-1-7B/2) 723030 MSWG-50 F-A VT-3 1 ---SUPPORT F1.30 2 ---x --3
          ------------------------------ ------- ---- - ----------- ----------- ----------- - ------------------------------
* 4 ---723035 MSWG-50 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 ---x --3 ---4 ---10-2-SW-127 (FIG NO SW-1-78/4) 723040 MSWG-20 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ------723050 MSWG-13 F-A VT-3 SUPPORT F1 .30 2 3 ---4
6-2-SW-954 (FIG NO SW-1-7B/2) 723020 MSWG-40                         F-A     VT-3 1 - -   -
* DATE: 03/28/92 REVISION:
SUPPORT                       F1.30         2 -   - -     x - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -   -   -
* SERVICE WATER SYSTEM FIRST _____ PLAN STATUS ____ _ SECOND THIRD INSPECTION INTERVAL _ *
4 -   -   -
* ASME SEC. XI PERIOD PERIOD PERIOD
723025 MSWG-40                       D-B     VT-3 INTEGRAL ATTACHMENT           02.20         2             x -   -
3 4 -   -   -
6-2-SW-963 (FIG NO SW-1-7B/2) 723030 MSWG-50                         F-A     VT-3   1 - - -
SUPPORT                       F1.30           2 - - -     x   - -
* 3 4 -   - -
723035 MSWG-50                         D-B     VT-3   1 - -   -
INTEGRAL ATTACHMENT           02.20           2 - -   -   x   - -
3 -   -   -
4 - -   -
10-2-SW-127 (FIG NO SW-1-78/4) 723040 MSWG-20                         F-A     VT-3   1 - -   -
SUPPORT                         F1.30         2 - -   -
3 - -   -
4 - -   -     - - -
723050 MSWG-13                         F-A     VT-3 SUPPORT                         F1 .30         2 3 - - -
4
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 70 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND     THIRD ASME                 PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * ---* -0 U T A G E * -----NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-125 (FIG NO SW-1-7B/4) 723060 MSWG-12 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 --10-2-SW-123 (FIG NO SW-1-7B/4) 723070 MSWA-345A F-A VT-3 1 ---SUPPORT F1.30 2 --4 -723075 MSWA-345A D-B VT-3 1 ---INTEGRAL ATTACHMENT D2.20 2 ---3 ---4 ---10-2-sw-112 (FIG NO SW-1-7B/4) 723080 MSWG-18 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---723090 MSWG-15 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---10-2-SW-110 (FIG NO SW-1-7B/4) 723100 MSWG-10 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 ---4 ---PAGE: INSTRUCTIONS
EXAMINATION AREA               CATGY NOE         * - - - * - 0 UTAGE * - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 70 
10-2-SW-125 (FIG NO SW-1-7B/4) 723060 MSWG-12                         F-A     VT-3 1   - - -
* *
SUPPORT                       F1.30         2 - - -
* DATE: 03/28/92 REVISION:
3 -
0 SERVICE WATER SYSTEM SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
- - -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI -----------
10-2-SW-123 (FIG NO SW-1-7B/4) 723070 MSWA-345A                       F-A     VT-3 1   - -   -
-----------
SUPPORT                       F1.30           2 -
-----------
3  -  - -
4 -
723075 MSWA-345A                     D-B     VT-3 1   - - -
INTEGRAL ATTACHMENT           D2.20           2 - - -
                                                              - -
* 3 -
4 - - -
10-2-sw-112 (FIG NO SW-1-7B/4) 723080 MSWG-18                         F-A     VT-3 1   - -   -
SUPPORT                         F1.30         2 - -   -
3 - -   -
4 - -   -
723090 MSWG-15                         F-A     VT-3 1 - - -
SUPPORT                         F1.30         2 - - -
3 - - -
4 - - -
10-2-SW-110 (FIG NO SW-1-7B/4) 723100 MSWG-10                         F-A     VT-3 1 - -   -
SUPPORT                         F1.30         2 - -   -
3 - -   -
4 - -   -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 71 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS SERVICE WATER SYSTEM                                      FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 u T A G E ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3  
EXAMINATION AREA               CATGY NOE       --- ---0     u TAGE    ------       INSTRUCT IONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3         **CALIBRATION BLOCK**
------------
                                                        - ----------- ----------- ----------- -
-----------
10-2-SW-108 (FIG NO SW-1-7B/4) 723110 MSWA-345C                       F-A     VT-3 1 -
-----------
SUPPORT                       F1.30         2 -
10-2-SW-108 (FIG NO SW-1-7B/4) 723110 MSWA-345C F-A VT-3 1 -SUPPORT F1.30 2 4 -723115 MSWA-345C D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-SW-414 (FIG NO SW-2-3/1) 723120 2P-22SWS F-A VT-3 1 ---SUPPORT F1 .30 2 4 . 10-2-SW-445R (FIG NO SW-2-3/1) 723130 2P-SWR-43 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-678 (FIG NO SW-2-3/1) 723140 2P-22SWS-9 F-A VT-3 1 -SUPPORT F1.30 2 4 -723150 2P-SWA-102 F-A VT-3 1 -SUPPORT F1.30 2 4 --PAGE: INSTRUCT IONS **CALIBRATION BLOCK** 71 DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ .PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
723115 MSWA-345C                     D-B     VT-3 1 -
* ASME SEC. XI PERIOD PERIOD
INTEGRAL ATTACHMENT           02.20         2 -
3 -
4 -
24-2-SW-414 (FIG NO SW-2-3/1) 723120 2P-22SWS               F-A     VT-3 1 -   - -
SUPPORT                       F1 .30         2 -
* 3 -
4 .
10-2-SW-445R (FIG NO SW-2-3/1) 723130 2P-SWR-43                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-SW-678 (FIG NO SW-2-3/1) 723140 2P-22SWS-9                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
723150 2P-SWA-102                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
*
 
                                                                                                                    ---1 DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE:  72 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _.PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                      FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-678 (FIG NO SW-2-3/1) 723155 2P-SWA-102 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 2-SW-P-1171 CFIG NO SW-2-3/51) 723160 2P-SWA-110 SUPPORT 723165 2P-SWA-110 INTEGRAL ATTACHMENT 723170 2P-25SWG-1 SUPPORT F-A F1 .30 D-B 02.20 F-A F1.30 10-2-SW-P-1175 (FIG NO SW-2-3/51) 723180 2P-24SWG-1 SUPPORT 723190 2P-SWA-111 SUPPORT F-A F1 .30 F-A F1 .30 VT-3 VT-3 VT-3 VT-3 VT-3 3 ---4 2 4 ---1 3 1 3 1 3 1 3 ---PAGE: INSTRUCTIONS
6-2-SW-678 (FIG NO SW-2-3/1) 723155 2P-SWA-102                     D-B     VT-3 1 -
**CALIBRATION BLOCK** ---1 72 
INTEGRAL ATTACHMENT           02.20         2 -
* *
3 -  -  -
* DATE: 03/28/92 REVISION:
4 -
0 SERVICE WATER SYSTEM  
10-2-SW-P-1171 CFIG NO SW-2-3/51) 723160 2P-SWA-110                     F-A      VT-3  1 -
SUPPORT                       F1 .30        2 -
3 -
4 -  - -
723165 2P-SWA-110                     D-B      VT-3  1 -
INTEGRAL ATTACHMENT           02.20          2 -
* 3 -
4 -
723170 2P-25SWG-1                     F-A     VT-3  1 -
SUPPORT                        F1.30         2 -
3 -
4 -
10-2-SW-P-1175 (FIG NO SW-2-3/51) 723180 2P-24SWG-1                     F-A     VT-3  1 -
SUPPORT                        F1 .30         2 -
3 -           - - -
4 -
723190  2P-SWA-111                    F-A      VT-3 1 -
SUPPORT                        F1 .30        2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                          PAGE: 73 REVISION:     0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
EXAMINATION AREA               CATGY NDE       - - - - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    123         123         123       **CALIBRATION BLOCK**
ASME SEC. XI CATGY NDE ITEM NO METH _____ .PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------
10-2-SW-P-1175 (FIG NO SW-2-3/51) 723195 2P-SWA-111                     D-B     VT-3 1 -
123 123 123 10-2-SW-P-1175 (FIG NO SW-2-3/51) 723195 2P-SWA-111 INTEGRAL ATTACHMENT D-B VT-3 1 -D2.20 2 4 2-SW-P-1182 (FIG NO SW-2-3/51) 723200 2P-23SWG-1 SUPPORT 723210 2P-SWA-112 SUPPORT 723215 2P-SWA-112 INTEGRAL ATTACHMENT F-A F1.30 F-A F1 .30 D-B D2.20 VT-3 1 3 VT-3 1 3 VT-3 1 3 16-2-SW-P-1167 CFIG NO SW-2-3/51) 723220 2P-22SWG-3 SUPPORT F-A VT-3 1 -F1.30 2 --4 ---16-2-SW-P-1168 (FIG NO SW-2-3/51) 723230 2P-22SWA-5 F-A VT-3 1 -SUPPORT F1 .30 2 4 -------PAGE: INSTRUCTIONS
INTEGRAL ATTACHMENT            D2.20         2 -
**CALIBRATION BLOCK** 73 
3 -
* *
4 -
* DATE: 03/28/92 REVISION:
10-2-SW-P-1182 (FIG NO SW-2-3/51) 723200 2P-23SWG-1                     F-A      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD SEC. XI -----------
SUPPORT                       F1.30          2 -
-----------
3 -
-----------
4 -
723210 2P-SWA-112                     F-A     VT-3  1 -
SUPPORT                        F1 .30         2 -
* 3 -
4 -
723215  2P-SWA-112                    D-B     VT-3  1 -
INTEGRAL ATTACHMENT            D2.20         2 -
3 -
4 -  - -
16-2-SW-P-1167 CFIG NO SW-2-3/51) 723220 2P-22SWG-3                     F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 - - -
16-2-SW-P-1168 (FIG NO SW-2-3/51) 723230 2P-22SWA-5                     F-A     VT-3 1 -           - - -
SUPPORT                       F1 .30         2 -           - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 74 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-458 (FIG NO SW-2-3/3) 723240 2P-SWR-44 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-468 (FIG NO SW-2-3/3) 723250 2C-24SWH-2 F.-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-469 (FIG NO SW-2-3/3) 723260 2C-23SWG-3A F-A VT-3 1 -SUPPORT F1.30 2 4 -723270 2C-23SWH-4A F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-470 CFIG NO SW-2-3/3) 723280 2C-23SWG-5A F-A VT-3 1 ---SUPPORT F1 .30 2 4 -723290 2C-23SWG-6A F-A VT-3 1 -SUPPORT F1 .30 2 ---3 PAGE: INSTRUCTIONS
10-2-SW-458 (FIG NO SW-2-3/3) 723240 2P-SWR-44                       F-A     VT-3 1 -
**CALIBRATION BLOCK** 74 
SUPPORT                       F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
10-2-SW-468 (FIG NO SW-2-3/3) 723250 2C-24SWH-2                     F.-A     VT-3 1 -
_ ____ .PLAN STATUS ____ _ SERVICE WATER SYSTEM  
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-469 (FIG NO SW-2-3/3)
* 723260 2C-23SWG-3A                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
723270 2C-23SWH-4A                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-470 CFIG NO SW-2-3/3) 723280 2C-23SWG-5A                     F-A     VT-3 1 - - -
SUPPORT                       F1 .30         2 -
3 -
4 -
723290 2C-23SWG-6A                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE:    75 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                   I FIRST        SECOND      THIRD ASME            I PERIOD        PERIOD      PERIOD SEC. XI        I -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 10-2-SW-471 (FIG NO SW-2-3/3) 723300 2C-23SWH-7A SUPPORT 723310 2C-24SWA-4 SUPPORT 10-2-SW-472 (FIG NO SW-2-3/3) 723320 2C-24SWH-5A SUPPORT 10-2-SW-474 CFIG NO SW-2-3/3) 723330 2C-23SWH-11A SUPPORT 10-2-SW-475 (FIG NO SW-2-3/3)
EXAMINATION AREA               CATGY NOE      1 - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH -1 1 2 3         1 2 3     1 2 3     **CALIBRATION BLOCK**
'723340 2C-23SWG-12A SUPPORT 723350 2C-23SWG-13A SUPPORT I FIRST SECOND ASME I PERIOD PERIOD I -----------
                                                                                              --~---------------------------
THIRD PERIOD SEC. XI CATGY NOE ITEM NO METH 1 -----0 U T A G E ------1 2 3 1 2 3 1 2 3 F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 --4 -F-A VT-3 1 -F1.30 2 4 ---F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 ---3 . --F-A VT-3 1 ---F1.30 2 ---3 PAGE: INSTRUCTIONS
10-2-SW-471 (FIG NO SW-2-3/3) 723300 2C-23SWH-7A                    F-A     VT-3 1 -
**CALIBRATION BLOCK** 75 
SUPPORT                        F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
723310 2C-24SWA-4                      F-A     VT-3 1 -
_ ____ .PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                        F1.30         2 -
3 -   -  -
4 -
10-2-SW-472 (FIG NO SW-2-3/3) 723320 2C-24SWH-5A                    F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
* 3 -
4 -   -  -
10-2-SW-474 CFIG NO SW-2-3/3) 723330 2C-23SWH-11A                    F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
10-2-SW-475 (FIG NO SW-2-3/3)
  '723340  2C-23SWG-12A                  F-A     VT-3 1 -
SUPPORT                        F1.30         2 - -   -
3 -
4 - .-   -
723350 2C-23SWG-13A                    F-A     VT-3 1 - -   -
SUPPORT                        F1.30         2 - -   -
3 -
4 -
* DATE: 03/28/92                                   SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 76 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                         FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
. EXAMINATION AREA CATGY NOE * * ----0 UT AGE -*** -* -NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-476 (FIG NO SW-2-3/4) 723360 2C-24SWH-7 F-A SUPPORT F1.30 10-2-SW-477 CFIG NO SW-2-3/4) 723370 2C-24SWG-8 F-A SUPPORT F1.30 . 10-2-SW-P-843 NO 723380 2C-24SWA-4001 SUPPORT 723385 2C-24SWA-4001 INTEGRAL ATTACHMENT F*A F1.30 D*B 02.20 10-2-SW-P-845 CFIG NO SW-2-3&#xa3;35) 723390 2C-24SWG-4002 SUPPORT 723395 2C-24SWG-4002 INTEGRAL ATTACHMENT F*A F1 .30 D*B 02.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 1 ---2 ---3 ---" -. 1 3 1 x 3 1 x 3 1 x 3 ---4 --2 -x 3 PAGE: INSTRUCTIONS
. EXAMINATION AREA               CATGY NOE       * * - - - - 0 UT AGE - *** - * - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 76 DATE: 03/28/92 REVISION:
10-2-SW-476 (FIG NO SW-2-3/4) 723360 2C-24SWH-7                       F-A     VT-3  1 -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                         F1.30         2 -  - -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
3 -  - -      " -.  -
_____ .PLAN STATUS ____ _ SECOND FIRST THIRD * *
4 -
10-2-SW-477 CFIG NO SW-2-3/4) 723370 2C-24SWG-8                       F-A     VT-3  1 -
SUPPORT                         F1.30         2 -
3 -
4 -
        . 10-2-SW-P-843 ~FIG NO SW-2-3&#xa3;35~
* 723380 2C-24SWA-4001                     F*A      VT-3  1 -
SUPPORT                         F1.30          2 -          x 3 -
4 -
723385   2C-24SWA-4001                   D*B     VT-3  1 -
INTEGRAL ATTACHMENT            02.20         2 -          x 3 -
4 -
10-2-SW-P-845 CFIG NO SW-2-3&#xa3;35) 723390 2C-24SWG-4002                     F*A     VT-3  1 -
SUPPORT                        F1 .30         2 -           x 3 - - -
4 -
723395  2C-24SWG-4002                  D*B      VT-3 1 - - -
INTEGRAL ATTACHMENT            02.20          2 -           x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 77 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST      SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NOE ITEM NO METH 10-2-SW-P-845 (FIG NO SW-2-3/35) 723400 2C-24SWG-4003 SUPPORT 723405 2C-24SWG-4003 INTEGRAL ATTACHMENT 10-2-SW-482AR (FIG NO SW-2-3/5) 723410 2P-SWR-45 SUPPORT 723420 2P-23SWS-5 SUPPORT 10-2-SW-495 (FIG NO sw-2-3/5) 723430 2C-23SWH-2 SUPPORT 723440 2C-23SWG-3B SUPPORT F-A VT-3 F1.30 D-B VT-3 02.20 F-A VT-3 F1 .30 F-A VT-3 F1 .30 F-A VT-3 F1.30 F-A VT-3 F1 .30 PERIOD PERIOD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     123        123        123        **CALIBRATION BLOCK**
123 123 123 1 x --3 1 x 3 1 3 1 3 --1 3 1 3 PAGE: INSTRUCTIONS
10-2-SW-P-845 (FIG NO SW-2-3/35) 723400 2C-24SWG-4003                   F-A      VT-3  1 -
**CALIBRATION BLOCK** 77 DATE: 03/28/92 REVISION:
SUPPORT                         F1.30          2 -          x - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
4 -
_ ___ _.PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
723405 2C-24SWG-4003                   D-B      VT-3  1 -
* ASME SEC. XI PERIOD PERIOD
INTEGRAL ATTACHMENT             02.20          2 -          x 3 -
4 -
10-2-SW-482AR (FIG NO SW-2-3/5) 723410 2P-SWR-45                       F-A      VT-3  1 -
SUPPORT                         F1 .30        2 -
* 3 -
4 -
723420 2P-23SWS-5                     F-A      VT-3  1 -
SUPPORT                         F1 .30        2 -
3 -
4 -  - -
10-2-SW-495 (FIG NO sw-2-3/5) 723430 2C-23SWH-2                       F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
723440 2C-23SWG-3B                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 78 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ __.PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                      FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - I~STRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3   **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-496 CFIG NO SW-2-3/5) 723450 2C-23SWH-4B F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SW-497 CFIG NO SW-2-3/5) 723460 2C-23SWG-5B F-A VT-3 1 -SUPPORT F1.30 2 4 -723470 2C-23SWG-6B F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-498 CFIG NO SW-2-3/5) 723480 2C-23SWH-7B F-A VT-3 1 -SUPPORT F1.30 2 4 -723490 2C-23SWG-8B F-A VT-3 1 -SUPPORT F1.30 2 _) 10-2-SW-499 (FIG NO SW-2-3/5) 723500 2C-23SWA-10 F-A VT-3 1 -SUPPORT ' F1 .30 2 4 -PAGE:
10-2-SW-496 CFIG NO SW-2-3/5) 723450 2C-23SWH-4B                     F-A     VT-3 1 -
**CALIBRATION BLOCK** 78 
SUPPORT                       F1 .30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
10-2-SW-497 CFIG NO SW-2-3/5) 723460 2C-23SWG-5B                     F-A     VT-3 1 -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                       F1.30         2 -
3 -
4 -
723470 2C-23SWG-6B                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3-4 -
10-2-SW-498 CFIG NO SW-2-3/5) 723480 2C-23SWH-7B                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
723490 2C-23SWG-8B                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -                    _) -
4 -
10-2-SW-499 (FIG NO SW-2-3/5) 723500 2C-23SWA-10                   F-A     VT-3 1 -
SUPPORT '                     F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 79 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ----*
EXAMINATION AREA               CATGY NOE       - - - - *
* 0 U T A G E ------
* 0 UTAGE - - - - - -   INSTRUCT IONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-501 (FIG NO SW-2-3/5) 723510 2C-23SWH-11B F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-502 (FIG NO SW-2-3/5) 723520 2C-23SWG-12B F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-503 (FIG NO SW-2-3/6) 723530 2C-23SWG-13B F-A VT-3 1 -SUPPORT F1.30 2 4 -723540 2C-23SWH-14B F-A . VT-3 1 -SUPPORT F1.30 2 4 2-SW-504 (FIG NO SW-2-3/6) 723550 2C-23SWG-15B F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SW-505 (FIG NO SW-2-3/6) 723560 2C-23SWH-17 F-A VT-3 1 -SUPPORT F1 .30 2 4 -PAGE: INSTRUCT IONS **CALIBRATION BLOCK** 79 
10-2-SW-501 (FIG NO SW-2-3/5) 723510 2C-23SWH-11B                   F-A     VT-3 1 -
* *
SUPPORT                       F1.30         2 -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
10-2-SW-502 (FIG NO SW-2-3/5) 723520 2C-23SWG-12B                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-503 (FIG NO SW-2-3/6)
* 723530 2C-23SWG-13B                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
723540 2C-23SWH-14B                   F-A . VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-504 (FIG NO SW-2-3/6) 723550 2C-23SWG-15B                   F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
10-2-SW-505 (FIG NO SW-2-3/6) 723560 2C-23SWH-17                   F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 80 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-505 (FIG NO SW-2-3/6) 723570 2C-23SWS-18 F-A SUPPORT F1 .30 10-2-SW-506 (FIG NO SW-2-3/6) 723580 2C-23SWG-19 F-A SUPPORT F1 .30 10-2-SW-P-784 NO 723590 2C-23SWA-3001 SUPPORT 723595 2C-23SWA-3001 INTEGRAL ATTACHMENT F-A F1.30 D-B 02.20 10-2-SW-P-786 (FIG NO SW-2-3&#xa3;33) 723600 2C-23SWG-3002 SUPPORT 723610 2C-23SWG-3003 SUPPORT F-A F1 .30 F-A F1.30 VT-3 1 3 VT-3 1 3 VT-3 1 x --3 VT-3 1 x 3 VT-3 1 3 VT-3 1 ---2 4 -PAGE: INSTRUCTIONS
10-2-SW-505 (FIG NO SW-2-3/6) 723570 2C-23SWS-18                     F-A     VT-3 1 -
**CALIBRATION BLOCK** 80 DATE: 03/28/92 REVISION:
SUPPORT                         F1 .30         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
4 -
PLAN STATUS SECOND FIRST THIRD *
10-2-SW-506 (FIG NO SW-2-3/6) 723580 2C-23SWG-19                     F-A     VT-3  1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                         F1 .30         2 -
3 -
4 -
10-2-SW-P-784 ~FIG NO SW-2-3&#xa3;33~
* 723590 2C-23SWA-3001                   F-A      VT-3  1 -
SUPPORT                         F1.30          2 -          x - -
3 -
4 -
723595 2C-23SWA-3001                   D-B     VT-3  1 -
INTEGRAL ATTACHMENT            02.20         2 -          x 3 -
4 -
10-2-SW-P-786 (FIG NO SW-2-3&#xa3;33) 723600 2C-23SWG-3002                   F-A     VT-3  1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
723610 2C-23SWG-3003                    F-A      VT-3 1 - - -
SUPPORT                        F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 81 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_  ~~~~-
PLAN STATUS -~~~~
* SERVICE WATER SYSTEM                                       FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   I NSTRUCTI CNS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-454 (FIG NO SW-2-3/2) 723620 2C-25SWS-1 F-A SUPPORT F1.30 10-2-SW-455 (FIG NO SW-2-3/2) 723630 2C-25SWG-3 F-A SUPPORT F1.30 10-2-SW-P-958 NO SW-2-3&#xa3;372 723640 2C-25SWA-5001 SUPPORT 723645 2C-25SWA-5001 INTEGRAL ATTACHMENT F-A F1.30 D-B 02.20 10-2-SW-P-960 (FIG NO SW-2-3&#xa3;37) 723650 2C-25SWG-5002 SUPPORT 723660 2C-25SWG-5003 SUPPORT F-A F1.30 F-A F1.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 1 --3 1 3 1 x 3 --1 x --3 1 --3 1 3 PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** 81 DATE: 03/28/92 REVISION:
10-2-SW-454 (FIG NO SW-2-3/2) 723620 2C-25SWS-1                     F-A     VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                         F1.30         2 -  - -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD *
3 -
* ASME SEC. XI *----------
4 -
-----------
10-2-SW-455 (FIG NO SW-2-3/2) 723630 2C-25SWG-3                     F-A     VT-3  1 -
-----------
SUPPORT                         F1.30         2 -
3 -
4 -
10-2-SW-P-958 ~FIG NO SW-2-3&#xa3;372
* 723640 2C-25SWA-5001                   F-A      VT-3  1 -
SUPPORT                         F1.30          2 -          x 3 -
4 -  - -
723645 2C-25SWA-5001                   D-B     VT-3  1 -
INTEGRAL ATTACHMENT            02.20         2 -          x  - -
3 -
4 -
10-2-SW-P-960 (FIG NO SW-2-3&#xa3;37) 723650 2C-25SWG-5002                   F-A      VT-3  1 -
SUPPORT                         F1.30         2 - - -
3 -
4 -
723660  2C-25SWG-5003                  F-A      VT-3 1 -
SUPPORT                        F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 82 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND      THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         *---------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -     INSTRUCT IONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-535R 723670 2P-22SWS-26
10-2-SW-535R (FIG NO SW-2-3/7) 723670 2P-22SWS                   F-A      VT-3  1 -
-SUPPORT 723680 2P-SWR-49 SUPPORT 10-2-SW-513 723690 2P-SWR-50 SUPPORT 10*2-SW-525 723700 2C-21SWH-1 SUPPORT 723710 2C-21SWG-3D SUPPORT (FIG NO SW-2-3/7) (FIG NO SW-2-3/7)
SUPPORT                        F1.30          2 -
NO 10-2-SW-547 (FIG NO SW-2-3[7) 723720 2C-22SWH-1 SUPPORT F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 ---F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 ---3 PAGE: INSTRUCT IONS **CALIBRATION BLOCK** 82 DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ SECOND FIRST THIRD *
723680 2P-SWR-49                       F-A      VT-3  1 - - -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                         F1.30          2 -
3 -
4 -
10-2-SW-513 (FIG NO SW-2-3/7) 723690  2P-SWR-50                      F-A      VT-3  1 -
SUPPORT                        F1.30          2 -
* 3 -
4 -
10*2-SW-525  ~FIG NO SW-2-3[7~
723700  2C-21SWH-1                     F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
723710  2C-21SWG-3D                    F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
10-2-SW-547 (FIG NO SW-2-3[7) 723720 2C-22SWH-1                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 83 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-547 (FIG NO SW-2-3/7) 723730 2C-21SWG-3C F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-526 (FIG NO SW-2-3/9) 723740 2C-21SWG-4D F-A VT-3 1 -SUPPORT F1 .30 2 4 -723750 2C-21SWG-5D F-A VT-3 1 -SUPPORT F1.30 2 4 ---10-2-SW-527 (FIG NO SW-2-3/9) 723760 2C-21SWA-6 F-A VT-3 1 -SUPPORT F1.30 2 4 -723770 2C-21SWG-8D F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-528 (FIG NO SW-2-3/9) 723780 2C-21SWG-9D F-A VT-3 1 -SUPPORT F1 .30 2 4 -PAGE: INSTRUCTIONS
10-2-SW-547 (FIG NO SW-2-3/7) 723730 2C-21SWG-3C                     F-A     VT-3 1 -
**CALIBRATION BLOCK** 83 DATE: 03/28/92 REVISION:
SUPPORT                       F1.30         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
4 -
* ASME SEC. XI PERIOD PERIOD
10-2-SW-526 (FIG NO SW-2-3/9) 723740 2C-21SWG-4D                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
723750 2C-21SWG-5D                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 - - -
10-2-SW-527 (FIG NO SW-2-3/9) 723760 2C-21SWA-6                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
723770 2C-21SWG-8D                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-528 (FIG NO SW-2-3/9) 723780 2C-21SWG-9D                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 84 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE -* * -* -0 U T A G E --
EXAMINATION AREA               CATGY NOE       - * * - * - 0 UTAGE - - * - - -   I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
* ---NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW*529R (FIG NO SW-2-3/9) 723790 2C-21SWH*10 F-A SUPPORT F1 .30 10*2-SW*531 (FIG NO SW*2*3/9) 723800 2C-21SWG*13 F-A SUPPORT F1.30 10*2-SW*P*556 NO SW*2-3[292 723810 2C*21SWA*1001 SUPPORT 723815 2C-21SWA-1001 INTEGRAL ATTACHMENT F*A F1 .30 D*B 02.20 10*2-SW-P-558 (FIG NO SW-2-3[292 723820 2C-21SWG-1002 SUPPORT 723830 2C-21SWG-1003 SUPPORT F-A F1 .30 F-A F1.30 VT-3 1 -2 . 3 . -VT-3 1 . 2 -x 3 -. VT-3 1 -2 . x 3 . 4 . VT*3 1 . 2 . x 3 . 4 -VT-3 1 3 VT-3 1 3 --PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** 84 DATE: 03/28/92 REVISION:
10-2-SW*529R (FIG NO SW-2-3/9) 723790 2C-21SWH*10                   F-A     VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                       F1 .30         2 .
* SERVICE WATER SYSTEM INSPECTION INTERVAL_  
3 -
-----'PLAN STATUS ____ _ SECOND FIRST THIRD *
4 -  . -
* ASME '
10*2-SW*531 (FIG NO SW*2*3/9) 723800 2C-21SWG*13                   F-A     VT-3  1 .
SUPPORT                       F1.30         2 -          x 3 -  . -
4 -
10*2-SW*P*556 ~FIG NO SW*2-3[292
* 723810 2C*21SWA*1001                 F*A      VT-3 1  -
SUPPORT                       F1 .30        2 .          x 3 .
4 .
723815 2C-21SWA-1001                 D*B     VT*3  1 .
INTEGRAL ATTACHMENT            02.20         2 .          x 3 .
4 -
10*2-SW-P-558 (FIG NO SW-2-3[292 723820 2C-21SWG-1002                 F-A     VT-3  1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
723830  2C-21SWG-1003                  F-A      VT-3 1 -
SUPPORT                        F1.30          2 -
3 -
4 - - -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 85 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ -----'PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                        FIRST      SECOND     THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI
  '


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NOE ITEM NO METH 16-2-SW-P-1217 (FIG SW-2-3/53) 723840 2P-21SWA-5 SUPPORT 723850 2P-21SWG-5 SUPPORT F-A F1.30 F-A F1.30 10-2-SW-P-1226 (FIG NO SW-2-3/53) 723860 2P-22SWG-13 F-A SUPPORT F1.30 723870 2P-SWA-106 F-A SUPPORT F1 .30 10-2-SW-P-1222 (FIG NO SW-2-3/53) 723880 2P-21SWG-9 F-A SUPPORT F1.30 10-2-SW-P-1223 (FIG NO SW-2-3/53) 723890 2P-SWA-105 F-A SUPPORT F1.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 PERIOD PERIOD PERIOD ------0 U T A G E ------123 123 123 1 3 ---4 2. ---3 1 3 1 3 1 3 --. 2 4 -PAGE: INSTRUCTIONS
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     123        123        123        **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 85 
16-2-SW-P-1217 (FIG ~O SW-2-3/53) 723840 2P-21SWA-5                     F-A      VT-3 1  -
* * '"'"'
SUPPORT                       F1.30          2 -
* DATE: 03/28/92 REVISION:
3 -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_ ____ .PLAN STATUS ____ _ SERVICE WATER SYSTEM  
723850 2P-21SWG-5                     F-A     VT-3 1  -
SUPPORT                        F1.30         2. -  - -
3 -
4 -
10-2-SW-P-1226 (FIG NO SW-2-3/53) 723860 2P-22SWG-13                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 -
723870 2P-SWA-106                     F-A     VT-3  1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
10-2-SW-P-1222 (FIG NO SW-2-3/53) 723880 2P-21SWG-9                     F-A     VT-3  1 -
SUPPORT                       F1.30         2 -
3 -
4 -            - - .-
10-2-SW-P-1223 (FIG NO SW-2-3/53) 723890 2P-SWA-105                     F-A     VT-3 1 -
SUPPORT                        F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 86 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NOE ITEM NO METH 10-2-SW-P-1223 CFIG NO SW-2-3/53) 723895 2P-SWA-105 D-B INTEGRAL ATTACHMENT 02.20 24-2-SW-420 (FIG NO SW-2-3/10) 723900 2P-22SWS-2 F-A SUPPORT F1 .30 24-2-SW-431A (FIG NO SW-2-3j10) 723910 2-SWWA-6J1 F-A WALL ANCHOR F1.30 723915 2-SWWA-6J1 D-B INTEGRAL ATTACHMENT 02.20 24-2-SWSL-105 NO SW-2-3L10l 723920 2-SWWA-6K4 WALL ANCHOR 723925 2-SWWA-6K4 INTEGRAL ATTACHMENT F-A F1.30 D-B 02.20 VT-3 VT-3 VT-3 SEE INST VT-3 SEE INST FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------1 2 3 1 2 3 1 2 3 1 3 1 ---2 4 2 4 2 4 2 ---3 1 3 --PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** INACCESSIBLE INACCESSIBLE 86 J DATE: 03/28/92 REVISION:
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A G E - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
10-2-SW-P-1223 CFIG NO SW-2-3/53) 723895 2P-SWA-105                       D-B     VT-3  1 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD *
INTEGRAL ATTACHMENT             02.20         2 -
* ASME SEC. XI -----------
3 -
-----------
4 -
-----------
24-2-SW-420 (FIG NO SW-2-3/10) 723900 2P-22SWS-2                       F-A     VT-3  1 -  - -
SUPPORT                         F1 .30         2 -
3 -
4 -
24-2-SW-431A (FIG NO SW-2-3j10)
* 723910 2-SWWA-6J1                       F-A     VT-3 1  -
WALL ANCHOR                     F1.30         2 -
3 -
'"'"'                                                          4 -
723915 2-SWWA-6J1                     D-B     SEE  1 -                                  INACCESSIBLE INTEGRAL ATTACHMENT             02.20   INST  2 -
3 -
4 -
24-2-SWSL-105 ~FIG  NO SW-2-3L10l 723920 2-SWWA-6K4                       F-A      VT-3  1 -
WALL ANCHOR                    F1.30         2 - - -
3 -
4 -
723925  2-SWWA-6K4                      D-B      SEE  1 -                                   INACCESSIBLE INTEGRAL ATTACHMENT            02.20    INST  2 -
3 -
4 - - -
      *
 
                                                                                                                            ---i DATE: 03/28/92                                     SALEM NUCLEAR POWER STATION UNIT 2                             PAGE:  87 REVISION:        0                                INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                           FIRST     SECOND      THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA                   CATGY NOE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                       ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 24-2-S\.l-432 (FIG NO S\./-2-3/10) 723930 2P-21S\.IS-1 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-S\.l-434 (FIG NO S\./-2-3/10) 723940 2P-21S\.IS-4 F-A VT-3 1 -SUPPORT F1 .30 2 4 -723950 2P-SWA-\.IS04 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-S\.ISL-104
24-2-S\.l-432 (FIG NO S\./-2-3/10) 723930 2P-21S\.IS-1                         F-A     VT-3 1 - - -
{FIG NO 723960 2-S\.l\.IA-6K3  
SUPPORT                             F1 .30         2 -
\./ALL ANCHOR 723965 2-S\.IWA-6K3 INTEGRAL ATTACHMENT 24-2-S\.l-420 (FIG NO S\./-2-3[10) 723970 2P-21S\.IS-2 SUPPORT F-A VT-3 1 -F1.30 2 4 -D-B SEE 1 -02.20 INST 2 4 -F-A VT-3 1 -F1.30 2 4 --------PAGE: INSTRUCTIONS
3 -
**CALIBRATION BLOCK** INACCESSIBLE
4 -
---i 87 
24-2-S\.l-434 (FIG NO S\./-2-3/10) 723940 2P-21S\.IS-4                         F-A     VT-3 1 -
* *
SUPPORT                             F1 .30         2 -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 - - -
_____ .PLAN STATUS ____ _ SERVICE WATER SYSTEM  
723950 2P-SWA-\.IS04                       F-A     VT-3 1 - -
SUPPORT                             F1 .30         2 -
* 3 -
4 -
24-2-S\.ISL-104 {FIG NO S\./-2-3[10~
723960 2-S\.l\.IA-6K3                       F-A      VT-3  1 -
          \./ALL ANCHOR                       F1.30          2 -
3 -  - -
4 -
723965 2-S\.IWA-6K3                       D-B      SEE  1 -                                  INACCESSIBLE INTEGRAL ATTACHMENT               02.20    INST  2 -
3 -
4 -
24-2-S\.l-420 (FIG NO S\./-2-3[10) 723970 2P-21S\.IS-2                       F-A     VT-3 1 -
SUPPORT                            F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 88 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NOE ITEM NO METH FIRST SECOND THIRD PERIOD PERIOD PERIOD * -----0 U T A G E ------1 2 3 1 2 3 1 2 3 24-2-SWSL-107 CFIG NO SW-2-3/10) 723974 2-SWWA-6K2 WALL ANCHOR 723978 2-SWWA-6K2 INTEGRAL ATTACHMENT F-A F1.30 D-B 02.20 VT-3 SEE INST 1 3 --1 --3 24-2-SWSL-106 (FIG NO SW-2-3/10) 723980 2-SWWA-6K1 WALL ANCHOR 723985 2-SWWA-6K1 INTEGRAL ATTACHMENT 723990 2P-SWWA-WA6 SUPPORT 8-2-SW-676AR CFIG NO SW-2-3/10) 724000 2P-22SWR-31 SUPPORT F-A VT-3 1 -F1.30 2 4 -D-B SEE 1 -02.20 INST 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 ---F1.30 2 4 ---"-... -PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** INACCESSIBLE INACCESSIBLE 88 DATE: 03/28/92 REVISION:
EXAMINATION AREA               CATGY NOE       * - - - - - 0 U T A G E - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                  ITEM NO METH    1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
24-2-SWSL-107 CFIG NO SW-2-3/10) 723974 2-SWWA-6K2                       F-A      VT-3  1 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ .PLAN STATUS ____ _ SECOND FIRST THIRD *
WALL ANCHOR                     F1.30          2 -
* ASME SEC. XI PERIOD PERIOD PERIOD
3 -
4 -  - -
723978 2-SWWA-6K2                       D-B     SEE  1 -                                  INACCESSIBLE INTEGRAL ATTACHMENT            02.20   INST 2 - - -
3 -
4 -
24-2-SWSL-106 (FIG NO SW-2-3/10) 723980 2-SWWA-6K1                     F-A      VT-3  1 -
WALL ANCHOR                     F1.30          2 -
* 3 -
4 -
723985 2-SWWA-6K1                     D-B      SEE  1 -              "-...
                                                                                -            INACCESSIBLE INTEGRAL ATTACHMENT             02.20    INST  2 -
3 -
4 -
723990 2P-SWWA-WA6                     F-A      VT-3  1 -
SUPPORT                         F1.30          2 -
3 -
4 -
8-2-SW-676AR CFIG NO SW-2-3/10) 724000 2P-22SWR-31                     F-A     VT-3 1 - - -
SUPPORT                        F1.30         2 -
3 -
4 - - -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 89 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-SW-978 (FIG NO SW-2-3/10) 724010 2P-22SWR-29 F-A VT-3 1 ---SUPPORT F1.30 2 4 2-SW-979 (FIG NO SW-2-3/10) 724020 2P-22SWR-32 F-A VT-3 1 -SUPPORT F1 .30 2 4 ---8-2-SW-980 CFIG NO SW-2-3/10) 724030 2P-21SWR-28 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-981 (FIG NO SW-2-3/10) 724040 2P-21SWR-29 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-549 CFIG NO SW-2-3/8) 724050 2C-21SWG-4C F-A VT-3 1 -SUPPORT F1.30 2 ---3 . ---724060 2C-21SWG-5C F-A VT-3 1 ---SUPPORT F1.30 2 , 4 -PAGE: INSTRUCTIONS
8-2-SW-978 (FIG NO SW-2-3/10) 724010 2P-22SWR-29                     F-A     VT-3 1 - - -
**CALIBRATION BLOCK** 89 
SUPPORT                       F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
8-2-SW-979 (FIG NO SW-2-3/10) 724020 2P-22SWR-32                     F-A     VT-3 1 -
_ ____ PLAN STATUS. ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
SUPPORT                       F1 .30         2 -
3 -
4 - - -
8-2-SW-980 CFIG NO SW-2-3/10)
* 724030 2P-21SWR-28                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
8-2-SW-981 (FIG NO SW-2-3/10) 724040 2P-21SWR-29                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-549 CFIG NO SW-2-3/8) 724050 2C-21SWG-4C                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 - - -
3 -
4 -          . - - -
724060 2C-21SWG-5C                     F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 -
3 -                                ,
4 -
* DATE: 03/28/92                               SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 90 REVISION:      0                            INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                     FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 UT A G*E ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-549 CFIG NO SW-2-3/8) 724070 2C-22SWG-3C F-A VT-3 1 -SUPPORT F1.30 2 4 -724080 2C-22SWA-4 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-sw-550 CFIG NO SW-2-3/8) 724090 2C-21SWG-9C F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-551 CFIG NO SW-2-3/8) 724100 2C-21SWG-11C F"A VT-3 1 ---SUPPORT F1.30 2 4 2-SW-552 (FIG NO SW-2-3/8) 724110 2C-22SWG-6C F-A VT-3 1 -SUPPORT F1.30 2 4 -724120 2C-22SWG-7C F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
EXAMINATION AREA             CATGY NOE       - - - - - - 0 UT A G*E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 90 
10-2-SW-549 CFIG NO SW-2-3/8) 724070 2C-22SWG-3C                   F-A     VT-3 1 -
* *
SUPPORT                       F1.30         2 -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD SEC. XI -----------
724080 2C-22SWA-4                     F-A     VT-3 1 -
-----------
SUPPORT                       F1 .30         2 -
-----------
3 -
4 -
10-2-sw-550 CFIG NO SW-2-3/8) 724090 2C-21SWG-9C                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 -
10-2-SW-551 CFIG NO SW-2-3/8) 724100 2C-21SWG-11C                 F"A     VT-3 1 - - -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-552 (FIG NO SW-2-3/8) 724110 2C-22SWG-6C                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
724120 2C-22SWG-7C                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                     SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 91 REVISION:      0                                  INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                           FIRST      SECOND      THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA                   CATGY NOE       - - - - - - 0 UT A GE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                       ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-S\.J-553 (FIG NO SW-2-3/8) 724130 2C-22SWH-9 F-A SUPPORT F1.30 10-2-SW-554 CFIG NO SW-2-3/8) 724140 2C-22S\.JG-12 F-A SUPPORT F1 .30 10-2-S\.J-P-669 (FIG NO S\.J-2-3/31) 724150 2C-22S\.JH-2002 SUPPORT 10-2-S\.J-P-672 724160 2C-22SWG-2003 SUPPORT 724170 2C-22S\.JG-2004 SUPPORT 724180 2C-22S\.JA-2001 SUPPORT F-A F1 .30 NO F-A F1 .30 F-A F1 .30 F-A F1.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 1 3 1 ---2 4 --2 4 --2 --4 2 4 2 ---x --3 PAGE: INSTRUCTIONS
10-2-S\.J-553 (FIG NO SW-2-3/8) 724130 2C-22SWH-9                           F-A     VT-3  1 -
**CALIBRATION BLOCK** 91 
SUPPORT                             F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SERVICE WATER SYSTEM  
10-2-SW-554 CFIG NO SW-2-3/8) 724140 2C-22S\.JG-12                       F-A     VT-3  1 -  - -
SUPPORT                             F1 .30         2 -
3 -
4 -
10-2-S\.J-P-669 (FIG NO S\.J-2-3/31)
* 724150 2C-22S\.JH-2002                     F-A      VT-3  1 -  - -
SUPPORT                             F1 .30        2 -
3 -
4 -
10-2-S\.J-P-672 ~FIG NO S\.J-2-3[31~
724160 2C-22SWG-2003                       F-A      VT-3  1 - - -
SUPPORT                             F1 .30         2 -
3 - - -
4 -
724170 2C-22S\.JG-2004                      F-A      VT-3 1 -
SUPPORT                            F1 .30        2 -
3 -
4 -
724180  2C-22S\.JA-2001                    F-A      VT-3  1 -
SUPPORT                            F1.30          2 - - -       x - -
3 -
4 -
* DATE: 03/28/92                                SALEM NUCLEAR POWER STATION UNIT 2                            PAGE:  92 REVISION:     0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
EXAMINATION AREA               CATGY NOE         - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH      123         123       123         **CALIBRATION BLOCK**
ASME SEC. XI CATGY NOE ITEM NO METH _____ PLAN STATUS. ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------
10-2-SW-P-672 (FIG NO SW-2-3/31) 724185 2C-22SWA-2001                 D-B      VT-3  1 -  -  -
123 123 123 10-2-SW-P-672 (FIG NO SW-2-3/31) 724185 2C-22SWA-2001 INTEGRAL ATTACHMENT 20-2-SW-422 (FIG NO SW-2-3/19) 724190 2P-SWA-WS10 SUPPORT 724195 2P-SWA-WS10 INTEGRAL ATTACHMENT 6-2-SW-685 (FIG NO SW-2-3/19) 724200 2P-SWA-100A SUPPORT 724205 2P-SWA-100A INTEGRAL ATTACHMENT 724210 2P-22SWS-10 SUPPORT D-B VT-3 1 ---02.20 2 4 ---F-A F1.30 D-B 02.20 F-A F1.30 D-B 02.20 F-A F1.30 VT-3 1 3 VT-3 1 3 VT-3 1 3 VT-3 1 3 VT-3 1 3 --x --PAGE: INSTRUCTIONS
INTEGRAL ATTACHMENT           02.20          2 -            x - -
**CALIBRATION BLOCK** 92 -----__J DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -  -  -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
20-2-SW-422 (FIG NO SW-2-3/19) 724190 2P-SWA-WS10                   F-A      VT-3  1 -
_ ____ PLAN STATUS. ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD *
SUPPORT                       F1.30          2 -
* ASME
3 -
4 -
724195 2P-SWA-WS10                   D-B      VT-3  1 -
INTEGRAL ATTACHMENT           02.20          2 -  - -
* 3  -
4  -
6-2-SW-685 (FIG NO SW-2-3/19) 724200 2P-SWA-100A                     F-A    VT-3  1 -
SUPPORT                         F1.30          2 -
3 -
4 -
724205 2P-SWA-100A                   D-B     VT-3   1 -
INTEGRAL ATTACHMENT          02.20           2 -
3 -
4 -
724210  2P-22SWS-10                    F-A     VT-3  1 -
SUPPORT                        F1.30         2 -
3 -
4 -
*
                                                                                                                  - --- - __J
 
DATE: 03/28/92                                   SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 93 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                        FIRST     SECOND      THIRD ASME                  PERIOD     PERIOD       PERIOD SEC .. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SEC .. XI CATGY NOE ITEM NO METH ------0 U T A G E ------1 2 3 1 2 3 1 2 3 16-2-SW-P-1195 CFIG NO SW-2-3/52) 724220 2P-22SWG-6 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-P-1188 CFIG NO SW-2-3/52) 724230 2P-22SWH-8 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-P-1187 NO SW-2-3[522 724240 2P-22SWG-2 SUPPORT 724245 2P-SWA-109 SUPPORT 724246 2P-SWA-109 INTEGRAL ATTACHMENT F-A F1.30 F-A F1.30 D-B 02.20 VT-3 1 3 VT-3 1 3 VT-3 1 3 10-2-SW-P-1190 CFIG NO SW-2-3/522 724250 2P-PSR-46 VALVE SUPPORT F-A VT-3 1 -F1.40 2 4 --------------PAGE: INSTRUCTIONS
EXAMINATION AREA               CATGY NOE         - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH      1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 93 
16-2-SW-P-1195 CFIG NO SW-2-3/52) 724220 2P-22SWG-6                     F-A       VT-3 1 -
* *
SUPPORT                       F1.30           2 -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ .PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD  
4 -
10-2-SW-P-1188 CFIG NO SW-2-3/52) 724230 2P-22SWH-8                     F-A       VT-3 1 - - -
SUPPORT                       F1.30           2 -
3 -  - -
4 -  - -
10-2-SW-P-1187 ~FIG NO SW-2-3[522
* 724240 2P-22SWG-2                     F-A        VT-3  1 - - -
SUPPORT                       F1.30            2 -  - -
3 -
4 -
724245  2P-SWA-109                     F-A       VT-3 1  -
SUPPORT                        F1.30           2 -
3 -
4 -                      - - -
724246 2P-SWA-109                      D-B       VT-3  1 -
INTEGRAL ATTACHMENT            02.20           2 -
3 -
4 -
10-2-SW-P-1190 CFIG NO SW-2-3/522 724250 2P-PSR-46                       F-A       VT-3 1 -
VALVE SUPPORT                  F1.40           2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 94 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NOE ITEM NO METH ------0 U T A G E ------123 123 123 10-2-SW-P-1204 (FIG NO SW-2-3/52) 724260 2P-SWR-42 VALVE SUPPORT F-A VT-3 1 -F1.40 2 4 2-SW-P-1200 (FIG NO SW-2-3/52) 724270 2P-SWA-108 SUPPORT 724275 2P-SWA-108 F-A F1 .30 D-B INTEGRAL ATTACHMENT 02.20 724280 2P-24SWG-2 F-A SUPPORT F1 .30 10-2-SW-P-1212 (FIG NO SW-2-3/52) 724290 2P-SWR-41 F-A VALVE SUPPORT F1 .40 10-2-SW-P-1209 (FIG NO SW-2-3/52) 724300 2P-25SWG-2 F-A SUPPORT F1 .30 VT-3 1 3 VT-3 1 3 VT-3 1 3 VT-3 1 3 VT-3 1 3 PAGE: INSTRUCTIONS
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    123         123         123       **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 94 
10-2-SW-P-1204 (FIG NO SW-2-3/52) 724260 2P-SWR-42                       F-A     VT-3 1 -
* *
VALVE SUPPORT                  F1.40         2 -
* DATE: 03/28/92 REVISION:
3 -
0 SERVICE WATER SYSTEM  
4 -
10-2-SW-P-1200 (FIG NO SW-2-3/52) 724270 2P-SWA-108                     F-A      VT-3  1 -
SUPPORT                       F1 .30        2 -
3 -
4 -
724275 2P-SWA-108                     D-B     VT-3  1 -
INTEGRAL ATTACHMENT           02.20         2 -
* 3 -
4 -
724280 2P-24SWG-2                     F-A     VT-3  1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
10-2-SW-P-1212 (FIG NO SW-2-3/52) 724290 2P-SWR-41                       F-A     VT-3  1 -
VALVE SUPPORT                 F1 .40         2 -
3 -
4 -
10-2-SW-P-1209 (FIG NO SW-2-3/52) 724300 2P-25SWG-2                     F-A     VT-3 1 -
SUPPORT                        F1 .30        2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                            PAGE: 95 REVISION:     0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ ASME SEC. XI CATGY NOE ITEM NO METH _____ PLAN STATUS. ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------1 2 3 1 2 3 1 2 3 10-2-SW-P-1208 CFIG NO SW-2-3/52) 724310 2P-SWA-107 SUPPORT 724315 2P-SWA-107 INTEGRAL ATTACHMENT 10-2-SW-560 (FIG NO SW-2-3/15) 724320 2P-23SWS-7 SUPPORT 10-2-SW-580 (FIG NO SW-2-3/15) 724330 2C-23SWG-12C SUPPORT 10-2-SW-579 (FIG NO SW-2-3/15) 724340 2C-23SWH-11C SUPPORT 10-2-SW-577 (FIG NO SW-2-3/15) 724350 2C-23SWA-9 SUPPORT F-A VT-3 1 -F1.30 2 4 -D-B VT-3 1 -D2.20 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1 .30 2 4 -PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** 95 DATE: 03/28/92 REVISION:
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                  ITEM NO METH    1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
10-2-SW-P-1208 CFIG NO SW-2-3/52) 724310 2P-SWA-107                     F-A      VT-3  1 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
SUPPORT                       F1.30          2 -
_ ____ PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
3 -
* ASME SEC. XI PERIOD PERIOD
4 -
724315 2P-SWA-107                     D-B      VT-3  1 -
INTEGRAL ATTACHMENT           D2.20          2 -
3 -
4 -
10-2-SW-560 (FIG NO SW-2-3/15) 724320 2P-23SWS-7                     F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
* 3 -
4 -
10-2-SW-580 (FIG NO SW-2-3/15) 724330 2C-23SWG-12C                   F-A      VT-3  1 -
SUPPORT                        F1.30          2 -
3 -
4 -
10-2-SW-579 (FIG NO SW-2-3/15) 724340 2C-23SWH-11C                    F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
10-2-SW-577 (FIG NO SW-2-3/15) 724350 2C-23SWA-9                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 96 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-576 (FIG NO SW-2-3/15) 724360 2C-23SWG-8C F-A VT-3 1 ---SUPPORT F1 .30 2 4 ---724370 2C-27SWH-7C F-A VT-3 1 -SUPPORT F1 .30 2 --4 2-SW-575 (FIG NO SW-2-3/15) 724380 2C-23SWG-6C F-A VT-3 1 ---SUPPORT F1.30 2 ---3 724390 2C-23SWG-5C F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-574 (FIG NO SW-2-3/15) 724400 2C-23SWH-4C F-A VT-3 1 -SUPPORT F1 .30 2 --4 2-SW-573 (FIG NO SW-2-3/15) 724410 2C-23SWG-3C F-A VT-3 1 ---SUPPORT F1 .30 2 4 -PAGE: INSTRUCTIONS
10-2-SW-576 (FIG NO SW-2-3/15) 724360 2C-23SWG-8C                     F-A     VT-3 1 - - -
**CALIBRATION BLOCK** 96 DATE: 03/28/92 REVISION:
SUPPORT                       F1 .30         2 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* SERVICE YATER SYSTEM FIRST _ ____ PLAN STATUS. ____ _ SECOND THIRD INSPECTION INTERVAL_
4 - - -
*
724370 2C-27SWH-7C                   F-A     VT-3 1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                       F1 .30         2 -
3 - - -
4 -
10-2-SW-575 (FIG NO SW-2-3/15) 724380 2C-23SWG-6C                   F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 - - -
* 3 -
4 -
724390 2C-23SWG-5C                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-574 (FIG NO SW-2-3/15) 724400 2C-23SWH-4C                   F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 - - -
4 -
10-2-SW-573 (FIG NO SW-2-3/15) 724410 2C-23SWG-3C                   F-A     VT-3 1 - - -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 97 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* SERVICE YATER SYSTEM                                       FIRST     SECOND     THIRD ASME                 PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * -----0 U T A G E ------
EXAMINATION AREA               CATGY NOE         * - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SY-573 (FIG NO SY-2-3/15) 724420 2C-23SYH-1 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SY-581 (FIG NO SY-2-3/14) 724430 2C-23SYG-13C F-A VT-3 1 -SUPPORT F1.30 2 4 -724440 2C-23SYH-14C F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SY-582 (FIG NO SY-2-3/14) 724450 2C-23SYG-15C F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SY-583 (FIG NO SY-2-3/14) 724460 2C-23SYS-16 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SY-584 (FIG NO SY-2-3/14) 724470 2C-23SYG-23 F-A VT-3 1 -SUPPORT F1.30 2 --4 -PAGE: INSTRUCTIONS
10-2-SY-573 (FIG NO SY-2-3/15) 724420 2C-23SYH-1                     F-A     VT-3 1   -
**CALIBRATION BLOCK** 97 DATE: 03/28/92 REVISION:
SUPPORT                       F1.30         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3  -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
4 -
FIRST _ ____ PLAN STATUS. ____ _ SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI  
10-2-SY-581 (FIG NO SY-2-3/14) 724430 2C-23SYG-13C                   F-A     VT-3   1 -
SUPPORT                       F1.30           2 -
3  -
4 -
724440 2C-23SYH-14C                     F-A     VT-3   1 -
SUPPORT                         F1 .30         2 -
* 3  -
4 -
10-2-SY-582 (FIG NO SY-2-3/14) 724450 2C-23SYG-15C                   F-A     VT-3   1 -
SUPPORT                         F1 .30         2 -
3  -
4 -
10-2-SY-583 (FIG NO SY-2-3/14) 724460 2C-23SYS-16                     F-A     VT-3   1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
10-2-SY-584 (FIG NO SY-2-3/14) 724470 2C-23SYG-23                     F-A     VT-3 1 -
SUPPORT                         F1.30         2 -
- - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 98 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                        FIRST      SECOND     THIRD ASME                 PERIOD     PERIOD     PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-837 (FIG NO SW-2-3/34) 724480 2C-23SWA-3007 F-A VT-3 1 ---SUPPORT F1.30 2 -x 3 --724485 2C-23SWA-3007 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 -x 3 10-2-SW-P-837 CFIG NO SW-2-3/34) 724490 2C-23SWG-3008 F-A VT-3 1 -SUPPORT F1.30 2
EXAMINATION AREA               CATGY NOE         - - - - - - 0 U T A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3       **CALIBRATION BLOCK**
* 4 2-SW-P-836 CFIG NO SW-2-3/34) 724500 2C-23SWG-3009 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-P-837 (FIG NO SW-2-3/34) 724510 2C-23SWG-3010 F-A VT-3 1 ---SUPPORT F1.30 2 4 2-SW-P-836 CFIG NO SW-2-3/34) 724520 2C-23SWG-3011 F-A VT-3 1 ---SUPPORT F1.30 2 4 ---* PAGE: I NSTRUCTI CNS **CALIBRATION BLOCK** 98 \' 
10-2-SW-837 (FIG NO SW-2-3/34) 724480 2C-23SWA-3007                   F-A     VT-3 1   - - -
* *
SUPPORT                       F1.30         2 -                     x 3 -
* DATE: 03/28/92 REVISION:
4  -  - -
0 SERVICE YATER SYSTEM  
724485 2C-23SWA-3007                 D-B     VT-3 1   - - -
INTEGRAL ATTACHMENT           02.20         2 -                     x 3 -
4  -
10-2-SW-P-837 CFIG NO SW-2-3/34) 724490 2C-23SWG-3008                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3  -                                                              \'
4 -
10-2-SW-P-836 CFIG NO SW-2-3/34) 724500 2C-23SWG-3009                   F-A     VT-3   1 -
SUPPORT                       F1.30         2 -
3  -
4 -
10-2-SW-P-837 (FIG NO SW-2-3/34) 724510 2C-23SWG-3010                   F-A     VT-3   1 - - -
SUPPORT                       F1.30         2 -
3  -
4 -
10-2-SW-P-836 CFIG NO SW-2-3/34) 724520 2C-23SWG-3011                   F-A     VT-3   1 - - -
SUPPORT                       F1.30         2 -
3  -
4 - - -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                          PAGE: 99 REVISION:     0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE YATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
EXAMINATION AREA               CATGY NOE       - - * - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    123         123         123       **CALIBRATION BLOCK**
ASME SEC. XI CATGY NOE ITEM NO METH _____ PLAN STATUS ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD --* ---0 U T A G E ------
10-2-SY-P-836 (FIG NO SY-2-3/34) 724530 2C-23SYS-3012                   F-A      VT-3  1 -
123 123 123 10-2-SY-P-836 (FIG NO SY-2-3/34) 724530 2C-23SYS-3012 SUPPORT 724535 2C-23SYS-3012 INTEGRAL ATTACHMENT 10-2-SY-588 (FIG NO SY-2-3/17) 724540 2P-24SYS-9 SUPPORT 10-2-SY-608 (FIG NO SY-2-3/17) 724550 2C-23SYG-12D SUPPORT 10-2-SY-607 (FIG NO SY-2-3/17) 724560 2C-23SYH-11D SUPPORT 10-2-SY-605 (FIG NO SY-2-3/17) 724570 2C-24SYH-5D SUPPORT F-A F1 .30 D-B D2.20 F-A F1.30 F-A F1 .30 F-A F1.30 F-A F1.30 VT-3 1 x 3 VT-3 1 ---2 -x 3 VT-3 1 3 VT-3 1 3 VT-3 1 3 --VT-3 1 3 PAGE: INSTRUCTIONS
SUPPORT                       F1 .30        2 -                      x 3 -
**CALIBRATION BLOCK** 99 
4 -
* *
724535 2C-23SYS-3012                 D-B      VT-3  1 - - -
* DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT           D2.20          2 -                      x 3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
4 -
10-2-SY-588 (FIG NO SY-2-3/17) 724540 2P-24SYS-9                     F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
* 3 -
4 -
10-2-SY-608 (FIG NO SY-2-3/17) 724550 2C-23SYG-12D                   F-A      VT-3  1 -
SUPPORT                       F1 .30        2 -
3 -
4 -
10-2-SY-607 (FIG NO SY-2-3/17) 724560 2C-23SYH-11D                   F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -
4 -  - -
10-2-SY-605 (FIG NO SY-2-3/17) 724570 2C-24SYH-5D                   F-A     VT-3  1 -
SUPPORT                        F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 100 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                       FIRST     SECOND     THIRD ASME                PERIOD     PERIOD     PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-604 (FIG NO SW-2-3/17) 724580 2C-24SWA-3 F-A VT-3 1 ---SUPPORT F1 .30 2 4 -724590 2C-23SWH-7D F-A VT-3 1 -SUPPORT F1.30 2 --4 2-SW-603 CFIG NO SW-2-3/17) 724600 2C-23SWG-6D F-A vr-3 1 -SUPPORT F1.30 2 4 -724610 2C-23SWG-5D F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SW-601 (FIG NO SW-2-3/17) 724620 2C-23SWH-4D F-A VT-3 1 ---SUPPORT F1.30 2 4 -724630 2C-23SWG-3D F-A VT-3 1 -SUPPORJ F1.30 2 4 ---PAGE: 100 I NSTRUCTI CNS **CALIBRATION BLOCK**
10-2-SW-604 (FIG NO SW-2-3/17) 724580 2C-24SWA-3                     F-A     VT-3 1 - - -
DATE: 03/28/92 REVISION:
SUPPORT                       F1 .30         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3  -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
4 -
_____ PLAN STATUS ____ _ SECOND FIRST THIRD *
724590 2C-23SWH-7D                     F-A     VT-3 1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                       F1.30         2 -
3  -  - -
4 -
10-2-SW-603 CFIG NO SW-2-3/17) 724600 2C-23SWG-6D                     F-A     vr-3 1 -
SUPPORT                       F1.30         2 -
* 3  -
4 -
724610 2C-23SWG-5D                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3  -
4 -
10-2-SW-601 (FIG NO SW-2-3/17) 724620 2C-23SWH-4D                   F-A     VT-3   1 - - -
SUPPORT                       F1.30         2 -
3  -
4 -
724630 2C-23SWG-3D                   F-A     VT-3   1 -
SUPPORJ                       F1.30         2 -
3 -
4 -   - -
* DATE: 03/28/92                                   SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 101 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                         FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA                 CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                     ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-601 (FIG NO SW-2-3/17) 724640 2C-24SIJH-1 F-A SUPPORT F1 .30 10-2-SIJ-609 (FIG NO SIJ-2-3/16) 724650 2C-23SIJG-13D F-A SUPPORT F1.30 724660 2C-24SIJG-6 F-A SUPPORT F1.30 10-2-SIJ-610 (FIG NO SIJ-2-3/16) 724670 2C-24SIJG-12 F-A SUPPORT F1 .30 10-1-SIJ-P-952 NO 724680 2C-24SIJA-4007 SUPPORT 724685 2C-24SIJA-4007 INTEGRAL ATTACHMENT F-A F1.30 D-B 02.20 VT-3 1 3 --VT-3 1 3 VT-3 1 3 VT-3 , ---2 4 -VT-3 1 x 3 VT-3 1 x --3 ---4 -PAGE: 101 INSTRUCTIONS
10-2-SW-601 (FIG NO SW-2-3/17) 724640 2C-24SIJH-1                       F-A     VT-3  1 -
**CALIBRATION BLOCK** 
SUPPORT                           F1 .30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_  
10-2-SIJ-609 (FIG NO SIJ-2-3/16) 724650 2C-23SIJG-13D                     F-A     VT-3  1 -
-----'PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME  
SUPPORT                           F1.30         2 -
3 -
4 -
724660 2C-24SIJG-6                       F-A     VT-3  1 -
SUPPORT                           F1.30         2 -
* 3 -
4 -
10-2-SIJ-610 (FIG NO SIJ-2-3/16) 724670 2C-24SIJG-12                       F-A     VT-3  ,-  - -
SUPPORT                           F1 .30         2 -
3 -
4 -
10-1-SIJ-P-952 ~FIG NO SIJ-2-3&#xa3;36~
724680  2C-24SIJA-4007                   F-A     VT-3 1 -
SUPPORT                          F1.30          2 -                       x 3 -
4 -
724685  2C-24SIJA-4007                    D-B      VT-3 1 -
INTEGRAL ATTACHMENT              02.20          2 -                      x - -
3 - - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 102 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ -----'PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NOE ITEM NO METH 10-2-SW-P-951 (FIG NO SW-2-3/36) 724690 2C-24SWG-4010 F-A SUPPORT F1 .30 10-2-SW-P-950 (FIG NO SW-2-3/36) 724700 2C-24SWG-4011 F-A SUPPORT F1.30 10-2-SW-P-951 (FIG NO SW-2-3/36) 724710 2C-24SWG-4008 F-A SUPPORT F1 .30 10-2-SW-P-950 NO SW-2-3l362 724720 2C-24SWG-4009 SUPPORT 724730 2C-24SWS-4012 SUPPORT 724735 2C-24SWS-4012 INTEGRAL ATTACHMENT F-A F1 .30 F-A F1.30 D-B 02.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     123        123        123        **CALIBRATION BLOCK**
123 123 123 1 3 1 3 1 3 1 ---2 4 --2 -x --3 1 ---2 -x 3 PAGE: 102 INSTRUCTIONS
10-2-SW-P-951 (FIG NO SW-2-3/36) 724690 2C-24SWG-4010                   F-A     VT-3  1 -
**CALIBRATION BLOCK**
SUPPORT                         F1 .30         2 -
DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE IJATER SYSTEM INSPECTION INTERVAL _ _____ .PLAN STATUS. ____ _ * *
10-2-SW-P-950 (FIG NO SW-2-3/36) 724700 2C-24SWG-4011                   F-A     VT-3  1 -
SUPPORT                         F1.30         2 -
3 -
4 -
10-2-SW-P-951 (FIG NO SW-2-3/36)
* 724710 2C-24SWG-4008                   F-A     VT-3  1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
10-2-SW-P-950 ~FIG NO SW-2-3l362 724720 2C-24SWG-4009                   F-A      VT-3  1 - - -
SUPPORT                        F1 .30         2 -
3 -
4 -
724730  2C-24SWS-4012                  F-A      VT-3 1 - - -
SUPPORT                        F1.30          2 -                       x - -
3 -
4 -
724735  2C-24SWS-4012                  D-B      VT-3 1 - - -
INTEGRAL ATTACHMENT            02.20          2 -                       x 3 -
4 -
* DATE: 03/28/92                                     SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 103 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _.PLAN STATUS._ _ _ __
* SERVICE IJATER SYSTEM                                          FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 10*2*SIJ*671A CFIG NO SIJ-2*3/11) 724740 2C*21SIJG*17 SUPPORT 10-2-SIJ-671 (FIG NO SIJ-2*3/11) 724750 2C*21SIJH*12 SUPPORT 10*2-SIJ-670 (FIG NO SIJ-2*3/11) 724760 2C*21SIJG*11A SUPPORT 10-2-SIJ-669 CFIG NO SIJ-2*3/11) 724770 2C*21SIJG*9A SUPPORT 10-2-SIJ-668 (FIG NO SIJ-2*3/11) 724780 2C*21SIJG*8A SUPP,ORT ' 724790 2C*21SIJA*7 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F*A VT-3 F1 .30 F*A VT-3 F1.30 F-A VT-3 F1 .30 F*A VT-3 FL30 F*A VT-3 F1 .30 F-A VT-3 F1.30 FIRST SECOND THIRD PERIOD PERIOD PERIOD * * * * *
EXAMINATION AREA                   CATGY NOE        * * * * *
* 0 U T A G E * * -* *
* 0 UT A GE * * - * *
* 123 123 123 1 ---2 4 ---1 ---2 4 2 -. 3 1 3 1 3 1 3 PAGE: 103 I NSTRUCTI CNS **CALIBRATION BLOCK**
* I NSTRUCTI CNS NUMBER IDENTIFICATION                     ITEM NO METH    123        123        123      **CALIBRATION BLOCK**
DATE: 03/28/92 REVISION:
10*2*SIJ*671A CFIG NO SIJ-2*3/11) 724740 2C*21SIJG*17                       F*A      VT-3  1 -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                           F1 .30        2 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
3 -
FIRST _ ____ PLAN STATUS. ____ _ SECOND THIRD *
4 -  - -
* ASME SEC. XI PERIOD PERIOD PERIOD
10-2-SIJ-671 (FIG NO SIJ-2*3/11) 724750 2C*21SIJH*12                       F*A      VT-3  1 -  - -
SUPPORT                           F1.30          2 -
3 -
4 -
10*2-SIJ-670 (FIG NO SIJ-2*3/11)
* 724760 2C*21SIJG*11A                       F-A      VT-3 1  -
SUPPORT                           F1 .30        2 -.
3 -
4 -
10-2-SIJ-669 CFIG NO SIJ-2*3/11) 724770 2C*21SIJG*9A                       F*A      VT-3 1  -
SUPPORT                           FL30          2 -
3 -
4 -
10-2-SIJ-668 (FIG NO SIJ-2*3/11) 724780   2C*21SIJG*8A                     F*A     VT-3 1 -
SUPP,ORT                          F1 .30         2 -
3 -
4 -
  '
724790  2C*21SIJA*7                      F-A     VT-3 1 -
SUPPORT                          F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE:
REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                      FIRST      SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-667 CFIG NO SW-2-3/11) 724800 2C-21SWG-5A F-A VT-3 1 -SUPPORT F1 .30 2 4 -724810 2C-21SWG-4A F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-651 (FIG NO SW-2-3/12) 724820 2C-22SWG-16 F-A VT-3 1 ---SUPPORT F1.30 2 4 2-SW-650 (FIG NO SW-2-3/12) 724830 2C-22SWH-11 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-649 (FIG NO SW-2-3/12) 724840 2C-22SWG-7B F-A VT-3 1 -SUPPORT F1 .30 2 ---3 724845 2C-22SWG-8 F-A VT-3 1 ---SUPPORT F1.30 2 4 -PAGE: INSTRUCTIONS
10-2-SW-667 CFIG NO SW-2-3/11) 724800 2C-21SWG-5A                     F-A     VT-3 1 -
**CALIBRATION BLOCK**
SUPPORT                       F1 .30         2 -
DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
724810 2C-21SWG-4A                   F-A     VT-3 1 -
_____ PLAN STATUS ____ _ * *
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-651 (FIG NO SW-2-3/12) 724820 2C-22SWG-16                     F-A     VT-3 1 -           ~  - -
SUPPORT                       F1.30         2 -
* 3 -
4 -
10-2-SW-650 (FIG NO SW-2-3/12) 724830 2C-22SWH-11                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
10-2-SW-649 (FIG NO SW-2-3/12) 724840 2C-22SWG-7B                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 - - -
3 -
4 -
724845 2C-22SWG-8                     F-A     VT-3 1 - - -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 105 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 10-2-SW-648A (FIG NO SW-2-3/12) 724850 2C-22SWG-6B SUPPORT 10-2-SW-648 (FIG NO SW-2-3/12) 724860 2C-21SWG-11B SUPPORT 10-2-SW-647 (FIG NO SW-2-3/12) 724870 2C-21SWG-9B SUPPORT 724880 2C-22SWA-5 SUPPORT 10-2-SW-646 (FIG NO SW-2-3/12) 724890 2C-22SWG-3B SUPPORT 10-2-SW-645 (FIG NO SW-2-3/12) 724900 2C-21SWG-5B SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1 .30 F-A VT-3 F1 .30 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------123 123 123 1 3 1 3 1 --3 ---4 2 4 2 4 2 4 -PAGE: 105 I NSTRUCTI CNS **CALIBRATION BLOCK** 
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                   ITEM NO METH    123        123        123        **CALIBRATION BLOCK**
* *
10-2-SW-648A (FIG NO SW-2-3/12) 724850 2C-22SWG-6B                     F-A      VT-3  1 -
* DATE: 03/28/92 REVISION:
SUPPORT                         F1 .30        2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
3 -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME FIRST PERIOD SECOND PERIOD THIRD PERIOD SEC. XI -----------
4 -
-----------
10-2-SW-648 (FIG NO SW-2-3/12) 724860 2C-21SWG-11B                   F-A      VT-3  1 -
-----------
SUPPORT                         F1 .30        2 -
3 -
4 -
10-2-SW-647 (FIG NO SW-2-3/12)
* 724870 2C-21SWG-9B                     F-A      VT-3  1 -
SUPPORT                         F1.30          2 -  - -
3 -  - -
4 -
724880 2C-22SWA-5                       F-A      VT-3  1 -
SUPPORT                         F1.30          2 -
3 -
4 -
10-2-SW-646 (FIG NO SW-2-3/12) 724890 2C-22SWG-3B                     F-A      VT-3  1 -
SUPPORT                         F1.30          2 -
3 -
4 -
10-2-SW-645 (FIG NO SW-2-3/12) 724900 2C-21SWG-5B                     F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 106 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -     INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-645 (FIG NO SW-2-3/12) 724910 2C-21SWG-4B F-A SUPPORT F1.30 10-2-SW-626 (FIG NO SW-2-3/18) 724920 2c-25sws-2 F-A SUPPORT F1.30 10-2-SW-626A (FIG NO SW-2-3/18) 724930 2C-25SWG-7 F-A SUPPORT F1 .30 10-2-SW-P-609 NO 724940 2C-21SWA-1007 SUPPORT 724945 2C-21SWA-1007 INTEGRAL ATTACHMENT 724950 2C-21SWG-1010 SUPPORT F-A F1.30 D-B 02.20 F-A F1 .30 VT-3 1 ---2 4 -VT-3 1 3 ---4 -VT-3 1 --3 VT-3 1 x 3 VT-3 1 x 3 VT-3 1 3 PAGE: 106 INSTRUCTIONS
10-2-SW-645 (FIG NO SW-2-3/12) 724910 2C-21SWG-4B                     F-A     VT-3  1 -  - -
**CALIBRATION BLOCK**
SUPPORT                         F1.30         2 -
DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
10-2-SW-626 (FIG NO SW-2-3/18) 724920 2c-25sws-2                     F-A     VT-3  1 -
_____ PLAN STATUS ____ _ SECOND FIRST THIRD *
SUPPORT                         F1.30         2 -
* ASME PERIOD PERIOD PERIOD  
3 -  - -
4 -
10-2-SW-626A (FIG NO SW-2-3/18)
* 724930 2C-25SWG-7                     F-A     VT-3  1 -
SUPPORT                         F1 .30         2 -  - -
3 -
4 -
10-2-SW-P-609 ~FIG NO sw-2-3L30~
724940 2C-21SWA-1007                   F-A     VT-3  1 -
SUPPORT                        F1.30         2 -                       x 3 -
4 -
724945  2C-21SWA-1007                  D-B      VT-3 1 -
INTEGRAL ATTACHMENT            02.20          2 -                       x 3 -
4 -
724950  2C-21SWG-1010                  F-A      VT-3 1 -
SUPPORT                        F1 .30        2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 107 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST      SECOND       THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NOE ITEM NO METH ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    123         123         123       **CALIBRATION BLOCK**
123 123 123 10-2-SW-P-608 (FIG NO SW-2-3/30) 724960 2C-21SWG-1011 SUPPORT 724970 2C-21SWG-1009 SUPPORT F-A F1.30 F-A F1 .30 VT-3 1 3 VT-3 1 3 10-2-SW-P-609 (FIG NO SW-2-3/30) 724980 2C-21SWG-1008 SUPPORT F-A VT-3 1 -F1.30 2 --4 ---10-2-SW-P-608 (FIG NO SW-2-3/30) 724990 2c-21sws-1012 SUPPORT 724995 2c-21sws-1012 INTEGRAL ATTACHMENT F-A F1 .30 D-B 02.20 VT-3 1 3 VT-3 1 3 10-2-SW-P-723 (FIG NO SW-2-3/32) 725000 2C-22SWA-2008 SUPPORT F-A VT-3 1 -F1.30 2 4 ---x x x --PAGE: 107 INSTRUCTIONS
10-2-SW-P-608 (FIG NO SW-2-3/30) 724960 2C-21SWG-1011                   F-A      VT-3  1 -
**CALIBRATION BLOCK** 
SUPPORT                       F1.30          2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SERVICE WATER SYSTEM  
724970 2C-21SWG-1009                 F-A     VT-3  1 -  - -
SUPPORT                        F1 .30         2 -
3 -
4 -
10-2-SW-P-609 (FIG NO SW-2-3/30) 724980 2C-21SWG-1008                   F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
* 3 -
4 - -   -
10-2-SW-P-608 (FIG NO SW-2-3/30) 724990 2c-21sws-1012                 F-A      VT-3  1 -
SUPPORT                       F1 .30        2 -                      x 3 -  - -
4 -
724995 2c-21sws-1012                 D-B     VT-3  1 -
INTEGRAL ATTACHMENT            02.20         2 -                       x 3 -
4 -
10-2-SW-P-723 (FIG NO SW-2-3/32) 725000 2C-22SWA-2008                 F-A     VT-3 1 -
SUPPORT                        F1.30         2 -                       x - -
3 -
4 -
* DATE: 03/28/92                                   SALEM NUCLEAR POWER STATION UNIT 2                          PAGE: 108 REVISION:       0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _._PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       ' FIRST      SECOND      THIRD ASME.              PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
EXAMINATION AREA                 CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                    ITEM NO METH    1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
ASME. SEC. XI CATGY NOE ITEM NO METH ____ ._PLAN STATUS ____ _ ' FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------1 2 3 1 2 3 1 2 3 10-2-SW-P-723 (FIG NO SW-2-3/32) 725005 2C-22SWA-2008 D-B INTEGRAL ATTACHMENT 02.20 725010 2C-22SWG-2009 F-A SUPPORT F1.30 725020 2C-22S\.JG-2011 F-A SUPPORT F1.30 10-2-SW-P-722 NO 725030 2C-22SWG-2012 SUPPORT 725040 2C-22SWA-2014 SUPPORT 725045 2C-22S\.JA-2014 INTEGRAL ATTACHMENT 725050 2C-22SWG-2010 SUPPORT F-A F1.30 F-A F1.30 D*B 02.20 F-A F1.30 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 1 x 3 1 3 1 3 1 --3 1 ---2 -x 3 ---4 --2 -x --3 1 3 PAGE: 108 INSTRUCTIONS
10-2-SW-P-723 (FIG NO SW-2-3/32) 725005 2C-22SWA-2008                   D-B     VT-3  1 -
**CALIBRATION BLOCK** ) 
INTEGRAL ATTACHMENT             02.20         2 -                      x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
725010 2C-22SWG-2009                     F-A     VT-3  1 -                                                )
0 SERVICE WATER SYSTEM  
SUPPORT                         F1.30         2 -
3 -
4 -
725020 2C-22S\.JG-2011                   F-A     VT-3  1 -
SUPPORT                         F1.30         2 -
3 -
4 -
* 10-2-SW-P-722 725030 2C-22SWG-2012 SUPPORT
                          ~FIG NO SW-2-3L32~
F-A F1.30 VT-3  1 -
2 -
3 -
                                                              - -
4 -
725040 2C-22SWA-2014                    F-A     VT-3  1 - - -
SUPPORT                          F1.30         2 -                       x 3 - - -
4 -
725045  2C-22S\.JA-2014                  D*B      VT-3 1 - - -
INTEGRAL ATTACHMENT              02.20          2 -                       x - -
3 -
4 -
725050 2C-22SWG-2010                    F-A      VT-3 1 -
SUPPORT                          F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                            PAGE: 109 REVISION:     0                              INSERVICE INSPECTIO~ LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    ,. 2 3     1 2 3       1 2 3     **CALIBRATION BLOCK**
ASME SEC. XI CATGY NOE ITEM NO METH _____ PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------
10-2-SW-P-722 CFIG NO SW-2-3/32) 725060 2C-22SWS-2013                   F-A     VT-3 1 -
,. 2 3 1 2 3 1 2 3 10-2-SW-P-722 CFIG NO SW-2-3/32) 725060 2C-22SWS-2013 SUPPORT 725065 2C-22SWS-2013 INTEGRAL ATTACHMENT F-A VT-3 1 -F1.30 2 --4 -D-B VT-3 1 -02.20 2 ---3 10-2-SW-P-1066A (FIG NO SW-2-3/38) 725070 2C-25SWA-5007 F-A SUPPORT F1.30 725075 2C-25SWA-5007 D-B INTEGRAL ATTACHMENT 02.20 10-2-SW-P-1066 NO 725080 2C-25SWG-5008 SUPPORT 725090 2C-25SWG-5010 SUPPORT F-A F1.30 F-A F1.30 VT-3 1 3 VT-3 1 3 VT-3 1 3 VT-3 1 3 x x x x PAGE: 109 INSTRUCTIONS
SUPPORT                        F1.30         2 -                       x 3 -  -  -
**CALIBRATION BLOCK**
4 -
* DATE: 03/28/92 REVISION:
725065  2C-22SWS-2013                  D-B     VT-3 1 -
0 SERVICE WATER SYSTEM  
INTEGRAL ATTACHMENT            02.20         2 - - -                 x 3 -
4 -
10-2-SW-P-1066A (FIG NO SW-2-3/38) 725070 2C-25SWA-5007                   F-A     VT-3  1 -
SUPPORT                       F1.30         2 -                      x
* 3 -
4 -
725075 2C-25SWA-5007                 D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -                      x 3 -
4 -
10-2-SW-P-1066 ~FIG NO SW-2-3&#xa3;38~
725080 2C-25SWG-5008                   F-A      VT-3 1  -
SUPPORT                       F1.30          2 -
3 -
4 -
725090 2C-25SWG-5010                   F-A     VT-3 1 -
SUPPORT                        F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                            PAGE: 110 REVISION:     0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS.COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD      PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS.COMPONENTS INSPECTION INTERVAL_
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
ASME SEC. XI CATGY NOE ITEM NO METH _____ .PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD PERIOD PERIOD ------0 U T A G E ------1 2 3 1 2 3 1 2 3 10-2-SW-P-1065 (FIG NO SW-2-3/38) 725100 2C-25SWG-5011 SUPPORT 725110 2C-25SWG-5009 SUPPORT 725120 2C.-25SWS-5012 SUPPORT F-A F1.30 F-A F1 .30 F-A F1 .30 VT-3 VT-3 VT-3 1 ---2 --4 --2 4 2 ---x 3
10-2-SW-P-1065 (FIG NO SW-2-3/38) 725100 2C-25SWG-5011                   F-A      VT-3  1 - - -
* 725125 2C-25SWS-5012 INTEGRAL ATTACHMENT D-B 02.20 VT-3 1 --x --3 16-2-SW-P-1233 (FIG NO SW-2-3/54) 725130 2P-21SWG-6 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SW-P-1229 (FIG NO SW-2-3/54) 725140 2P-WS-05 F-A VT-3 1 -SUPPORT ANCHOR F1.30 2 4 -* PAGE: 110 INSTRUCTIONS
SUPPORT                       F1.30         2 -
**CALIBRATION BLOCK**
3 - - -
DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
725110 2C-25SWG-5009                  F-A     VT-3 1 -  - -
* SERVICE YATER SYSTEM INSPECTION INTERVAL_
SUPPORT                        F1 .30        2 -
_ ____ PLAN STATUS. ____ _ SECOND FIRST THIRD *
3 -
* ASME PERIOD PERIOD PERIOD  
4 -
725120 2C.-25SWS-5012                  F-A      VT-3  1 -
SUPPORT                        F1 .30        2 - - -                   x 3 -
4 -
* 725125 2C-25SWS-5012                 D-B     VT-3  1 -
INTEGRAL ATTACHMENT            02.20         2 - - -                 x - -
3 -
4 -
16-2-SW-P-1233 (FIG NO SW-2-3/54) 725130 2P-21SWG-6                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
10-2-SW-P-1229 (FIG NO SW-2-3/54) 725140 2P-WS-05                       F-A     VT-3 1 -
SUPPORT ANCHOR                 F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                     SALEM NUCLEAR POYER STATION UNIT 2                             PAGE: 111 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* SERVICE YATER SYSTEM                                          FIRST      SECOND       THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NOE ITEM NO METH ------0 U T A G E ------
EXAMINATION AREA                   CATGY NOE       - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                      ITEM NO METH    123         123         123         **CALIBRATION BLOCK**
123 123 123 10-2-S\.J-P-1228A (FIG NO S\.J-2-3/54) 725150 2P-22S\.JH-30 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-S\.J-P-1247 (FIG NO S\.J-2-3/54) 725160 2P-S\.JR-47 VALVE SUPPORT 10-2-S\.J-P-1245 725170 2P-21S\.JG-10 SUPPORT 10"2-S\.J-P-1244 725180 2P-S\.JA-103 SUPPORT 725185 2P-S\.JA-103 F-A VT-3 1 -F1.40 2 4 -(FIG NO S\.J-2-3/54)
10-2-S\.J-P-1228A (FIG NO S\.J-2-3/54) 725150 2P-22S\.JH-30                     F-A     VT-3 1 -
F-A VT-3 1 -F1.30 2 4 -{FIG NO S\.J-2-3L542 F-A VT-3 1 -F1.30 2 4 -D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-S\.J-P-1240 (FIG NO S\.J-2-3L542 725190 2P-S\.JR-48 VALVE SUPPORT F-A VT-3 1 -F1.40 2 4 -----PAGE: 111 INSTRUCTIONS
SUPPORT                           F1 .30         2 -
**CALIBRATION BLOCK**
3 -  - -
DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
10-2-S\.J-P-1247 (FIG NO S\.J-2-3/54) 725160 2P-S\.JR-47                       F-A      VT-3  1 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ SECOND FIRST THIRD * *
VALVE SUPPORT                     F1.40          2 -
3 -
4 -
10-2-S\.J-P-1245 (FIG NO S\.J-2-3/54)
* 725170 2P-21S\.JG-10                     F-A      VT-3  1 -
SUPPORT                           F1.30          2 -
3 -
4 -
10"2-S\.J-P-1244 {FIG NO S\.J-2-3L542 725180  2P-S\.JA-103                       F-A     VT-3 1 -
SUPPORT                            F1.30          2 - - -
3 -
4 -
725185  2P-S\.JA-103                      D-B     VT-3 1 -
INTEGRAL ATTACHMENT               02.20         2 -
3 -
4 -
10-2-S\.J-P-1240 (FIG NO S\.J-2-3L542 725190 2P-S\.JR-48                       F-A     VT-3 1 -
VALVE SUPPORT                      F1.40         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 112 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                        FIRST      SECOND     THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NOE ITEM NO METH 10-2-SW-P-1238 (FIG NO SW-2-3/54) 725200 2P-22SWG-14 F-A VT-3 SUPPORT F1.30 725210 2P-SWA-104 F-A VT-3 SUPPORT F1.30 725215 2P-SWA-104 D-B VT-3 INTEGRAL ATTACHMENT 02.20 12-2-SW-947 (FIG NO SW-2-7/1) 725220 2-SWG-405 F-A VT-3 SUPPORT F1.30 12-2-SW-946 (FIG NO SW-2-7/1) 725230 2-SWG-406 F-A VT-3 SUPPORT F1.30 12-2-SW-944 (FIG NO SW-2-7/1) 725240 2-SWG-407 F-A VT-3 SUPPORT F1.30 PERIOD PERIOD PERIOD ------0 U T A G E ------123 123 123 1 ---2 ---3 1 ---2 4 ---1 3 --1 ---2 4 2 4 2 -x 3 PAGE: 112 INSTRUCTIONS
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     123        123        123        **CALIBRATION BLOCK**
**CALIBRATION BLOCK**
10-2-SW-P-1238 (FIG NO SW-2-3/54) 725200 2P-22SWG-14                     F-A     VT-3 1  -  - -
DATE: 03/28/92 REVISION:
SUPPORT                       F1.30         2  -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3  -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
4  -
PLAN STATUS ____ _ FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
725210 2P-SWA-104                     F-A     VT-3 1  -  - -
-----------
SUPPORT                       F1.30         2  -
-----------
3  -
4  -  - -
725215 2P-SWA-104                     D-B     VT-3 1  -
INTEGRAL ATTACHMENT           02.20         2  -
3  -
4  -  - -
* 12-2-SW-947 (FIG NO SW-2-7/1) 725220 2-SWG-405 SUPPORT F-A F1.30 VT-3 1 2
3 4
                                                          -
                                                          -
                                                          -
                                                          -
                                                              - -
12-2-SW-946 (FIG NO SW-2-7/1) 725230 2-SWG-406                       F-A     VT-3   1 -
SUPPORT                       F1.30         2 -
3 -
4 -
12-2-SW-944 (FIG NO SW-2-7/1) 725240 2-SWG-407                       F-A     VT-3 1  -
SUPPORT                       F1.30         2 -                     x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 113 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_              PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME               PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G.E ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-SW-944 (FIG NO SW-2-7/1) 725245 2-SWG-407 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x 3 12-2S-SW-942 (FIG NO SW-2-7/1) 725250 2-SWS-408 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 725255 2-SWS-408 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 -x --3 -* 4 ---8-2S-SW-942 (FIG NO SW-2-7/1) 725260 2-SWR(A)-410 F-A VT-3 1 -VALVE SUPPORT F1.40 2 4 2-SW-940 (FIG NO SW-2-7/2) , 725270 2-SWG-400 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-938 (FIG NO SW-2-7/2) 725280 2-SWG-401 F-A VT-3 1 -SUPPORT F1 .30 2 4 -* PAGE: 113 INSTRUCTIONS
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A G.E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
**CALIBRATION BLOCK**
12-2-SW-944 (FIG NO SW-2-7/1) 725245 2-SWG-407                     D-B     VT-3 1 -
DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT           02.20         2 -                       x 3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
12-2S-SW-942 (FIG NO SW-2-7/1) 725250 2-SWS-408                       F-A     VT-3 1 -
* ASME SEC. XI PERIOD PERIOD
SUPPORT                       F1.30         2 -                       x 3 -
4 -
725255 2-SWS-408                     D-B     VT-3 1 - - -
INTEGRAL ATTACHMENT           02.20         2 -                       x - -
* 3 -
4 - - -
8-2S-SW-942 (FIG NO SW-2-7/1) 725260 2-SWR(A)-410                   F-A     VT-3 1 -
VALVE SUPPORT                 F1.40         2 -
3 -
4 -
12-2-SW-940 (FIG NO SW-2-7/2)
  , 725270 2-SWG-400                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
12-2-SW-938 (FIG NO SW-2-7/2) 725280 2-SWG-401                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 114 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * * --*
EXAMINATION AREA               CATGY NOE       * * - - *
* 0 U T A G E ------
* 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 *3     1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 *3 1 2 3 1 2 3 12-2*SW-936 (FIG NO SW*2*7/2) 725290 2-SWG-402 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 725295 2*SWG-402 D*B VT*3 1 . INTEGRAL ATTACHMENT 02.20 2 -x 3 12-2-SW-934 (FIG NO SW-2-7/2) 725300 2-SWS-403 F-A VT-3 1 -SUPPORT F1.30 2 -x 3 725305 2-SWS-403 . D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x --3 B-2-SW-934 (FIG NO SW-2-7/2) 725310 2-SWR-411 F-A VT-3 1 -VALVE SUPPORT F1.40 2 4 2-SW-729 (FIG NO SW-2-2/2) 725320 A2-SWH-40 F-A VT-3 1 -SUPPORT F1.30 2 --4 -PAGE: 114 INSTRUCTIONS
12-2*SW-936 (FIG NO SW*2*7/2) 725290 2-SWG-402                       F-A     VT-3 1 -
**CALIBRATION BLOCK** 
SUPPORT                       F1.30         2 -                       x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
725295 2*SWG-402                     D*B     VT*3 1 .
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
INTEGRAL ATTACHMENT           02.20         2 -                       x 3 -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM  
4 -
12-2-SW-934 (FIG NO SW-2-7/2) 725300 2-SWS-403                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -                       x
* 3 -
4 -
725305 2-SWS-403 .                   D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -                       x - -
3 -
4 -
B-2-SW-934 (FIG NO SW-2-7/2) 725310 2-SWR-411                       F-A     VT-3 1 -           ~
VALVE SUPPORT                 F1.40         2 -
3 -
4 -
20-2-SW-729 (FIG NO SW-2-2/2) 725320 A2-SWH-40                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -  - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 115 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 20-2-SW-730 (FIG NO SW-2-2/2) 725330 A2-SWH-41 SUPPORT 20-2-SW-P-147 (FIG NO SW-2-2/2) 725340 A2-SWG-42 SUPPORT 20-2-SW-P-149 (FIG NO SW-2-2/2) 725350 A2*SWG-43 SUPPORT 24-2-SW-727 (FIG NO SW-2-2/2) 725360 A2-SWH-39 SUPPORT 24*2-SW-726 (FIG NO SW-2-2/2) 725370 2-SWWA-6J2 WALL ANCHOR 725375 2*SWWA-6J2 INTEGRAL ATTACHMENT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 F-A VT-3 F1.30 F*A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 D-B SEE 02.20 INST FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------1 2 3 1 2 3 1 2 3 1 3 1 ---2 4 --2 4 --2 4 2 4 2 4 -PAGE: 115 INSTRUCTIONS
EXAMINATION AREA               CATGY NOE        - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH    1 2 3      1 2 3      1 2 3      **CALIBRATION BLOCK**
**CALIBRATION BLOCK** INACCESSIBLE DATE: 03/28/92 REVISION:
20-2-SW-730 (FIG NO SW-2-2/2) 725330 A2-SWH-41                       F-A      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                         F1.30          2 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
3 -
_ ____ PLAN STATUS ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD ASME SEC. XI -----------
4 -
-----------
20-2-SW-P-147 (FIG NO SW-2-2/2) 725340 A2-SWG-42                       F-A      VT-3  1 -  - -
-----------
SUPPORT                         F1.30          2 -
3 -
4 -
20-2-SW-P-149 (FIG NO SW-2-2/2)
* 725350 A2*SWG-43                       F*A      VT-3  1 -  - -
SUPPORT                         F1.30          2 -
3 -
4 -
24-2-SW-727 (FIG NO SW-2-2/2) 725360 A2-SWH-39                       F-A      VT-3  1 -  - -
SUPPORT                         F1.30          2 -
3 -
4 -
24*2-SW-726 (FIG NO SW-2-2/2) 725370 2-SWWA-6J2                       F-A     VT-3 1 -
WALL ANCHOR                    F1.30         2 -
3 -
4 -
725375  2*SWWA-6J2                      D-B     SEE   1 -                                  INACCESSIBLE INTEGRAL ATTACHMENT            02.20   INST 2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 116 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND      THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA -CATGY NDE ------0 U T A G E ------
EXAMINATION AREA             - CATGY NDE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 24-2-SW-717 (FIG NO SW-2-2/2) 725380 2-SWWA-6H1 F-A VT-3 1 -SUPPORT WALL ANCHOR F1.30 2 --4 -725390 A2-SWS-44 F-A VT-3 1 ---SUPPORT F1 .30 2 ---3 ----4 ---8-2-SW-741 (FIG NO SW-2-2/2) 725400 A2-SWA(G)-75 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 -* 4 -725410 A2-SWG-74 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SW-742 (FIG NO SW-2-2/2) 725420 A2-SWA-79 F-A VT-3 1 -SUPPORT F1.30 2 4 -725430 A2-SWG-73 F-A VT-3 1 -SUPPORT F1.30 2 4 -* PAGE: 116 INSTRUCTIONS
24-2-SW-717 (FIG NO SW-2-2/2) 725380 2-SWWA-6H1                       F-A     VT-3 1 -
**CALIBRATION BLOCK**
SUPPORT WALL ANCHOR             F1.30         2 -
DATE: 03/28/92 REVISION:
3 -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ FIRST _____ PLAN STATUS. ____ _ SECOND THIRD *
725390 A2-SWS-44                       F-A     VT-3 1 - - -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                         F1 .30         2 - - -
3 - -- -
4 - -   -
8-2-SW-741 (FIG NO SW-2-2/2) 725400 A2-SWA(G)-75                     F-A     VT-3 1 -
SUPPORT                         F1 .30         2 - - -
* 3 -
4 -
725410 A2-SWG-74                       F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -
3 -
4 -
8-2-SW-742 (FIG NO SW-2-2/2) 725420 A2-SWA-79                       F-A     VT-3 1 -
SUPPORT                         F1.30         2 -
3 -
4 -
725430 A2-SWG-73                       F-A     VT-3 1 -
SUPPORT                         F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 117 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                       FIRST     SECOND     THIRD ASME                 PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-SW-742 (FIG NO SW-2-2/2) 725440 A2-SWA-80 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-747 (FIG NO SW-2-2/2) 725450 A2-SWG-66 F-A VT-3 1 -SUPPORT F1.30 2 ---3 725460 A2-SWA-67 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 10-2-SW-746 (FIG NO SW-2-2/2) 725470 A2-SWS-68 F-A VT-3 1 ---SUPPORT F1.30 2 ---3 8-2-SW-745 (FIG NO SW-2-2/2) 725480 A2-SWG-70 F-A VT-3 1 -SUPPORT F1.30 2 4 -725490 A2-SWG-71 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: 117 INSTRUCTIONS
8-2-SW-742 (FIG NO SW-2-2/2) 725440 A2-SWA-80                       F-A     VT-3 1 -
**CALIBRATION BLOCK**
SUPPORT                       F1.30         2 -
DATE: 03/28/92 REVISION:
3  -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS, ____ _ FIRST SECOND THIRD PERIOD *
10-2-SW-747 (FIG NO SW-2-2/2) 725450 A2-SWG-66                       F-A     VT-3 1 -
* ASME PERIOD PERIOD SEC. XI -----------
SUPPORT                       F1.30         2 - - -
-----------
3 -
-----------
4  -
725460 A2-SWA-67                       F-A     VT-3   1 - - -
SUPPORT                         F1.30         2 - - -
* 3 -
4  -
10-2-SW-746 (FIG NO SW-2-2/2) 725470 A2-SWS-68                       F-A     VT-3   1 - - -
SUPPORT                         F1.30         2 - - -
3 -
4  -
8-2-SW-745 (FIG NO SW-2-2/2) 725480 A2-SWG-70                       F-A     VT-3   1 -
SUPPORT                         F1.30         2 -
3  -
4 -
725490 A2-SWG-71                       F-A     VT-3   1 -
SUPPORT                         F1.30         2 -
3  -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 118 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS,_ _ _ __
* SERVICE WATER SYSTEM                                      FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-SW-744 (FIG NO SW-2-2/2) 725495 A2-SWG-70 SUPPORT 8-2-SW-872 (FIG NO SW-2-2/3) 725500 2*SWWA-6P4 WALL ANCHOR 725505 2*SWWA*6P4 INTEGRAL ATTACHMENT 725510 A2-SWG*323 SUPPORT 725515 A2*SWG*323 INTEGRAL ATTACHMENT 725520 A2*SWG*324 SUPPORT 725525 A2*SWG*324 INTEGRAL ATTACHMENT F-A F1.30 F-A F1.30 D-B 02.20 F-A F1.30 D*B 02.20 F*A F1.30 D-B 02.20 VT-3 1 3 --VT-3 1 3 SEE 1 -INST 2 4 ---VT-3 1 3 VT-3 1 --3 VT-3 1 ---2 -x 3 VT-3 1 ---2 -x 3 PAGE: 118 INSTRUCTIONS
8-2-SW-744 (FIG NO SW-2-2/2) 725495 A2-SWG-70                       F-A      VT-3  1 -
**CALIBRATION BLOCK** INACCESSIBLE DATE: 03/28/92 REVISION:
SUPPORT                       F1.30          2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
4 -  - -
_ ____ PLAN STATUS. ____ _ SECOND FIRST THIRD *
8-2-SW-872 (FIG NO SW-2-2/3) 725500 2*SWWA-6P4                     F-A      VT-3  1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
WALL ANCHOR                   F1.30          2 -
3 -
4 -
725505 2*SWWA*6P4                     D-B      SEE  1 -                                  INACCESSIBLE INTEGRAL ATTACHMENT           02.20    INST  2 -
* 3 -
4 -  - -
725510 A2-SWG*323                     F-A     VT-3  1 -
SUPPORT                        F1.30         2 -
3 -
4 -
725515 A2*SWG*323                      D*B     VT-3 1 -
INTEGRAL ATTACHMENT            02.20          2 -  - -
3 -
4 -
725520 A2*SWG*324                      F*A      VT-3 1 - - -
SUPPORT                        F1.30          2 -                       x 3 -
4 -
725525 A2*SWG*324                      D-B      VT-3 1 - - -
INTEGRAL ATTACHMENT            02.20          2 -                       x 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 119 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                        FIRST      SECOND     THIRD ASME                 PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-SW-871 (FIG NO SW-2-2/3) 725530 A2-SWG-313 SUPPORT 725540 A2-SWH-314 SUPPORT 8-2-SW-870 (FIG NO SW-2-2/3) 725550 A2-SWA-315 SUPPORT 725555 A2-SWA-315 INTEGRAL ATTACHMENT 725560 A2-SWG-316 SUPPORT 8-2-SW-858 (FIG NO SW-2-2/3) 725570 2-SWWA-6P1 WALL ANCHOR F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1 .30 2 4 -D-B VT-3 1 -02.20 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -------PAGE: 119 I NSTRUCTI CNS **CALIBRATION BLOCK** 
8-2-SW-871 (FIG NO SW-2-2/3) 725530 A2-SWG-313                     F-A      VT-3  1  -
* *
SUPPORT                       F1.30          2  -
* DATE: 03/28/92 REVISION:
3  -  - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4  -
PLAN STATUS SERVICE WATER SYSTEM  
725540 A2-SWH-314                     F-A      VT-3  1  -
SUPPORT                        F1.30          2 -
3 -
-
8-2-SW-870 (FIG NO SW-2-2/3) 725550 A2-SWA-315                      F-A     VT-3   1 -
SUPPORT                        F1 .30         2 -
* 3  -
4 -
725555 A2-SWA-315                      D-B      VT-3   1 -
INTEGRAL ATTACHMENT            02.20          2 -
3 -  - -
4 -
725560 A2-SWG-316                      F-A     VT-3   1 - - -
SUPPORT                        F1.30         2 -
3 -
4 -
8-2-SW-858 (FIG NO SW-2-2/3) 725570  2-SWWA-6P1                      F-A     VT-3   1 -
WALL ANCHOR                    F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 120 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI          ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA ASME SEC. XI CATGY NOE FIRST PERIOD -----------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u TA GE - - - - - -     INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3      1 2 3      1 2 3         **CALIBRATION BLOCK**
------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 8-2-SW-858 (FIG NO SW-2-2/3) 725575 2-SWWA-6P1 INTEGRAL ATTACHMENT 725580 A2-SWG-318 SUPPORT 725585 A2-SWG-318 INTEGRAL ATTACHMENT 8-2-SW-859 (FIG NO SW-2-2/3) 725590 A2-SWG-300 SUPPORT 725600 A2-SWG-301 SUPPORT 8-2-SW-860 (FIG NO SW-2-2/3) 725610 A2-SWH-302 SUPPORT ------------
                                                        - ----------- ----------- ----------- -
D-B SEE 1 -02.20 INST 2 4 -F-A VT-3 1 -F1.30 2 3 4 -D-B VT-3 1 -02.20 2 4 F-A VT-3 1 -F1.30 2 -3 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -SECOND THIRD PERIOD PERIOD -----------
8-2-SW-858 (FIG NO SW-2-2/3) 725575  2-SWWA-6P1                    D-B     SEE   1 -                                     INACCESSIBLE INTEGRAL ATTACHMENT            02.20   INST 2 -
-----------
3 -
0 u T A G E ------1 2 3 1 2 3
4 -
-----------
725580 A2-SWG-318                      F-A     VT-3 1 -
-----------
SUPPORT                        F1.30         2                         x 3
x x ---PAGE: 120 INSTRUCTIONS
4 -
**CALIBRATION BLOCK** INACCESSIBLE DATE: 03/28/92 REVISION:
725585  A2-SWG-318                    D-B     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
INTEGRAL ATTACHMENT            02.20         2 -                      x - -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
3 -
_____ PLAN STATUS ____ _ * *
4
* 8-2-SW-859 (FIG NO SW-2-2/3) 725590 A2-SWG-300 SUPPORT F-A F1.30 VT-3 1 -
2 -
3 4 -
725600 A2-SWG-301                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
8-2-SW-860 (FIG NO SW-2-2/3) 725610 A2-SWH-302                      F-A     VT-3 1 -
SUPPORT                        F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 121 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 8-2-SW-860 (FIG NO SW-2-2/3) 725620 A2-SWG-303 SUPPORT 8-2-SW-861 (FIG NO SW-2-2/3) 725630 A2-SWA-303A SUPPORT 725635 A2-SWA-303A INTEGRAL ATTACHMENT 725640 A2-SWG-304 SUPPORT 6-2-SW-903 (FIG NO SW-2-2/3) 725650 A2-SWG-364 SUPPORT 725660 A2-SWA-354 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1.30 F-A VT-3 F1.30 D-B VT-3 02.20 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 FIRST SECOND PERIOD PERIOD THIRD PERIOD * * * * --0 U T A G E ------
EXAMINATION AREA               CATGY NOE        * * * * - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    123        123        123        **CALIBRATION BLOCK**
123 123 123 1 -2 x 3 1 3 ---4 --2 4 2 4 ---1 3 1 --3 PAGE: 121 INSTRUCTIONS
8-2-SW-860 (FIG NO SW-2-2/3) 725620 A2-SWG-303                     F-A      VT-3 1 -
**CALIBRATION BLOCK**
SUPPORT                       F1.30          2x 3 -
DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
8-2-SW-861 (FIG NO SW-2-2/3) 725630 A2-SWA-303A                     F-A      VT-3 1  -
* SERVICE WATER SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ FIRST SECOND THIRD PERIOD *
SUPPORT                       F1.30          2 -
* ASME SEC. XI PERIOD PERIOD
3 -  - -
4 -
725635 A2-SWA-303A                     D-B      VT-3 1  -  - -
INTEGRAL ATTACHMENT           02.20          2 -
* 3 -
4 -
725640 A2-SWG-304                     F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -
4 -  - -
6-2-SW-903 (FIG NO SW-2-2/3) 725650 A2-SWG-364                     F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
725660 A2-SWA-354                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 122 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __
* SERVICE WATER SYSTEM                                        FIRST     SECOND     THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * -" -* -0 U T A G E ------
EXAMINATION AREA               CATGY NOE         * - " - * - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6*2-SW-901 (FIG NO SW*2*2/3) 725670 A2-SWG-366 F*A VT-3 1 . SUPPORT F1 .30 2 4 -725680 A2-SWG*367 F*A VT-3 1 . SUPPORT F1.30 2 . 3 . 4 -6*2*SW*891 (FIG NO SW*2*2/3) 725690 A2*SWS-351 F*A VT*3 1 -SUPPORT F1.30 2 --4 2*SW-890 (FIG NO SW-2*2/3) 725700 A2*SWG-352 F*A VT*3 1 . SUPPORT F1 .30 2 . 3 6-2-SW-892 (FIG NO SW*2*2/3) 725710 A2-SWG-368 F*A VT-3 1 . SUPPORT F1 .30 2 . 3 . --4 . 725720 A2-SWS*369 F-A VT-3 1 . SUPPORT F1 .30 2 . 3 . --4 . PAGE: 122 INSTRUCTIONS
6*2-SW-901 (FIG NO SW*2*2/3) 725670 A2-SWG-366                     F*A     VT-3 1 .
**CALIBRATION BLOCK**
SUPPORT                       F1 .30         2 -
DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE YATER SYSTEM INSPECTION INTERVAL_
725680 A2-SWG*367                     F*A     VT-3 1 .
_____ PLAN STATUS ____ _ * *
SUPPORT                       F1.30         2 .
3 .
4 -
6*2*SW*891 (FIG NO SW*2*2/3) 725690 A2*SWS-351                     F*A     VT*3 1 -
SUPPORT                       F1.30         2 -
* 3 -  - -
4 -
6-2*SW-890 (FIG NO SW-2*2/3) 725700 A2*SWG-352                     F*A     VT*3   1 .
SUPPORT                       F1 .30         2 .
3 -
4 -
6-2-SW-892 (FIG NO SW*2*2/3) 725710 A2-SWG-368                       F*A     VT-3   1 .
SUPPORT                         F1 .30         2 .
3 .   - -
4 .
725720 A2-SWS*369                       F-A     VT-3   1 .
SUPPORT                         F1 .30         2 .
3 .   - -
4 .
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 123 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE YATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 6-2-SY-893 (FIG NO SY-2-2/3) 725730 A2-SYA-356 SUPPORT 725740 A2-SYG-310 SUPPORT 8-2-SY-864 (FIG NO SY-2-2/3) 725750 A2-SYG-326 SUPPORT 8-2-SY-868 (FIG NO SY-2-2/3) 725760 A2-SYG-344 SUPPORT 725770 A2-SYA-345 SUPPORT 6-2-SY-865 (FIG NO SY-2-2/3) 725780 A2-SYG-343 SUPPORT ASME SEC. XI CATGY NOE ITEM NO METH F-A VT-3 F1 .30 F-A VT-3 F1.30 F-A ,/ VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 F-A VT-3 F1.30 FIRST SECOND PERIOD PERIOD THIRD PERIOD ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE        - - - - - - 0 UT AGE - - - - - -  INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH    123        123        123      **CALIBRATION BLOCK**
123 123 123 1 --3 1 3 1 3 1 3 ---4 2 4 --2 ---3 PAGE: 123 INSTRUCTIONS
6-2-SY-893 (FIG NO SY-2-2/3) 725730 A2-SYA-356                     F-A      VT-3  1 -
**CALIBRATION BLOCK**
SUPPORT                       F1 .30        2 -  - -
DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* SERVICE WATER SYSTEM INSPECTION INTERVAL_
725740 A2-SYG-310                     F-A      VT-3  1 -
_____ PLAN STATUS ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD ASME SEC. XI -----------
SUPPORT                       F1.30          2 -
-----------
3 -
-----------
4 -
8-2-SY-864 (FIG NO SY-2-2/3) 725750 A2-SYG-326                     F-A ,/  VT-3  1 -
SUPPORT                       F1.30          2 -
* 3 -
4 -
8-2-SY-868 (FIG NO SY-2-2/3) 725760 A2-SYG-344                     F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -  - -
4 -
725770 A2-SYA-345                     F-A      VT-3  1 -
SUPPORT                       F1.30          2 -
3 -
4 -
6-2-SY-865 (FIG NO SY-2-2/3) 725780 A2-SYG-343                     F-A     VT-3 1 - - -
SUPPORT                        F1.30         2 - - -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 124 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE WATER SYSTEM                                         FIRST   SECOND      THIRD ASME                  PERIOD   PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-910A (FIG NO SW-2-2/3) 725790 A2-SWG-347 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-910 (FIG NO SW-2-2/3) 725800 A2-SWG-348 F-A VT-3 1 -SUPPORT F1.30 2 4 ---6-2-SW-863 (FIG NO SW-2-2/3) 725810 A2-SWG-328 F-A VT-3 1 -* SUPPORT F1.30 2 ---3 6-2-SW-912 (FIG NO SW-2-2/3) 725820 A2-SWG-329 F-A VT-3 1 -SUPPORT F1.30 2 4 -I ') 6-2-SW-911 (FIG NO SW-2-2/3) 725830 A2-SWG-376 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-913 (FIG NO SW-2-2/3) 725840 A2-SWG-377 F-A VT-3 1 -SUPPORT F1.30 2 4 -* PAGE: 124 INSTRUCTIONS
6-2-SW-910A (FIG NO SW-2-2/3) 725790 A2-SWG-347                     F-A     VT-3 1 -
**CALIBRATION BLOCK** 
SUPPORT                       F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
6-2-SW-910 (FIG NO SW-2-2/3) 725800 A2-SWG-348                     F-A     VT-3 1 -
_ ____ PLAN STATUS. ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                       F1.30         2 -
3 -
4 -   - -
6-2-SW-863 (FIG NO SW-2-2/3)
* 725810 A2-SWG-328                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -   - -
3 -
4 -
6-2-SW-912 (FIG NO SW-2-2/3) 725820 A2-SWG-329                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
I
                                                            ')
6-2-SW-911 (FIG NO SW-2-2/3) 725830 A2-SWG-376                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-SW-913 (FIG NO SW-2-2/3) 725840 A2-SWG-377                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                     SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 125 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                           FIRST     SECOND     THIRD ASME                PERIOD     PERIOD     PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NDE ------0 U T A G E ------
EXAMINATION AREA                   CATGY NDE         - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                     ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-914 (FIG NO SW-2-2/3) 725850 A2-SWA-358 F-A VT-3 1 -SUPPORT F1 .30 2 4 -725860 A2-SWG-378 F-A VT-3 1 ---SUPPORT F1.30 2 4 ---6-2-S\.1-905 CFIG NO S\.1-2-2/4) 725870 A2-S\.IA-363 F-A VT-3 1 -SUPPORT F1.30 2 4 2-S\.1-907 (FIG NO S\.1-2-2/4) 725880 A2-S\.IR-392 F-A VT-3 1 -SUPPORT F1.30 2 ---3 725890 A2-S\.IA-353 F-A VT-3 1 -SUPPORT F1.30 2 4 2-S\.1-909 (FIG NO S\.1-2-2/4) 725900 A2-S\.IG-359 F-A VT-3 1 -SUPPORT F1.30 2 4 -PAGE: 125 INSTRUCTIONS
6-2-SW-914 (FIG NO SW-2-2/3) 725850 A2-SWA-358                         F-A     VT-3 1 -
**CALIBRATION BLOCK**  
SUPPORT                           F1 .30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
725860 A2-SWG-378                         F-A     VT-3 1 - - -
SUPPORT                           F1.30         2 -
3  -
4 - - -
6-2-S\.1-905 CFIG NO S\.1-2-2/4) 725870 A2-S\.IA-363                       F-A     VT-3   1 -
SUPPORT                           F1.30         2 -
* 3  -
4 -
6-2-S\.1-907 (FIG NO S\.1-2-2/4) 725880 A2-S\.IR-392                       F-A     VT-3   1 -
SUPPORT                           F1.30         2 -   - -
3 -
4 -
725890 A2-S\.IA-353                       F-A     VT-3   1 -
SUPPORT                           F1.30           2 -
3 -
4 -
6-2-S\.1-909 (FIG NO S\.1-2-2/4) 725900 A2-S\.IG-359                       F-A     VT-3   1 -
SUPPORT                           F1.30           2 -
3 -
4  -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 126 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS._ _ _ __
SERVICE WATER SYSTEM                                       FIRST     SECOND     THIRD ASME                PERIOD     PERIOD     PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-909 (FIG NO SW-2-2/4) 725910 A2-SWG-360 F-A VT-3 1 -SUPPORT F1.30 2 4 -725920 A2-SWG-361 F-A VT-3 1 -SUPPORT F1.30 2 4 ---6-2-SW-879 (FIG NO SW-2-2/4) 725930 A2-SWS-334 F-A VT-3 1 -SUPPORT F1 .30 2 4 -725940 A2-SWG-333 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-875 (FIG NO SW-2-2/4) 725950 2-SWWA-6P3 F-A VT-3 1 -WALL ANCHOR F1 .30 2 --4 -725955 2-SWWA-6P3 D-B SEE 1 -INTEGRAL ATTACHMENT 02.20 INST 2 ---3 ---4 -PAGE: 126 INSTRUCTIONS
6-2-SW-909 (FIG NO SW-2-2/4) 725910 A2-SWG-360                     F-A     VT-3   1 -
**CALIBRATION BLOCK** INACCESSIBLE 
SUPPORT                       F1.30           2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SERVICE WATER SYSTEM SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
725920 A2-SWG-361                     F-A     VT-3   1 -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI ---------------------------------
SUPPORT                       F1.30           2 -
3 -
4 - - -
6-2-SW-879 (FIG NO SW-2-2/4) 725930 A2-SWS-334                     F-A     VT-3   1 -
SUPPORT                       F1 .30         2 -
* 3 -
4 -
725940 A2-SWG-333                     F-A     VT-3   1 -
SUPPORT                       F1.30           2 -
3 -
4 -
8-2-SW-875 (FIG NO SW-2-2/4) 725950 2-SWWA-6P3                     F-A     VT-3   1 -
WALL ANCHOR                   F1 .30         2 -
3 -  - -
4 -
725955 2-SWWA-6P3                     D-B     SEE   1 -                                 INACCESSIBLE INTEGRAL ATTACHMENT           02.20     INST 2 - - -
3 - - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                                         PAGE: 127 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_                         PLAN STATUS SERVICE WATER SYSTEM                                          FIRST             SECOND       THIRD ASME                  PERIOD             PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 -......................
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u TAGE - - - - - -                INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3                  1 2 3      1 2 3         **CALIBRATION BLOCK**
8-2-SW-875 (FIG NO SW-2-2/4) 725960 A2-SWG-321 SUPPORT 725965 A2-SWG-321 INTEGRAL ATTACHMENT 725970 A2-SWG-322 SUPPORT 725975 A2-SWG-322 INTEGRAL ATTACHMENT 725980 A2-SWG-309 SUPPORT 725990 A2-SWG-310 SUPPORT 8-2-SW-877 (FIG NO SW-2-2/4) 726000 A2-SWA-311 SUPPORT F-A VT-3 1 -F1.30 2 -. 3 D-B VT-3 1 -02.20 2 4 -F-A VT-3 1 -F1.30 2 4 -D-B VT-3 1 -02.20 2 3 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 -3 4 -F-A 1 -F1.30 2 4 ---0 u T A G E ------1 2 3 1 2 3 -----------
                                                        - ...................... ----------- ----------- -
-----------
8-2-SW-875 (FIG NO SW-2-2/4) 725960 A2-SWG-321                      F-A     VT-3 1 -
x x -PAGE: 127 INSTRUCTIONS
SUPPORT                        F1.30         2 -.                                 x 3 -
**CALIBRATION BLOCK**
4 -
DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 128 REVISION:
725965 A2-SWG-321                      D-B     VT-3 1 -
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
INTEGRAL ATTACHMENT            02.20         2 -                                  x 3 -
* INSPECTION INTERVAL -PLAN STATUS SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
4 -
-----------
725970 A2-SWG-322                      F-A     VT-3 1 -
-----------
SUPPORT                        F1.30         2 -
3 -    - -
4 -
* 725975 A2-SWG-322 INTEGRAL ATTACHMENT D-B 02.20 VT-3 1 2
3
                                                          -
4 -
725980 A2-SWG-309                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
725990 A2-SWG-310                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 4 -
8-2-SW-877 (FIG NO SW-2-2/4) 726000 A2-SWA-311                      F-A      VT-~  1 -
SUPPORT                        F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE:   128 REVISION:     0                             INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL                 PLAN STATUS SERVICE WATER SYSTEM
                                                      -      FIRST     SECOND       THIRD ASME                 PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------INSTRUCTIONS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK** ------------------------------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UTAGE    ------     INSTRUCTIONS NUMBER !DENT! Fl CATION               ITEM NO METH     1 2 3     1 2 3       1 2 3       **CALIBRATION BLOCK**
-----------------------
          ------------------------------ ------- ---- - ----------- ----------- ----------- - ------------------------------
-----------
8-2-SW-877 (FIG NO SW-2-2/4) 726005 A2-SWA-311                     D-B     VT-3   1 -
-----------
INTEGRAL ATTACHMENT           02.20           2 -
-------------------------------
3 -
8-2-SW-877 (FIG NO SW-2-2/4) 726005 A2-SWA-311 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-SW-878 (FIG NO SW-2-2/4) 726010 A2-SWA-332 F-A VT-3 1 -SUPPORT F1 .30 2 4 ---8-2-SW-887 (FIG NO SW-2-2/4) 726020 2-SWWA-6P2 F-A VT-3 1 -* WALL ANCHOR F1 .30 2 4 -726025 2-SWWA-6P2 D-B SEE 1 -INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 4 -726030 A2-SWG-319 F-A VT-3 1 -SUPPORT F1 .30 2 -x 3 726035 A2-SWG-319 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 ---x 3
4 -
* DATE: 03/28/92 REVISION:
8-2-SW-878 (FIG NO SW-2-2/4) 726010 A2-SWA-332                     F-A     VT-3   1 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                       F1 .30         2 -
* SERVICE YATER SYSTEM INSPECTION INTERVAL_
3 -
_ ____ PLAN STATUS. ____ _ FIRST SECOND THIRD PERIOD *
4 - - -
* ASME SEC. XI PERIOD PERIOD
8-2-SW-887 (FIG NO SW-2-2/4)
* 726020 2-SWWA-6P2                     F-A     VT-3   1 -
WALL ANCHOR                   F1 .30         2 -
3  -
4 -
726025 2-SWWA-6P2                     D-B     SEE   1 -                                   INACCESSIBLE INTEGRAL ATTACHMENT           02.20   INST   2 -
3 -
4 -
726030 A2-SWG-319                     F-A     VT-3   1 -
SUPPORT                       F1 .30         2 -                       x 3 -
4 -
726035 A2-SWG-319                     D-B     VT-3   1 -
INTEGRAL ATTACHMENT           02.20           2 - - -                 x 3 -
4  -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                           PAGE: 129 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
* SERVICE YATER SYSTEM                                        FIRST     SECOND     THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * -----0 U T A G E ------
EXAMINATION AREA               CATGY NOE         * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-SY-887 (FIG NO SY-2-2/4) 726040 A2-SYG-320 F-A VT-3 1 -SUPPORT F1.30 2 ---x 3 726045 A2-SYG-320 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 -x --3 8-2-SY-886
8-2-SY-887 (FIG NO SY-2-2/4) 726040 A2-SYG-320                       F-A     VT-3 1 -
{FIG NO ) 726050 A2-SYG-305 F-A VT-3 1 -SUPPORT F1 .30 2 4 -726060 A2-SYG-306 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SY-885 (FIG NO SY-2-2L4) 726070 A2-SYG-307 F-A VT-3 1 -SUPPORT F1 .30 2 -" --3 8-2-SY-884 (FIG NO SY-2-2L4) 726080 A2-SYA(G)-307A F-A VT-3 1 -SUPPORT F1 .30 2 4 -PAGE: 129 INSTRUCTIONS
SUPPORT                         F1.30         2 - - -                 x 3 -
**CALIBRATION BLOCK**  
4  -
* *
726045 A2-SYG-320                       D-B     VT-3 1 -
* DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT             02.20         2 -                     x - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
3 -
4  -
8-2-SY-886 {FIG NO SY-2-2L4~
  ) 726050 A2-SYG-305                       F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -
* 3  -
4 -
726060 A2-SYG-306                       F-A     VT-3 1 -
SUPPORT                         F1.30         2 -
3  -
4 -
8-2-SY-885 (FIG NO SY-2-2L4) 726070 A2-SYG-307                       F-A     VT-3 1 -
SUPPORT                         F1 .30         2 -           "   - -
3 -
4 -
8-2-SY-884 (FIG NO SY-2-2L4) 726080 A2-SYA(G)-307A                   F-A     VT-3   1 -
SUPPORT                         F1 .30         2 -
3 -
4  -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 130 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 8-2-SW-884 (FIG NO SW-2-2/4) 726085 A2-SWA(G)-307A INTEGRAL ATTACHMENT 726090 A2-SWG-308 SUPPORT 8-2-SW-883 726100 A2-SWA-340 SUPPORT 6-2-SW-881 726110 A2-SWS-336 SUPPORT 726120 A2-SWS-335 SUPPORT 726130 A2-SWG-337 SUPPORT (FIG NO SW-2-2/4) (FIG NO SW-2-2/4)
8-2-SW-884 (FIG NO SW-2-2/4) 726085 A2-SWA(G)-307A                 D-B      VT-3  1 -
D-B VT-3 1 -D2.20 2 --4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 4 -PAGE: 130 INSTRUCTIONS
INTEGRAL ATTACHMENT           D2.20          2 -
**CALIBRATION BLOCK** 
3 -  - -
* *
4 -
* DATE: 03/28/92 REVISION:
726090 A2-SWG-308                     F-A      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
SUPPORT                       F1.30          2 -
____ ......;PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST PERIOD SECOND PERIOD THIRD PERIOD
3 -
4 -
8-2-SW-883 (FIG NO SW-2-2/4) 726100 A2-SWA-340                      F-A      VT-3 1 -
SUPPORT                        F1.30          2 -
* 3 -
4 -
6-2-SW-881 (FIG NO SW-2-2/4) 726110 A2-SWS-336                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
726120 A2-SWS-335                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
726130 A2-SWG-337                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _......;PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * -----0 U T A G E ------
EXAMINATION AREA               CATGY NOE       * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-881 (FIG NO SW-2-2/4) 726140 A2-SWS-338 F*A VT-3 1 -SUPPORT F1.30 2 4 2-SW-896 (FIG NO SW-2*2/4) 726150 A2-SWA-373 F-A VT-3 1 -SUPPORT F1 .30 2 4 ---726160 A2-SWR-393 F*A VT-3 1 -SUPPORT F1.30 2 4 2-SW-898 CFIG NO SW-2-2/4) 726170 A2-SWA-355 F-A VT-3 1 -SUPPORT F1.30 2 4 -6*2-SW-899 (FIG NO SW-2-2/4) 726180 A2-SWS-374 F-A VT-3 1 -SUPPORT F1.30 2 -3 "/ 4 -6*2-SW-900 CFIG NO SW-2-2/4) 726190 A2-SWG*375 F-A VT-3 1 -SUPPORT F1.30 2 4 -INSTRUCTIONS
6-2-SW-881 (FIG NO SW-2-2/4) 726140 A2-SWS-338                     F*A     VT-3 1 -
**CALIBRATION BLOCK** 
SUPPORT                       F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
6-2-SW-896 (FIG NO SW-2*2/4) 726150 A2-SWA-373                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 - - -
726160 A2-SWR-393                     F*A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 -
6-2-SW-898 CFIG NO SW-2-2/4) 726170 A2-SWA-355                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6*2-SW-899 (FIG NO SW-2-2/4) 726180 A2-SWS-374                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 "/
4 -
6*2-SW-900 CFIG NO SW-2-2/4) 726190 A2-SWG*375                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 132 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UTAGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-900 (FIG NO SW-2-2/4) 726200 A2-SWA-339 F-A VT-3 1 -SUPPORT F1.30 2 ---3 ---4 -726210 A2-SWS-331 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-916 (FIG NO SW-2-2/4) 726220 A2-SWA-381 F-A VT-3 1 -SUPPORT F1 .30 2 4 2-SW-918 (FIG NO SW-2-2/4) 726230 A2-SWR-394 F-A VT-3 1 -SUPPORT F1.30 2 4 2-SW-919 (FIG NO SW-2-2/4) 726240 A2-SWA-357 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 6-2-SW-920 (FIG NO SW-2-2/4) 726250 A2-SWG-382 F-A VT-3 1 -SUPPORT F1 .30 2 4 -PAGE: 132 INSTRUCTIONS
6-2-SW-900 (FIG NO SW-2-2/4) 726200 A2-SWA-339                     F-A     VT-3 1 -
**CALIBRATION BLOCK**
SUPPORT                       F1.30         2 - - -
DATE: 03/28/92 REVISION:
3 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS  
4 -
*. SERVICE WATER SYSTEM INSPECTION INTERVAL_
726210 A2-SWS-331                     F-A     VT-3 1 -
_____ PLAN STATUS ____ _ ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-SW-916 (FIG NO SW-2-2/4) 726220 A2-SWA-381                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
* 3 -
4 -
6-2-SW-918 (FIG NO SW-2-2/4) 726230 A2-SWR-394                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
6-2-SW-919 (FIG NO SW-2-2/4) 726240 A2-SWA-357                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 - - -
3 -
4 -
6-2-SW-920 (FIG NO SW-2-2/4) 726250 A2-SWG-382                     F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 133 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* . SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 6-2-SW-920 CFIG NO SW-2-2/4) 726260 A2-SWG-350 SUPPORT 726270 A2-SWG-349 SUPPORT 726280 A2-SWG-342 SUPPORT
6-2-SW-920 CFIG NO SW-2-2/4) 726260 A2-SWG-350                     F-A      VT-3 1 -
* 726290 A2-SWG-341 SUPPORT 20-2-SW-P-95 726300 A2-SWR-84 SUPPORT CFIG NO SW-2-2/5) 20-2-SW-P-94 (FIG NO SW-2-2/5) 726310 2A-SWA-86 SUPPORT
SUPPORT                       F1 .30        2 - - -
* F-A VT-3 1 -F1 .30 2 ---3 --F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 ---F1.30 2 ---3 F-A VT-3 1 -F1.30 2 --4 -F-A VT-3 1 -F1.30 2 --4 -PAGE: 133 INSTRUCTIONS
3 -
**CALIBRATION BLOCK**
4 - - -
DATE: 03/28/92 REVISION:
726270 A2-SWG-349                      F-A     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
SUPPORT                        F1 .30         2 -
* SERVICE \.JATER SYSTEM INSPECTION INTERVAL_
3 -
_____ PLAN STATUS ____ _ ASME SEC. XI FIRST SECOND PERIOD PERIOD THIRD PERIOD  
4 -
726280 A2-SWG-342                      F-A     VT-3 1 -
SUPPORT                        F1 .30         2 -
3 -
4 -
* 726290 A2-SWG-341                      F-A     VT-3 1 -   - -
SUPPORT                        F1.30         2 - - -
3 -
4 -
20-2-SW-P-95 CFIG NO SW-2-2/5) 726300 A2-SWR-84                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -  - -
4 -
20-2-SW-P-94 (FIG NO SW-2-2/5) 726310 2A-SWA-86                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -  - -
4 -
* DATE: 03/28/92                                   SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 134 REVISION:        0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE \.JATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA                 CATGY NOE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 20-2-SW-738 (FIG NO S\.1-2-2/5) 726320 2-SWWA-6J1 WALL ANCHOR 726325 2-S\.JWA-6J1 INTEGRAL ATTACHMENT 726330 2-S\.J\.JS-10 SUPPORT
20-2-SW-738 (FIG NO S\.1-2-2/5) 726320 2-SWWA-6J1                       F-A      VT-3  1 -
* 726340 A2-S\.JH-49 SUPPORT 20-2-S\.J-740 (FIG NO SW-2-2/5) 726350 2-SW\.JA-6H2 SUPPORT F-A VT-3 1 -F1.30 2 --4 -D-B SEE 1 -02.20 INST 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1 .30 2 4 -F-A VT-3 1 -F1.30 2 4 ---20-2-SW-P-1357 (FIG NO SW-2-2/28)
WALL ANCHOR                     F1.30          2 -
* 726360 A2-S\.JH-45 SUPPORT F-A VT-3 1 -F1.30 2 4 ---PAGE: 134 INSTRUCTIONS
3 -  -  -
**CALIBRATION BLOCK** INACCESSIBLE DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
726325 2-S\.JWA-6J1                     D-B      SEE  1 -                                INACCESSIBLE INTEGRAL ATTACHMENT             02.20    INST  2 -
* SERVICE YATER SYSTEM INSPECTION INTERVAL_
3 -
_____ PLAN STATUS ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD *
4 -
* ASME
726330 2-S\.J\.JS-10                     F-A      VT-3  1 -
SUPPORT                         F1 .30        2 -
3 -
4 -
* 726340 A2-S\.JH-49                       F-A      VT-3  1 - - -
SUPPORT                         F1 .30        2 -
3 -
4 -
20-2-S\.J-740 (FIG NO SW-2-2/5) 726350 2-SW\.JA-6H2                     F-A     VT-3 1 -
SUPPORT                          F1.30         2 -
3 -
4 -
20-2-SW-P-1357 (FIG NO SW-2-2/28) 726360 A2-S\.JH-45                       F-A     VT-3 1 -
SUPPORT                          F1.30         2 -
3 -
4 - - -
* DATE: 03/28/92                                     SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 135 REVISION:      0                                INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
* SERVICE YATER SYSTEM                                           FIRST     SECOND      THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NOE ITEM NO METH 20-2-S\.J-P-1359 (FIG NO SW-2-2/28) 726370 A2-S\.JH-46 F-A VT-3 SUPPORT F1 .30 20-2-S\.J-P-1363 CFIG NO S\.J-2-2/28) 726380 A2-S\.JG-47 F-A VT-3 SUPPORT F1 .30 20-2-S\.J-P-1365 CFIG NO SW-2-2/28) 726390 A2-SWG-48 F-A VT-3 SUPPORT F1.30 20-2-S\.J-P-1353 CFIG NO S\.J-2-2/28) 726400 2A-SWR-85 F-A VT-3 SUPPORT F1.30 20-2-S\.J-P-1354 (FIG NO S\.J-2-2/28) 726410 A2-S\JH-50 F-A VT-3 SUPPORT F1.30 20-2-S\.J-428 (FIG NO S\.J-2-3/13) 726420 2P-21SIJS-3 F-A VT-3 SUPPORT F1.30 ------0 U T A G E ------
EXAMINATION AREA                   CATGY NOE        - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                     ITEM NO METH     123        123        123        **CALIBRATION BLOCK**
123 123 123 1 3 1 3 1 3 ---4 2 -" --3 1 3 1 3 PAGE: 135 INSTRUCTIONS
20-2-S\.J-P-1359 (FIG NO SW-2-2/28) 726370 A2-S\.JH-46                         F-A     VT-3 1 -
**CALIBRATION BLOCK** 
SUPPORT                           F1 .30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
20-2-S\.J-P-1363 CFIG NO S\.J-2-2/28) 726380 A2-S\.JG-47                         F-A     VT-3 1 -
_____ PLAN STATUS ____ _ SERVICE WATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
SUPPORT                           F1 .30         2 -
3 -
4 -
20-2-S\.J-P-1365 CFIG NO SW-2-2/28)
* 726390 A2-SWG-48                           F-A     VT-3 1 -
SUPPORT                           F1.30         2 -
3 -  - -
4 -
20-2-S\.J-P-1353 CFIG NO S\.J-2-2/28) 726400 2A-SWR-85                         F-A     VT-3 1 -
SUPPORT                           F1.30         2 -          "  - -
3 -
4 -
20-2-S\.J-P-1354 (FIG NO S\.J-2-2/28) 726410 A2-S\JH-50                         F-A     VT-3 1 -
SUPPORT                           F1.30         2 -
3 -
4 -
20-2-S\.J-428 (FIG NO S\.J-2-3/13) 726420 2P-21SIJS-3                         F-A     VT-3 1 -
SUPPORT                           F1.30         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 136 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-SW-666 (FIG NO SW-2-3/13) 726430 2C-21SWG-3A SUPPORT 726440 2C-21SWH-2 SUPPORT 10-2-SW-644 (FIG NO SW-2-3/13) 726450 2C-21SWG-3B SUPPORT 726460 2C-22SWH-2 SUPPORT 10-2-SW-636 (FIG NO SW-2-3/13) 726470 2P-22SWH-16 SUPPORT F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 ---F1.30 2 4 -F-A VT-3 1 -F1.30 2 4 -F-A VT-3 1 -F1.30 2 3 F-A VT-3 1 -F1.30 2 4 -SYSTEM !NSERVICE TEST (FIG NO SW-2-3/13) 726474 SW SYSTEM COMPONENTS D-B PRESSURE RETAINING COMPONENTS 02.10 VT-2 1 -2 x 3 --x x PAGE: 136 INSTRUCTIONS
10-2-SW-666 (FIG NO SW-2-3/13) 726430 2C-21SWG-3A                     F-A      VT-3  1 -
**CALIBRATION BLOCK**  
SUPPORT                         F1.30          2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SERVICE WATER SYSTEM  
726440 2C-21SWH-2                       F-A      VT-3  1 - - -
SUPPORT                        F1.30          2 -
3 -
4 -
10-2-SW-644 (FIG NO SW-2-3/13) 726450 2C-21SWG-3B                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
* 3 -
4 -
726460 2C-22SWH-2                       F-A     VT-3 1 -
SUPPORT                        F1.30         2 3 -
4 -
10-2-SW-636 (FIG NO SW-2-3/13) 726470  2P-22SWH-16                    F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
SYSTEM !NSERVICE TEST (FIG NO SW-2-3/13) 726474 SW SYSTEM COMPONENTS             D-B     VT-2  1 -
PRESSURE RETAINING COMPONENTS 02.10           2 x          x          x 3 -
4 -  -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                            PAGE: 137 REVISION:     0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
SERVICE WATER SYSTEM                                       FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
EXAMINATION AREA               CATGY NOE       - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    123         123         123       **CALIBRATION BLOCK**
ASME SEC. XI CATGY NOE ITEM NO METH _____ PLAN STATUS ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD ------0 U T A G E ------
SYSTEM HYDROSTATIC TEST (FIG NO SW-2-3/13) 726478 SW SYSTEM COMPONENTS           D-B     VT-2 1 -
123 123 123 SYSTEM HYDROSTATIC TEST (FIG NO SW-2-3/13) 726478 SW SYSTEM COMPONENTS D-B VT-2 1 -PRESSURE RETAINING COMPONENTS 02.10 2 --4 --x -PAGE: 137 INSTRUCTIONS
PRESSURE RETAINING COMPONENTS 02.10           2 -                       - x -
**CALIBRATION BLOCK**
3 -  - -
DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
*
* AUXILIARY FEEDWATER INSPECTION INTERVAL_
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 138 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
_____ PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD *
* AUXILIARY FEEDWATER                                       FIRST     SECOND         THIRD ASME                PERIOD    PERIOD        PERIOD SEC. XI
* ASME SEC. XI PERIOD PERIOD


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3         1 2 3   **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 21 AUXILIARY FEEDWATER PUMP 726480 2AFE4 F-A VT-3 1 ---SUPPORT F1.40 2 ---3 726490 2AFE4 D-A VT-3 1 -INTEGRAL ATTACHMENT 01 .20 2 4 -22 AUXILIARY FEEDWATER PUMP 726500 2AFE5 F-A VT-3 1 -SUPPORT F1.40 2 --x 4 ---726510 2AFE5 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 --x 4 ---23 AUXILIARY FEEDWATER PUMP 726520 2AFE6 F-A VT-3 1 -SUPPORT F1.40 2 4 -726530 2AFE6 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 ---', 4 -PAGE: 138 INSTRUCTIONS
21 AUXILIARY FEEDWATER PUMP 726480 2AFE4                           F-A     VT-3 1 - - -
**CALIBRATION BLOCK** 
SUPPORT                       F1.40         2 - - -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 COMPONENT COOLING SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
726490 2AFE4                           D-A     VT-3 1 -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI -----------
INTEGRAL ATTACHMENT           01 .20         2 -
-----------
3 -
-----------
4 -
22 AUXILIARY FEEDWATER PUMP 726500 2AFE5                           F-A     VT-3 1 -
SUPPORT                       F1.40         2 -                         - x -
* 3 -
4 - - -
726510 2AFE5                           D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -                         - x -
3 -
4 - - -
23 AUXILIARY FEEDWATER PUMP 726520 2AFE6                         F-A     VT-3 1 -
SUPPORT                       F1.40         2 -
3 -
4 -
726530 2AFE6                           D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 - - -                 ', -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 139 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS COMPONENT COOLING                                          FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 u T A G E ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 ------------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u T AGE - - - - - -     INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1 2 3       1 2 3       1 2 3         **CALIBRATION BLOCK**
-----------
                                                        - ----------- ----------- ----------- -
-----------
21 COMPONENT COOLING PUMP 726540 2CCE2                           F-A     VT-3 1 -
21 COMPONENT COOLING PUMP 726540 2CCE2 F-A VT-3 1 -SUPPORT F1.40 2 4 -726550 2CCE2 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 . 3 4 -22 COMPONENT COOLING PUMP 726560 2CCE3 F-A VT-3 1 -SUPPORT F1.40 2 -x 4 -726570 2CCE3 D-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 -x 4 -23 COMPONENT COOLING PUMP 726580 2CCE4 F-A VT-3 1 -SUPPORT F1.40 2 4 -726590 2CCE4 D-B VT-3 INTEGRAL ATTACHMENT 02.20 2 3 -PAGE: 139 INSTRUCTIONS
SUPPORT                         F1.40         2 -
**CALIBRATION BLOCK**
3 -
DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 140 REVISION:
4 -
0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
726550 2CCE2                           D-B     VT-3 1 -
* INSPECTION INTERVAL -PLAN STATUS COMPONENT COOLING FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI -----------
INTEGRAL ATTACHMENT             02.20         2 .
-----------
3 4 -
-----------
22 COMPONENT COOLING PUMP 726560 2CCE3                           F-A     VT-3 1 -
SUPPORT                         F1.40         2 - x -
* 3 -
4 -
726570 2CCE3                           D-B     VT-3 1 - - -
INTEGRAL ATTACHMENT             02.20         2 - x -
3 -
4 -
23 COMPONENT COOLING PUMP 726580 2CCE4                           F-A     VT-3 1 -
SUPPORT                         F1.40         2 -
3 -
4 -
726590 2CCE4                           D-B     VT-3 INTEGRAL ATTACHMENT             02.20         2 3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE:   140 REVISION:     0                             INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL                 PLAN STATUS COMPONENT COOLING
                                                      -      FIRST     SECOND       THIRD ASME                 PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * -----0 U T A G E ------
EXAMINATION AREA               CATGY NOE         * - - - - - 0 UT AGE - - - - - -   I NSTRUCTI CNS NUMBER !DENT! Fl CATION               ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
I NSTRUCTI CNS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK** ------------------------------
          ------------------------------ ------- ---- - ----------- ----------- ----------- - ------------------------------
---------------------------------------------
COMPONENT COOLING SURGE 726600 2CCE1                         F-A     VT-3   1 -
-------------------------------
SUPPORT                       F1.40         2 -           - x -
COMPONENT COOLING SURGE 726600 2CCE1 F-A VT-3 1 -SUPPORT F1.40 2 --x 4 -726610 2CCE1 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 --x 4 -22 CC HEAT EXCHANGER 726620 2CCE6 F-A VT-3 1 -SUPPORT F1.40 2 --x 3 -* 4 -726630 2CCE6 D*B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 --x 3 21 CC HEAT EXCHANGER 726640 2CCE5 F-A VT-3 1 -SUPPORT F1.40 2 ----3 726650 2CCE5 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 -*  
3  -
* *
4 -
* DATE: 03/28/92 REVISION:
726610 2CCE1                           D-B     VT-3   1 -
0 SERVICE WATER SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
INTEGRAL ATTACHMENT           02.20         2 -           - x -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI -----------
3  -
-----------
4 -
-----------
22 CC HEAT EXCHANGER 726620 2CCE6                           F-A     VT-3   1 -
SUPPORT                       F1.40         2 - - x
* 3 -
4 -
726630 2CCE6                           D*B     VT-3 1 - - -
INTEGRAL ATTACHMENT           02.20         2 - - x 3 -
4  -
21 CC HEAT EXCHANGER 726640 2CCE5                         F-A     VT-3 1 -
SUPPORT                       F1.40         2 -           - - -
3 -
4  -
726650 2CCE5                           D-B     VT-3 1 -
INTEGRAL ATTACHMENT           02.20         2 -
3 -
4  -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             _PAGE: 141 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS SERVICE WATER                                              FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 u T A G E ------NUMBER IDENTIFICATION ITEM NO METH 21 SW PUMP STRAINER LEGS 726660 2SWE7 SUPPORT 726670 2SWE7 INTEGRAL ATTACHMENT 22 SW PUMP STRAINER 726680 2SWE8 SUPPORT 726690 2SWE8 INTEGRAL ATTACHMENT LEGS 23 SW PUMP STRAINER LEGS 726700 2SWE9 SUPPORT 726710 2SWE9 INTEGRAL ATTACHMENT F-A VT-3 F1.40 D-B VT-3 02.20 F-A VT-3 F1.40 D-B VT-3 02.20 F-A VT-3 F1.40 D-B VT-3 02.20 1 2 3 1 2 3 1 2 3 ------------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 u TAGE - - - - - -     INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3      1 2 3      1 2 3        **CALIBRATION BLOCK**
-----------
                                                        - ----------- ----------- ----------- -
-----------
21 SW PUMP STRAINER LEGS 726660 2SWE7                           F-A     VT-3 1  -
1 x --3 1 x --3 1 3 1 3 1 3 1 3 4 --_PAGE: 141 INSTRUCTIONS
SUPPORT                        F1.40         2 -            x - -
**CALIBRATION BLOCK**
3 -
DATE: 03/28/92 REVISION:
4 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
726670 2SWE7                          D-B     VT-3 1 -
* SERVICE WATER FIRST _ ____ PLAN STATUS. ____ _ SECOND THIRD INSPECTION INTERVAL_
INTEGRAL ATTACHMENT            02.20           2 -          x - -
*
3 -
* ASME SEC. XI PERIOD PERIOD PERIOD
4 -
22 SW PUMP STRAINER LEGS 726680  2SWE8                          F-A     VT-3   1 -
SUPPORT                        F1.40           2 -
* 3  -
4 -
726690 2SWE8                          D-B     VT-3   1 -
INTEGRAL ATTACHMENT            02.20           2 -
3 -
4 -
23 SW PUMP STRAINER LEGS 726700 2SWE9                            F-A    VT-3 1  -
SUPPORT                        F1.40          2 -
3 -
4 -
726710  2SWE9                          D-B      VT-3   1 -
INTEGRAL ATTACHMENT            02.20          2 -
3 4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 142 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
* SERVICE WATER                                             FIRST     SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 24 SW PUMP STRAINER LEGS 726720 2SWE10 SUPPORT 726730 2SWE10 INTEGRAL ATTACHMENT 25 SW PUMP STRAINER LEGS 726740 2SWE11 SUPPORT 726750 2SWE11 INTEGRAL ATTACHMENT 26 SW PUMP STRAINER LEGS 726760 2SWE12 SUPPORT 726770 2SWE12 INTEGRAL ATTACHMENT F-A F1.40 D-B 02.20 F-A F1.40 D-B 02.20 F-A F1.40 D-B 02.20 VT-3 1 3 VT-3 1 --3 VT-3 1 --3 VT-3 1 3 VT-3 1 3 VT-3 1 --3 PAGE: 142 INSTRUCTIONS
24 SW PUMP STRAINER LEGS 726720 2SWE10                         F-A      VT-3 1  -
**CALIBRATION BLOCK** 
SUPPORT                       F1.40          2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 -
0 SERVICE WATER SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
726730 2SWE10                         D-B      VT-3  1 -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI -----------
INTEGRAL ATTACHMENT           02.20          2 -  - -
-----------
3 -
-----------
4 -
25 SW PUMP STRAINER LEGS 726740 2SWE11                         F-A     VT-3  1 -
SUPPORT                        F1.40         2 -  - -
* 3 -
4 -
726750 2SWE11                          D-B     VT-3  1 -
INTEGRAL ATTACHMENT            02.20         2 -
3 -
4 -
26 SW PUMP STRAINER LEGS 726760 2SWE12                          F-A      VT-3 1 -
SUPPORT                        F1.40          2 -
3 -
4 -
726770 2SWE12                          D-B      VT-3 1 -
INTEGRAL ATTACHMENT            02.20          2 - - -
3 -
4 -
* DATE: 03/28/92                           SALEM NUCLEAR POWER STATION UNIT 2                                         PAGE: 143 REVISION:      0                        INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS SERVICE WATER                                        FIRST       SECOND               THIRD ASME                PERIOD       PERIOD               PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 u T A G E ------NUMBER IDENTIFICATION ITEM NO METH 21 SW PUMP SKIRT 726780 2SWE1 SUPPORT 726790 2SWE1 INTEGRAL ATTACHMENT 22 SW PUMP SKIRT 726800 2SWE2 SUPPORT 726810 2SWE2 INTEGRAL ATTACHMENT 23 SW PUMP SKIRT 726820 2SWE3 SUPPORT 726830 2SWE3 INTEGRAL ATTACHMENT F-A VT-3 F1.40 D-B VT-3 02.20 F-A VT-3 F1.40 D-B VT-3 02.20 F-A VT-3 F1.40 D-B VT-3 02.20 1 2 3 1 2 3 1 2 3 ------------
EXAMINATION AREA         CATGY NOE       - - - - - - 0 u T A GE - - - - - -               INSTRUCTIONS NUMBER IDENTIFICATION             ITEM NO METH     1 2 3       1 2 3                 1 2 3         **CALIBRATION BLOCK**
......................  
                                                  - ----------- ...................... ----------- -
-----------
21 SW PUMP SKIRT 726780 2SWE1                      F-A      VT-3  1 -
1 x 3 1 x 3 1 3 1 3 1 3 1 3 -PAGE: 143 INSTRUCTIONS
SUPPORT                  F1.40          2 -          x 3 -
**CALIBRATION BLOCK**
4 -
DATE: 03/28/92 REVISION:
726790 2SWE1                      D-B      VT-3  1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
INTEGRAL ATTACHMENT      02.20          2 -          x 3 -
* SERVICE WATER INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ FIRST PERIOD SECOND PERIOD THIRD PERIOD *
4 -
* ASME SEC. XI -----------
22 SW PUMP SKIRT 726800 2SWE2                      F-A      VT-3  1 -
-----------
SUPPORT                  F1.40          2 -
-----------
* 3 -
4 -
726810 2SWE2                      D-B      VT-3  1 -
INTEGRAL ATTACHMENT      02.20          2 -
3 -
4 -
23 SW PUMP SKIRT 726820 2SWE3                      F-A      VT-3 1 -
SUPPORT                  F1.40          2 -
3 -
4 -
726830 2SWE3                      D-B      VT-3 1 -
INTEGRAL ATTACHMENT      02.20          2 -
3 -
4 -
* DATE: 03/28/92                           SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 144 REVISION:      0                        INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS._ _ _ __
* SERVICE WATER                                          FIRST     SECOND      THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E -----NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 24 SW PUMP SKIRT 726840 2SWE4 SUPPORT 726850 2SWE4 INTEGRAL ATTACHMENT 25 SW PUMP SKIRT 726860 2SWE5 SUPPORT 726870 2SWE5 INTEGRAL ATTACHMENT 26 SW PUMP SKIRT 726880. 2SWE6 SUPPORT 726890 2SWE6 INTEGRAL ATTACHMENT F-A D-B 02.20 F-A F1.40 D-B 02.20 F-A F1.40 D-B 02.20 VT-3 1 3 VT-3 1 3 ---4 -VT-3 1 3 VT-3 1 3 VT-3 1 3 VT-3 1 3 PAGE: 144 INSTRUCTIONS
EXAMINATION AREA         CATGY NOE         - - - - - - 0 UT AGE - - - - ~ -   INSTRUCTIONS NUMBER IDENTIFICATION             ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
**CALIBRATION BLOCK** 
24 SW PUMP SKIRT 726840 2SWE4                     F-A      VT-3  1  -
* *
SUPPORT                   F1.~0          2 -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
PLAN STATUS AUXILIARY FEEDWATER SYSTEM  
726850 2SWE4                     D-B      VT-3  1  -
INTEGRAL ATTACHMENT       02.20          2 -
3 -  - -
4 -
25 SW PUMP SKIRT 726860 2SWE5                     F-A     VT-3  1  -
SUPPORT                  F1.40         2  -
* 3  -
4  -
726870 2SWE5                      D-B     VT-3  1  -
INTEGRAL ATTACHMENT      02.20         2  -
-
-
26 SW PUMP SKIRT 726880. 2SWE6                    F-A      VT-3   1 -
SUPPORT                  F1.40          2 -
3 -
4 -
726890 2SWE6                      D-B      VT-3 1 -
INTEGRAL ATTACHMENT      02.20          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 145 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS AUXILIARY FEEDWATER SYSTEM                                 FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI          ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA ASME SEC. XI CATGY NOE NUMBER IDENTIFICATION ITEM NO METH 4-2-AF-156 (FIG NO AF-2-2/3) 726900 2-AFA-139 F-A VT-3 SUPPORT F1.30 726910 2-AFA-139 D-A VT-3 INTEGRAL ATTACHMENT 01.20 4-2-AF-154 (FIG NO AF-2-2/3) 726920 2-AFA-148 F-A VT-3 SUPPORT F1 .30 726930 2-AFA-148 D-A VT-3 INTEGRAL ATTACHMENT 01.20 4-2-AF-96 (FIG NO AF-2-2/4) 726940 2-AFA-166 F-A VT-3 SUPPORT F1 .30 726950 2-AFA-166 D-A VT-3 INTEGRAL ATTACHMENT 01.20 FIRST PERIOD -----------
EXAMINATION AREA               CATGY NOE       -- --- -0    u T A GE - - - - - -    INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3      1  2 3      1 2 3        **CALIBRATION BLOCK**
------1 2 3 ------------1 3 1 --3 1 ---2 4 2 4 2 4 --2 4 -SECOND THIRD PERIOD PERIOD -----------
                                                        - ----------- ----------- ----------- -
-----------
4-2-AF-156 (FIG NO AF-2-2/3) 726900 2-AFA-139                       F-A     VT-3 1 -
0 u T A G E ------1 2 3 1 2 3 -----------
SUPPORT                       F1.30         2 -
-----------
3 -
-PAGE: 145 INSTRUCTIONS
4 -
**CALIBRATION BLOCK** 
726910 2-AFA-139                       D-A     VT-3 1 -
* *
INTEGRAL ATTACHMENT           01.20         2 -  - -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_ ____ PLAN STATUS. ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
4-2-AF-154 (FIG NO AF-2-2/3) 726920 2-AFA-148                       F-A     VT-3 1 -  - -
SUPPORT                       F1 .30         2 -
* 3 -
4 -
726930 2-AFA-148                       D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -
3 -
4 -
4-2-AF-96 (FIG NO AF-2-2/4) 726940 2-AFA-166                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
3 -
4 -
726950 2-AFA-166                       D-A     VT-3 1 -  - -
INTEGRAL ATTACHMENT           01.20         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 146 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NDE ------0 U T A G E ------
EXAMINATION AREA               CATGY NDE       - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 4-2-AF-99 (FIG NO AF-2-2/4) 726960 2-AFA-167 F-A VT-3 1 -SUPPORT F1.30 2 4 ---726970 2-AFA-167 D-A VT-3 1 -INTEGRAL ATTACHMENT D1.20 2 4 2-AF-102 CFIG NO AF-2-2/4) 726980 2-AFA-169 F-A VT-3 1 -SUPPORT F1.30 2 4 ---/ 726990 2-AFA-169 D-A VT-3 1 -INTEGRAL ATTACHMENT D1.20 2 4 2-AF-106 (FIG NO AF-2-2/4) 727000 2-AFA-170 F-A VT-3 1 -SUPPORT F1.30 2 4 -727010 2-AFA-170 D-A VT-3 1 -INTEGRAL ATTACHMENT D1.20 2 4 -PAGE: 146 INSTRUCTIONS
4-2-AF-99 (FIG NO AF-2-2/4) 726960 2-AFA-167                       F-A     VT-3 1 -
**CALIBRATION BLOCK** 
SUPPORT                       F1.30         2 -
* *
3 -
* DATE: 03/28/92 REVISION:
4 - - -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS. ____ _ AUXILIARY FEEDWATER SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
726970 2-AFA-167                       D-A     VT-3 1 -
INTEGRAL ATTACHMENT           D1.20         2 -
3 -
4 -
4-2-AF-102 CFIG NO AF-2-2/4) 726980 2-AFA-169                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3 -
4 - - -
                                /
726990 2-AFA-169                       D-A     VT-3 1 -
INTEGRAL ATTACHMENT           D1.20         2 -
3 -
4 -
4-2-AF-106 (FIG NO AF-2-2/4) 727000 2-AFA-170                       F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
727010 2-AFA-170                       D-A     VT-3 1 -
INTEGRAL ATTACHMENT           D1.20         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 147 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS._ _ _ __
AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 4-2-AF-109 (FIG NO AF-2-2/4) 727020 2-AFA-172 F-A VT-3 1 -SUPPORT F1.30 2 --4 -727030 2-AFA-172 D-A VT-3 1 ---INTEGRAL ATTACHMENT 01.20 2 4 2-AF-140 (FIG NO AF-2-2/4) 727040 2-AFA-174 F-A VT-3 1 -SUPPORT F1 .30 2 --4 -727050 2-AFA-174 D-A VT-3 1 -INTEGRAL ATTACHMENT D1.20 2 4 2-AF-148 (FIG NO AF-2-2/4) 727060 2-AFA-177 F-A VT-3 1 ---SUPP PORT F1 .30 2 4 -727070 2-AFA-177 D-A VT-3 1 -INTEGRAL ATTACHMENT D1 .20 2 4 -PAGE: 147 INSTRUCTIONS
4-2-AF-109 (FIG NO AF-2-2/4) 727020 2-AFA-172                     F-A     VT-3 1 -
**CALIBRATION BLOCK**
SUPPORT                       F1.30         2 -
DATE: 03/28/92 REVISION:
3 -  - -
0 SALEM NUCLEAR STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* AUXILIARY FEEDWATER SYSTEM PLAN STATUS FIRST SECOND THIRD INSPECTION INTERVAL_
727030 2-AFA-172                     D-A     VT-3 1 - - -
*
INTEGRAL ATTACHMENT           01.20         2 -
* ASME SEC. XI  
3 -
4 -
4-2-AF-140 (FIG NO AF-2-2/4) 727040 2-AFA-174                       F-A     VT-3 1 -
SUPPORT                       F1 .30         2 -
* 3 - - -
4 -
727050 2-AFA-174                     D-A     VT-3 1 -
INTEGRAL ATTACHMENT           D1.20         2 -
3 -
4 -
4-2-AF-148 (FIG NO AF-2-2/4) 727060 2-AFA-177                       F-A     VT-3 1 - - -
SUPP PORT                     F1 .30         2 -
3 -
4 -
727070 2-AFA-177                       D-A     VT-3 1 -
INTEGRAL ATTACHMENT           D1 .20         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR PO~ER STATION UNIT 2                               PAGE: 148 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_              PLAN STATUS
* AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE NUMBER IDENTIFICATION ITEM NO METH 4-2-AF-130 (FIG NO AF-2-2/4) 727080 2-AFA-186 F-A VT-3 SUPPORT F1 .30 727090 2-AFA-186 D-A VT-3 INTEGRAL ATTACHMENT 01.20 4-2-AF-126 (FIG NO AF-2-2/4) 727100 2-AFA-187 F-A VT-3 SUPPORT F1.30 727110 2-AFA-187 D-A VT-3 INTEGRAL ATTACHMENT 01.20 4-2-AF-122 (FIG NO AF-2-2/5) 727120 2-AFA-189 F-A VT-3 SUPPORT F1.30 727130 2-AFA-189 D-A VT-3 INTEGRAL ATTACHMENT 01.20 PERIOD PERIOD PERIOD -----------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u T AGE - - - - - -    INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3      1 2 3      1 2 3        **CALIBRATION BLOCK**
-----------
                                                        - ----------- ----------- ----------- -
-----------
4-2-AF-130 (FIG NO AF-2-2/4) 727080 2-AFA-186                     F-A     VT-3 1 -
------0 u T A G E ------1 2 3 1 2 3 1 2 3 ------------
SUPPORT                       F1 .30         2 -  - -
-----------
3 -
-----------1 --3 1 3 1 3 1 3 1 3 1 3 -PAGE: 148 INSTRUCTIONS
4 -
**CALIBRATION BLOCK**
727090 2-AFA-186                     D-A     VT-3 1 -
DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT           01.20         2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* AUXILIARY FEEDWATER SYSTEM INSPECTION INTERVAL_
4 -
FIRST _ ____ PLAN STATUS. ____ _ SECOND THIRD *
4-2-AF-126 (FIG NO AF-2-2/4) 727100 2-AFA-187                     F-A     VT-3 1 -
* ASME SEC. XI PERIOD PERIOD PERIOD
SUPPORT                       F1.30         2 -
* 3 -
4 -
727110 2-AFA-187                     D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -
3 -
4 -
4-2-AF-122 (FIG NO AF-2-2/5) 727120 2-AFA-189                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
727130 2-AFA-189                     D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 149 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____PLAN STATUS._ _ _ __
* AUXILIARY FEEDWATER SYSTEM                                 FIRST     SECOND     THIRD ASME                 PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO'METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO'METH 1 2 3 1 2 3 1 2 3 3-2-AF-166 CFIG NO AF-2-2/3) 727140 2-AFA-215 F-A VT-3 1 -SUPPORT F1.30 2 4 -727150 2-AFA-215 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 4 2-AF-177 (FIG NO AF-2-2/1) 727160 2-AFA-216 F-A VT-3 1 -SUPPORT F1.30 2 --4 -727170 2-AFA-216 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 4 2-AF-30 (FIG NO AF-2-3/1) 727180 22-AFWA-29 F-A VT-3 1 -SUPPORT F1.30 2 4 ---727190 22-AFWA-29 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 --4 -PAGE: 149 INSTRUCTIONS
3-2-AF-166 CFIG NO AF-2-2/3) 727140 2-AFA-215                     F-A     VT-3 1 -
**CALIBRATION BLOCK**
SUPPORT                       F1.30         2 -
DATE: 03/28/92 REVISION:
3  -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
4 -
* AUXILIARY FEED\.JATER SYSTEM FIRST _ ____ PLAN STATUS. ____ _ SECOND THIRD INSPECTION INTERVAL_
727150 2-AFA-215                     D-A     VT-3 1 -
*
INTEGRAL ATTACHMENT           01.20         2 -
* ASME SEC. XI PERIOD PERIOD PERIOD
3  -
4 -
3-2-AF-177 (FIG NO AF-2-2/1) 727160 2-AFA-216                     F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
* 3  - - -
4 -
727170 2-AFA-216                     D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -
3  -
4  -
4-2-AF-30 (FIG NO AF-2-3/1) 727180 22-AFWA-29                     F-A     VT-3   1 -
SUPPORT                       F1.30         2 -
3  -
4 - - -
727190 22-AFWA-29                     D-A     VT-3   1 -
INTEGRAL ATTACHMENT           01.20         2 -
3  -  - -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 150 REVISION:      0                            INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __
* AUXILIARY FEED\.JATER SYSTEM                               FIRST     SECOND       THIRD ASME               PERIOD    PERIOD      PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE * -----0 U T A G E ------
EXAMINATION AREA               CATGY NOE       * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3*    **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3
4-2-AF-49 (FIG NO AF-2-3/3) 727200 24-AF\.JA-29                   F-A     VT-3 1 -
* 4-2-AF-49 (FIG NO AF-2-3/3) 727200 24-AF\.JA-29 F-A VT-3 1 -SUPPORT F1 .30 2 4 -727210 24-AF\.JA-29 D-A VT-3 1 -INTEGRAL ATTACHMENT 01 .20 2 ---3 4-2-AF-66 (FIG NO AF-2-3/) 727220 21-AF\.JA-41 F-A VT-3 1 -SUPPORT' F1.30 2 4 ---727230 21-AF\.JA-41 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 ---3 4-2-AF-24 (FIG NO AF-2-3/1) 727240 22-AF\.JA-41 F-A VT-3 1 -SUPPORT F1 .30 2 ---3 727250 22-AF\.JA-41 D-A VT-3 1 -INTEGRAL ATTACHMENT 01.20 2 4 -PAGE: 150 INSTRUCTIONS
SUPPORT                       F1 .30         2 -
**CALIBRATION BLOCK** 
3 -
* *
4 -
* DATE: 03/28/92 REVISION:
727210 24-AF\.JA-29                   D-A     VT-3 1 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
INTEGRAL ATTACHMENT           01 .20         2 - - -
_ ____ PLAN STATUS ____ _ AUXILIARY FEEDWATER SYSTEM  
3 -
4 -
4-2-AF-66 (FIG NO AF-2-3/)
727220 21-AF\.JA-41                   F-A     VT-3 1 -
SUPPORT'                       F1.30         2 -
* 3 -
4 - - -
727230 21-AF\.JA-41                   D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 - - -
3 -
4 -
4-2-AF-24 (FIG NO AF-2-3/1) 727240 22-AF\.JA-41                   F-A     VT-3 1 -
SUPPORT                       F1 .30         2 - - -
3 -
4 -
727250 22-AF\.JA-41                   D-A     VT-3 1 -
INTEGRAL ATTACHMENT           01.20         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 151 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
AUXILIARY FEEDWATER SYSTEM                             I . FIRST      SECOND      THIRD ASME            I PERIOD        PERIOD      PERIOD SEC. XI        I -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA NUMBER IDENTIFICATION 4-2-AF-61 (FIG NO AF-2-3/4) 727260 23-AFWA-41 SUPPORT 727270 23-AFWA-41 INTEGRAL ATTACHMENT 4-2-AF-43 (FIG NO AF-2-3/3) 727280 24-AFWA-41 SUPPORT 727290 24-AFWA-41 INTEGRAL ATTACHMENT 4-2-AF-69 (FIG NO AF-2-3/4) 727300 21-AFWA-46 SUPPORT 727310 21-AFWA-46 INTEGRAL ATTACHMENT ASME SEC. XI CATGY NOE ITEM NO METH I . FIRST SECOND I PERIOD PERIOD I -----------
EXAMINATION AREA               CATGY NOE      1 - - - - - - 0 U T A GE          I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH I 1 2 3          1 2 3      1 2 3    **CALIBRATION BLOCK**
1 I ------0 U T A G E 1 2 3 1 2 3 F-A VT-3 1 -F1.30 2 --4 -D-A VT-3 1 -D1.20 2 4 ---F-A VT-3 1 -F1.30 2 4 -D-A VT-3 1 ---D1.20 2 --4 -F-A VT-3 1 -F1.30 2 4 -D-A VT-3 1 -D1.20 2 4 -THIRD PERIOD 1 2 3 PAGE: 151 I NSTRUCTI CNS **CALIBRATION BLOCK**
4-2-AF-61 (FIG NO AF-2-3/4) 727260 23-AFWA-41                     F-A      VT-3  1 -
DATE: 03/28/92 REVISION:
SUPPORT                       F1.30          2 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -  -  -
* AUXILIARY FEEDYATER SYSTEM INSPECTION INTERVAL_
4 -
PLAN STATUS FIRST SECOND THIRD *
727270 23-AFWA-41                     D-A      VT-3  1 -
* ASME SEC. XI  
INTEGRAL ATTACHMENT            D1.20          2 -
3 -
4 - - -
4-2-AF-43 (FIG NO AF-2-3/3) 727280 24-AFWA-41                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
* 3 -
4 -
727290 24-AFWA-41                      D-A     VT-3 1 -   -  -
INTEGRAL ATTACHMENT            D1.20         2 -
3 -   - -
4 -
4-2-AF-69 (FIG NO AF-2-3/4) 727300 21-AFWA-46                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 -
3 -
4 -
727310 21-AFWA-46                      D-A     VT-3 1 -
INTEGRAL ATTACHMENT            D1.20         2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                                         PAGE: 152 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_                          PLAN STATUS
* AUXILIARY FEEDYATER SYSTEM                                   FIRST             SECOND       THIRD ASME                   PERIOD            PERIOD      PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE NUMBER IDENTIFICATION ITEM NO METH 4-2-AF-64RY (FIG NO AF-2-3/4) 727320 23-AFYA-46 F-A VT-3 SUPPORT F1.30 727330 23-AFYA-46 D-A VT-3 INTEGRAL ATTACHMENT 01.20 PERIOD -----------------1 2 3 -...................... 1 --3 1 3 PERIOD PERIOD
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u T AGE - - - - - -               INSTRUCTIONS NUMBER IDENTIFICATION                  ITEM NO METH    1 2 3                  1 2 3       1 2 3         **CALIBRATION BLOCK**
-----------
                                                        - ...................... ----------- ----------- -
-----------
4-2-AF-64RY (FIG NO AF-2-3/4) 727320 23-AFYA-46                      F-A      VT-3  1 -
0 u T A G E ------1 2 3 1 2 3 -----------
SUPPORT                        F1.30          2 -     - -
-----------
3 -
-PAGE: 152 INSTRUCTIONS
4 -
**CALIBRATION BLOCK**
727330 23-AFYA-46                      D-A      VT-3  1 -
DATE: 03/28/92 REVISION:
INTEGRAL ATTACHMENT            01.20          2 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
3 -
* CONTAINMENT SPRAY SYSTEM INSPECTION INTERVAL _ _____ PLAN STATUS ____ _ FIRST SECOND THIRD PERIOD ASME PERIOD PERIOD SEC. XI ----------------------
4 -
-----------
*
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                             PAGE: 153 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
* CONTAINMENT SPRAY SYSTEM                                   FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI           ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------0 U T A G E ------
EXAMINATION AREA               CATGY NOE         - - - - - - 0 UT AGE - - - - - -   INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3       1 2 3       **CALIBRATION BLOCK**
NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 10-2-CS-34 (FIG NO CS-2-2/1) 729000 2-CSS-150 F-A VT-3 1 -SUPPORT F1 .30 2 4 -729010 2-CSS-150 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 ---3 10-2-CS-42 (FIG NO CS-2-2/1) 729020 2-CSS-152 F-A VT-3 1 -SUPPORT F1 .30 2
10-2-CS-34 (FIG NO CS-2-2/1) 729000 2-CSS-150                       F-A     VT-3 1 -
* 4 -729030 2-CSS-152 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-CS-40 (FIG NO CS-2-2/1) 729040 2-CSA-156 F-A VT-3 1 -SUPPORT F1 .30 2 4 -729050 2-CSA-156 0-B VT-3 1 ---INTEGRAL ATTACHMENT 02.20 2 4 -* PAGE: 153 INSTRUCTIONS
SUPPORT                       F1 .30         2 -
**CALIBRATION BLOCK**  
3  -
* *
4 -
* DATE: 03/28/92 REVISION:
729010 2-CSS-150                       D-B     VT-3 1 -
0 CONTAINMENT SPRAY SYSTEM SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
INTEGRAL ATTACHMENT           02.20         2 - - -
PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD ASME SEC. XI -----------
3 -
-----------
4  -
-----------
10-2-CS-42 (FIG NO CS-2-2/1) 729020 2-CSS-152                       F-A     VT-3   1 -
SUPPORT                       F1 .30         2 -
* 3  -
4 -
729030 2-CSS-152                       D-B     VT-3   1 -
INTEGRAL ATTACHMENT           02.20           2 -
3  -
4 -
12-2-CS-40 (FIG NO CS-2-2/1) 729040 2-CSA-156                       F-A     VT-3   1 -
SUPPORT                       F1 .30         2 -
3  -
4 -
729050 2-CSA-156                       0-B     VT-3   1 - - -
INTEGRAL ATTACHMENT           02.20           2 -
3 -
4  -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                               PAGE: 154 REVISION:    0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS CONTAINMENT SPRAY SYSTEM                                  FIRST     SECOND       THIRD ASME                PERIOD     PERIOD       PERIOD SEC. XI         ----------- ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 ------------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u T AGE - - - - - -    INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3      1 2 3      1 2 3         **CALIBRATION BLOCK**
SYSTEM INSERVICE TEST (FIG NO CS-2-2/1) 729100 CS SYSTEM COMPONENTS D-B PRESSURE RETAINING COMPONENTS 02.10 VT-2 1 -2 x --3 SYSTEM HYDROSTATIC TEST (FIG NO CS-2-2/1) 729110 CS SYSTEM COMPONENTS D-B VT-2 1 -PRESSURE RETAINING COMPONENTS 02.10 2 4 0 u T A G E ------1 2 3 1 2 3 -----------
                                                        - ----------- ----------- ----------- -
-----------x --x -x --PAGE: 154 INSTRUCTIONS
SYSTEM INSERVICE TEST (FIG NO CS-2-2/1) 729100 CS SYSTEM COMPONENTS           D-B     VT-2  1 -
**CALIBRATION BLOCK** 
PRESSURE RETAINING COMPONENTS 02.10           2 x  - -     x - -       x 3 -
* *
4 -
* DATE: 03/28/92 REVISION:
SYSTEM HYDROSTATIC TEST (FIG NO CS-2-2/1) 729110 CS SYSTEM COMPONENTS           D-B     VT-2 1 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
PRESSURE RETAINING COMPONENTS 02.10           2 -                       - x -
PLAN STATUS SAFETY INJECTION SYSTEM  
3 -
4
*
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                               PAGE: 155 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_               PLAN STATUS SAFETY INJECTION SYSTEM                                     FIRST      SECOND      THIRD ASME                PERIOD    PERIOD      PERIOD SEC. XI          ----------- ---*------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA ASME SEC. XI CATGY NOE NUMBER IDENTIFICATION ITEM NO METH * (FIG NO RH-2-2/6) 731000 2A-SIS-203 SUPPORT 731010 2A-SIS-203 INTEGRAL ATTACHMENT 731020 2A-SIS-204 SUPPORT 731030 2A-SIS-204 INTEGRAL ATTACHMENT 12-2-RH-45 (FIG NO RH-2-2/3) 731040 2-RHRA-22-29 SUPPORT 731050 2-RHRA-22-29 INTEGRAL ATTACHMENT 12-2-RH-46 (FIG NO RH-2-2/3) 731060 2-RHRA-22-39 SUPPORT F-A VT-3 F1.30 D-B VT-3 02.20 F-A VT-3 F1.30 D-B VT-3 02.20 F-A VT-3 F1 .30 D-B VT-3 02.20 F-A VT-3 F1.30 FIRST PERIOD -----------------1 2 3 ------------
EXAMINATION AREA               CATGY NOE       - - - - - - 0 u T A GE - - - - - -    INSTRUCTIONS NUMBER IDENTIFICATION                   ITEM NO METH     1  2 3      1  2 3      1  2 3        **CALIBRATION BLOCK**
1 ---2 4 2 4 2 ---3 1 3 ---4 2 4 2 -3 4 --2 4 -SECOND THIRD PERIOD PERIOD ---*-------
                                                        - ----------- ----------- ----------- -
-----------
        * (FIG NO RH-2-2/6) 731000 2A-SIS-203                      F-A     VT-3 1 -  - -
0 u T A G E ------1 2 3 1 2 3 -----------
SUPPORT                        F1.30         2 -
-----------
3 -
-PAGE: 155 INSTRUCTIONS
4 -
**CALIBRATION BLOCK** 
731010 2A-SIS-203                      D-B     VT-3 1 -
* *
INTEGRAL ATTACHMENT            02.20         2 -
* DATE: 03/28/92 REVISION:
3 -
0 SALEM NUCLEAR POWER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_
4 -
_ ____ PLAN STATUS. ____ _ SAFETY INJECTION SYSTEM ASME SEC. XI FIRST SECOND THIRD PERIOD PERIOD PERIOD  
731020 2A-SIS-204                      F-A     VT-3 1 -
SUPPORT                        F1.30         2 - - -
3 -
4 -
* 731030 2A-SIS-204 INTEGRAL ATTACHMENT D-B 02.20 VT-3  1 -
2 -
3 -
4 -
                                                              - -
12-2-RH-45 (FIG NO RH-2-2/3) 731040  2-RHRA-22-29                  F-A      VT-3  1 -
SUPPORT                        F1 .30        2 -
3 -
4 -
731050  2-RHRA-22-29                  D-B      VT-3 1 -
INTEGRAL ATTACHMENT            02.20          2 -
3 4 -
12-2-RH-46 (FIG NO RH-2-2/3) 731060  2-RHRA-22-39                  F-A     VT-3 1 - - -
SUPPORT                        F1.30          2 -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POWER STATION UNIT 2                           PAGE: 156 REVISION:      0                              INSERVICE INSPECTION LONG TERM PLAN
* CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
SAFETY INJECTION SYSTEM                                     FIRST     SECOND     THIRD ASME                PERIOD     PERIOD     PERIOD SEC. XI


==SUMMARY==
==SUMMARY==
EXAMINATION AREA CATGY NOE ------*o UT AGE -----NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 12-2-RH-46 (FIG NO RH-2-2/3) 731070 2-RHRA-22-39 . D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 2-RH-50 (FIG NO RH-2-2/3) 731080 2-RHRA-22-42 F-A VT-3 1 -SUPPORT F1.30 2 4 -731090 2-RHRA-22-42 D-B VT-3 1 -INTEGRAL ATTACHMENT 02.20 2 4 -I SYSTEM INSERVICE TEST (FIG NO RH-2-2i3) 731100 SJ SYSTEM COMPONENTS D-B VT-2 1 -PRESSURE RETAINING COMPONENTS 02.10 2 x x --x 3 --SYSTEM HYDROSTATIC TEST (FIG NO RH-2-2/3) 731150 SJ SYSTEM COMPONENTS D-B VT-2 1 -PRESSURE RETAINING COMPONENTS 02.10 2 --x 4 -PAGE: 156 I NSTRUCTI CNS **CALIBRATION BLOCK**
EXAMINATION AREA               CATGY NOE         - - - - - -*o UT AGE - ~ - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3       1 2 3     1 2 3     **CALIBRATION BLOCK**
DATE: 03/28/92 REVISION:
12-2-RH-46 (FIG NO RH-2-2/3) 731070 2-RHRA-22-39 .                 D-B     VT-3 1 -
0 SALEM NUCLEAR POYER STATION UNIT 2 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
INTEGRAL ATTACHMENT           02.20         2 -
* SPENT FUEL COOLING SYSTEM PLAN STATUS FIRST SECOND THIRD INSPECTION INTERVAL_
3  -
*
4 -
* ASME PERIOD SEC. XI CATGY NOE ________ .. __  
12-2-RH-50 (FIG NO RH-2-2/3) 731080 2-RHRA-22-42                   F-A     VT-3 1 -
SUPPORT                       F1.30         2 -
3 -
4 -
731090 2-RHRA-22-42                   D-B     VT-3   1 -
INTEGRAL ATTACHMENT           02.20         2 -
* 3  -
4 -
I SYSTEM INSERVICE TEST (FIG NO RH-2-2i3) 731100 SJ SYSTEM COMPONENTS           D-B     VT-2   1 -
PRESSURE RETAINING COMPONENTS 02.10           2x            x   - -   x 3 -
4 -  - -
SYSTEM HYDROSTATIC TEST (FIG NO RH-2-2/3) 731150 SJ SYSTEM COMPONENTS           D-B     VT-2   1 -
PRESSURE RETAINING COMPONENTS 02.10           2 -                       - x -
3 -
4 -
* DATE: 03/28/92                                 SALEM NUCLEAR POYER STATION UNIT 2                               PAGE: 157 REVISION:    0                              INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_                  PLAN STATUS
* SPENT FUEL COOLING SYSTEM                                 FIRST         SECOND       THIRD ASME               PERIOD
________ .. __   PERIOD      PERIOD SEC. XI                        ----------- -----------


==SUMMARY==
==SUMMARY==
EXAMINATION AREA ------NUMBER IDENTIFICATION ITEM NO METH 1 2 3 ------*-----
EXAMINATION AREA               CATGY NOE        - - - - - - 0 u T AGE - - - - - -      INSTRUCTIONS NUMBER IDENTIFICATION                 ITEM NO METH     1 2 3          1 2 3      1 2 3       **CALIBRATION BLOCK**
SYSTEM INSERVICE TEST (FIG NO RH-2-2/3) 732000 SFC SYSTEM COMPONENTS D-C VT-2 1 -PRESSURE RETAINING COMPONENTS 03.10 2 X 3 SYSTEM HYDROSTATIC TEST (FIG NO RH-2-2/3) 732100 SFC SYSTEM COMPONENTS D-C VT-2 1 -PRESSURE RETAINING COMPONENTS 03.10 2 4 --" PERIOD PERIOD ----------------------
                                                        - -----*----- ----------- ----------- -
0 u T A G E ------1 2 3 1 2 3 ----------------------x x -x --PAGE: 157 INSTRUCTIONS
SYSTEM INSERVICE TEST (FIG NO RH-2-2/3) 732000 SFC SYSTEM COMPONENTS           D-C     VT-2 1 -
**CALIBRATION BLOCK** 
PRESSURE RETAINING COMPONENTS 03.10           2 X             x          x 3 -
* *
4 -
* 28 1/4" 360' I 180" I o* I I I I 18515/8" \29-RCN-1210 27 1/2-RCN-12620 29-ROCN-12720 27 1/2-RcN-1230"' 27
SYSTEM HYDROSTATIC TEST (FIG NO RH-2-2/3) 732100 SFC SYSTEM COMPONENTS         D-C     VT-2 1 -
"-,, 29-RCN-12307 ' I 2-RPV-744-2
PRESSURE RETAINING COMPONENTS 03.10           2 - -   "                   - x -
___ . ____
3 -
____
4 -
.... "--27 1/2-RCN-1210 I , _/ 2-RPV-14426_/
j' I 2-RPV-1442C 2-RPV-1442A_/
29-RCN-1240
___
342 21/32" ""
2-RPV-34428 2-RPV-3442A
---------330' 270' 210* 150* go* 30* / / / 2-RPV-1HOB/
\ 2-RPV-1443A
/ 2-2-RPV-144-3E 2-RPV-14430
""' 2-RPV-1443C\,_ 2-RPV-9442 / 2-RPV-10442 P & JD: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM REACTOR PRESSURE VESSEL FIGURE: A-1 SHT. 1 OF 1 REV. 0
* 360' I I 180' I I
* T 29-RC-1220 7 1 27 1/2-RC-1220-5 7 27 1/2-RC-1230-5 85 5/8" "' 29-RC-1230-;
Q 27 1/2-RCN-1210-IRS 29-RCN-1220-IRS
\ J \/ 27 1/2-RC-1210-5 29-RC-124.0-1 , 27 1/2-RCN-1230-IRS\
29-RCN-1240-IRS 27 1/2-RCN-1220-IRS 27 1/2-RCN-1240-IRS o* I I
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM RPV INNER RADIUS & SAFE-END NOZZLES FIGURE: A-2 SHT. 1 OF 1 REV. 0
* 360' I I I 85 518.. \ 29-RC-1210-1
$-180' I I 29-RC-1220-7 27.5-RC-1220-4 7 00 \_ 27.5-RC-1210-4
* 27.5-RC-1230-4
-. 27.5-RC-1240-4
'\_ * \ o o* "'---29-RC-1240-2 29-RC-1230-;
0 o* I I * / P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM RPV & SAFE END TO PIPE \I/ELD FIGURE: A-2A SHT. 1 OF 1 REV. 0
* LIFTING LUG 14
* REACTOR PRESSURE.
VESSEL CLOSURE HEAD LAYOUT 90" 2-RPVCH-64468 I 2-RPVCH-6446A 54 WASHER (2-RPVCH-WASHERS 1-54) NO. 1 STUD (2-RPVCH-STUDS 1-54) 270"
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR PRESSURE VESSEL CLOSURE HEAD FIGURE: A-3 SHT. 1 OF 1 REV. 0 
*
*
* 90" 76 (29 TOTAL) 2-CRDH-38 lHRU '\ I o* I 270"
* I I I RIVE HOUSING I CONTROL ROD gTER WELDS I BODY-TO-ADA I 160" I I I I ELECTRIC & GAS PUBLIC UNIT_z __ _ DRAWING INSPECTION SSEL PRESSURE REA ROD DRIVE l REV. 0 CONTROL SHT. 1 OF FIGURE: A-4
* 2-PZR-CIRC (D=579.25")
"' 2-PZR-CIRC . (0=451.00")
'\ 2-PZR-LONG C (A"=+45" OR +36.5") 2-PZR-CIRC (D=193.00")
"' 2-PZR-LONG A (A"=+28" OR +22.7") "' (180") +A"-SHELL 0 I I SHELL C I I SHELL B I I SHELL A I / / /
* 2-PZR-LONG 0 /(A'=-46" OR -37.3") / 2-PZR-CIRC BC /
/ 2-PZR-CIRC LHA / (0=64.25")
2-PZR-SKIRT 6-PR-1204-1 6-PRN-1204-1\
6-PR-1205-1 \
* 6-PR-1203-1 6-PRN-1203-IRS 6-PRN-1205-IRS
""" + (180") A -""' 0 0
--o* 0 0 '""-4-PR-1200-1 4-PS-1231-33_/
\ 4-PRN-1200-IRS 4-PSN-1231-IRS
\_ 2-PZR-MB 1-16 p & 10: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER FIGURE: A-5 SHT. 1 OF 1 REV. 0
* 45* 31-STG-1240-IRS 29-STG-1240-IRS OU1LET MANWAY 24-STG-OMB (BOLTING) 24-STG-IMB (BOLTING) 225" END VIEW
* 24-STG-LHTS CLASS 2 CLASS 1 STEAM GENERATOR NO. 24
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 24 FIGURE: A-6 SHT. 1 OF 1 REV. 0
* 45* 31-STG-1230-IRS 29-STG-1230-IRS OUTLET MANWAY --135" 23-STG-IMB (BOLTING)
INLET MANWAY 225" END VIEW
* CLASS 2 CLASS 1 STEAM GENERATOR NO. 23
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 23 FIGURE: A-7 SHT. 1 OF 1 REV. 0
* 45* 31-STG-1220-IRS 29-STG-1220-IRS OUTLET MANWAY 315"--22-STG-OMB (SOL.TING) 22-STG-IMB (BOLTING) 225" END VIEW
* 22-STG-LHTS CLASS 2 CLASS 1 STEAM GENERA TOR NO. 22
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 22 FIGURE: A-8 SHT. 1 OF 1 REV. 0
* 45* 31-STG-1210-IRS 29-STG-1210-IRS OUTLET MAN WAY 21-STG-OMB (BOLTING) 21-STG-IMB (BOLTING)
INLET MANWAY 225" END VIEW
* I* *I CLASS 2 CLASS 1 STEAM GENERA TOR NO. 21 21-STG-LHTS
** P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 21 FIGURE: A.-9 SHT. 1 OF 1 REV. 0
* 2RC30 4 'J LINE 2-RC-1241 ( SEE FIG. A-47 ..._ ____ 9_0_' BEND (H.) 5 8 n BA 9 @ BEND 17 BEND (H.)
* Q\ v CLASS 2 CLASS 1 27 2CV2 /25 2" x 3* _/ 25 RED. / NO. 2 REGEN. HX. ' 'I'-' '--... I '......i FLOW ______ (H.) 0
* 3" X 2" _/ 45' (H.) 23 RED. / 12-CV-1243 22A /'n. 90" BEND (V.J 'Z P & ID: 205301, 205328 ISOMETRIC:
RC-2-3, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LETDOWlll 12-CV-1243, 3-CV-1243 FIGURE: A-10 SHT. 1 OF 1 REV. 0
* 2RC30 '-..J LINE 2-RC-1241 ( SEE FIG. A-47 .__ ___ -..90' BEND (H.) 3-CV-1243----..._,
* 2C-CVCS-522 ............ 2C-CVCH-521 BEND * (:;\ v 2C-CVCS-513 2" x 3* / RED. / 3" x 2" _/ RED. NO. 2 REGEN. HX. ' "!'---..........
I '-..J FLOW 45' (H.) BEND (H.) 2C-CVCG-514
/
* 2C-CVCH-515---------90' BEND (V.} k P & ID: 205301, 205328 ISOMETRIC:
RC-2-3, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LETDOWN 12-CV-1243, 3-CV-1243 FIGURE: A-10H SHT. 1 OF 1 REV. 0 
* (:;:\ v BEND / 2'\,/ FROM NO. \... REGEN. HX.
* EL. g9' 10 9 8 BEND \ CLASS 2 BEND 45' (H.) * ) 14 (-..... ..... ..... LINE 27 1/2-RC-1240'.J SEE FIG. A-37 ( P & ID: 205328, 205301 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1241 FIGURE: A-12 SHT. 1 OF 1 REV. 0 
* (:;;\ v 2C-CVCA-509 BEND 2\..,/ FROM NO. (.,__ REGEN. HX. ---------------------
-----/ ** EL. BEND 45' (H.) BEND 2C-CVCS-506 \ CLASS 2 ' LINE 27 1/2-RC-1240'.J SEE FIG. A-37 (
* P & ID: 205328, 205301 . ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1241 FIGURE: A-12H SHT. 1 OF 1 REV. 0
* BEND BEND ' * ' ' BEND 45* (H.) '(FROM NO. 2 REGEN. HX.
* 18 ' LINE 27 1/2-'-RC-1230',.j SEE FIG. A-38 ( 90" (V.} ELL. 12 11 P & ID: 205328, 205301 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1231 FIGURE: A-13 SHT. 1 OF 1 REV. 0 
*
*
* 3/4-" '!'-' I
 
* 2C-CVCH-737 2CV274-RL-26 '\ 1 n-mu 4-' '> / ' / / .......,,.
            *                                                                            *
/ /Ir. BEND <,,..,-"4f.[. . ' <o&deg;' BEND 4-5' (H.) 2C-CVCH-736 ___....---
* 360'                                                          180"                                                      o*
/2C-CVCS-502 (BPR-1) ..,,,_....-2C-CVCG-501
28 1/4"   I                                                            I                                                        I I                                                            I                                                        I
/ (8PR-2) 2C-CVCG-5D3 2C-CVCG-734 (9PR-1) BEND 2C-CVCG-735 BEND ' ' (9PR-2) ' '(FROM NO. 2 REGEN. HX. ...... LINE 27 1/2-RC-1230',..j SEE FIG. A-38 ( 90" (V.} ELL. P & ID: 205328, 205301 ISOMETRIC:
:---------~-------------~----------------.,...-----~~/
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\!VlNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1231 FIGURE: A-13H SHT. 1 OF 1 REV. 0 
18515/8"        \29-RCN-1210  27 1/2-RCN-12620      29-ROCN-12720                  27 1/2-RcN-1230"'                        ~~
*
27 1/2-RCN-1240~                "-,,  29-RCN-12307
* BEND 16 5
                                                                                                        '                            I            2-RPV-744-2 1llr'-----~~------~-----~_o
* LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 24 G P & ID: 205328, 205301 ISOMETRIC:
                      ....
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15 SHT. 1 OF 2 REV. 0
2-RPV-1442C
* BEND 2C-PRH-153 (7PR) &#xa3; 2C-PRS-152 (9PR-1) /2C-PRG-151 (9PR-2) *
_/
(21 PR) "' 2C-PRG-148 (11PR-3) 2C-PRG-147 (13PR-1) ( 2C-PRG-154 (2PR) RHE ROOM 2C-PRH-146 (13PR-3)
                                              "-- 27 1/2-RCN-1210 2-RPV-14426_/  j' I .____u~r------~~--n
* LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 8 _,,,.--2C-PRA-235
___                2-RPV-1442A_/
/ (27PS-1,-2)
I
EL. 131' 2C-PRG-333
____/~~//~~~~
_,,,.--2C-PRG-332
                                                                                                                                        ,
/ (25PR) P & ID: 205328, 205301 ISOMETRIC:
29-RCN-1240 D~~-------------~~-----~-R_P_V_-_2_4_4_~------~'-~ 2_-_R_P_~~2-4_4_2_B----~~~2-RP~~~                    ___
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15H SHT. 1 OF 2 REV. 0
342 21/32"
* LINE 4-PS-1231 ) SEE FIG. A-26 SHT. 3 _......-\..
                                          ~2-RPV-3442C 2-RPV-34428 ~                            2-RPV-3442A ---------
PRESSURIZER ROOM / (/ 44 28 I r-L LINE 2-CV-1275 SEE FIG. A-15 SHT. 1
                                                                                                                                    ""      ~ 2-RPV-9442
* 34 PLATFORM EL. 151' PLATFORM EL 140' 31
                                                                                                                                              ~
* P & ID: 205328, 205301 ISOMETRIC:
                                                                                                                                            /   2-RPV-10442 330'                 270'              210*                    150*          go*            30*    /
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15 SHT. 2 OF 2 REV. 0
P & JD: 205301
* LINE 4-PS-1231 . J SEE FIG. A-26 SHT. 3 ,.....,.....-1..._
                                                                          /
* PRESSURIZER ROOM 2C-PRG-233 (31PR-1) 2C-PRH-234 (29PR) "\ I ,.--(_, LINE 2-CV-1275 SEE FIG. A-15 SHT. 1 "Z_ ...............
                                                                        /                                                                      PUBLIC SERVICE ELECTRIC & GAS
2C-:-PRH-229 (37PR) -' # r
                                                  ~RPV-1443F/                                                              ~
* P & ID: 205328, 205301 ISOMETRIC:
SALEM UNIT 2 2-RPV-1HOB/                                                                        \                                                  INSERVICE INSPECTION DRAWING 2                                                            2-RPV-14430 ""'                REACTOR COOLANT SYSTEM 2-RPV-1443A /        -                        2-RPV-144-3E 2-RPV-1443C\,_              REACTOR PRESSURE VESSEL FIGURE: A-1 SHT. 1 OF 1 REV. 0
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275
 
* FIGURE: A-15H SHT. 2 OF 2 REV. 0 
*                                                                 *
*
* 360'                                                  180'                                              o*
* LINE 6-PR-2203 ) SEE FIG. 8-51 (-.... 3 ' iJ 2PR5 CLASS 2 lOFB CLASS 1 10
I                                                      I                                              I I                                                      I                                              I T
* P & ID: 205301 ISOMETRIC:
85 5/8" 27 1/2-RC-1220-5 7
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1205 FIGURE: A-17 SHT. 1 OF 1 REV. 0
29-RC-1220 1 7                27 1/2-RC-1230-5 ~
* * / 2C-PRH-201 LINE 6-PR-2203 ) SEE FIG. B-51 (', ';1\2PR5 CLASS 2 , nlOFB CLASS 1 2C-PRA-150A (9PR)
                                                                                            "'
* P & ID: 205301 ISOMETRIC:
29-RC-1230-;
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1205 FIGURE: A-17H SHT. 1 OF 1 REV. 0
Q 27 1/2-RCN-1210-IRS 27 1/2-RC-1210-5 29-RCN-1220-IRS \
*
29-RC-124.0-1 J \/ , ~
* 6 7 1" 45' (V.) ) LINE 6-PR-2204
27 1/2-RCN-1230-IRS\
_..."'\, SEE FIG. 8-50 ,... CLASS 2 -C-LA_S_S__::._1 2 PR 4 10FB
29-RCN-1240-IRS 27 1/2-RCN-1220-IRS 27 1/2-RCN-1240-IRS P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM RPV INNER RADIUS & SAFE-END NOZZLES FIGURE: A-2 SHT. 1 OF 1 REV. 0
* P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1204 FIGURE: A-18 SHT. 1 OF 1 REV. 0 
*                                                            *                                                                  *
* * / 2C-PRH-202 45' (V.) CLASS 2 CLASS 1 / J!!.2PR4 10FB. LINE 6-PR-.2204 SEE FIG. B-50
                                                                                                              /
* P & ID: 205301 ISOMETRIC:
360'                                              180'                                                o*
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1204 . FIGURE: A-18H SHT. 1 OF 1 REV. 0
I                                                I                                                  I I                                                I                                                  I I
* CLASS 2 10 9A 90" (V.) 3 ...... ...... \{ ...... 2PR3 10FB 45" (V.) ...... * ) LINE 6-PR-2205
85 518.. \ 29-RC-1210-1 27.5-RC-1220-4 7  29-RC-1220-7                    27.5-RC-1230-4 -.
,.....\_SEE FIG. 8-49 6 7
27.5-RC-1240-4 '\_      *      \
* p & 10: 205301 ISOMETRIC:
29-RC-1230-;
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION .DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1203 FIGURE: A-19 SHT. 1 OF 1 REV. 0
          $-                       00 o
* 90' (V.) / / / * ) LINE 6-PR'--2205
                        \_ 27.5-RC-1210-4 o*
,,..\_SEE FIG. B-49 ').,,/ \\ 2C-P.RH-203
                                                                "'--- 29-RC-1240-2 0
\ 2PR3 10FB "'--2C-PRA.:_154A (9PR) 45' (V.)
P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM RPV & SAFE END TO PIPE \I/ELD FIGURE: A-2A SHT. 1 OF 1 REV. 0
* P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1203 FIGURE: A-19H SHT. 1 OF 1 REV. 0
*                                                            *
* LINE 3-PR-1206 ) SEE FIG. A-24 (', ' '-3" x 4" RED. r 4-PR-1200 I 6 158'
* REACTOR PRESSURE. VESSEL CLOSURE HEAD LAYOUT 90" 2-RPVCH-64468                              2-RPVCH-6446A I
* 5 ---------LINE 3-PR-1207
LIFTING LUG 14 P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING 270"                  54 WASHER (2-RPVCH-WASHERS 1-54)    REACTOR PRESSURE VESSEL NO. 1 STUD (2-RPVCH-STUDS 1-54)                                                                            CLOSURE HEAD FIGURE: A-3 SHT. 1 OF 1 REV. 0
* 0 7 P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS .SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 4-PR-1200, 3-PR-1207 FIGURE: A-20 SHT. 1 OF 1 REV. 0
        *                              *
* LINE 3-PR-1206 j SEE FIG. A-24 {'-, ...... ........_
* 90" 2-CRDH-38 lHRU 76 (29 TOTAL) ~' \  I I
3" x 4" RED. 4" x 3" RED. 45* (V.) * -------LINE 3-PR-1207 (3PR) CLASS 1 CLASs2] LINE 3-PR-2201
I HOUSING ~ I II BODY-TO-ADA gTER CONTROL ROD RIVE WELDS I
}__ ---I SEE FIG. 8-53 ("" 2 PR 2
I I
* 0 P & ID: 205301 ISOMETRIC:
I I
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 4-PR-1200, 3-PR-1207 FIGURE: A-20H SHT. 1 OF 1 REV. 0
o*                              160" SER~Ac~M ELECTRIC & GAS PUBLIC              UNIT_z_ __
* 2 45' (H.) 7 * /LINE 4-PR-1200 ) LINE 3-PR-1207
DRAWING INSER~~gR INSPECTION PRESSURE H~SINGS SSEL I
....-\..SEE FIG. A-20 ............ . / ,.... I ,.... ...... ...... r-/.. ---l-)---1--
270" REA CONTROL FIGURE: A- 4 ROD  DRIVE SHT. 1 OF l REV. 0
EL. 158' I 4"' X 3"' 4" x 3* I RED. RED. I FLOW : . ' ' X.ssURIZER 2PR1 13,,,-1 CLASS 2 LINE 3-PR-2202 SEE FIG. B-52 ---( EL. 152' -------------* P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 3-PR-1206 FIGURE: A-24 SHT. 1 OF 1 REV. 0
*                                                      *                                                      *
* 2C-PRH-205
(180")
/ (3PR) 45' (H.) * /LINE 4-PR-1200
                              +A"-
} LINE 3-PR-1207
2-PZR-CIRC  DUH~
.....-\_ SEE FIG. A-20 ...... ...............  
(D=579.25")    "'
...... ...... ...... I ............  
2-PZR-CIRC CD~ .
...... r-/. __.... __
(0=451.00")    '\
EL. 15(3' 4" X 3" 4* x 3* I REQ. RED. I FLOW 45" (H.) l XssuR1zrn 2PR1 CLASS ,I CLASS 2 LINE 3-PR-2202 SEE FIG. B-52 .,...---( EL. 152'
                          "'                                      6-PR-1204-1 6-PRN-1204-1\                        6-PR-1203-1 6-PRN-1203-IRS SHELL 0          2-PZR-LONG 0
* P & ID: 205301 ISOMETRIC:
                                        /(A'=-46" OR -37.3")
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 3-PR-1206 FIGURE: A-24H SHT. 1 OF 1 REV. 0
I    /                      6-PR-1205-1 ~
* LINE 29-RC-1230'',.J SEE FIG. A-34 (
6-PRN-1205-IRS  """
* BEND (H.) PRESSURIZER 1 BEND (V.) BEND (H.)
                                                                                    \
* P & ID: 205301 ISOMETRIC:
2-PZR-LONG C              I                                      +
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SURGE 14-PS-1231 FIGURE: A-25 SHT. 1 OF 1 REV. 0
(180") A -
* LINE 29-RC-1230''..._.J SEE FIG. A-34 (
                                                                                ""' 0--e--~
* BEND (H.) 2C-PSH-3 / (3PR) PRESSURIZER .BEND (V.) * / 2C-PSH-2 (2PR) . BEND (H.) P & ID: 205301 ISOMETRIC:
0              --o*
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SURGE 14-PS-1231 FIGURE: A-25H SHT. 1 OF 1 REV. 0
SHELL C        /  2-PZR-CIRC BC
* 6 8 5 &#xa5; I BEND (H.) 3 45* (V.) 2 :-... LINE 27 1/2-RC-1230  
                                                                                    ~0 0 (A"=+45" OR +36.5")
'...) SEE FIG. A-38 (
                                        /      (0=321.56~)
* 10
I /                                                                '""-4-PR-1200-1 4-PS-1231-33_/      \                   4-PRN-1200-IRS 2-PZR-CIRC AB~
* LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 P & ID: 205301 ISOMETRIC:
(D=193.00")    "'
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 1 OF 3 REV. 0
I SHELL B 4-PSN-1231-IRS
* BEND (H.) /R-240183-32 LINE 27 1/2-RC-1230'-.......J SEE FIG. A-38 ( *
                                                                                          \ _ 2-PZR-MB 1-16 I
* 2-PRG-227
2-PZR-LONG A (A"=+28" OR +22.7")
./ (11PR) /2-PRH-223 (15PR-1)
I SHELL A
/ (15PR-2) R-240183-8 LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 P & ID: 205301 ISOMETRIC:
                                          /   2-PZR-CIRC LHA
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 1 OF 3 REV. 0
                                      /      (0=64.25")
* LINE 4-PS-1231 LINE 4-PS-1231 SEE FIG. A-26 SHT. SEE FIG. A-26 SHT.
I    /
..... .....
p & 10: 205301 2-PZR-SKIRT PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER FIGURE: A-5 SHT. 1 OF 1 REV. 0
* 3
 
* 2PS29 ..,, \ L-''\--, 24 . 18 PLATFORM EL 151'
          *                                                 *
* P & ID: 205301 ISOMETRIC:
* 45*
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 2 OF 3 REV. 0
31-STG-1240-IRS 29-STG-1240-IRS OU1LET MANWAY 24-STG-OMB (BOLTING) 24-STG-IMB (BOLTING) 225" END VIEW 24-STG-LHTS P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 24 STEAM GENERATOR NO. 24            FIGURE: A-6 SHT. 1 OF 1 REV. 0
 
              *                                              *
* 45*
31-STG-1230-IRS 29-STG-1230-IRS OUTLET MANWAY
                                            -  -135" 23-STG-IMB (BOLTING)
INLET MANWAY 225" END VIEW P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 23 STEAM GENERATOR NO. 23 FIGURE: A- 7 SHT. 1 OF 1 REV. 0
 
          *                                                    *
* 45*
31-STG-1220-IRS 29-STG-1220-IRS OUTLET MANWAY 315"- -
22-STG-OMB (SOL.TING) 22-STG-IMB (BOLTING) 225" END VIEW 22-STG-LHTS P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 22 STEAM GENERA TOR NO. 22            FIGURE: A-8 SHT. 1 OF 1 REV. 0
 
            *                                                      *                                                       **
45*
31-STG-1210-IRS 29-STG-1210-IRS OUTLET MAN WAY I*
21-STG-OMB (BOLTING)
                                                                                *I 21-STG-IMB (BOLTING)
INLET MANWAY 225" END VIEW 21-STG-LHTS P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 21 STEAM GENERA TOR NO. 21 FIGURE: A.-9 SHT. 1 OF 1 REV. 0
 
*                                                      *
* Q\
2RC30 4
                  'J LINE  2-RC-1241
( SEE FIG. A-47
          ...__ _ _ _9_0_' BEND (H.)
v CLASS 2 NO. 2 REGEN. HX.
5 CLASS 1            '          'I'-'
                                                                                    '--...       I BEND                                                              '......i 27      2CV2 FLOW
                                                                      /25 2" x 3* _ /
RED.
25
                                                                            /
_ _ _ _ _ _B_E_N~D (H.)              0 3" X 2" _ /      45' (H.)            23
          --~
RED.                                                        22A 8
        ~    n BA                            / 12-CV-1243 9
90" BEND (V.J
                                                                                                                            ~'Z  /'n.
17 P & ID: 205301, 205328 ISOMETRIC: RC-2-3, CV-2-3 BEND (H.)
PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LETDOWlll 12-CV-1243, 3-CV-1243
                    @                                                                                              FIGURE: A-10 SHT. 1 OF 1 REV. 0
 
  *                                                                    *                                                                                  *
(:;\
2RC30
                                    '-..J LINE
              .___ _ _-..90' BEND (H.)
(
2-RC-1241 SEE FIG. A-47                  v                              NO. 2 REGEN. HX.
3-CV-1243----..._,          *
                                            ~ 2C-CVCH-521                                '
                                                                                            ..........
                                                                                                        "!'---
I BEND                                                      '-..J 2C-CVCS-522 ~        ............
2C-CVCS-513 ~                                        FLOW 2" x 3*  /                                      BEND (H.)
RED.             /
3"  x 2" _/  45' (H.)
RED.
2C-CVCG-514 /
2C-CVCH-515---------
90' BEND (V.}
                                                                                                                                              ~k>~.
P & ID: 205301, 205328 ISOMETRIC: RC-2-3, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LETDOWN 12-CV-1243, 3-CV-1243 FIGURE: A-10H SHT. 1 OF 1 REV. 0
 
*                                    *                                                                    *
                                                                      )            14
(-..... .....
EL. g9'       10                                      .....
LINE 27 1/2-RC-1240'.J
(:;:\                                  9 BEND 45' (H.)
SEE FIG. A-37              (
v                                      ~i 8
BEND BEND
                      '\,/
                            /  \        ~6                                                    P & ID: 205328, 205301
                                ~
ISOMETRIC: CV-2-3 FROM NO. 2 \...
REGEN. HX.              CLASS 2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1241 FIGURE: A-12 SHT. 1 OF 1 REV. 0
 
*                                         **
* EL.                                            '
LINE 27 1/2-RC-1240'.J
(:;;\                                              BEND 45' (H.)
SEE FIG. A-37      (
v 2C-CVCA-509 ~'
BEND
                                                  ~
BEND
                                                  ~ 2C-CVCS-506
                                                  ~
                              \..,/
                                    /  \    ~6                                            P & ID: 205328, 205301
                                          ~
                                                                                            . ISOMETRIC: CV-2-3 FROM NO. 2 (.,__
REGEN. HX.            CLASS 2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1241 FIGURE: A-12H SHT. 1 OF 1 REV. 0
 
*        *                                                                      *
                                                      ~1 18 BEND 45* (H.)
                                                      '
LINE 27 1/2-'-RC-1230',.j SEE FIG. A-38    (
90" (V.} ELL.
12
                              ~1 11 BEND BEND P & ID: 205328, 205301 ISOMETRIC: CV-2-3
      ' '                                                      PUBLIC SERVICE ELECTRIC & GAS
          '                                                              SALEM UNIT 2
            '(FROM NO. 2 REGEN. HX.                                      INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1231 FIGURE: A-13 SHT. 1 OF 1 REV. 0
 
*                                                              *
* 3/4-"
                                                                                                      '!'-'
I 2C-CVCH-737 ~ 2CV274-BEND 4-5' (H.)
                                                                                                              ......
2C-CVCH- 736 ___....---        LINE 27 1/2-RC-1230',..j RL-26            '\                                                              SEE FIG. A-38       (
1  n-mu          4-                                     2C-CVCS-502 (BPR-1)              90" (V.} ELL.
                            '  /
                                '>                  /
                                                          /
                                                              ..,,,_....-2C-CVCG-501 (8PR-2)
        ' .......,,. / /
                                /Ir./
                                                                                      ~1 BEND                  <,,..,-     "4f.[.
    .
  <o&deg;'
                            '
  ~?                            ~ 2C-CVCG-5D3 2C-CVCG-734 (9PR-1)
                                                                      ~_/
BEND        2C-CVCG-735 (9PR-2)
BEND P & ID: 205328, 205301 ISOMETRIC: CV-2-3
                                                          ' '                                                              PUBLIC SERVICE ELECTRIC & GAS
                                                                '                                                                    SALEM UNIT 2
                                                                    '(FROM NO. 2 REGEN. HX.                                        INSERVICE INSPECTION DRA\!VlNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1231 FIGURE: A-13H SHT. 1 OF 1 REV. 0
 
*          *
* LINE 2-CV-1275 SEE FIG. A-15 SHT. 2
                          ~:~      G BEND 24 16
      ~1 5
P & ID: 205328, 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15 SHT. 1 OF 2 REV. 0
 
      *                                        *
* LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 2C-PRS-152
:~            8
                  &#xa3; (9PR-1)
                      /
2C-PRG-151 (9PR-2) 2C-PRH-330~
(21 PR)
                                                          ~,,,_
                                                              ~*
                                                                  "'              /
_,,,.-- 2C-PRA-235 (27PS-1,-2)
EL. 131'
                                                                                  ~ 2C-PRG-333 BEND
_,,,.--2C-PRG-332 2C-PRH-153 ~                                                                      /          (25PR)
(7PR) 2C-PRG-148    ~
(11PR-3) 2C-PRG-147  ~_/
(13PR-1)
              ~1 2C-PRH-146 (13PR-3) 2C-PRG-154 (2PR)
(                                                              P & ID: 205328, 205301 RHE ROOM                                                    ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15H SHT. 1 OF 2 REV. 0
 
*                                      *
* LINE 4-PS-1231            )
SEE FIG. A-26 SHT. 3 _......-\..
                        /
(/      44 34 PLATFORM EL. 151' PRESSURIZER ROOM
                                              ~r PLATFORM EL 140' 31                          P & ID: 205328, 205301 ISOMETRIC: RC-2-3 28                                          PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I
r-L                                        INSERVICE INSPECTION DRAWING LINE 2-CV-1275                                CHEMICAL & VOLUME CONTROL SYSTEM SEE FIG. A-15 SHT. 1                                      AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15 SHT. 2 OF 2 REV. 0
 
*                                                  *
* LINE 4-PS-1231              .        J SEE FIG. A-26 SHT. 3      ,.....,.....-1..._
                                                        ~o,.
                                                          "Z_ ............... 2C-:-PRH-229
                                                            ~                  (37PR) r
                                                                            -' #
2C-PRG-233 ~
                                                      ~1 (31PR-1)
PRESSURIZER ROOM 2C-PRH-234 ~
(29PR)                      "\
P & ID: 205328, 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I
                        ,.--(_,
INSERVICE INSPECTION DRAWING LINE 2-CV-1275                                                            CHEMICAL & VOLUME CONTROL SYSTEM SEE FIG. A-15 SHT. 1                                                                AUXILIARY SPRAY 2-CV-1275
* FIGURE: A-15H SHT. 2 OF 2 REV. 0
 
*  *
* LINE 6-PR-2203 )
SEE FIG. 8-51 (-....
                          ' iJ 2PR5  CLASS 2 lOFB CLASS 1 3                          10 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1205 FIGURE: A-17 SHT. 1 OF 1 REV. 0
 
*              *                                                    *
  / 2C-PRH-201 LINE 6-PR-2203 )
SEE FIG. B-51 (',
                                  ';1\2PR5 CLASS 2 ,
nlOFB CLASS 1
                                        ~    2C-PRA-150A (9PR)
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1205 FIGURE: A-17H SHT. 1 OF 1 REV. 0
 
*        *
* 6
                  ~
3~.
45' (V.)
7
  ~
                                            )    LINE 6-PR-2204
                                    ,... _..."'\, SEE FIG. 8-50 CLASS 2              ~
            -C-LA_S_S__::._1--~--'* 2PR 4 10FB 1"
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1204 FIGURE: A-18 SHT. 1 OF 1 REV. 0
 
*              *                                                        *
  / 2C-PRH-202 45' (V.)
LINE 6-PR-.2204
                                  /
                                    /~ SEE FIG. B-50 CLASS 2 CLASS 1    J!!.2PR4 10FB.
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1204 .
FIGURE: A-18H SHT. 1 OF 1 REV. 0
 
*                                                      *                                *
                                                  ) LINE 6-PR-2205
                                              ,.....\_SEE FIG. 8-49
                                        ......
CLASS 2                        ......
                          ......
  ~            \{ ......
2PR3 10  10FB 9A 6
90" (V.)
7 3
45" (V.)
p & 10: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION .DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1203 FIGURE: A-19 SHT. 1 OF 1 REV. 0
 
*                              *                                      *
                            ) LINE 6-PR'--2205
                          ,,..\_SEE FIG. B-49
                        /
                    /
                  /
          ').,,/
          \\                            2C-P.RH-203 \
2PR3 10FB
          " ' - - 2C-PRA.:_154A (9PR) 90' (V.)
45' (V.)
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1203 FIGURE: A-19H SHT. 1 OF 1 REV. 0
 
          *                                                  *
* 5
                                                              ~
                                                              --------- LINE 3-PR-1207
                                ~  r  Ll~E 4-PR-1200 I
6                                                        0 LINE 3-PR-1206 )
SEE FIG. A-24 ( ' ,
                    ' '-                              158' 3" x 4"
                                      ~1 RED.
7 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS
                                                                                                    .SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 4-PR-1200, 3-PR-1207 FIGURE: A-20 SHT. 1 OF 1 REV. 0
 
        *                                                                  *                                            *
                                                                              ~  ------- LINE 3-PR-1207 0
LINE 3-PR-1206 j SEE FIG. A-24 {'-,
                  ...... ........_
                                                                            ~2C-PRH-204 (3PR) 3" x 4" 4" x 3"
                                                                                                                    ~1
                                                    ~1 RED. RED.
45* (V.)
CLASS 1 CLASs2]
LINE 3-PR-2201 }__ - - -  ~I SEE FIG. 8-53  (""          PR 2    2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 4-PR-1200, 3-PR-1207 FIGURE: A-20H SHT. 1 OF 1 REV. 0
 
*                                        *
* LINE 4-PR-1200                          )    LINE 3-PR-1207
                                                                                      ....-\..SEE FIG. A-20
                            ~          /                                ............
                                ,. . ~.......
I .            ,. . . . . /
2          . . . r-
                      ---l-)---1-- EL. 158'            /..
45' (H.)                                    I 4"' X 3"'      4"    x  3*    I RED.            RED.            I 7                                            :'            ~y
                                                                .    \~
                                                  '
X.ssURIZER LINE 3-PR-2202 FLOW 2PR1                            SEE FIG. B-52
                                                                    - - - ( EL. 152' 13,,,-1
                                              ~
CLASS 2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 3-PR-1206 FIGURE: A-24 SHT. 1 OF 1 REV. 0
 
*                                                    *
* LINE 4-PR-1200                          }    LINE 3-PR-1207
                                                                                                      .....-\_ SEE FIG. A-20
                                        ~              /                                        ......
                                              ...............                    ...... ......
2C-PRH-205 /                            ...                I          ......
(3PR)
                                    . . . r-
__....__[__.)---~-- EL. 15(3'
                                                                        /.
45' (H.)
4" X 3"          4* x 3*                I REQ.              RED.                  I l        ~~
XssuR1zrn LINE 3-PR-2202 FLOW 2PR1                            SEE FIG. B-52
                                                                              .,...---( EL. 152' 45" (H.)
CLASS CLASS 2
                                                                      ,I P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 3-PR-1206 FIGURE: A-24H SHT. 1 OF 1 REV. 0
 
*                            *
* BEND (H.)
LINE 29-RC-1230'',.J SEE FIG. A-34    (                      BEND (H.)
PRESSURIZER 1
BEND (V.)
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SURGE 14-PS-1231 FIGURE: A-25 SHT. 1 OF 1 REV. 0
 
*                              *
* BEND (H.)  ~ 2C-PSH-3
                                              /  (3PR) 2C-PSH-2 (2PR) .
                                                                    /
LINE 29-RC-1230''..._.J SEE FIG. A-34        (                                    BEND (H.)
PRESSURIZER
                          .BEND (V.)
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SURGE 14-PS-1231 FIGURE: A-25H SHT. 1 OF 1 REV. 0
 
*                                            *
* 6 8
5
  &#xa5;.~I BEND (H.)
3              LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 45* (V.)
2
                            ~,J      :-...
LINE 27 1/2-RC-1230 '...)
SEE FIG. A-38              (
10 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 1 OF 3 REV. 0
 
*                                        *                                            *
                /R-240183-32
                                              ~  2-PRG-227
                                            ./    (11PR) 2-PRH-223 (15PR-1)
                                                /        ~2-PRSN-31 BEND (H.)                                          /      (15PR-2)
LINE 4-PS-1231 SEE FIG. A-26 SHT. 2
                        ~,J LINE 27 1/2-RC-1230'-.......J SEE FIG. A-38            (
P & ID: 205301 ISOMETRIC: RC-2-3
                                            ~  R-240183-8                PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 1 OF 3 REV. 0
 
*                                            *
* LINE 4-PS-1231
                                            ~'..._ ..,,
SEE FIG. A-26 SHT. 3
* 2PS29
                                                        \
                                                          .
L-''\--, 24 18 LINE 4-PS-1231 SEE FIG. A-26 SHT. >~-...
                            ..... .....                      PLATFORM EL 151' P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 2 OF 3 REV. 0
 
*                                                            *
* LINE 4-PS-1231 SEE FIG. A-26 SHT.
* LINE 4-PS-1231 SEE FIG. A-26 SHT.
* 1"l/ 2-PRH-222  
1"l/
/ (23PR-1) 2-PRH-217 2-PRG-226  
2-PRH-222 /
---......._
(23PR-1)
LINE 4-PS-1231 1 ) ' (17PR) '-.... SEE FIG. A-26 SHT. r ' ...... ...... PLATFORM EL. 151'
                                                                    ~      2-PRH-217 2-PRG-226 ---......._
* P & ID: 205301 ISOMETRIC:
LINE 4-PS-1231       ) '           (17PR)               '-....
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 2 OF 3 REV. 0
SEE FIG. A-26 SHT. 1r '
* LINE 4-PS-1211 ) SEE FIG. A-28 ('-.... ...... 3/4" I
                            ......
* BEND 30 'r LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 31 32 PRESSURIZER LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 29
                                  ......                             PLATFORM EL. 151' P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 2 OF 3 REV. 0
* P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 3 OF 3 REV. 0
*                                         *
* LINE 4-PS-1211 ) SEE FIG. A-28 ('-... ...... 3/4" I ...... *
* BEND 29 3/4" 30
* 2C-PRG-225  
                              ~
/ (28PR-1) BEND ---...;._--, 'r LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 PRESSURIZER  
LINE 4-PS-1211 )
'-;J LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 2C-PRH-220
I
/ (28PR-2) P & ID: 205301 ISOMETRIC:
                                    'r LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 31 32 SEE FIG. A-28 ('-....
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 3 OF 3 REV. 0
                        ......
*
PRESSURIZER LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 3 OF 3 REV. 0
* BEND (H.) LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 6 45* (V.) 2 LINE 27 1/2-RC-1210 SEE FIG. A-40
 
* P & ID: 205301 ISOMETRIC:
*                                               *                                                                          *
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1211 FIGURE: A-28 SHT. 1 OF 1 REV. 0
                                                                                      ~  2C-PRG-225 BEND          /     (28PR-1)
* P LA TFOR M EL. 151' ,______,,"------'
                                                                        ---...;._--,
2-PRG-228 (18PR)
                                                                                            ~  2C-PRH-220
* 2-PRH-215\
                                                                                        /      (28PR-2) 3/4"
(16PR-1) 2-PRSN-30)
                              ~
LINE 4-PS-1211 )
I
                                            'r LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 SEE FIG. A-28 ('-...
                      ......
PRESSURIZER
                                  ......
                                          '-;J LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 3 OF 3 REV. 0
 
*          *
* LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 6
                  ~1 45* (V.)
2 BEND (H.)
P & ID: 205301 ISOMETRIC: RC-2-3 LINE 27 1/2-RC-1210 SEE FIG. A-40 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1211 FIGURE: A-28 SHT. 1 OF 1 REV. 0
 
  *                                                                     *
* 2-PRH-221 (23PR)
LINE 4-PS-1231
                                                                                                            /
                                                                                                                    /~  SEE FIG. A-26 SHT. 3
                                                                                                  ./
                                                                                                    .......
                                                                                                            .......
2-PRH-215\
(16PR-1)                                                                  'rJ LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 PLA TFOR M EL. 151' ,______,,"------'
                                                                                        \ 2C-PRS-178
                                                                                        \ (7PR-1) 2-PRG-228   ~                                          2-PRA-219~
(18PR) 2-PRSN-30)
(16PR-2)
(16PR-2)
R-240183-10 2C-PRG-157 R-240183-11 2C-PRG-158 BEND (H.) 2-PRH-221 (23PR) ./ ....... / ....... 'rJ \ 2C-PRS-178
                                                                                                              ~1 BEND 2C-PRG-156~
\ (7PR-1) BEND (7PR-3) 2C-PRG-179  
                                                                      ~~
/ (11APR) 45" (V.) LINE 4-PS-1231 SEE FIG. A-26 SHT. LINE 4-PS-1231 SEE FIG. A-26 SHT. (< LINE 27 1/2-RC-1210 SEE FIG. A-40 3 3
2C-PRH~
* P & ID: 205301 ISOMETRIC:
R-240183-10 2C-PRG-157 ~
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1211 FIGURE: A-28H SHT. 1 OF 1 REV. 0
45" (V.)
* :1' 90" (ELL.) ...... ......  
R-240183-11 ~
......  
(7PR-3) 2C-PRG-158 ~
'?J3/4" GENERATOR 24 I I ....-.v
BEND (H.)                           ~    2C-PRG-179
* LINE 3-CV-1243 SEE FIG. A-10 REACTOR COOLANT PUMP 24 6 90" (ELL.)
                                                                            /     (11APR)                                                             P & ID: 205301 ISOMETRIC: RC-2-3
* P & ID: 205301 ISOMETRIC:
(<         LINE 27 1/2-RC-1210 SEE FIG. A- 40 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1211 FIGURE: A-28H SHT. 1 OF 1 REV. 0
RC:-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1240 FIGURE: A-29 SHT. 1 OF 1 REV. 0
 
* REACTOR COOLANT PUMP 23 6 I I
*                                          *
* LINE 2-RC-1231 SEE FIG. A-50 2 3 3LD-I-.....
* GENERATOR 24
3/4(<., '-...3LD-0 3/4"(---
            ......
GENERA TOR 23 P & ID: 205301 ISOMETRIC:
            ...... '~3/4"
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1230 FIGURE: A-30 SHT. 1 OF 1 REV. 0
            ...... '~3/4"
* STEAM GENERA TOR 45* (V.) 2 3 ..... 3/4" ..... 3/4"
                    '?J3/4"
* LINE 2-RC-1221 SEE FIG. A-53 REACTOR COOLANT PUMP 22 6
:1'
* P & ID: 205301 ISOMETRIC:
  ~
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEl;l UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1220 FIGURE: A-31 SHT. 1 OF 1 REV. 0 
90" (ELL.)
REACTOR COOLANT PUMP 24 6
I I
                                  ....-.v LINE 3-CV-1243 SEE FIG. A-10 90" (ELL.)
                                                    ~-
P & ID: 205301 ISOMETRIC: RC:-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1240 FIGURE: A-29 SHT. 1 OF 1 REV. 0
 
*
*
* 45* (V.) R-240276-2  
* GENERA TOR 23 2
...... 3/4"' ...... 3/4" '"f3/4" LINE 2-RC-1221 SEE FIG. A-53 REACTOR COOLANT PUMP 22 " Y""
3 3LD-I-.....
* P & ID: 205301 ISOMETRIC:
3/4(<.,        '-...3LD-0 3/4"(-- -            --~3/4" REACTOR COOLANT PUMP 23 6
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1220 FIGURE: A-31H SHT. 1 *OF 1 REV. 0
I I
* REACTOR COOLANT PUMP 21 6 I I LINE 2-RC-1211 SEE FIG. A-56
                        ~
* STEAM 3/4" r<., 3/4" r<., 45* (V.) 2 3 3/4"
LINE 2-RC-1231 SEE FIG. A-50 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1230 FIGURE: A-30 SHT. 1 OF 1 REV. 0
* P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1210 FIGURE: A-32 SHT. 1 OF 1 REV. 0
*                                      *
* REACTOR COOLANT PUMP 21 LINE 2-RC-1211 SEE FIG. A-56
* STEAM GENERA TOR REACTOR COOLANT PUMP 22 45* (V.)                                     6 2
* _3/4" r< ...... 3/4" r< ...... 45* (V.) R-240276-1
3
'r-13/4"
                          ..... ~ 3/4"
* P & ID: 205301 ISOMETRIC:
                          ..... ~ 3/4" LINE 2-RC-1221 SEE FIG. A-53 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEl;l UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1220 FIGURE: A-31 SHT. 1 OF 1 REV. 0
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1210 FIGURE: A-32H SHT. 1 OF 1 REV. 0
 
* STEAM GENERATOR 24 LINE 6-SJ-1241'(,,,..
*                          *
SEE-, FIG. A-74 ,,,..
* REACTOR COOLANT PUMP 22 45 * (V.) ~ R-240276-2
* _,.,1.Y4" ,.,-_,,., TE-443A I I REACTOR
                                                  "  ~
* P &: ID: 205301 ISOMETRIC:
Y""
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVY1NG REACTOR COOLANT SYSTEM HOT LEG 29-RC-1240 FIGURE: A-33 SHT. 1 OF 1 REV. 0
            ...... ~ 3/4"'
*
            ...... ~ 3/4"
* 3C LINE 6-RH-1231 L -SEE FIG. A-77 \
            '"f3/4" LINE 2-RC-1221 SEE FIG. A-53 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1220 FIGURE: A-31H SHT. 1 *OF 1 REV. 0
* P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM HOT LEG 29-RC-1230 FIGURE: A-34 SHT. 1 OF 1 REV. 0
*                                *
* STEAM GENERATOR 3C 3BC-5 38 3BC-4 ,,,. 3A ,,,. 3BC-2 * '\LINE 6-SJ-1221 SEE FIG. A-80 ,,,. TE-423A I I
* STEAM REACTOR COOLANT PUMP 21 6                                       45* (V.)
* P & ID: 205301 ISOMETRIC:
2 3
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG REACTOR COOLANT SYS1EM HOT LEG 29-RC-1220 FIGURE: A-35 SHT. 1 OF 1 REV. 0
3/4" r<.,
* TE-413A I / LINE 14-RH-1211\/
3/4" r<.,
SEE FIG. A-61
I
* I 1 3/4" 21
                                                      '~ 3/4" I
* P & ID: 205301 ISOMETRIC:
                        ~
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM HOT LEG 29-RC-1210 FIGURE: A-36 SHT. 1 OF 1 REV. 0
LINE 2-RC-1211 SEE FIG. A-56 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1210 FIGURE: A-32 SHT. 1 OF 1 REV. 0
* * * / ,,,,.....  
 
// ',  
*                                *
/ ' LINE 10-SJ-1241 LINE 3-CV-124-1 LINE 1 1 /2-SJ-1242  
* REACTOR COOLANT PUMP 21 45* (V.)
/ ' / TE-4-438 SEE FIG. A-63 SEE FIG. A-12 SEE FIG. A-101 SHT. 3 / ' / > '!'--"' / / / / I I I I / / / / I 2* I I I < / 0 0 0 0 ' / REACTOR 3', / 1 2 / COOLANT lo. / rnc-2 lBC-4 1BC-5 --' / PUMP 24 1BC-1 22" (H.) "-......,,,.  
                                                ~ R-240276-1
/ FLOW.,. P & ID: 205301 ISOMETRIC:
_3/4" r< . .
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1240 FIGURE: A-37 SHT. 1 OF 1 REV. 0
3/4" r< . .
                                                  'r-13/4" LINE 2-RC-1211 SEE FIG. A-56 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1210 FIGURE: A-32H SHT. 1 OF 1 REV. 0
 
*                                                    *
* STEAM GENERATOR 24
_,.,1.Y4"
                                          ,.,-_,,.,       TE-443A
                                                            ~
I I
                                    ,,,..
LINE 6-SJ-1241'(,,,..
SEE-, FIG. A- 74 REACTOR P &: ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVY1NG REACTOR COOLANT SYSTEM HOT LEG 29-RC-1240 FIGURE: A-33 SHT. 1 OF 1 REV. 0
 
*        *
* 3C LINE 6-RH-1231 L-SEE FIG. A- 77 \
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM HOT LEG 29-RC-1230 FIGURE: A-34 SHT. 1 OF 1 REV. 0
 
*                                                      *
* STEAM GENERATOR 3BC-5 38 3C 3BC-4 LINE 6-SJ-1221
                                      ,,,. ,,,.' \
SEE FIG. A-80 3A
                                  ,,,.
3BC-2                          TE-423A
                                                            ~
I I
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG REACTOR COOLANT SYS1EM HOT LEG 29-RC-1220 FIGURE: A-35 SHT. 1 OF 1 REV. 0
 
*                      *
* TE-413A
                ~
I 21
                      /
LINE 14-RH-1211\/
SEE FIG. A-61 I
                          -~
1 3/4" P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM HOT LEG 29-RC-1210 FIGURE: A-36 SHT. 1 OF 1 REV. 0
 
*                                                           *                                                                                                   *
                                            /
                                                                                                                        ,,,,..... REACTQ~
                                                                                                                    //             ',       ~\,*
                                                                                                            /
                                                                                                                /                       '
LINE 10-SJ-1241   LINE 3-CV-124-1 LINE 1 1/2-SJ-1242 TE-4-438       SEE FIG. A-63     SEE FIG. A-12   SEE FIG. A-101 SHT. 3             /
                                                                                                      /
                                                                                                                                                ''
                ~                  '!'--"'             ~              ~                  /
                                                                                            /
                                                                                                /
                                                                                                                                                /
                                                                                                                                                    >
                                                                                                                                              /
                                                                                        /
I                   I                 I               I             /                                               /
                                                                                                                                          /
I     2*           I                 I               I           <                                           /
                                                                                                                                    /
                                                                                      '
0     1A~
0                 0               0
                                                                                                                          /
REACTOR 1                                                                    2      3',                           /
                                                                                                                      /
COOLANT lo.                                                                 ~
                                                                              -
                                                                                      ~
                                                                                      -                            /
PUMP 24      1BC-1  rnc-2     1BC~3              lBC-4           1BC-5 22" (H.) ' "-......,,,. /
FLOW.,.
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1240 FIGURE: A-37 SHT. 1 OF 1 REV. 0
 
*                                *
* LINE 1 1/2-SJ-1232 SEE FIG. A-1 03 SHT. 2
* LINE 1 1/2-SJ-1232 SEE FIG. A-1 03 SHT. 2
* I LINE 4-PS-1231 SEE FIG. A-26 SHT. I LINE 3-CV-1231 SEE FIG. A-13 I LINE SEE FIG. A-64 I r TE-4338 'I'-' I
      ~
* P & ID: 205301 ISOMETRIC:
I    LINE 4-PS-1231 SEE FIG. A-26 SHT.
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1230 FIGURE: A-38 SHT. 1 OF 1 REV. 0
                ~
* REACTOR COOLANT PUMP 22 TE-4238 I
I      LINE 3-CV-1231 SEE FIG. A-13                  r
* LINE 1 O-SJ-1221 SEE FIG. A-65 LINE 1 1/2-SJ-1222 SEE FIG. A-105 SHT. 2 '[---1
                            ~
* P & ID: 205301 ISOMETRIC:
I LINE 10-~J-1231 SEE FIG. A-64
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1220 FIGURE: A-39 SHT. 1 OF 1 REV. 0 
                                            ~
* *
I TE-4338
* LINE 1 1/2-SJ-1212 LINE 4-PS-1211 LINE 10-SJ-1211 SEE FIG. A-107 SHT. 2 SEE FIG. A-2B SEE FIG. A-66 TE-4138 0---' '!'-'" 0---' _,,.-..., I I I I / ' I I I 2" I / 68" (H.)'-, 0 0 rJ i!J1A r:J REACTOR / 1 / _, -.
                                                          'I'-'
/ -'> ... / i 1sc-s rn6: ... 4 1BC-2 rnc-1 / 3 / PUMP 21 / / / / / / FLOW / / / / / / / / <. / ' / ' / REACTOR ' / fl / ' / ' .__/
I P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1230 FIGURE: A-38 SHT. 1 OF 1 REV. 0
l P & ID: 205301 ISOMETRIC:
 
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1
*                              *
* REACTOR COOLANT TE-4238 PUMP 22  ~
I LINE 1 O-SJ-1221 SEE FIG. A-65 LINE 1 1/2-SJ-1222 SEE FIG. A-105 SHT. 2
                                  '[---
1 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1220 FIGURE: A-39 SHT. 1 OF 1 REV. 0
 
    *                                                                                                          *
* LINE 1 1/2-SJ-1212    LINE 4-PS-1211    LINE 10-SJ-1211 SEE FIG. A-107 SHT. 2 SEE FIG. A-2B    SEE FIG. A-66          TE-4138 0---'            '!'-'"            0---'              ~
_,,.-...,                          I                  I                I                    I
                                                    /                                      I                  I                I          2"        I
                                                /                '
                                    /
                                        /
                                            /            68"  (H.)'-,
                                                                        -3
_,
                                                                                '>
                                                                                        - 0                    0      ...      rJ        i!J1A    r:J  .
1 REACTOR COOLA~IT
                              /
                                /
                                                                              /
i 1sc-s              rn6:... 4          1BC~3      1BC-2  rnc-1    PUMP 21
                          /                                                /
                      /
                    /                                                    /
                                                                      /                                              FLOW
                /                                                  /
              /                                                /
            /                                                /
        /                                                /
    <.                                                /
          '                                        /
REACTOR      '                            /
                                              /
                  ' '                /
fl~\,.*
                        '  .__/
                                  /
l                                                                                                                                  P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1210 FIGURE: A-40 SHT. 1 OF 1 REV. 0
 
*                              *                                              *
        '1----
  ~R~.1
      ~I              3" x 2" h..        RED.
        'rl,. .......
2RC30 ','
          "
        'T, I
        ---0 LINE 3-CV-1243 SEE FIG. A-10
                                '- 'f TO REACTOR COOLANT DRAIN TANK P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1241 FIGURE: A-47 SHT. 1 OF 1 REV. 0
 
*                                    *
* LINE 31-RC-1230~
SEE FIG. A-30 ,,,,.
23RC13 TO REACTOR COOLANT (
DRAIN TANK
                      ''    23RC14
                          '              4 2" x 3/4" RED. INS.
P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1231 FIGURE: A-50 SHT. 1 OF 1 REV. 0
 
*                  *                                  *
                              '01' LINE 31-RC-1220
                          ~v
                        }";
SEE FIG. A-31 _......-\..
                .....
2 22RC13 3
4 CLASS 1 22RC14 CLASS 3 I
          ..-.L_,
TO REACTOR COOLANT DRAIN TANK P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1221 FIGURE: A-53 SHT. 1 OF 1 REV, 0
 
*              *                            *
    )    LINE 31-RC-1210
(,    SEE FIG. A-32
      'r1',..J 1  (  ",
21RC13 2    ~-
                  ~1 3
4 CLASS 1 21RC14 CLASS 3 I
r-L, TO REACTOR COOLANT DRAIN TANK P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1211 FIGURE: A-56 SHT. 1 OF 1 REV. 0
 
*                                                        ,.
* j LINE 29-RC-1210
(,SEE FIG. A-36 LINE 6-SJ-1211 SEE FIG. A-99 SHT.
                                            'f
                      '      .
                        ....., \
L-~--,
21RC8      V-...._J
                                      /3/4" 8
4 2RH50          } 3 / 4"
                                                                              /'Y~
 
3/4"\-*,/,...-
3/4"\-*,/,...-
*\ I 22SJ136 ,)/, 4" x 4" x 2" , ...--.v 3/4" RED. TEE
22SJ136 22SJ137
* LINE 2-SJ-1228 SEE FIG. A-96 SHT. 2(, ...... ...... BEND 1" '!'--' .1, 'x' 2SJ264 I\ *r*
                                                    *\
RED. INS. BEND I x 3/4" ...---L,-RED. INS.
                                                      ,)/,
3/4" .y 2" x 1" INS. I I I I I <l, \I 2SJ25B ,\ LT' ..-G 1"
1" p & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 4" x 4" x 2"     , ...--.v                           3/4" RED. TEE                                                                                                                                       INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96H SHT. 1 OF 3 REV. O
* p & ID: 205334 ISOMETRIC:
 
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96H SHT. 1 OF 3 REV.
*                                                      **                                                   *
* -_j LINE 2-SJ-1228 ( SEE FIG. A-96 SHT. 3 43 . 38 BEND 36 35 33 34 RED. INS. .1, 2SJ356 *r* 1" ** 18 19. 25 26 28
                              -_j LINE 2-SJ-1228
* 0 (Y BEND ...... ...... 'r LINE 2-SJ-1228 SEE FIG. A-96 SHT. P & ID: 205334 ISOMETRIC:
( SEE FIG. A-96 SHT. 3 0
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96 SHT. 2 OF 3 REV. 0
43 18      'O~
* 2C-22-SIA-540 2C-22-SIG-541 -..J LINE 2-SJ-1228 ( SEE FIG. A-96 SHT. 3 BEND 2C-22-SIS-544
(Y BEND
_/ / 2C-22-SIS-545
                                                                ~~
_/ 2"X1"_/ RED. INS. / 2C-24-SIS-588
    . 38 BEND
/ /2C-22-SIG-546
                                                                                      'r
.1, 2SJ356 'T' r--l__, 1" BEND 2C-22-SIG-743  
                                                                        ......
/ / 2C-22-SIG-742_,,/&deg;'" / 2C-22-SIG-741_/  
                                                                                ......
/ 2C-22-SIS-740_,,/&deg;'" *
: 19.                          LINE 2-SJ-1228 SEE FIG. A-96 SHT.
* lp7 BEND -2C-22-SIH-734 ' ',..J ( LINE 2-SJ-1228 SEE FIG. A-96 SHT. 1 /2C-22-SIS-739 0
36 35
P & ID: 205334 ISOMETRIC:
              ~        33 34 2"X1"~
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96H SHT. 2 OF 3 REV. 0
RED. INS.   .1,
* LINE 2-SJ-1228 SEE FIG. A-96 SHT.
                  ~< 2SJ356                              25
* 1" '"!'--' ,1, 'x' 2SJ262 I\ 'T' 51 52 53 <:i 2" x 1"/,l, RED. INS. :< 2SJ260 'r' ,...-..J.__, 1" 60 59 58 * \ \ t LINE SEE FIG. A-80 P & ID: 205334 ISOMETRIC:
                  *r*
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96 SHT. 3 OF 3 REV. 0
                  ~                                    26 1"
* LINE 2-SJ-1 228 SEE FIG. A-96 SHT. 2C-22-SIS-535 (47PR) 2C-22-SIS-536 (45PR-3) \ 2C-SISN-12 2 C-22-SIS-537 BEND ' BEND \ 2C-22-SIS-538 (45PR-2) 2C-22-SIS-539 . (45PR-1) *
P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 28 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96 SHT. 2 OF 3 REV. 0
* 1" 'I'-' ,1, X 2SJ262 'T' / 2C-22-SIH-530 6" / 2 C-22-SIH-534
 
\ t SJ-1 221 SEE FIG. A-80 2C-22-SIS-532 (57PR-2) \ 2"X1"/ ,l, 2C-22-SIS-533 (57PR-1) RED. INS. \' 2SJ260 I\ 'T' , .. p & ID: 205334 ISOMETRIC:
*                                                                   *                                                  *
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96H SHT. 3 OF 3 REV. 0
                        ~
* LINE 6-SJ-1212  
2C-22-SIA-540 ~                -..J LINE 2-SJ-1228
} SEE FIG. A-81 ,,.. \... 2" x RED.
( SEE FIG. A-96 SHT. 3 2C-22-SIG-541 ~
* 27 26 10 J  
                                                                                          'O~
' /\ 2FB LINE 4-SJ-1294 J 3 SEE FIG. A-85 I 2 '\ '\ l ', I < ' '--., .) 3/4" 21SJ142 '/ ---( : !T\ 21SJ141 I ---L, I 3/4" I I } LINE 2-SJ-1229 I _.... '\.. SEE FIG. A-94 SHT. 1 ,,,.. f ""') LINE 2-SJ-1249 I ,,..\...SEE FIG. A-89 SHT. ,,,..,,.. ( LINE 2-SJ-1239 I ,,.. SEE FIG. A-92 I ,,.. L-/
lp7 BEND
* P & ID: 205334 ISOMETRIC:
                                                                                  ~ - ~ 2C-22-SIH-734 BEND                                                                        ,~
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1219 FIGURE: A-98 SHT. 1 OF 1 REV. 0
                                                                                              ' ',..J
*
( LINE 2-SJ-1228 2C-22-SIS-544 _ / /                                                                                  SEE FIG. A-96 SHT. 1 2C-22-SIS-545 _ /
* LINE 6-SJ-1212 ) SEE FIG. A-81 / \. t/ ?
                                        /    2C-24-SIS-588
[2C-21-SIH-180 J I v/ 2FB 21SJ143 2" x 1 * '!---RED. INS. LINE 4-SJ-1294 J-SEE FIG. A-85 v . \ \\ 2C-21-SIS-189 I l \\.._ ,, _) 3/4" 21SJ142 'x' ---( : /T':. 21SJ141 I ---L, I 3/4" I I ) LINE 2-SJ-1229 I ,,,,. SEE FIG. A-94 SHT. 1 (/ ( ) LINE 2-SJ-1249 I / \. SEE FIG. A-89 SHT. (// ( LINE 2-SJ-1239 I / SEE FIG. A-92 I / I-/
                                      /          /2C-22-SIG-546 2"X1"_/
* P & ID: 205334 ISOMETRIC:
RED. INS.   .1,
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1219 FIGURE: A-98H SHT. 1 OF 1 REV. 0
                            ~< 2SJ356                                /2C-22-SIS-739
* LINE 4-SJ-1282 SEE FIG. A-86 ".!----I I I 5FB 21SJ136 5 3/4") --{>::}-----1..;
                            'T' r--l__,
r ,,> ;;! 21SJ137 3 2* x ,._/ RED. INS. I I I l... ' 'v \ ... _ .... _.., "'....) 2SJ252 * ( 1 .. 3/4-::( v BEND (V.)
1"               BEND P & ID: 205334 2C-22-SIG-743 /             /                                                     ISOMETRIC: RH-2-3 2C-22-SIG- 742_,,/&deg;'"     /                                           PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 2C-22-SIG-741_/ /
* BEND 19 20 16 0 I ..-.l_., 3/4" 21 BEND 22
2C-22-SIS- 740_,,/&deg;'"
* FLOW _) LINE 2-SJ-1218 BEND --( SEE FIG. A-99 SHT. 2 P & ID: 205334 ISOMETRIC:
                                                                            ~2C-22-SIG-737              INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 0                                          2-SJ-1228 FIGURE: A-96H SHT. 2 OF 3 REV. 0
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1218 FIGURE:
 
SHT. 1 OF 2 REV. 0
        *                *
* LINE 4-SJ-1282 SEE FIG. A-86 '!---I I I 2" 2C-23-SIH-886 2" x RED.
* 1"
* BEND f 2C-21-SIG-72B I 3/4" 2"X1"/ RED. INS. 5FB 21 SJ1 36 '@. 3/4") ---f::<I---(./ c-"" "' I > l.. * ......, \
                  '"!'--'
/* 3/4z 2SJ252 V*-....;J 1 ... / 2C-21-SIS-727 21SJ139 ...._ --.,\ 21 SJ254 BEND (V.) "---\--.,.  
                    ,1,
\"-...._.J ( ,. 0
                      'x' I\
* FLOW ' _) LINE 2-SJ-1218 --( SEE FIG. A-99 SHT. 2 P & ID; 205334 ISOMETRIC:
2SJ262                            60
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1218 FIGURE: A-99H SHT. 1 OF 2 REV. 0
                    'T' LINE 2-SJ-1228 SEE FIG. A-96 SHT.
* 29 28 LINE 2-SJ-1218 ) ---+-' EL 88' SEE FIG. A-99 SHT. 1 \--27 rr---.1, 'x' 2SJ256 " 'T'
                                                          ~1           \
* BEND BEND * ,.._ I LINE 14-RH-1211 SEE FIG. A-61 P & ID: 205334, 205301 ISOMETRIC:
                                                                          \
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1211 2-SJ-1218 FIGURE: A-99 SHT. 2 OF 2 REV. 0
51 t LINE ~-SJ-1221 SEE FIG. A-80 52                             59 58 53
*
                                  <:i
* 2C-21-SIH-711  
                            ~
/  
2" x 1"/,l, RED. INS.     :< 2SJ260
/ 2C-21-SN-13 2C-21-SIS-715 /2C-21-SIS-714 BEND 2C-21-SIS-716 ""' 2C-21-SIS-717 2C-21-SIS-718 BEND LINE 2-SJ-1218  
                                              'r'
}_ __ --+--!-----'
                                          ,...-..J.__,
EL. 88' SEE FIG. A-99 SHT. 1 \ J 2C-21-SIA-719 BEND RED.
1"                                   P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96 SHT. 3 OF 3 REV. 0
* I LINE 14-RH-1211 SEE FIG. A-61 P & ID: 205334. 205301 ISOMETRIC:
 
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1211 2-SJ-1218 FIGURE: A-99H SHT. 2 OF 2 REV. 0
        *                                                          *
* 13
* 2C-22-SIS-535 (47PR)         1"
* LINE 1 1/2-SJ-1242 FIG. A-101 SHT. 2 r ---/ WALL/)'-, "-' (SLEEVE "-14 24SJ388 24SJ16 \_ 12 1 1/2" x 1" RED. INS. 5 6 7 4 EL. 81' LINE 3-SJ-1292 SEE FIG. A-84
                                                              'I'-'
* P & ID: 205334, 205301 ISOM,ETRIC:
2C-22-SIS-536           ,1,                                            /          2C-22-SIH-530 (45PR-3)       \       X 2SJ262 2C-SISN-12                         'T' 2 C-22-SIS-537
RH-2-3 PUBLIC SERVICE Et.ECTRIC  
                                  ~""'~          BEND                                                                             6" LINE 2-SJ-1 228 SEE FIG. A-96 SHT.
& GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 1 OF 3 REV. 0
                                                                        /          2 C-22-SIH-534
*
                                        ~ 2C-22-SIS-538
* LINE 1 1 /2-SJ-1242  
                                                                                                                    \
""A.:EE FIG. A-101 SHT. 2 r, / WALL))', ', (SLEEVE ' r 2C-24-SIS-798 I 24SJ388 24SJ16 81' \__ 1 1/2" x 1" RED. INS. t 24 SJlS : : 2C-24-SIA-799 3 / 4" --tv1-_J 1 "' '* \/24SJ14 I\ 'r* ...-..l__, 3/4" j LINE 3-SJ-1292
                  '        BEND
(' SEE FIG. A-84 ?-rY
                                    \
* P & ID: 205334, 205301 ISOMETRIC:
(45PR-2) 2C-22-SIS-539 .
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101H SHT. 1 OF 3 REV. 0
(45PR-1)                               2C-22-SIS-532 (57PR-2)        \
* BEND (H.) 1" rr--,l, 2SJ352 '.' I\ LT> BEND (H.) / / LINE 1 1/2-SJ-1242  
t LINE~-  SJ-1 221 SEE FIG. A-80
'( SEE FIG. A-101 SHT. 1
                                                                                                  -~~ 2 C-22-SIS-531 2C-22-SIS-533 (57PR-1) 2 " X 1 " / ,l, RED. INS.       \' 2SJ260 I\
* 25 BEND (V.) 18 17 BEND (V.) LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 3 34 I I I l._ '-...,., 24SJ317 4..-"'r--, '."-'...) ( 1"
                                                                                        'T'
* 0 ,,,.__,. 26 27 Ct. P & ID: 205334, 205301 ISOMETRIC:
                                                                                        ~
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 2 OF 3 REV. 0
                                                                                          ,..                                       p & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96H SHT. 3 OF 3 REV. 0
* 2C-24-SIS-792 BEND (H.) 2C-24-SIS-793_/
 
1" rr--,l, 2SJ352 >: LT> 0 / 2C-24-SIG-796 2C-24-SIA-797 / / LINE 1 1/2-SJ-1242  
*                                                *
'( SEE FIG. A-101 SHT. 1 BEND (V.) BEND (V.)
* LINE 6-SJ-1212     }
* LINE 1 1 /2-SJ-1242 SEE FIG. A-101 SHT. 3 I I I l._ '-"*' 24SJ317 L--\--,. \'-.. '.J ( 1"
SEE FIG. A-81 ,,.. \...
* 2C-24-SIS-572 2C-24-SIG-573 2C-24-SIG-574 2C-24-SIG-575 2C-24-SIG-787 \' \ \_
27 26 10
2C-24-SIG-789 P, & ID: 205334, 205301 ISOMETRIC:
                                                            ~1" 2SJ2J~:X' 2" x RED.
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101H SHT. 2 OF 3 REV. 0
J
* 1" /f--' ,.L, X 24SJ315 1 1/2" X 1" 'T* RED. INS. 36 35 I I ---L LINE 1 SEE FIG. A-101 SHT. 2
:~s.
* 41 LINE 27 1/2-RC-1240 SEE FIG. A-37
                                        ~,....,.........-
* P & ID: 205334, 205301 ISOMETRIC:
LINE 4-SJ-1294 SEE FIG. A-85
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 3 OF 3 REV. 0
                                                          '  /\
* 1" 'l---' ,.1, >: 24SJ315 1 1/2" X 1" 4 T, RED. INS.
J ~D<11 I
* ___-2C-24-SIG-571
2FB
::::.---2C-SISN-11 I I ---l_., LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 2 ?:----1 LINE 27 1/2-RC-1240 SEE FIG. A-37
                                                                                    ~    3 2 '\ '\
* P & ID: 205334, 205301 ISOMETRIC:
                                                                                        <
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-1 OlH SHT. 3 OF 3 REV. 0
l ',
* 21 20 1 1/2" x RED. INS. 17 LINE 1 1 /2-SJ-1232 SEE FIG. A-103 SHT. 2 18 16 15 1"_/ 23SJ388 .1, '/ 23SJ313 I\ 'T' ,-.l___, 1"
                                                                                            ' '--     .,   ~*      .) 3/4" I        21SJ142 '/               - ---<..~",_J- - - (
* 7 8 9 * (....._ LINE 3-SJ-1292
:                       !T\         21SJ141 I                     ---L, I                     3/4" I                                                                       P & ID: 205334 I               } LINE 2-SJ-1229                                     ISOMETRIC: RH-2-3 I       _.... '\.. SEE FIG. A-94 SHT. 1
...._SEE FIG. A-84 3 r 4 P & ID: 205334, 205301 ISOMETRIC:
                                                                ,,,..
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103 SHT. 1 OF 2 REV. 0
f             ""') LINE 2-SJ-1249 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I           ,,..\...SEE FIG. A-89 SHT.
* / LINE 1 1/2-SJ-1232 SEE FIG. A-103 SHT. 2 /
                                                                ,,,..,,..
11/2"X1"/
(             ~    LINE 2-SJ-1239                             INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM I           ,,..     SEE FIG. A-92 2-SJ-1219 I     ,,..
,1, RED. INS. . \' 23SJ313 I\ 'f ,....-l__, 1" * * (....._ LINE 3-SJ-1292 FIG. A-84 r P & ID: 205334, 205301 ISOMETRIC:
L-/                                                         FIGURE: A-98 SHT. 1 OF 1 REV. 0
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103H SHT. 1 OF 2 REV. 0
 
* 34 35 31 36 29 ' LINE 27 1/2-RC-1230
*                                    *
'J SEE FIG. A-38 ( 28
* LINE 6-SJ-1212   )
* 1" I ,17 ',' 2SJ350 I\ 'L( 1 1/2" x 1*
SEE FIG. A-81 / \.
INS. 27 24 y// LINE 1 1 /2-SJ-1232
t/         ?
\... SEE FIG. A-1 03 SHT. 1
                                              /~1*            [2C-21-SIH-180
* P & ID: 205334, 205301 ISOMETRIC:
:s~~~i~~
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1 /2-SJ-1232 FIGURE: A-103 SHT. 2 OF 2 REV. 0
2" x 1* J RED. INS.
* 2C-23-SIH-875\  
I v/
...... LINE 27 1/2-RC-1230
LINE 4-SJ-1294 SEE FIG. A-85       vJ- ~
'...J SEE FIG. A-38 I 23SJ17 \
                                                  '!---
* 1" rr----1 .1, ',' 2SJ350 I\ Lf 1 1/2" x 1*
2FB
INS. / 2C-23-SIS-876
                                                                . \\\~
/ 2C-SISN-10
                                                                    ~\.
/ 2C-23-SIS-877
21SJ143 2C-21-SIS-189 I     21SJ142 l'x' \\.._ - ,, ~" - - _)(
/ /
                                                                                      -t~M,J-3/4"
'/ y// LINE 1 1/2-SJ-1232  
:                   /T':.         21SJ141 I                 ---L, I                 3/4" I                                                             P & ID: 205334 I           )   LINE 2-SJ-1229                             ISOMETRIC: RH-2-3 I     ,,,,. ~    SEE FIG. A-94 SHT. 1
\,__ SEE FIG. A-103 SHT. 1
(/
* p & 10: 205334. 205301 ISOMETRIC:
PUBLIC SERVICE ELECTRIC & GAS
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103H SHT. 2 OF 2 REV. 0
(           )   LINE 2-SJ-1249 SALEM UNIT 2 I         / \. SEE FIG. A-89 SHT.
* LINE 3-SJ-1292
(//
'.._J SEE FIG. A-84 ( 8 7 1 1/2" x , .. RED. INS. L
(           ~    LINE 2-SJ-1239 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM I         /     SEE FIG. A-92 2-SJ-1219 I   /                                               FIGURE: A-98H SHT. 1 OF 1 REV. 0 I-/
-( 1" 2SJ19
 
* 17 16 LINE 1 1/2-SJ-1222 j SEE FIG. A-105 SHT. 2(....._ ...... 22 23 * * ' > . / ,.,.. r-+-..i. \.,/ ...-'/ 22SJ313 1" \.. p & 10: 205334, 205301 ISOMETRIC:
          *                                                                          *
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALE.M UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105 SHT. 1 OF 2 REV. 0
* BEND          19 20 LINE 4-SJ-1282                                                                             BEND SEE FIG. A-86 0
* 2C-22-SlH-807
              ".!----
\ 1 1/2" x 1" RED. INS.
v 'O~
* 2C-22-SlH-810
16
\ t \\ 1* ,. "' ... .. 3/4"
                                                                                                ~1 I
'-
          ~1 I
3/4" 22SJ14 22SJ15 L-fvt-J 1 .. ..... ....... ( LINE 3-SJ-1292
I
'.J SEE FIG. A-84 ( 2SJ19 /2C-22-SIS-806 2C-22-SIS-818
                                                                  ~1                    I
\ 2C-22-SIA-819 LINE 1 1/2-SJ-1222 j SEE FIG. A-105 SHT. 2 (" ..._ ....
                                                                                    ..-.l_.,
* P & ID: 205334, 205301 ISOMETRIC:
3/4" 5FB
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105H SHT. 1 OF 2 REV. 0
                                                            ~6*
* 0 41 "< 40 31 28 27 32 ..... * , .. 'I'-' ,l, \I 2SJ346 ,\ 1 1/2" x 1" .T, RED. INS. -----------
FLOW 5
'rLINE 1 SEE FIG. A-105 SHT. 1 43 0 42 *-.. _,,_" ,. :*._,l 47 48 / ..... 49 LINE 27 1 /2-RC-122-;)" r SEE FIG. A-39 .
21SJ136
* P & ID: 205334, 205301 ISOMETRIC:
_) LINE 2-SJ-1218 3/4")
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105 SHT. 2 OF 2 REV. 0
r --{>::}-----1..;
* 2C-22-SIH-383 I/ 2C-22-SIG-382 2C-22-SIG-381
                                                        ,,>                                                 BEND - -  ( SEE FIG. A-99 SHT. 2 3                                        ;;! 21SJ137 2* x ,._/
/ /2C-22-SIS-239 2C-22-SIG-237 2C-22-SIS-236 2C-22-SIG-235
3/4-::(
_// / 2C-22-SIS-234
RED. INS.         I I                                                                               21 I
___,/"" ,. 2C-22-SIG-233 2C-21-SIS-232 2C-22-SIG-231
l... 'v... _
/ 2C-22-SIA-230
                            '\.... _..,                                                             22
/ '
                                  "'....)                           BEND (V.)
* 1" '[---' ,1, \I 2SJ346 ,\ 1 1/2" X 1" 'T, RED. INS. -----------'ruNE 1 1/2-SJ-1222 SEE FIG. A-105 SHT. t' LINE 27 1/2-RC-122-;-r SEE FIG. A-39
2SJ252                *     (  ..
* P & ID: 205334. 205301 ISOMETRIC:
1 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1218 FIGURE: A~99 SHT. 1 OF 2 REV. 0
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1 /2-SJ-1222 FIGURE: A-105H SHT. 2 OF 2 REV. 0 
 
* ) l', 3 LINE 3-SJ-1292
          *                                                                                           *
', . .) 4 SEE FIG. A-84 ( 7 ----.!_, 3/4" 11 12 * / * ) LINE 1 1/2-SJ-1212
* BEND 2C-23-SIH-886 ~
,,\_SEE FIG. A-107 SHT. 2 / P & ID: 205334, 205301 ISOMETRIC:
LINE 4-SJ-1282 SEE FIG. A-86
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 FIGURE: A-107 SHT. 1 OF 2 REV. 0 
              '!---
* (<. ..... _ ..... __ LINE 3-SJ-1292
I I                           2" I
'-.. SEE FIG. A-84 r I I I .l, I ',' 21SJ15 21SJ14,-_/
                                                                    ~1          2" x RED.
/\ '"-+-.. T '\.,>.I 3/4" \.. *
I f     2C-21-SIG-72B
* f 2C-21-SIS-804
                                                                                                      ~
/ 2C-21-SIA-805
3/4"
* r 2C-21-SIS-812 ) LINE 1 1/2-SJ-1212
                                            ~          5FB FLOW 21 SJ1 36       '@.                                                                     '            _) LINE 2-SJ-1218 c- --f::<I-3/4") -              --(./
...-\_SEE -FIG. A-107 SHT. 2 ..... .....
                                          " "' .~i21sJ137 I >                           2C-21-SIS-727
P & ID: 205334, 205301 ISOMETRIC:
                                                                                                                        ~~~~B-E_N_D - - (      SEE FIG. A-99 SHT. 2 21SJ139 2"X1"/
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 FIGURE: A-107H SHT. 1 OF 2 REV. 0
                                                  /*
* 1" rr---,1, 2sJ348 'l I\ I 1/2" X 1" 'T, RED.INS. 40 39 35 38 \, 1(// LINE 1 1/2-SJ-1212 SEE FIG. A-107 SHT.
                                                                                /
* 45 34A 34 23 22 / ) 1" /'i<" "'\... 't'-+-J. /./ 21SJ13 x 1" RED. INS.
0 3/4z RED. INS.
* P & ID: 205334, 205301 ISOMETRIC:
l.. ......,*\
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM I 1/2-SJ-1212 FIGURE: A-107 SHT. 2 OF 2 REV. 0 
                        '--~-..,.
*
                                                                                            ...._ --.,\ 21 SJ254
* 1" '[---' .1-, 2SJ348 '.' I\ 1 1/2" x 1* 'T' RED.INS. 2C-21-SIS-199
                                                                                                  "---\--.,.
/ BEND 2C-21-SIS-194
2SJ252            V*-....;J1...                          BEND (V.)
_/ 2C-21-SIS-193
                                                                                                        \"-...._.J
_/ 2C-21-SIA-192
(   ,.                     P & ID; 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1218 FIGURE: A-99H SHT. 1 OF 2 REV. 0
/ 1(_// LINE 1 1/2-SJ-1212 SEE FIG. A-107 SHT. /
 
  *                                                       *
* rr---
                                              .1,
                                                'x' 2SJ256
                                                "
                                              'T'
                                                                                ,.._
I LINE 14-RH-1211 SEE FIG. A-61 BEND BEND 29
                            ~1 28 LINE 2-SJ-1218      )    - - - + - ' EL 88'                              P & ID: 205334, 205301 SEE FIG. A-99 SHT. 1 \ - -                                                    ISOMETRIC: RH-2-3 27 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1211 2-SJ-1218 FIGURE: A-99 SHT. 2 OF 2 REV. 0
 
  *                                                                         *                                          *
                                                                          ~  2C-21-SIH-711
                                                                      /   ~2C-21-SIS-712
                                                                        /     ~  2C-21-SN-13
                                                                          ~2C-21-SIS-713                      ~
I LINE 14-RH-1211 SEE FIG. A-61
                                                                                /2C-21-SIS-714 2C-21-SIS-715 ~
RED.
2C-21-SIS-716 ~          ""'   BEND          BEND 2C-21-SIS-717 2C-21-SIS-718   ~~
BEND LINE 2-SJ-1218 SEE FIG. A-99 SHT. 1 \
                      }_ __
J
                            --+--!-----' EL. 88'                                                           P & ID: 205334. 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS 2C-21-SIA- 719                                                                                     SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1211 2-SJ-1218 FIGURE: A-99H SHT. 2 OF 2 REV. 0
 
*                                       *
* LINE 1 1/2-SJ-1242 r - /
WALL/)'-,
                        ~EE    FIG. A-101 SHT. 2
          "-'   (SLEEVE                                   4
                    "-                                 5        LINE 3-SJ-1292 SEE FIG. A-84
                                                  ~1 14 13                  24SJ388 24SJ16                 6 EL. 81' 12                                7
  \_
1 1/2" x 1" RED. INS.
P & ID: 205334, 205301 ISOM,ETRIC: RH-2-3 PUBLIC SERVICE Et.ECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 1 OF 3 REV. 0
 
*                                            *
* r, /
LINE 1 1/2-SJ-1242
                        ""A.:EE FIG. A-101 SHT. 2 WALL))',
        ',     (SLEEVE
                  '                                                             j    LINE 3-SJ-1292
('    SEE FIG. A-84 r   2C-24-SIS- 798                   ~1                    ?-  rY I 24SJ388 24SJ16 1--~----1 1--~.j.......j.~~~~EL. 81'
  \__ 1 1/2" x 1" RED. INS.              3 / 4" t
24 SJlS
                                      --tv1- _J 1
: :     ~    2C-24-SIA- 799
                                        "' '*     \/24SJ14 I\
                                                  'r*
                                                ...-..l__,
3/4" P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101H SHT. 1 OF 3 REV. 0
 
*                                            *
* 1" rr--
                    ,l, 2SJ352 I'.'\
LT>
25 LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 3 34
  ~*
BEND (H.)
0
                                                                                                                      ~1
                                                                                                        ,,,.__,.
BEND (H.)                                               I                                          26 BEND (V.)
I I                             27      Ct.
l._
                                                                          '- ...,., 24SJ317                 ~
18                                        4..-"'r--,
                                                                                  '."-'...)
17
(   1" BEND (V.)
P & ID: 205334, 205301 ISOMETRIC: RH-2-3
                                  /
                                /                                                                  PUBLIC SERVICE ELECTRIC & GAS LINE 1 1/2-SJ-1242 ' (                                                                                SALEM UNIT 2 SEE FIG. A-101 SHT. 1 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 2 OF 3 REV. 0
 
      *                                                  *
* 1" rr--
                            ,l, 2SJ352 >:
LT>
LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 3 0
2C-24-SIS- 792 ~                                                                                          2C-24-SIS-572 2C-24-SIG-573 2C-24-SIG-574 2C-24-SIG-575
            ~-                                                                                                      2C-24-SIG- 787 BEND (H.)
2C-24-SIS-793_/
                                      /     2C-24-SIG-796 I
BEND (V.)
I I
l._                          \'        ~
2C-24-SIA-797 ~
                                                                                      '- "*' 24SJ317 L--\--,.
                                                                                            \'-.. '.J          \ \_  2C-24-:~S-790
( 1"            2C-24-SIG-789 BEND (V.)
P, & ID: 205334, 205301 ISOMETRIC: RH-2-3
                                          /
                                        /                                                                        PUBLIC SERVICE ELECTRIC & GAS LINE 1 1/2-SJ-1242 ' (                                                                                    SALEM UNIT 2 SEE FIG. A-101 SHT. 1 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101H SHT. 2 OF 3 REV. 0
 
*                                  *
* 1"
                      /f--'                       41
                      ,.L, 24SJ315 1 1/2" X 1"         'T*
RED. INS.   ~                                  ~21 36                LINE 27 1/2-RC-1240 SEE FIG. A-37 35 I
I
                      ---L LINE 1 1/2~SJ-1242 SEE FIG. A-101 SHT. 2 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 3 OF 3 REV. 0
 
*                                                   *
* 1"
                      'l---'
                        ,.1, 4
                          >: 24SJ315 1 1/2" X 1"            T,
              ~
RED. INS.
                                                            ?:-- --1 LINE 27 1/2-RC-1240 SEE FIG. A-37
___- 2C-24-SIG-571
: : : : . - - - 2C-SISN-11 I
I
                      ---l_.,
LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 2 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-1 OlH SHT. 3 OF 3 REV. 0
 
*                                              *
* LINE 1 1/2-SJ-1232 SEE FIG. A-103 SHT. 2 21
  ~1    20 18 17 7
16 23SJ388            8
(....._   LINE 3-SJ-1292 15 9
4                    3    r
                                                      ......_-+-------~ ...._SEE FIG. A-84 P & ID: 205334, 205301 1 1/2"  x RED. INS.
1"_/ .1,                                                    ISOMETRIC: RH-2-3
                      '/ 23SJ313 I\
PUBLIC SERVICE ELECTRIC & GAS
                      'T'                                                    SALEM UNIT 2
                  ,-.l___,
1"                                        INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103      SHT. 1 OF 2 REV. 0
 
*                                                 *                                *
                    ~
LINE 1 1/2-SJ-1232 SEE FIG. A-103 SHT. 2
                  /
              /
  ~1
            ~2C-23-SIA-800
(....._    LINE 3-SJ-1292
                                                    ~---------~-....,,.:SEE FIG. A-84 r
P & ID: 205334, 205301 ISOMETRIC: RH-2-3 1 1 / 2 " X 1 " / ,1, RED. INS.    .      \' 23SJ313                              PUBLIC SERVICE ELECTRIC & GAS I\
                      'f                                                    SALEM UNIT 2
                    ,....-l__,
1"                                      INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103H SHT. 1 OF 2 REV. 0
 
*                                             *
* 1"
                                  ~
I
                                    ,17
                                    ',' 2SJ350 I\
                                  'L(
1 1/2"  x  1*
                                        ~RED.
34 INS.
35 31 36        29 LINE 27 1/2-RC-1230' 'J SEE FIG. A-38         (
28 27 24 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 y//
LINE 1 1/2-SJ-1232    \...
SEE FIG. A-1 03 SHT. 1          INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103 SHT. 2 OF 2 REV. 0
 
*                                                       *
* 1" rr----
1
                                            .1, 2C-23-SIH-875\    ',' 2SJ350 Lf I\
1 1/2" x 1*
23SJ17 \        ~RED.          INS.
                    ......
LINE 27 1/2-RC-1230      '...J SEE FIG. A-38              I
                                                      /         2C-23-SIS-876
                                                                /          2C-SISN-10
                                                                          /       2C-23-SIS-877
                                                                        / /          2C-23-~H-678
                                                                                        ' /     2C-23-~S-879 p & 10: 205334. 205301
                                                                                            ~
ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 y//
LINE 1 1/2-SJ-1232      \,__
SEE FIG. A-103 SHT. 1                                     INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103H SHT. 2 OF 2 REV. 0
 
*                                                      *                                                              *
* 16 8
1 1/2" x , ..
RED. INS.
RED. INS.
* P & ID: 205334, 205301 ISOMETRIC:
                ~1    7 L -{>~}- -(
RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1 /2-SJ-1212 FIGURE: A-1 07H SHT. 2 OF 2 REV. 0
2SJ19 1"
* PUMP NO_ 22 / 22-PMP-LUGS-1 22-PMP-BOL TS\ (24 EACH) \ _,,_ _ __,...-22-PMP-LIG
22 17 LINE 1 1/2-SJ-1222    j SEE FIG. A-105 SHT. 2(....._                23
"._ 0 (24 EACH) '\. 0 0 LINE 31-RC-1220 0 /-------....,_--;::----/ I I I '-...__::::_
                                                                                          ......
____ ____,_ ____ 0 Oo 22-PMP-LUGS-31 LINE 27 1/2-RC-1220 22-PMP-LUGS-2 TO RPV TO RPV LINE 27 1 /2-RC-1210 21-PMP-LUGS-2 j 21-PMP-BOL TS 0 &deg; (24 EACH} 0 21-PMP-LIG, 0 (24 EACH) /-------....._--;::----/ I I I '-...__::::__
LINE 3-SJ-1292 '.._J
FROM STG 22 FROM STG 21 0 Oo LINE 31-RC-1210
                                                                                                                      .'
** FROM STG 24 23-PMP-LUGS-2 j LINE 31-RC-1240 24-PMP-LUGS-3 7 TO RPV
                                                                                                                    ,.,..
* 24 Oo 0 24-PMP-BOLTS u-------(24 EACH) 0 oO ------------
r-+-..i.
24-PMP-LIG (24 EACH) 24-PMP-LUGS-2 LINE 27 1/2-RC-1240 TO RPV LINE 27 1/2-RC-1230
                                                                                                                          /
/ 23-PMP-LIG J.---------L
                                                                                                                            >
/ * (24 EACH) OQ 23-PMP-LUGS-3 23-PMP-BOL TS 0 ( I O" (24-EACH) I I LINE,,__ 1--R-C---1-2-30-+-----
SEE FIG. A-84  (
/ 0 FROM STG 23 P & ID: 205301 oO 23-PMP-LUGS-1  
                                                                                                        \.,/ ...-'/ 22SJ313 1" \..
/ PUMP NO. 23 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'WlNG REACTOR COOLANT SYSTEM REACTOR COOLANT PUMPS FIGURE: A-109 SHT. -1 OF 1 REV. 0 
p & 10: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALE.M UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105 SHT. 1 OF 2 REV. 0
*
 
* 24-STG-SDUH MAN WAY MAN WAY o* ""' MANWAY AT 90" /16-BFN-2241-1 16-BFNl:-2241-1
*                                                                  *
'--0Y / 24-STG-MB90 / (BOLTING)
* 2C-22-SlH-810 \
I 24-STG-SCSD x-----MANWAY AT 270" j 24-STG-MB270 (BOLTING) y PLAN VIEW -z ""---32-MSN-2241-1 32-MSNIR-2241-1 SHELL SECTION C """' TRANSITION CONE 24_STG-TCSC I SHELL SECTION A / 24-STG-STBSA
2C-22-SlH-807 \
___,/ STUB ARREL CLASS 2 TUBE ---CLASS 1 24-STG-SBTC
3/4" t  ,.    "' \\'-
"---24-STG-SASB 24-STG-TSSTB STEAM GENERATOR NO. 24
                                                                  ---<..>~.;--'
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 24 FIGURE: B-1 SHT. 1 OF 1 REV. 0
                                                                                    ...  .
* o* l 16-BFN-2231-1 15-BFNl:-2231-1 MANWAY AT 90" / 23-STG-MB90 x-----MANWAY AT 270" J 23-STG-MB270 (BOLTING) y PLAN \llEW / (BOLTING)
                                                                                  --:>~...--
-----z "'----32-MSN-2231-1 32-MSNIR-2231-1 MANWAY ' MANWAY 23-STG-SDUH SHELL SrTION D I "---23-STG-SCSD SHELL SECTION C ' TRANSITION CONE 23-STG-TCSC 23-STG-SBTC SHELL SECTION B I I ........._
1*
23-STG-SASB SHELL SECTION A / 23-STG-STBSA
3/4" 22SJ14          22SJ15 1 1/2" x 1" RED. INS.                                                                  2C-22-SIS-818 \
_,/ STUB ARREL 23-STG-TSSTB CLASS 2 TUBE CLASS 1 STEAM GENERA TOR NO. 23 '. --------* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG REACTOR COOLANT SYSTEM
                ~1 L-fvt-J
* STEAM GENERA TOR NO. 23 FIGURE: B-2 SHT. 1 OF 1 REV. 0
                                        ..... ....... ( 1..                                       2C-22-SIA-819 ~
* o* l 16-BFN-:2221-1 16-BFNl:-2221-1 MANWAY AT 90" / 22-STG-MB90
2SJ19
/ (BOLTING}
                            /2C-22-SIS-806 LINE 1 1/2-SJ-1222    j SEE FIG. A-105 SHT. 2 (" ..._
x-----MAN WAY AT 270" J 22-STG-MB270 (BOLTING) y PLAN VIEW -----z 32-MSN-2221-1 32-MSNIR-2221-1
                                                                                                                                  ....
* MANWAY ' SHELL SECTION D "'-22-STG-SDUH I MAN WAY I 22-STG-SCSD SHELL SECTION C ' TRANSITION CONE "'-22-STG-TCSC
LINE 3-SJ-1292 '.J SEE FIG. A-84  (
' "'-22-STG-SEl TC I 22-STG-SASB SHELL SECTION A / 22-STG-STBSA STUB 22-STG-TSSTB CLASS 2 TUBE CLASS 1 STEAM GENERATOR NO. 22
P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105H SHT. 1 OF 2 REV. 0
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 22 FIGURE: B-3 SHT. 1 OF 1 REV. 0
 
* o* [ 15-BFN-2211-1 15-BFN:-2211-1 MANWAY AT 90"
*                                                            *
/ 21-STG-MB90
* 0
/ (BOLTING}
  ~.9n:  41
x-----MAN WAY AT 270" J > 21-STG-MB270 (BOLTING) y PLAN \/IEW -----z ""-----32-MSN-2211-1 32-MSNIR-2211-1
    "<
* ' SHELL SECTION D "'-..'--21-STG-SDUH MAN WAY I MAN WAY I "'---21-STG-SCSD SHELL SECTION C ' TRANSITION CONE 21-STG-TCSC SHELL SrTION B I '--21-STG-SASB SHELL SECTION A / 21-STG-STBSA
40
_/ STUB 21-STG-TSSTB CLASS 2 TUBE CLASS 1 STEAM GENERATOR NO. 21
                                                                                    ,.
* P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 21 FIGURE: B-4 SHT. 1 OF 1 REV. 0 
                                                                                  'I'-'
* *
                                                                                    ,l,                47
* 0 / 2-CVCT-1 L 0=CENTER LINE OF MANWAY 2-CVCT-2VS-3 2-CVCT-2VS-7 q 2-CVCT-2VS-5:_
                                                                                    \I 2SJ346 ,\
2-CVCT-2VS-1  
48 1 1/2" x  1"              .T, RED. INS.    -----------
------A ----------
43
' --, -----1-I ---,.__ I r---1 1 2-CVCT-2VS-6
                                                                                                        / ..... 49 LINE 27 1/2-RC-122-;)"    r
&#xa3; 2-CVCT-MWY-NUTS
                                                                        ~1 42 32                                                                      SEE FIG. A-39        .
/ 2-CVCT-MWY-BOLTS
31 0
/ 2-CVCT-2VS-2
28 27 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS
_/ 2-CVCT-2VS-8 2-CVCT-2VS-4 P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL TANK FIGURE: B-5 SHT. 1 OF I REV. 0
                            .....                                                                                                  SALEM UNIT 2
* 2-ELHEX-2
                                  'rLINE 1    1/2-SJ~1222                                                                INSERVICE INSPECTION DRAWING SEE FIG. A-105 SHT. 1 SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105 SHT. 2 OF 2 REV. 0
\ 2-El.HEX-1
                  *-.. _,,_" ,. :*._,l
\
 
21 CLASS 3 I * *
*                                                                *                                                                  *
+/- l / 2-ELHEX-NU1' -I-
          ~          I/ ~ 2C-22-SIH-383 2C-22-SIG-382
-----EL.=82'
                                /2C-22-SIS-239 2C-22-SIG-381 /
\__ (NOTE: VESSEL 2-ELHEX-STUDS IN HORIZONTAL POSITION.)
1"
P & ID: 205328 NOTE: VESSEL IS IN ROOM NEXT TO RHE AND ACCUMULATOR
                                                                                    '[---'
: 23. PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING EXCESS LETDOWN HEAT EXCHANGER FIGURE: B-6 SHT. 1 OF 1 REV. 0
                                                                                      ,1, B~ 2C-22-SIG-237                              2SJ346 ,\
* VENT I'-' 21-HT-1 "" -------NO. 21 21-HT-2 1-------i I 21WR66 TO RC DRAIN TANK
                                                                                      \I 1 1/2" X 1"             'T,
* VENT VENT ---! ---! -------2" NO. 23 (TYP.) Lo I ----2" EXEMPT------@ (TYP.) NO. 24 ------1"" (TYP.) 23WR66 I I 24WR66 EL. 110' TO RC TO RC DRAIN TANK DRAIN TANK
                            ~ 2C-22-SIS-236                RED. INS.  -----------
* VENT ---! NO. 22 1-------1
2C-22-SIG-235 _ // /
/ 22-HT-2 22WR66 I TO RC DRAIN TANK P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING HEAD TANKS FIGURE: 8-7 SHT. 1 OF 1 REV. 0  
t' LINE 27 1/2-RC-122-;-r
* *
                                                                          ~1 2C-22-SIS-234 ___,/"" ,.                                                                SEE FIG. A-39 2C-22-SIG-233
* CLASS 21 CLASS 3 2-UJEX-1 \ l / 1" BOL,NG (EXE"PT) -I-
                                      ~  2C-21-SIS-232
------EL.=88' NOTE: VESSEL IS IN ROOM EAST OF THE WEST STAIRWELL (NOTE: VESSEL IS IN HORIZONTAL POSITION.)
                                    ~ 2C-22-SIG-231
P & ID: 205328 PUBLIC. SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG LETDOWN HEAT EXCHANGER FIGURE: B-8 SHT. 1 OF 1 REV. 0
                              /     2C-22-SIA-230 P & ID: 205334. 205301
* 2* 2* -n ______ ri I I r-----i 3/4"  
                                /                                                                                         ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
/ VESSEL SUPPORTS / (SEE TOP VIEW) *
                                      '
* 2-RCF-.SVS TH_RU 8VS Lo TOP VIEW * / 2-RCF-9VS THRU 12VS P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT FILTER FIGURE: 8-9 SHT. 1 OF 1 REV. 0 .. ***---_________________
                                        'ruNE 1 1/2-SJ-1222 SEE FIG. A-105 SHT.                                                         INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105H SHT. 2 OF 2 REV. 0
__,
 
* 2-RHE-1 J 2-RHE-5 J 2-RHE-9 J I I I IN
*                                         *
* OUT IN SHELL A T VESSEL SUPPORT WELDS CANNOT BE EXAMINED DUE TO LIMITED ACCESS. SHELL B SHELL C 2-RHE-10 J 2-RHE-2 !I 2-RHE-3 2-RHE-6 !I 2-RHE-7 2-RHE-11 JI 2-RHE-12 NOTE: VESSEL IS IN ROOM NEXT TO ACCUMULATOR NO. 24. OUT \ 2-RHE-4 \ 2-RHE-8 \ \ 2-RHE-13 ** P & ID: 205328 PUBLIC SERVICE ELECTRIC &: GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REGENERATIVE HEAT EXCHANGER FIGURE: 8-10 SHT. 1 OF 1 REV. 0
* 7 11        ) LINE 1 1/2-SJ-1212
** 1**,t t''' CLASSJ CLASS 2 ------------
                                                ,,\_SEE FIG. A-107 SHT. 2
* NO. 21 1--.---=----------=----l 21-RHRHEX-1 21-RHRHEX-2VS INLET (FRONT) -----21-RHRHEX-IN 21-RHRHEX-OUT
                                              /
--------21-RHRHEX-2
            )    ~                          /
-.:: \\ouTLET (BACK) 11, VESSEL SUPPORT -------**-*-"-"""
l',    3        ----.!_,
* P & ID: 205332 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RHR HEAT EXCHANGER 21 FIGURE: B-11 SHT. 1 OF 1 REV: 0 . .
LINE 3-SJ-1292 ' , . .) 4            12 3/4" SEE FIG. A-84    (
* CLASS 3 CLASS 2 ------------
P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 FIGURE: A-107 SHT. 1 OF 2 REV. 0
* NO. 22 22-RHRHEX-1 22-RHRHEX-1VS 22-RHRHEX-2VS INLET (FRONT} ..... :::\\ouTLET (BACK) l l J VESSEL SUPPORT RHRHEX-IN
 
--l---'--------------------1
*                                                                  *
---22-RHRHEX-OUT 22-RHRHEX-2
* f 2C-21-SIS-804 r
* P & ID: 205332 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RHR HEAT EXCHANGER 22 FIGURE: B-12 SHT. 1 OF 1 REV. 0
2C-21-SIS-812 I I                                                            )  LINE 1 1/2-SJ-1212
* / s /
                                                                /      2C-21-SIA-805 I .l,                                                        ...-\_SEE -FIG. A-107 SHT. 2
/ PENETRATION 8 .__.,.,. 2PL-1 THRU 8 <l.7 \I 24BF57 1\ LT> ....--.I._,, 1" 8PL-1 THRU 8/ B 7PL-1,-2------
(<. ..... _~..... __    21SJ14,-_/
                                        '"-+-..
                                    '\.,>.I I ',' 21SJ15
                                                  /\
T
                                                                                                  ..... .....
LINE 3-SJ-1292 SEE FIG. A-84
                    '-..
r  3/4" \.. *
                                                                                      ~2C-21-SIS-811 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 FIGURE: A-107H SHT. 1 OF 2 REV. 0
 
*                                       *
* 1" rr---
                        ,1,                  ~~
2sJ348  'l I\
45 I 1/2" X 1"           'T, RED.INS.    ~
40
              ~1    39 35 38 34A
                  \,
34
                    ~
                                                                )    1"           P & ID: 205334, 205301 23 ISOMETRIC: RH-2-3
                                                          /'i<" "'\...
                                                    't'-+-J.
22      /./ 21SJ13                PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
                                                    ~11/2" x            1"    INSERVICE INSPECTION DRAWING
                                      // /                  RED. INS.            SAFETY INJECTION SYSTEM I 1/2-SJ-1212 LINE 1 1/2-SJ-1212 SEE FIG. A-107 SHT. 1(                                    FIGURE: A-107 SHT. 2 OF 2 REV. 0
 
*                                           *
* 1"
                        '[---'
                          .1-,
2SJ348 I'.'\
1 1/2" x 1*          'T' RED.INS.    ~
2C-21-SIS-199 /
BEND 2C-21-SIS-194 _ /
2C-21-SIS-193 _ /
2C-21-SIA-192 /                              P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
                                                ~11/2"X1"        INSERVICE INSPECTION DRAWING
                                          //  /    RED. INS.        SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 LINE 1 1/2-SJ-1212 SEE FIG. A-107 SHT. 1(_                    FIGURE: A-1 07H SHT. 2 OF 2 REV. 0
 
              *                                                                          **
* PUMP NO_ 22                                                                                                                      24 22-PMP-LUGS-1 22-PMP-BOLTS\
(24 EACH)        \      _,,__ __,...-/
22-PMP-LIG "._
(24 EACH)       '\. 0 0                                                                                                                        Oo 0                                                                                                                                          0u-------~
LINE 31-RC-1220                                        LINE 31-RC-1240
                              /-------....,_--;::----                                                                                                                               24-PMP-BOLTS
                            /              I                          FROM                                FROM 0      I
                            '-...__::::_
I
____ ____,_____        ~
STG 22 STG 24 (24 EACH) 0                                                                                                                                          0      ------------ 24-PMP-LIG (24 EACH)
Oo                                                                                                                          oO                ~              24-PMP-LUGS-2
                                              ~                                                                                            7 22-PMP-LUGS-31 LINE 27 1/2-RC-1240 LINE 27 1/2-RC-1220                            22-PMP-LUGS-2                                                   24-PMP-LUGS-3 TO RPV                                                                                                                TO RPV TO RPV                                                                                  TO RPV LINE 27 1/2-RC-1210 21-PMP-LUGS-2   j 23-PMP-LUGS-2            j                      LINE 27 1/2-RC-1230
                                                                                                                                      /    23-PMP-LIG
                                &deg; J.---------L /      * (24 EACH)
OQ                    ~ 23-PMP-LUGS-3 21-PMP-BOL TS (24 EACH}          0 0 /-------....._--;::----                                     ~----+-----7~~,                                  0 23-PMP-BOL TS (24- EACH)
FROM 21-PMP-LIG, (24 EACH)      ~ 0 / II  I STG 21 FROM STG 23
(
I            I I    O" P & ID: 205301 0 '-...__::::__ ----'-----~        LINE 31-RC-1210      LINE,,__-3-1--R-C---1-2-30-+- - - - -   ~._,_____ /    0 Oo                                                                                            oO                                              PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'WlNG REACTOR COOLANT SYSTEM 23-PMP-LUGS-1 /                                                                      REACTOR COOLANT PUMPS PUMP NO. 23                                        FIGURE: A-109 SHT. -1 OF 1 REV. 0
 
  *                                                                 *                                                                    *
                                                                                                        ~  24-STG-SDUH 16-BFN-2241-1 16-BFNl:-2241-1 MAN WAY                              MAN WAY o*
            ""'                  MANWAY AT 90"
                '--0Y
                    /                          /    24-STG-MB90
                                                                                                        ~    24-STG-SCSD
                  /~                        /      (BOLTING)                              I SHELL SECTION C x-- ---                                 -z                                  TRANSITION CONE  """' ~  24_STG-TCSC
                                                                                                      ~  24-STG-SBTC MANWAY AT 270"    j        y
                                        ""--- 32-MSN-2241-1 32-MSNIR-2241-1
                                                                                                      "--- 24-STG-SASB SHELL I
SECTION A 24-STG-MB270 (BOLTING)
PLAN VIEW
                                                                                  /
24-STG-STBSA ___,/    STUB  ARREL          24-STG-TSSTB P & ID: 205301 CLASS 2    TUBE
                                                                          - --
CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 24 STEAM GENERATOR NO. 24                      FIGURE: B-1 SHT. 1 OF 1 REV. 0
 
*
* 16-BFN-2231-1                                                   SHELL SrTION D
                                                                                                    '      ~      23-STG-SDUH l
15-BFNl:-2231-1 MANWAY                                    MANWAY o*                    MANWAY AT 90"
            ~                                /    23-STG-MB90                                              " - - STG-SCSD
                                            /     (BOLTING)
I SHELL SECTION C x-----                    -----z TRANSITION CONE '    ~      23-STG-TCSC
                                                                                                      ~        23-STG-SBTC SHELL SECTION B MANWAY AT 270" J        y
                                      "'---- 32-MSN-2231-1 32-MSNIR-2231-1                              I
                                                                                                    ........._ 23-STG-SASB I
SHELL SECTION  A 23-STG-MB270 (BOLTING)
PLAN \llEW
                                                                                  /
23-STG-STBSA _ , /    STUB  ARREL                23-STG-TSSTB P & ID: 205301 CLASS 2    TUBE CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG REACTOR COOLANT SYSTEM
* STEAM GENERA TOR NO. 23 STEAM GENERA TOR NO. 23                            FIGURE: B-2 SHT. 1 OF 1 REV. 0
                                        '.
 
*                                                             *
* 16-BFN-:2221-1                                              SHELL SECTION D
                                                                                              '    " ' STG-SDUH l
16-BFNl:-2221-1 MANWAY                                MAN WAY o*                                                                            I MANWAY AT 90"
            ~                              /   22-STG-MB90                                        ~      22-STG-SCSD
                                        /       (BOLTING}
I SHELL SECTION C x-----                   -----z TRANSITION CONE'  " ' STG-TCSC
                                                                                            '  " ' STG- SEl TC
                                      ~ 32-MSN-2221-1 MAN WAY AT 270" J       y 32-MSNIR-2221-1
                                                                                                ~ 22-STG-SASB I
SHELL SECTION A 22-STG-MB270 (BOLTING)
PLAN VIEW
                                                                              /
22-STG-STBSA ~        STUB                  22-STG-TSSTB P & ID: 205301 CLASS 2     TUBE CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 22 STEAM GENERATOR NO. 22                      FIGURE: B-3 SHT. 1 OF 1 REV. 0
 
*                                                                 *
* 15-BFN-2211-1 15-BFN:-2211-1 SHELL SECTION D
                                                                                                    '  "'-..'-- 21-STG-SDUH MAN WAY                              MAN WAY o*                  MANWAY AT 90" I
              ~ [  ~-r----~
                                                                                                      "'--- 21-STG-SCSD
                                              /    21-STG-MB90
                                            /      (BOLTING}
I SHELL SECTION C x-----                   -----z TRANSITION CONE '  ~        21-STG-TCSC J
SHELL SrTION B
                                      ""----- 32-MSN-2211-1 32-MSNIR-2211-1 MAN WAY AT 270" y                                                                          '-- 21-STG-SASB I
SHELL SECTION  A
  >21-STG-MB270 (BOLTING)
PLAN \/IEW
                                                                                  /
21-STG-STBSA _ /      STUB                    21-STG-TSSTB P & ID: 205301 CLASS 2    TUBE CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 21 STEAM GENERATOR NO. 21                       FIGURE: B-4 SHT. 1 OF 1 REV. 0
 
*                                                *
* 0 2-CVCT-1 L0 =CENTER LINE OF MANWAY t--~--'-~~~~~~~~~~---i        /
                                                                                &#xa3;      2-CVCT-MWY-NUTS q
2-CVCT-2VS-3 2-CVCT-2VS- 7            /      2-CVCT-MWY-BOLTS 2-CVCT-2VS-6 2-CVCT-2VS-5:_
2-CVCT-2VS-1 ------
                    ----
A ----------
I
                                                              ' --,
                                                        ---,.__    I r---1                        --~-
1
                            /
                                                                        ~    2-CVCT-2VS-8 2-CVCT-2VS-2 _ /
P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING 2-CVCT-2VS-4                      CHEMICAL & VOLUME CONTROL TANK FIGURE: B-5 SHT. 1 OF I REV. 0
 
*                                                      *                                            *
                                    ~LASS  21 CLASS 3 I
2-ELHEX-2 \      2-El.HEX-1 \
            ~~----------~--
                                            +/-
                                                      /     2-ELHEX-NU1' l
                                            -I-
__.--:-----------------~ -----EL.=82'
                                                        \__                              (NOTE: VESSEL 2-ELHEX-STUDS              IN HORIZONTAL POSITION.)
P & ID: 205328 NOTE: VESSEL IS IN ROOM NEXT TO RHE AND ACCUMULATOR 23.                            PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING EXCESS LETDOWN HEAT EXCHANGER FIGURE: B-6 SHT. 1 OF 1 REV. 0
 
      *                                                  *
* VENT              VENT                              VENT                VENT I'-'                ---!                              ---!                ---!
                                          - - - - - - - 2" EXEMPT-----
(TYP.)
21-HT-1 " "
            -------                                                    Lo I
                                                - - - - 2" EXEMPT------@
(TYP.)
NO. 21              NO. 23                            NO. 24              NO. 22 21-HT-2  ~  1-------i                                                                  1-------1 /        22-HT-2
                                            - - - - - - 1"" EXEMPT------
(TYP.)
I  21WR66 23WR66    I                                  I  24WR66 22WR66    I
                ~--f><]      [><}--~                  EL. 110'
                                                                        ~--t><J      [><}--~
TO RC              TO RC                            TO RC                TO RC DRAIN TANK            DRAIN TANK                        DRAIN TANK          DRAIN TANK P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING HEAD TANKS FIGURE: 8- 7 SHT. 1 OF 1 REV. 0
 
*                                  *
* CLASS 21 CLASS  3 2-UJEX-1 \
l /              1" BOL,NG (EXE"PT)
                        -I-
_.-----------------~~    ------EL.=88' (NOTE: VESSEL IS IN HORIZONTAL POSITION.)
P & ID: 205328 NOTE: VESSEL IS IN ROOM EAST OF THE WEST STAIRWELL                          PUBLIC. SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG LETDOWN HEAT EXCHANGER FIGURE: B-8 SHT. 1 OF 1 REV. 0
 
*                                      *
* 2-RCF-.SVS TH_RU 8VS ~                      /        2-RCF-9VS THRU 12VS 2*
Lo TOP VIEW 2* - n______ ri  ~ 2-RCF-,~
I      I r-----i      / VESSEL SUPPORTS
                  /  (SEE TOP VIEW)
* P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS 3/4"                                                                                SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT FILTER FIGURE: 8-9 SHT. 1 OF 1 REV. 0
                                                                      .. ***--- _________________                __,
 
*                                  *                                                      **
OUT    IN SHELL A 2-RHE-1 J T VESSEL SUPPORT WELDS CANNOT BE EXAMINED DUE TO LIMITED ACCESS.
2-RHE-2 2-RHE-3
                                                  !I      \  2-RHE-4 SHELL B 2-RHE-5 J                              2-RHE-6 2-RHE-7
                                                  !I        \  2-RHE-8
                                                                        \
SHELL C J  I                J          2-RHE-11  JI      \  2-RHE-13 P & ID: 205328
                                                    ~
2-RHE-9          2-RHE-10 I                            2-RHE-12                          PUBLIC SERVICE ELECTRIC &: GAS I
IN        NOTE: VESSEL IS IN ROOM          OUT SALEM UNIT 2 NEXT TO ACCUMULATOR                            INSERVICE INSPECTION DRAWING NO. 24.                                        REGENERATIVE HEAT EXCHANGER FIGURE: 8-10 SHT. 1 OF 1 REV. 0
 
**                                                  *
* 1
          **,t  t'''
NO. 21 CLASSJ CLASS 2    ------------
1--.---=----------=----l~                                21-RHRHEX-1
                                                                  ~ 21-RHRHEX-2VS INLET (FRONT)
                                            ----
                                              -.:: \\ouTLET (BACK) 11, j~ ~
21-RHRHEX-IN      -
                    ---~-'--------------------1--
VESSEL SUPPORT 21-RHRHEX-OUT
                                                                  - - - - - - - RHRHEX-2            P & ID: 205332 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RHR HEAT EXCHANGER 21
                                                                                                            .
FIGURE: B-11 SHT. 1 OF 1 REV:
                                                                                                                            . 0
                    -------  **-*-"-"""
 
*                                                *
* NO. 22 CLASS 3 CLASS 2 ------------
1--~-__;=-----------=-----l ~ 22-RHRHEX-1 22-RHRHEX-1VS ~                                            ~ 22-RHRHEX-2VS INLET (FRONT}
                                            .....
:::\\ouTLET (BACK) l lJ j~ ~
22-RHRHEX-IN    -
                  --l---'--------------------1 ---
                                                              ~
VESSEL SUPPORT 22-RHRHEX-OUT 22-RHRHEX-2            P & ID: 205332 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RHR HEAT EXCHANGER 22 FIGURE: B-12 SHT. 1 OF 1 REV. 0
 
*                                                            *
* FLOW 1 STEAM EL.          GENERATOR
                                                                                    \    24
                                                                                      \_14&deg;  x 16" RED.
11 12 10 2PL-1 THRU 8
                /
            /
s                                                    THRU 18
          ~---<:          /
PENETRATION 8  .__.,.,.
130'
                                      <l.7
                                      \I 24BF57 1\
LT>
                                  ....--.I._,,
1" 8PL-1 THRU 8 /
B P & ID: 205302 ISOMETRIC: SGF-2-3 7PL-1,-2------
7                                      PUBUC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2241, 14-BF-2241 FIGURE: 8-13 SHT. 1 OF 1 REV. 0
 
*                    *
* FLOW STEAM GENERATOR
                                                      \__ 24 14"  x 16" RED.
24BF22
                        ~2-FWH-24-22
                      /      (3PS-1 THRU 4)
T-21-17 (3PS-5) 2-FWH-24-24 1s6M~~p~.* 205302 SGF 3
                      ~
                          ~ 2-FWH-2
                        ~          (5PR)  4-23                  PUBLIC SERVICE SALEM  ~~WT~IC  & GAS T-21-17 (5PS)
BOILER FE~gTl~N DRAWING INSERVICE INSP STEAM GEN      YSTEM 16-BF-22 ERATOR FEED FIGURE: B-13 H41,  14-BF-224 SHT. 1 OF 1 REV.
1  o
 
          *                                *
* STEAM GENERATOR 23
                        ~LUGS
                        ~ 15PL-11 THRU 18 15PL-9,-10 23BF22 1
CLASS 3 15PL-1                                                                                3PL-1,-2\CLASS 2 3
PENETRATION 7
                                                                      ~"/"
                                                                ,,,,.-  ~LUGS
                                                  ,J.,                                                                --,\ 2BF59 23BF57  X LT>
                                                                            /
EL. 100' ,,---Y<i---L_,,_\,'l...(3/4"
                                                ---0 1" 16-BF-2231
                                                                              ,J.7
                                                                                                                *s
                                                                                        '-~~____.,._..,.__~---'~  EL. 97'
                                                                                                      ~6PL-1 2BF60~\
LT>
                                                                          ---L-                                      THRU 4 1*
P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2231, 14-BF-2231 FIGURE: 8-14      SHT. 1 OF 1 REV. 0
 
          *                                                  *
* STEAM GENERATOR 23 2-FWH-23-24 ~
EL. 130'                                                                                                CLASS3 CLASS 2 T-21-17 (10PS-5)                      2-FWH-23-18  ~*
                                                                  /
9PS        J
                                                                                                ,PENETRATION 7
                                                                              /
                                                                                      ~'l 2-FWH-23-21 /                        /      <.
(10PS-1 Tl*lRU 4-)        ,.L,                      --:>                                    -.,.\ 2BF59
                                                                                                                        ,-.__,_.,.,___~ L-*\,7....(3/4"
                                                                                              /
23BF57 :\                                        .EL1QQ'.
                                \  T-21-17                          LT>
(12PS)
                                                                                                <.L7 2BF60    X LT>
                                                                                                        / , _ FWS-23-19
                                                                                            ...-.G 1*
P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVVlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2231, 14-BF-2231 FIGURE: B-14H SHT. 1 OF 1 REV. 0
 
  *          *
* r 14" RED.
x 16" STEAM GENERATOR 22 11PL-11 THRU 18~
1lPL-9,-10~
THRU 8 3PL-1 THRU P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVVlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2221, 14-BF-2221 FIGURE: 8-'16 SHT. 1 OF 1 REV. 0
                                              -------    ------------------------'
 
*  . ,'
                                              *
* r14" RED.
x STEAM 16" GENERATOR 22
              >....-
              ----z 16-BF-2221          "-,        \_ 2-FWH-22-18 PENETRATION 6 "-"-          (SPS-1 THRU 4)
                            ,L, 3PS-2/
                              \/
1\ 228F57
                            'r,
                            ,.-G 1"
P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
                                                            *INSERVICE INSPECTION DRA\lilNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2221, 14-BF-2221 FIGURE: B-16H SHT. 1 OF 1 REV. 0
 
*                                                      *
* STEAM GENERATOR 21 14 15 13
                              ~11PL-13 THRU 20 12
                              ...-------11 PL-11, -12 EL. 130' 11PL-3 THRU  ~
11PL-1,-2 11 9 8 P & ID: 205302 ISOMETRIC: SGF 3 PUBLIC SERVICE ELECTRIC & GAS x 14"              SALEM UNIT 2 RED. ELL.
INSERVICE INSPECTION DRAWlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2211, 14-BF-2211 FIGURE: B-17 SHT. 1 OF 1 REV. 0
 
*                                                        *
* STEAM
            /RED.
14"  x  16" EL. 144-'      /      14PS GENERATOR 21
                        ,. FLOW/
                      '----l-1---    ------- S- 22
                                  .---        (13PS)
                                  /        2-FWH-21-19 TRUNNIONS EL. 130' 4"'
5        ~
I  21BF22 P & ID: 205302 ISOMETRIC: SGF-2-3
                                                          \ _ 16" x 14"          PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 RED. ELL.
INSERVICE INSPECTION DRAWING BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2211, 14-BF-2211 FIGURE: B-17H SHT. 1 OF 1 REV. 0
 
*                                            *
* 7
(,                /8-CS-2215 LINE 8-CS-2227    ' '-....J SEE FIG. B- 79 SHT. 1    (
                                    ~1 1 1/4<<-....
6 LINE 8-RH-2215 SEE FIG. B- 75 P & ID: 205334, 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG CONTAINMENT SPRAY SYSTEM 6-RH-2215. 8-CS-2215 FIGURE: B-18    SHT. 1 OF 2 REV. 0
 
*                                                    *                                                *
                ~......                / 8-CS-2215 LINE 8-CS-2227        ' '...._.J /
SEE FIG. 8- 79 SHT. 1          (
                                      ~1 1 1/4(<.,
2P-CSH-310 (2PR)
                                                  /
                                                      /~/4"
                                                              ~~        I I
8"TEE/l~ ...---v LINE 8--RH-2215 SEE FIG. 8- 75 P & ID: 205334, 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CONTAINMENT SPRAY SYSTEM 8-RH-2215, 8-CS-2215 FIGURE: 8-18H SHT. 1 OF 2 REV. 0
 
*                                                              *
* 1 1/4&deg; I'-'
I 12 11
                            ~.10
                                              )    LINE 8-CS-2229
_,.."'\. SEE FIG. 8-96 SHT. 2 8
8-CS-2225 /
CONTAINMENT
{
    /
      --- ' \
SPRAY HEADER                                                                    I ',
J___    'rJ  LINE 8~RH-2225 SEE FIG. B-74 20 I          I                                                            LINE 8-RH-2225 I          1...--                                                      SEE FIG. B- 74 22CS48      19 8-CS-2225  ~      18 NO. 44                  P & ID: 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-.3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-RH-2225, 8-CS-2225 FIGURE: B-18    SHT. 2 OF 2 REV. 0
 
*                                                                        *
* 1 1/4" 2P-CSH-305 /BEND
                              ---r--
1
                                                            ) LINE 8-CS-2229
_,.."\_ SEE FIG. B-96 SHT. 2 CONTAINMENT
{ /
                --- ' l SPRAY HEADER r  2-CSH-2 I',
I
                                                                                          ........!...._,
LINE 8-RH-2225
                                                                                                              ',)
(  LINE 8-RH-2225 SEE FIG. B- 7 4 I          I I          1..---                                                      SEE FIG. B- 74 22CS48 8-CS-2225 _ /            /ANCHOR
                                              /,,-2_,
_..
                                        \_"'7' l    PENETRATION NO. 44                              P & ID: 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-3
                                          / / \..' --.,_>
PUBLIC SERVICE ELECTRIC & GAS ANCHOR~~'-        ,,,,.,
SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-RH-2225, 8-CS-2225 FIGURE: B-18H SHT. 2 OF 2 REV. 0
 
*                                          *                                                                    *
                                                                  )  LINE 8-CV-2201 g _.... ...- \. SEE FIG. 8-20 SHT. 2 6
                            ~1 SA FROM NO. 2 REFUELING WATER (-
STORAGE TANK
                    ' '                5 I
l '
                              'y \
L--\o---,
2SJ306 ',"-..        2 SJ 1 FROM NO. 2
                                        ';Y3/4" REFUELING WATER STORAGE TANK P & ID: 205328. 205.334 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 IN SERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: B-20 SHT. 1 OF .3 REV. 0
 
*                                      *
* j    LINE 8-CV-2201
                                                          ,,, \.. SEE FIG. B- 20 SHT. 2
                                                  .,.. /
                          ~i
                                    /2A-SISN-105 & 105A FROM NO. 2 REFUELING WATER~
STORAGE TANK
                  ' '
I l ...,' \
                            *-\~'Z_        2SJ1 2SJ306        '..J              FROM NO. 2
( 3/4"          REFUELING WATER STORAGE TANK P & ID: 205328, 205334 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: B-20H SHT. 1 OF 3 REV. 0
 
I ---
      *                                                *
* LINE 8-CV-2201 SEE FIG. 8-20 SHT. 3
                                                                          ~
I I
4" rr--      8" x 8" x 4"
                                                              \    )\'                : / R E D . TEE LINE 6-CV-2211 SEE FIG. 8-24
                              *.\.'' \.
LINE 6-CV-2212 j SEE FIG. 8-23 ( ' ,
                                                      ......
                                                            ......
2CV49/,,.->
or-+-.J.
                                                  ,>.I
(  v I
I I
2 11  ~
                                        ~ ~8" x                              8" x 6" RED. TEE
                            /
LINE 8-CV-2201 ( '
SEE FIG. 8-20 SHT. 1 P & ID: 205328, 205334 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 SHT. 2 OF 3 REV. 0
 
*                        *
* LINE SEE 8-C V-2201 FIG.,........._,
B-20 k H  3 T 2A -CVCH 427 I
I      / r    (18PR) -
4A-CVCG-427A
                                                .I  0--
                                                      ,    /    8" x 8" x 4" I/        RED. TEE
                        /
LINE 8-CV      \.. _,
SEE FIG B- 2201 \..
        .. -20 SHT. 1 p & ID*
ISOMETRIC* 205328. 205334
                                                                                            . CV-2-2
* RH 2 SALEM U~~~T~IC & GAS PUBLIC SERVICE E INSERVICE CHEMICAL  & VOINSPECTION DRA'MNG LUME CON FIGURE* B 8-CV-2201 TROL SYSTEM
                                                                                      . -20H SHT. 2 OF 3 REV. O
 
*                    *
* 1'(<',
                                            '-JI\
                                              /L -7, 2CV43 L .lo
                                                                                    /    SLEEVE    :
I I
I                      )    LINE 8-RH-2225
                                                                        ....-"\_ SEE FIG. 8-74 22SJ45 /'<'
36 ~:t-j, 6"  x 8"
                                                                  ~RED.
                                                                  \
2SJ114'\.Z..._j
( LINE 6-CV-2201 SEE FIG. B-25 .
3/4"
  'I'-'
21 20
          '
            ';JUNE 8-CV-2201 P & ID: 205328, 205334 SEE FIG. 8-20 SHT. 2                                                  ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 SHT. 3 OF 3 REV. 0
 
*                                **
* 2A-CVCS-485 (31PR-1) 2A-CVCG-484 (30PR-3) 2A-CVCG-483          2A-CVCG-345A\
(30PR-2) 2A-CVCG-482 (30PR-1)
                                  ~*        \
                                                                      ~
LINE 8-RH-2225
                                                                  ./    SEE FIG. B-74 22SJ45 /..,-
r-+-.;,,.
I v            6"  x  8"
                                                            ~RED.
                                                              \
2sJ114\~;:,_..,.)
( LINE 6-CV-2201 SEE FIG. B-25 2A-CVCH-435 _ /
(22PR)
                        '
                          'ruNE 8-CV-2201                                          P & ID: 205328, 205334 SEE FIG. B-20 SHT. 2                              ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 H SHT. 3 OF 3 REV. 0
 
*                                  *
* 3/4"
                                                                ~
I 3/4" )                                                    ,1,
        '"'\                                                    \' 2CY361 2CV25~-\~.(                                              /\
LT' 3/4" CAP  (J.,
                .....
TEMPORARY STRAINER TSS-6 10 EL. 89' -
            ----,-              8" x 8"  x 6"
                      / +-"
('- I /,.-
                            ' /
RED. TEE c, -
                                              ---..........
LINE 8-CV-2201 SEE FIG. 8-20 SHT. 2
_/
NO. 22 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CY-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2212 FIGURE: B-23 SHT. 1 OF 1 REV. 0
____ _ _ _ J
 
*                                          *
* 2A-CVCH-406 (4PR)
                                              '                      3/4"
                                                                    '[----'
                                                /                      I
                                                                      ),
                                                                      'x' I\
2CV361
                                                                      'r' 3/4" CAP  (J...._
                    ......
TEMPORARY STRAINER TSS-6                                                              i EL. 89' =
            ---,                        8" x    8" x 6"          y
                                                                      ~ V RED. TEE        ~    ,,,.-'\._
                          ,.....-1-,
(/LINE 8-CV-2201
( I I/                              SEE FIG. 8-20 SHT. 2
                          "  _ /;,.....
NO. 22 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & 'voLUME CONTROL SYSTEM 6-CV-2212 FIGURE: B-23H SHT. 1 OF 1 REV. 0
 
*                                            *
* 3/4"
                                                                  'I'-'
I 3/4")
          ''y'\
2CV25~-\:.z.._
                                        ~1 3/4" CAP    (J...._
                      ......
TEMPORARY STRAINER TSS-6 10
              -----.-
EL. 89' -                  8" x 8" x 6" RED. TEE    ~
                              ,.-+-,                    (....-LINE 8-CV-2201
( I '_,,                            SEE FIG. B-20 SHT. 2
                            '  _ //,.-
NO. 21 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2211 FIGURE: 8-24 SHT. 1 OF 1 REV. 0
 
*                                    *
* 2A-CVCG-342A (4PR-2) 2A-CVCH-406A f
                                  /,      (4PR-1) 3/4"
                                                              '!'--'
I 3/4")                                                      ,1,
        ,.....,,.\                                              \' 2CV356
              ""-""-.,                                          I\
2CV259 '-"'                                              'r' 3/4" CAP    (J.'
                      '
TEMPORARY STRAINER TSS-6                                                        c;i
                                                                ~\..*y EL. 89' I          8" x 8"  x 6"            )~
RED. TEE      ~        ,,-"\._
                        ,...+-,                  t _,,.LINE 8-CV-2201
( I '_,,                      SEE FIG. 8-20 SHT. 2
                        " _ //_,-
NO. 21 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2211 FIGURE: B-24H SHT. 1 OF 1 REV. 0
 
*                                                    *                                                                *
                                                              ) LINE 4-SJ-2211
                                                            ..--'\_SEE FIG. 8-86 SHT. 2
                                                          /
                                                        /                            '
LINE 4-SJ-2210 SEE FIG. 8-86 SHT. 2 LINE 8-CV-2201 SEE FIG. 8-20. SHT. 3  ~
(',
                              ......
                                    ......
                                            .......
5 a*
RED.
P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2201 FIGURE: 8-25 SHT. 1 OF 1 REV. 0
 
*                          *                                                                  *
                                  )    LINE 4-SJ-2211
_...\..SEE FIG. B-86 SHT. 2
                              /
                            /
LINE 4-SJ-2210 SEE FIG. B-86 SHT. 2 x 6"
                                )>9Y                RED.
                            ~ 2A-SIG-199 LINE 8-CV-2201                    (3PR)
SEE FIG. B-20 SHT. 3 s*
RED.
P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2201 FIGURE: B-25H SHT. 1 OF 1 REV. 0
 
      *                                                                      *
* SUPPORT LUGS-""
  ~RANCH        CONNECTIONS I      .          ~
A SUPPORT STRUCTURES                              r      z
                                                                                ~ I
                                    ~----L-L--~~~~~~~/
                                                                                  ,
4-                        2 A                                            /                                                          ,,.-- LINE 6-lvtS-2246 D De/
                                                                                                                              /          SEE FIG. 8-38 A = 34-MS-2241-2 B = 34-MS-2241-4/8-MS-2245 C = 34-MS-2241-4/6-MS-224-6 D = 34-MS-2241-4/8-MS-224-4 00                                                                                                                                E = 34-MS-2241-4/8-MS-224-3 F = 34-MS-2241-4/8-MS-2242 G = 34-MS-2241-4/8-lvlS-2241 LINE 8-MS-2242 /        LINE B-MS-2244 /                ,...~-...'\    ,,,-- LINE 6-MS-2247        I< = 34-MS-2241-4/6-MS-224-7 SEE FIG. B-38 LINE 8-MS-2241~
SEE FIG. B-38 LINE 8-MS-2243 ~
SEE FIG. B-38    ""'
I I
                                                                                      \ ...... _
K
                                                                                                ./
                                                                                                    \-"
I SEE FIG. B-4-2        AA = 34-MS-2241-2PL-17 THRU 2PL-20 BB = 34~MS-2241-2PL-13 THRU 2PL-16 CC = 34-MS-2241-2PL- 7 THRU 2PL-10 DD = 34-MS-2241-2PL-3 THRU 2PL-6 SEE FIG. B-38      ""'                                                                              1 = 34-MS-2241-2PL-21 2 = 34-MS-224-1-2PL-12 3 = 34-MS-224-1-2PL-11 4 = 34-MS-2241-2PL-2 5 = 34-MS-2241-2PL-1 Z = 34-MS-224-1-TO VALVE 24MS167 Ls* BRANCH CONNECTION  J                                                                                                    '...-..____ LINE 8-MS-2245 SEE FIG. B-38
                                                                                ~RT CIRCUMFERENTIAL WELD                                    5
                                                    \                    /    J                            STRUCTlJRES                                  P & ID: 205303 SUPPORT  LUGS~                                                                                  ISOMETRIC: MS-2-3 NOTE:
PUBLIC SERVICE ELECTRIC & GAS SEE FIG. B-30 SHT. 1 & 2                                                                                                                  SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM MAIN STEAM HEADER 32-MS-224-1, 34-MS-2241 FIGURE: B-26 SHT. 1 OF 1 REV. 0
 
          *                                                                          *
* I    SUPPORT LUGS~
SUPPORT STRUCTURES 1
                                                                                                                /SUPPORT LUG CIRCUMFERENTIAL\
WELD 4                          2          /'
A
                                                                                                /              -  UNE B-*s-ms SEE FIG. 8-39 I  z 0
                                                                                /
AA a a                                                  a
[ ]                    [ ]                \
A= 34-MS-2231-2 F                          D                          B              B = 34-MS-2231-3/8-MS-2235 C = 34-MS-2231-3/6-MS-2236 LINE 6-MS-2231 /                                                                                                            D = 34-MS-2231-3/8-MS-2233 SEE FIG. B-43 SHT. 1                                                                                                        E = 34-MS-2231-3/8-MS-2234
                                                                                                              ~LINE 6-MS-2237    F = 34-MS-2231-3/8-MS-2231 LINE B-MS-2231 /        LINE 8-MS-2233 /                    /--...-'      SEE FIG. 8-42 G = 34-MS-2231-318-MS-2232 SEE FIG. B-39            SEE FIG. B-39                      /    K '>\                    H = 34-MS-2231-3f6-MS-2231 0          0                    LINE B-MS-2232~        LINE 8-MS-2234~
I
                                                                                                  \....__/
                                                                                                            /
K = 34-MS-2231-3/6-MS-2237 AA= 34-MS-2231-2PL-17 THRU 2PL-20 BB = 34-MS-2231-2PL-13 THRU 2PL-16 CC = 34-MS-2231-2PL- 7 THRU 2PL-10 SEE FIG. 8-39  "'      SEE FIG. 8-39      "'                                            DD = 34-MS-2231-2PL-3 THRU 2PL-6 1 = 34-MS-2231-2PL-21 2 = 34-MS-2231-2PL-12 3 = 34-MS-2231-2PL-11 4 = 34-MS-2231-2PL-2 5 = 34-MS-2231-2PL-1 Z = 34-MS-2231-TO VALVE 23MS167 0
                          \
                                                                                          ~SUPPORT 3" BRANCH~                                                  5                          3 CONNECTION 1" BRANCH                                                                    STRUCTURES                      P & ID: 205303 CONNECTIONS        \SUPPORT L U G S /                                                                      ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS NOTE:                                                                                                                      SALEM UNIT 2 SEE FIG. 8-31 SHTS. 1 & 2 INSERVICE INSPECTION DRA\MNG MAIN STIEAM SYSTEM MAIN STEAM HEADER 34-MS-2231 FIGURE: 8-27 SHT. 1 OF 1 REV. 0
 
    *                                                                          *
* r 1" BRANCH CONNECTIONS CIRCUMFERENTIAL\
I    SUPPORT LUGS~
SUPPORT STRUCTURES WELD 4                        2
    ""'~
\          ~
A
                              ~~i ~;;"~~~~22""              c:J // D                                \ LINE 6-MS-2226
                                                                                                      \SEE FIG. B- 40 0              0 aa        LINE 8-MS-2224 _ /
SEE FIG. B-40                ,,,.- .....
Ur          /
A = 34-MS-2221-2 B = 34-MS-2221-2/8-MS-2225 C = 34-MS-2221-2/6-MS-2226 D = 34-MS-2221-2/8-MS-2224 E = 34-MS-2221-2/8-MS-2223 F = 34-MS-2221-2/8-MS-2222 G = 34-MS-2221-2/8-MS-2221 0                          LINE 8-MS-2221 ~
SEE FIG. B-40      "\.
LINE 8-MS-2223 " '
SEE FIG. B-40    "\.
I l
                                                                                    \.,__
                                                                                          -
K      \
                                                                                              *,../''--LINE 6-MS-2227 SEE FIG. El-42 K = 34-MS-2221-2/6-MS-2227 AA = 34-MS-2221-2PL-17 THRU 2PL-20 BB = 34-MS-2221-2PL-13 THRU 2PL-16 CC = 34-MS-2221-2PL-7 THRU 2PL-10 DD = 34-MS-2221-2PL-3 THRU 2PL-6 1 = 34-MS-2221-2PL-21 Orln:-1 Q                                        o-2 = 34-MS-2221-2PL-12 3 = 34-MS-2221-2PL-11 4 = 34-MS-2221-2PL-2 5 = 34-MS-2221-2PL-1 Z = 34-MS-2221-TO VALVE 22MS167 o~              0 1,:-1 t                                        L_J ~ ~                              /LINE B-MS-2225 SEE FIG 8-4-0 3" CONNEC~            1.. BRANCH CONNECTIONS
                                                  \
5 SUPPORT LUGS_//
3~                  1    ......_' - - SUPPORT LUG SUPPORT STRUCTURES                                      P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS NOTE:                                                                                                              SALEM UNIT 2 SEE FIG. B-32 SHTS. 1 & 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM MAIN STEAM HEADER 34-MS-2221 FIGURE: 8-28 SHT. 1 OF 1 REV. 0
 
        *                                                                              *
* I    SUPPORT  LUGS~
SUPPORT STRUCTURES 3" BRANCH CONNECTION.\
[
CIRCUMFERENTIAL WELD 4-                            2
                                                                                  /
1                    ~      SUPPORT LUG I
z
[] [J 0
  ..-~~~~~~~~-'-~~A~__,
I                \LINE 5-MS-"'5 SEE FIG. 8-41 a cJ AA A = 34-MS-2211-2 B = 34-MS-2211-1/8-MS-2215 C = 34-MS-2211-1/6-MS-2216 D = 34-MS-2211-1/8-MS-2213
                                                        /                          /                                                  E = 34-MS-2211-1/8-MS-2214
__,,/                      ____,/'                                                  F = 34-MS-2211-1/8-MS-2211 LINE 8-MS-2211              LINE 8-MS-2213                      ,,.---.                            G = 34-MS-2211-1/8-MS-2212 0
SEE FIG. B-41              SEE FIG. 8-41                                \                          H = 32-MS-2211-1-6-MS-2211 I    K      \                        K = 34-MS-2211-1/6-MS-2217 I            /                        AA = 34-MS-2211-2PL-17 THRU 2PL-20
                                                                                                  \      /'-.                          88 = 34-MS-2211-2PL-13 THRU ZPL-16 LINE 8-MS-2212 ~                LINE 8-MS-2214 ~                  '--        "-LINE 6-MS-2217        CC = 34-MS-2211-2PL-7 THRU 2PL-10 SEE FIG. 8-41        '          SEE FIG. B-41      '                          SEE FIG. 8-42        DD = 34-MS-2211-2PL-3 THRU 2PL-6
          \_LINE 6-MS-2211                                                                                                            1 = 34-MS-2211-2PL-21 SEE FIG. 8-45                                                                                                            2 = 34-MS-2211-2PL--12 Q6-M~
3  34-MS-2211-2PL-11 4  34-MS-2211-2PL-2 5  34-MS-2211-2PL-1 Z  34-MS-2231-TO VALVE 21MS167 0
I                                                                                          LINE
                                                                                  ~
SEE FIG. B-41
                                                                                              '
        \&#xa3;  CONNECTIONS 5
                                                          \SUPPORT LUGS/
3
                                                                                          ~SUPPORT                STRUCTURES                            P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS NOTE:                                                                                                                            SALEM UNIT 2 SEE FIG. 8-33 SHTS. 1 & 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM MAIN STEAM HEADER 34-MS-2211 FIGURE: 8-29 SHT. 1 OF 1 REV. 0
_J
 
    *                                                        *                                                                  *
                                                                                                    <J_7 5LU-I -  -5LU-O                    \' 24-MS189 I\
5                          "T' 5PL-1-2~
3LU-I 3    /
                                                                                                                  /    t'f..
6                                  3LU-O    ~,
                                                                                                                          ~2PL-1 2LD -2LD-I
                                          / 8 P L - 3 THRU 10                                                                          x
                                          ~8PR                                        A    /
                                                                                            .---\1"        1 1/+"
2
                                                                                                                            /RED.
32"  30" I '<
PLUG            EL. 165'
                                                                              '("-+-.>.
1
                                                                              >-J 24MS2 LINE 32-MS-224-1                                                                                                    STEAM SEE FIG. B-30 SHT. 2 ; ,        1 1/4-"
PLUG                                                  A    /
                                                                                            .---\1"        GENERATOR NO. 24
                        ......        9                                          I  '<
                                                                              '("-+-"
                                                                              *V 9LD-I- -9LD-O EL. 130' P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-224-1, 30-MS-2241 FIGURE: 8-30 SHT. 1 OF 2 REV. 0
 
    *                                            *
* 24-MSR-3 (3PR-2) 1''
                                                        ~
                                                        <"17
                                                      /  \' 24MS189
                                                          "        /      24-MSR-2
                                                        <r'                (3PR-1)
                                                                /
                                                                                  . 32" x 30" 1 1/4-"
                                                                              ~RED.
PLUG          *EL. 166' STEAM LINE 32-MS-224-1 SEE FIG. 8-30 SHT. 2!,                                            GENERATOR NO. 24
                      ......
                        '
24-MSLS-9 /
S-209/
(10PS-1,-2)
                                  '------ 24-MSR-8
                                                    @                    P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM 32-MS-224-1, 30-MS-2241 FIGURE: 8-30H SHT. 1 OF 2 REV. 0
 
*                                                        *
* 1"
                                          ~
LINE 34-MS-2241
                          ~                        SEE FIG. B-38 I      /
                                      /
                                  /
2PL-1 THRU 3 /
PENETRATION 4
                        /
                      /
                  /
                <...__ ___ /
                                /
                            /
                          /
L-----.....
                                    ' '  ..___.,.. /
                                                      /
                                                                      'y  LINE 30-MS-2241 SEE FIG. B-30 SHT. 1          P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2241 FIGURE: B-30 SHT. 2 OF 2 REV. 0
 
*                                          *                                                                  *
                ,.                    LINE 34-MS-2241
              ~                        SEE FIG. 8-38
                              ,; {
I        /
                      /
                    "(r*
              \    24-MSR-10 24-MSLS-17~
PA-209                                  *
(1PS-3 THRU 12)
                                      ~          PENETRATION 4-
            /
                        /
                            ,,,.,,,. 7*        ,,.,,. 1
                    ,,.                I  ,,....-        I
                                      /_../                  l
                                                                ' '
                                                                  /
                                                                    >
                                                                /
                                                            /
                                                          /
                                                      /
                                                                  '-;J LINE 30-MS-2241 SEE FIG. B-30 SHT. 1          P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2241 FIGURE: B-30H SHT. 2 OF 2 REV. 0
 
            *                                                    *
* 1 1/4" PLUG
                                                                            .............__8PL-1,-2
                                                                            / 8 P L - 3 THRU 10 2LD                          -5LU-O 1 1/4''.                        5 PLUG                            - - - - - 5PL-1,-2 EL. 166' 1
STEAM                                                    ....____ SPL-11,-12 1 1/4" GENERATOR NO. 23                                          PLUG
                                            / 5 P L - 3 THRU 10 9LD      9LD-I 10LU-I
                                                                            /
1 1/4" PLUG
                                                    . ....-\.
                                                    '"'
r-+-.:J.
                                                            ' 1''
                                              >/ 23MS2
                                                                                                    ' ~LINE
                                                    . '1" 32-MS-2231 23MS3
* SEE FIG. B-31 SHT. 2 I y'
                                                        ....-\_
:\....;,,-t-~
                                                .-/-~
1,'\..  "          ,A/ 23MS4 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2231, 30-MS-2231 FIGURE: 8-31 SHT. 1 OF 2 REV. 0
 
          *                                              *
* 23-MSR-21 1..
Q            '-<"'
7
7
* FLOW EL. 11 12 10 THRU 18 130' -'--------------------------------------
          ~*               ~< 23MS1/8 23-MSR-3 LT>
*------------------
1 1/4" PLUG
---------1 STEAM GENERATOR
                                                                      /       23-MSR-B 1 1/4" PLUG EL. 166' STEAM GENERATOR NO. 23 MSH-203~
\ 24 \_14&deg; x 16" RED.
2'-MSR~5~                                                      S-209 (10PS-1.-2)
* P & ID: 205302 ISOMETRIC:
                                                                              /
SGF-2-3 PUBUC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2241, 14-BF-2241 FIGURE: 8-13 SHT. 1 OF 1 REV. 0 
                                                                          /(.       1 1/4"
*
                                                                      ~-
* 24BF22 2-FWH-24-24
1 1/4"                                     PLUG PLUG 11''
/ (3PS-1 THRU 4) T-21-17 (3PS-5) 2-FWH-2 (5PR) 4-23 T-21-17 (5PS) FLOW
A   / \.. 23-MSLS--9
* STEAM GENERATOR
                                        .>-/
\__ 24 14" x 16" RED.
tY r-+-.:i..
205302
23MS2                    \                 ' (-1 LINE 32-MS-2231 11"                                       SEE FIG. B-31 SHT. 2 A   / \..
* SGF-2-3 PUBLIC SERVICE SALEM
                                              !Y r-+-..:..
& GAS INSERVICE INSP BOILER DRAWING STEAM GEN YSTEM 16-BF-22 ERATOR FEED FIGURE: B-13 41, 14-BF-224 H SHT. 1 OF 1 1 REV. o STEAM GENERATOR 23
                                        ..A/ 23MS4 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2231, 30-MS-2231 FIGURE: 8-31H SHT. 1 OF 2 REV. 0
* 15PL-9,-10 15PL-1 15PL-11 THRU 18 * ,J., 23BF57 X LT> ---0 1" 16-BF-2231 PENETRATION 7
 
,,,,.-
*                                                                     *
/ CLASS 3 3PL-1,-2\CLASS 2 3 --,\ 2BF59
* EL. 100' ,,---Y<i---L_,,_\,'l...(3/4" 1 23BF22 ,J.7 *s EL. 97' LT> ---L-1*
THRU 4 P & ID: 205302 ISOMETRIC:
SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2231, 14-BF-2231 FIGURE: 8-14 SHT. 1 OF 1 REV. 0 STEAM GENERATOR 23
* 2-FWH-23-24
* EL. 130' CLASS3 CLASS 2 2-FWH-23-18 * \ 2-FWH-23-21
/ /T-21-17 (10PS-5) /9PS J ,PENETRATION 7 (10PS-1 Tl*lRU 4-) ,.L, 23BF57 :\ T-21-17 LT> (12PS) / <. --:> / <.L7 2BF60 X LT> ...-.G 1* -.,.\ 2BF59 .EL1QQ'.
L-*\,7....(3/4" /,_ FWS-23-19 P & ID: 205302 ISOMETRIC:
SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVVlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2231, 14-BF-2231 FIGURE: B-14H SHT. 1 OF 1 REV. 0
* 3PL-1 THRU
* 11PL-11 THRU 1
* 14" x 16" r RED. THRU 8 STEAM GENERATOR 22 P & ID: 205302 ISOMETRIC:
SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVVlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2221, 14-BF-2221 FIGURE: 8-'16 SHT. 1 OF 1 REV. 0 -------------------------------' 
* ' . , >....-----z 16-BF-2221
"-, PENETRATION 6 "-"-3PS-2/ ,L, \/ * \_ 2-FWH-22-18 (SPS-1 THRU 4) 1\ 228F57 'r, ,.-G 1"
* 14" x 16" r RED. STEAM GENERATOR 22 P & ID: 205302 ISOMETRIC:
SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 *INSERVICE INSPECTION DRA\lilNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2221, 14-BF-2221 FIGURE: B-16H SHT. 1 OF 1 REV. 0
* STEAM GENERATOR 21 15 14 13 12 11PL-3 THRU 11PL-1,-2 11
* THRU 20 ...-------11 PL-11, -12 EL. 130' 9 8 x 14" RED. ELL.
* P & ID: 205302 ISOMETRIC:
SGF 3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2211, 14-BF-2211 FIGURE: B-17 SHT. 1 OF 1 REV. 0
* STEAM GENERATOR 21 14" x 16" /RED. EL. 144-' / 14PS ,. FLOW/ '----l-1---
-------S-22 .---(13PS) / 2-FWH-21-19 TRUNNIONS EL. 130'
* 5 4"' I \_ 16" x 14" RED. ELL. 21BF22
* P & ID: 205302 ISOMETRIC:
SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2211, 14-BF-2211 FIGURE: B-17H SHT. 1 OF 1 REV. 0 
* (, ' LINE 8-CS-2227
'-....J SEE FIG. B-79 SHT. 1 ( 1 1/4<<-....
6 7 /8-CS-2215
* LINE 8-RH-2215 SEE FIG. B-75
* P & ID: 205334, 205335 ISOMETRIC:
RH-2-2, CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG CONTAINMENT SPRAY SYSTEM 6-RH-2215.
8-CS-2215 FIGURE: B-18 SHT. 1 OF 2 REV. 0 
* ...... ' LINE 8-CS-2227
'...._.J SEE FIG. 8-79 SHT. 1 ( 1 1/4(<., / 8-CS-2215
/ * / 2P-CSH-310 (2PR) I I
...---v LINE 8--RH-2215 SEE FIG. 8-75
* P & ID: 205334, 205335 ISOMETRIC:
RH-2-2, CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CONTAINMENT SPRAY SYSTEM 8-RH-2215, 8-CS-2215 FIGURE: 8-18H SHT. 1 OF 2 REV. 0
* CONTAINMENT SPRAY HEADER ---/ ' { \ I I I 1...--1 1/4&deg; I'-' I 20 12 11 22CS48 19 8-CS-2225 18 * ) LINE 8-CS-2229
_,.."'\. SEE FIG. 8-96 SHT. 2 8 8-CS-2225
/ NO. 44
* I ', J___ 'rJ LINE SEE FIG. B-74 LINE 8-RH-2225 SEE FIG. B-74 P & ID: 205335 ISOMETRIC:
RH-2-2, CS-2-2, CS-2-.3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-RH-2225, 8-CS-2225 FIGURE: B-18 SHT. 2 OF 2 REV. 0
* 2P-CSH-305
/BEND CONTAINMENT SPRAY HEADER ---/ ' { l I I I 1..---1 1/4" ---r--1 22CS48 r 2-CSH-2 * ) LINE 8-CS-2229
_,.."\_ SEE FIG. B-96 SHT. 2 8-CS-2225
_/ /ANCHOR /,,-2_, _... l PENETRATION
\_"'7' // \..' --.,_>
,,,,., NO. 44
* I', I ',) ........!...._, ( LINE 8-RH-2225 SEE FIG. B-7 4 LINE 8-RH-2225 SEE FIG. B-74 P & ID: 205335 ISOMETRIC:
RH-2-2, CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-RH-2225, 8-CS-2225 FIGURE: B-18H SHT. 2 OF 2 REV. 0
* FROM NO. 2 REFUELING WATER STORAGE TANK ' ' I l ' 'y \ 6 SA 5
* L--\o---, 2SJ306 ',"-.. 2 SJ 1 ';Y3/4" ) LINE 8-CV-2201 g _.... ...-\. SEE FIG. 8-20 SHT. 2 FROM NO. 2 REFUELING WATER STORAGE TANK
* P & ID: 205328. 205.334 ISOMETRIC:
CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 IN SERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: B-20 SHT. 1 OF .3 REV. 0
* FROM NO. 2 REFUELING STORAGE TANK ' ' * .,.. j LINE 8-CV-2201
,,, \.. SEE FIG. B-20 SHT. 2 / /2A-SISN-105
& 105A I l ' ..., \
2SJ1 2SJ306 '..J ( 3/4" FROM NO. 2 REFUELING WATER STORAGE TANK
* P & ID: 205328, 205334 ISOMETRIC:
CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: B-20H SHT. 1 OF 3 REV. 0 I ---* / LINE 8-CV-2201
(' SEE FIG. 8-20 SHT. 1 *.\.'' \.
* LINE 8-CV-2201 SEE FIG. 8-20 SHT. 3 \ )\' LINE 6-CV-2211 SEE FIG. 8-24 I I LINE 6-CV-2212 j SEE FIG. 8-23 (', ...... ...... 2CV49/,,.->
or-+-.J. ,>.I ( v I I I 11 x 8" x 6" RED. TEE 4" rr--8" x 8" x 4" :/RED. TEE
* P & ID: 205328, 205334 ISOMETRIC:
CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 SHT. 2 OF 3 REV. 0 
*
* LINE 8-C SEE V-2201 FIG. B-20 kHT 3 2A ,........._, -CVCH I (18PR) -427 I / r 4A-CVCG-427A . I 0--, / 8" x 8" x 4" I/ RED. TEE / LINE 8-CV \.. _, SEE FIG B-2201 \.. .. -20 SHT. 1
* p & ID* ISOMETRIC*
205328. 205334 . CV-2-2 RH
* 2 PUBLIC SERVICE E SALEM
& GAS INSERVICE CHEMICAL & VOINSPECTION DRA'MNG LUME CON FIGURE* B 8-CV-2201 TROL SYSTEM . -20H SHT. 2 OF 3 REV. O
* 3/4" 'I'-' 21 20 '
* 1'(<', '-JI\ /L -7, 2CV43 L .lo / SLEEVE : ';JUNE 8-CV-2201 SEE FIG. 8-20 SHT. 2 I I I * ) LINE 8-RH-2225
....-"\_ SEE FIG. 8-74 22SJ45 /'<' 36 6" x 8"
\ 2SJ114'\.Z..._j ( LINE 6-CV-2201 SEE FIG. B-25 . P & ID: 205328, 205334 ISOMETRIC:
CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 SHT. 3 OF 3 REV. 0
* 2A-CVCG-484 (30PR-3) 2A-CVCG-483 (30PR-2) 2A-CVCG-482 (30PR-1) 2A-CVCH-435
_/ (22PR) ** 2A-CVCS-485 (31PR-1) 2A-CVCG-345A\ \ ' 'ruNE 8-CV-2201 SEE FIG. B-20 SHT. 2
* LINE 8-RH-2225
./ SEE FIG. B-74 22SJ45 /..,-r-+-.;,,.
I v 6" x 8"
\ ( LINE 6-CV-2201 SEE FIG. B-25 P & ID: 205328, 205334 ISOMETRIC:
CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 H SHT. 3 OF 3 REV. 0
* 3/4" ) '"'\
3/4" CAP (J., ..... TEMPORARY STRAINER TSS-6 10 EL. 89' -----,-/ +-" ( I ' / '-/,.-_/ NO. 22 CHARGING SAFETY INJECTION PUMP
* 3/4" I ,1, \' 2CY361 /\ LT' 8" x 8" x 6" RED. TEE ---..........
c ,,-LINE 8-CV-2201 SEE FIG. 8-20 SHT. 2
* P & ID: 205328 ISOMETRIC:
CY-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2212 FIGURE: B-23 SHT. 1 OF 1 REV. 0 ____ ___J
* 3/4" CAP (J...._ ...... TEMPORARY STRAINER TSS-6 EL. 89' = ---, ,.....-1-, ( I I/ " ;,..... _/ NO. 22 CHARGING SAFETY INJECTION PUMP * /2A-CVCH-406 (4PR) ' 3/4" '[----' I ), 'x' 2CV361 I\ 'r' V i 8" x 8" x 6" y RED. TEE ,,,.-'\._
(/LINE 8-CV-2201 SEE FIG. 8-20 SHT. 2
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & 'voLUME CONTROL SYSTEM 6-CV-2212 FIGURE: B-23H SHT. 1 OF 1 REV. 0
* 3/4") ''y'\
3/4" CAP (J...._ ...... TEMPORARY STRAINER TSS-6 10 EL. 89' ------.-,.-+-, ( I '_,, ' _/ NO. 21 CHARGING SAFETY INJECTION PUMP
* 3/4" 'I'-' I 8" x 8" x 6" RED. TEE (....-LINE 8-CV-2201 SEE FIG. B-20 SHT. 2
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2211 FIGURE: 8-24 SHT. 1 OF 1 REV. 0 
* * /, 2A-CVCG-342A (4PR-2) f 2A-CVCH-406A (4PR-1) 3/4" 3/4") ,.....,,.\
""-""-., 2CV259 '-"' 3/4" CAP (J.' ' TEMPORARY STRAINER TSS-6 EL. 89' I ,...+-, ( I '_,, " _/ NO. 21 CHARGING SAFETY INJECTION PUMP '!'--' I ,1, \' 2CV356 I\ 'r' c;i 8" x 8" x 6" RED. TEE ,,-"\._ t _,,.LINE 8-CV-2201 SEE FIG. 8-20 SHT. 2
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2211 FIGURE: B-24H SHT. 1 OF 1 REV. 0
* LINE 8-CV-2201 SEE FIG. 8-20. SHT. 3 (', a* RED. * ...... ...... ....... 5 / ) LINE 4-SJ-2211
..--'\_SEE FIG. 8-86 SHT. 2 * / ' LINE 4-SJ-2210 SEE FIG. 8-86 SHT. 2 P & ID: 205334 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2201 FIGURE: 8-25 SHT. 1 OF 1 REV. 0
* LINE 8-CV-2201 SEE FIG. B-20 SHT. 3 s* RED. * / ) LINE 4-SJ-2211
_...\..SEE FIG. B-86 SHT. 2 /
* LINE 4-SJ-2210
)>9Y 2A-SIG-199 (3PR) SEE FIG. B-86 SHT. 2 x 6" RED. P & ID: 205334 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2201 FIGURE: B-25H SHT. 1 OF 1 REV. 0 
* *
* CONNECTIONS I SUPPORT LUGS-"" . r z A SUPPORT STRUCTURES 4-2 I
/ , A 00 LINE 8-MS-2242
/ SEE FIG. B-38 LINE SEE FIG. B-38 ""' D De/ LINE B-MS-2244
/ SEE FIG. B-38 LINE 8-MS-2243 SEE FIG. B-38 ""'
,,,--LINE 6-MS-2247 I K \-" SEE FIG. B-4-2 I I \ ./ ...... _ Ls* BRANCH CONNECTION J CIRCUMFERENTIAL WELD 5 \ / J STRUCTlJRES SUPPORT NOTE: SEE FIG. B-30 SHT. 1 & 2 ,,.--LINE 6-lvtS-2246
/ SEE FIG. 8-38 A = 34-MS-2241-2 B = 34-MS-2241-4/8-MS-2245 C = 34-MS-2241-4/6-MS-224-6 D = 34-MS-2241-4/8-MS-224-4 E = 34-MS-2241-4/8-MS-224-3 F = 34-MS-2241-4/8-MS-2242 G = 34-MS-2241-4/8-lvlS-2241 I< = 34-MS-2241-4/6-MS-224-7 AA = 34-MS-2241-2PL-17 THRU 2PL-20 BB =
THRU 2PL-16 CC = 34-MS-2241-2PL-7 THRU 2PL-10 DD = 34-MS-2241-2PL-3 THRU 2PL-6 1 = 34-MS-2241-2PL-21 2 = 34-MS-224-1-2PL-12 3 = 34-MS-224-1-2PL-11 4 = 34-MS-2241-2PL-2 5 = 34-MS-2241-2PL-1 Z = 34-MS-224-1-TO VALVE 24MS167 '...-..____
LINE 8-MS-2245 SEE FIG. B-38 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM MAIN STEAM HEADER 32-MS-224-1, 34-MS-2241 FIGURE: B-26 SHT. 1 OF 1 REV. 0
* CIRCUMFERENTIAL\
WELD 0 LINE 6-MS-2231
/ SEE FIG. B-43 SHT. 1 0 3" CONNECTION 0 0 \ NOTE: A *
* 4 1 SUPPORT STRUCTURES
/SUPPORT LUG 2 /' I SUPPORT AA [] / []/ -UNE B-*s-ms I z \ SEE FIG. 8-39 a a a A= 34-MS-2231-2 F D B B = 34-MS-2231-3/8-MS-2235 C = 34-MS-2231-3/6-MS-2236 D = 34-MS-2231-3/8-MS-2233
/ / E = 34-MS-2231-3/8-MS-2234 6-MS-2237 F = 34-MS-2231-3/8-MS-2231 LINE B-MS-2231 LINE 8-MS-2233
/--...-' SEE FIG. 8-42 G = 34-MS-2231-318-MS-2232 SEE FIG. B-39 SEE FIG. B-39 / K '>\ H = 34-MS-2231-3f6-MS-2231 LINE SEE FIG. 8-39 "' 5 LINE SEE FIG. 8-39 "' 1" BRANCH CONNECTIONS
\SUPPORT LUGS/ I K = 34-MS-2231-3/6-MS-2237
/ AA= 34-MS-2231-2PL-17 THRU 2PL-20 \....__/ BB = 34-MS-2231-2PL-13 THRU 2PL-16 CC = 34-MS-2231-2PL-7 THRU 2PL-10 DD = 34-MS-2231-2PL-3 THRU 2PL-6 3 STRUCTURES 1 = 34-MS-2231-2PL-21 2 = 34-MS-2231-2PL-12 3 = 34-MS-2231-2PL-11 4 = 34-MS-2231-2PL-2 5 = 34-MS-2231-2PL-1 Z = 34-MS-2231-TO VALVE 23MS167 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 SEE FIG. 8-31 SHTS. 1 & 2 INSERVICE INSPECTION DRA\MNG MAIN STIEAM SYSTEM MAIN STEAM HEADER 34-MS-2231 FIGURE: 8-27 SHT. 1 OF 1 REV. 0
* 1" BRANCH CONNECTIONS CIRCUMFERENTIAL\
WELD ""' A \ 0 0 0 0 t 4 I SUPPORT 2
* r SUPPORT STRUCTURES c:J // D aa \ LINE 6-MS-2226
\SEE FIG. B-40 Ur LINE 8-MS-2224
_/ / SEE FIG. B-40 ,,,.-..... I K \ l \.,__ *,../''--LINE 6-MS-2227
-SEE FIG. El-42 LINE 8-MS-2221 LINE 8-MS-2223
"' SEE FIG. B-40 "\. SEE FIG. B-40 "\. Or Q o-ln:-1 1,:-1 /LINE B-MS-2225 3"
1 .. BRANCH CONNECTIONS L_J SEE FIG 8-4-0 1 ......_ '--SUPPORT LUG SUPPORT STRUCTURES 5 \ SUPPORT LUGS_// NOTE: SEE FIG. B-32 SHTS. 1 & 2
* A = 34-MS-2221-2 B = 34-MS-2221-2/8-MS-2225 C = 34-MS-2221-2/6-MS-2226 D = 34-MS-2221-2/8-MS-2224 E = 34-MS-2221-2/8-MS-2223 F = 34-MS-2221-2/8-MS-2222 G = 34-MS-2221-2/8-MS-2221 K = 34-MS-2221-2/6-MS-2227 AA = 34-MS-2221-2PL-17 THRU 2PL-20 BB = 34-MS-2221-2PL-13 THRU 2PL-16 CC = 34-MS-2221-2PL-7 THRU 2PL-10 DD = 34-MS-2221-2PL-3 THRU 2PL-6 1 = 34-MS-2221-2PL-21 2 = 34-MS-2221-2PL-12 3 = 34-MS-2221-2PL-11 4 = 34-MS-2221-2PL-2 5 = 34-MS-2221-2PL-1 Z = 34-MS-2221-TO VALVE 22MS167 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM MAIN STEAM HEADER 34-MS-2221 FIGURE: 8-28 SHT. 1 OF 1 REV. 0 
* *
* 4-3" BRANCH CONNECTION.\
1 SUPPORT STRUCTURES SUPPORT LUG 2 z I SUPPORT
[CIRCUMFERENTIAL WELD
[] / [J I \LINE 5-MS-"'5 I 0 \_LINE 6-MS-2211 SEE FIG. 8-45 0 I \&#xa3; CONNECTIONS NOTE: SEE FIG. 8-41 A = 34-MS-2211-2 B = 34-MS-2211-1/8-MS-2215 C = 34-MS-2211-1/6-MS-2216 D = 34-MS-2211-1/8-MS-2213 a cJ AA 0 / / E = 34-MS-2211-1/8-MS-2214
__,,/ ____,/' F = 34-MS-2211-1/8-MS-2211 LINE 8-MS-2211 LINE 8-MS-2213
,,.---. G = 34-MS-2211-1/8-MS-2212 SEE FIG. B-41 SEE FIG. 8-41 \ H = 32-MS-2211-1-6-MS-2211 I K \ K = 34-MS-2211-1/6-MS-2217 I / AA = 34-MS-2211-2PL-17 THRU 2PL-20 \ /'-. 88 = 34-MS-2211-2PL-13 THRU ZPL-16 '--"-LINE 6-MS-2217 CC = 34-MS-2211-2PL-7 THRU 2PL-10 SEE FIG. 8-42 DD = 34-MS-2211-2PL-3 THRU 2PL-6 1 = 34-MS-2211-2PL-21 LINE 8-MS-2212 LINE 8-MS-2214 SEE FIG. 8-41 ' SEE FIG. B-41 ' 2 = 34-MS-2211-2PL--12 3 34-MS-2211-2PL-11 4 34-MS-2211-2PL-2 5 34-MS-2211-2PL-1 Z 34-MS-2231-TO VALVE 21MS167 ' Q LINE SEE FIG. B-41 5 \SUPPORT LUGS/ 3 STRUCTURES P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 SEE FIG. 8-33 SHTS. 1 & 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM MAIN STEAM HEADER 34-MS-2211 FIGURE: 8-29 SHT. 1 OF 1 REV. 0 _J
* LINE 32-MS-224-1 SEE FIG. B-30 SHT. 2;, ...... 1 1/4-" PLUG 9 /8PL-3 THRU 10 9LD-I--9LD-O
* 5LU-I --5LU-O 5 6 A / I '< '("-+-.>.
.---\1" >-J 24MS2 A / I '< '("-+-" *V .---\1" EL. 130' * <J_7 \' 24-MS189 I\ "T' 3LU-I 3 / / t'f.. 3LU-O 2LD-0--2LD-I 1 1/+" PLUG 1 2 32" x 30" /RED. EL. 165' STEAM GENERATOR NO. 24 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-224-1, 30-MS-2241 FIGURE: 8-30 SHT. 1 OF 2 REV. 0
* LINE 32-MS-224-1 SEE FIG. 8-30 SHT. 2!, ...... ' 24-MSLS-9
/ S-209/ (10PS-1,-2)
* '------24-MSR-8 @ * /24-MSR-3 (3PR-2) 1'' <"17 \' 24MS189 <r' (3PR-1) " / 24-MSR-2 / 1 1/4-" PLUG . 32" x 30"
*EL. 166' STEAM GENERATOR NO. 24 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM 32-MS-224-1, 30-MS-2241 FIGURE: 8-30H SHT. 1 OF 2 REV. 0
* 2PL-1 THRU 3/ < 1" I / / / ...__ ___ / / / / / L-----.....
/ /
* LINE 34-MS-2241 SEE FIG. B-38 PENETRATION 4 ' / ' / ..___.,..
'y LINE 30-MS-2241 SEE FIG. B-30 SHT. 1
* P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2241 FIGURE: B-30 SHT. 2 OF 2 REV. 0 
* , . I / / ,; * { LINE 34-MS-2241 SEE FIG. 8-38 \ "(r* 24-MSR-10 (1PS-3 THRU 12) /PA-209
* PENETRATION 4-,,,.,,,. 7* 1 / ,,.,,. ,,. I ,,....-I /_../ l / / ' ' / / / > '-;J LINE 30-MS-2241 SEE FIG. B-30 SHT. 1
* P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2241 FIGURE: B-30H SHT. 2 OF 2 REV. 0 EL. 166'
* 2LD-0 -1 1/4''. PLUG 1 STEAM GENERATOR NO. 23 23MS3
* I y' 1,'\.. " -5LU-O 5 -----5PL-1,-2 /5PL-3 THRU 10 1 1/4" PLUG ' 1'' . ....-\. '"' r-+-.:J. >/ 23MS2 '1" . ....-\_ ,A/ 23MS4
* 1 1 /4" PLUG 1 1/4" PLUG .............__8PL-1,-2
/8PL-3 THRU 10 ....____ SPL-11,-12 9LD-0-9LD-I 10LU-I / '
* 32-MS-2231 SEE FIG. B-31 SHT. 2 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2231, 30-MS-2231 FIGURE: 8-31 SHT. 1 OF 2 REV. 0 EL. 166'
* 23-MSR-21 1 .. Q '-<"'
23-MSR-3 LT> 1 1/4" PLUG 1 1/4" PLUG STEAM GENERATOR NO. 23 1 1/4" PLUG 11'' A / \.. tY r-+-.:i..  
.>-/ 23MS2 11" A / \.. !Y r-+-..:..  
..A/ 23MS4 * * / 23-MSR-B 23-MSLS--9 \ / S-209 (10PS-1.-2)
/(. 1 1/4" PLUG ' (-1 LINE 32-MS-2231 SEE FIG. B-31 SHT. 2 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2231, 30-MS-2231 FIGURE: 8-31H SHT. 1 OF 2 REV. 0
* LINE 30-MS-2231 SEE FIG. B-31 SHT. 1PS-1 r PENETRATION 3 /,__,->/\
GUIDE / "'-1 / ' \ <,._...--?
I ' \__ I ', -> 'L...._ 1PS-2 ,,,,, ,,; v 2PL-1
* 1" , .. ,,; ,,;
34-MS-2231 SEE FIG. B-39 * -:::---32-MS-2231-2/6-MS-2231
..... ._)LINE 6-MS-2231
{ SEE FIG. B-43 SHT. 1 P & ID: 205303 ISOMETRIC:
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVJCE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2231, 32-MS-2231 FIGURE: 8-31 SHT. 2 OF 2 REV. 0
* LINE 30-MS-2231 SEE FIG. B-31 SHT.
* LINE 30-MS-2231 SEE FIG. B-31 SHT.
* PENETRATION 3 .........  
LINE
'> <:.__,, "'--\ &#xa3; R-210 / " "--'l.. '\. __,..> PA-209 (lPS-3 THRU 12) v.,,.. 1 1/4" 1" PLUG 23-MSLS-17
                                                                                                  ~ SEE FIG.
,.; ,.; -\LINE 34-MS-2231 SEE FIG. B-39 * -.. _)LINE 6-MS-2231 ( SEE FIG. B-43 SHT. l 23-*SR-10 P & ID: 205303 ISOMETRIC:
34-MS-2231 1PS-1                                                                  B-39 r                    PENETRATION 3 1"           ,,;
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAIMNG MAIN STEAM SYSTEM 34-MS-2231, 32-MS-2231 FIGURE: 8-31H SHT. 2 OF 2 REV. 0
                                                                                              ,,;
* LINE 32-MS-2221 SEE FIG. B-32 SHT. 2 ) r ............  
                                /
....... 1 1/4" PLUG 8LD-I 0 8 --8LD-O
                                /,__,->/\
* 5LU-I --5LU-O 5PL-1,-2 5PL-3 THRU 10 SAPL-1,-2 ""j . 1 1/4" PLUG fy T'--1--.i.
                                      "'-1 GUIDE                  ,..    - : : : - - MS-2231-2/6-MS-2231
,.>.I ).., ,... *22MS5 1,. " 1 1/4" PLUG / I'<' r-r-.i. _..,\1" .>./ 22MS4 /7PL-3 THRU 10 / 7PL-11,-12 STEAM GENERATOR NO. 22
                      <,._...--?
* P & ID: 205303 ISOMETRIC:
                        /        '        \                                  ..... ._)LINE 6-MS-2231
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM 32-MS-2221, 30-MS-2221 FIGURE: 8-32 SHT. 1 OF 2 REV. 0
{ SEE FIG. B-43 SHT. 1 I        '      \__
*
I            ',        ->
* LINE 32-MS-2221 SEE FIG. B-32 SHT. 21 ...................
L...._    1PS-2        ,,,,,
1 1/4" ""=ij PLUG "'-22-MSR-8 ' I'<" T"--1--.l.
                                ~      ,,;
_,..., \./ *22MS5 1" \_ 1 1/4" PLUG * . / 22-tvlSR-3 (3PR-2) 1 1 /4" 1" PLUG ,1., 'x' 22MS189 f MSH-202 22-MSR-5 ' / I y f"--f--...1
v
,,,\1" -"/ 22MS4 STEAM GENERATOR NO. 22 P & ID: 205303 ISOMETRIC:
                    '
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'WING MAIN STEAM SYSTEM 32-MS-2221, 30-MS-2221 FIGURE: 8-32H SHT. 1 OF 2 REV. 0
2PL-1 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVJCE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2231, 32-MS-2231 FIGURE: 8-31 SHT. 2 OF 2 REV. 0
* / / / / * ..... ) LINE 34-MS-2221
 
...-"\_SEE FIG. B-40 -/ L. ---"7 -I / I / I --.._ / L----./ LINE 30-MS-2221 SEE FIG. B-32 SHT.
*                                                                          *
* P & ID: 205303 ISOMETRIC:
* LINE 30-MS-2231 SEE FIG. B-31 SHT.                                                                                         LINE 34-MS-2231 SEE FIG. B-39
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'vlilNG MAIN STEAM SYSTEM 34--MS-2221, 32-MS-2221 FIGURE: 8-32 SHT. 2 OF 2 REV.
                                                                                                    ,.; -\
* * ..... / ) LINE 34-MS-2221
                                                                                                ,.;
....-"'\_SEE FIG. B-40 r-1 /"\ PENETRATION 2 r THRU 9) / / \ // I // \.__ / / / / / / LINE 30-MS-2221 SEE FIG. 8-32 SHT.
                                            &#xa3; PENETRATION 3
* P & ID: 205303 ISOMETRIC:
                            .........'>
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG MAIN STEAM SYSTEM 34-MS-2221, 32-MS-2221 FIGURE: B-32H SHT. 2 OF 2 REV. 0
1"
* EL. 166' 2LD-I --2LD-O 1 1/4" PLUG 1 2 32" x 30" RED. STEAM GENERATOR NO. 21 1" .......,,.
                      <:.__,, "'--\                  R-210
<.J.7 '/ 21MS189 .!T':. I I -5LU-I 5
                                                                                        -.. _)LINE 6-MS-2231
/5PL-3 THRU 10 1 1/4" PLUG ) 1" ' .....-\.., /'<" . -r-+-.l. .,>.j 21MS2 ) , .. ' ...... 1.., /Y -r-+-.i. .,>.j 21MS4
( SEE FIG. B-43 SHT.
* 9LD-O--9LD-I 10LU-I ,,, ...... ...... * 'rJ LINE 32-MS-2211 SEE FIG. 8-33 SHT. 2 P & ID: 205303 ISOMETRIC:
                        /            "'\. "--__,..>
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2211, 30-MS-2211 FIGURE: 8-33 SHT. 1 OF 2 REV. 0
l..
* 1" 21-MSR-2 ..___,,........ (3PR-1) !T\ f.21-MSR-3 I (3PR-2) I 1 1/4" PLUG 21-MSLS-1 EL. 166' STEAM GENERATOR NO. 21 * .
                          -~
21-MSR-5___..,/
v.,,..
&#xa9; 1 1/4" PLUG ) 1" ' ,....\_ I'< 'C'--f-.:J.
                                                  ~
..A/ 21MS2 ) 1" ' ,....\_ I'< 't"-+-.l.
PA-209 (lPS-3 THRU 12) 1 1/4" PLUG l 23-*SR-10
..A/ 21MS4
                    '
* 1 1/4" PLUG * ./S-209 (10PS-1,-2)
1~ 23-MSLS-17 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAIMNG MAIN STEAM SYSTEM 34-MS-2231, 32-MS-2231 FIGURE: 8-31H SHT. 2 OF 2 REV. 0
'/ / 21-MSLS-9
 
/, 1/4" PLUG ' ' 'rJ LINE 32-MS-2211 SEE FIG. B-33 SHT. 2 P & JD: 205303 ISOMETRIC:
          *                                                  *
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2211, 30-MS-2211 FIGURE: 8-33H SHT. 1 OF 2 REV. 0
* 5LU-I -      -  5LU-O 5PL-1,-2 ~5 5PL-3 THRU 10 ~
* LINE 30-MS-2211 SEE Fl G. B-33 SHT. 1 rl' ' / ? / / < '-----7 / PENETRATION 1 //
SAPL-1,-2 ~
............
                                                                        ""j
/ '-"" 2PL-1 / 2LD-0
                                                                        ~ . 1 1/4" PLUG LINE 32-MS-2221 SEE FIG. B-32 SHT. 2 )
* 3/ LINE 6-MS-2211 SEE FIG. B-45 I'-' I 1((, .....
0 r . . . . . . .......
* LINE 34-MS-2211 FIG. 8-41 "'--32-MS-2211-3./6-MS-2211 P & ID: 205303 ISOMETRIC:
                                                      ~1 1 1/4" PLUG 8
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2211.
                                                                                                    ~  /
.32-MS-2211 FIGURE: B-33 SHT. 2 OF 2 REV. 0 I **-----_ _J
_..,\1"           STEAM GENERATOR NO. 22 I'<'
* LINE 30-MS-2211 SEE FIG. B-33 SHT. 1 r<' ...... / / / < ------7 PENETRATION 1 / / /
8LD-I -  -8LD-O                                    r-r-.i.
' ' / PA:09// (1PS-3 THRU 12) MSG-209 (1PR)
                                                                                              .>./ 22MS4 fy T'--1--.i.
* 1(<_ LINE 6-MS-2211
                                                                              ,.>.I
' SEE FIG. 8-45 I'-' I .....
                                                                    ).., ,...   *22MS5 1,. "
* LINE 34--MS-2211
1 1/4" PLUG
,.....:\SEE FIG. 8-41 P & ID: 205303 ISOMETRIC:
                                                                                          / 7 P L - 3 THRU 10
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSEIWICE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2211.
                                                                                            /            7PL-11,-12            P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM 32-MS-2221, 30-MS-2221 FIGURE: 8-32    SHT. 1 OF 2 REV. 0
32-MS-2211 FIGURE: B-33H SHT. 2 OF 2 REV. 0
 
* LINE 32-MS-224-1
          *                                               *                                                                                *
(,,-. SEE FIG. B-30 SHT. 2 NOTE: ,,, 24MS11 2FB  3 2 FOR ENLARGED DETAIL OF NO. MANIFOLD SEE FIG. 8-26(  24 * &#xa9; 24MS13\7  2  24-MS15\7 2FB 2 LINE 6-MS-2247 SEE FIG. B-42 3<-MS-2241
                                                                                                    .     /  22-tvlSR-3 (3PR-2) 1 1 /4"         1" PLUG          ~
&#xa9; LINE 8-MS-2241 LINE 8-MS-2244 SEE FIG. B-26 SEE FIG. 8-26  LINE 8-MS-2242 LINE 8-MS-2245 SEE FIG. B-26 SEE FIG. 8-26 &#xa9; LINE 8-MS-2243
                                                                                                                ,1.,
&#xa9; LINE 6-MS-2246 SEE FIG. B-26 SEE FIG. 8-26 * ,.34-MS-2241 8-MS-2241 8-MS-2242 8-MS-2243 8-MS-2244 8-MS-2245 6-MS-2246 P & ID: 205303 ISOMETRIC:
                                                                                                                  'x' 22MS189
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM MAIN STEAM RELIEF +SEE ABOVE FIGURE: 8-38 SHT. 1 OF 1 REV. 0 
                                                                                                            ~!T\
* .,,, LINE 32-MS-2241 t"" SEE FIG. B-30 SHT. 2 NOTE: &#xa9; 24MS11 z 2FB=  24MS12& 2FB = FOR ENLARGED DETAIL OF NO. 24 MANIFOLD SEE FIG. B-26. &#xa9; 24MS13.z 2FB=
f      22~MSR-4
* 24MS146) 2FB_  24MS15V 2FB _ _6_ &#xa9; x
                                                                              ~ MSH-202
\ MSS-220 (2PS-3,-4)
                                                                              ~          22-MSR-5 LINE 32-MS-2221 SEE FIG. B-32 SHT. 21 ...................
LINE 5-MS-224 7 SEE FIG. 8-42 &#xa9;  &#xa9; \ MSS-216 (2PS-1,-2) 34-MS-2241 LINE 8-MS-2241 SEE FIG. B-26 LINE 8-MS-2242 SEE FIG. 8-26 LINE 8-MS-2243 SEE FIG. 8-26  LINE 8-MS-2244 SEE FIG. B-26  Ll\\IE 8-MS-2245 SEE FIG. B-26 &#xa9; LINE 6-MS-2246 SEE FIG. B-26 ' 1"1SS-224 MSH-224T MSSN-24 (3PR) * >1<34-MS-2241 8-MS-2241 8-MS-2242 8-MS-2243 8-MS-2244 8-MS-2245 6-MS-2246 P & ID: 205303 ISOMETRIC:
1PLUG 1/4" ""=ij
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION MAIN STEAM SYSTEM MAIN STEAM RELIEF *SEE ABOVE FIGURE: B-38H SHT. 1 OF 1 REV. 0 
                                                  "'-
* &#xa9; 23Ms12V 2 'V,,,.,,,."'
                                                                                        '
LINE 32-MS-2231
                                                                                              ,,,\1"                            STEAM GENERATOR NO. 22 I y /
\_ SEE FIG. 8-31 SHT. 2 NOTE: FOR ENLARGED DETAIL OF NO. 23 MANIFOLD SEE FIG. B-27. &#xa9; 23MS14 V 2FB 2 0 0  * &#xa9; 23MS10  23MS13A(1 2FB1*.3 2 LINE 8-MS-2231 SEE FIG. B-27 LINE 8-MS-2232 SEE FIG. B-27 LINE 8-MS-2233 SEE FIG. B-27 23MS9 I 2 LINE 6-MS-2237 SEE. FIG. B-42  &#xa9; LINE 8-MS-2234 SEE FIG. 8-27 LINE 8-MS-2235 SEE FIG. 8-27 LINE 6-MS-2236 SEE FIG. 8-27 * *34-MS-2231 8-MS-2231 8-MS-2232 8-MS-2233 8-MS-2234 8-MS-2235 6-MS-2236 P & ID: 205303 ISOMETRIC:
f"--f--...1
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM MAIN STEAM RELIEF &#xa5;SEE ABOVE FIGURE: 8-39 SHT. 1 OF 1 REV. 0 
                                                                                -"/ 22MS4
* &#xa9; 23MS12z 2FB= &#xa9; 23MS14z 2FB= &#xa9; 23MS118 ZFB=  23MS136J 2FB= MSS-215 (3PS-1,-2)
                                                  ~ 22-MSR-8
* &#xa9; 23MS10 f 23MS9 z I
                                                                          '
* 2FB-=-
I'<"
SEE FIG. B-42 MSS-219 (3PS-3,-4) MSS-223 MSH-223T MSSN-23 (4PR) / \,,;,,,.,,,.
_,...,
LINE 32-MS-2231
T"--1--.l.
\.._ SEE FIG. 8-31 SHT. 2  LINE 8-MS-2231 LINE 8-MS-2234 NOTE: SEE FIG. B-27 SEE FIG. B-27 FOR ENLARGED DETAIL OF NO. &#xa9; LINE 8-MS-2232 LINE B-MS-2235 23 MANIFOLD SEE FIG. B-27. SEE FIG. B-27 SEE FIG. 8-27  LINE 8-MS-2233
                                                              \./   *22MS5 1" \_
&#xa9; LINE 6-MS-2236 SEE FIG. B-27 SEE FIG. 8-27 * ><34-MS-2231 8-MS-2231 8-MS-2232 8-MS-2233 8-MS-2234 8-MS-2235 6-MS-2236 P & ID: 205303 ISOMETRIC:
1 1/4" PLUG P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'WING MAIN STEAM SYSTEM 32-MS-2221, 30-MS-2221 FIGURE: 8-32H SHT. 1 OF 2 REV. 0
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAV11NG . MAIN STEAM SYSTEM MAIN STEAM RELIEF *SEE ABOVE FIGURE: 8-39H SHT. 1 OF 1 REV. 0
 
* 22MS11 V  2 22M S1 2 Jci 2FB 2 1 * &#xa9; 22MS13V 2FB 2 22MS14 ,,ci 2FB 2 34-MS-2221
*                       *                                                                        *
)... ............
                                      ) LINE 34-MS-2221
LINE 32-MS-2221 , \_ SEE FIG. 8-32 SHT. 2 NOTE: FOR ENLARGED DETAIL OF NO. 22 MANIFOLD SEE FIG. B-28. &#xa9;  &#xa9; LINE 8-MS-2221 SEE FIG. B-28 LINE 8-MS-2222 SEE FIG. 8-28 LINE 8-MS-2223 SEE FIG. 8-28  22MS15V 2FB 2 I* &#xa9; LINE 6-MS-2227 SEE FIG. B-42  &#xa9; LINE 8-MS-2224 SEE FIG. 8-28 LINE 8-MS-2225 SEE FIG. 8-28 LINE 6-MS-'2226 SEE FIG. 8-28 * >t<34-MS-2221 8-MS-2221 8-MS-2222 8-MS-2223 8-MS-2224-8-MS-2225 6-MS-2226 P & ID: 205303 ISOMETRIC:
                                ...- "\_SEE FIG. B                            .....
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM MAIN STEAM RELIEF +SEE ABOVE FIGURE: 8-40 SHT. 1 OF 1 REV. 0 
                        /
* )... ..........
            /
LINE 32-MS-2221 , \. SEE FIG. 8-32 SHT. 2 NOTE:  22MS11 z 2FB=  22MS12Lfl 2F8 = FOR ENLARGED DETAIL OF NO. 22 MANIFOLD SEE FIG. 8-28. * &#xa9; 22MS13z 2FB=  22MS14Lfl 2FB= &#xa9;  &#xa9; LINE 8-MS-2221 SEE flG. B-25 LINE 8-MS-2222 SEE FIG. 8-28 LINE 8-MS-2223 SEE FIG. 8-28  22MS15 V 2F8 _,6._ I &#xa9; \NE 6-MS-2227 EE FIG. B-42. MSS-218 (2PS-1,-2)
          /
  &#xa9; LINE 8-MS-2224 SEE FIG. 8-28 LINE 8-MS-2225 SEE FIG. 8-28 LINE 6-MS-2226 SEE FIG. 8-28 MSS-222 MSH-222T MSSN-22 (3PR) * >t<34-MS-2221 8-MS-2221 8-MS-2222 8-MS-2223 8-MS-2224-8-MS-2225 6-MS-2226 P & ID: 205303 ISOMETRIC:
        /
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\IVlNG MAIN STEAM SYSTEM MAIN STEAM RELIEF *SEE ABOVE FIGURE: 8-40H SHT. 1 OF 1 REV. 0 LINE 32-MS-2211 2 '\,./ SEE FIG. B-33 SHT. \_ NOTE: FOR ENLARGED DETAIL OF / ,; NO. 21 MANIFOLD SEE FIG. B-29. 21MS12 \J 2FB 2 CD 21MS14\J 2F8 2
L.
* 34-*S-2211 0 &#xa9;  LINE 8-MS-2211 SEE FIG. B-29 LINE 8-MS-2212 SEE FIG. B-29 LINE 8-MS-2213 SEE FIG. B-29 &#xa9; 21MS10 21MS9 I 2  21MS15 ,ci.3 2F8 2 LINE 6-MS-2217 SEE FIG. 8-4-2  &#xa9; LINE 8-MS-2214 SEE FIG. 8-29 LINE B-MS-2215 SEE FIG. 8-29 LINE 6-MS-'2216 SEE FIG. 8-29 * *.34-MS-2211 8-MS-2211 8-MS-2212 8-MS-221.3 8-MS-2214-8-MS-2215 6-MS-2216 P & ID: 20530.3 ISOMETRIC:
    /
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM MAIN STEAM RELIEF +SEE ABOVE FIGURE: 8-4-1 SHT. 1 OF 1 REV. 0 
      -
* ,,,."" LINE 32-MS-2211 2 v"" SEE FIG. B-33 SHT. \_ NOTE: FOR ENLARGED DETAIL OF NO. 21 MANIFOLD SEE FIG. 8-29. @ 21MS12 z 2FB=
          ---"7   I                      /
* 21MS14 z 2FB=  21MS13s 2FEl =  21MS11lf1 2FB= 0 &#xa9; (2PS-1,-2)
I                       /
LINE 8-MS-2211 SEE FIG. B-29 LINE 8-MS-2212 SEE FIG. B-29 LINE 8-MS-2213 SEE FIG. B-29 21MS10 f 21MS9 z I  21MS15s 2FB-=-LINE 6-MS-2217 SEE FIG. B-42 MSS-217 (2PS-3,-4)
I     --.._            /                 LINE 30-MS-2221 L--         --./
  &#xa9; LINE 8-MS-2214 SEE FIG. B-29 LINE 8-MS-2215 SEE FIG .. B-29 LINE 6-MS-2216 SEE FIG.
SEE FIG. B-32 SHT.
* MSS-221 MSH-221T MSSN-21 (3PR) / *34-MS-2211 8-MS-2211 8-MS-2212 8-MS-2213 8-MS-2214 8-MS-2215 6-MS-2216 P & ID: 205303 ISOMETRIC:
P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'vlilNG MAIN STEAM SYSTEM 34--MS-2221, 32-MS-2221 FIGURE: 8-32    SHT. 2 OF 2 REV. 0
MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM MAIN STEAM RELIEF *SEE ABOVE FIGURE: B-41H SHT. 1 OF 1 REV. 0 
 
* *
*           *                                                                                      *
* LINE 34-MS-2241 LINE 34-MS-2221 SEE FIG. B-.38 _,,."" SEE FIG. B-40 _,,"" . (,,,. .... (fl /
                          ) LINE 34-MS-2221
1 < 2 2 LINE 6-MS-2247 LINE 6-MS-2227 LINE 34-MS-2231 LINE 34-MS-2211 SEE FIG. B-39 _,,. _,, SEE FIG. B-41 _,,"" 't_,,.,,,.(JI
                      ....-"'\_SEE FIG. B-40
/
                .....
1 < *6-MS-2247 6-MS-2237 6-MS-2227 6-MS-2217 2 2 P & ID: 205303 ISOMETRIC:
              /
MS-2-3 LINE 6-MS-2237 LINE 6-MS-2217 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVv1NG MAIN STEAM SYSTEM MAIN STEAM HEADER *SEE ABOVE FIGURE: B-42 SHT. 1 OF 1 REV. 0 
r 0
* / LINE 6-MS-2231 2\..... _,, SEE FIG. 8-43 SHT. * \.
(~5~ i THRU  9) r-                    /"\          PENETRATION 2
* LINE 32-MS-2231 SEE FIG. B-31 SHT. 2
            /    1              /    \
.6Y.,.. ,..,-1A
        //        I      //            \.__
/ *-----............
      /          ~GUIDE                        ~~?
(_,..,-2 3/4" WELDED CAP
                                              /
* P & ID: 205303 ISOMETRIC:
                                          /
MS-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43 SHT. 1 OF 2 REV. 0
                                      /
* 2-MSAH-110
                                  /
_/ (10PR) LINE 6-MS-2231 2\ .. / SEE FIG. B-43 SHT. \. /
                                /
* LINE 32-MS-2231
LINE 30-MS-2221 SEE FIG. 8-32 SHT.
/ 2-MSALS-H12 SEE FIG. B-31 SHT. 2 ?-\\x_JOJd')
P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG MAIN STEAM SYSTEM 34-MS-2221, 32-MS-2221 FIGURE: B-32H SHT. 2 OF 2 REV. 0
/ 2-MSAH-107
 
...-'2.-;_..,.,...
*                                                                        *
...-1-+-+-+-+-----...
* 1"
(3PR) (._...-J 2-MSALS-14 , .. ',' 23MS191 ' ,, .................
                                .......,,.
LT.l '..J / 2-MSAG-150
                                  <.J.7
/ NO ID BEND (H.) I 2-MSALS-13 23MS45 I / 2-MSALS-H11 2-MSAH-108 2-MSALS-13 (6PR) //2-MSALS-8
                                  '/ 21MS189
{,
                                  .!T':.
.. o/ 3/4" WELDED CAP 2-MSAA-111
' (14PS) "'---2-MSAG-151 (15PR-1) 2-MSAS-112
' (15PR-2) "-2-MSAG-113 (15PS-1 THRU 8)
* P & ID: 205303 ISOMETRIC:
MS-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43H SHT. 1 OF 2 REV. 0
* BEND (H.) 17PS-1 THRU 8 \ BEND (H.) THRU 16 FLOOR EL. BEND (V.) 0
* l LINE 6-MS-2231
/ , _..."\._SEE FIG. B-43 SHT. TO NO. 23 AUXILIARY
}.. / FEED PUMP TURBINE \._... .
* 32 6" TEE P & ID: 205303 ISOMETRIC:
MS-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 JNSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43 SHT. 2 OF 2 REV. 0 *-----*-------------------------------------
* 2-MSALS-54 2-MSALS-5 (20PS) 2-MSALS-H5 2-MSAG-115 BEND (H.) (16PS-3,-4)
BEND (H.) 2-MSAS-119 (23PR) 25PS-1 THRU FLOOR EL. 100' 2A-MSASN-152
---* / 2-MSALS-H6
/ (16PS-1,-2)
/ 2-MSAS-114
/ (15PR-3) ) LINE 6-MS-2231
/ J _,.'\_SEE FIG. B-43 SHT. 1
* 0 2A-MSASN-154 2A-MSASN-155
&
/ (31PR) '-..... sy TO NO. 23 AUXILIARY
\.. _,. FEED PUMP TURBINE \__,. . sy 6" TEE 2-MSAS-124 2-MSALS-1 (32PS-1 THRU 4) P & ID: 205303 ISOMETRIC:
MS-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 BEND (V.) \ 2-MSAG-123 0 \ 2A-MSASN-153 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43H SHT. 2 OF 2 REV. 0 
*
* FLOW 4 11 6" TEE 3 21MS45 2 lA -') LiNE 32-MS-2211 ,,-_,. )l SEE FIG. 8-33 SHT. 2 / ,,.,,. ,,. A'
\,-1.{'"'s 23 I ,_,..,,. ;.../ / / _,..LINE 6-MS-2231 SEE FIG. B-43 SHT.
* P & ID: 205303 ISOMETRIC:
MS-2-2 PUBLIC SERVICE ELECTRIC &: GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2211 FIGURE: B-45 SHT. 1 OF 1 REV. 0
* 2-MSALS-H13
\ (13APS-1 THRU 8) 2-MSALS-11 . .,jY (8PR-1) 2-MSAS-103
""""'-" (8PR-2) ""-.... 11 6" TEE 12 6'" CAP 1 * ,1,
* 5 FLOW 4 2-MSAH-101 (5PR) 1A 2-MSALS-12 2-MSALS-H14 . LINE 32-MS-2211 1 ,...,...1 SEE FIG. 8-33 SHT. 2 / ,... ,...
,... ..... ,...-J.s
'.' 21MS191 " 160 'T* r !;"' 15 'CJ 16 16A 3/4'" CAP 2-MSAS-1D4
/,1MS46 2-MSALS-9
/. 2-MSAS-105 o/ 17 23 2-MSALS-H8
/ (21PS-1 THRU 8) 6" Tff---............
I ,,,/
,... ,... * *""LINE 6-MS-2231 SEE FIG. 8-43 SHT. 1
* p & ID: 205303 ISOMETRIC:
MS-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2211 FIGURE: B-45H SHT. 1 OF 1 REV. 0
* LINE 6-PR-2204 SEE FIG. B-50 I 3/4" I
* WELDOLET CAP '\V lPS-1 THRU 4 / l_ r 12-PR-2201
/6-PR-2204 LINE
..... , I/,, 12-PR-2201/6-PR-2201 SEE FIG. B-51 _,.."-..._ ,,.. '...J l 1 L/Y _,.. ( LINE 6-PR-2201
'-... V SEE FIG. 8-53 ..... .....
,,..-..... 12-PR-2201/6-PR-2203
--------.
VY' '...J .*V ( LINE 6-PR-2205
_/ii. 2 SEE FIG. B-49 12-PR-2201
/6-PR-2205 EL. 130' I \ r---llf-=1
* 3 tt 3A ..... ''(LINE 12-PR-2201 SEE FIG. B-46 SHT. 2
* P &: ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: B-46 SHT. 1 OF 2 REV. 0
* LINE 6-PR-2204 SEE FIG. B-50 'I'-' I 3/4" I
* WELDOLET CAP ------2-PRG-66 m --') 3/4" t::Y-m 2-PRG-1B l.__ 12-PR-2201
/6-PR-2204 LINE
..... , I 12-PR-2201/6-PR-2201 SEE
'C:: I ................
-..........
..J l t::Y _..... ( LINE 6-PR-2201 . ', SEE FIG. 8-53 ...........
't::: ..-..... l:Y',.....
'"(LINE 6-PR-2205 SEE FIG. B-49 EL. 130' /-\ (2PS-1,-2)
L___] ..... ''(LINE 12-PR-2201 SEE FIG. 8-46 SHT. 2
* P &: ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: 8-46H SHT. 1 OF 2 REV. 0
* _) LINE 12-PR-2201 SEE FIG. B-46 SHT. Ct. "f-' 3B 3C 3D' 3E C-\ v NO. 2 PRESSURIZER RELIEF TANK 7 8
* 13 12 11 BEND (H.) BEND (V.)
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: B-46 SHT. 2 OF 2 REV. 0
* LINE 12-PR-2201 SEE FIG. B-46 SHT. 1 4. 'l'-'
NO. 2 PRESSURIZER RELIEF TANK
* L-112 (14PR-1) / 2C-PRSN-400
/ 2C-PRSN-401 2C-PRSN-402
_../ / 2C-PRH-101
_/ (SPR) v \ \END (H.) 2C-PRS-103 . (8PR) 2C-PRS-102 (7PR) / 2C-PRS-111 (13PR-2) * / 2C-PRS-110 (13PR-1) / 2C-PRSN-405
& 405A BEND (V.) -------2C-PRSN-406
& 406A 2C-PRS-109 (12PR-1) "---2C-PRS-108 (llPR-1) "---2C-PRS-107 (lOPR-2) BEND (V.) .....____ 2C-PRS-106
"'--(lOPR-1) """ 2C-PRS-105 (9PR-2) 2C-PRA-104 P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201
* LINE 12-PR-2201 SEE FIG. B-46 SHT. 1 I I ---1.__,
* CLASS 2 2PR3 2 T I ,.-..t__, LINE 6-PR-1203 SEE FIG. A-19 6 5 3 BEND
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 6-PR-2205 FIGURE: 8-49 SHT. 1 OF 1 REV. 0
* _,/' 2-PRG-51 _,/' 2-PRG-1 (2PR) 'I'-'
* 51' PLATFORM EL. 1 2-PRSN-2 2C-PRH-212 2-PRSN-50 2-PRSN-49 2-PRSN-4B
/ : .//
2-PRG-42 _,/' PR-2201 N 43 / B-4' SHT. 1: 2-PRS -'l '-...._/_/-i::.+-
/t-/t--c-r-:
9 END
--l_.
2-PRSN-4 ./ 2-PRSN-46RSN-47 2-P * & ID* 205301 p . RC-2-3 ISOMETRIC:
& GAS PUBLIC UNIT 2 __ _ PECTION DRA'MNG R NT PRESSU CONTAINME 6-PR-22050F 1 REV. 0 B-49H SHT. 1 FIGURE:
* 5 45" (V.) 6
* 2PR4 LINE 6-PR-1204
_) I SEE FIG. A-18 (', I 'I LINE 12-PR-2201 I SEE FIG. B-46 SHT. I ----L., ---**----*--****-------------*--------*
2 BENO PLATFORM EL. 151'
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2204 FIGURE: B-50 SHT. 1 OF 1 REV. 0 . _______________ .l.._ _______________
_, 
*
* 2-CPRA-146A yJY CLASS 2 2-PRSN-8 \ 2-PRSN-37
""' 2-PRG-9 ""' 2-PRSN-36 "' BENDD __
2-PRSN-35
/ 45" (V.)
(2PR) 2-PRSN-10 LINE 12-PR-2201 I SEE FIG. 8-46 SHT. I ---l_, PLATFORM EL. 151'
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2204 FIGURE: B-50H SHT. I OF I REV. 0
* 9 10 LINE 6-PR-1205 SEE FIG. A-17 11 (V.) * -. I ---_J ---3 LINE 12-PR-2201 I SEE FIG. B-46 SHT. 1 I ..--G CLASS 2 CLASS 1
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2203 FIGURE: B-51 SHT. 1 OF 1 REV. 0
* E:;_ 2-PRG-26
* CLASS 2 /CLAsS1 -,-1 2PR5 LINE 6-PR-1205
)_ __ _____ J SEE FIG. A-17 ( 2-PRG-27 PT-5_/ J 2-PRG-29 2-PRSN-32 2-PRSN-33 2C-PRH-210 (7PR) 0: . 45 (V.) 2-PRSN-34
/ LINE 12-PR-2201 I SEE FIG. 8-46 SHT. 1 I ----L, \
2-PRG-30
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG REACTOR COOLANT SYSTEM . PRESSURIZER RELIEF 6-PR-2203 FIGURE: 8-51 H SHT. 1 OF 1 REV. 0 
*
* CLASS 2 LINE 3-PR-1207
)_ SEE FIG. A-24 [ ---1>4---1 2PR1 I EL. 143' I 3" x 6" f -\PLATFORM EL. 151' I I. .I I LINE 6-PR-2201 SEE FIG. B-53 05
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2202 FIGURE: 8-52 SHT. 1 OF 1 REV. 0
* CLASS 2 LINE 3-PR-1207 t SEE FIG. A-24 ----t><J---1 2PR1 I I
* 3" x 6"
/ ""'\PLATFORM EL. 151' I 1 I__] /PT-12 /2-PRSN-64
/ 2-PRSN-65 2C-PRH-208 j (3PR) [ b / 2-PRSN-63
,,,,,,,-PT -1 2
* EL. 143' 1.:i : .*. .. :i ::'.., *. -----2-PRSN-62 rn / 6" TEE (-------1 LINE 6-PR-2201 SEE FIG. 8-53 P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2202 FIGURE: B-52H SHT. 1 OF 1 REV. 0
* LINE 12-PR-2201 SEE FIG. 8-46 SHT. 1 I I I ..--L 12 11 45' (H.)
* CLASS *1 CLASS 21 ----{>:::}-----_)LINE 3-PR-1206 i 2 PR 2 \ SEE FIG. A-20 3 LINE 6-PR-2202 SEE FIG. 8-52 I'-' 6" TEE I \! 9 10 \ 45* (H.: 9Ps-1 n-rnu 3 SA 58 6
* P & ID: 205301 ISOMETRIC:
RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2201, 3-PR-2201 FIGURE: 8-53 SHT. 1 OF 1 REV. 0
* PLATFORM EL 151' * . I I CLASS1 LINE 3-PR-1206
---1><}-------( SEE FIG. A-20 r 2PR2 I . 2-PRSN-17 J LINE 6-PR-2202 SEE FIG. 8-52 LINE 1 2-PRSN-55 (H.) 2-PRSN-59 SEE FIG. I 2-PRSN-57 45' (H.) j PT-14 I 2-PRSN-56 I 2-PRSN-58
...--L.,.
2C-PRH-214 (1 OPR)
* p & ID:
ISOMETRIC:
RC-2 ELECTRIC & GAS PUBLIC UNIT 2 CT/ON DRAWING INSERVICE INSPgLANT SYSTEM REACTOR RELIEF PRESS PR-2201 6-PR-2201, 3-1 OF 1 REV. 0 FIGURE: 8-53H SHT. 
* * ) LINE 14-RH-2214 14" TEE
"'\. SEE FIG. B-55 ...... ...... ...... LINE 14-RH-2212 t,...... j SEE FIG. 8-56 -' ....
y--5 LINE 14-SJ-2224 SEE FIG. 22RH8 , LINE 8-RH-2226
(/ SEE FIG. 8-61 ' , .,,,. , ...... v
* P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2224 FIGURE: 8-54 SHT. 1 OF 1 REV. 0 
* * . ) LINE 14-RH-2214 1 4" TEE _,.. _,.. _,..-'\ SEE 'FIG. 8-55 ...... ...... ...... ...... LINE 14-RH-2212
'c_,.. j SEE FIG. B-56 E; _J .... )P 2-RHRH-22-5 22RH4 (4PR) "" LINE 14-SJ-222 4 SEE FIG. 8-65 r<, I ' 3/4" I'-' l.__'Y\ 2RH78 *-.. ,:,:_ ';) 22RH8, LINE 8-RH-2226 t_,.. SEE FIG. 8-61 ' I ,A I ...... . 3/4" I'-' I I THRU 4
* P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2224 FIGURE: B-54H SHT. 1 OF 1 REV. 0
* LINE 14-RH-2212
\"" SEE FIG. 8-56 .... .... .... I I I ) /'&#xa5;""/ _..;./;;RH4 LINE 14-RH-2224 t SEE FIG. 8-54 6 45* (V.)
* LINE SEE FIG. 8-65 ' ' 9 *> _j-:> 45* (H.) '(_.J 2RH77 LINE 8-RH-2216
\"" SEE FIG. 8-63 ...... ...... I ' I ' .>. I _..
* 22RH8 3/4" 'f--,1, * \/ ,\21RH30 'f /\ Tt-jRU 4 P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2214 FIGURE: 8-55 SHT. 1 OF 1 REV. 0 '------------*-------------------------------------------------...1.-.---------------1
------------------------------------------------------------------
* 2-RHRH-21-6 (lPR) ""' LINE 14-RH-2212 t:._,, SEE FIG. B-56 / / / I I I ) /'&#xa5;"'/ 'f'-+-.i.
_,,*'"-' 22RH4 LINE 14-RH-2224 t SEE FIG. B-54 45* (V.) 2-RHRH-21-7
_/
* LINE SEE FIG. B-65 ...... ' ' 45* (H.) LINE 8-RH-2216 t:._,, SEE FIG. B-63 I ' I ' ,A/ _,, v 22RH8 3/4" '/-----* ,1, \/ ,\21RH30 '( P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2214 FIGURE: B-55H SHT. 1 OF 1 REV. 0
* 13 14 16
* CLASS 2 CLASS LINE 14-RH-1211 L-SEE FIG. A-61 ( 2RH2 24 , I 1(!' :.'_\_, I 2RH63 \"-...J 23 14" x RED.
* 6 5 f'' -.,\ 2RH64 I L-'\-;,_f
*
* 3/4".,,-7 8 _, .r I PENETRATION NO. 9 ID. 4A
<.-'/ :-... I /j' _,-' 1 1/2" &If--( 3" l-...._ / 8PS-1 --......,.-'
'/--" I THIS SECTION OF PIPING LOCATED IN PIPE CHASE. ) LINE 14-RH-2214
_, "\._ SEE Fl G. 8-55 1 "--1 4" TEE 29 I I P & ID: 205332 ,.-.l_, ISOMETRIC:
RH-2-2, RH-2-3 LINE 14-RH-2224 SEE FIG. 8-54 , 2SJ70 _...,_,, \ .... ...._J ( LINE 12-SJ-2269 SEE FIG. 8-67 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2212 FIGURE: B-56 SHT. 1 OF 1 REV. 0 
*
* i'l; 2RH49\'
3" -,--I 2C-21-RHS-8
/ r-. (6PR) [' ..... I
\ ,,_..) * ( 3/4''_,,.7
_.., _.., j PENETRATION
/ / <.,.1 I L-...._ _.., .......,.,.., t. ..... > / / 1 1/2" I
* NO. 9 / 2P-21-RHH-10 (11PR-1) /2P-21-RHH-11
/ (11PR-2) CLASS 2 CLASS 11 /\ 'T, J LINE 14-RH-1211L-SEE FIG. A-61 ( 2RH2 2-RHRH-22-36 (20PR) ""' 1'') , .. ,., I L--lt--7 I 2RH63 \'--..J 2P-21-RHG-12 2C-21-RHH-7 (2PR) THIS SECTION OF PIPING LOCATED IN PIPE CHASE. \ 2-RHRA-22-31
------.._,,--_....
__ l EL. 65' 2-RHRH-22-46 (19PR) o/
RED. \-RHRH-21-5 l LINE 14-RH-2214 8PR) _..,'\_SEE FIG. 8-55 I'-...._ 14" TEE . I r--------------1 I P & ID: 205332 .---l_, ISOMETRIC:
RH-2-2, RH-2-3 LINE 14-RH-2224 SEE FIG. 8-54 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 , 2SJ70 -.Irr--, '."-....... ...) ( LINE 12-SJ-2269 SEE FIG. 8-67 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2212 FIGURE: 8-56H SHT. 1 OF 1 REV. 0 -------. ----------.. -----. --------------*----------'----------------1
* LINE 8-RH-2273 t"" SEE FIG. 8-59 ..... ,,,. 3 .....
2y 'y LINE 8-RH-2273 SEE FIG. 8-59
* 5 ) LINE 8-RH-2216 2RH20 ,,,. \_SEE FIG. 8-63 \-'j ,,,"'v LINE 12-RH-2252("" '\_ SEE FIG. B-68 "'---12" X 8" RED. A., " ...
* P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2274 FIGURE: B-58 SHT. 1 OF 1 REV. 0 *-----'------*---*--------'
* LINE 8-RH-2273 SEE FIG. B-59 ..... ' ' A.fY Y 'y LINE 8-RH-2273 SEE FIG. B-59 * /2-RHRH-21-23 (4PR) ) LINE 8-RH-2216 2RH20 \/...-\._SEE FIG. B-63 '>..-v LINE 12-RH-225;c:
...-"\. SEE FIG. B-68 "'---12" X 8" RED. \
* P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2274 FIGURE: B-58H SHT. 1 OF 1 REV. 0 ..... ****-**------'
* LINE 8-RH-2226 ) SEE FIG. 8-61 (', "'r\ L-"r-., 22RH14 \...._ 21RH14 ,*Y'""' \,. ;..-,+-* LINE 8-RH-2216
\.
* SEE FIG. 8-63 8-RH-2226 , SEE FIG. B-61 Iv' _,,.J.7izRH10 1
* 8-RH-2216 SEE FIG. B-63 21RH10,*V"'
,,., / v / 7 6 / LINE 8-RH-2274 FIG. 8-58 3/4" r---1 12 /I I P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2273 FIGURE: 8-59 SHT. 1 OF 1 REV. 0
* LINE 8-RH-2226 ) SEE FIG. B-61 ("....._ 'y\
22RH14 '*"-21RH14 /.,,.,,.,.
\.... ;;.-,+-* LINE 8-RH-2216
\..
* SEE FIG. B-63 8-RH-2226 , SEE FIG. B-61 , .,,,. _,...>.ti2RH10
* >_LINE 8-RH-2216 SEE FIG. B-63 21RH10/.,...-
,..-+-"" ,,.., / v (3PR-1) / / LINE 8-RH-2274
_,.,..:{_SEE FIG. 8-58 3/4"' I--' I
* 2-RHRH-21-24
/ (14PR) P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2273 FIGURE: B-59H SHT. 1 OF 1 REV. 0 
*
* TO REFUELING STORAGE TANK '!'---' I 7 6 --------------------------
---------EL. 55' j LINE 12-RH-2252
(',SEE FIG. B-68 /) (J I'
* P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2253 FIGURE: B-60 SHT. 1 OF 1 REV. 0
* 2-RHRA-22-25
/ (3PS-1 THRU 9)
* TO REFUELING STORAGE TANK r--1 j LINE 12-RH-2252
(',SEE Fl,G. B-68
* P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2253 FIGURE: B-60H SHT. 1 OF 1 REV. 0 -----------****-
----------------------------------------------------1..----------------'
* 14" x 8" RED. "" 22 21 RESIDUAL HEAT EXCHANGER NO. 22 20
* 31 / LINE 8-RH-2225 C.""30 SEE FIG. 8-74 ' . ....,, '
3/4" I 29 22RH8 22RH12 '-"', YLINE 8-RH-2273 SEE FIG. B-59 / / LINE 8-SJ-'2262
("" SEE FIG. B-70 LINE 12-RH-2252 ) SEE FIG. B-68 ,,,-'\. "("" 45 44 ) LINE 14-RH-2224 o,1' _,,,"\.._
SEE FIG. 8-54 v
* 39 40 P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT-2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT* REMOVAL SYSTEM 8-RH-2226 FIGURE: 8-61 SHT. 1 OF 1 REV. 0
* RESIDUAL HEAT EXCHANGER NO. 22 8" x 14" RED. /2-RHRH-22-11 (15PR) I 3/4" LINE 8-RH-2225 C./ SEE FIG. 8-74 ...... . ..... \ 3/4" r---1 22RH10 * /0
/ LINE 8-SJ-2262 r/ SEE FIG. 8-70 LINE 12-RH-2252 ) SEE FIG. B-68 /"'\. ) LINE 14-RH-2224 o,1' /"'\_SEE FIG. 8-54 &#xa5; / 2-RHRH-22-7 (2PR-1) 2-RHRG-22-7 (2PR-2) rJLINE 8-RH-2273 SEE FIG. B-59
* 2-RHRH-22-16
/(37PR)
(40PS-1 THRU 4) P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2226 FIGURE: B-61H SHT. 1 OF 1 REV. 0 --*-*-----*------------------==-========---------====================:==='.
* 19 RESIDUAL HEAT EXCHANGER NO. 21 Q 8 27 / LINE 8-RH-221;c_.,,,.
SEE FIG. 8-75 26 I-' 5 '..,.*, 21RH12 L-.Jr-,. '*' 25 'rJLINE 8-RH-2273 SEE FIG. 8-59
* 0 / 21RH8 21RH44 :\... :,,.-,....-*
3/4' \_ v I 3" LINE 8-SJ-2252!
SEE FIG. 8-72 / ) LINE 14-RH-2214
.,,,. '\ SEE FIG. 8-55 LINE 8-RH-2274 ) SEE FIG. 8-58 ('-.._,,.,
2RH20 \A......_
LINE 12-RH-2252(.,,,.
SEE FIG. 8-68 ....... / / ..... ......
* 29 38 ......
39? P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2216 FIGURE: B-63 SHT. 1 OF 1 REV. 0 ---------==------------------------1._
_______ _1
* 2-RHRH-21-11
/ (8PR) / LINE SEE FIG. 8-75 [---* 21RH8 3FB \ 2-RHRH-21-10
{2PR-1) -...
* 21RH12 ""!_\_, 2-RHRG-21-10
\"-(2PR-2) 'rLINE 8-RH-2273 SEE FIG. 8-59 / / 0 21RH44 ,*'<" :\...;:,..-,+-*
3/4" \_ * \ LINE 14-RH-2214
/"\..SEE FIG. B-55 LINE SEE FIG. 8-72 ...... * ......
2-RHRS-21-44 (39PS-1 THRU 4) P & ID: 205332 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2216 FIGURE: B-63H SHT. 1 OF 1 REV. 0
* 22SJ44 1 3/4" PENETRATION I _..,,.,..,,.
NO. 31 LINE 14-RH-2224 21SJ44 1 * / / < _..,,.-1 "' I 3/4" >--i : /.....>I ,..,,.,..,,.
I I
I I
* I LINE 14-RH-2214 PENETRATION I ,..,,.,..,,.
2PL-1~
NO. 30 ,.,.. LINE 14-RH-2224
2LD-I -   -2LD-O 2                          -5LU-I 1 1/4"      32"  x 30"              5 EL. 166' PLUG      RED.                     ~5PL-1.-2 1                            / 5 P L - 3 THRU 10 STEAM GENERATOR NO. 21 9LD-O- -    9LD-I 1 1/4" PLUG                                ,,,
\:/ SEE FIG. 8-54 4-5' (V.) ,.,.. ,.,.. ' 45" (V.) 7 ,0 8 'Jtr ...... ...... 'r LINE 14-RH-2214-9 10 '\... ...........
10LU-I
'yLINE 14-RH-2224 SEE FIG. B-54 LINE 14--RH-2214
                                                                ) 1"
\. SEE FIG. 8-55 SEE FIG. B-55 P & ID: 205334-ISOMETRIC:
                                                        '
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION 14-RH-2224 14-RH-2214-FIGURE: 8-65 SHT. 1 OF 1 REV. 0
                                                        /'<" .....-\..,
* 22SJ4-4 PENETRATION NO. 31 2-RHRH-22-1 J (4PR) 2-RHRH-22-2  
                                                                  .
/ (9PR} ' LINE 14-RH-2224-21SJ44 * / / < _.,.,..., "' I PENETRA TlON I ..,.,. NO . .30 2-RHRH-22-3  
                                                  -r-+-.l.
\ (11PR) LINE 14-RH-2224 t,; SEE FIG. B-54 ,,,.
                                                  .,>.j 21MS2
* LINE 14-RH-2214 45" (V.} 45* (V.) 2-RHRH-21-1 (8PR-1) 2-RHRH-21-2 (8PR-2) / 2-RHRH-22-4 (14PR) ,,,. ,,,. " 'rJLINE 14-RH-2224 SEE flG. B-54 10PR) / LINE
                                                                )     ,.                       ......
... ..... ..... '(LINE 14-RH-2214-SEE FIG. 8-*55 SEE FIG. 8-55 P & ID: 205.334 ISOMETRIC:
                                                        ' ...... 1..,
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 14-RH-2224-14-RH-2214 FIGURE: 8-65H SHT. 1 OF 1 REV. 0
                                                        /Y                                            ......
*
                                                  -r-+-.i.
* LINE 14-RH-2212 ) SEE FIG. B-56 (' ...._ ...... / 12" x RED. ...... / '</ 3PL-1,-2\
                                                  .,>.j 21MS4                                                'rJ  LINE 32-MS-2211 SEE FIG. 8-33 SHT. 2 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2211, 30-MS-2211 FIGURE: 8-33              SHT. 1 OF 2 REV. 0
 
*                                                                      *
* 1" 21-MSR-2   ..___,,........
          ~  (3PR-1)  ~ \~7Z1MS1B9
          ~,                 !T\ f.21-MSR-3 I            (3PR-2)
I 1 1/4" PLUG 21-MSLS-1 EL. 166' STEAM GENERATOR NO. 21  * .MSH-2~1~                                  1 1/4" PLUG
                                                                                  ./S-209 21-MSR-5___..,/        1 1/4"                              (10PS-1,-2)
PLUG                        '/     /    21-MSLS-9
                                                                  ) 1"
                                                              ' ,....\_
I'<                    / , 1/4"
                                                      'C'--f-.:J.
PLUG
                                                      ..A/ 21MS2
                                                                  ) 1"
                                                              ' ,....\_
I'<                              ''
                                                      't"-+-.l.
                                                      ..A/ 21MS4                                  'rJ  LINE 32-MS-2211 SEE FIG. B-33 SHT. 2 P & JD: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
                                                  &#xa9;                                          INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2211, 30-MS-2211 FIGURE: 8-33H SHT. 1 OF 2 REV. 0
 
          *                                                                *
* LINE 30-MS-2211 SEE Fl G. B-33 SHT. 1rl'                                                                                                           LINE 34-MS-2211
                                                                                                                              ...-~SEE  FIG. 8-41
                                                                                                                        .....
                        '
                                  /
                                    ?                                                        1((,
                              /                                              LINE 6-MS-2211
                            /
SEE FIG. B-45
                          <' - - - - - 7
                                      /
I'-'
PENETRATION 1      //
I L-~--....
                                          ............      /
                                                        '-""
                                                                                        "'-- 32-MS-2211-3./6-MS-2211
                                                                          /
2LD-0 2PL-1 ~HRU  3/
P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2211. .32-MS-2211 FIGURE: B-33        SHT. 2 OF 2 REV. 0
                                                                                                                                                    **----- __J
 
        *                                                    *
* LINE 30-MS-2211 SEE FIG. B-33 SHT. 1r<'                                                                                    LINE 34--MS-2211
                                                                                                    ,.....:\SEE FIG. 8-41
                        ......                                                                .....
                                    /
1(<_
                                  /                            LINE 6-MS-2211      '
                                /
                              <------7                        SEE FIG. 8-45
                                          /
I'-'
PENETRATION 1            /                            I
                                      /
L-~--...
                                            ' '  /
PA:09//
(1PS-3 THRU 12)
MSG-209 (1PR)
P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSEIWICE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2211. 32-MS-2211 FIGURE: B-33H SHT. 2 OF 2 REV. 0
 
*                                                                *
* 24-MS15\7 2FB ~3 2
                                                      &#xa9; 24MS13\7 2FB~3 2
 
24MS11 2FB 3
2 LINE 6-MS-2247 SEE FIG. B-42 LINE 32-MS-224-1    (,,-
                            ,,,
                                                ~        3<-MS-2241
                                                                                                              ,.34-MS-2241 8-MS-2241 8-MS-2242 8-MS-2243 8-MS-2244 8-MS-2245
. SEE FIG. B-30 SHT. 2 6-MS-2246 P & ID: 205303 NOTE:                          &#xa9;  LINE 8-MS-2241 SEE FIG. B-26                LINE 8-MS-2244 SEE FIG. 8-26 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 24 MANIFOLD SEE FIG. 8-26(            LINE 8-MS-2242 SEE FIG. B-26                LINE 8-MS-2245 SEE FIG. 8-26 SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG
                                                &#xa9;  LINE 8-MS-2243 SEE FIG. B-26            &#xa9;    LINE 6-MS-2246 SEE FIG. 8-26 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                              +SEE ABOVE FIGURE: 8-38 SHT. 1 OF 1 REV. 0
 
*                                                                *                                                                    *
                                                                                                &#xa9;
 
24MS15V x  24~1510 2FB __6_
                                                      &#xa9; 24MS13.z 2FB=
                                                                                                          ' ~ 1"1SS-224 MSH-224T MSSN-24 24MS146)                                          (3PR) 2FB_
                                      &#xa9; 24MS11 2FB=
z 24MS12&
                                                                                  \      MSS-220 (2PS-3,-4) 2FB =
LINE 5-MS-224 7 SEE FIG. 8-42
                                                    \    MSS-216 (2PS-1,-2)
                                                                                                                                >1<34-MS-2241 34-MS-2241                                                            8-MS-2241
                          .,,,                                                                                                    8-MS-2242 8-MS-2243 LINE 32-MS-2241 SEE FIG. B-30 SHT. 2 t""                                                                                                        8-MS-2244 8-MS-2245 6-MS-2246 P & ID: 205303 NOTE:                            &#xa9;  LINE 8-MS-2241 SEE FIG. B- 26                  LINE 8-MS-2244 SEE FIG. B-26 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 24 MANIFOLD SEE FIG. B-26.            LINE 8-MS-2242 SEE FIG. 8-26                  Ll\\IE 8-MS-2245 SEE FIG. B-26 SALEM UNIT 2 INSERVICE INSPECTION DRA~NG
                                                &#xa9;  LINE 8-MS-2243 SEE FIG. 8-26
                                                                              &#xa9;    LINE 6-MS-2246 SEE FIG. B-26 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                                                *SEE ABOVE FIGURE: B-38H SHT. 1 OF 1 REV. 0
 
*                                                                    *                                                      *
                                                                                &#xa9; 23MS10 23MS9
                                                      &#xa9;                            2 23MS14 V 2FB ~3
 
2    23MS13A(1 2FB1*.3
                                      &#xa9;                          2 23Ms12V 2FB~3      0                                I 2                                    ~
LINE 6-MS-2237 SEE. FIG. B-42
                                                                                                                      *34-MS-2231 8-MS-2231 8-MS-2232
                    'V,,,.,,,."'                                                                                      8-MS-2233 8-MS-2234 LINE 32-MS-2231      \_
8-MS-2235 SEE FIG. 8-31 SHT. 2 6-MS-2236 P & ID: 205303 NOTE:
0  LINE 8-MS-2231 SEE FIG. B-27                    LINE 8-MS-2234 SEE FIG. 8-27 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO.
23 MANIFOLD SEE FIG. B-27.
LINE 8-MS-2232 SEE FIG. B-27                    LINE 8-MS-2235 SEE FIG. 8-27 SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG LINE 8-MS-2233 SEE FIG. B-27
                                                                                          &#xa9; LINE 6-MS-2236 SEE FIG. 8-27 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                                      &#xa5;SEE ABOVE FIGURE: 8-39 SHT. 1 OF 1 REV. 0
 
*                                                                    *                                                                    *
                                                                                &#xa9; 23MS10  f 23MS9  z
 
23MS15~  *
                                                      &#xa9;                                    2FB-=-
                                                                                                              ~ MSS-223 23MS14z 2FB=
MSH-223T MSSN-23 23MS136J (4PR) 2FB=
                                        &#xa9; 23MS12z 2FB=
                                                &#xa9;                                I 23MS118
                                                                        ~
ZFB=                            LIN~-MS-2237 SEE FIG. B-42 MSS-219 (3PS-3,-4)
                                                    ~      MSS-215 (3PS-1,-2)
                                                                                                                                    ><34-MS-2231 8-MS-2231 8-MS-2232
                                  /
                    \,,;,,,.,,,.                                                                                                      8-MS-2233 8-MS-2234 LINE 32-MS-2231        \.._                                                                                                            8-MS-2235 SEE FIG. 8-31 SHT. 2                                                                                                                  6-MS-2236 P & ID: 205303 NOTE:
LINE 8-MS-2231 SEE FIG. B-27 LINE 8-MS-2234 SEE FIG. B- 27 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO.
23 MANIFOLD SEE FIG. B-27.
                                                      &#xa9;  LINE 8-MS-2232 SEE FIG. B-27                      LINE B-MS-2235 SEE FIG. 8-27 SALEM UNIT 2 INSERVICE INSPECTION DRAV11NG .
LINE 8-MS-2233 SEE FIG. B-27
                                                                                            &#xa9;  LINE 6-MS-2236 SEE FIG. 8-27 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                                                      *SEE ABOVE FIGURE: 8-39H SHT. 1 OF 1 REV. 0
 
*                                                                                *                                                  *
                                                                                                          &#xa9;
 
22MS15V 2FB ~3 2
                                                                  &#xa9; 22MS13V              ~
2FB ~3 2      22MS14 ,,ci 2FB &#xa3;~3 2
 
22MS11 V                                                I*
2FB~3                                                ~
LINE 6-MS-2227 2  22M S1 2 Jci SEE FIG. B-42 2FB ~3 2
1
                                              ~    34-MS-2221
                                                                                                                              >t<34-MS-2221 8-MS-2221 8-MS-2222
                    )... ............                                                                                          8-MS-2223 LINE 32-MS-2221    , \_                                                                                                      8-MS-2224-SEE FIG. 8-32 SHT. 2                                                                                                          8-MS-2225 6-MS-2226 P & ID: 205303 NOTE:                                                                                              ISOMETRIC: MS-2-3 FOR ENLARGED DETAIL OF NO. 22          &#xa9;    LINE 8-MS-2221 SEE FIG. B-28              LINE 8-MS-2224 SEE FIG. 8-28 MANIFOLD SEE FIG. B-28.                                                                      PUBLIC SERVICE ELECTRIC & GAS LINE 8-MS-2222 SEE FIG. 8-28              LINE 8-MS-2225 SEE FIG. 8-28 SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG
                                                              &#xa9;    LINE 8-MS-2223 SEE FIG. 8-28
                                                                                              &#xa9;  LINE 6-MS-'2226 SEE FIG. 8-28 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                                              +SEE ABOVE FIGURE: 8-40 SHT. 1 OF 1 REV. 0
 
*                                                                      *                                                          *
                                                                                                  &#xa9;
 
22MS15 V 2F8 _,6._
                                                          &#xa9;                                            ~ MSS-222 22MS13z 2FB=
MSH-222T MSSN-22 22MS14Lfl                                (3PR) 2FB=
 
22MS11 2FB=
z 22MS12Lfl
                                                                                    ~
I NE 6-MS-2227 EE FIG. B-42.
2F8 =
                                                                            \      MSS-218 (2PS-1,-2)
                                                                                                                            >t<34-MS-2221 8-MS-2221 8-MS-2222
                    )... ..........                                                                                          8-MS-2223 LINE 32-MS-2221    , \.                                                                                                      8-MS-2224-SEE FIG. 8-32 SHT. 2                                                                                                          8-MS-2225 6-MS-2226 P & ID: 205303 NOTE:                                                                                            ISOMETRIC: MS-2-3 FOR ENLARGED DETAIL OF NO. 22    &#xa9;  LINE 8-MS-2221 SEE flG. B-25                LINE 8-MS-2224 SEE FIG. 8-28 MANIFOLD SEE FIG. 8-28.                                                                      PUBLIC SERVICE ELECTRIC & GAS LINE 8-MS-2222 SEE FIG. 8-28                LINE 8-MS-2225 SEE FIG. 8-28 SALEM UNIT 2 INSERVICE INSPECTION DRA\IVlNG
                                                        &#xa9;  LINE 8-MS-2223 SEE FIG. 8-28
                                                                                    &#xa9;    LINE 6-MS-2226 SEE FIG. 8-28 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                                            *SEE ABOVE FIGURE: 8-40H SHT. 1 OF 1 REV. 0
 
                                                              *                                                  *
                                                                        &#xa9; 21MS10 21MS9
 
21MS15 ,ci.3
                                                                                      ~
CD                    2      2F8 2
21MS14\J 2F8  ~3 2
 
21MS12 \J 2FB ~3                                I 2                                ~
LINE 6-MS-2217 SEE FIG. 8-4-2
                                                                                                          *.34-MS-2211
                                        ~
8-MS-2211 8-MS-2212
                              /
                          ,;                                                                                8-MS-221.3 LINE 32-MS-2211    '\,./                34-*S-2211                                                        8-MS-2214-SEE FIG. B-33 SHT. 2 \_                                                                                    8-MS-2215 6-MS-2216 P & ID: 20530.3 NOTE:                                        0    LINE 8-MS-2211 SEE FIG. B-29 LINE 8-MS-2214 SEE FIG. 8- 29 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 21 MANIFOLD SEE FIG. B-29.              &#xa9;    LINE 8-MS-2212 SEE FIG. B-29              LINE B-MS-2215 SEE FIG. 8-29 SALEM UNIT 2 INSERVICE INSPECTION DRAWING LINE 8-MS-2213 SEE FIG. B-29
                                                                          &#xa9;    LINE 6-MS-'2216 SEE FIG. 8-29 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                          +SEE ABOVE FIGURE: 8-4-1 SHT. 1 OF 1 REV. 0
 
*                                                                  *
* 21MS10  f 21MS9  z
 
21MS15s 2FB-=-
21MS14 2FB=
z    21MS13s
 
                                                                                                            ~ MSS-221 MSH-221T MSSN-21 (3PR) 2FEl =
                                          @
21MS12 2FB=
z 21MS11lf1 I
                                                                                    ~
                                                                            ~
2FB=                              LINE 6-MS-2217 SEE FIG. B-42
                                                                                                              /
MSS-217 (2PS-3,-4)
                                                        ~MSS-213(2PS-1,-2)
                                                                                                                            *34-MS-2211 8-MS-2211 8-MS-2212
                            ,,,.""                                                                                          8-MS-2213 LINE 32-MS-2211      v""                                                                                                  8-MS-2214 8-MS-2215 SEE FIG. B-33 SHT. 2  \_
6-MS-2216 P & ID: 205303 NOTE:                                          0    LINE 8-MS-2211 SEE FIG. B-29                      LINE 8-MS-2214 SEE FIG. B- 29 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 21 MANIFOLD SEE FIG. 8-29.                &#xa9;    LINE 8-MS-2212 SEE FIG. B-29                      LINE 8-MS-2215 SEE FIG .. B-29 SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG LINE 8-MS-2213 SEE FIG. B-29
                                                                                        &#xa9;  LINE 6-MS-2216 SEE FIG. B~29 MAIN STEAM SYSTEM MAIN STEAM RELIEF
                                                                                                                            *SEE ABOVE FIGURE: B-41H SHT. 1 OF 1 REV. 0
 
*                        *
* LINE 34-MS-2241 ~        LINE 34-MS-2221 ~
SEE FIG. B-.38 _,,.""    SEE FIG. B- 40 _,,""
      . (,,,. . . (fl                /
                        ~(""
1
  ~ ~1                  <          ~1 2                    2 LINE 6-MS-2247          LINE 6-MS-2227 LINE 34-MS-2231 ~        LINE 34-MS-2211 ~
SEE FIG. B-39 _,,. _,,  SEE FIG. B-41 _,,""
      't_,,.,,,.(JI                  /
                        ~(""
1
  ~ ~1                  <          ~
                                                            *6-MS-2247 6-MS-2237 6-MS-2227 6-MS-2217 2                    2              P & ID: 205303 ISOMETRIC: MS-2-3 LINE 6-MS-2237          LINE 6-MS-2217 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVv1NG MAIN STEAM SYSTEM MAIN STEAM HEADER
                                                            *SEE ABOVE FIGURE: B-42 SHT. 1 OF 1 REV. 0
 
*                                                                      *
* LINE 32-MS-2231 SEE FIG. B-31 SHT. 2          'i'--
                                                      .,_~ry..'Oj;ji
                                                  .6Y.,.. ,..,-        1A 7-~y:.--
(_,..,-  / * - - - - -............
2 3/4" WELDED CAP P & ID: 205303
                                /                                                          ISOMETRIC: MS-2-2 LINE 6-MS-2231      \..... _,,
SEE FIG. 8-43 SHT. 2* \.                                                            PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43 SHT. 1 OF 2 REV. 0
 
*                                                                              *
* LINE 32-MS-2231                                /        2-MSALS-H12 SEE FIG. B-31 SHT. 2                    ?-
                                              ~s...-
                                                        \\x_JOJd')  ...-                          / 2-MSAH-107
(._. .- J
                                        '2.-;_..,.,... ...- 1-+-+-+-+-----...                      (3PR)
I 2-MSALS-13 2-MSALS-14                                                        23MS45 I/      2-MSALS-H11
                                                                      ,.
                                                                  ~
                                                                                                    \  ~
                                                                      ',' 23MS191
                                                '    .........
                                                                      ,,
LT.l BEND (H.)              2-MSAH-108
                                                                '..J 2-MSALS-13 (6PR) 2-MSAH-110 _ /                                      /              2-MSAG-150 (10PR)
                                                /                            NO ID
                                                              //2-MSALS-8 2-~SALS-H7
{,
                                                                                        .. ..y...-
o/
                                                                                    ~
3/4" WELDED CAP 2-MSAA-111
                                                            '                      (14PS)
                                                                "'--- 2-MSAG-151 (15PR-1) 2-MSAS-112                                                                              P & ID: 205303
                            /                                                                                                            ISOMETRIC: MS-2-2
                              '                    (15PR-2)
LINE 6-MS-2231      \ ../
SEE FIG. B-43 SHT. 2 \.        "-2-MSAG-113                                                                                        PUBLIC SERVICE ELECTRIC & GAS (15PS-1 THRU 8)                                                                                          SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43H SHT. 1 OF 2 REV. 0
 
*                                        *
* BEND (H.)
17PS-1 THRU 8 \
                                            ~..._o/    l LINE 6-MS-2231
                                          /      , _..."\._SEE FIG. B-43 SHT.
BEND (H.)
THRU 16 32      6" TEE
                                                                                    ~
TO NO. 23 AUXILIARY }.. /
FEED PUMP TURBINE      \._...
                                                                  .
                                                                  ~y
                                                                    ~y FLOOR EL.
P & ID: 205303 ISOMETRIC: MS-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 BEND (V.)
JNSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 0                                              FIGURE: B-43 SHT. 2 OF 2 REV. 0
 
    *                                                                      *                                                                            *
                                                              /    2-MSALS-H6 2-MSALS-H5                    /        (16PS-1,-2) 2-MSAG-115  ~~        BEND (H.)
(16PS-3,-4)    ~""'                              /    2-MSAS-114
                                                                      /        (15PR-3)
                                                                                ~\-rJ)Y'    ) LINE 6-MS-2231
                                                                              /        J _,.'\_SEE FIG. B-43 SHT. 1 BEND (H.)
0    ~      2A-MSASN-154 2-MSALS-54 ~
2-MSALS-5                                                                                              2A-MSASN-155 & 156~        /
(20PS)                                                                                                (31PR)            '-.....
6" TEE
                                                                                                                                  ~
                                                                                                                                  -~        2-MSAS-124 2-MSALS-1 TO NO. 23 AUXILIARY \.. _,.                        (32PS-1 THRU 4)
FEED PUMP TURBINE    \__,.
                                                                                                      .
sy
                                                                                                        ~y
                                      ~    2-MSAS-119 (23PR)
                                ~ 25PS-1      THRU FLOOR EL. 100' ~~* ~~
2A-MSASN-152 - - -
                                                                        '~
P & ID: 205303 ISOMETRIC: MS-2-2 sy PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
                                                                  ~
BEND (V.)
                                                                \        2-MSAG-123                                                    INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 0    \    2A-MSASN-153 6-MS-2231 FIGURE: B-43H SHT. 2 OF 2 REV. 0
 
*                        *
* FLOW 4
3 21MS45 2
lA
                                                                  -') LiNE 32-MS-2211
                                                      ~ ,,- _,.    )l SEE FIG. 8-33 SHT. 2
                                                                /
11  6" TEE                                ,,.,,.      /.~s'?--
    ~                                  ,,.        A' ~SI'
                                <<.-~ \,-1.{'"'s P & ID: 205303 ISOMETRIC: MS-2-2 23                                                                                  PUBLIC SERVICE ELECTRIC &: GAS 6"TEE~                                                                                              SALEM UNIT 2 I    ,_,..,,.
                  ;.../                                                                        INSERVICE INSPECTION DRAWING
                /
            /                                                                                      MAIN STEAM SYSTEM
_,..LINE 6-MS-2231                                                                        AUXILIARY MAIN STEAM SEE FIG. B-43 SHT.                                                                        6-MS-2211 FIGURE: B-45 SHT. 1 OF 1 REV. 0
 
*                                                                                *
* FLOW 5    4 2-MSAH-102~
(8PR-1) 2-MSAS-103 """"'- "
(8PR-2)            ""-....                              2-MSAH-101 (5PR)                        1A ~ 2-MSALS-12
                                                                                                                  ~ 2-MSALS-H14 .
1
                                                                                                                  /
                                                                                                                      ,...,...1
                                                                                                                            ,...
LINE 32-MS-2211 SEE FIG. 8-33 SHT. 2 11              6" TEE                                        ,...        ,,,(fv~
2-MSALS-H13 \
(13APS-1 THRU 8)                          ~                                            ~
                                                                                              ,... .....      ,,,"\i'-~I"
                                                                                                        ,...-J.s 12                                  ~~'\....""'i' 2-MSALS-11 ~.                            6'" CAP 1*
                                                ~
              . .,jY                            ,1, r      !;"'
                    'CJ 15 16    16A
                                                '.' 21MS191 3/4'" CAP                      "
160 'T*
                                                          / . 2-MSAS-105
                        /,1MS46 2-MSAS-1D4
                                                                      .~
17        o/
2-MSALS-H8
                                                                              /        (21PS-1 THRU 8) 2-MSALS-9
                                                                              ~1 p & ID: 205303 ISOMETRIC: MS-2-2 23                                                                                      PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 6" Tff---............            I ,,,/
                                                              ~J..,...
                                                                  ,... ,...                                                                              INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM
                                                      *      *""LINE 6-MS-2231                                                                              AUXILIARY MAIN STEAM
                                              ~                  SEE FIG. 8-43 SHT. 1                                                                            6-MS-2211 FIGURE: B-45H SHT. 1 OF 1 REV. 0
 
*                                                        *
* 3/4"
                                          ~
I WELDOLET CAP LINE 6-PR-2204                '\V    lPS-1 THRU 4 SEE FIG. B-50                  /
                  ~
I l_                            r        12-PR-2201 /6-PR-2204 LINE  6-PR-22~' ..... ,
SEE FIG. B-51                    *~
I/,,          12-PR-2201/6-PR-2201
_,.."-..._
                  ~                      ~~              ,,..            '...J l                        1 L/Y _,..                      (  LINE 6-PR-2201
                      '-...                  V                                SEE FIG. 8-53
                            .....
                                  .....
                                        't::~ ,,..-.. .
12-PR-2201/6-PR-2203 --------. VY'
                                          .*V                      '...J
( LINE    6-PR-2205 ii.                            SEE FIG. B-49
_/        2 12-PR-2201 /6-PR-2205 EL. 130'          I                \
r---llf-=1
* 3 P &: ID: 205301 tt 3A                                                    ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS
                                                .....                                                    SALEM UNIT 2
                                                      ''(LINE 12-PR-2201 SEE FIG. B-46 SHT. 2              INSERVICE INSPECTION DRA'MNG REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: B-46 SHT. 1 OF 2 REV. 0
 
*                                                  *
* 3/4"
                                    ~
I WELDOLET CAP
                                          - - - - - PRG-66 m
                                                  -- ') 3/4" t::Y-          ~'
LINE 6-PR-2204 SEE FIG. B-50                  m
            'I'-'
I                          ~ 2-PRG-1B l.__                                12-PR-2201 /6-PR-2204 LINE  6-PR-22~' ..... ,                      I  12-PR-2201/6-PR-2201 SEE  FIG.~                    'C:: I . . . . . . . . - . . . . . ..J l
              . ',
t::Y _. .                    ( LINE  6-PR-2201 SEE FIG. 8-53
                    ...........
                                't:::              ..-.. .
l:Y',.....          '"(LINE 6-PR-2205 SEE FIG. B-49 I0~2C-PRA-224 EL. 130' /-                        \      (2PS-1,-2)
L___]      ~
P &: ID: 205301 ISOMETRIC: RC-2-3
                                          .....                                          PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
                                                ''(LINE 12-PR-2201 SEE FIG. 8-46 SHT. 2                INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: 8-46H SHT. 1 OF 2 REV. 0
 
  *                                            *
* _)
LINE 12-PR-2201 SEE FIG. B-46 SHT.      NO. 2 PRESSURIZER RELIEF TANK Ct.  "f-'                                          13
      ~'n*I                                                      BEND (V.)
          ~ 3B 3C 3D' 3E 4-.1n~
                        ~*
                                                            ~1 12 11 7
8 BEND (H.)
C-\
v                                                                      P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: B-46 SHT. 2 OF 2 REV. 0
 
*                                                              *
* 2C-PRS-111 16F~                                              (13PR-2) 2C-PRS-110 (13PR-1)
                                                                            /
LINE 12-PR-2201 SEE FIG. B-46 SHT. 1 4.
    ~I
          'l'-'
NO. 2 PRESSURIZER RELIEF TANK L-112 (14PR-1)
                                                                                /
                                                                                            /          2C-PRSN-405 & 405A BEND (V.)
                  ~In~
                                                                                      ~1
                                                                                                  - - - - - - - 2C-PRSN-406 & 406A 2C-PRS-109
                      ~*                                                                                        (12PR-1)
                    /    2C-PRSN-400                                                              " - - - 2C-PRS-108 (llPR-1)
                    /    2C-PRSN-401
                                                                                                  " - - - 2C-PRS-107 (lOPR-2)
BEND (V.)
                                                                                .....____    ~          2C-PRS-106
                                                                                        "'--            (lOPR-1) 2C-PRSN-402 _ . . //                                                    """                2C-PRS-105
                                                                              ~              (9PR-2) 2C-PRH-101 _ /
2C-PRA-104 (SPR)
                                                            \END (H.)
              ~
v                              \
                                                          .
2C-PRS-102 (7PR) 2C-PRS-103 (8PR)                                                                P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201
  --------------*----===============-----=-------,---------------L.:.F:IG=U~R:E:~B--_:46:H~SH~T~._:2:._:0~F~2:._::R:EV:*~O:_j
 
*                                                      *
* CLASS 2                FLOW..-~
                            ~
2PR3  2 T
I
                                      ,.-..t__,
LINE 6-PR-1203 SEE FIG. A-19 3
LINE 12-PR-2201 SEE FIG. B-46 SHT. 1 I I
                  ---1.__,            6 5
BEND P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 6-PR-2205 FIGURE: 8-49 SHT. 1 OF 1 REV. 0
 
*                                                                  *
* PLATFORM EL. 151'
_,/'
2-PRG-51 _ , / '
2-PRG-1 (2PR) 2-PRSN-2
                                                                      ~~(4PR-1) 2C-PRH-212 2-PRSN-50
                                                                          ~
2-PRSN-49
                'I'-' ~                                                      ~        2-PRSN-4B
                                                                                /
~~~ ~t                                                                            ~2-PRSN-J C~P:!i)-213 PR
          -2201            N 43 _,/'
2-PRG-42        /                                        ~
:
2-PRS 2-
                                  .//
                                      'l                      /t-/t--c-r-:
                                                '-...._/_/-i::.+-
                                -~~:~~:.
B-4' SHT. 1:                                                          END 9
                --l_.                      2-PRSN-4      ./
                                                                                                                    & ID* 205301 p      . RC-2-3 ISOMETRIC:
2-PRSN-46RSN-47 2-P                                              ------.=--::E~LECTRIC        & GAS PUBLIC  S~RA~~~  UNIT 2_ __
PECTION DRA'MNG INSEE~~i5tg00LAN~
R      NT PRESSU 1 i~~T~~LIEF CONTAINME 6-PR-22050F 1 REV. 0 FIGURE: B-49H SHT. 1
 
*                                                    *
* 2 2PR4 LINE 6-PR-1204 _)    I SEE FIG. A-18 ( ' ,    I
                                                        'I PLATFORM EL. 151' BENO BENO~-------
5 6
45" (V.)
LINE 12-PR-2201                                                                P & ID: 205301 I SEE FIG. B-46 SHT.                                                              ISOMETRIC: RC-2-3 I
                                ----L.,                                                                        PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2204 FIGURE: B-50 SHT. 1 OF 1 REV. 0
                                                                        . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.l..__ _ _ _ _ _ _ _ _ _ _ _ _ _ __,
  ---**----*--****-------------*--------*
 
*                                                        *
* 2-CPRA-146A    ~    yJY CLASS 2
                                                ~
2-PRSN-8 \
PLATFORM EL. 151' 2-PRSN-37 " " '
2-PRG-9 ~                  ""'
2-PRSN-36 ~      "'      BENDD_ _-i::\-__....18--t=t~
                                    ~2C-PRH-211 (2PR)
                            ~    2-PRSN-10 2-PRSN-35 /
45" (V.)
LINE 12-PR-2201                                            P & ID: 205301 I SEE FIG. 8-46 SHT.                                        ISOMETRIC: RC-2-3 I
                                  ---l_,                                                    PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2204 FIGURE: B-50H SHT. I OF I REV. 0
 
*                                    *
* CLASS 2 CLASS 1
                                                      -.
I
                                        --- ---
_J LINE 6-PR-1205 SEE FIG. A-17 3
_6PS~
9 10 P & ID: 205301 0~        11                                                            ISOMETRIC: RC-2-3
  ~5*  (V.)
PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 LINE 12-PR-2201                    INSERVICE INSPECTION DRAWING I SEE  FIG. B-46 SHT. 1                REACTOR COOLANT SYSTEM I                                          PRESSURIZER RELIEF
                          ..--G                                              6-PR-2203 FIGURE: B-51 SHT. 1 OF 1 REV. 0
 
*                                          *
* E:;_
                              ~!<:
                                      ~*
2-PRG-26 ~
CLASS 2 2_:PRSN-25~                                  /CLAsS1 2PR5
                                                              -,-
_ _ _ _ _ J1 LINE 6-PR-1205  )_ __
SEE FIG. A-17  (
2-PRG-27  ~
2-PRSN-28~
PT-5_/
2-PRG-29 J
2-PRSN-32
                        ~  ~
                                                                        ~PT-6 2-PRSN-33
                                                            \
PT-7~                                                        2-PRG-30
                            ~        2C-PRH-210 (7PR)
P & ID: 205301 0:                                                                            ISOMETRIC: RC-2-3
      .
45 (V.)                                                                  PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 2-PRSN-34 /
LINE 12-PR-2201                          INSERVICE INSPECTION DRA'MNG I  SEE FIG. 8-46 SHT. 1                        REACTOR COOLANT SYSTEM I                                                . PRESSURIZER RELIEF
                              ----L,                                                      6-PR-2203 FIGURE: 8-51 H SHT. 1 OF 1 REV. 0
 
*                                                    *
* CLASS 2 LINE 3-PR-1207 )_
SEE FIG. A-24  [ -
                      ~
                      - -1>4- - -1 2PR1          I I
3" x 6"
                                              ~RED.
f  -      \PLATFORM EL. 151' I    I. .I    I 05 P & ID: 205301 ISOMETRIC: RC-2-3 EL. 143'                                            PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 LINE 6-PR-2201 SEE FIG. B-53                          INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2202 FIGURE: 8-52 SHT. 1 OF 1 REV. 0
 
*                                                                      *
* CLASS 2 LINE 3-PR-1207 SEE FIG. A-24 t ~-t><J- -
                              - - -
2PR1
                                                      -1 I
I 3" x 6"
                                                              ~RED..
                                                    /          ""'\PLATFORM EL. 151' I  1  I__]
2-PRSN-65  2-PRSN-64
                                                                                                      /PT-12
                                                                                          /          ~
                                                  ~L_~~~~=~~~-13;:::'.~~--1:::8--~~~~~~..__,~
                                                                          /
2C-PRH-208 (3PR) j                        [b/        2-PRSN-63
                                                                                                            ,,,,,,,- PT-1 2
                                                ~*~
                                                            -~~~~~~~~~~---e.r~..-/"
                                                            - - - - PRSN-62
                                              ~1 rn P & ID: 205301
                                                          /        6" TEE                                                      ISOMETRIC: RC-2-3 EL. 143'
(---- ---1 LINE 6-PR-2201 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 SEE FIG. 8-53                                                            INSERVICE INSPECTION DRA\MNG REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2202 FIGURE: B-52H SHT. 1 OF 1 REV. 0 1.:i ~ : .*.~:..:i ::'.., *.
 
*                                                *
* CLASS *1 CLASS  21 i  ----{>:::}-----_)LINE 3-PR-1206 2
PR 2
                                                            \    SEE FIG. A-20 3
SA 58 LINE 6-PR-2202 SEE FIG. 8-52 I'-'                        6 6" TEE        I LINE 12-PR-2201 SEE FIG. 8-46 SHT. 1 I
I 12 11          \!        9 I  45' (H.)              10                                            P & ID: 205301
                                                      \    45* (H.:                        ISOMETRIC: RC-2-3
                    ..--L PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 9Ps-1  n-rnu 3 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2201, 3-PR-2201 FIGURE: 8-53    SHT. 1 OF 1 REV. 0
 
*                                                                          *                . I
* CLASS1 I
                                                                  ---1><}-------(      LINE 3-PR-1206 SEE FIG. A-20 Ir      2PR2
                                                                            .
PLATFORM EL 151' 2-PRSN-17    J                                ~2C-PRH-207 LINE 6-PR-2202 SEE FIG. 8- 52 2    2 LINE 1 -~~4i ~~T.
SEE FIG.
1 I    2-PRSN-57 2-PRSN-55    ~/                    ----t==t------e:J--~45* (H.)                  -PRSN-59 I
                  ...--L.,.
2-PRSN-56 45' (H.)  j                                        PT-14 2
p & ID: 20530~3 ISOMETRIC: RC-2 ELECTRIC & GAS I                      2C-PRH-214                                            2-PRSN-58          PUBLIC S~A~~~  UNIT 2 (1 OPR)
CT/ON DRAWING INSERVICE INSPgLANT SYSTEM REACTOR u~?zrn RELIEF PRESS        PR-2201 6-PR-2201, 3-1 OF 1 REV. 0 FIGURE: 8-53H SHT.
 
*                                                                *                                          *
                                                            ) LINE 14-RH-2214 14" TEE ~,......,......,......,...... "'\. SEE FIG. B-55
                                            ......
j
                                      ......
                              ......
LINE 14-RH-2212 SEE FIG. 8-56 t,...... ~
                              ....
                              -'
                                                    ---~
y--
5        LINE 14-SJ-2224 SEE FIG.
22RH8 ,
                                                                              .,,,.' ,,          P & ID: 205332
                                                                        ......        v          ISOMETRIC: RH-2-2 LINE 8-RH-2226 ( /
SEE FIG. 8-61                          PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2224 FIGURE: 8-54 SHT. 1 OF 1 REV. 0
 
*                                                                                      *                                                              *
                                                                            . ) LINE 14-RH-2214 14" TEE ~                                  _,.. _,.. _,..-'\ SEE 'FIG. 8-55
                                                          ......
                                                    ......
j
                                            ......
                                      ......
LINE 14-RH-2212 SEE FIG. B-56
LINE 14-RH-2212 SEE FIG. B-56
* P & ID: 205334 ISOMETRIC:
                            'c_,.. E;
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG SAFETY INJECTION SYSTEM 12-RH-2269 FIGURE: 8-67 SHT. 1 OF 1 REV. 0 ______ I 
                                    ....
*
_J
* LINE 14-RH-2212 ) SEE FIG. B-56 ('...._ ...... /
                                                            ---~
14-RH-2212 SEE FIG. 8-56 A I T"-+-.;J.  
                                                            )P 2-RHRH-22-5 ~          22RH4 (4PR)            ""
\...*-\I 2sJ1 60 3/4"\.._ ...... / '<"' 12" x 14" RED. 2SJ70
LINE 14-SJ-222 4 SEE FIG. 8-65                      r<,                            3/4" I'-'
* P & ID: 205.334 ISOMETRIC:
                                                                            '
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG SAFETY INJECTION SYSTEM 12-RH-2269 FIGURE: B-57H SHT. 1 OF 1 REV. 0
3/4" I'-'
* * * ..._,\ 2RH47 ...-...-;> PENETRATION NO. 16 /22PS-1,-2
I I
&.-..... -,. \"--....._..J
                                                                                                              ~~-/11PS-1 THRU 4 I
., ___ 7 41 (3/4" ,_ ___ r" , FLOOR EL. 78' THIS PORTION OF PIPING LOCATED IN PIPE CHASE. 12" x 12" RED. TEE 43 2RH26 ,* . LINE 12-RH-1251\...-...-_...:;/-
l.__'Y\ 2RH78                                                                              ~
SEE FIG. A-62 \_ CLASS 1 CLASS 2 FLOOR EL. 55' LINE 8-RH-2274)
                            *- . ,:,:_ ';)
SEE FIG. 8-58 ('....._ x 8" \LINE 8-RH-2216 SEE FIG. 8-63 / LINE 8-RH-2253 SEE FIG. 8-60 5PL-1 THRU ...... 1 8" x 12" } LINE 8-RH-2226 , ,,. \._SEE FIG. 8-61 I
22RH8, P & ID: 205332
!.-,,;.*'
                                                                                                ......
22RH19 RED. s ..... 3/4" r---1 32 P & ID: 205332 ISOMETRIC:
                                                                                                        '
RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 12-RH-2252 FIGURE: B-68 SHT. 1 OF 1 REV. 0
                                                                                                          .
* 0 * . 2C-23-RHH-1
                                                                                                        ,A I I
\ (42PR) \ I FLOOR EL. 78' 2RH.2_6/J
ISOMETRIC: RH-2-2 LINE 8-RH-2226 SEE FIG. 8-61 t_,..                                    PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2224 FIGURE: B-54H SHT. 1 OF 1 REV. 0
* 2RH47 'y \ '--.lr-7 v-....,.....J (3/4"
 
* 38PS-4 /, PENETRATION NO. 16 ....----"" ---7 \ )._ 38PS-3 / \ 38PS-1,-2 ---'v---ZP-23-RHG-12
          *                                               *
.... / LINE SEE FIG. A-CLASS 2 ---------(38PR) 2P-23-RHH-9 (35PR-2) 2 P-23-RHR-10
* LINE 14-SJ-2214~                        3/4" SEE FIG. 8-65                          'f--
/(35PR-1)
                                                                                  ......
THIS PORTION OF PIPING LOCATED IN PIPE CHASE. FLOOR EL. 55' 12" x 12" x 8" l RED. TEE 6 . LINE 8-RH-221 .
                                                                                          ......         ,1,
FIG. 8-63 LINE 8-RH-2274)
                                                                                                          \/
/ SEE FIG. 8-5 8 !'-........_
                                                                                                          ,\21RH30
ELBOW" 2RH22 '\ 3/4"(--t>::}-x 12" '-.... RED. ""-2PS 2-RHRH-22-2 4 / 2-RHRH-22723 (13PR) /I 8" ____,,/' I ......{( .,. 12" x 12" x --L RED. TEE 3 LINE 8-RH-225 . SEE FIG. B-60 8-RH-2226 SEE FIG. 8-61 I * "" I'<" I ;.-lz2RH19 f.... v 3/4" &deg;I'--' I ZP-23-RHH-11
                                                                                                        'f                              /\
/ (33PR) 0 p & ID:
                              .... .... .... I LINE 14-RH-2212 \""                  I SEE FIG. 8-56                        I
ISOMETRIC:
                                            )
RH-2-2, (: & GAS PUBLIC SERVICE ELETCTR21 SALEM UNI ON DRAW1NG INSERVICE SYSTEM RESIDUAL 12 1 OF 1 REV. 0 . FIGURE: 8-68H SHT. 
                              /'&#xa5;""/                  6 LINE 14-RH-2224 SEE FIG. 8-54 t _..;./;;RH4              45* (V.)
*
                                                                        ' '
* LINE 6-SJ-1262 SEE FIG. A-67 SHT. 1 3/4" '-.... , 22SJ49 "'i'-2 1 /2" &deg;7_\_, /' I 16 CLASS 2 9 FLOOR EL. 55' 3/4" !'-" I
9        *>
* LINE 8-RH-2226 SEE FIG. 8-61 ...... ............
_j-:>
'( P & ID: 205.334 ISOMETRIC:
45* (H.)  '(_.J 2RH77                                                Tt-jRU 4 I
RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAIMNG SAFETY INJECTION SYSTEM B-RH-2262 FIGURE: 8-70 SHT. 1 OF 1 REV. 0
                                                                                          '      I  '
* LINE 6-SJ-1262 1 ) 3/4" SEE FIG. A-67 SHT. (' '' , 22SJ49 '[--2 1 /2" I I CLASS2 / 2P-22-SIH-30
                                                                                        .>. I
/ (15PR) (13PR) L__ _____ -* FLOOR EL. 64' 2-RHRH-22-19/
_..
(5PR) 2-RHRH-22-8 (3PR) 3/4" \ 3/4" \ 3/4" r-' I \ \ \ \ \ ....... --..) 2FB ( )''\ 22SJ46 \.. -+-, < I I"" 22SJ47'L<
* 22RH8 LINE 8-RH-2216\""
v ;>$14 .. 114"
SEE FIG. 8-63 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2214 FIGURE: 8-55 SHT. 1 OF 1 REV. 0
* LINE 8-RH-2226 SEE FIG. B-61 ...... ............
'------------*-------------------------------------------------...1.-.---------------1
'( 2-RHRH-22-17 (1PR) P & ID: 205334 ISOMETRIC:
 
RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM B-RH-2262 FIGURE: 8-70H SHT. 1 OF 1 REV. 0
    *                                                        *
* FLOOR EL. 55' I ..--L 3/4"
* 2-RHRH-21-6        ~
* LINE 8-SJ-1252 SEE FIG. A-69 SHT. 21SJ49 22 I / , 2 1/2" I y/\ \..-,,.-CLASS 2 1 \.. CLASS 1 FLOW 3 2 ' 3/4" 3/4" /!'---' I
LINE 14-SJ-2214~                              3/4" (lPR)               ""'                        SEE FIG. B-65                              '/-----
* 0 8-RH-2216
                                                                                            ......
/ SEE FIG. B-63 /y ' I ' /',/ 21RH1B ' '!uNE 8-RH-2216 SEE FIG. B-63 P & ID: 205334-ISOMETRIC:
                                                                                          '        '              ,1,
RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG SAFETY INJECTION SYSTEM 8-RH-2252 FIGURE: 8-72 SHT. 1 OF 1 REV. 0
                                                                                                                    \/
* 2P-21-SIH-18
                                                                                                                    ,\21RH30
/ (19PR-1) / /
                                                                                                                    '(
2-RHRH-21-20)
                                  /
                                /
                            /         I LINE 14-RH-2212 t:._,,            I I
SEE FIG. B-56
                                    )
                            /'&#xa5;"'/
                        'f'-+-.i.
LINE 14-RH-2224 SEE FIG. B-54 t _,,*'"-' 22RH4                  45* (V.)
2-RHRH-21-7 _ /
45* (H.)
I
                                                                                                    '   I   '
                                                                                                    ,A/
_,,       v    22RH8 LINE 8-RH-2216  t:._,,
SEE FIG. B-63 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2214 FIGURE: B-55H SHT. 1 OF 1 REV. 0
 
*                                        *
* 6 5                f'' -.,\ 2RH64 I       L-'\-;,_f                  *
                                                                            ~1
* 3/4".,,-7 8  _, ~ .r I PENETRATION NO. 9
                                                                                                                ~LUGSNO
                                                            &If--( 3" 4A
                                                                                                /j'
                                                                                            <.- '/
I l-...._
8PS-1 --......,.-'
                                                                                                              /
:-..
                                                                                                                        ~8PS-2
_,-'    1 1/2"
                                                                                                                              '/--"
ID.
I CLASS 2 CLASS  11,-::{_1 ~~2.-.,-,~
LINE 14-RH-1211 L-SEE FIG. A-61   (      2RH2 1(!' ,        I 13                                    :.'_\_, I 2RH63 \"- ...J 14 16 THIS SECTION OF PIPING 23 LOCATED IN PIPE CHASE.
                                                                                                      ) LINE 14-RH-2214
_, "\._ SEE Fl G. 8-55
                                                                                  ~,/
24 1" - - 14" TEE 29    I I                                            P & ID: 205332
                                                                                    ,.-.l_,                                    ISOMETRIC: RH-2-2, RH-2-3 LINE 14-RH-2224 SEE FIG. 8-54                                PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
                                                            , 2SJ70
_...,_,,
                                                              \ .... ...._J                                                  INSERVICE INSPECTION DRAWING 14" x                                                                            RESIDUAL HEAT REMOVAL SYSTEM RED.                        (  LINE 12-SJ-2269                                            14-RH-2212 SEE FIG. 8-67                                FIGURE: B-56 SHT. 1 OF 1 REV. 0
 
*                                                                         *                                                                                                                          *
                                                                                                                                        ~              2C-21-RHS-8
                                                                                                                                  /         r-.       (6PR)
[' .....
I         I~\,.~~H64
                                                                                                                                                              \    ,,_..)
                                                                                                                      ~1
                                                                                                                                                                * ( 3/4''_,,.7
_.., ~ _.., j        PENETRATION NO. 9
                                                                                                                                                /
: t. .....
                                                                                                                                          /
                                                                                                                                                                                /
                                                                                                                                                                                      >
                                                                                                                                      <.,.1                              /
I                                          1 1/2"
                                                                                                  ~1~-r 3" L-...._    .......,.,.., _..,                ~
i'l;                                                                                            I
                                                                                                                              ~
                                                                                                  -,--
J 2P-21-RHH-10                                                                  2RH49\'
(11PR-1)                                                                           /\
                                                                                        'T,          I CLASS 2
/    /2P-21-RHH-11
  /        (11PR-2)                              CLASS 11
                                                                                              ~                                  2P-21-RHG-12 LINE 14-RH-1211L-SEE FIG. A-61  (                2RH2                                    2C-21-RHH- 7 1'')                                (2PR)
                                                                      , ..,.,        I L--lt--7  I 2RH63 \'-- ..J 2-RHRH-22-36 ~
(20PR)            ""'
THIS SECTION OF PIPING LOCATED IN PIPE CHASE.
                              \     2-RHRA-22-31 ------.._,,--_...._ _
2-RHRH-22-46
                                                  ~~*~~                    EL. 65'
                                                                                                                        -RHRH-21-5                l LINE 14-RH-2214 (19PR)                                                                                8PR)                _..,'\_SEE FIG. 8-55
                                                                                                                            ~//
                                                                                                            \                    I'-...._ 14" TEE                      .
I                                    r--------------1 I                                                          P & ID: 205332
                                                                                                                              .---l_,                                                ISOMETRIC: RH-2-2, RH-2-3 LINE 14-RH-2224 SEE FIG. 8-54                                            PUBLIC SERVICE ELECTRIC & GAS
                                                                                  .~                                                                                                        SALEM UNIT 2 o/              , 2SJ70
                                                                                                -.Irr--,
14"X12"~              '."- ....... ...)                                                              INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM RED.                               (    LINE 12-SJ-2269 14-RH-2212 SEE FIG. 8-67 FIGURE: 8-56H SHT. 1 OF 1 REV. 0
                                                  ------- . ----------.. -----. --------------*----------'----------------1
 
*                                                        *
* 3
                                ~1 5                                        ~**
                                                                  ~~
2RH20
                                                                                          ) LINE 8-RH-2216
                                                                                      ,,,. \_SEE FIG. 8-63
                                                                                \-'j
                                                                            ,,,"'v LINE 12-RH-2252(""        '\_
2y 1~,.~          SEE FIG. B-68                "'--- 12" X 8" I~'.                  RED.
A., "
                                                                                                              ...
                    ,,,. ..... .....
LINE 8-RH-2273 SEE FIG. 8-59 t""                  'y  LINE 8-RH-2273 SEE FIG. 8-59 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2274 FIGURE: B-58 SHT. 1 OF 1 REV. 0
                                                                                                      *-----'------*---*--------'
 
*                                                *
* 2-RHRH-21-23 (4PR)
                                                  /
                                                            ~.                      ) LINE 8-RH-2216 2RH20 W~          \/...-\._SEE FIG. B-63
                                                                  '>..-v LINE 12-RH-225;c: ...-      "\.
A.fY          SEE FIG. B-68                  "'--- 12" X 8" Y                                                  RED.
                            ''
LINE 8-RH-2273 SEE FIG. B-59 t...- .....    'y LINE 8-RH-2273 SEE FIG. B-59 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2274
                                                                                    \              FIGURE: B-58H SHT. 1 OF 1 REV. 0
                                                                                                                    ..... ****-**------'
 
  *
* LINE 8-RH-2216 21RH10,*V"'
                                                                                ,,.,
or-+-~
                                                                                        ~ SEE FIG. B-63
                                                                              /  v 21RH14    ,*Y'""'                                          LINE 8-RH-2274
                                                            \,. ;..-,+-*                                          _,,~SEE FIG. 8-58    3/4" LINE 8-RH-2216 \.    *                                            /
r---
SEE FIG. 8-63                                                    /                          1 12
                                                                                                                                              /I  I 7
6 LINE 8-RH-2226 )
                                      ~
LINE 8-RH-2226 SEE FIG. 8-61 (',                  ,  SEE FIG. B-61
                  "'r\
L-"r-.,
Iv' 22RH14 \...._ _,,.J.7izRH10 1
P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2273 FIGURE: 8-59 SHT. 1 OF 1 REV. 0
 
  *                                                                                            *
* LINE 8-RH-2216 21RH10/.,...-
                                                                                                    >_ SEE FIG. B-63
                                                                                        /
                                                                                          ,,..,
                                                                                            ,..-+-""
v 21RH14 /.,,.,,.,.                                              LINE 8-RH-2274
                                                                      \.... ;;.-,+-*                                      _,.,..:{_SEE FIG. 8-58    3/4"'
LINE 8-RH-2216 \..      *                                        /
I--'
SEE FIG. B-63                                                  /                              I 2-RHRH-21-24 /
(14PR)
LINE 8-RH-2226 )                                LINE
                                      ,, .,,,. ~SEE 8-RH-2226 SEE FIG. B-61 ("....._                                FIG. B-61
                      'y\
                        &.-~-,.
22RH14 '*"-      _,...>.ti2RH10
                                                              ~2-RHRH-22-21                                                                                  P & ID: 205332 ISOMETRIC: RH-2-2 (3PR-1)
PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2273 FIGURE: B-59H SHT. 1 OF 1 REV. 0
 
*              *
* TO REFUELING STORAGE TANK
      '!'---'
I EL. 55' 7
6
                                          /) (J I'
j LINE 12-RH-2252
(',SEE FIG. B-68 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2253 FIGURE: B-60 SHT. 1 OF 1 REV. 0
 
            *                                        *
* TO REFUELING STORAGE TANK r--
1 2-RHRA-22-25 /
(3PS-1 THRU 9)                j LINE 12-RH-2252
(',SEE Fl,G. B-68 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2253 FIGURE: B-60H SHT. 1 OF 1 REV. 0
-----------****- ----------------------------------------------------1..----------------'
 
    *                                                            *
* 14" x 8" RED.    ~
31
              " " 22 21                                                /                                                          /
RESIDUAL HEAT                      LINE 8-RH-2225 C.""30                                      LINE 8-SJ-'2262 ( " "
EXCHANGER                        SEE FIG. 8- 74                                              SEE FIG. B-70 NO. 22                                                                                                                              39 20 29 LINE 12-RH-2252 )
SEE FIG. B-68  ,,,-'\.
40
                                                                                                                "("" 45 44
                                                                            /
                                                                                  )    LINE 14-RH-2224
_,,,"\.._ SEE FIG. 8-54      v  o,1' 3/4"
                                                      ~                22RH8 I
P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS
                                          ....,,.'
SALEM UNIT- 2
                                        '    '--~-..,
22RH12 '-"',                                                                              INSERVICE INSPECTION DRAWING YLINE 8-RH-2273                                                          RESIDUAL HEAT* REMOVAL SYSTEM SEE FIG. B-59                                                                  8-RH-2226 FIGURE: 8-61 SHT. 1 OF 1 REV. 0
                -**------**--*--**"-----------------__,..._:_----------------.....J.------------~
 
*                                                                *
* 22R~                /(37PR) 2-RHRH-22-16 RESIDUAL HEAT EXCHANGER LINE 8-RH-2225 SEE FIG. 8- 74 C./ /0                                LINE 8-SJ-2262 SEE FIG. 8- 70 r/  /
NO. 22
~ 8"      x  14" LINE 12-RH-2252 )
RED.
I                                                                          SEE FIG. B-68  /"'\.
2-RHRH-22-11 ~
(15PR)      3/4"
    /
                                                                                                                                        ~2-RHRS-22-45 (40PS-1 THRU 4)
                                                                                      ) LINE 14-RH-2224        o,1'
                                                                                /
                                                                                  /"'\_SEE FIG. 8-54      &#xa5; 3/4" r---
1
                                                                ~ 2-RHRH-22-7                                                      P & ID: 205332 (2PR-1)
                                                ~                                                                                ISOMETRIC: RH-2-2 22RH10 2-RHRG-22-7 PUBLIC SERVICE ELECTRIC & GAS
                                ......
                                        ......\
(2PR-2)
SALEM UNIT 2 22RH~2'\~.i:._,                                                                                INSERVICE INSPECTION DRA'MNG rJLINE 8-RH-2273                                                      RESIDUAL HEAT REMOVAL SYSTEM SEE FIG. B-59                                                                8-RH-2226 FIGURE: B-61H SHT. 1 OF 1 REV. 0
 
*                                                          *
* 27 21RH44 /y-
                                            /                                                  :\... :,,.-,....-*
19          LINE 8-RH-221;c_.,,,.
SEE FIG. 8- 75        26 0                                3/4' \_      v I                  29 RESIDUAL HEAT                                                                                                          ~
EXCHANGER        I-'                                                                                                  3" NO. 21 LINE 8-SJ-2252!
SEE FIG. 8- 72
                                                                                                                            ..... ......
25
                                                                            ) LINE 14-RH-2214
                                                                      .,,,. ' \ SEE FIG. 8- 55
                                                                    /
                                                                  /
Q 12~*                                                                                                                          38
        ~11PL-1.-2                                          21RH8
                                                                                                                                                  . . . ~/4" LINE 8-RH-2274 )
SEE FIG. 8-58 ('-.._,,.,
L-~-7                                      39?
2RH20      \A......_
                                                                                                                .......
                                                                                                              /
5                                                                          /
                          '..,.*, 21RH12 L-.Jr-,.                                  LINE 12-RH-2252(.,,,.
                                  '*'                                  SEE FIG. 8-68 8                        'rJLINE 8-RH-2273 SEE FIG. 8-59 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2216 FIGURE: B-63 SHT. 1 OF 1 REV. 0
  - - - - - - - - - = = - - - - - - - - - - - - - - - - - - - - - - - - 1 . __ _ _ _ _ _ __ 1
 
  *                                                        *
* 0 21RH44        ,*'<"
                                        /                                                  :\...;:,..-,+-*
LINE 8-RH-221~.,,,.
3/4" \_
* SEE FIG. 8- 75
[---
                                      ~1                                                              LINE 8-SJ-225~
SEE FIG. 8- 72
                                                                                                                      ......
                                                                                                                              ......
                                                                          \ LINE 14-RH-2214
                                                                        /"\..SEE FIG. B-55
                                                                      /
                                                                    /
21RH8
                                  ~
3FB        ~
                                ~        \      ~ {2PR-1) 2-RHRH-21-10
                        -...
* 21RH12
                            ""!_\_,            2-RHRG-21-10                                                                  21RH19~ (39PS-1    2-RHRS-21-44 THRU 4)
                                \"-            (2PR-2)
                                    'rLINE 8-RH-2273 2-RHRH-21-11 /                          SEE FIG. 8-59 (8PR)                                                                                                                                      P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2216 FIGURE: B-63H SHT. 1 OF 1 REV. 0
 
          *                                                        *
* 21SJ44 22SJ44                                                    1 1
                                                  ~
~                                3/4"
                                                                                                                ~
3/4"
                                                                                                  >--i :
                                                                                              ~-            /.....>I              I
                                                                      /
                                                                    /                              ,..,,.,..,,. I      LINE 14-RH-2214
                                                                  <    _..,,.-1 I
                                                                    "' I PENETRATION    I        ,..,,.,..,,.
                                                                                                                                ,0 NO. 30        v~
PENETRATION I  _..,,.,..,,.
NO. 31      v~                                                                    4-5' (V.)
7 8      'Jtr 45" (V.)
                                                                                                                                                                              ......
                                                                                                                                                                                      ......
                                                                                                                                                                                            'r 9    10          '\... ...........
LINE 14--RH-2214 \.                                  LINE 14-RH-2214-SEE FIG. 8-55                                        SEE FIG. B-55
                                                                                        ,.,.. ,.,..
                                                                                ,.,..                  '      'yLINE 14-RH-2224 LINE 14-RH-2224 \ : /                                          SEE FIG. B-54 LINE 14-RH-2224 SEE FIG. 8-54 P & ID: 205334-ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTE~
14-RH-2224 14-RH-2214-FIGURE: 8-65 SHT. 1 OF 1 REV. 0
 
          *                                                              *
* 21SJ44 22SJ4-4
                                                                            /
LINE 14-RH-2214
                                                                        < _.,.,. .,
                                                                          /
                                                                          "' I PENETRA TlON    I      ..,.,.
NO . .30        v~
                                                                                                                                        -RHRH-21-.3
                                                                                                                                    ~
PENETRATION NO. 31                                                                                45" (V.}                                    10PR) 2-RHRH-22-1 J                                                                          45* (V.)
                                                                                                                                              ~
(4PR) 2-RHRH-21-1 (8PR-1)
                                                                                                              ~/              LINE 14--RH-2214~(...
                                                                                                                                                      /  ..... .....
                                                                                                                                                                      '(LINE 14-RH-2214-2-RHRH-21-2                SEE FIG. 8-*55                            SEE FIG. 8-55 (8PR-2) 2-RHRH-22-3 \
(11PR) 2-RHRH-22-2 /
(9PR}
                                        '                                            ,,,. ,,,.
                                                                                                  /
                                                                                                ,,,.
2-RHRH-22-4 (14PR)
                                                                                                      " 'rJLINE 14-RH-2224 LINE 14-RH-2224-LINE 14-RH-2224 SEE FIG. B-54 t,;                          SEE flG. B-54 P & ID: 205.334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 14-RH-2224-14-RH-2214 FIGURE: 8-65H SHT. 1 OF 1 REV. 0
 
*                                          *
* LINE 14-RH-2212 LINE 14-RH-2212 )                              ~ SEE FIG. B-56 SEE FIG. B-56  ( ' ...._
                          ......              /
                                  ......    /
                                        '</
12"      x RED.
3PL-1,-2\
P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG SAFETY INJECTION SYSTEM 12-RH-2269 FIGURE: 8-67 SHT. 1 OF 1 REV. 0
______
 
*                                                *
* Lll~E 14-RH-2212 LINE 14-RH-2212 )                                  ~ SEE FIG. 8-56 SEE FIG. B-56        ('...._
                              ......              /
                                      ......      /
                                            '<"'
2SJ70 12"  x      14"    ~
RED.
A I
T"-+-.;J.
      \...*-\I 2sJ1 60 3/4"\.._
P & ID: 205.334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG SAFETY INJECTION SYSTEM 12-RH-2269 FIGURE: B-57H SHT. 1 OF 1 REV. 0
 
*                                                                      *                                                                                                            *
                                                                                                ..._,\ 2RH47
                                                                                                    & . - ..... - , .
                                                                                                                                          . .- .,. .-;>
___    PENETRATION 7            NO. 16
                ,_ ___ r "
                          /22PS-1,-2
                              , FLOOR EL. 78' 41
                                                                                                              \"--....._..J (3/4"
                                                                                                                                                      ..... s 43 2RH26 ,* .
LINE 12-RH-1251\...-...-_...:;/-
SEE FIG. A-62  \_  CLASS 1 CLASS 2 THIS PORTION OF PIPING LOCATED IN                                                                                                                                                                            3/4" PIPE CHASE.                                                                                                                                                                          r---
1 FLOOR EL. 55'
                                                                                                                      ~~*~-x r~f x 8"
                                                                                                            ~
LINE 8-RH-2216 17~                                        LINE 8-RH-2274)                                            SEE FIG. 8-63                                                32
                                                                                                                            / \
SEE FIG. 8-58 ('....._
                                                                                                ......
                                                                                                                          ~
1 8" x 12" RED.
5PL-1 THRU
                                                                                          } LINE 8-RH-2226
                                                                                      , ,,. \._SEE FIG. 8-61 I .-/-~
                                                                            !.-,,;.*' 22RH19 P & ID: 205332 ISOMETRIC: RH-2-2, RH-2-3 12" x 12"                                                                                                                                                    PUBLIC SERVICE ELECTRIC & GAS RED. TEE                                                                                                                                                            SALEM UNIT 2 LINE 8-RH-2253 SEE FIG. 8-60 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 12-RH-2252 FIGURE: B-68 SHT. 1 OF 1 REV. 0
 
  *                                                                                    *
* 0
 
38PS-4
                                    ~2-RHRA-22~30 .                                                                  'y \
* 2RH47
                                                                                                                        '--.lr-7
                                                                                                                                                          /        ---
                                                                                                                                                            ....- , PENETRATION NO. 16
                                                                                                                                                                  "" - - - 7 2C-23-RHH-1 \            ~*                        v-....,.....J
                                                                                                                                                          \              )._        38PS-3
                                                                                                                                                                    ~~ 38PS-1,-2 (42PR)              \      I                              (3/4" FLOOR EL. 78 '                                                                                        /              \
                                                                                                                                                ~        ---
2RH.2_6/J
                                                                                                                                                  'v---                                  ZP-23-RHG-12
                                                                                  .... /                                                                                --------- (38PR)
LINE 12-RH6~251 t....-~:S*l                                                                                                                2P-23-RHH-9 SEE FIG. A-            CLASS 2                                                                                                            (35PR-2) 2P-23-RHR-10
                                                                                                                                                                                          /(35PR-1)
THIS PORTION OF PIPING LOCATED IN                                                                                                                                                                                    3/4" PIPE CHASE.                                                                                                                                                                                  &deg;I'--'
I FLOOR EL. 55'                                                                    12" x 12" x 8"
                                                                                                                                                                                              /
l RED. TEE                            6
                                                                                                                                            ~SEE
                                                                                                                                      .      LINE 8-RH-221                  ZP-23-RHH-11 LINE .8-RH-2274)
FIG. 8-63                (33PR)
                                                                                                                                          /
SEE FIG. 8-5 8 !'-........_
ELBOW" 2RH22 ' \
2-RHRS-22-22~
                                                                                                                    '-....
                                                                                                                                        ~8" x      RED.
12" 0
                                                                                                                        ""-2PS 3/4"(- -t>::}-
LINE
                                                                                                                ~ SEE FIG.
8-RH-2226 8-61
                                ~
I
* I'<" ""
2                                                  I ;.-lz2RH19
                        /                      -RHRH-22723                                    f.... v 2-RHRH-22-2 4 p & ID: 20533~H-2-3 (13PR)                                /I                                                                                                                                          ISOMETRIC: RH-2-2, 12" x  12" x 8"  ____,,/'    I
                                              --L          ......{(-~
                                                                    .,.                                                                                                              PUBLIC SERVICE ELETCTR21 (: & GAS RED. TEE                              3                                                                                                                                      SALEM UNI LINE 8-RH-225 .
SEE FIG. B-60                                                                                                                                                    ON DRAW1NG INSERVICE INSP~i~OVAL SYSTEM RESIDUAL H~;H_
2252 12 SHT. 1 OF 1 REV. 0 .
FIGURE: 8-68H
 
    *                                            *
* LINE 6-SJ-1262 SEE FIG. A-67 SHT. 1~                  3/4"
                      '-.... , 22SJ49 "'i'-2  1/2"
                            &deg;7_\_,        Ir~
                            /'              I
                ~              16 CLASS 2 9
FLOOR EL. 55'                LINE 8-RH-2226 3/4" SEE FIG. 8-61
                                                                  !'-"        ......
I                ............ '(
P & ID: 205.334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAIMNG SAFETY INJECTION SYSTEM B-RH-2262 FIGURE: 8- 70 SHT. 1 OF 1 REV. 0
 
                  *                                            *
* LINE 6-SJ-1262 SEE FIG. A-67 SHT. 1()'              3/4"
                                      ' ' , 22SJ49 '[--2 1/2"
                                        ~-\-,        I~
                              ~',                        I CLASS2      /
2P-22-SIH-30 /
(15PR)                ~
FLOOR EL. 64' (13PR)
LINE 8-RH-2226 3/4" 2-RHRH-22-8                                              SEE FIG. B-61 r-'                      ......
(3PR) 3/4" I                              ............ '(
                                                                                            \
                                                                                                                                  ~
3/4" \
                                                                                        \      \
                                                                                          \      \                                        2-RHRH-22-17
                                                                                              \                    ....... --..)          (1PR) 2FB      ~                        (
                                                                                                      )''\ 22SJ46
                                                                                                    \.. -+-,
22SJ47'L< v
                                                                                                    < I  I"" ;>$        ..
2-RHRH-22-19/                                        14 (5PR) 114"                                      P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM B-RH-2262 FIGURE: 8- 70H SHT. 1 OF 1 REV. 0 L _ _ _____ -
 
*                            *
* 2 1/2"  '  3/4"
                                                                  ~
I  ~i                      3/4"
                                                                                                /!'---'
22                                    I 21SJ49 I
                                                    / y/\
                                                      ,                    ~o,,19A LINE 8-SJ-1252    \..-,,.-CLASS 2                  ~
SEE FIG. A-69 SHT. 1 \..          CLASS 1 0
FLOOR EL. 55'
  ~12 I
                    ..--L 3/4" FLOW 8-RH-2216
                                                                                              ~
LINE 3      2                    /    SEE FIG. B-63
                                                                                        /y
                                                                                  '  I  '
                                                                                /',/ 21RH1B
                                                                              '    '!uNE 8-RH-2216 SEE FIG. B-63 P & ID: 205334-ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG SAFETY INJECTION SYSTEM 8-RH-2252 FIGURE: 8- 72 SHT. 1 OF 1 REV. 0
 
*                                                                                *                                                                                    *
      ~ 2P-21-SIH-18
  /    (19PR-1)
      /
    /
2 1/2"  ' 3/4"
                                                                                                            ~            ~
                                                                                                                              ~i 2P-21-SIH-17 &: 17A
(~P~                          ~        I 3/4"
                                                                                                                                                    ~
I LINE B-SJ-1252
                                                                                                          /
                                                                                                ).,./CLASS 2 Yr'\
21SJ49 /'
                                                                                                            ,
SEE FIG. A-69 SHT. 1 t___            , CLASS 1 2-RHRH-21~19 1---rr>-~i--'--'FL~O~O~R'-'='EL~.~5~5~* ( (8PR) 2-RHRH-21-18 2-RHRH-21-20)
                                                          ~
I 3/4"
                                                                          /
                                                                            /
                                                                              ~6FB
                                                                                  /
                                                                                      /r    I (5PR}
                                                                                            !'-" 3 I 4"
                                                                                                ---r----
I (9PR)                                  21 SJ4 7  i{      j:,                                    FLOW
                                                                    -;r    }J 21SJ46
                                                            -.. ., / ;1X                                                                              LINE 8-RH-2216
                                                                                                                                            ,*... '1J 3/4" \...                                                                              /    SEE FIG. 8-63
                                                                                                                                      '  I    '
                                                                                                                                    / / 21RH1B
                                                                                                                                  '
                                                                                                                                        'ruNE B-RH-2216 SEE FIG. 8-63 P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-RH-2252 FIGURE: 8- 72H SHT. 1 OF 1 REV. 0
 
*                        *
* LINE 8-RH-2225 SEE FIG. B-18 SHT. 2
                                ~
I I
I EL. 84'
                                                    !'--'
I LINE  8-RH-2226 1      SEE FIG. B-61 I
                                                    ..-.L..
13
                              ~THIS      PORTION ENCLOSED LINE 8-CV-2201  t,,.
SEE FIG. B-20 SHT. 3 22SJ45        IN RUPTURE SEAL CABINET.                    P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG RESIDUAL HEAT REMOVAL SYSTEM B-RH-2225 FIGURE: 8-74    SHT. 1 OF 1 REV. 0
 
*                                      *
* LINE 8-RH-2225 SEE FIG. B-18 SHT. 2 f-'
I I
I 2A-RHRG-250 \
(8PR) 2A-RHRG-251\
(9PR)
(9PR)
* 2 1/2" 2P-21-SIH-17
                                                                ~
&: 17A I 21SJ49 /' / , LINE B-SJ-1252 SEE FIG. A-69 SHT. Yr'\ ).,./CLASS 2 1 t___ , CLASS 1 (8PR) I 3/4" /r 2-RHRH-21-18 (5PR} 6FB !'-" 3 I 4" / I ---r----/ / I 21 SJ4 7 i{ j:, -;r }J 21SJ46 -....,,/ ;1X 3/4" \... FLOW ' 3/4" ,* ... ' I ' 3/4" I '1J LINE
I LINE 8-RH-2226 SEE' FIG. 8-61 I
                                                                ..-.I._.,
                                                      ~      2-RHRH-22-13 (1PR) 22SJ45
                                          ~THIS      PORTION ENCLOSED IN RUPTURE SEAL CABINET.                        P & JD: 205334 LINE B-CV-2201  t_....                                                            ISOMETRIC: RH-2-2 SEE FIG. B-20 SHT. 3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 JNSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM B-RH-2225 FIGURE: 8- 74H SHT. 1 OF 1 REV. 0
 
*                                                  *                                *
/                            12 UNC e-Re-2'"5          )
SEE FIG. B-1 B SHT. *1 ( ' ,
                            ~r  11
                            '
10 21
                                    ,........__,.
I LINE 8-RH-2216 SEE FIG. B-63 I
                                    ,-.l._..
                                                                      '...JUNE 8-SJ-2208
( SEE FIG. B-86 SHT. 3 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2215 FIGURE: 8- 75    SHT. 1 OF 1 REV. 0
 
*                                                        *
* 2A-SIH-254 3/4-"                                          (16PR-1)  ~
                      ~
                                                                            ~      ~
I 2A-RHRG-246 (16PR-2)          ""
LINE 8-RH-2215 SEE FIG. 8-1 B SHT.
                      . ~ 2A-SIG-248A
                    /        (9PR}
                                                                                    ---L 3/4"
                    /        2-RHRA-24-26 "l'---
1 LINE 8-RH-2216 SEE FIG. B-63
                                          ~                                                    '.....)LINE 8-SJ-2208
( SEE FIG. B-86 SHT. 3
                                      ~  2-RHRH-21-21 (2PR)
P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2215 FIGURE: 8-75H SHT. 1 OF 1 REV. 0
 
*                          *                                                    *
                        *ov
                        ~        6-SJ-2203 1  ~1 LINE 4-SJ-2201'(_  '
SEE FIG. B-80          1A BORON INJECTION TANK NO. 2 4
                  ~1 3
6-SJ-2204 4" x 6"                P & ID: 205334
                            /                                        ISOMETRIC: RH-2-3
                                    /RED.
1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 rJ LINE 4-SJ-2212 INSERVICE INSPECTION DRAWING
                                  ,
                                --L.
SEE FIG. 8-84 SHT. 2 SAFETY INJECTION SYSTEM 6-SJ-2203 6-SJ-2204 FIGURE: 8-77 SHT. 1 OF 1 REV. 0
 
*                          *
* 16    18 15    17 LINE 8-CS-2227 LINE 5-CS-2215 SEE FIG. 8- 79 SHT.
_...\ SEE FIG. B-18 SHT. 1
                                                          .....
                                                ..........
6 31 30      29 FLOW I
I
    ""'<.__                                                                                P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 TO CS PUMP PUBLIC SERVICE ELECTRIC & GAS 21                                23                                                      SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG CONTAINMENT SPRAY SYSTEM 8-CS-2227 FIGURE: 8- 79  SHT. 1 OF 2 REV. 0
 
*                                                              *
* 2-CSG-122 ~                      0 2-CSG-124          ~
2-.CSG-126          ~ "'>..
2-CSG-128 ~
2-CSG-130 ~ "-......
2-CSG-132  ~
2-CSG-134 ~ "-......
2-CSG-136 ~
2-CSG-138 ~
LINE 8-CS-2227 LINE 8-CS-2215 2-CSA-140 ~                                            SEE FiG. 8-79 SHT.
                                                                                                                            .,....\ SEE FIG. B-18 SHT. 1
                                                                                                                      ......
                                                                                                        ............
                                                                                                                                        /      2P-CSG-311 2-CSG-100 ~                                                                                                    /2-CSA-14-9 2-CSG-102 ~
2-CSS-104 ~ "...                                                                                                          /
2-CSG-108
                                                    ~      ,,,,,,.-- 2-CSG-110
                                                        /      /        2-CSH-112 FLOW I
I
    ""'(_                                                                                                                                                  P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 TO CS PUMP PUBLIC SERVICE ELECTRIC & GAS 21 SALEM UNIT 2
                                                                              ........._,_
                                                                                            '- ~ 2-CSS-116*
                                                                                              ~ 2-CSG-118                                            INSERVICE INSPECTION DRA'MNG
                                                                                          ~ 2-CSG-120                                                  CONTAINMENT SPRAY SYSTEM 8-CS-2227 FIGURE
3/4"
3/4"
* NO. 21 SAFETY PUMP SUCTION
                                          ~        \
* 6 4 5 ' ' 'rLINE 6-SJ-2210 SEE FIG. B-86 SHT. 2 x 4" ECC. RED. P & ID: 205334 ISOMETRIC:
                                                    ~
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-2207, 6-SJ-2207 4-SJ-2207 FIGURE: B-86 SHT. 1 OF 3 REV. 0
CLASS 3 P & ID: 205331 ISOMETRIC: CC-2-3 PUBLIC SERVlCE ELECTRIC & GAS SALEM UNIT 2.
* LINE 6-SJ-2208 SEE FIG. 8-86 SHT. 2A-SIS-165 I 3/4"
INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM
* 8" x 6" RE/ 2A-SIS-167 0 /2A-SIA-164 CLASS 2 I
                                                                  *5-cc~2202      **
'..J 3/4" ( NO. 3/4(!. ...._
FIGURE: 8-114 SHT. 1 OF 1 REV. 0
* 0 P & ID: 205334 ISOMETRIC:
        *------------------*------*---------------------L---------------'
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG SAFETY INJECTION SYSTEM 8-SJ-2207, 6-SJ-2207 4-SJ-2207 FIGURE: B-86H SHT. 1 OF 3 REV. 0 *--*--*-----------'-----
 
-----------'
*                                                 *
* 32 .4--SJ-2211
\,. ..........
LINE 6-CV-2201
\_ SEE FIG. B-25 I ,--l_, 3/4-"
* 28 9 LINE 6-SJ-2207 SEE FIG. B-86 SHT. 8 7 3/4" I
* P & ID: 205334-ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG SAFETY INJECTION SYSTEM 6-SJ-2210 4-SJ-2211, 4-SJ-2210 FIGURE: B-86 SHT. 2 OF 3 REV. 0
* 2A-SIS-193 2A-SIG-194 "'-..,. 2A-SIG-195 "'-..,. 2A-SIG-196 "'-..,. I .----l__,, 3/4" 6" x 4" RED. 4-SJ-2211
\.. ..........
LINE 6-CV-2201
\., SEE FIG. B-25
* 2A-SIS-192
/ / 2A-SIG-191 2A-SIVE-108, 7 LINE 6-SJ-2207 ii SEE FIG. 8-86 SHT. 1 f 2A-SIH-190 3/4" '!'---' I
* P & ID: 205334 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-2210 4-SJ-2211, 4-SJ-2210 FIGURE: B-86H SHT. 2 OF 3 REV. 0
* LINE ) SEE FIG. B-75 (....,, ..... 15 NO. 22 SAFETY PUMP SUCTION
* 12 x 4" ECC. RED. .....
8-SJ-2207 SEE FIG. B-86 SHT.
* P & ID: 205334 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM B-SJ-2208, 6-SJ-2208 4-SJ-2208 FIGURE: 8-86 SHT. 3 OF 3 REV. 0 *
* LINE 8-RH-2215 ) SEE FIG. B-75 (-.... ...... ----L 3/4" NO. 22 SAFETY PUMP SUCTION * ':} 3/4" '-.........._..
2A-SIS-169 ECC. RED. 8" x RED. ...... 'rJ LINE 8-SJ-2207 SEE FIG. 8-86 SHT.
* P & ID: 205334 ISOMETRIC:
RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-2208, 6-SJ-2208 4-SJ-2208 FIGURE: B-86H SHT. 3 OF 3 REV. 0
* 3/4"
* 3/4"
* LINE 3-CV-2257 SEE FIG. B-88 SHT. ! B,,,,E_N_D
                                    -r--
____ _. BEND LINE 3-CV-2258 SEE FIG. B-87 SHT. LINE 3-CV-2260 SEE FIG. B-88 SHT. 2 I I I I LINE 3-CV-2259 14 .\ SEE FIG. B-88 SHT . NO. 23 RECIPROCATING CHARGING PUMP .... ,,,
1 ANCHOR l, . __ >
* 2A-CVCS-428
                                                    -0  -:7 PENETRATION NO. 33 z=.,,j,,.. , .
/ I 3/4" P & ID: 205328 ISOMETRIC:
                                        ;UIDE
CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWJNG CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2258 FIGURE: 8-87 SHT. 1 OF 2 REV. 0
                              ~1 2C-CCS-269 \
* 2A-CVCG-401 2A-CVCVE-34JA
CLASS 2 CLASS 3 \
/ / 2A-CVCH-W3
I
/ 2A-CVCA-404 3/4" "I ' '
                            ..-c..
* LINE 3-CV-2257 SEE FIG. B-88 SHT. 1 'l'-' !B
6" t---               \
____ _. BEND LINE 3-CV-2258 SEE FIG. B-87 SHT. .LINE 3-CV-2260 SEE FIG. 8-88 SHT. 2 I ! 2A-CVCA-454 2A-CVCS-414 LINE 3-CV-2259 .
                      ,.-lJ 3/4" 3/4"
SEE FIG. 8-88 SHT. .....  
                                                              ~\
............ "Z_ NO. 23 RECIPROCATING CHARGING PUMP
CLASS 3    ~
* 2A-CVCS-428
6" P & ID: 205331 ISOMETRIC: CC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM 6-CC-2202 FIGURE: B-114H SHT. 1 OF 1 REV. 0
/ \ \_ 3/4" \ 2A-CVCS-451 2A-CVCG-411 P & ID: 205328 ISOMETRIC:
 
CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWJNG CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2258
              *                                                           *J
*FIGURE: 8-87H SHT. 1 OF 2 REV. 0
                                                                            ,I
* 48 49 52 47 3/4" ['---' I
                '
* LINE 3-CV-2255 SEE FIG. B-95 SHT. (!....._ 58 59 LINE 2-CV-2213
o*
' SEE FIG. B-98 34 35 46 36 37 38  ..... .
I D
3-CV-2258 SEE FIG. 8-87 SHT. 42
                                                                                      ---90" D  MANWAY UPPER HEAD 2-BIT-C ___.,/"
* LINE 2-CV-2257 SHT. 1 SEE FIG. B-97 '45]
                                                                                        ,.,,.           2 1/2" STUDS-2-BIT-STUD SHELL
RED. )!' '----3" x 2" RED. P & ID: 205328 ISOMETRIC:
                                                                                      ./        16 -         2 1/2" NUTS P & ID: 205.334 LOWER HEAD                                                                                                                  PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG D              D                                                                                                                        BORON INJECTION TANK.
CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2258 FIGURE: B-87 SHT. 2 OF Z REV.
I 2-BIT-1                                                                                                              FIGURE: B-119                        SHT. 1 OF 1 REV. 0
*
                                                                                          .
* R-248950-6 2A-CVCS-514 2A-CVCS-513 2A-CVCG-512 -... ZA-CVCG-511 '... ZA-CVCG-510 2A--:CVCG-509 2A-CVCG-508 2A-CVCG-506 LINE 3-CV-2255 SEE FIG. B-95 SHT. ;-<...., 2A-CVCG-505 2A-CVCG-504-2A-CVCG-503 2A-CVCS-502 R-24-8950-3 r.JCf_--+-+-----+-+--' 2A-CVCG-486 R-248950-8
L_*-_-_------------------------..,.,,-=~~~...:.~*.~n:'!ri::rr~"C.t::=.:...c:::::::.:..~-:- *.":l:o::tr.r.:-...a=nrn':"'.tr..:*:r:::i;::o.-::1:**~~~-.-:-..:..=:-::::z-.:::-m_:.~~.....:---?.r:r.!'"1Cr?'7?;:n=x=:r:-'.:i..:1~:7=*=-n=-====*-::::r:~-*:*..}}
/'-.....,, ZA-CVCS-461 l___ 2A-CVCS-445 3/4" ["--" I y 2A-CVCS-440
/ / .Q._ \  ,...,,----R-248950-5 LINE 2-CV-2213 SEE FIG. 8-98 \,... .... / R-248950-1 /  .....
3-CV-2258 SEE FIG. B-87 SHT. 1 LINE 3-CV-2251 SEE FIG. B-89 SHT. 1
* LINE 2-CV-22547 SEE FIG. B-97/ P & ID: 205328 ISOMETRIC:
CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2258 FIGURE: B-B7H SHT. 2 OF 2 REV. 0
* 2 ) LINE 2-CV-2212
,,.,\_SEE FIG. 8-102 SHT. 1 NO. 22 CHARGING SAFETY INJECTION PUMP 3-CV-2257
\ 9 10 I --L 3/4" "'f-..--1 LINE 3-CV-2258 SEE FIG. 8-87 SHT. 1 14 4-CV-2257
'-..........._
4" x*3" 3 LINE 3-CV-2258 SEE FIG. 8-87 SHT. \-<......_
...... ....... LINE 3-CV-2258 1 \...-_.,"" SEE FIG. 8-87 SHT. \-.
* 4 3 5 g /. 3-CV-2259 19 20 18 x 3" RED.
* LINE 4-SJ-2202 SEE FIG. B-84 SHT. 1 r<, LINE 4-CV-2258 SEE FIG. B-88 SHT. 2 I I P & ID: 205328 ISOMETRIC:
CV-2-2 ...... PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 4-CV-2257 3-CV-2259, 3-CV-2257 FIGURE: 8-88 SHT. 1 OF 2 REV. 0 
* * ) LINE 2-CV-2212
...-\.SEE FIG. 8-102 SHT. yJY NO. 22 CHARGING SAFETY INJECTION PUMP 3-CV-2257
\ 2A-CVCG-458 4-CV-2257 3/4" I I ..-L LINE 3-CV-2258 SEE FIG. 8-87 SHT. LINE 3-CV-2258 SEE FIG. 8-87 SHT. 1!, ...... ...... LINE 3-CV-2258 1 &deg;"V,,,...-
SEE FIG. 8-87 SHT. \... RED.
* LINE 4-SJ-2202 SEE FIG. 8-84 SHT. LINE 4-CV-2258 SEE FIG. 8-88 SHT. 2 { 2A-cvcs-421
;:Ii I , / 4-CV-2257 : ,, I 3" L 2A-CVCG-449 2A-CVCS-410
&deg;""" 2A-CVCA-453 2A-CVCG-413 P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 4-CV-2257 3-CV-2259, 3-CV-2257 FIGURE: 8-88H SHT. 1 OF 2 REV. 0
* 4-CV-2258
\ ) LINE 2-CV-2218
...-\_SEE FIG. B-101 NO. 21 CHARGING SAFETY INJECTION PUMP 9 10 I --L 3/4" I LINE 3-CV-2258 SEE FIG. 8-87 SHT.
* 18 19 20 I ----L LINE 4-CV-2257 SEE FIG. B-88 SHT. 1 14 3 4 3-CV-2260
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 4-CV-2258 3-CV-2260 FIGURE: B-88 SHT. 2 OF 2 REV. D
* 4-CV-2258
\ 2A-CVCG-605 ) LINE 2-CV-2218
_.,.'\..SEE FIG. B-101 NO. 21 CHARGING SAFETY INJECTION PUMP I ---L 3/4" -r-----1 LINE 3-CV-2258 SEE FIG. B-87 SHT.
* I ----L LINE 4-CV-2257 SEE FIG. 8-88 SHT. 1 y ""--2A-CVCG-459 2A-CVCS-422A 3-CV-2260
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 4-CV-2258 3-CV-2260 FIGURE: B-88H SHT. 2 OF 2 REV. 0
* 13 14 3/4" I ,> ...... "<:>&#xa5; LINE t_.... y SEE FIG. 8-99 Cf. 9
* 6 5 LINE 3-CV-2251 SEE FIG. B-89 SHT. 2 r 3" ) LINE 2-CV-2216
...-\_SEE FIG. 8-100 ...... pr '(1 LINE 3-CV-2258 SEE FIG. B-87 SHT. 2
* P & ID: 205328 ISOMETRIC:
CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: 8-89 SHT .. 1 OF 2 REV. 0 
*
* LINE .3-CV-2251 2A-CVCG-493 SEE FIG. B-89 SHT. 2 2A-CVCS-490 R-248950-20"" ""' .3/4" --r---1 ............
,,oY LINE 2-CV-2215
'c 7 SEE FIG. B-99 2A-CVCG-494 2A-CVCG-492 2A-CVCG-491 !
3" . ) LINE 2-CV-2216
....-"\SEE FIG. B-100 ...... T '--;LINE 3-CV-2258 SEE FIG. B-87 SHT. 2
* P & ID: 205328 ISOMETRIC:
CV-2-2, CV-2-.3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: B-B9H SHT.
* 1 OF 2 REV. 0
* LINE SEE FIG. 8-91 LINE SEE FIG. 8-92 \....-// LINE 3-CV-2251 I__ SEE FIG. 8-89 SHT. 1 * ..... ..... I 3/4"
* 21v*
* P & ID: 205328 ISOMETRIC:
CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: 8-89 SHT. 2 OF 2 REV. 0
* LINE CV-2-2244 SEE FIG. B-90 ,.!_ ' LINE SEE FIG. B-91 .....
* LINE SEE FIG. B-92 ..... / 2P-CVCG-908 2A-CVCS-500
---......____
2P-CVCG-907
/ 2P-CVCS-906 CJ* / 2A-CVCS-499
---......____
-..........
2A-CVCG-498 -..........
2A-CVCG-496 \,,// LINE 3-CV-2251
\.. SEE FIG. B-89 SHT. 1 I 3/4"
* P & ID: 205328 ISOMETRIC:.
CV.-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: B-89H SHT. 2 OF 2 REV. 0
* LINE 2-CV-1243 SEE FIG. A-111 SHT. CLASS 1 I 2" x , .. r RED. INS. --(1"
* 26 12 14 2" x 1" 11 LlED. INS. 10'-.,\
.. 24CV98 '"-9 7 6
* LINE 3-CV-2251 SEE FIG. 8-89 SHT. 2 I ...--l_...
P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2244 FIGURE: 8-90 SHT. 1 OF 1 REV. 0 L__ __ _
* LINE 2-CV-1243 SEE FIG. A-111 SHT. CLASS 1 r 2" x , .. r RED. INS. --(1" * * '\.<,..,'
.. 1:1NE 3-CV-2251 SEE FIG. B-89 SHT. 2 I P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 IN SERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2244 FIGURE: B-90H SHT. 1 OF 1 REV. 0 
-*
* LINE 2-CV-1223 j SEE FIG. A-112 SHT. 1 ("', 2" x , .. Sz::D71NS
\ '-7 22CV98* 5 10
* I'-' I I LINE 3-CV-2251 SEE FIG.* 8-89 SHT. 2 I I ---L P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2224 FIGURE: 8-91 SHT. 1 OF 1 REV. 0
* LINE 2-CV-1223 j SEE FIG. A-112 SHT. 1 (', ,.,. *
* 2" x 1" z::D7 22CV98 '.'--, ,c-, ............... )$'< / 2P-CVCS-937 R-248950-15 LINE 3-CV-2251 SEE FIG. B-89 SHT. 2 I I ,-L P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2224 FIGURE: 8-91H SHT. 1 OF 1 REV. 0
* LINE 2-CV-1232 SEE FIG. A-110 r\' \ CLASS 2 2" x ,.. 11 RED.
* 8 2" x 1" I' I ....... .., \ I 4-... -, ----l_, 23CV98 \A........_ 3/4" 6 5 Q I-' I I LINE 3-CV-2251 SEE FIG. 8-89 SHT. 2 I I ----L-* P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2234 FIGURE: B-92 SHT. 1 OF 1 REV. 0
* LINE 2-CV-1232 SEE FIG. A-110 r\' \ CLASS 2 2* x 1" RED.
---L 1" .5 &#xa3;-7 PENETRATION I 26 /ANCHOR KGUIDE < .> . 2" x 1" l I', I '-' 'I\
* J-----RED71NS I "-"",-z 2P-CVCS-940
---L 23CV98 v , / 3/4" / 2P-CVCS-93S C( I I I LINE 3-CV-2251 SEE FIG. 8-89 SHT. 2 I I ---L
* P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2234 FIGURE: B-92H SHT. 1 OF 1 REV. 0
* LINE 2-CV-1213 SEE FIG. A-113 r\' \ CLASS 2 2* x 1" 11 RED.
21CV99 * / 9 8 2" x 1*
I*', I ' * '(\ I "'--'T-.., _.--.L 21CV98 '*"-....._ 3/4" 6 5 LINE 3-CV-2251 SEE FIG. 8-89 SHT. 2 I I ---L
* P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2214 FIGURE: B-93 SHT. 1 OF 1 REV. 0
* LINE 2-CV-1213 SEE FIG. A-113 ry' \ 21CV99 CLASS 2 2" x 1" RED. 1" .f .;e-7 PENETRATION
/ 26 /ANCHOR KGUIDE ? ..> I', I ' ,
* 2'" x 1* i----RED71NS l ...,, I "-'\--:, / 2P-CVCS-941
--L 21CV98 * '-/ 3/4" _,,,,,----
2P-CVCS-939 LINE 3-CV-2251 SEE FIG. 8-89 SHT. 2 I I --L
* P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2214 FIGURE: B-93H SHT. 1 OF 1 REV. 0 
*
* LINE 2-CV-1275 SEE FIG. A-15 SHT. 1 r<, LINE 3-CV-1231 SEE FIG. A-13 ;., ' ., ' NO. 2 REGEN. HX. x 3" x 2" RED. TEE 2CV79 LINE 3-CV-1241 SEE FIG. A-12 CLASS 2
* P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2253 2-CV-2253 FIGURE: 8-94 SHT. 1 OF 1 REV. 0
* LINE 2-CV-1275 SEE FIG. A-15 SHT. LINE 3-CV-1231 SEE FIG. A-13 !-.... ...... ...... ' CLASS 2 2C-CVCS-505
_/
* CLASS 1 I NO. 2 REGEN. HX. x 3" x 2" RED. TEE / / \ LINE 3-CV-1241 SEE FIG. A-12
* P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2253 2-CV-2253 FIGURE: B-94H SHT. 1 OF 1 REV. 0
* TO NO. 2 REGEN. HX. r'-..._
/
* 3/4" ) (', 3/4'{<, 5 6 * ..... . 'rJ LINE 3-CV-2258 SEE FIG. B-87 SHT. 2 P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2256 3-CV-2255 FIGURE: B-95 SHT. 1 OF 1 REV. 0
* TO NO. 2 REGEN. HX. rl ...._ 2CV69 / 2P-CVCS-9.62 2P-CVCS-919
_/ / 3-CV-2256
/ 2P-CVCA-920
* R-248950-11 3/4'('(, 3/4';).., /R-248950-12 2CV72 /2P-CVCG-918 2CV71 * .............
3-CV-2258 SEE FIG. 8-87 SHT. 2 / 2-CVCGLS-248950-14 P & ID: 205328 ISOMETRIC:
CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTElvl 3-CV-2256 3-CV-2255 FIGURE: 8-95H SHT. 1 OF 1 REV. 0
* 7 6 ' fY TO CS PUMP 22
* 15 17 14,;-...-------1-'
16 16 0 25
* LINE 8-CS-2229 SEE FIG. B-96 SHT. 2 P & ID: 205335 ISOMETRIC:
CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\hilNG CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: B-96 SHT. 1 OF 2 REV. 0
* 2-CSG-135 2-CSG-137 '--.... 2-CSA-139 2-CSG-142
' fY TO CS PUMP 22
* 2-CSG-119 2-CSG-121 2-CSG-123 2-CSG-125 2-CSG-127 2-CSG-129 2-CSG-131 2-CSG-1'.33 0
* LINE 8-CS-2229 SEE FIG. B-96 SHT. 2 P & ID: 205335 ISOMETRIC:
CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: B-96H SHT. 1 OF 2 REV_ 0 
* !, ' ' LINE 8-CS-2225
'.......J SEE FIG. 8-18 SHT. 2 (
* 32 31 LINE 8-CS-2229 1 \,_........-
SEE FIG. 8-96 SHT. \_
* 27 FLOW P & ID: 205335 ISOMETRIC:
CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: 8-96 SHT. 2 OF 2 REV. 0 
*
* 2-CSSN-180 r<., ' LINE 8-CS-2225 SEE FIG. 8-18 SHT. 2 1" ,....,.,---2-CSG-107 2-CSH-111 2-CSG-117 LINE 8-CS-2229 1 '\._......-
SEE FIG. 8-95 SHT. \..
* FLOW P & ID: 205335 ISOMETRIC:
CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: 8-95H SHT. 2 OF 2 REV. 0 
*
* 21 '\.. ..........
LINE 3-CV-2258
* \_,_ SEE FIG. 8-87 SHT. 2
* FLOW 22 _JNO. 21 SEAL WATER 23 2 4 \_ INJECTION FILTER P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2254 FIGURE: B-97 SHT. 1 OF 1 REV. 0
* 3* x RED. \.... ............
LINE 3-CV-2258 , \_ SEE FIG. 8-87 SHT. 2
* FLOW _)NO. 21 SEAL WATER -1 INJECTION FILTER
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONIBOL SYSTEM 2-CV-2254 FIGURE: B-97H -SHT. 1 OF 1 REV. 0
* NO. 22 SEAL WATER INJECTION FILTER * ) LINE 3"'-CV-2258
..-\.SEE FIG. B-87 SHT. 2
'9"7
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2213 FIGURE: B-98 SHT. 1 OF 1 REV. 0 
*
* 3" x 2" RED. '\ ) LINE 3-CV-2258
...-'.\_SEE FIG. B-87 SHT. 2 "I 2A-CVCG-3B4 2A-CVCG-385 I I NO. 22 SEAL WATER INJECTION FILTER
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2213 FIGURE: B-98H SHT. 1 OF 1 REV. 0 r----*
* NO. 22 SEAL WATER INJECTION FILTER I-' ) LINE 3-CV-2251
_ _.,"\_SEE FIG. B-89 SHT. 1 2" x 3/4" RED. INS.
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2215 FIGURE: B-99 SHT. 1 OF 1 REV. 0 *----------*---------------------------------------------------------'-----------------1 
*
* y:: ) LINE 3-CV-2251
...-\_SEE FIG. B-89 SHT. 1 2A-CVCH-375 NO. 22 SEAL WATER INJECTION FILTER '!'-' x 3/4" RED. INS.
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2215 FIGURE: 8-99H SHT. 1 OF 1 REV. 0 
*
* LINE 3-CV-2251
\, _.... SEE FIG. B-89 SHT. 1 \_
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2216 FIGURE: B-100 SHT. 1 OF 1 REV. 0 
*
* LINE 3-CV-2251
\.-" SEE FIG. 8-89 SHT. 1 I,_
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2
* INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2216 FIGURE: 8-100H SHT. 1 OF 1 REV. 0 ---
* 2 3" x 2" .___,,,/ RED. 2" x RED. 2
_, 'SP': 4,. . 2-CY-2218
* / / s_--1' *,,.,,....
,,..,,. <...../ LINE 4-CV-2258 SEE FIG. 8-88 SHT. 2 I 2 yY ..-.l_...
16 0 17 ./ . c_,,. LINE 2-CV-2217 SEE FIG. 8-102 SHT. / / / 9 / / / / / 10
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2210 2-CV-2218, 2-CY-2219 FIGURE: 8-101 SHT. 1 OF 1 REV. 0 ___ I
* LINE 4-CV-2258 SEE FIG. 8-88 SHT. 2 I 3" x RED. 2" x RED. ---L _, * / / / s_..,. ,,, / / / / 2-CV-2218
_,,-< J 2A-CVCG-=O
: r. '\. ............
\,._ LINE 2-CV-2217 SEE FIG. B-1 02 SHT. / / / / / / / / / / * ./"'-' 1 ,,,,,-2A-CVCS-425
/ / / 2CV136 P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2210 2-CV-2218, 2-CV-2219 FIGURE: B-101H SHT. 1 OF 1 REV. 0
* 2 3" x 2" _/ RED. 2" x 3"_/ RED. 2CV137 4' 3 2-CV-2212 LINE 4-CV-2257 SEE FIG. 8-88 SHT. 1 I ...--L / 2-CV-2217 15 LINE 2-CV-2219 SEE FIG. 8-101 1---1 16 17 I I I I 3/4" * / / / 0 s_.., ,,,.,,./'
.,,If'-<..._,/ x 3/4" RED. INS. 8 9 LINE 2-CV-2217 SEE FIG. 8-102 SHT. 2 2-CV-2217
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2211 2-CV-2212, 2-CV-2217 FIGURE: B-102 SHT. 1 OF 3 REV. 0 LINE 4-CV-2257 RED.
RED. " . 2CV137 i 2-CV-2212 SEE FIG. 8-88 SHT. 1 I r ---L / 2-CV-2217 LINE 2-CV-2219 SEE FIG. B-101 1----1 I
* 0 ,/"-/ 1 ,,.,,. / > ,,. .::::.--------
2A-CVCS-424A 2-CV-2217 LINE 2-CV-2217 SEE FIG. B-102 SHT. 2
* I I x 3/4" \ ,._L, RED. INS. l 3/4" 2A-CVCG-409 2A-CVCA-456 2A-CVCS-4S2j P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2211 2-CV-2212, 2-CV-2217 FIGURE: B-102H SHT. 1 OF 3 REV. 0 
* * ' FLOW. LINE 2-CV-2217 SEE FIG. 8-102 SHT.
* 2-CV-2217 SEE FIG. B-102 SHT. 3 P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102 SHT. 2 OF 3 REV. 0 
*
* 2A-eves-no 2A-CVCG-766 "...... 2A-CVCG-764 "...... .2A-CVCG-762
* FLOW 2A-CVCG-758 2A-CVCG-460 2A-CVCS-443 ? 2A-CVCS-436
/ / 2A-CVCS-432
_/' / 2A-CVCS-429 / LINE 2-CV-2217
' 2A-CVCS-431 SEE FIG. 8-102 SHT. '
* 2-CV-2217 SEE FIG. 8-102 SHT. 3 P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102H SHT. 2 OF 3 REV. 0
* LINE 2-CV-2217 SEE FIG. B-102 SHT. 2 r-2-...._
/ / / s _...., ,...,..'/
"""'-<.._,,.,,.
41
* 52
* P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102 SHT. 3 OF 3 REV. 0
* LINE 2-CV-2217 SEE FIG. 8-102 SHT. 2!, / / ,,,,,,.-< ,,,.. ,,,,} ..... 2A-CVCA:98 2A-CVCG-302 J * * / 2A-CVCG-305
/ 2A-CVCG-309 2A-CVCG-321 2A-CVCG-322A 2CV139 / 2A-CVCG-310
/ 2A-CVCH-261
/ 2A-CVCG-320 P & ID: 205328 ISOMETRIC:
CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102H SHT. 3 OF 3 REV. 0 
. .,, !'* I /;, . * * *
* 6" \ \ CLASS 2
* 5 CLASS 2/ '';) 6" CLASS 3
* P & ID: 205331 ISOMETRIC:
CC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM 6-CC-2201 FIGURE: 8-113 SHT. 1 OF 1 REV. 0
* 6" ;-.! \ \ CLASS 2
* I ANCHOR (, _ "7 PENETRATION NO. 32 / . ,5/// 2P-CCS-328 GUIDE J\,.' _,.,,-2P-CCS-327 A . / / 2P-CCS-327 CLAss2/ 'r 6" CLASS 3
* P & ID: 205331 ISOMETRIC:
CC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM 6-CC-2201 FIGURE: B-113H SHT. 1 OF 1 REV. 0 6" c---2 I \ ,-,l__.. ,..-1--' 3/4" 3/4" 3/4" "]--.--'
* p 7 \ CLASS 3
* P & ID: 205331 ISOMETRIC:
CC-2-3 PUBLIC SERVlCE ELECTRIC & GAS SALEM UNIT 2. INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM
** FIGURE: 8-114 SHT. 1 OF 1 REV. 0 *------------------*------*---------------------L---------------'
* 2C-CCS-269
\ CLASS 2 CLASS 3\ 6" t---\ ,.-lJ 3/4" I ..-c.. 3/4" 3/4" -r--1
* l ANCHOR :7 PENETRATION NO. 33 ,,.. __ > z=.,,j,,..
,,.. ;UIDE CLASS 3 6"
* P & ID: 205331 ISOMETRIC:
CC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM 6-CC-2202 FIGURE: B-114H SHT. 1 OF 1 REV. 0 I * ' 2-BIT-C ___.,/" D
* J ,I o* I UPPER HEAD SHELL LOWER HEAD D ---90" D MANWAY ,.,,.-16 -2 1/2" STUDS-2-BIT-STUD
./ 16 -2 1/2" NUTS D P & ID: 205.334 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG BORON INJECTION TANK. 2-BIT-1 FIGURE: B-119 SHT. 1 OF 1 REV. 0
...
..}}

Revision as of 10:19, 21 October 2019

Forwards Vols A-D of Salem Generating Station Unit 2 Inservice Insp Program (Second Insp Interval) Long-Term Plan. Requests for Relief Also Included
ML18096A677
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/04/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18096A678 List:
References
NLR-N92045, NUDOCS 9205080168
Download: ML18096A677 (495)


Text

1~--

'At

  • Public Service Electric and Gas Company
  • Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations

- I. *- 7 *'~,,- ~AY 0 't 1992 .

NLR-N92045 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

INSERVICE INSPECTION PROGRAM SECOND TEN-YEAR INTERVAL SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 Pursuant to 10CFR50.55a(q) (4) (ii), Public Service Electric &

Gas Company (PSE&G) hereby submits a copy of the Salem Unit 2 Inservice Inspection (ISI) Program , Revision o, for the second ten-year inspection interval. The second ten-year ISI interval is to begin upon completion of the current ten-year outage, presently scheduled to conclude May 4, 1992.

The revised ISI Program adopts the 1986 Edition of the ASME Boiler and Pressure Vessel Code. Adoption of this more rec<<?nt.

edition of the Code involves no conflict with Salem Unit 2 Technical Specification requirements.

Requests for relief from certain ASME code requirements are included in the attached submittal. Some of these requests were included in the Salem Unit 2 ISI Program for the first ten-year interval. The attached submittal also includes relief requests which are being submitted for the first time.

Should there be any questions with regard to this submittal, please do not hesitate to contact us. Your cooperation in this matter is appreciated.

Sincerely,

-- ~-n.S2_CtL1 _ QJ;

/ 9205080168-9-20504--

PDR ADOCK 05000311 G PDR

F-----

1 I - ~ ,f'

-:./

Document .Control

'/

De~k 2

  • NLR-N92045 All without enc.losure c Mr. J. c. stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Mr. Emanuel J. Mossa New Jersey Department of Labor and Industry PO Box 1503, Labor and Industry Building Trenton, NJ 08625

PSE&G Yh* Enere People VOLUME D SALEM GENERATING STATION UNIT 2 INSERVICE INSPECTION PROGRAM (2ND INSPECTION INTERVAL)

LONG TERM PLAN

DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGJ;:

REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL- PLAN STATUS

  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ,I ASME PERIOD PERIOD PERIOD I SEC. XI ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 I **CALIBRATION BLOCK**


------- -.. -- - ----------- ----------- ----------- -

24-2-CC-32 CFIG NO CC-2-2/1) 720000 2-CCH-59 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

16-2-CC-31 (FIG NO CC-2-2/1) 720010 2-CCH-60 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

16-2-CC-30 (FIG NO CC-2-2/1)

  • 720020 2-CCG-61 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

720030 2-CCA-62 F-A VT-3 1 - - -

SUPPORT F1.30 2 x 3 -

4 -

720035 2-CCA-62 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2x 3 -

4 -

16-2-CC-29 (FIG NO cc-2-2/1) 720040 2-CCG-63 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR PO~ER STATION UNIT 2 PAGE: 2 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

16-2-CC-29 CFIG NO CC-2-2/1) 720050 2-CCS-64 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

16-2-CC-28 (FIG NO cc-2-2/1) 720060 2-CCG-65 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

720070 2-CCA-66 F-A VT-3 1 -

SUPPORT F1.30 2 x

  • 3 -

4 -

720075 2-CCA-66 0".B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

12-2-CC-27 (FIG NO CC-2-2/1) 720080 2-CCH-67 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

12-2-CC-13 CFIG NO CC-2-2/1) 720090 2-CCG-68 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 3 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS._ _ _ __
  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ' I ASME PERIOD PERIOD PERIOD I SEC. XI ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T AGE - - - - - - I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 I **CALIBRATION BLOCK**

12-2-CC-12R CFIG NO CC-2-2/1) 720100 2-CCA-7 F-A VT-3 1 -

SUPPORT F1.30 2X - -

3 -

4 -

720105 2-CCA-7 0-B ' VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2x 3 -

4 -

12-2-CC-11 CFIG NO CC-2-2/1) 720110 2-CCG-6 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

12-2-cc-10 (FIG NO CC-2-2/1) 720120 2-CCA-5 F-Al VT-3 1 -

SUPPORT F1.30 2 X 3 -

4 -

720125 2-CCA-5 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 - - -

12-2-CC-9 CFIG NO CC-2-2/1) 720130 2-CCA-3B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 4 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-9 (FIG NO CC-2-2/1) 720135 2-CCA-3B D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2 - - -

3 - - -

4 - - -

12-2-CC-7 (FIG NO CC-2-2/1) 720140 2-CCG-2 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

720145 2-CCG-2 D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2x

  • 3 -

4 -

'\

720150 2-CCH-1 F-A VT-3 1 -

SUPPORT F1 .30 2 x - -

3 -

4 - - -

720155 2-CCH-1 D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.40 2 x 3 -

4 -

12-2-cc-1 (FIG NO CC-2-2/1)

.

720160 2-CCH-8 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE:

REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN

  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-1 CFIG NO CC-2-2/1) 720165 2-CCH-8 D-B VT-3 1 -.

INTEGRAL ATTACHMENT 02.40 2 -

3 -

4 -

720170 2-CCA-3A F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

720175 2-CCA-3A D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4

  • 720180 2-CCS-10 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 4 -

12-2-cc-2 (FIG NO CC-2-2/1) 720190 2-CCA-12 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 - - -

720195 2-CCA-12 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

12-2-CC-3 CFIG NO CC-2-2/1) 720200 2-CCG-13 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 6 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-4 (FIG NO CC-2-2/1) 720210 2-CCG-14 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

12-2-CC-5R (FIG NO CC-2-2/1) 720220 2-CCA-15 F-A VT-3 1 -

SUPPORT F1 .30 2 x 3 -

4 -

720223 2-CCA-15 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 -

  • 3 - - -

4 -

12-2-CC-3 (FIG NO CC-2-2/1) 720225 2-CCG-13 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 - - -

12-2-CC-6 (FIG NO CC-2-2/1) 720230 2-CCG-55 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-33 (FIG NO CC-2-2/1) 720240 2-CCH-54 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 7 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-33 (FIG NO cc-2-2/1) 720250 2-CCG-53 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

12-2-CC-34 (FIG NO CC-2-2/1) 720260 2-CCA-52 F-A VT-3 1 -

SUPPORT F1 .30 2 x - -

3 -

4 -

720265 2-CCA-52 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x

  • 3 -

4 -

12-2-CC-35RW (FIG NO CC-2-2/1) 720270 2-CCS-51 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

720280 2-CCH-49 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-41 (FIG. NO CC-2-2/1) 720290 2-CCG-709 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -


DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 8 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-41 (FIG NO CC-2-2/1) 720300 2-CCH-704 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-42 (FIG NO CC-2-2/1) 720310 2-CCS-57 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

16-2-CC-42 (FIG NO cc-2-2/1)

  • 720320 2-CCH-58 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-54 (FIG NO CC-2-2/1) 720330 2-CCS-44 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

720340 2-CCH-214 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-53 (FIG NO CC-2-2/1) 720350 2-CCS-56 F-A VT-3 1 -

SUPPORT F1.30 2 x - -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 9 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
  • COMPONENT COOLING SYSTEM

~UMMARY NUMBER EXAMINATION AREA IDENTIFICATION

\

1.NSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

ASME SEC~ XI CATGY NOE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD

  • - * * - - 0 UT A GE - - * * - -

1 2 3 1 2 3 1 2 3 INSTRUCTIONS

    • CALIBRATION BLOCK**

12-2-CC-53 CFIG NO CC-2*2/1) 720355 2-CCS-56 D*B VT-3 1 -

INTEGRAL ATTACHMENT 02.40 2 x 3 -

4 -

12-2-CC-36 CFIG NO cc-2-2/1) 720360 2-CCS-50 F*A VT-3 1

  • SUPPORT F1.30 2 - x 3 -

4 - - -

720365 2-ccs-50 D*B VT-3 1 -

INTEGRAL ATTACHMENT D2.40 2 - x - -

  • 3 -

4 -

12-2-CC-14 (FIG NO CC-2-2/2) 720370 2-CCH-22 F*A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

720375 2-CCH-22 D*B VT-3 1 -

INTEGRAL ATTACHMENT 02.40 2 - x 3 -

4 -

720380 2*CCA-23A F-A VT-3 1 * * -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 10 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-14 (FIG NO CC-2-2/2) 720385 2-CCA-23A D-8 VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 - - '

-

4 -

720390 2-CCS-24 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

12-2-CC-15 CFIG NO CC-2-2/2) 720400 2-CCA-26 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

720405 2-CCA-26 D-8 VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

12-2-CC-17 CFIG NO CC-2-2/2) 720410 2-CCG-27 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-18R CFIG NO CC-2-2/2) 720420 2-CCA-28 F-A VT-3 1 -

SUPPORT F1.30 2 - x - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 11 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-18R (FIG NO CC-2-2/2) 720425 2-CCA-28 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 - - -

4 -

720430 2-CCG-29 F-A VT-3 1 - - " -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-62 (FIG NO CC-2-2/2) 720440 2-CCH-30 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

12-2-CC-61 ~FIG NO CC-2-2£22 720450 2-CCA-31 F-A VT-3 1 -

SUPPORT

  • F1 .30 2 - x 3 -

4 -

720455 2-CCA-31 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 - - -

720460 2-CCG-32 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 12 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERICO PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-60 (FIG NO cc-2-2/2) 720470 2-CCG-33 F-A VT-3 1 -

SUPPORT F1.30* 2 -

3 -

4 -

12-2-CC-59 CFIG NO cc-2-2/2) 72048,0 2-CCS-34 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

12-2-CC-58 CFIG NO CC-2-2/2)

  • 720490 2-CCG-35 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

720500 2-CCA-36 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

720505 2-CCA-36 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 - - -

4 -

12-2-CC-57 CFIG NO CC-2-2/2) 720510 2-CCH-37 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR PO~ER STATION UNIT 2 PAGE: 13 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

12-2-CC-56 (FIG NO cc-2-2/2) 720520 2-CCS-38 F-A VT-3 1 -

SUPPORT F1.30 2 - x - -

3 -

4 -

720525 2-CCS-38 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.40 2 - x - -

3 -

4 - - -

12-2-CC-48 (FIG NO CC-2-2/2) 720530 2-CCS-39 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

720535 2-CCS-39 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.40 2 -

3 -

4 -

16-2-CC-49 (FIG NO CC-2-2/2) 720540 2-CCH-45 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

16-2-CC-51 (FIG NO CC-2-2/2) 720550 2-CCH-46 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 14 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

16-2-CC-51 CFIG NO CC-2-2/2) 720555 2-CCH-46 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.40 2 -

3 -

4 -

16-2-CC-43 (FIG NO CC-2-2/2) 720560 2-CCH-703 . F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

720570 2-CCG-41 F-A VT-3 1 -

SUPPORT F1.30 2 - x

  • 3 -

4 -

720575 2-CCG-41 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

\ 4 -

16-2-CC-45 CFIG NO CC-2-2/2) 720580 2-CCS-40 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

720585 2-CCS-40 D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.40 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 15 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FlRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-38 (FIG NO cc-2-2/2) 720590 2-CCS-48 F-A VT-3 1 -

SUPPORT F1.30 2 - x - -

3 - - -

4 -

720595 2-CCS-48 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.40 2 - x - -

3 -

4 - - -

12-2-CC-39 CFIG NO CC-2-2/2) 720600 2-CCH-47 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

  • 3 -

4 -

16-2-CC-39 CFIG NO CC-2-2/2) 720610 2-CCH-42 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

720615 2-CCH-702 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

16-2-CC-40 CFIG NO CC-2-2/2) 720620 2-CCH-43 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 16 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - -*- - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


------- ---- - ----------- ----------- ----------- -

16-2-CC-68 (FIG NO CC-2-2/2) 720630 2-CCH-69 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - - x - -

3 - - -

4 - - -

720635 2-CCH-69 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.40 2 - - - XI - -

3 - - -

4 - - -

16-2-CC-67 (FIG NO cc-2-2/2) 720640 2-CCH-70 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

  • 720650 2-CCG-71 SUPPORT F-A F1.30 VT-3 4 - -

1 - -

2 -

3 -

-

-

-

-

-

-

-

4 - -

16-2-CC-66 (FIG NO CC-2-2/2) 720660 2-CCG-72 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

720670 2-CCS-73 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 17 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD ~ERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3* **CALIBRATION BLOCK**

16-2-CC-65 CFIG NO CC-2-2/2) 720680 2-CCG-74 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

16-2-CC-64 (FIG NO CC-2-2/2) 720690 2-CCG-75 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

720700 2-CCA-76 F-A VT-3 1 -

SUPPORT F1.30 2 - x

  • 3 -

4 - - -

720705 2-CCA-76 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

16-2-CC-63 CFIG NO CC-2-2/2) 720710 2-CCH-77 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

12-2-CC-26 (FIG NO CC-2-2/2) 720720 2-CCG-78 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 18 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - ~ - - - - 0 U T A G E INSTRUCT IONS NUMBER IDENTIFICATION ITEM NO METH 123 123 1 2 3 **CALIBRATION BLOCK**

12-2-CC-25R (FIG NO CC-2-2/2) 720730 2-CCA-21 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

720735 2-CCA-21 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

12-2-CC-24 (FIG NO CC-2-2/2) 720740 2-CCG-20 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 - - -

4 -

12-2-CC-23 (FIG NO CC-2-2/2) 720750 2-CCA-19 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

720755 2-CCA-19 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

12-2-CC-22 (FIG NO cc-2-2/2) 720760 2-CCS-18 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 19 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-22 (FIG NO CC-2-2/2) 720770 2-CCA-23B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

720775 2-CCA-23B D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

12-2-cc-20 (FIG NO CC-2-2/2) 720780 2-CCG-17 F-A VT-3 1 -

SUPPORT F1 .30 2 - - - x

  • 3 4 - .n 720785 2-CCG-17 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

720790 2-CCH-16 F-A VT-3 1 -

SUPPORT F1 .30 2 - x 3 -

4 -

720795 2-CCH-16 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.40 2 - x 3 -

4 -

8-2-CC-303 (FIG NO CC-2-2/3) 720800 2A-CCA-260 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • (  !

DATE: 03/28/92 SALEM NUCLEAR PO~ER STATION UNIT 2 PAGE: 20 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN

  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS COMPONENT COOLING SYSTEM

- FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - I NSTRUCTI CNS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


------------------------------ ------- ---- - ----------- ----------- ----------- - ------------------------------

8-2-CC-304 (FIG NO CC-2-2/3) 720810 2A-CCG-488 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 - - -

4 -

720820 2A-CCG-489 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 - - -

8-2-CC-305 (FIG NO CC-2-2/3) 720830 2A-CCH-537 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

8-2-CC-314 (FIG NO CC-2-2/3) 720840 2A-CCH-536 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-78 (FIG NO CC-2-2/3) 720850 2-CCA-88 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

720855 2-CCA-88 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

(

DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 21 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN

  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME

  • PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - - - * - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


------- ---- - ----------- ----------- ----------- -

12-2-CC-78 (FIG NO CC-2-2/3) 720860 2-CCG-89 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12*2-CC-79 (FIG NO cc-2-2/3) 720870 2*CCG-90 F-A VT*3 1 .

SUPPORT F1.30 2 . - -

3 .

4 .

8*2-CC-79 (FIG NO CC-2-2/3)

  • 720880 2-CCS-91 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-CC-80 (FIG NO CC-2-2/3) 720890 2-CCH-92 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-CC-81 (FIG NO CC-2-2/3) 720900 2-CCA-93 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 - - -

720905 2-CCA*93 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - - x - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 22 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ -----'PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-CC-81 (FIG NO CC-2-2/3) 720910 2-CCH-94 F-A VT-3 1 -

SUPPORT F1 .30 2 x 3 -

4 -

8-2-CC-82R (FIG NO cc-2-2/3) 720920 2-CCG-95 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

720925 2-CCG-95 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

  • 3 - - -

4 -

6-2-CC-130 (FIG NO CC-2-2/3) 720930 2-CCH-128 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 - - -

4 -

720940 2-CCG-130 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

6-2-CC-315 CFIG NO CC-2-2/3) 720950 2A-CCA-284 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 23 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD

_____ ............ ......................

SEC. XI -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u TAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

6-2-CC-315 (FIG NO CC-2-2/3) 720955 2A-CCA-284 0-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 - - -

4 -

6-2-CC-316 (FIG NO CC-2-2/3) 720960 2A-CCG-458 F-A VT-3 1 -

SUPPORT F1 .30 2 3 -

4 -

6-2-CC-317 (FIG NO CC-2-2/3)

SUPPORT F1.30 2 -

3 -

4 -

720975 2A-CCA-459 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

16-2-CC-69 (FIG NO CC-2-2/3) 720980 2-CCH-79 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

16-2-CC-70 (FIG NO CC-2-2/3) 720990 2-CCH-80 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 24 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS
  • COMPONENT COOLING SYSTEM

SUMMARY

EXAMINATION AREA NUMBER !DENT! Fl CATION INSPECTION INTERVAL ASME SEC. XI CATGY NOE ITEM NO METH

- FIRST PERIOD


1 2 3 PLAN STATUS SECOND PERIOD THIRD PERIOD


----------- -----------

OUTAGE - - - - - -

1 2 3 1 2 3 INSTRUCTIONS

    • CALIBRATION BLOCK**

------- ---- - ----------- ----------- ----------- - ------------------------------

16-2-CC-71 (FIG NO CC-2-2/3) 721000 2-CCH-81 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

721010 2-CCSN-100 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

721020 2-CCH-706 F-A VT-3 SUPPORT F1 .30 2 -

3 -

4 -

  • 16-2-CC-72 (FIG NO CC-2-2/3) 721030 2"CCH-82 SUPPORT F-A F1.30 VT-3 1 -

2 -

3 -

4 -

- -

12-2-CC-73 (FIG NO CC-2-2/3) 721040 2-CCH-83 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

12-2-CC-75 (FIG NO CC-2-2/3) 721050 2-CCA-84 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 25 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-CC-75 (FIG NO CC-2-2/3) 721055 2-CCA-84 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 - - -

4 -

721060 2-CCH-85 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-CC-76 (FIG NO CC-2-2/3) 721070 2-CCG-86 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

12-2-CC-77 (FIG NO CC-2-2/3) 721080 2-CCG-87 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-135 (FIG NO CC-2-2/3) 721090 2-CCH-121 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-136 (FIG NO CC-2-2/3) 721100 2-CCG-123 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 26 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS-INSPECTION INTERVAL_ PLAN STATUS COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u TAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ...................... ----------- ----------- -

6-2-CC-136 ~FIG NO CC-2-2[32 721110 2-CCA-124 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

721115 2-CCA-124 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

6-2-CC-137 (FIG NO CC-2-2[3) 721120 2-CCG-125 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

721130 2-CCS-126 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

6-2-CC-138 (FIG NO CC-2-2[3) 721140 2P-CCA-368 F-A VT-3 1 -

SUPPORT ANCHOR F1.30 2 -

3 -

4 -

721145 2P-CCA-368 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 27 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

16-2-CC-99 (FIG NO CC-2-2/5) 721150 2-CCG-103 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721160 2-CCS-104 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-CC-98 (FIG NO CC-2-2/5) 721170 2-CCS-105 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

  • 3 -

4 -

721180 2-CCH-106 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

6-2-CC-131 (FIG NO cc-2-2/5) 721190 2-CCH-127 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-132 (FIG NO CC-2-2/5) 721200 2-CCG-129 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 28 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCT IONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-CC-325 (FIG NO CC-2-2/5) 721210 2A-CCA-275 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721215 2A-CCA-275 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

6-2-CC-324 (FIG NO CC-2-2/5) 721220 2A-CCG-457 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

6-2-CC-324A (FIG NO CC-2-2/5) 721230 2A-CCG-460 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-323 (FIG NO cc-2-2/5) 721240 2A-CCS-461 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

6-2-CC-321A (FIG NO CC-2-2/5) 721250 2A-CCA-462 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 29 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
  • COMPONENT COOL I NG SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

6-2-CC-142 (FIG NO CC-2-2/5) 721260 2P-CCA-367 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721265 2P-CCA-367 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

6-2-CC-141 (FIG NO CC-2-2/5) 721270 . 2-ccs-120 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

721280 2-CCG-119 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

\

4 -

6-2-CC-140 (FIG NO CC-2-2/5) 721290 2-CCA-118 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

721295 2-CCA-118 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 30 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-CC-140 (FIG NO CC-2-2/5) 721300 2-CCG-117 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-139 (FIG NO CC-2-2/5) 721310 2-CCH-116 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-306 (FIG NO CC-2-2/5)

SUPPORT F1 .30 2 -

3 -

4 -

721330 2A-CCG-538 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

8-2-CC-309 (FIG NO CC-2-2/5) 721340 2A-CCS-485 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

8-2-CC-310 (FIG NO CC-2-2/5) 721350 2A-CCH-483 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 31 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-CC-310 (FIG NO CC-2-2/5) 721360 2A-CCG-482 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-CC-311 (FIG NO CC-2-2/5) 721370 2A-CCS-481 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

721380 2A-CCG-480 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

  • 3 -

4 -

8-2-CC-312 (FIG NO CC-2-2/5) 721390 2A-CCH-479 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-CC-313 (FIG NO CC-2-2/5) 721400 2A-CCG-478 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721410 2A-CCA-261 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 32 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS

-

  • COMPONENT COOL I NG SYSTEM FIRST SECOND THIRD I ASME PERIOD PERIOD PERIOD I SEC. XI ----------- ----------- ----------- I

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E ------ I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 r **CALIBRATION BLOCK**

8-2-CC-313 (FIG NO CC-2-2/5) 721413 2A-CCA-261 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

721415 2:ccG-708 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-CC-107 (FIG NO cc-2-2/5) 721420 2-CCH-98 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

10-2-CC-106 (FIG NO CC-2-2/5) 721430 2-CCH-99 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

10-2-CC-103 (FIG NO CC-2-2/5) 721440 2-CCG-10Q F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-CC-102 (FIG NO CC-2-2/5)

  • ~

721450 2-CCG-101 F-A VT-3 1 -

SUPPORT FL30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 33 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _______PLAN STATUS._ _ _ __
  • COMPONENT COOL I NG SYSTEM I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I. ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE 1 - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1,123 123 123 **CALIBRATION BLOCK**

8-2-CC-92 (FIG NO cc-2-2/6) 721460 2-CCA-107 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 - -/ -

4 - - -

721465 2-CCA-107 D-8 VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 - - -

4 -

721470 2-CCG-711 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • 6-2-CC-96 CFIG NO CC-2-2/6) 721480 2-CCG-110 SUPPORT F-A F1.30 VT-3 1 2

3 4

-

-

-

-

721490 2-CCH-109 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

6-2-CC-95 (FIG NO CC-2-2/6) 721500 2-CCG-108 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -


~-----------------------------------------

DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 34 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - * - *

  • 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-CC-93 CFIG NO CC-2-2/6) 721510 2-CCS-710 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 - - -

6-2-CC-146 (FIG NO CC-2-3/1) 721520 2P-CCG-322 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

6-2-CC-147 CFIG NO CC-2-3/1)

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-148 (FIG NO CC-2-3/1) 721540 2P*CCG*326 F*A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

6-2-CC-152 (FIG NO CC-2*3/1) 721550 2C-CCH-121 F*A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

6*2-CC-153 CFIG NO CC-2-3/1) 721560 2C*CCG*122 F*A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 35 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN

--* COMPONENT COOLING SYSTEM

SUMMARY

EXAMINATION AREA ASME SEC. XI CATGY NOE CLASS 3 All STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

FIRST PERIOD SECOND PERIOD THIRD PERIOD

- - ~ - - - 0 UT AGE - - - - - -

J INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

'- 6-2-CC-153 (FIG NO cc-2-3/1) 721570 2C-CCA-59 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - - -

6-2-CC-232 ~FIG NO cc-2-3l22 721580 2C-CCS-29 '--. F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

721590 2C-CCS-32 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

6-2-CC-233 (FIG NO cc-2-3l22 721600 2c-ccs~36 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

721610 2C-CCS-39 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-234 (FIG NO CC-2-3l22 721620 2C-CCG-42 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 36 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EX~MINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-CC-235 CFIG NO CC-2-3/2) 721630 2C-CCA-46 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721640 2C-CCS-49 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - - '

4 -

6-2-CC-236 (FIG NO CC-2-3/2) 721650 2C-CCS-53 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 - - -

4 - - -

721660 2C-CCS-56 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-207 (FIG NO CC-2-3/3) 721670 2C-CCS-55B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721680 2C-CCS-52 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 37 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


\ - ----------- ----------- ----------- -

6-2-CC-208 (FIG NO cc-2-3/3) 721690 2C-CCS-48 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721700 2C-CCA-45 F-A VT-3 SUPPORT F1.30 2 3 -

4 -

721705 2C-CCS-48 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

  • 6-2-CC-209 (FIG NO CC-2-3/3) 721710 2C-CCG-41 SUPPORT F-A F1.30 VT-3 2

3 1 -

-

-

4 -

6-2-CC-210 (FIG NO CC-2-3/3) 721720 2C-CCS-38 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 - - -

721730 2C-CCS-35 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 38 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-CC-187 (FIG NO CC-2-3/5) 721740 2C-CCA-60 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

721750 2C-CCG-270 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721760 2C-CCH-271 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-CC-190 (FIG NO CC-2-3/5) 721780 2P-CCS-334 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

6-2-CC-192 (FIG NO CC-2-3/5) 721790 2P-CCG-333 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 39 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS COMPONENT COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI --------*-- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ------------ ----------- -

6-2-CC-192 CFIG NO CC-2-3/5) 721800 2P-CCG-325 F*A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

6-2-CC-193 CFIG NO CC-2-3/5) 721810 2P-CCG-323 F*A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

SYSTEM INSERVICE TEST (FIG NO cc-2-3/5)

  • 721814 CC SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2 x x x 3 -

4 -

SYSTEM HYDROSTATIC TEST (FIG NO CC-2-3/5) 721818 CC SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2 - - - - x -

3 -

4 -


~

DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 40 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN

  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - * - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-AF-73 (FIG NO AF-2-2/1) 721820 2-AFS-100 F-A VT-3 1 -

SUPPORT F1.30 2X 3 - - -

4 -

721825 2-AFS-100 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2x 3 -

4 -

721830 2-AFG-102 F-A VT-3 1 -

SUPPORT F1 .30 2x 3 -

4 -

  • 721835 2-AFG-102 INTEGRAL ATTACHMENT D-A 01.20 VT-3 1 -

2x 3 -

4 -

721840 2-AFS-104 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

721845 2-AFS-104 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 x 3 -

4 -

\J 10-2-AF-74 (FIG NO AF-2-2/1) 721850 2-AFG-106 F-A VT-3 1 - - -

SUPPORT F1.30 2 x 3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 41 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-AF-74 (FIG NO AF-2-2/1) 721855 2-AFG-106 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 x 3 -

4 -

721860 2-AFA-108 F-A VT-3 1 -

SUPPORT F1 .30 2 x 3 - - -

4 -

721865 2-AFA-108 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01 .20 2 x 3 -

4 - - -

  • 721870 10-2-AF-75 (FIG NO AF-2-2/1) 2-AFS-110 SUPPORT F-A F1.30 VT-3 1 -

2 -

3 -

4 -

721880 2-AFS-113 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

10-2-AF-76 (FIG NO AF-2-2/1) 721890 2-AFH-114 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 42 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-AF-76 (FIG NO AF-2-2/1) 721900 2-AFG-116 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

10-2-AF-77 (FIG NO AF-2-2/1) 721910 2-AFG-118 F-A VT*3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

721920 2-AFG-120 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

721930 2-AFH-122 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-AF-78 (FIG NO AF-2-2/1) 721940 2-AFG-124 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721950 2-AFS-126 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 43 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL- PLAN STATUS AUXILIARY FEEDYATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE ------ 0 UT AGE ------ INSTRUCTIONS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


............... ---- - ----------- ----------- ----------- - ------------------------------

10*2*AF-79 (FIG NO AF-2-2/1) 721960 2-AFG-128 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

721970 2-AFS-130 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-AF-80 (FIG NO AF-2-2/1) 721980 2-AFA-134 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

721985 2-AFA-134 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 4 -

721990 2-AFS-136 . F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722000 2-AFG-138 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-AF-81 (FIG NO AF-2-2/1) 722010 2-AFS-140 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 44 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
  • AUXILIARY FEEDYATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * * * * *

  • 0 U T A GE * * * * -
  • INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10*2*AF*83 CFIG NO AF-2*2/1) 722020 2*AFG*142 F*A VT-3 1

  • SUPPORT F1.30 2
  • 3
  • 4
  • 722023 2*AFA*146 F*A VT-3 1 .

SUPPORT F1.30 '- 2 x 3 .

4 . - '"

722026 2*AFA*146 D*A VT-3 1 .

INTEGRAL ATTACHMENT 01.20 2x 3 .

4 .

  • 8-2*AF*87 CFIG NO AF*2*2/1) 722030 2-AFG*150A SUPPORT F*A F1.30 VT-3 1 2

3 4

.

.

.

722040 2*AFH*150 F*A VT-3 1 . . .

SUPPORT F1.30 2 .

3 .

4 .

6*2*AF*89 (FIG NO AF-2-2/1) 722050 2*AFS*154 F*A VT-3 1

  • SUPPORT F1 .30 2x . . .

3

  • 4 .
  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 45 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS,_ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * * * * *

  • 0 UT AGE * * * * *
  • INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6*2-AF-89 (FIG NO AF-2*2/1) 722055 2-AFS-154 D*A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2x 3 -

4 -

6*2-AF-137 (FIG NO AF-2*2/1) 722060 2-AFA-159 F*A VT-3 1 -

SUPPORT F1 .30 2x 3 -

4 - - -

722065 2*AFA*159 D*A VT-3 1 - - -

INTEGRAL ATTACHMENT ' D1.20 2x

  • 3 -

4 -

6*2-AF-136 (FIG NO AF-2-2/1) 722070 2*AFS-158 F*A VT-3 1 -

SUPPORT F1 .30 2 - x - -

3 -

4 - - -

722075 2-AFS-158 D*A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 .2 - x - -

3 -

4 -

6*2*AF*143 CFIG NO AF-2-2/1) 722080 2-AFS-157 F*A VT-3 1 -

SUPPORT F1.30 2 - x - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 46 REVISION: .0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-AF-143 CFIG NO AF-2-2/1) 722085 2-AFS-157 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT D1.20 2 - x 3 -

4 - - -

6-2-AF-142 CFIG NO AF-2-2/1) 722090 2-AFS-156 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 "

722095 2-AFS-156 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 - x

  • 3 -

4 - - -

8-2-AF-86 (FIG NO AF-2-2/1) 722100 2-AFS-155 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

722105 2-AFS-155 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT D1.20 2 - x 3 -

4 -

8-2-AF-84 CFIG NO AF-2-2/1) 722110 2-AFA-152 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 47 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __
  • AUXILIARY FEEDYATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-AF-84 (FIG NO AF-2-2/1) 722115 2-AFA-152 D-A VT-3 INTEGRAL ATTACHMENT 01.20 2 - x 3 -

4 6-2-AF-91 (FIG NO AF-2-2/5) 722120 2-AFG-160 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 - - -

722125 2-AFG-160 D-A Vf-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - x

  • 3 -

4 -

722130 2-AFS-161 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

722140 2-AFA-162 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

722145 2-AFA-162 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - x 3 -

4 -

6-2-AF-92 (FIG NO AF-2-2/5) 722150 2-AFS-163 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 48 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE * * - - - - 0 UT AGE - * - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-AF-2 (FIG NO AF-2-2/2) 722160 2-AFSG-3 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 - - -

4 -

722170 2-AFSG-4 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

12-2-AF-3 CFIG NO AF-2-2/2) 722180 2-AFSG*S F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

12-2-AF-4 (FIG NO AF-2-2/2) 722190 2-AFSG-6 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

722200 2-AFSG-7 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 - - -

12-2-AF-5 (FIG NO AF-2-2/2) 722210 2-AFSG-8 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 49 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-AF-5 (FIG NO AF-2-2/2) 722220 2-AFSG-9 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 - - -

12-2-AF-6 (FIG NO AF-2-2/2) 722230 2-AFSG-10 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722240 2-AFSG-11 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

12-2-AF-7 (FIG NO AF-2-2/2) 722250 2-AFSG~12 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722260 2-AFSG-13 F-A VT*3 1 -

SUPPORT F1.30 2 -

3 -

4 - 7 - -

12-2-AF-8 (FIG NO AF-2-2/2) 722270 2-AFSA-14 F-A VT-3 1 - - -

SUPPORT F1 .30 2 - x - -

~ -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 50 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-AF-8 CFIG NO AF-2-2/2) 722275 2-AFSA-14 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT 01.20 2 - x 3 -

4 -

'-

12-2-AF-9 CFIG NO AF-2-2/2) 722280 2-AFSG-15 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722290 2-AFSG-16 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

  • 3 -

4 -

12-2-AF-10 CFIG NO AF-2-2/2) 722300 2-AFSG-17 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-AF-11 CFIG NO AF-2-2/2) 722310 *2-AFSG-18 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722320 2-AFSG-19 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 51 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL- PLAN STATUS AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI --*- -------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E ------ INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


------- ---- - ----------- ----------- ----------- - ------------------------------

12-2-AF-12 (FIG NO AF-2-2/2) 722330 2-AFSG-20 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722340 2-AFSG-21 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

12-2-AF-14 (FIG NO AF-2-2/2) 722350 2-AFSS-22 F-A VT-3 SUPPORT F1 .30 2 -

  • 3 -

4 -

722360 2-AFSS-23 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

722365 2-AFSS-23 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - x 3 -

4 -

10-2-AF-14 (FIG NO AF-2-2/2) 722370 2-AFSA-24 F-A VT-3 1 -

SUPPORT F1.30 2 - - x - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 52 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 U T A GE - - - ~ - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-AF-14 CFIG NO AF-2-2/2) 722375 2-AFSA-24 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - x - -

3 -

4 -

8-2-AF-15 CFIG NO AF-2-2/2) 722380 2-AFSG-25 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-AF-19 CFIG NO AF-2-2/2)

  • 722390 2-AFSA-27 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722395 2-AFSA-27 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

8-2-AF-18 CFIG NO AF-2-2/2) 722400 2-AFSG-26 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-AF-162A CFIG NO AF-2-2/3) 722410 2-AFS-262 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 - - - - - - '

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 53 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS.,.--_ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-AF-162B (FIG NO AF-2-2/3) 722420 2-AFS-261 F-A VT-3 1 -

SUPPORT F1 .~30 2 -

3 -

4 -

6-2-AF-163 (FIG NO AF-2-2/3) 722430 2-AFS-113A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

722440 2-AFS-112 F-A VT-3 1 -

SUPPORT F1.30 2 -

) 3 -

4 -

722450 2-AFA-111 F-A VT-3 1 -

SUPPORT F1.30 2 - x - -

3 -

4 -

722455 2-AFA-111 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - x 3 -

4 -

6-2-AF-164 (FIG NO AF-2-2/3) 722460 2-AFG-109 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 54 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-AF-164 CFIG NO AF-2-2/3) 722465 2-AFG-109 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 - x 3 -

4 -

722470 2-AFG-107 F-A VT-3 1 - - -

SUPPORT F1.30 2 - x 3 -

4 -

722475 2-AFG-107 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 - x - -

3 -

4 -

  • 722480 6-2-AF-165 2-AFS-105 SUPPORT

~FIG I

NO AF-2-2[32 F-A F1.30 VT-3 1 -

2 -

3 -

x 4 - - -

722485 2-AFS-105 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 - x - -

3 -

4 -

722490 2-AFG-103 F-A VT-3 1 -

SUPPORT F1 .30 2 - x 3 - - -

4 -

722495 2-AFG-103 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT 01.20 2 - - - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 55 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

6-2-AF-165 (FIG NO AF-2-2/3) 722500 2-AFG-101A- F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

722505 2-AFG-101A D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - x 3 -

4 -

722510 2-AFS-101 F-A VT-3 1 -

SUPPORT F1 .30 2 - x 3 -

4 -

  • 722515 2-AFS-101 INTEGRAL ATTACHMENT D-A 01.20 VT-3 1 -

2 -

3 4 -

x SYSTEM INSERVICE TEST (FIG NO AF-2-2/3) 722517 AUX. FW SYSTEM COMPONENTS D-A VT-2 1 -

PRESSURE RETAINING COMPONENTS 01.10 2 x x x - -

3 4 -

SYSTEM HYDROSTATIC TEST (FIG NO AF-2-2/3) 722519 AUX. FW SYSTEM COMPONENTS D-A VT-2 1 -

PRESSURE RETAINING COMPONENTS 01.10 2 - - x -

3 -

4 -

  • __ j

DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 56 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN

  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __

MAIN STEAM SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-AMS-15 (FIG NO MS-2-2/3) 722520 2-MSAH-125 F-A VT-3 1 -

SUPPORT F1.30 2 - - - x - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 57 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

20-2-SW-94 CFIG NO SW-1-7L>

722530 SWPS-14 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 - - -

722535 SWPS-14 0-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

20-2-SW-95 CF I G NO SW 7L>

722540 SWPS-28 F-A VT-3 1 -

SUPPORT F1.30 2 x - - -

  • 3 -

4 -

722545 SWPS-28 0-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

20-2-SW-93 (FIG NO SW-1-7L) 722550 SWPS-15 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

722555 SWPS-15 0-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 58 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
  • SERVI CE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION. BLOCK**

20-2-SW-92 CFIG NO SW-1-7L>

722560 SWPS-16 F-A VT-3 1 -

SUPPORT F1 .30 2x - -

3 -

4 -

f

(

722565 SWPS-16 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x - -

3 -

4 -

30-2-SW-91 CFIG NO SW-1-7L>

722570 SWPH-59 F-A VT-3 1 -

SUPPORT F1 .30 2 x

  • 3 -

4 -

722575 SWPH-59 0-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 ~ - -

4 -

722580 SWPH-60 F-A VT-3 1 -

SUPPORT F1 .30 2 x 3 -

4 -

722585 SWPH-60 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 " - -

4 -

30-2-SW-90 (FIG NO SW"1-7L) 722590 SWPG-20 F-A VT-3 1 -

SUPPORT F1.30 2 X 3 -

4 -

,

DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 59 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN

  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _....;PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

30-2-SW-90 (FIG NO SW-1-7L) 722595 SWPG-20 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2x 3 -

4 -

30-2-SW-89 (FIG NO SW-1-7L) 722600 SWPA-26 F-A VT-3 1 -

SUPPORT F1.30 2. -

3 -

4 -

30-2-SW-88 (FIG NO SW-1-7L)

  • 722610 SIJPG-50 F-A VT-3 1 -

SUPPORT F1.30 2x 3 -

4 -

722615 SIJPG-50 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2x 3 -

4 -

30-2-SW-99 (FIG NO SIJ-1-7L) 722620 SIJPG-21 F-A VT-3 1 -

SUPPORT F1.30 2X 3 -

4 -

722630 SIJPG-21 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 60 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

30-2-SW-100 (FIG NO SW-1-7L) 722640 SWPA-24 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

30-2-SW-101 (FIG NO SW 7L) 722650 SWPG-498 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

24-2-SW-96 (FIG NO SW-1-7L)

  • 722660 SWPS-17 F-A VT-3 1 -

SUPPORT F1 .30 2 x 3 -

4 -

722665 SWPS-17 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

24-2-SW-97 (FIG NO SW-1-7L) 722670 SWPS-18 F-A VT-3 1 -

SUPPORT F1.30 2x 3 -

4 -

722675 SWPS-18 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 61 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

24-2-SW-98 (FIG NO SW-1-7L) 722680 SWPA-19 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

30-2-SW-102 (FIG NO SW-1-7M) 722690 SWPA-41 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

30-2-SW-103 CFIG NO SW-1-7M)

  • 722710 SWPG-39 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

30-2-SW-83 (FIG NO SW-1-7M) 722720 SWPA-35 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

30-2-SW-141 CFIG NO SW-1-7M) 722730 SWPS-34 F-A VT-3 1 -

SUPPORT F1.30 2x 3 -

4 -

722735 SWPS-34 D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2 x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 62 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _____ PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - ', INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

30-2-SW-81RW CFIG NO SW-1-7M) 722740 SWPS-33 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

722745 SWPS-33 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

30-2-SW-86 CFIG NO SW-1-7M) 722750 SWPG-40 F-A VT-3 1 - - -

SUPPORT F1 .30 2 x

  • 3 -

4 - - -

722755 SWPG-40 D-B VT-3 1 - - - - - -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

30-2-SW-87 (FIG NO SW-1-7M) 722760 SWPA-42 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

30-2-SW-75 (FIG NO SW-1-7M) 122no SWPH-62 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 63 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

30-2-SW-75 (FIG NO SW-1-7M) 722775 SWPH-62 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

722780 SWPH-61 F-A VT-3 1 -

SUPPORT F1 .30 2 x 3 -

4 -

722785 SWPH-61 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

  • 722790 24-2-SW-73 (FIG NO SW-1-7M)

SWPA-38 SUPPORT F-A F1 .30 VT-3 1 2

3 4

-

-

-

-

- -

24-2-SW-74 (FIG NO sw-1-7M) 722800 SWPS-37 F-A VT*3 1 -

SUPPORT F1.30 2 x 3 -

4 -

722805 SWPS-37 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 64 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

24-2-SW-74 (FIG NO SW-1-7M) 722810 SWPS-36 F-A VT-3 1 -

SUPPORT F1.30 2x 3 - - -

4 -

722815 SWPS-36 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2x 3 -

( 4 -

20-2-SW-76 CFIG NO SW-1-7M) 722820 SWPS-32 F-A VT-3 1 - - -

SUPPORT F1.30 2 - 'x

  • 3 -

4 -

722825 SWPS-32 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 - - - ' -

4 -

20-2-SW-79 (FIG NO SW-1-7M) 722830 SWPS-54 F-A VT-3 1 -

SUPPORT F1 .30 2 - x 3 -

4 -

722835 SWPS-54 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 65 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _P.LAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCT IONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

20-2-SW-77 (FIG NO SW-1-7M) 722840 SWPS-31 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3

4 -

722845 SWPS-31 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4 -

20-2-SW-78 (FIG NO SW-1-7M) 722850 SWPS-30 F-A VT-3 1 -

SUPPORT F1.30 2 - x

  • 3 -

4 -

722855 SWPS-30 D*B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 x 3 -

4 -

6-2-SW-957 (FIG NO SW-1-7B/2) 722860 MSWG-42 F-A VT-3 1 -

SUPPORT F1.30 2 x 3 -

4 -

722865 MSWG-42 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 66 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-120 (FIG NO SW-1-7B/2) 722870 MSWG-41A F-A VT-3 1 - - ~

-

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

722880 MSWG-41 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

10-2-sw-112 (FIG NO SW-1-7B/2) 722890 MSWA-23 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

  • 3 - - -

4 - - -

6-2-SW-951 ~FIG NO SW-1-7B[22 722900 MSWG-39 F-A VT-3 1 -

SUPPORT F1 .30 2 - - - x - -

3 - - -

4 - - -

722905 MSWG-39 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT D2.20 2 - x - -

3 -

4 - - -

6-2-SW-114 (FIG NO SW-1-7B[22 722910 MSWG-38 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 67 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
  • FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


------------------------------ ------- ---- - ----------- ----------- ----------- -

6-2-SW-113 (FIG NO SW-1-7B/2) 722920 MSWG-31 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-113 CFIG NO SW-1-7B/2) 722930 MSWH-26 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

6-2-SW-960 (FIG NO SW-1-78/2)

  • 722940 MSWG-49 F-A VT-3 1 -

SUPPORT F1.30 2 - - - x - -

3 -

4 -

722945 MSWG-49 D-8 VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2 - x - -

3 -

4 -

6-2-SW-135 (FIG NO SW-1-78/2) 722950 MSWG-48A F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

722960 MSWG-48 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 68 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS

SUMMARY

EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

ASME SEC. XI CATGY NOE ITEM NO METH FIRST PERIOD SECOND PERIOD THIRD PERIOD

- - - - - - 0 UTA GE - - - - - -

1 2 3 1 2 3 1 2 3 INSTRUCTIONS

    • CALIBRATION BLOCK**

------- ---- - ----------- ----------- ----------- -

10-2-SW-127 (FIG NO SW-1-7B/2) 722970 MSWA-21 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

6-2-SW-966 (FIG NO SW-1-7B/2) 722980 MSWG-52 F-A VT-3 1 - - -

SUPPORT F1 .30 2 - - - x - -

3 - - -

4 - - -

722985 MSWG-52 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - - - .x - -

  • 3 - - -

4 - - -

6-2-SW-129 (FIG NO SW-1-7B/2) 722990 MSWG-51 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

723000 MSWH-29 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

8-2-SW-128 (FIG NO SW-1-7B/2) 723010 MSWH-28 F-A VT-3 1 - - -

SUPPORT F1 .30 2 - - -

3 - - -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 69 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS

SUMMARY

EXAMINATION AREA NUMBER !DENT! Fl CATION INSPECTION INTERVAL-ASME SEC. XI CATGY NOE ITEM NO METH FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD PERIOD


----------* -----------

- - - - - - 0 UTA GE - - - - - -

1 2 3 1 2 3 1 2 3 I NSTRUCTI CNS

    • CALIBRATION BLOCK**

------- ---- - ----------- ----------- ----------- - ------------------------------

6-2-SW-954 (FIG NO SW-1-7B/2) 723020 MSWG-40 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - - x - -

3 - - -

4 - - -

723025 MSWG-40 D-B VT-3 INTEGRAL ATTACHMENT 02.20 2 x - -

3 4 - - -

6-2-SW-963 (FIG NO SW-1-7B/2) 723030 MSWG-50 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - - x - -

  • 3 4 - - -

723035 MSWG-50 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - - - x - -

3 - - -

4 - - -

10-2-SW-127 (FIG NO SW-1-78/4) 723040 MSWG-20 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - - - - -

723050 MSWG-13 F-A VT-3 SUPPORT F1 .30 2 3 - - -

4

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 70 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE * - - - * - 0 UTAGE * - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-125 (FIG NO SW-1-7B/4) 723060 MSWG-12 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 -

4 - - -

10-2-SW-123 (FIG NO SW-1-7B/4) 723070 MSWA-345A F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 - - -

4 -

723075 MSWA-345A D-B VT-3 1 - - -

INTEGRAL ATTACHMENT D2.20 2 - - -

- -

  • 3 -

4 - - -

10-2-sw-112 (FIG NO SW-1-7B/4) 723080 MSWG-18 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

723090 MSWG-15 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

10-2-SW-110 (FIG NO SW-1-7B/4) 723100 MSWG-10 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 71 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE --- ---0 u TAGE ------ INSTRUCT IONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

10-2-SW-108 (FIG NO SW-1-7B/4) 723110 MSWA-345C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723115 MSWA-345C D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

24-2-SW-414 (FIG NO SW-2-3/1) 723120 2P-22SWS F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

  • 3 -

4 .

10-2-SW-445R (FIG NO SW-2-3/1) 723130 2P-SWR-43 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-SW-678 (FIG NO SW-2-3/1) 723140 2P-22SWS-9 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723150 2P-SWA-102 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

---1 DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 72 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _.PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-678 (FIG NO SW-2-3/1) 723155 2P-SWA-102 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 - - -

4 -

10-2-SW-P-1171 CFIG NO SW-2-3/51) 723160 2P-SWA-110 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

723165 2P-SWA-110 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

  • 3 -

4 -

723170 2P-25SWG-1 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-P-1175 (FIG NO SW-2-3/51) 723180 2P-24SWG-1 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 - - - -

4 -

723190 2P-SWA-111 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 73 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-P-1175 (FIG NO SW-2-3/51) 723195 2P-SWA-111 D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2 -

3 -

4 -

10-2-SW-P-1182 (FIG NO SW-2-3/51) 723200 2P-23SWG-1 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723210 2P-SWA-112 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

723215 2P-SWA-112 D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2 -

3 -

4 - - -

16-2-SW-P-1167 CFIG NO SW-2-3/51) 723220 2P-22SWG-3 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

16-2-SW-P-1168 (FIG NO SW-2-3/51) 723230 2P-22SWA-5 F-A VT-3 1 - - - -

SUPPORT F1 .30 2 - - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 74 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-458 (FIG NO SW-2-3/3) 723240 2P-SWR-44 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-468 (FIG NO SW-2-3/3) 723250 2C-24SWH-2 F.-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-469 (FIG NO SW-2-3/3)

SUPPORT F1.30 2 -

3 -

4 -

723270 2C-23SWH-4A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-470 CFIG NO SW-2-3/3) 723280 2C-23SWG-5A F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

723290 2C-23SWG-6A F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 75 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM I FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I -----------

SUMMARY

EXAMINATION AREA CATGY NOE 1 - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH -1 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

--~---------------------------

10-2-SW-471 (FIG NO SW-2-3/3) 723300 2C-23SWH-7A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723310 2C-24SWA-4 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

10-2-SW-472 (FIG NO SW-2-3/3) 723320 2C-24SWH-5A F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 - - -

10-2-SW-474 CFIG NO SW-2-3/3) 723330 2C-23SWH-11A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-475 (FIG NO SW-2-3/3)

'723340 2C-23SWG-12A F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 - .- -

723350 2C-23SWG-13A F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 76 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

. EXAMINATION AREA CATGY NOE * * - - - - 0 UT AGE - *** - * - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-476 (FIG NO SW-2-3/4) 723360 2C-24SWH-7 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 - - - " -. -

4 -

10-2-SW-477 CFIG NO SW-2-3/4) 723370 2C-24SWG-8 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

. 10-2-SW-P-843 ~FIG NO SW-2-3£35~

SUPPORT F1.30 2 - x 3 -

4 -

723385 2C-24SWA-4001 D*B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

10-2-SW-P-845 CFIG NO SW-2-3£35) 723390 2C-24SWG-4002 F*A VT-3 1 -

SUPPORT F1 .30 2 - x 3 - - -

4 -

723395 2C-24SWG-4002 D*B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 77 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-P-845 (FIG NO SW-2-3/35) 723400 2C-24SWG-4003 F-A VT-3 1 -

SUPPORT F1.30 2 - x - -

3 -

4 -

723405 2C-24SWG-4003 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

10-2-SW-482AR (FIG NO SW-2-3/5) 723410 2P-SWR-45 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

723420 2P-23SWS-5 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

10-2-SW-495 (FIG NO sw-2-3/5) 723430 2C-23SWH-2 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723440 2C-23SWG-3B F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 78 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ __.PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - I~STRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-496 CFIG NO SW-2-3/5) 723450 2C-23SWH-4B F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-497 CFIG NO SW-2-3/5) 723460 2C-23SWG-5B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723470 2C-23SWG-6B F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3-4 -

10-2-SW-498 CFIG NO SW-2-3/5) 723480 2C-23SWH-7B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723490 2C-23SWG-8B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - _) -

4 -

10-2-SW-499 (FIG NO SW-2-3/5) 723500 2C-23SWA-10 F-A VT-3 1 -

SUPPORT ' F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 79 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - *

  • 0 UTAGE - - - - - - INSTRUCT IONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-501 (FIG NO SW-2-3/5) 723510 2C-23SWH-11B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-502 (FIG NO SW-2-3/5) 723520 2C-23SWG-12B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-503 (FIG NO SW-2-3/6)

SUPPORT F1.30 2 -

3 -

4 -

723540 2C-23SWH-14B F-A . VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-504 (FIG NO SW-2-3/6) 723550 2C-23SWG-15B F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-505 (FIG NO SW-2-3/6) 723560 2C-23SWH-17 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 80 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-505 (FIG NO SW-2-3/6) 723570 2C-23SWS-18 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-506 (FIG NO SW-2-3/6) 723580 2C-23SWG-19 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-P-784 ~FIG NO SW-2-3£33~

SUPPORT F1.30 2 - x - -

3 -

4 -

723595 2C-23SWA-3001 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

10-2-SW-P-786 (FIG NO SW-2-3£33) 723600 2C-23SWG-3002 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

723610 2C-23SWG-3003 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 81 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ ~~~~-

PLAN STATUS -~~~~

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-454 (FIG NO SW-2-3/2) 723620 2C-25SWS-1 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

10-2-SW-455 (FIG NO SW-2-3/2) 723630 2C-25SWG-3 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-P-958 ~FIG NO SW-2-3£372

SUPPORT F1.30 2 - x 3 -

4 - - -

723645 2C-25SWA-5001 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4 -

10-2-SW-P-960 (FIG NO SW-2-3£37) 723650 2C-25SWG-5002 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

723660 2C-25SWG-5003 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 82 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
  • SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI *---------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCT IONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-535R (FIG NO SW-2-3/7) 723670 2P-22SWS F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723680 2P-SWR-49 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-513 (FIG NO SW-2-3/7) 723690 2P-SWR-50 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

10*2-SW-525 ~FIG NO SW-2-3[7~

723700 2C-21SWH-1 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723710 2C-21SWG-3D F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-547 (FIG NO SW-2-3[7) 723720 2C-22SWH-1 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 83 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-547 (FIG NO SW-2-3/7) 723730 2C-21SWG-3C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-526 (FIG NO SW-2-3/9) 723740 2C-21SWG-4D F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

723750 2C-21SWG-5D F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 - - -

10-2-SW-527 (FIG NO SW-2-3/9) 723760 2C-21SWA-6 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

723770 2C-21SWG-8D F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-528 (FIG NO SW-2-3/9) 723780 2C-21SWG-9D F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 84 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - * * - * - 0 UTAGE - - * - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW*529R (FIG NO SW-2-3/9) 723790 2C-21SWH*10 F-A VT-3 1 -

SUPPORT F1 .30 2 .

3 -

4 - . -

10*2-SW*531 (FIG NO SW*2*3/9) 723800 2C-21SWG*13 F-A VT-3 1 .

SUPPORT F1.30 2 - x 3 - . -

4 -

10*2-SW*P*556 ~FIG NO SW*2-3[292

  • 723810 2C*21SWA*1001 F*A VT-3 1 -

SUPPORT F1 .30 2 . x 3 .

4 .

723815 2C-21SWA-1001 D*B VT*3 1 .

INTEGRAL ATTACHMENT 02.20 2 . x 3 .

4 -

10*2-SW-P-558 (FIG NO SW-2-3[292 723820 2C-21SWG-1002 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

723830 2C-21SWG-1003 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 85 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ -----'PLAN STATUS_ _ _ __

'

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

16-2-SW-P-1217 (FIG ~O SW-2-3/53) 723840 2P-21SWA-5 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

723850 2P-21SWG-5 F-A VT-3 1 -

SUPPORT F1.30 2. - - -

3 -

4 -

10-2-SW-P-1226 (FIG NO SW-2-3/53) 723860 2P-22SWG-13 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

723870 2P-SWA-106 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-P-1222 (FIG NO SW-2-3/53) 723880 2P-21SWG-9 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - - .-

10-2-SW-P-1223 (FIG NO SW-2-3/53) 723890 2P-SWA-105 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 86 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-P-1223 CFIG NO SW-2-3/53) 723895 2P-SWA-105 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

24-2-SW-420 (FIG NO SW-2-3/10) 723900 2P-22SWS-2 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

24-2-SW-431A (FIG NO SW-2-3j10)

  • 723910 2-SWWA-6J1 F-A VT-3 1 -

WALL ANCHOR F1.30 2 -

3 -

'"'"' 4 -

723915 2-SWWA-6J1 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 -

24-2-SWSL-105 ~FIG NO SW-2-3L10l 723920 2-SWWA-6K4 F-A VT-3 1 -

WALL ANCHOR F1.30 2 - - -

3 -

4 -

723925 2-SWWA-6K4 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 - - -

---i DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 87 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

  • SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

24-2-S\.l-432 (FIG NO S\./-2-3/10) 723930 2P-21S\.IS-1 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

24-2-S\.l-434 (FIG NO S\./-2-3/10) 723940 2P-21S\.IS-4 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

723950 2P-SWA-\.IS04 F-A VT-3 1 - -

SUPPORT F1 .30 2 -

  • 3 -

4 -

24-2-S\.ISL-104 {FIG NO S\./-2-3[10~

723960 2-S\.l\.IA-6K3 F-A VT-3 1 -

\./ALL ANCHOR F1.30 2 -

3 - - -

4 -

723965 2-S\.IWA-6K3 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 -

24-2-S\.l-420 (FIG NO S\./-2-3[10) 723970 2P-21S\.IS-2 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 88 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 U T A G E - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

24-2-SWSL-107 CFIG NO SW-2-3/10) 723974 2-SWWA-6K2 F-A VT-3 1 -

WALL ANCHOR F1.30 2 -

3 -

4 - - -

723978 2-SWWA-6K2 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 - - -

3 -

4 -

24-2-SWSL-106 (FIG NO SW-2-3/10) 723980 2-SWWA-6K1 F-A VT-3 1 -

WALL ANCHOR F1.30 2 -

  • 3 -

4 -

723985 2-SWWA-6K1 D-B SEE 1 - "-...

- INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 -

723990 2P-SWWA-WA6 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-676AR CFIG NO SW-2-3/10) 724000 2P-22SWR-31 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 89 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-SW-978 (FIG NO SW-2-3/10) 724010 2P-22SWR-29 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-979 (FIG NO SW-2-3/10) 724020 2P-22SWR-32 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

8-2-SW-980 CFIG NO SW-2-3/10)

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-981 (FIG NO SW-2-3/10) 724040 2P-21SWR-29 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-549 CFIG NO SW-2-3/8) 724050 2C-21SWG-4C F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 - . - - -

724060 2C-21SWG-5C F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 - ,

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 90 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A G*E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-549 CFIG NO SW-2-3/8) 724070 2C-22SWG-3C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724080 2C-22SWA-4 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-sw-550 CFIG NO SW-2-3/8) 724090 2C-21SWG-9C F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

10-2-SW-551 CFIG NO SW-2-3/8) 724100 2C-21SWG-11C F"A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-552 (FIG NO SW-2-3/8) 724110 2C-22SWG-6C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724120 2C-22SWG-7C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 91 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-S\.J-553 (FIG NO SW-2-3/8) 724130 2C-22SWH-9 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-554 CFIG NO SW-2-3/8) 724140 2C-22S\.JG-12 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-S\.J-P-669 (FIG NO S\.J-2-3/31)

  • 724150 2C-22S\.JH-2002 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-S\.J-P-672 ~FIG NO S\.J-2-3[31~

724160 2C-22SWG-2003 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 - - -

4 -

724170 2C-22S\.JG-2004 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

724180 2C-22S\.JA-2001 F-A VT-3 1 -

SUPPORT F1.30 2 - - - x - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 92 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-P-672 (FIG NO SW-2-3/31) 724185 2C-22SWA-2001 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4 - - -

20-2-SW-422 (FIG NO SW-2-3/19) 724190 2P-SWA-WS10 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724195 2P-SWA-WS10 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - -

  • 3 -

4 -

6-2-SW-685 (FIG NO SW-2-3/19) 724200 2P-SWA-100A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724205 2P-SWA-100A D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

724210 2P-22SWS-10 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

- --- - __J

DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 93 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

16-2-SW-P-1195 CFIG NO SW-2-3/52) 724220 2P-22SWG-6 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-P-1188 CFIG NO SW-2-3/52) 724230 2P-22SWH-8 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 - - -

4 - - -

10-2-SW-P-1187 ~FIG NO SW-2-3[522

SUPPORT F1.30 2 - - -

3 -

4 -

724245 2P-SWA-109 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - - -

724246 2P-SWA-109 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

10-2-SW-P-1190 CFIG NO SW-2-3/522 724250 2P-PSR-46 F-A VT-3 1 -

VALVE SUPPORT F1.40 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 94 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-P-1204 (FIG NO SW-2-3/52) 724260 2P-SWR-42 F-A VT-3 1 -

VALVE SUPPORT F1.40 2 -

3 -

4 -

10-2-SW-P-1200 (FIG NO SW-2-3/52) 724270 2P-SWA-108 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

724275 2P-SWA-108 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

  • 3 -

4 -

724280 2P-24SWG-2 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-P-1212 (FIG NO SW-2-3/52) 724290 2P-SWR-41 F-A VT-3 1 -

VALVE SUPPORT F1 .40 2 -

3 -

4 -

10-2-SW-P-1209 (FIG NO SW-2-3/52) 724300 2P-25SWG-2 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 95 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-P-1208 CFIG NO SW-2-3/52) 724310 2P-SWA-107 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724315 2P-SWA-107 D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2 -

3 -

4 -

10-2-SW-560 (FIG NO SW-2-3/15) 724320 2P-23SWS-7 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

10-2-SW-580 (FIG NO SW-2-3/15) 724330 2C-23SWG-12C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-579 (FIG NO SW-2-3/15) 724340 2C-23SWH-11C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-577 (FIG NO SW-2-3/15) 724350 2C-23SWA-9 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 96 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-576 (FIG NO SW-2-3/15) 724360 2C-23SWG-8C F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 - - -

724370 2C-27SWH-7C F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 - - -

4 -

10-2-SW-575 (FIG NO SW-2-3/15) 724380 2C-23SWG-6C F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

  • 3 -

4 -

724390 2C-23SWG-5C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-574 (FIG NO SW-2-3/15) 724400 2C-23SWH-4C F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 - - -

4 -

10-2-SW-573 (FIG NO SW-2-3/15) 724410 2C-23SWG-3C F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 97 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
  • SERVICE YATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SY-573 (FIG NO SY-2-3/15) 724420 2C-23SYH-1 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SY-581 (FIG NO SY-2-3/14) 724430 2C-23SYG-13C F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724440 2C-23SYH-14C F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

10-2-SY-582 (FIG NO SY-2-3/14) 724450 2C-23SYG-15C F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SY-583 (FIG NO SY-2-3/14) 724460 2C-23SYS-16 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SY-584 (FIG NO SY-2-3/14) 724470 2C-23SYG-23 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 98 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-837 (FIG NO SW-2-3/34) 724480 2C-23SWA-3007 F-A VT-3 1 - - -

SUPPORT F1.30 2 - x 3 -

4 - - -

724485 2C-23SWA-3007 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

10-2-SW-P-837 CFIG NO SW-2-3/34) 724490 2C-23SWG-3008 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 - \'

4 -

10-2-SW-P-836 CFIG NO SW-2-3/34) 724500 2C-23SWG-3009 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-P-837 (FIG NO SW-2-3/34) 724510 2C-23SWG-3010 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-P-836 CFIG NO SW-2-3/34) 724520 2C-23SWG-3011 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 99 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE YATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - * - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SY-P-836 (FIG NO SY-2-3/34) 724530 2C-23SYS-3012 F-A VT-3 1 -

SUPPORT F1 .30 2 - x 3 -

4 -

724535 2C-23SYS-3012 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT D2.20 2 - x 3 -

4 -

10-2-SY-588 (FIG NO SY-2-3/17) 724540 2P-24SYS-9 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

10-2-SY-608 (FIG NO SY-2-3/17) 724550 2C-23SYG-12D F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SY-607 (FIG NO SY-2-3/17) 724560 2C-23SYH-11D F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

10-2-SY-605 (FIG NO SY-2-3/17) 724570 2C-24SYH-5D F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 100 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-604 (FIG NO SW-2-3/17) 724580 2C-24SWA-3 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

724590 2C-23SWH-7D F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

10-2-SW-603 CFIG NO SW-2-3/17) 724600 2C-23SWG-6D F-A vr-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

724610 2C-23SWG-5D F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-601 (FIG NO SW-2-3/17) 724620 2C-23SWH-4D F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

724630 2C-23SWG-3D F-A VT-3 1 -

SUPPORJ F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 101 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-601 (FIG NO SW-2-3/17) 724640 2C-24SIJH-1 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

10-2-SIJ-609 (FIG NO SIJ-2-3/16) 724650 2C-23SIJG-13D F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724660 2C-24SIJG-6 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

10-2-SIJ-610 (FIG NO SIJ-2-3/16) 724670 2C-24SIJG-12 F-A VT-3 ,- - -

SUPPORT F1 .30 2 -

3 -

4 -

10-1-SIJ-P-952 ~FIG NO SIJ-2-3£36~

724680 2C-24SIJA-4007 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

724685 2C-24SIJA-4007 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 102 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ -----'PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-P-951 (FIG NO SW-2-3/36) 724690 2C-24SWG-4010 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-P-950 (FIG NO SW-2-3/36) 724700 2C-24SWG-4011 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-P-951 (FIG NO SW-2-3/36)

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-P-950 ~FIG NO SW-2-3l362 724720 2C-24SWG-4009 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

724730 2C-24SWS-4012 F-A VT-3 1 - - -

SUPPORT F1.30 2 - x - -

3 -

4 -

724735 2C-24SWS-4012 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 103 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _.PLAN STATUS._ _ _ __
  • SERVICE IJATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * * * * *

  • I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10*2*SIJ*671A CFIG NO SIJ-2*3/11) 724740 2C*21SIJG*17 F*A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 - - -

10-2-SIJ-671 (FIG NO SIJ-2*3/11) 724750 2C*21SIJH*12 F*A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

10*2-SIJ-670 (FIG NO SIJ-2*3/11)

  • 724760 2C*21SIJG*11A F-A VT-3 1 -

SUPPORT F1 .30 2 -.

3 -

4 -

10-2-SIJ-669 CFIG NO SIJ-2*3/11) 724770 2C*21SIJG*9A F*A VT-3 1 -

SUPPORT FL30 2 -

3 -

4 -

10-2-SIJ-668 (FIG NO SIJ-2*3/11) 724780 2C*21SIJG*8A F*A VT-3 1 -

SUPP,ORT F1 .30 2 -

3 -

4 -

'

724790 2C*21SIJA*7 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE:

REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-667 CFIG NO SW-2-3/11) 724800 2C-21SWG-5A F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

724810 2C-21SWG-4A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-651 (FIG NO SW-2-3/12) 724820 2C-22SWG-16 F-A VT-3 1 - ~ - -

SUPPORT F1.30 2 -

  • 3 -

4 -

10-2-SW-650 (FIG NO SW-2-3/12) 724830 2C-22SWH-11 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-649 (FIG NO SW-2-3/12) 724840 2C-22SWG-7B F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

724845 2C-22SWG-8 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 105 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-648A (FIG NO SW-2-3/12) 724850 2C-22SWG-6B F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-648 (FIG NO SW-2-3/12) 724860 2C-21SWG-11B F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-647 (FIG NO SW-2-3/12)

SUPPORT F1.30 2 - - -

3 - - -

4 -

724880 2C-22SWA-5 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-646 (FIG NO SW-2-3/12) 724890 2C-22SWG-3B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-645 (FIG NO SW-2-3/12) 724900 2C-21SWG-5B F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 106 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-645 (FIG NO SW-2-3/12) 724910 2C-21SWG-4B F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-626 (FIG NO SW-2-3/18) 724920 2c-25sws-2 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

10-2-SW-626A (FIG NO SW-2-3/18)

SUPPORT F1 .30 2 - - -

3 -

4 -

10-2-SW-P-609 ~FIG NO sw-2-3L30~

724940 2C-21SWA-1007 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

724945 2C-21SWA-1007 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

724950 2C-21SWG-1010 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 107 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-P-608 (FIG NO SW-2-3/30) 724960 2C-21SWG-1011 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

724970 2C-21SWG-1009 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-P-609 (FIG NO SW-2-3/30) 724980 2C-21SWG-1008 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 - - -

10-2-SW-P-608 (FIG NO SW-2-3/30) 724990 2c-21sws-1012 F-A VT-3 1 -

SUPPORT F1 .30 2 - x 3 - - -

4 -

724995 2c-21sws-1012 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

10-2-SW-P-723 (FIG NO SW-2-3/32) 725000 2C-22SWA-2008 F-A VT-3 1 -

SUPPORT F1.30 2 - x - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 108 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _._PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM ' FIRST SECOND THIRD ASME. PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-P-723 (FIG NO SW-2-3/32) 725005 2C-22SWA-2008 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

725010 2C-22SWG-2009 F-A VT-3 1 - )

SUPPORT F1.30 2 -

3 -

4 -

725020 2C-22S\.JG-2011 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

~FIG NO SW-2-3L32~

F-A F1.30 VT-3 1 -

2 -

3 -

- -

4 -

725040 2C-22SWA-2014 F-A VT-3 1 - - -

SUPPORT F1.30 2 - x 3 - - -

4 -

725045 2C-22S\.JA-2014 D*B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4 -

725050 2C-22SWG-2010 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 109 REVISION: 0 INSERVICE INSPECTIO~ LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH ,. 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-P-722 CFIG NO SW-2-3/32) 725060 2C-22SWS-2013 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 - - -

4 -

725065 2C-22SWS-2013 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - - x 3 -

4 -

10-2-SW-P-1066A (FIG NO SW-2-3/38) 725070 2C-25SWA-5007 F-A VT-3 1 -

SUPPORT F1.30 2 - x

  • 3 -

4 -

725075 2C-25SWA-5007 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

10-2-SW-P-1066 ~FIG NO SW-2-3£38~

725080 2C-25SWG-5008 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

725090 2C-25SWG-5010 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 110 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS.COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _.PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-P-1065 (FIG NO SW-2-3/38) 725100 2C-25SWG-5011 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 - - -

4 -

725110 2C-25SWG-5009 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

725120 2C.-25SWS-5012 F-A VT-3 1 -

SUPPORT F1 .30 2 - - - x 3 -

4 -

INTEGRAL ATTACHMENT 02.20 2 - - - x - -

3 -

4 -

16-2-SW-P-1233 (FIG NO SW-2-3/54) 725130 2P-21SWG-6 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

10-2-SW-P-1229 (FIG NO SW-2-3/54) 725140 2P-WS-05 F-A VT-3 1 -

SUPPORT ANCHOR F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 111 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __
  • SERVICE YATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-S\.J-P-1228A (FIG NO S\.J-2-3/54) 725150 2P-22S\.JH-30 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 - - -

4 -

10-2-S\.J-P-1247 (FIG NO S\.J-2-3/54) 725160 2P-S\.JR-47 F-A VT-3 1 -

VALVE SUPPORT F1.40 2 -

3 -

4 -

10-2-S\.J-P-1245 (FIG NO S\.J-2-3/54)

  • 725170 2P-21S\.JG-10 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10"2-S\.J-P-1244 {FIG NO S\.J-2-3L542 725180 2P-S\.JA-103 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

725185 2P-S\.JA-103 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

10-2-S\.J-P-1240 (FIG NO S\.J-2-3L542 725190 2P-S\.JR-48 F-A VT-3 1 -

VALVE SUPPORT F1.40 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 112 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

10-2-SW-P-1238 (FIG NO SW-2-3/54) 725200 2P-22SWG-14 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 -

4 -

725210 2P-SWA-104 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 - - -

725215 2P-SWA-104 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 - - -

  • 12-2-SW-947 (FIG NO SW-2-7/1) 725220 2-SWG-405 SUPPORT F-A F1.30 VT-3 1 2

3 4

-

-

-

-

- -

12-2-SW-946 (FIG NO SW-2-7/1) 725230 2-SWG-406 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-SW-944 (FIG NO SW-2-7/1) 725240 2-SWG-407 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 113 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS_ _ _ __
  • SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A G.E - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-SW-944 (FIG NO SW-2-7/1) 725245 2-SWG-407 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

12-2S-SW-942 (FIG NO SW-2-7/1) 725250 2-SWS-408 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

725255 2-SWS-408 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x - -

  • 3 -

4 - - -

8-2S-SW-942 (FIG NO SW-2-7/1) 725260 2-SWR(A)-410 F-A VT-3 1 -

VALVE SUPPORT F1.40 2 -

3 -

4 -

12-2-SW-940 (FIG NO SW-2-7/2)

, 725270 2-SWG-400 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

12-2-SW-938 (FIG NO SW-2-7/2) 725280 2-SWG-401 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 114 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE * * - - *

  • 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 *3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2*SW-936 (FIG NO SW*2*7/2) 725290 2-SWG-402 F-A VT-3 1 -

SUPPORT F1.30 2 - x 3 -

4 -

725295 2*SWG-402 D*B VT*3 1 .

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

12-2-SW-934 (FIG NO SW-2-7/2) 725300 2-SWS-403 F-A VT-3 1 -

SUPPORT F1.30 2 - x

  • 3 -

4 -

725305 2-SWS-403 . D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4 -

B-2-SW-934 (FIG NO SW-2-7/2) 725310 2-SWR-411 F-A VT-3 1 - ~

VALVE SUPPORT F1.40 2 -

3 -

4 -

20-2-SW-729 (FIG NO SW-2-2/2) 725320 A2-SWH-40 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 115 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

20-2-SW-730 (FIG NO SW-2-2/2) 725330 A2-SWH-41 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

20-2-SW-P-147 (FIG NO SW-2-2/2) 725340 A2-SWG-42 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

20-2-SW-P-149 (FIG NO SW-2-2/2)

  • 725350 A2*SWG-43 F*A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

24-2-SW-727 (FIG NO SW-2-2/2) 725360 A2-SWH-39 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

24*2-SW-726 (FIG NO SW-2-2/2) 725370 2-SWWA-6J2 F-A VT-3 1 -

WALL ANCHOR F1.30 2 -

3 -

4 -

725375 2*SWWA-6J2 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 116 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____PLAN STATUS_ _ _ __
  • SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA - CATGY NDE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

24-2-SW-717 (FIG NO SW-2-2/2) 725380 2-SWWA-6H1 F-A VT-3 1 -

SUPPORT WALL ANCHOR F1.30 2 -

3 - - -

4 -

725390 A2-SWS-44 F-A VT-3 1 - - -

SUPPORT F1 .30 2 - - -

3 - -- -

4 - - -

8-2-SW-741 (FIG NO SW-2-2/2) 725400 A2-SWA(G)-75 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

  • 3 -

4 -

725410 A2-SWG-74 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

8-2-SW-742 (FIG NO SW-2-2/2) 725420 A2-SWA-79 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

725430 A2-SWG-73 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 117 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-SW-742 (FIG NO SW-2-2/2) 725440 A2-SWA-80 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-747 (FIG NO SW-2-2/2) 725450 A2-SWG-66 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

725460 A2-SWA-67 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

  • 3 -

4 -

10-2-SW-746 (FIG NO SW-2-2/2) 725470 A2-SWS-68 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 -

4 -

8-2-SW-745 (FIG NO SW-2-2/2) 725480 A2-SWG-70 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

725490 A2-SWG-71 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 118 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS,_ _ _ __
  • SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-SW-744 (FIG NO SW-2-2/2) 725495 A2-SWG-70 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

8-2-SW-872 (FIG NO SW-2-2/3) 725500 2*SWWA-6P4 F-A VT-3 1 -

WALL ANCHOR F1.30 2 -

3 -

4 -

725505 2*SWWA*6P4 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

  • 3 -

4 - - -

725510 A2-SWG*323 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

725515 A2*SWG*323 D*B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - -

3 -

4 -

725520 A2*SWG*324 F*A VT-3 1 - - -

SUPPORT F1.30 2 - x 3 -

4 -

725525 A2*SWG*324 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 119 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-SW-871 (FIG NO SW-2-2/3) 725530 A2-SWG-313 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

725540 A2-SWH-314 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-870 (FIG NO SW-2-2/3) 725550 A2-SWA-315 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

725555 A2-SWA-315 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 - - -

4 -

725560 A2-SWG-316 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-858 (FIG NO SW-2-2/3) 725570 2-SWWA-6P1 F-A VT-3 1 -

WALL ANCHOR F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 120 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u TA GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

8-2-SW-858 (FIG NO SW-2-2/3) 725575 2-SWWA-6P1 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 -

725580 A2-SWG-318 F-A VT-3 1 -

SUPPORT F1.30 2 x 3

4 -

725585 A2-SWG-318 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4

  • 8-2-SW-859 (FIG NO SW-2-2/3) 725590 A2-SWG-300 SUPPORT F-A F1.30 VT-3 1 -

2 -

3 4 -

725600 A2-SWG-301 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-860 (FIG NO SW-2-2/3) 725610 A2-SWH-302 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 121 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE * * * * - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

8-2-SW-860 (FIG NO SW-2-2/3) 725620 A2-SWG-303 F-A VT-3 1 -

SUPPORT F1.30 2x 3 -

4 -

8-2-SW-861 (FIG NO SW-2-2/3) 725630 A2-SWA-303A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

725635 A2-SWA-303A D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 -

  • 3 -

4 -

725640 A2-SWG-304 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

6-2-SW-903 (FIG NO SW-2-2/3) 725650 A2-SWG-364 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

725660 A2-SWA-354 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 122 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE * - " - * - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6*2-SW-901 (FIG NO SW*2*2/3) 725670 A2-SWG-366 F*A VT-3 1 .

SUPPORT F1 .30 2 -

3 -

4 -

725680 A2-SWG*367 F*A VT-3 1 .

SUPPORT F1.30 2 .

3 .

4 -

6*2*SW*891 (FIG NO SW*2*2/3) 725690 A2*SWS-351 F*A VT*3 1 -

SUPPORT F1.30 2 -

  • 3 - - -

4 -

6-2*SW-890 (FIG NO SW-2*2/3) 725700 A2*SWG-352 F*A VT*3 1 .

SUPPORT F1 .30 2 .

3 -

4 -

6-2-SW-892 (FIG NO SW*2*2/3) 725710 A2-SWG-368 F*A VT-3 1 .

SUPPORT F1 .30 2 .

3 . - -

4 .

725720 A2-SWS*369 F-A VT-3 1 .

SUPPORT F1 .30 2 .

3 . - -

4 .

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 123 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • SERVICE YATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

6-2-SY-893 (FIG NO SY-2-2/3) 725730 A2-SYA-356 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

725740 A2-SYG-310 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SY-864 (FIG NO SY-2-2/3) 725750 A2-SYG-326 F-A ,/ VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

8-2-SY-868 (FIG NO SY-2-2/3) 725760 A2-SYG-344 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

725770 A2-SYA-345 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-SY-865 (FIG NO SY-2-2/3) 725780 A2-SYG-343 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 124 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-910A (FIG NO SW-2-2/3) 725790 A2-SWG-347 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-SW-910 (FIG NO SW-2-2/3) 725800 A2-SWG-348 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

6-2-SW-863 (FIG NO SW-2-2/3)

  • 725810 A2-SWG-328 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

6-2-SW-912 (FIG NO SW-2-2/3) 725820 A2-SWG-329 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

I

')

6-2-SW-911 (FIG NO SW-2-2/3) 725830 A2-SWG-376 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-SW-913 (FIG NO SW-2-2/3) 725840 A2-SWG-377 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 125 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-914 (FIG NO SW-2-2/3) 725850 A2-SWA-358 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

725860 A2-SWG-378 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 - - -

6-2-S\.1-905 CFIG NO S\.1-2-2/4) 725870 A2-S\.IA-363 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

6-2-S\.1-907 (FIG NO S\.1-2-2/4) 725880 A2-S\.IR-392 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

725890 A2-S\.IA-353 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-S\.1-909 (FIG NO S\.1-2-2/4) 725900 A2-S\.IG-359 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 126 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS._ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-909 (FIG NO SW-2-2/4) 725910 A2-SWG-360 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

725920 A2-SWG-361 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

6-2-SW-879 (FIG NO SW-2-2/4) 725930 A2-SWS-334 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

725940 A2-SWG-333 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-875 (FIG NO SW-2-2/4) 725950 2-SWWA-6P3 F-A VT-3 1 -

WALL ANCHOR F1 .30 2 -

3 - - -

4 -

725955 2-SWWA-6P3 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 - - -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 127 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u TAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ...................... ----------- ----------- -

8-2-SW-875 (FIG NO SW-2-2/4) 725960 A2-SWG-321 F-A VT-3 1 -

SUPPORT F1.30 2 -. x 3 -

4 -

725965 A2-SWG-321 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

725970 A2-SWG-322 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

  • 725975 A2-SWG-322 INTEGRAL ATTACHMENT D-B 02.20 VT-3 1 2

3

-

4 -

725980 A2-SWG-309 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

725990 A2-SWG-310 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 4 -

8-2-SW-877 (FIG NO SW-2-2/4) 726000 A2-SWA-311 F-A VT-~ 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 128 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS SERVICE WATER SYSTEM

- FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE ------ INSTRUCTIONS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


------- ---- - ----------- ----------- ----------- - ------------------------------

8-2-SW-877 (FIG NO SW-2-2/4) 726005 A2-SWA-311 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

8-2-SW-878 (FIG NO SW-2-2/4) 726010 A2-SWA-332 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

8-2-SW-887 (FIG NO SW-2-2/4)

  • 726020 2-SWWA-6P2 F-A VT-3 1 -

WALL ANCHOR F1 .30 2 -

3 -

4 -

726025 2-SWWA-6P2 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 -

726030 A2-SWG-319 F-A VT-3 1 -

SUPPORT F1 .30 2 - x 3 -

4 -

726035 A2-SWG-319 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - - x 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 129 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __
  • SERVICE YATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-SY-887 (FIG NO SY-2-2/4) 726040 A2-SYG-320 F-A VT-3 1 -

SUPPORT F1.30 2 - - - x 3 -

4 -

726045 A2-SYG-320 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4 -

8-2-SY-886 {FIG NO SY-2-2L4~

) 726050 A2-SYG-305 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

726060 A2-SYG-306 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SY-885 (FIG NO SY-2-2L4) 726070 A2-SYG-307 F-A VT-3 1 -

SUPPORT F1 .30 2 - " - -

3 -

4 -

8-2-SY-884 (FIG NO SY-2-2L4) 726080 A2-SYA(G)-307A F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 130 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

8-2-SW-884 (FIG NO SW-2-2/4) 726085 A2-SWA(G)-307A D-B VT-3 1 -

INTEGRAL ATTACHMENT D2.20 2 -

3 - - -

4 -

726090 A2-SWG-308 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

8-2-SW-883 (FIG NO SW-2-2/4) 726100 A2-SWA-340 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

6-2-SW-881 (FIG NO SW-2-2/4) 726110 A2-SWS-336 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

726120 A2-SWS-335 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

726130 A2-SWG-337 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _......;PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-881 (FIG NO SW-2-2/4) 726140 A2-SWS-338 F*A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-SW-896 (FIG NO SW-2*2/4) 726150 A2-SWA-373 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 - - -

726160 A2-SWR-393 F*A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

6-2-SW-898 CFIG NO SW-2-2/4) 726170 A2-SWA-355 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6*2-SW-899 (FIG NO SW-2-2/4) 726180 A2-SWS-374 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 "/

4 -

6*2-SW-900 CFIG NO SW-2-2/4) 726190 A2-SWG*375 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 132 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UTAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-900 (FIG NO SW-2-2/4) 726200 A2-SWA-339 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 - - -

4 -

726210 A2-SWS-331 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-SW-916 (FIG NO SW-2-2/4) 726220 A2-SWA-381 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

6-2-SW-918 (FIG NO SW-2-2/4) 726230 A2-SWR-394 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

6-2-SW-919 (FIG NO SW-2-2/4) 726240 A2-SWA-357 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

6-2-SW-920 (FIG NO SW-2-2/4) 726250 A2-SWG-382 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 133 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

6-2-SW-920 CFIG NO SW-2-2/4) 726260 A2-SWG-350 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 - - -

726270 A2-SWG-349 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

726280 A2-SWG-342 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • 726290 A2-SWG-341 F-A VT-3 1 - - -

SUPPORT F1.30 2 - - -

3 -

4 -

20-2-SW-P-95 CFIG NO SW-2-2/5) 726300 A2-SWR-84 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

20-2-SW-P-94 (FIG NO SW-2-2/5) 726310 2A-SWA-86 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 134 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • SERVICE \.JATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

20-2-SW-738 (FIG NO S\.1-2-2/5) 726320 2-SWWA-6J1 F-A VT-3 1 -

WALL ANCHOR F1.30 2 -

3 - - -

4 -

726325 2-S\.JWA-6J1 D-B SEE 1 - INACCESSIBLE INTEGRAL ATTACHMENT 02.20 INST 2 -

3 -

4 -

726330 2-S\.J\.JS-10 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

  • 726340 A2-S\.JH-49 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

3 -

4 -

20-2-S\.J-740 (FIG NO SW-2-2/5) 726350 2-SW\.JA-6H2 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

20-2-SW-P-1357 (FIG NO SW-2-2/28) 726360 A2-S\.JH-45 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 135 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __
  • SERVICE YATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

20-2-S\.J-P-1359 (FIG NO SW-2-2/28) 726370 A2-S\.JH-46 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

20-2-S\.J-P-1363 CFIG NO S\.J-2-2/28) 726380 A2-S\.JG-47 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

20-2-S\.J-P-1365 CFIG NO SW-2-2/28)

  • 726390 A2-SWG-48 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

20-2-S\.J-P-1353 CFIG NO S\.J-2-2/28) 726400 2A-SWR-85 F-A VT-3 1 -

SUPPORT F1.30 2 - " - -

3 -

4 -

20-2-S\.J-P-1354 (FIG NO S\.J-2-2/28) 726410 A2-S\JH-50 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

20-2-S\.J-428 (FIG NO S\.J-2-3/13) 726420 2P-21SIJS-3 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 136 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-SW-666 (FIG NO SW-2-3/13) 726430 2C-21SWG-3A F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

726440 2C-21SWH-2 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

10-2-SW-644 (FIG NO SW-2-3/13) 726450 2C-21SWG-3B F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

726460 2C-22SWH-2 F-A VT-3 1 -

SUPPORT F1.30 2 3 -

4 -

10-2-SW-636 (FIG NO SW-2-3/13) 726470 2P-22SWH-16 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

SYSTEM !NSERVICE TEST (FIG NO SW-2-3/13) 726474 SW SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2 x x x 3 -

4 - - -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 137 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SERVICE WATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 U T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 123 123 123 **CALIBRATION BLOCK**

SYSTEM HYDROSTATIC TEST (FIG NO SW-2-3/13) 726478 SW SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2 - - x -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 138 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

21 AUXILIARY FEEDWATER PUMP 726480 2AFE4 F-A VT-3 1 - - -

SUPPORT F1.40 2 - - -

3 -

4 -

726490 2AFE4 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01 .20 2 -

3 -

4 -

22 AUXILIARY FEEDWATER PUMP 726500 2AFE5 F-A VT-3 1 -

SUPPORT F1.40 2 - - x -

  • 3 -

4 - - -

726510 2AFE5 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - - x -

3 -

4 - - -

23 AUXILIARY FEEDWATER PUMP 726520 2AFE6 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726530 2AFE6 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - - - ', -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 139 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS COMPONENT COOLING FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

21 COMPONENT COOLING PUMP 726540 2CCE2 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726550 2CCE2 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 .

3 4 -

22 COMPONENT COOLING PUMP 726560 2CCE3 F-A VT-3 1 -

SUPPORT F1.40 2 - x -

  • 3 -

4 -

726570 2CCE3 D-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - x -

3 -

4 -

23 COMPONENT COOLING PUMP 726580 2CCE4 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726590 2CCE4 D-B VT-3 INTEGRAL ATTACHMENT 02.20 2 3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 140 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL PLAN STATUS COMPONENT COOLING

- FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 UT AGE - - - - - - I NSTRUCTI CNS NUMBER !DENT! Fl CATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**


------- ---- - ----------- ----------- ----------- - ------------------------------

COMPONENT COOLING SURGE 726600 2CCE1 F-A VT-3 1 -

SUPPORT F1.40 2 - - x -

3 -

4 -

726610 2CCE1 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - x -

3 -

4 -

22 CC HEAT EXCHANGER 726620 2CCE6 F-A VT-3 1 -

SUPPORT F1.40 2 - - x

  • 3 -

4 -

726630 2CCE6 D*B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 - - x 3 -

4 -

21 CC HEAT EXCHANGER 726640 2CCE5 F-A VT-3 1 -

SUPPORT F1.40 2 - - - -

3 -

4 -

726650 2CCE5 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 _PAGE: 141 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS SERVICE WATER FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u TAGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

21 SW PUMP STRAINER LEGS 726660 2SWE7 F-A VT-3 1 -

SUPPORT F1.40 2 - x - -

3 -

4 -

726670 2SWE7 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x - -

3 -

4 -

22 SW PUMP STRAINER LEGS 726680 2SWE8 F-A VT-3 1 -

SUPPORT F1.40 2 -

  • 3 -

4 -

726690 2SWE8 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

23 SW PUMP STRAINER LEGS 726700 2SWE9 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726710 2SWE9 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 142 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

24 SW PUMP STRAINER LEGS 726720 2SWE10 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726730 2SWE10 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - -

3 -

4 -

25 SW PUMP STRAINER LEGS 726740 2SWE11 F-A VT-3 1 -

SUPPORT F1.40 2 - - -

  • 3 -

4 -

726750 2SWE11 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

26 SW PUMP STRAINER LEGS 726760 2SWE12 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726770 2SWE12 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 143 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS SERVICE WATER FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ...................... ----------- -

21 SW PUMP SKIRT 726780 2SWE1 F-A VT-3 1 -

SUPPORT F1.40 2 - x 3 -

4 -

726790 2SWE1 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - x 3 -

4 -

22 SW PUMP SKIRT 726800 2SWE2 F-A VT-3 1 -

SUPPORT F1.40 2 -

  • 3 -

4 -

726810 2SWE2 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

23 SW PUMP SKIRT 726820 2SWE3 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726830 2SWE3 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 144 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _____ PLAN STATUS._ _ _ __
  • SERVICE WATER FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - ~ - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

24 SW PUMP SKIRT 726840 2SWE4 F-A VT-3 1 -

SUPPORT F1.~0 2 -

3 -

4 -

726850 2SWE4 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 - - -

4 -

25 SW PUMP SKIRT 726860 2SWE5 F-A VT-3 1 -

SUPPORT F1.40 2 -

  • 3 -

4 -

726870 2SWE5 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

26 SW PUMP SKIRT 726880. 2SWE6 F-A VT-3 1 -

SUPPORT F1.40 2 -

3 -

4 -

726890 2SWE6 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 145 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE -- --- -0 u T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

4-2-AF-156 (FIG NO AF-2-2/3) 726900 2-AFA-139 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

726910 2-AFA-139 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - - -

3 -

4 -

4-2-AF-154 (FIG NO AF-2-2/3) 726920 2-AFA-148 F-A VT-3 1 - - -

SUPPORT F1 .30 2 -

  • 3 -

4 -

726930 2-AFA-148 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

4-2-AF-96 (FIG NO AF-2-2/4) 726940 2-AFA-166 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

726950 2-AFA-166 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 146 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NDE - - - - - - 0 UT A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

4-2-AF-99 (FIG NO AF-2-2/4) 726960 2-AFA-167 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

726970 2-AFA-167 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 -

3 -

4 -

4-2-AF-102 CFIG NO AF-2-2/4) 726980 2-AFA-169 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 - - -

/

726990 2-AFA-169 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 -

3 -

4 -

4-2-AF-106 (FIG NO AF-2-2/4) 727000 2-AFA-170 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

727010 2-AFA-170 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 147 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _ PLAN STATUS._ _ _ __

AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

4-2-AF-109 (FIG NO AF-2-2/4) 727020 2-AFA-172 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

727030 2-AFA-172 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

4-2-AF-140 (FIG NO AF-2-2/4) 727040 2-AFA-174 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 - - -

4 -

727050 2-AFA-174 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 -

3 -

4 -

4-2-AF-148 (FIG NO AF-2-2/4) 727060 2-AFA-177 F-A VT-3 1 - - -

SUPP PORT F1 .30 2 -

3 -

4 -

727070 2-AFA-177 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1 .20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR PO~ER STATION UNIT 2 PAGE: 148 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS
  • AUXILIARY FEEDWATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

4-2-AF-130 (FIG NO AF-2-2/4) 727080 2-AFA-186 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

727090 2-AFA-186 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

4-2-AF-126 (FIG NO AF-2-2/4) 727100 2-AFA-187 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

727110 2-AFA-187 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

4-2-AF-122 (FIG NO AF-2-2/5) 727120 2-AFA-189 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

727130 2-AFA-189 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 149 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____PLAN STATUS._ _ _ __

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO'METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

3-2-AF-166 CFIG NO AF-2-2/3) 727140 2-AFA-215 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

727150 2-AFA-215 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

3-2-AF-177 (FIG NO AF-2-2/1) 727160 2-AFA-216 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 - - -

4 -

727170 2-AFA-216 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

4-2-AF-30 (FIG NO AF-2-3/1) 727180 22-AFWA-29 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 - - -

727190 22-AFWA-29 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 - - -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 150 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ ____ PLAN STATUS._ _ _ __
  • AUXILIARY FEED\.JATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE * - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3* **CALIBRATION BLOCK**

4-2-AF-49 (FIG NO AF-2-3/3) 727200 24-AF\.JA-29 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

727210 24-AF\.JA-29 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01 .20 2 - - -

3 -

4 -

4-2-AF-66 (FIG NO AF-2-3/)

727220 21-AF\.JA-41 F-A VT-3 1 -

SUPPORT' F1.30 2 -

  • 3 -

4 - - -

727230 21-AF\.JA-41 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 - - -

3 -

4 -

4-2-AF-24 (FIG NO AF-2-3/1) 727240 22-AF\.JA-41 F-A VT-3 1 -

SUPPORT F1 .30 2 - - -

3 -

4 -

727250 22-AF\.JA-41 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 151 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _PLAN STATUS_ _ _ __

AUXILIARY FEEDWATER SYSTEM I . FIRST SECOND THIRD ASME I PERIOD PERIOD PERIOD SEC. XI I -----------

SUMMARY

EXAMINATION AREA CATGY NOE 1 - - - - - - 0 U T A GE I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH I 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

4-2-AF-61 (FIG NO AF-2-3/4) 727260 23-AFWA-41 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 - - -

4 -

727270 23-AFWA-41 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 -

3 -

4 - - -

4-2-AF-43 (FIG NO AF-2-3/3) 727280 24-AFWA-41 F-A VT-3 1 -

SUPPORT F1.30 2 -

  • 3 -

4 -

727290 24-AFWA-41 D-A VT-3 1 - - -

INTEGRAL ATTACHMENT D1.20 2 -

3 - - -

4 -

4-2-AF-69 (FIG NO AF-2-3/4) 727300 21-AFWA-46 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

727310 21-AFWA-46 D-A VT-3 1 -

INTEGRAL ATTACHMENT D1.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 152 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS
  • AUXILIARY FEEDYATER SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ...................... ----------- ----------- -

4-2-AF-64RY (FIG NO AF-2-3/4) 727320 23-AFYA-46 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

727330 23-AFYA-46 D-A VT-3 1 -

INTEGRAL ATTACHMENT 01.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 153 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL _ _ _ _ _ _PLAN STATUS_ _ _ __
  • CONTAINMENT SPRAY SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 UT AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

10-2-CS-34 (FIG NO CS-2-2/1) 729000 2-CSS-150 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

729010 2-CSS-150 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 - - -

3 -

4 -

10-2-CS-42 (FIG NO CS-2-2/1) 729020 2-CSS-152 F-A VT-3 1 -

SUPPORT F1 .30 2 -

  • 3 -

4 -

729030 2-CSS-152 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

12-2-CS-40 (FIG NO CS-2-2/1) 729040 2-CSA-156 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

729050 2-CSA-156 0-B VT-3 1 - - -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 154 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS CONTAINMENT SPRAY SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

SYSTEM INSERVICE TEST (FIG NO CS-2-2/1) 729100 CS SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2 x - - x - - x 3 -

4 -

SYSTEM HYDROSTATIC TEST (FIG NO CS-2-2/1) 729110 CS SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2 - - x -

3 -

4

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 155 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS SAFETY INJECTION SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI ----------- ---*------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T A GE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- ----------- ----------- ----------- -

  • (FIG NO RH-2-2/6) 731000 2A-SIS-203 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

731010 2A-SIS-203 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

731020 2A-SIS-204 F-A VT-3 1 -

SUPPORT F1.30 2 - - -

3 -

4 -

  • 731030 2A-SIS-204 INTEGRAL ATTACHMENT D-B 02.20 VT-3 1 -

2 -

3 -

4 -

- -

12-2-RH-45 (FIG NO RH-2-2/3) 731040 2-RHRA-22-29 F-A VT-3 1 -

SUPPORT F1 .30 2 -

3 -

4 -

731050 2-RHRA-22-29 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 4 -

12-2-RH-46 (FIG NO RH-2-2/3) 731060 2-RHRA-22-39 F-A VT-3 1 - - -

SUPPORT F1.30 2 -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POWER STATION UNIT 2 PAGE: 156 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN
  • CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ _ _ _ _ _ PLAN STATUS._ _ _ __

SAFETY INJECTION SYSTEM FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - -*o UT AGE - ~ - - - - I NSTRUCTI CNS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

12-2-RH-46 (FIG NO RH-2-2/3) 731070 2-RHRA-22-39 . D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

3 -

4 -

12-2-RH-50 (FIG NO RH-2-2/3) 731080 2-RHRA-22-42 F-A VT-3 1 -

SUPPORT F1.30 2 -

3 -

4 -

731090 2-RHRA-22-42 D-B VT-3 1 -

INTEGRAL ATTACHMENT 02.20 2 -

  • 3 -

4 -

I SYSTEM INSERVICE TEST (FIG NO RH-2-2i3) 731100 SJ SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2x x - - x 3 -

4 - - -

SYSTEM HYDROSTATIC TEST (FIG NO RH-2-2/3) 731150 SJ SYSTEM COMPONENTS D-B VT-2 1 -

PRESSURE RETAINING COMPONENTS 02.10 2 - - x -

3 -

4 -

  • DATE: 03/28/92 SALEM NUCLEAR POYER STATION UNIT 2 PAGE: 157 REVISION: 0 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECTION INTERVAL_ PLAN STATUS
  • SPENT FUEL COOLING SYSTEM FIRST SECOND THIRD ASME PERIOD

________ .. __ PERIOD PERIOD SEC. XI ----------- -----------

SUMMARY

EXAMINATION AREA CATGY NOE - - - - - - 0 u T AGE - - - - - - INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH 1 2 3 1 2 3 1 2 3 **CALIBRATION BLOCK**

- -----*----- ----------- ----------- -

SYSTEM INSERVICE TEST (FIG NO RH-2-2/3) 732000 SFC SYSTEM COMPONENTS D-C VT-2 1 -

PRESSURE RETAINING COMPONENTS 03.10 2 X x x 3 -

4 -

SYSTEM HYDROSTATIC TEST (FIG NO RH-2-2/3) 732100 SFC SYSTEM COMPONENTS D-C VT-2 1 -

PRESSURE RETAINING COMPONENTS 03.10 2 - - " - x -

3 -

4 -

  • *
  • 360' 180" o*

28 1/4" I I I I I I

---------~-------------~----------------.,...-----~~/

18515/8" \29-RCN-1210 27 1/2-RCN-12620 29-ROCN-12720 27 1/2-RcN-1230"' ~~

27 1/2-RCN-1240~ "-,, 29-RCN-12307

' I 2-RPV-744-2 1llr'-----~~------~-----~_o

....

2-RPV-1442C

_/

"-- 27 1/2-RCN-1210 2-RPV-14426_/ j' I .____u~r------~~--n

___ 2-RPV-1442A_/

I

____/~~//~~~~

,

29-RCN-1240 D~~-------------~~-----~-R_P_V_-_2_4_4_~------~'-~ 2_-_R_P_~~2-4_4_2_B----~~~2-RP~~~ ___

342 21/32"

~2-RPV-3442C 2-RPV-34428 ~ 2-RPV-3442A ---------

"" ~ 2-RPV-9442

~

/ 2-RPV-10442 330' 270' 210* 150* go* 30* /

P & JD: 205301

/

/ PUBLIC SERVICE ELECTRIC & GAS

~RPV-1443F/ ~

SALEM UNIT 2 2-RPV-1HOB/ \ INSERVICE INSPECTION DRAWING 2 2-RPV-14430 ""' REACTOR COOLANT SYSTEM 2-RPV-1443A / - 2-RPV-144-3E 2-RPV-1443C\,_ REACTOR PRESSURE VESSEL FIGURE: A-1 SHT. 1 OF 1 REV. 0

  • *
  • 360' 180' o*

I I I I I I T

85 5/8" 27 1/2-RC-1220-5 7

29-RC-1220 1 7 27 1/2-RC-1230-5 ~

"'

29-RC-1230-;

Q 27 1/2-RCN-1210-IRS 27 1/2-RC-1210-5 29-RCN-1220-IRS \

29-RC-124.0-1 J \/ , ~

27 1/2-RCN-1230-IRS\

29-RCN-1240-IRS 27 1/2-RCN-1220-IRS 27 1/2-RCN-1240-IRS P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM RPV INNER RADIUS & SAFE-END NOZZLES FIGURE: A-2 SHT. 1 OF 1 REV. 0

  • * *

/

360' 180' o*

I I I I I I I

85 518.. \ 29-RC-1210-1 27.5-RC-1220-4 7 29-RC-1220-7 27.5-RC-1230-4 -.

27.5-RC-1240-4 '\_ * \

29-RC-1230-;

$- 00 o

\_ 27.5-RC-1210-4 o*

"'--- 29-RC-1240-2 0

P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM RPV & SAFE END TO PIPE \I/ELD FIGURE: A-2A SHT. 1 OF 1 REV. 0

  • *
  • REACTOR PRESSURE. VESSEL CLOSURE HEAD LAYOUT 90" 2-RPVCH-64468 2-RPVCH-6446A I

LIFTING LUG 14 P & ID: 205301 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING 270" 54 WASHER (2-RPVCH-WASHERS 1-54) REACTOR PRESSURE VESSEL NO. 1 STUD (2-RPVCH-STUDS 1-54) CLOSURE HEAD FIGURE: A-3 SHT. 1 OF 1 REV. 0

  • *
  • 90" 2-CRDH-38 lHRU 76 (29 TOTAL) ~' \ I I

I HOUSING ~ I II BODY-TO-ADA gTER CONTROL ROD RIVE WELDS I

I I

I I

o* 160" SER~Ac~M ELECTRIC & GAS PUBLIC UNIT_z_ __

DRAWING INSER~~gR INSPECTION PRESSURE H~SINGS SSEL I

270" REA CONTROL FIGURE: A- 4 ROD DRIVE SHT. 1 OF l REV. 0

  • * *

(180")

+A"-

2-PZR-CIRC DUH~

(D=579.25") "'

2-PZR-CIRC CD~ .

(0=451.00") '\

"' 6-PR-1204-1 6-PRN-1204-1\ 6-PR-1203-1 6-PRN-1203-IRS SHELL 0 2-PZR-LONG 0

/(A'=-46" OR -37.3")

I / 6-PR-1205-1 ~

6-PRN-1205-IRS """

\

2-PZR-LONG C I +

(180") A -

""' 0--e--~

0 --o*

SHELL C / 2-PZR-CIRC BC

~0 0 (A"=+45" OR +36.5")

/ (0=321.56~)

I / '""-4-PR-1200-1 4-PS-1231-33_/ \ 4-PRN-1200-IRS 2-PZR-CIRC AB~

(D=193.00") "'

I SHELL B 4-PSN-1231-IRS

\ _ 2-PZR-MB 1-16 I

2-PZR-LONG A (A"=+28" OR +22.7")

I SHELL A

/ 2-PZR-CIRC LHA

/ (0=64.25")

I /

p & 10: 205301 2-PZR-SKIRT PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER FIGURE: A-5 SHT. 1 OF 1 REV. 0

  • *
  • 45*

31-STG-1240-IRS 29-STG-1240-IRS OU1LET MANWAY 24-STG-OMB (BOLTING) 24-STG-IMB (BOLTING) 225" END VIEW 24-STG-LHTS P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 24 STEAM GENERATOR NO. 24 FIGURE: A-6 SHT. 1 OF 1 REV. 0

  • *
  • 45*

31-STG-1230-IRS 29-STG-1230-IRS OUTLET MANWAY

- -135" 23-STG-IMB (BOLTING)

INLET MANWAY 225" END VIEW P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 23 STEAM GENERATOR NO. 23 FIGURE: A- 7 SHT. 1 OF 1 REV. 0

  • *
  • 45*

31-STG-1220-IRS 29-STG-1220-IRS OUTLET MANWAY 315"- -

22-STG-OMB (SOL.TING) 22-STG-IMB (BOLTING) 225" END VIEW 22-STG-LHTS P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 22 STEAM GENERA TOR NO. 22 FIGURE: A-8 SHT. 1 OF 1 REV. 0

  • * **

45*

31-STG-1210-IRS 29-STG-1210-IRS OUTLET MAN WAY I*

21-STG-OMB (BOLTING)

  • I 21-STG-IMB (BOLTING)

INLET MANWAY 225" END VIEW 21-STG-LHTS P & ID: 205301 CLASS 2 CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERATOR NO. 21 STEAM GENERA TOR NO. 21 FIGURE: A.-9 SHT. 1 OF 1 REV. 0

  • *
  • Q\

2RC30 4

'J LINE 2-RC-1241

( SEE FIG. A-47

...__ _ _ _9_0_' BEND (H.)

v CLASS 2 NO. 2 REGEN. HX.

5 CLASS 1 ' 'I'-'

'--... I BEND '......i 27 2CV2 FLOW

/25 2" x 3* _ /

RED.

25

/

_ _ _ _ _ _B_E_N~D (H.) 0 3" X 2" _ / 45' (H.) 23

--~

RED. 22A 8

~ n BA / 12-CV-1243 9

90" BEND (V.J

~'Z /'n.

17 P & ID: 205301, 205328 ISOMETRIC: RC-2-3, CV-2-3 BEND (H.)

PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LETDOWlll 12-CV-1243, 3-CV-1243

@ FIGURE: A-10 SHT. 1 OF 1 REV. 0

  • * *

(:;\

2RC30

'-..J LINE

.___ _ _-..90' BEND (H.)

(

2-RC-1241 SEE FIG. A-47 v NO. 2 REGEN. HX.

3-CV-1243----..._, *

~ 2C-CVCH-521 '

..........

"!'---

I BEND '-..J 2C-CVCS-522 ~ ............

2C-CVCS-513 ~ FLOW 2" x 3* / BEND (H.)

RED. /

3" x 2" _/ 45' (H.)

RED.

2C-CVCG-514 /

2C-CVCH-515---------

90' BEND (V.}

~k>~.

P & ID: 205301, 205328 ISOMETRIC: RC-2-3, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LETDOWN 12-CV-1243, 3-CV-1243 FIGURE: A-10H SHT. 1 OF 1 REV. 0

  • * *

) 14

(-..... .....

EL. g9' 10 .....

LINE 27 1/2-RC-1240'.J

(:;:\ 9 BEND 45' (H.)

SEE FIG. A-37 (

v ~i 8

BEND BEND

'\,/

/ \ ~6 P & ID: 205328, 205301

~

ISOMETRIC: CV-2-3 FROM NO. 2 \...

REGEN. HX. CLASS 2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1241 FIGURE: A-12 SHT. 1 OF 1 REV. 0

  • **
  • EL. '

LINE 27 1/2-RC-1240'.J

(:;;\ BEND 45' (H.)

SEE FIG. A-37 (

v 2C-CVCA-509 ~'

BEND

~

BEND

~ 2C-CVCS-506

~

\..,/

/ \ ~6 P & ID: 205328, 205301

~

. ISOMETRIC: CV-2-3 FROM NO. 2 (.,__

REGEN. HX. CLASS 2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1241 FIGURE: A-12H SHT. 1 OF 1 REV. 0

  • * *

~1 18 BEND 45* (H.)

'

LINE 27 1/2-'-RC-1230',.j SEE FIG. A-38 (

90" (V.} ELL.

12

~1 11 BEND BEND P & ID: 205328, 205301 ISOMETRIC: CV-2-3

' ' PUBLIC SERVICE ELECTRIC & GAS

' SALEM UNIT 2

'(FROM NO. 2 REGEN. HX. INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1231 FIGURE: A-13 SHT. 1 OF 1 REV. 0

  • *
  • 3/4-"

'!'-'

I 2C-CVCH-737 ~ 2CV274-BEND 4-5' (H.)

......

2C-CVCH- 736 ___....--- LINE 27 1/2-RC-1230',..j RL-26 '\ SEE FIG. A-38 (

1 n-mu 4- 2C-CVCS-502 (BPR-1) 90" (V.} ELL.

' /

'> /

/

..,,,_....-2C-CVCG-501 (8PR-2)

' .......,,. / /

/Ir./

~1 BEND <,,..,- "4f.[.

.

<o°'

'

~? ~ 2C-CVCG-5D3 2C-CVCG-734 (9PR-1)

~_/

BEND 2C-CVCG-735 (9PR-2)

BEND P & ID: 205328, 205301 ISOMETRIC: CV-2-3

' ' PUBLIC SERVICE ELECTRIC & GAS

' SALEM UNIT 2

'(FROM NO. 2 REGEN. HX. INSERVICE INSPECTION DRA\!VlNG CHEMICAL & VOLUME CONTROL SYSTEM CHARGING 3-CV-1231 FIGURE: A-13H SHT. 1 OF 1 REV. 0

  • *
  • LINE 2-CV-1275 SEE FIG. A-15 SHT. 2

~:~ G BEND 24 16

~1 5

P & ID: 205328, 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15 SHT. 1 OF 2 REV. 0

  • *
~ 8

£ (9PR-1)

/

2C-PRG-151 (9PR-2) 2C-PRH-330~

(21 PR)

~,,,_

~*

"' /

_,,,.-- 2C-PRA-235 (27PS-1,-2)

EL. 131'

~ 2C-PRG-333 BEND

_,,,.--2C-PRG-332 2C-PRH-153 ~ / (25PR)

(7PR) 2C-PRG-148 ~

(11PR-3) 2C-PRG-147 ~_/

(13PR-1)

~1 2C-PRH-146 (13PR-3) 2C-PRG-154 (2PR)

( P & ID: 205328, 205301 RHE ROOM ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15H SHT. 1 OF 2 REV. 0

  • *
  • LINE 4-PS-1231 )

SEE FIG. A-26 SHT. 3 _......-\..

/

(/ 44 34 PLATFORM EL. 151' PRESSURIZER ROOM

~r PLATFORM EL 140' 31 P & ID: 205328, 205301 ISOMETRIC: RC-2-3 28 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I

r-L INSERVICE INSPECTION DRAWING LINE 2-CV-1275 CHEMICAL & VOLUME CONTROL SYSTEM SEE FIG. A-15 SHT. 1 AUXILIARY SPRAY 2-CV-1275 FIGURE: A-15 SHT. 2 OF 2 REV. 0

  • *
  • LINE 4-PS-1231 . J SEE FIG. A-26 SHT. 3 ,.....,.....-1..._

~o,.

"Z_ ............... 2C-:-PRH-229

~ (37PR) r

-' #

2C-PRG-233 ~

~1 (31PR-1)

PRESSURIZER ROOM 2C-PRH-234 ~

(29PR) "\

P & ID: 205328, 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I

,.--(_,

INSERVICE INSPECTION DRAWING LINE 2-CV-1275 CHEMICAL & VOLUME CONTROL SYSTEM SEE FIG. A-15 SHT. 1 AUXILIARY SPRAY 2-CV-1275

  • FIGURE: A-15H SHT. 2 OF 2 REV. 0
  • *
  • LINE 6-PR-2203 )

SEE FIG. 8-51 (-....

' iJ 2PR5 CLASS 2 lOFB CLASS 1 3 10 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1205 FIGURE: A-17 SHT. 1 OF 1 REV. 0

  • * *

/ 2C-PRH-201 LINE 6-PR-2203 )

SEE FIG. B-51 (',

';1\2PR5 CLASS 2 ,

nlOFB CLASS 1

~ 2C-PRA-150A (9PR)

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1205 FIGURE: A-17H SHT. 1 OF 1 REV. 0

  • *
  • 6

~

3~.

45' (V.)

7

~

) LINE 6-PR-2204

,... _..."'\, SEE FIG. 8-50 CLASS 2 ~

-C-LA_S_S__::._1--~--'* 2PR 4 10FB 1"

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1204 FIGURE: A-18 SHT. 1 OF 1 REV. 0

  • * *

/ 2C-PRH-202 45' (V.)

LINE 6-PR-.2204

/

/~ SEE FIG. B-50 CLASS 2 CLASS 1 J!!.2PR4 10FB.

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1204 .

FIGURE: A-18H SHT. 1 OF 1 REV. 0

  • * *

) LINE 6-PR-2205

,.....\_SEE FIG. 8-49

......

CLASS 2 ......

......

~ \{ ......

2PR3 10 10FB 9A 6

90" (V.)

7 3

45" (V.)

p & 10: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION .DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1203 FIGURE: A-19 SHT. 1 OF 1 REV. 0

  • * *

) LINE 6-PR'--2205

,,..\_SEE FIG. B-49

/

/

/

').,,/

\\ 2C-P.RH-203 \

2PR3 10FB

" ' - - 2C-PRA.:_154A (9PR) 90' (V.)

45' (V.)

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-1203 FIGURE: A-19H SHT. 1 OF 1 REV. 0

  • *
  • 5

~


LINE 3-PR-1207

~ r Ll~E 4-PR-1200 I

6 0 LINE 3-PR-1206 )

SEE FIG. A-24 ( ' ,

' '- 158' 3" x 4"

~1 RED.

7 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS

.SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 4-PR-1200, 3-PR-1207 FIGURE: A-20 SHT. 1 OF 1 REV. 0

  • * *

~ ------- LINE 3-PR-1207 0

LINE 3-PR-1206 j SEE FIG. A-24 {'-,

...... ........_

~2C-PRH-204 (3PR) 3" x 4" 4" x 3"

~1

~1 RED. RED.

45* (V.)

CLASS 1 CLASs2]

LINE 3-PR-2201 }__ - - - ~I SEE FIG. 8-53 ("" PR 2 2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 4-PR-1200, 3-PR-1207 FIGURE: A-20H SHT. 1 OF 1 REV. 0

  • *
  • LINE 4-PR-1200 ) LINE 3-PR-1207

....-\..SEE FIG. A-20

~ / ............

,. . ~.......

I . ,. . . . . /

2 . . . r-

---l-)---1-- EL. 158' /..

45' (H.) I 4"' X 3"' 4" x 3* I RED. RED. I 7  :' ~y

. \~

'

X.ssURIZER LINE 3-PR-2202 FLOW 2PR1 SEE FIG. B-52

- - - ( EL. 152' 13,,,-1

~

CLASS 2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 3-PR-1206 FIGURE: A-24 SHT. 1 OF 1 REV. 0

  • *
  • LINE 4-PR-1200 } LINE 3-PR-1207

.....-\_ SEE FIG. A-20

~ / ......

............... ...... ......

2C-PRH-205 / ... I ......

(3PR)

. . . r-

__....__[__.)---~-- EL. 15(3'

/.

45' (H.)

4" X 3" 4* x 3* I REQ. RED. I l ~~

XssuR1zrn LINE 3-PR-2202 FLOW 2PR1 SEE FIG. B-52

.,...---( EL. 152' 45" (H.)

CLASS CLASS 2

,I P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 3-PR-1206 FIGURE: A-24H SHT. 1 OF 1 REV. 0

  • *
  • BEND (H.)

LINE 29-RC-1230,.J SEE FIG. A-34 ( BEND (H.)

PRESSURIZER 1

BEND (V.)

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SURGE 14-PS-1231 FIGURE: A-25 SHT. 1 OF 1 REV. 0

  • *

/ (3PR) 2C-PSH-2 (2PR) .

/

LINE 29-RC-1230..._.J SEE FIG. A-34 ( BEND (H.)

PRESSURIZER

.BEND (V.)

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SURGE 14-PS-1231 FIGURE: A-25H SHT. 1 OF 1 REV. 0

  • *
  • 6 8

5

¥.~I BEND (H.)

3 LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 45* (V.)

2

~,J  :-...

LINE 27 1/2-RC-1230 '...)

SEE FIG. A-38 (

10 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 1 OF 3 REV. 0

  • * *

/R-240183-32

~ 2-PRG-227

./ (11PR) 2-PRH-223 (15PR-1)

/ ~2-PRSN-31 BEND (H.) / (15PR-2)

LINE 4-PS-1231 SEE FIG. A-26 SHT. 2

~,J LINE 27 1/2-RC-1230'-.......J SEE FIG. A-38 (

P & ID: 205301 ISOMETRIC: RC-2-3

~ R-240183-8 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 1 OF 3 REV. 0

  • *
  • LINE 4-PS-1231

~'..._ ..,,

SEE FIG. A-26 SHT. 3

  • 2PS29

\

.

L-\--, 24 18 LINE 4-PS-1231 SEE FIG. A-26 SHT. >~-...

..... ..... PLATFORM EL 151' P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 2 OF 3 REV. 0

  • *
  • LINE 4-PS-1231 SEE FIG. A-26 SHT.

1"l/

2-PRH-222 /

(23PR-1)

~ 2-PRH-217 2-PRG-226 ---......._

LINE 4-PS-1231 ) ' (17PR) '-....

SEE FIG. A-26 SHT. 1r '

......

...... PLATFORM EL. 151' P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 2 OF 3 REV. 0

  • *
  • BEND 29 3/4" 30

~

LINE 4-PS-1211 )

I

'r LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 31 32 SEE FIG. A-28 ('-....

......

PRESSURIZER LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26 SHT. 3 OF 3 REV. 0

  • * *

~ 2C-PRG-225 BEND / (28PR-1)

---...;._--,

~ 2C-PRH-220

/ (28PR-2) 3/4"

~

LINE 4-PS-1211 )

I

'r LINE 2-CV-1275 SEE FIG. A-15 SHT. 2 SEE FIG. A-28 ('-...

......

PRESSURIZER

......

'-;J LINE 4-PS-1231 SEE FIG. A-26 SHT. 2 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1231 FIGURE: A-26H SHT. 3 OF 3 REV. 0

  • *
  • LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 6

~1 45* (V.)

2 BEND (H.)

P & ID: 205301 ISOMETRIC: RC-2-3 LINE 27 1/2-RC-1210 SEE FIG. A-40 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1211 FIGURE: A-28 SHT. 1 OF 1 REV. 0

  • *
  • 2-PRH-221 (23PR)

LINE 4-PS-1231

/

/~ SEE FIG. A-26 SHT. 3

./

.......

.......

2-PRH-215\

(16PR-1) 'rJ LINE 4-PS-1231 SEE FIG. A-26 SHT. 3 PLA TFOR M EL. 151' ,______,,"------'

\ 2C-PRS-178

\ (7PR-1) 2-PRG-228 ~ 2-PRA-219~

(18PR) 2-PRSN-30)

(16PR-2)

~1 BEND 2C-PRG-156~

~~

2C-PRH~

R-240183-10 2C-PRG-157 ~

45" (V.)

R-240183-11 ~

(7PR-3) 2C-PRG-158 ~

BEND (H.) ~ 2C-PRG-179

/ (11APR) P & ID: 205301 ISOMETRIC: RC-2-3

(< LINE 27 1/2-RC-1210 SEE FIG. A- 40 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER SPRAY 4-PS-1211 FIGURE: A-28H SHT. 1 OF 1 REV. 0

  • *
  • GENERATOR 24

......

...... '~3/4"

...... '~3/4"

'?J3/4"

1'

~

90" (ELL.)

REACTOR COOLANT PUMP 24 6

I I

....-.v LINE 3-CV-1243 SEE FIG. A-10 90" (ELL.)

~-

P & ID: 205301 ISOMETRIC: RC:-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1240 FIGURE: A-29 SHT. 1 OF 1 REV. 0

  • GENERA TOR 23 2

3 3LD-I-.....

3/4(<., '-...3LD-0 3/4"(-- - --~3/4" REACTOR COOLANT PUMP 23 6

I I

~

LINE 2-RC-1231 SEE FIG. A-50 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1230 FIGURE: A-30 SHT. 1 OF 1 REV. 0

  • *

3

..... ~ 3/4"

..... ~ 3/4" LINE 2-RC-1221 SEE FIG. A-53 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEl;l UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1220 FIGURE: A-31 SHT. 1 OF 1 REV. 0

  • *

" ~

Y""

...... ~ 3/4"'

...... ~ 3/4"

'"f3/4" LINE 2-RC-1221 SEE FIG. A-53 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1220 FIGURE: A-31H SHT. 1 *OF 1 REV. 0

  • *

2 3

3/4" r<.,

3/4" r<.,

I

'~ 3/4" I

~

LINE 2-RC-1211 SEE FIG. A-56 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1210 FIGURE: A-32 SHT. 1 OF 1 REV. 0

  • *

~ R-240276-1

_3/4" r< . .

3/4" r< . .

'r-13/4" LINE 2-RC-1211 SEE FIG. A-56 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CROSSOVER LEG 31-RC-1210 FIGURE: A-32H SHT. 1 OF 1 REV. 0

  • *

_,.,1.Y4"

,.,-_,,., TE-443A

~

I I

,,,..

LINE 6-SJ-1241'(,,,..

SEE-, FIG. A- 74 REACTOR P &: ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVY1NG REACTOR COOLANT SYSTEM HOT LEG 29-RC-1240 FIGURE: A-33 SHT. 1 OF 1 REV. 0

  • *
  • 3C LINE 6-RH-1231 L-SEE FIG. A- 77 \

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM HOT LEG 29-RC-1230 FIGURE: A-34 SHT. 1 OF 1 REV. 0

  • *

,,,. ,,,.' \

SEE FIG. A-80 3A

,,,.

3BC-2 TE-423A

~

I I

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG REACTOR COOLANT SYS1EM HOT LEG 29-RC-1220 FIGURE: A-35 SHT. 1 OF 1 REV. 0

  • *
  • TE-413A

~

I 21

/

LINE 14-RH-1211\/

SEE FIG. A-61 I

-~

1 3/4" P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM HOT LEG 29-RC-1210 FIGURE: A-36 SHT. 1 OF 1 REV. 0

  • * *

/

,,,,..... REACTQ~

// ', ~\,*

/

/ '

LINE 10-SJ-1241 LINE 3-CV-124-1 LINE 1 1/2-SJ-1242 TE-4-438 SEE FIG. A-63 SEE FIG. A-12 SEE FIG. A-101 SHT. 3 /

/

~ '!'--"' ~ ~ /

/

/

/

>

/

/

I I I I / /

/

I 2* I I I < /

/

'

0 1A~

0 0 0

/

REACTOR 1 2 3', /

/

COOLANT lo. ~

-

~

- /

PUMP 24 1BC-1 rnc-2 1BC~3 lBC-4 1BC-5 22" (H.) ' "-......,,,. /

FLOW.,.

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1240 FIGURE: A-37 SHT. 1 OF 1 REV. 0

  • *
  • LINE 1 1/2-SJ-1232 SEE FIG. A-1 03 SHT. 2

~

I LINE 4-PS-1231 SEE FIG. A-26 SHT.

~

I LINE 3-CV-1231 SEE FIG. A-13 r

~

I LINE 10-~J-1231 SEE FIG. A-64

~

I TE-4338

'I'-'

I P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1230 FIGURE: A-38 SHT. 1 OF 1 REV. 0

  • *

I LINE 1 O-SJ-1221 SEE FIG. A-65 LINE 1 1/2-SJ-1222 SEE FIG. A-105 SHT. 2

'[---

1 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1220 FIGURE: A-39 SHT. 1 OF 1 REV. 0

  • *
  • LINE 1 1/2-SJ-1212 LINE 4-PS-1211 LINE 10-SJ-1211 SEE FIG. A-107 SHT. 2 SEE FIG. A-2B SEE FIG. A-66 TE-4138 0---' '!'-'" 0---' ~

_,,.-..., I I I I

/ I I I 2" I

/ '

/

/

/ 68" (H.)'-,

-3

_,

'>

- 0 0 ... rJ i!J1A r:J .

1 REACTOR COOLA~IT

/

/

/

i 1sc-s rn6:... 4 1BC~3 1BC-2 rnc-1 PUMP 21

/ /

/

/ /

/ FLOW

/ /

/ /

/ /

/ /

<. /

' /

REACTOR ' /

/

' ' /

fl~\,.*

' .__/

/

l P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM COLD LEG 27 1/2-RC-1210 FIGURE: A-40 SHT. 1 OF 1 REV. 0

  • * *

'1----

~R~.1

~I 3" x 2" h.. RED.

'rl,. .......

2RC30 ','

"

'T, I

---0 LINE 3-CV-1243 SEE FIG. A-10

'- 'f TO REACTOR COOLANT DRAIN TANK P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1241 FIGURE: A-47 SHT. 1 OF 1 REV. 0

  • *
  • LINE 31-RC-1230~

SEE FIG. A-30 ,,,,.

23RC13 TO REACTOR COOLANT (

DRAIN TANK

23RC14

' 4 2" x 3/4" RED. INS.

P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1231 FIGURE: A-50 SHT. 1 OF 1 REV. 0

  • * *

'01' LINE 31-RC-1220

~v

}";

SEE FIG. A-31 _......-\..

.....

2 22RC13 3

4 CLASS 1 22RC14 CLASS 3 I

..-.L_,

TO REACTOR COOLANT DRAIN TANK P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1221 FIGURE: A-53 SHT. 1 OF 1 REV, 0

  • * *

) LINE 31-RC-1210

(, SEE FIG. A-32

'r1',..J 1 ( ",

21RC13 2 ~-

~1 3

4 CLASS 1 21RC14 CLASS 3 I

r-L, TO REACTOR COOLANT DRAIN TANK P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM DRAIN LINE 2-RC-1211 FIGURE: A-56 SHT. 1 OF 1 REV. 0

  • ,.
  • j LINE 29-RC-1210

(,SEE FIG. A-36 LINE 6-SJ-1211 SEE FIG. A-99 SHT.

'f

' .

....., \

L-~--,

21RC8 V-...._J

/3/4" 8

4 2RH50 } 3 / 4"

/'Y~

.--+-.. .

19 /'/

2RH2 ~LINE 14-RH-2212 EL. 79' 1 - - -. ./~ - - -(SEE FIG. B-56 20 \ -

~ CLASS 1 12 13 p & 10: 205332. 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-1211 FIGURE: A-61 SHT. 1 OF 1 REV. 0

  • * *

) LINE 29-RC-1210

(,SEE FIG. A-36 LINE 5-SJ-1211 SEE FIG. A-99 SHT.

'r

' "\ .

. _""'_.,

21RC8 \.<.....0 ~ 2C-21-RHH-3 } 1"

( (3/4" ~ (9PR) ~ ....-\_ ~ 2C-21-RHS-6

/ (17PR) 2C-21-RHA-5 __/

2RH50 } 3/ 4 "

/'Y ,....."

~\ r-+-_.

_,A/

2RH"s6'~..: .J 2C-21-RHH-2 (1"/ 2RH2 _)LINE 14-RH-2212

- - -Z SEE FIG. 8-56 (SPR-2)

\CLASS 2 CLASS 1

~ 2C-21-RHH-4 (10PR) r--,

2RH43,*) '

'\.;,..-,+-*

3/4" \.._

  • P & ID: 205332, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 IN SERVICE INSPECTION ORA WING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-1211 FIGURE: A-61H SHT. 1 OF 1 REV. 0
  • * *

'

';JLINE 6-RH-1231 SEE FIG. A- 77

~R~ [',-\ 23RH27 I *-\~,.:.)

~*BEND (1

BEND (H.)

12" x 8"

/RED.

LINE 2-SJ-1237 6 SEE FIG. A-93

. 24RH27 5 12" x 12" x 8" LINE 8-SJ-1245 ) , ~* / R E D . TEE SEE FIG. A- 71 (" - ""i/ t- - /~3/4" CLASS 2

~

/

LINE 12-RH-2252 SEE FIG. B-68 l'\.g:!!.-- 1 2RH48 /'<' _,,,...;--- 1A

'~;...-,+-'

3/4" (,__ y

,*)

r-+-.1o

'\_, /'.' 2RH61 P & ID: 205332 1" (,__ ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 12-RH-1251 8-RH-1235 FIGURE: A-62 SHT. 1 OF 1 REV. 0
  • * *

.......

'rJuNE 6-RH-1231 SEE FIG. A-77 2C-23-RHH-3 ~ "'-!:.:_,q~

E"(.

( 3PR) ~*BEND 2C-23-RHH-4 /

(5PR) ~

BEND (H.)

I 12" x 8" I /RED.

v....,_

LINE 2-SJ-1237 ~ 2C-23-RHH-2 SEE FIG. A-93 / (5PR) 24RH27 12* x 12* x 8" LINE 8-SJ-1245 ) , ~" / R E D . TEE SEE FIG. A- 71 (" - -:_/ i - /~3/4"

/

J LINE 12-RH-2252

_ - \ SEE FIG. 8-68 2RH48 /v-

)~ ;,..-,+-*

3/4" '-- *

,.)

'('_..,_...,.

\,.- /'.' 2RH61 P & ID: 205332 1" '-- ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 12-RH-1251 8-RH-1235 FIGURE: A-62H SHT. 1 OF 1 REV. 0
  • *
  • 10" x 10" x 6" 11 24SJ55 / RED. TEE 1"

13 ~

I LINE 6-SJ-1242 SEE FIG. A- 73 10 19

f

~ 7 6 20 t-- --~

~

5

~ LINE 27 1/2-RC-1240 SEE FIG. A-37 4 45" (V.)

3 P & ID: 205334, 205301 ISOMETRIC: RH-2-J PUBLIC SERVICE ELECTRIC & GAS TO NO. 24 l~_,, SALEM UNIT 2 ACCUMULATOR \...

INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 10-SJ-1241 FIGURE: A-63 SHT. 1 OF 1 REV. 0

  • *

/ 10" x 10" x 6" 24SJ55 / RED. TEE 1"

'I'-'

I 24SJ56 LINE 6-SJ-1242 SEE FIG. A- 73

'-,..______ 2C-24-SIA-3 ~ 2C-24-SIS-5 (17PR)

~1

' (BPS) 2C-24-SIG-9 ___/"'

t-- --1 LINE 27 1/2-RC-1240 SEE FIG. A-37 45" (V.)

P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS TO NO. 24 '\~,., SALEM UNIT 2 ACCUMULATOR \....

INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 10-SJ-1241 FIGURE: A-63H SHT. 1 OF 1 REV. 0

  • *
  • 10" x 10" RED. TEE

'ruNE 27 1/2-RC-1230 BEND (H.) SEE FIG. A-38 5

TO NO. 23 j ACCUMULATOR ( , P & ID: 205334. 205301

' ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM ACCUMULATOR DISCHARGE 10-SJ-1231 FIGURE: A-64 SHT. 1 OF 1 REV. 0

  • *

(14PR) 10" x 10" x 6" RED. TEE ~

';)LINE 27 1/2-RC-1230 BEND (H.) SEE FIG. A-38 2C-23-SIA-6-......,_

(5PS) ...._ -........

//

> ......

// '

<-._ Jt,"1(.

TO NO. 23 j

' (.

ACCUMULATOR ( ...__ P & ID: 205334, 205301

' ~ 2C-23-SIG-11 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 2C-23-SIH-5 _ _ / INSERVICE INSPECTION DRAl'vlNG (lPR) SAFETY INJECTION SYSTEM ACCUMULATOR DISCHARGE 10-SJ-1231 FIGURE: A-64H SHT. 1 OF 1 REV. 0

  • *
  • 13 22SJ55
  • '--- 1o* x 1o* x s*

12A / R E D . TEE LINE 6-SJ-1222 SEE FIG. A- 79 12 LINE 2-SJ-1229 SEE FIG. A-94 SHT.

11 21 6

21A 3 22 LINE 27 1/2-RC-1220 SEE FIG. A-39 2 .

~

P & ID: 205334, 205301 TO NO. 22 ')_ - - 22SJ54 ISOMETRIC: RH-2-3 ACCUMULATOR C PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM ACCUMULATOR DISCHARGE 10-.SJ-1 221 FIGURE: A-65 SHT. 1 OF 1 REV. 0

  • *

/

22SJ55 10" x 10" x 6"

/ R E D . TEE 1"l/

\ . .- . .-r 2C-22-SIA-24

- \ \I (BPS) LINE 6-SJ-122'2

~ ~ SEE FIG. A- 79

\ \

\ \'l'l~':.

LINE 2-SJ-1229 SEE FIG. A-94 SHT.

LINE 27 1/2-RC-1220 SEE FIG. A-39 2C-22-SIS-23 \ .

(OPR) \

--"-~

TO NO. 22 )_ - - 22SJ54 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 ACCUMULATOR C PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM ACCUMULATOR DISCHARGE 10-SJ-1221 FIGURE: A-65H SHT. 1 OF 1 REV. 0

  • *
  • 10* x 10" RED. TEE LINE 6-SJ-1212 J SEE FIG. A-81 1*:-C/ 11 1" ~J 6 5 4 0 21

(-- --r LINE 27 1/2-RC-1210 SEE FIG. A-40 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

/

INSERVICE INSPECTION DRAVvlNG TO NO. 2;'(_ SAFETY INJECTION SYSTEM ACCUMULATOR ACCUMULATOR DISCHARGE 10-SJ-1211 FIGURE: A-66 SHT. 1 OF 1 REV. 0

  • *

(18PR) \

LINE 6-SJ-1212 SEE FIG. A-81 1*~/

1"

'1----

~1 1

I 2C-21-SIH-11 _ /

0 (5PR)

~1 P & ID: 205334, 205.301 ISOMETRIC: RH-2-.3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

/

2~

INSERVICE INSPECTION DRAWING TO NO. SAFETY INJECTION SYSTEM ACCUMULATOR ACCUMULATOR DISCHARGE 10-SJ-1211 FIGURE: A-66H SHT. 1 OF 1 REV. 0

  • * *

) LINE 8-SJ-1262

,.-\_SEE FIG. A-67 SHT. 2

/

/

)1" 2SJ220/...-'\...

/ .

'f'-+-,J,.

,A I I

18 3/4"

~

'I-

, I

,l,

\I 2SJ154 1\

Lr

~

13 17

14 15 11 .)

1<

.--+-.Jo

\,,..A.' 2SJ218 n ..

6PS-1 THRU 2SJ330 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING

'~ LINE 8-SJ-2262 SAFETY INJECTION SYSTEM 8-SJ-1262 SEE FIG. B- 70 FIGURE: A-67 SHT. 1 OF 2 REV. 0

  • * *

) LINE 8-SJ-1262

,...."\.SEE FIG. A-67 SHT. 2

..... .....

)1" 2SJ220 ,*< \.

.

.. -+-Jt.

..... ,>.I

(

~ 2C-22-SIS-4 (21PR-2)

\ 2C-22-SIG-3 (21PR-1) 3/4"

~

I

,1,

\/

2SJ154,\

2C-22-SIH-2 \

(15PR)

'1'

..............-2c-22-s1s-1

/ (11PR) 1"

-r-----

1 I

11 .

1<

,--+-Jt.

)

6PS-8 THRU 0 '\...,A/ 2SJ218 n ..

2SJ330 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING

'-;:J LINE 8-SJ-2262 SEE FIG. 8- 70 SAFETY INJECTION SYSTEM 8-SJ-1262 FIGURE: A-67H SHT. 1* OF 2 REV. 0

  • *
  • 45* BEND (H._)--(:!3-~29 BEND 28 cf~

8" x

~Y-RED.

~LINE 6-SJ-1222

--~'( _.... SEE FIG. A- 79 22SJ43 Q

~-

35 45* BEND (H.)

LINE 6-SJ-1242(_....

SEE FIG. A- 73 34 45" BEND (H.)

33 ~-

P & ID: 205334 ISOMETRIC: RC-2-3 LINE 8-SJ-1262 SEE FIG. A-67 SHT. PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-1262 FIGURE: A-67 SHT. 2 OF 2 REV. 0

  • *

(29PR-1) 45* BEND (H.)

2C-22-SIS-17 (30PR-1) cf~ / 2C-22-SIS-10 2C-22-SIS-1B~

(30PR-2)

--*

{" .,,- ~o/E LIN 6 -SJ-1222 SEE FIG. A- 79 22SJ43

~ . 4 5~* BEND (H.)

NE 6-SJ-1242(.,,-

~IEE FIG. A- 7 3

~2C-22-SIS-9

~

(25PR) 2C-22-SIS-8 2C-SISN-8 (24PR)

~ '

2C-22-SIS- 7 (23PR-2) 2C-22-SIS-5 ~

~ 2C-22-SIS-6 (23PR-1)

(22PR-2) ~

45* BEND (H.)

2C-22-SIS-5A ~

~* (22PR-1) ~

SJ-1262 c.,,, / p &

ID" 205334

. RC-2-3 ISOMETRIC_:- - -

LINE 8- A-67 SHT. 1 S~RA~EM SEE FIG. CE ELECTRIC & GAS PUBLIC UNIT 2 PECTION DRAWING INSERVICE INSJECTION SYSTEM SAFETY IN 8-SJ-1262 OF 2 REV. 0

~----

A-67H SHT. 2 FIGURE:

  • *
  • LINE 8-SJ-1252 SEE FIG. A-69 SHT. ~

'

PENETRATION 10 LINE

~

8-SJ-2252 SEE FIG. B- 72

/

P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-1252 FIGURE: A-69 SHT. 1 OF 2 REV. 0

  • *
  • LINE 8-SJ-1252 SEE FIG. A-69 SHT. ~

'

PENETRATION 10 CLASS 2 LINE 8-SJ-2252 2P-21-SIH-16 " " ~ / ~ SEE Fl G. B- 72

~ ""

p & 10: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-1252 FIGURE: A-69H SHT. 1 OF 2 REV. 0

  • * *

) LINE 6-SJ-1212

/-'\._ SEE FIG. A-81

--~</

21SJ43

~8"'X6" RED.

25

/

LINE 6-SJ-1232 SEE FIG. A- 76 t-" 24 20

~ 3/4"

~* ~

.1, 21SJ154 ','

16 Lt I\

~1 I

I A )

1V 17 ,..,,.. ,;.:t;;J224 18

)_::../;~J225 P & ID: 205334 1* \._ ISOMETRIC: RH-2-3

' PUBLIC SERVICE ELECTRIC & GAS

~LINE 8-SJ-1252 SALEM UNIT 2 SEE FIG. A-69 SHT.

INSERVJCE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-1252 FIGURE: A-69 SHT. 2 OF 2 REV. 0

  • * *

') LINE 6-SJ-1212

,..... "\._ SEE FIG. A-81

--~~/

21SJ43

~ 8" x 6" RED.

/

LINE 6-SJ-1232 SEE FIG. A- 76 C/

3/4" 2C-21-SIS-1 (13PR)

'I'---'

f

,1, 21SJ154 '/

Lf

/\

~ 2C-21-SIG-3

) (18PR)

/v

.s.:t;~J224

~'

/<

)_:;..-,+-*

.. \_

  • 2SJ225 P & ID: 205334 1 ISOMETRIC: RH-2-3

'~LINE PUBLIC SERVICE ELECTRIC & GAS 8-SJ-1252 SALEM UNIT 2 SEE FIG. A-69 SHT.

IN SERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-1252 FIGURE: A-69 H SHT. 2 OF 2 REV. 0

  • *
  • LINE 6-SJ-1241 SEE FIG. A-74 BEND (H.)

BEND (H.)

5A 5 4 3BC 3 12" x 12" RED. TEE 2

x 8" 1

\'f-'

I

---.---~t-----+-...,.r--+---~----<*.....- I LINE 12-RH-1251 BEND (H.) I SEE FIG. A-62

/ FLOW \ ~

~

LINE 2-SJ-1247 SJ4" SEE FIG. A-91 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-1245 FIGURE: A- 71 SHT. 1 OF 1 REV. 0

  • * *

/ 2C-24-RHS-10

_ / 2C-24-RHH-11

/ (12PR)

LINE 6-SJ-1241 SEE FIG. A-74 BEND (H.)

BEND (H.)

2C-24-RHS-3 \ 2C-24-RHS-1 \

(SPR) (3PR)

(7PR) 2C-24-RHS-4/

(6PR)

P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-1245 FIGURE: A- 71 H SHT. 1 OF 1 REV. 0

  • * *

. J ~INE 6-SJ-1222

,,- \.SEE FIG. A- 79

/

.,-y

. v,........___

,,-1' 6" x 8" I

---0 RED.

2 LINE 10-SJ-1241

(- ""'*', *

--

SEE FIG. A-63

' ',.....

24SJ55' -

--J tL 10" x 10" RED. TEE x 6 .. A (~

LINE 2-SJ-1249 SEE FIG. A-89 SHT. 2 9

P & ID: 205334 ISOMETRIC: RH-2-3 8 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM

  • 6-SJ-1242 FIGURE: A- 73 SHT. 1 OF 1 REV. 0
  • * *

) LINE 6-SJ-1222

,.-'\_SEE FIG. A-79

/

8" x RED. ,...

, .\.v, )

"'---- 6" x 8" I

---G RED.

2 t ....,*,

LINE 10-SJ-1241

, ',}..* ....... SEE FIG. A-63 24SJ55'

--- -(~ J 10" x 10" x 6" /

RED. TEE

'-....._

'rJ LINE 2-SJ-1249 SEE FIG. A-89 SHT. 2

~ 2C-24-SIS-6 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC &: GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1242 FIGURE: A- 73H SHT. 1 OF 1 REV. 0

  • *
  • 6 _J LINE 29-RC-1240 0, SEE FIG. A-33 1" _) .

( ...,*, 2SJ339

,_,,_,_.,

~'

18 '

'- ...,*, 2SJ336

- ...

'"- ....,,_ ';J

. I I

I 11 LINE 8-SJ-1245 ) 10 ~

SEE FIG. A- 71 ( ' ....._

P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1241 FIGURE: A-74 SHT. 1 OF 1 REV. 0

  • * *

~ 2C-24-RHH-12

/ (7PR-1) 2C-24-RHG-14A 2C-24-RHH-14 _.) LINE 29-RC-1240 2C-24-RHG-16 ~ (', SEE FIG. A-33 (13PR-1)

~'

(5PR) -......._

BEND 1" _)

{ ...,*, 2SJ339

,__...,_,,

',"--.,', 2SJ336

'--.-..- .

' ';Y

' ,._

. I I

2C-24-RHS-13------- I (7PR-2)

LINE 8-SJ-1245 )

SEE FIG. A- 71 (',

P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1241 FIGURE: A- 74H SHT. 1 OF 1 REV. 0

  • *
  • LINE 10-SJ-1231 )

SEE FIG. A-64 ...-'\.

'v" X-:2~SJ56

~ ............ " ' - 10" x 10" x 6"

~ 12 RED. TEE

~1 11 LINE 6-SJ-1212

~~D~ 6" \ J:\_ SEE FIG. A-81 r

45* (V.) 6

...-"'v

.,.......-J "'-- 8" x 6" I

I RED.

1 I I

LINE 2-SJ-1239 ..--G SEE FIG. A-92 LINE 8-SJ-1252 SEE FIG. A-69 SHT. 2 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1232 FIGURE: A- 76 SHT. 1 OF. 1 REV. 0

  • *
  • LINE 10-SJ-1231 j SEE FIG. A-64 ....-'\..

f'

_;;.:-Z;SJ56 t . . . . '-- 10" RED. TEE x 10" x 6"

~1 ~ 2C-23-SIH-3

/ (9PR-1)

LINE 6-SJ-1212 2C-23-SIS-1 ~~D~ 6" \"')"~SEE FIG. A-81 r

45' (V.) (3PS-1)

..... /J

. . . .v, "-.,,__ 8" x 6"

.  : RED.

I

\ _ 2C-23-SIS-2 I (3PS-2) LINE 2-SJ-1239 ..-.t__,

SEE FIG. A-92 LINE 8-SJ-1252 SEE FIG. A-69 SHT. 2 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1232 FIGURE: A- 76H SHT. 1 OF 1 REV. 0

'*.

  • 19 7 LINE 29-RC-1230 SEE FIG. A-34

~1 5 LINE B-RH-1235 )

SEE FIG. A-62 r-.... P & ID: 205334, 205301 ISOMETRIC: RH-2-3 I

) PUBLIC SERVICE ELECTRIC & GAS 2 A /

SALEM UNIT 2 I'("

r-+-~

\_.,..-'/ 2SJ232 INSERVICE INSPECTION DRAWING 1" \..

RESIDUAL HEAT REMOVAL SYSTEM 6-RH-1231 FIGURE: A- 77 SHT. 1 OF 1 REV. 0

  • *
  • LINE 29-RC-1230 SEE FIG. A-34

/ 2C-23-RHG-15

~1 LINE 8-RH-1235 )

P & ID: 205334, 205301 SEE FIG. A-62 (-.... ISOMETRIC: RH-2-3 I PUBLIC SERVICE ELECTRIC & GAS

) SALEM UNIT 2 A /

I _,

8"X6"/ II"-+--~

RED.

,. \...

\,.. /'/ 2SJ232

. INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 6-RH-1231 FIGURE: A- 77H SHT. 1 OF 1 REV. 0

  • *
  • r<*' \

22SJ55 '.-(

LINE 10-SJ-1221 SEE FIG. A-65 11

~ 10" x 10" RED. TEE x 6" x 6"

~i 8"

RED. /\,,,--1"

.f__ .> I LINE 6-SJ-1242 SEE FIG. A- 73 t  :

I

' .--l__.,

LINE 8-SJ-1262 SEE FIG. A-67 SHT. 2 10 9

P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG SAFETY INJECTION SYSTEM 6-SJ-1222 FIGURE: A- 79 SHT. 1 OF 1 REV. 0

  • *

22SJ55

\

'.<

LINE 10-SJ-1221 SEE FIG. A-65

~ 10" x 10" RED. TEE x , *.

8" X.6" RED. A....--1'

,(_..> I LINE 6-SJ-1242 SEE FIG. A-73 t .

I

,-..l_..,

LINE 8-SJ-1262 SEE FIG. A-67 SHT. 2 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC &. GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1222 FIGURE: A- 79H SHT. 1 OF 1 REV. 0

  • *
  • LINE 2- SJ-1228 SEE FIG. A-96 SHT. 3 2" x 6"

~ /RED~

'

2SJ328 /'<' "1 r-+-* I

'\../-"/ I 1\...

15" (V.)

......

......

LINE 29-RC-1220'-.J SEE FIG. A-35 (

P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1221 FIGURE: A-80 SHT. 1 OF 1 REV. 0

  • *
  • LINE 10-SJ-1211 c!- ..... SEE FIG. A-66

, 21SJ55 10* x 10* x 5* - -

RED. TEE

~

1 13 ")'_...;_,

  • "'-....)

(~,,

~

~ -...!..._<*

12 11 1"

21SJ281 ,._......~

.

.--+-..1.

,>. I

(

I 4

8" x 6" RED. ....-(

,...

.b I I 5 P & ID: 205334 ISOMETRIC: RH-2-3 LINE 6-SJ-1232 '\~....- I SEE FIG. A- 76 c_ ---l_,

PUBLIC SERVICE ELECTRIC & GAS LINE 8-SJ-1252 SALEM UNIT 2 SEE FIG. A-69 SHT. 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1212 FIGURE: A-81 SHT. 1 OF 1 REV. 0

  • *
  • LINE 10-SJ-1211 c< ......

SEE FIG. A-66

.

  • 21SJ55

':!'___ ,

10* x 10* x 6" - -

RED. TEE

~

1 *'..J i

(~(,

g

"-

'<*

,,,,,- 2C-21-SIH-8

/ ,,,,,-2c-21-s1G-41

/ (10PR) 1" 21 SJ2B1 ,*.,...- .:\_

,,.,

( .

.. -+- ...

I B" X 6" REb/(

/ I P & ID: 205334 ISOMETRIC: RH-2-3 LINE 6-SJ-1232 "\,/ I

"--, SEE FIG. A- 76 '- r--l_.,

PUBLIC SERVICE ELECTRIC &: GAS LINE 8-SJ-1252 SALEM UNIT 2 SEE FIG. A-69 SHT. 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1212 FIGURE: A-Bl H SHT. 1 OF 1 REV. 0

  • * *

/

3/4'\."" , - -

r--.. ......,., 2SJ311 I

I

,,....

._..,_,

  • rr*

PENETRATION I CONTAINMENT

~

<_,

\

\,. -

42 I

WALL \ """'\

'--- --~

/ 2 SJ-1222 1 SJ-1242 )'.:_/ 3

/ ~ LINE 1 1 A_:105 SHT.

SEE FIG.

LINE 1 1/2-101 SEE FIG. A- SHT. 1 18BC-1 1I A-1 SJ-1232 SJ-1212 LINE 1 1/;_:::-103 SHT.

SEE FIG. 18BC-2 ~SEELINE FIG. 2- 07 SHT. 1

/ .

.J7

'-..'I 1" 4-SJ-1295 CLASS 1 j

....-\..

LINE 4-SEE FIG. B-80 SJ-2201 l~i

~o,. I 4* x 3*

REDUCING

',01

  • 4-SJ-1295 4-SJ-1293 ELBOW . . . . ,, '-f.(oi., 3-SJ-1292

..................... ~

CLASS 2 -SJ-1293

~

................... 4 & ID* 205334 1sbMETRIC: RH-2-3 S~~~~ME ELECTRIC & GAS 2~

PUBLIC UNIT 2 PECTION DRAWING

'

?:!!:_~~~~~~~~~~~~----=-=L_=F~IG=U:R=E=:=A=-=~=-~~~~~~== 84 INSERVICE INSECTION SYSTEM 4" x 3" AFETY INJ VE 2 SJ3.09\~;...._;,..

t\ REDUCING ELBOW S *SEE ABO OF 1 REV. 0 SHT. 1

  • * *

}3/4" 2SJ149 /'<" \..

r-+-~

_,>./

/

3/4'\/

"\.. ,-- --,

14PS

\ PENETRATION CONTAINMENT ~ ....,

\;.. 42 WALL \

'--- --~

11PS l LINE 1 1/2-SJ-1222 LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 1 X/ /'\...SEE FIG. A-105 SHT. 1 2P-2-SIS-1 & 1A_.......

~ SEE FIG. A-107 SHT.

(10PR-2) LINE 1 1/2-SJ-1232 LINE 1 1/2-SJ-1 212 SEE FIG. A-103 SHT. 1

/

2P-2-SIG-2 _ . . /

(10PR-1) 3-SJ-1292 ~

'y 1" 4-SJ-1295 2P-2-SIH-5~

2P-2-SISN-104 & 104A C~P/ LINE 4-SJ-2201 (2PR) / CLASS 1 ) SEE FIG. B-80

~(/\.

4* x 3*

~OJr:

... ,~I *4-SJ-1295 REDUCING ....... 4-SJ-1293 ELBOW '-I, '4...oir CLASS 2 3-SJ-1292 2P-SIS-10 \ '....._-"'

(1PR) , '-... 74-SJ-1293 P & ID: 205334 rp ISOMETRIC: RH-2-3 rp PUBLIC SERVICE ELECTRIC & GAS

~

I SALEM UNIT 2 I

I I.,_

.......

...,.

L-Y-,.

\

4" x 3"

~ 2P-2-SIS-4 (2PR)

INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM

  • SEE ABOVE 2SJ309'-......J REDUCING FIGURE: A-84H SHT. 1 OF 1 REV. 0 (1" ELBOW
  • *
  • 1 LINE 2-SJ-1219

,...."l._SEE FIG. A-98 15 25,....

.....

4" x 4" x 2" RED. TEE 26 ). LINE 2-SJ-1229 PENETRATION ,.... "I._SEE FIG. A-94 SHT.

16 27 .....

.....

4" x 4" x 2" RED. TEE

/ 28 l LINE 2-SJ-124-9

/ ...-"\...SEE FIG. A-89 SHT.

< BPL- 29 .....

'i!_ THRU '!,.. 4" x 4" x 2"

/

) LINE 2-SJ-1239 CONTAINMENT '-,_,,,/ RED. TEE WALL 30 ,,.."\_SEE FIG. A-92

..........

5 4" x 2" 4 RED. ELBOW

~1 3 2SJ135

/ ............ .J P & ID: 205334-

~ (

ISOMETRIC: RH-2-3 CLASS 2 FROM NO.'S 21 & 22 PUBLIC SERVICE ELECTRIC & GAS SAFETY INJECTION SALEM UNIT 2 PUMPS INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-1294 FIGURE: A-85 SHT. 1 OF 1 REV. 0

  • * *

~ 2C-21-SIS-36

~ (19PR-2) ')LINE 2-SJ-1219 2C-21-SIS-37 ,,.."'\.SEE FIG. A-96 (19PR-1) ,.,...,,..

4" x 4" x 2" RED. TEE l LINE 2-SJ-1229 PENETRATION ,,.."'\..SEE FIG. A-94 SHT.

.,,..

/ ~ 2C-SISN-9 4" x 4" x 2" 11PS RED. TEE

/ / 1 Lll<JE 2-SJ-1249

/ ,,.."'\..SEE FIG. A-89 SHT.

< -....A .,,.. /

t--.. / 4 11 x 4" x 2" j LINE 2-SJ-1239 CONTAINMENT '-....,.-/,.,.. RED. TEE WALL ,,.."'\.SEE FIG. A-92

.,,...,,..

2P-21-SIG-34 / 4" x 2" RED. ELBOW

~1 2P-21-SIS-32 (5PR)

_/ 2SJ135 2P-21-SIH-31 (1PR) / ',.J P & ID: 205334

~ (

ISOMETRIC: RH-2-3 CLASS 2 FROM NO.'S 21 & 22 PUBLIC SERVICE ELECTRIC & GAS SAFETY INJECTION SALEM UNIT 2 PUMPS INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-1294 FIGURE: A-85H SHT. 1 OF 1 REV. 0

  • *
  • 3/+"

FROM NO. 22

'!-' SAFETY INJECTION

,17 PUMP 22SJ145 '/ / '\

2SJ19+/y-~" lT'.

'f'-7'--..I

('v' I

28 5 PENETRATION 70 6 3R 13 20 19 18 17 16 BEND (H.)

14 Q. 31 I 15 LINE 2-SJ-1228 L----lv1---r 1" ~, 32 _....~SEE FIG. A-96 SHT.

2~J3~4 4" x 4" x 2" ' 33 ,,..,.....

RED.TEE ~ ,..... 3/4"

-;::_

P & ID: 205334 ISOMETRIC: RH-2-3 4" x 2" RED. PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I

~

LINE 2-SJ-1218 INSERVICE INSPECTION DRAWING SEE FIG. A-99 SHT. SAFETY INJECTION SYSTEM 4-SJ-1282 FIGURE: A-86 SHT. 1 OF 1 R,EV. 0

  • *
  • 3/4" FROM NO. 22

~ SAFETY

~

INJECTION

. )7 PUMP

/

22SJ145 '-/

I\

2SJ194,\_..~" 'T*

\CLASS 2

't°-,4-...i

('/

CLASS 1 I

"--- 2P-2-SIH-17 PENETRATION 70 (1PR-1) *

\_

2P-21-SIS-22

~5PS (1PR-2)

" ' ;;>

/

,.-<

1PS"", ,...,....

' '-./

/ 2C-22-SIS-44

  • .,~

"-2P-22-SIS-41 (21PR) w 2P-22-SIS-40 2P-22-SIS-38 (16PR-2) (15PR-2)

\ _ 2P-22-SISN-103* & 103A

/ \ BEND (H.)

LINE 2-SJ-1228 L--f><}---{

I 1" \ \ ~,Q. '") SEE FIG. A-96 SHT.

/'\.._ .

2SJ344 4" x 4" x 2" / .

~

/

2P-22-SIS-39 2P-22-SIS-37 RED.TEE / 3/4" (16PR-1) (15PR-1)

/C P & ID: 205334 ISOMETRIC: RH-2-3 4" x 2" RED. PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I

,-.V LINE 2-SJ-1218 INSERVICE INSPECTION DRA\AilNG SEE FIG. A-99 SHT. SAFETY INJECTION SYSTEM 4-SJ-1282 FIGURE: A-86H SHT. 1 OF 1 REV. 0

  • *
  • PENEffiA TION 71

~20 3/4-"

19 4 'I-' FROM NO. 21 12 ), SAFETY INJECTION

\I ,..,":\ PUMP 21SJ145 1\

16 BEND (H.)

"f

~', BEND (~H~.)-+---.....

L.-:i..-"'1 11 2SJ339'l'J (1 ..

15 31 32 33 j LINE 2-SJ-1247 34 ,,.,,. ....-~\_SEE FIG. A-91

-

---4" x 4" x 2" A RED_ TEE 35 P & ID: 205334-ISOMETRIC: RH-2-3 4" x 2" PUBLIC SERVICE ELECTRIC & GAS RED. SALEM UNIT 2 I

,,---1J INSERVICE INSPECTION DRA'MNG LINE 2-SJ-1237 SAFETY INJECTION SYSTEM SEE FIG. A-93 4-SJ-1272 FIGURE:. A-87 SHT. 1 OF 1 REV. 0

  • *

'!'--' FROM NO. 21

), SAFETY INJECTION 21SJ145

\I _,...~ PUMP 1\

<T,

\CLASS 2

"' CLASS 1

~ 2P-22-SIS-34 (1PR)

J LINE 2-SJ-1247

1{<, -----4" x 4" x 2" RED. TEE P & ID: 205334 ISOMETRIC: RH-2-3 4" x 2" PUBLIC SERVICE ELECTRIC & GAS RED. SALEM UNIT 2 I

,,--0 INSERVICE INSPECTION DRA'MNG LINE 2-SJ-1237 SAFETY INJECTION SYSTEM SEE FIG. A-93 4-SJ-1272 FIGURE: A-87H SHT. 1 OF 1 .REV. 0

  • *
  • LINE 2-SJ-1249 j SEE FIG. A-89 SHT. 2 l'

~1 'I'-'

I j LINE 2-SJ-1219 I .,...\_SEE FIG. A-98 16

( j LINE 2-SJ-1229 L.,...\_SEE FIG. A-94 SHT.

I 7 I

I I 4

! <~ 3 24SJ143 .

~ 2 '~'----{::<}--t 3/4" I .1, 24SJ141 I 24SJ142 X I *r*

I ..--l...-

1 3/4"

j LINE 2-SJ-1239 I .,....,...'\. SEE FIG. A-92 I .,... .....

1,.. .....

P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1249 FIGURE: A-89 SHT. 1 OF 2 REV. 0

  • *
  • LINE 2-SJ-1249 j SEE FIG. A-89 SHT. 2 C'-

~

/ 2C-21-SIH-1B.6 rr---

1 ) LINE 2-SJ-1219 I ....-\..SEE FIG. A-98

( ) LINE 2-SJ-1229 L....-\..SEE FIG. A-94 SHT.

I I

I I

1~ F~

2 24SJ143 I \ '- ., ,* J

' '- - -t.,M,_:- - ( 3/4°'

I .1, 24SJ141 I

I 24SJ142

.

X

--L L ,

I I 3/4" I

I ) LINE 2-SJ-1239 I ,.... ....-\_ SEE FIG. A-92 I ,........-

1,,....

, P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1249 FIGURE: A-B9H SHT. 1 OF 2 REV. 0

  • *
  • 34 C!id o/L-J..--- LINE 6-SJ-1242 l 33 SEE FIG. A-73 ....-'\.

43 42

~41 BEND P & ID: 205334 ISOMETRIC: RH-2-3 20 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM

'..J

( LINE 2-SJ-1249 2-SJ-1249 SEE FIG. A-89 SHT. 1 FIGURE: A-89 SHT. 2 OF 2 REV. 0

  • *

/

I 2

~ c-::~::::~225 2C-24-SIA-372

~

LINE 6-SJ-1242 )

SEE FIG. A- 73 ,..... "\.

2C-24-SIG-224 -<...._

/ y~

BEND 2C-24-SIG-221 ~

~ 2C-2'-S,,-2W BEND 2C-24-SJH-576 ~

2C-24-SIS-222

_/ 2C-24-SIG-379

~i 2C-24-SIS-219

~ 2C-24-SIG-218 0

~

"~ 2 C-24-SIH-216

~2C-24-SIG-217 p & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE EULNEI~ TRIC 2 & GAS SALEM 2C-21-SIA-215 / '-...)LINE 2-SJ-1249 1 INSERVICE SAFETY TION DRAWING llNNSJ:~{ION SYSTEM 2-SJ-1249 2 REV. 0

( SEE FIG. A-89 SHT. FIGURE: A-89H SHT. 2 OF

  • *
  • t LINE 8-SJ-1245
E_FIG. A-=~ -(

26 22 17

~1 7

~"

13 16 FLOW 12 4FB 6 7 8 9 10 LINE 4-SJ-1272 i~lls i}('" . 2. 3 . j I 24SJ138 24SJ139 EL. 82' 11 SEE FIG.7A-87 I 1 II

, 3/4" (--t>~}-...J L{:::M~}--r 3/4"

~2" x 1" 4" X 4" X 2" ,..._l_, 24SJ136 24SJ137 ,1, RED. INS.

RED. TEE X LT>

24SJ238 P & ID: 205334

/

ISOMETRIC: RH-2-3 I

..--.v PUBLIC SERVICE ELECTRIC & GAS 1"

SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1247 FIGURE: A-91 SHT. 1 OF 1 REV. 0

  • *
  • LINE 8-SJ-1245

(-s_:E_FIG. A_::::~ -(

~1 2C-24-SIG- 702 \

FLOW

\ 4FB LINE 4-SJ-127~lll SEE_ FIG. A-87 1 II 24SJ138 24SJ139 /

4" X 4" X 2" 7 I

,-L 3/4" ( - -[:::<}- _J L{>:::}- - ~

24SJ136 24SJ137 3/4"

""-- 2" x 1" J

), RED. INS.

RED- TEE  :< 24SJ238

'T' P & ID: 205334 2C-24-SIH- 701 ISOMETRIC: RH-2-3 I

,--l_..,

1" PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1247 FIGURE: A-91H SHT. 1 OF 1 REV. 0

  • *
  • LINE 6-SJ-1232

(- SEE FIG. A- 76 29

'f 28 27 23 LINE 4-SJ-1294 SEE FIG. A-85

,--,.__,.

I ) LINE 2-SJ-1219 I .....- '~SEE FIG. A-98

(

17 I I

I

~1 I I

I I ) LINE 2-SJ-1229 I /'\SEE FIG. A-94 SHT.

16

,.~=\

'f'-+-~

(

,-/'/ 23SJ279 I

v,.... I I ) LINE 2-SJ-1249 I .....-'\.SEE FIG. A-89 SHT. 1 RED. INS. t' I 6 I

I I 2FB P & ID: 205334

0.~A3 2\ \ 23SJ141 ISOMETRIC: RH-2-3 RED. 1 1\__.,>:::}--{3/4" PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 ELBOW l

\t' 23SJ142 I\

INSERVICE INSPECTION DRAWING LT> SAFETY INJECTION SYSTEM

.--l_.., 2-SJ-1239 3/4" FIGURE: A-92 SHT. 1 OF 1 REV. 0

  • *

LINE 4-SJ-1294 SEE FIG. A-85

,.....,__,

I ) LINE 2-SJ-1219 I ....- '\.SEE FIG. A-98 2C-21-SIG-191 (

I

~

I

~1 I

. /2C-21-SIH-190 I

I I

I ) LINE 2-SJ-1229 I ....- '\..SEE FIG. A-94 SHT.

/y~

'"-r-~

( \.

_..../'/ 23SJ279 I

v ... I I ) LINE 2-SJ-1249 I _... '\.. SEE FIG. A-89 SHT.

RED. INS. I" I

I I

RED.

ELBOW v\\

I 2FB 23SJ141 J"---{>::}---(3/4" l

P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

\? 23SJ142 I\

INSERVICE INSPECTION DRAWING

'r* SAFETY INJECTION SYSTEM

..--J_, 2-SJ-1239 3/4" FIGURE: A-92H SHT. 1 OF 1 REV. 0

._;;., .; ... :: ....

  • *
  • LINE 8-RH-1235

---

SEE FIG. A-62 i

(- --- 26 2.3 24 EL. 89' 22

~1 21 19 18 LINE 4-SJ-1272 SEE FIG. A-87

,...,____

I I

11 11 , FLOW

~

2" x 1" 23SJ136 II 23SJ137 14 RED. IN~ 3/4" (l.. _..,_,..._

..,,,,,. .... .,

_J L -/-'°i- _ ) 3/4"

.. "' ....... ""{ P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1237 FIGURE: A-93 SHT. 1 OF 1 REV. 0

  • *
  • LINE 8-RH-1235 i

---

c-)_SEE__FIG._ A-62 EL. 89' _ _ _ _ _ __,

~1 LINE 4-SJ-1272 SEE FIG. A-87

,,,___,

I I

2" x 1" RED. IN~

FLOW

..

P & ID: 205334 ISOMETRIC: RH-2-3 I

1" )-- - --c..............

  • ......... 1t-- _J PUBLIC SERVICE ELECTRIC & GAS 2SJ216 SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1237 I FIGURE: A-93H SHT. 1 OF 1 REV. 0
  • *
  • LINE 2-SJ-1229 j SEE FIG. A-94 SHT. 2 (-...

17

~1 I-'

16

) ,. I I

/'Y~ I ) LINE 2-SJ-1219

\

~,,.2~sJ279 I I-'

_...\..SEE FIG. A-98 v,... I I

2" x 1" I

RED. INS.

2 F~(,. 22SJ143

~3

~

.

I 2 \ \__ *, /"

1 ) -t_..M,J- -1_) 3/4" I l 22SJ141 I 22SJ142 1\

'\ /

I 'y>

I I I ..-.i.._..,

I 3/4" I

I I

I ) LINE 2-SJ-1249 P & ID: 205334 I _....\..SEE FIG. A-89 SHT. 1 ISOMETRIC: RH-2-3 I"

I ) LINE 2-SJ-1239 PUBLIC SERVICE ELECTRIC & GAS I ...- \_ SEE FIG. A-92 SALEM UNIT 2 I .,.......-

~.,.......-

INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1229 FIGURE: A-94 SHT. 1 OF 2 REV. 0

-* *

  • r LINE 2-SJ-1229 j SEE FIG. A-94 SHT. 2 (-.....

2C-2'-SIG-'8*

~1 LINE 4-SJ-1294 SEE FIG. A-85

~

I I

I ) LINE 2-SJ-1219

' -------- 2C-21-SIS-183 I ...-\.SEE FIG. A-98 I-'

I I

I 2

l F~ 22SJ143

~\~'---i/\

I

__ _) 3/4" 2Z;J~41 -(

.1, I

I 22SJ142  :<

Ly*

I I I ...-.l__.,

I 3/4" I

I I

I ) LINE 2-SJ-1249 P & ID: 205334 I ...-\_SEE FIG. A-89 SHT. 1 ISOMETRIC: RH-2-3 I-'

I ) LINE 2-SJ-1239 PUBLIC SERVICE ELECTRIC & GAS I /\. SEE FIG. A-92 SALEM UNIT 2 I _........-

~_........-

INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1229 FIGURE: A-94H SHT. 1 OF 2 REV. 0

  • *
  • j LINE 10-SJ-1221

(-.... SEE FIG. A-65 45 .................. ~

44 42 41 BEND 40 39 36 26 23 0

P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING

'~LINE 2-SJ-1229 SAFETY INJECTION SYSTEM 2-SJ-1229 SEE FIG. A-94 SHT.

FIGURE: A-94 SHT. 2 OF 2 REV. 0

  • * *

/2C-22-SIA-367 LINE 10-SJ-1221

/2G_-22-SIG-212 SEE FIG. A-65

/2C-22-SIG-210

/ 2C-22-SIH-388 BEND'

/ 2C-22-SIG-391 BEND ~

2C-22-SIS-208 / ' /

2C-22-SIS-207 ~ /

2C-22-SIS-206 ~

/ 2C-22-SIS-369 BEND

~ 2C-22-SIS-204 2C-22-SIG-203 P & ID: 205334

/ ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM

';)LINE 2-SJ-1229 2-SJ-1229 SEE FIG. A-94 SHT. FIGURE: A-94H SHT. 2 OF 2 REV. 0

  • * *

,..

'!'-'

.1,

\' 2SJ264

/\

LT>

LINE 2-SJ-1228 SEE FIG. A-96 SHT. 2(....._

......

...... ~2"X1"RED. INS.

BEND 16 14 BEND

~2" x BEND I 3/4"

S ~ RED. INS.

~\..* ~ 3/4" 7 2" x 1"

/RED. INS.

BEND .,,

I I

I 7 I I

,1,

\I 2SJ258 ,\

2FB LT'


G V

'I--' ~3 1"

\\ p & ID: 205334

\\ ISOMETRIC: RH-2-3 LINE 4-SJ-1232 \ >-1 22SJ137 SEE FIG7A-86 I ) ,, ~* ~h PUBLIC SERVICE ELECTRIC & GAS 3/4"\--<,/,.; *\ SALEM UNIT 2 I 22SJ136 \ _;

~X~X2" ~ n-;1" 34 RED. TEE INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96 SHT. 1 OF 3 REV. O

  • *
  • 1"

'!'--'

.1,

'x' I\

2SJ264

  • r*

LINE 2-SJ-1228 SEE FIG. A-96 SHT. 2(,

......

...... ~2"X1" RED. INS.

BEND BEND

~

I ~2" x

...---L,-

3/4" RED. INS.

<(,.\..*~ 3/4"

.y 2" x 1"

~RED. INS.

BEND 2C-22-SIS- 730 ~ I I

I I

I

<l,

\I 2SJ25B ,\

\

2C-22-SIG-729 --............_ 2FB LT'

..___, ~ ~ ..-G LINE 4-SJ-1232 SEE FIG7A-B6 I VI I

\\

'>1

)_ ,, ~* ~~,,

3/4"\-*,/,...-

22SJ136 22SJ137

  • \

,)/,

1" p & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 4" x 4" x 2" , ...--.v 3/4" RED. TEE INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96H SHT. 1 OF 3 REV. O

  • ** *

-_j LINE 2-SJ-1228

( SEE FIG. A-96 SHT. 3 0

43 18 'O~

(Y BEND

~~

. 38 BEND

'r

......

......

19. LINE 2-SJ-1228 SEE FIG. A-96 SHT.

36 35

~ 33 34 2"X1"~

RED. INS. .1,

~< 2SJ356 25

  • r*

~ 26 1"

P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 28 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96 SHT. 2 OF 3 REV. 0

  • * *

~

2C-22-SIA-540 ~ -..J LINE 2-SJ-1228

( SEE FIG. A-96 SHT. 3 2C-22-SIG-541 ~

'O~

lp7 BEND

~ - ~ 2C-22-SIH-734 BEND ,~

' ',..J

( LINE 2-SJ-1228 2C-22-SIS-544 _ / / SEE FIG. A-96 SHT. 1 2C-22-SIS-545 _ /

/ 2C-24-SIS-588

/ /2C-22-SIG-546 2"X1"_/

RED. INS. .1,

~< 2SJ356 /2C-22-SIS-739

'T' r--l__,

1" BEND P & ID: 205334 2C-22-SIG-743 / / ISOMETRIC: RH-2-3 2C-22-SIG- 742_,,/°'" / PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 2C-22-SIG-741_/ /

2C-22-SIS- 740_,,/°'"

~2C-22-SIG-737 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 0 2-SJ-1228 FIGURE: A-96H SHT. 2 OF 3 REV. 0

  • *
  • 1"

'"!'--'

,1,

'x' I\

2SJ262 60

'T' LINE 2-SJ-1228 SEE FIG. A-96 SHT.

~1 \

\

51 t LINE ~-SJ-1221 SEE FIG. A-80 52 59 58 53

<:i

~

2" x 1"/,l, RED. INS.  :< 2SJ260

'r'

,...-..J.__,

1" P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96 SHT. 3 OF 3 REV. 0

  • *

'I'-'

2C-22-SIS-536 ,1, / 2C-22-SIH-530 (45PR-3) \ X 2SJ262 2C-SISN-12 'T' 2 C-22-SIS-537

~""'~ BEND 6" LINE 2-SJ-1 228 SEE FIG. A-96 SHT.

/ 2 C-22-SIH-534

~ 2C-22-SIS-538

\

' BEND

\

(45PR-2) 2C-22-SIS-539 .

(45PR-1) 2C-22-SIS-532 (57PR-2) \

t LINE~- SJ-1 221 SEE FIG. A-80

-~~ 2 C-22-SIS-531 2C-22-SIS-533 (57PR-1) 2 " X 1 " / ,l, RED. INS. \' 2SJ260 I\

'T'

~

,.. p & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG SAFETY INJECTION SYSTEM 2-SJ-1228 FIGURE: A-96H SHT. 3 OF 3 REV. 0

  • *
  • LINE 6-SJ-1212 }

SEE FIG. A-81 ,,.. \...

27 26 10

~1" 2SJ2J~:X' 2" x RED.

J

~s.

~,....,.........-

LINE 4-SJ-1294 SEE FIG. A-85

' /\

J ~D<11 I

2FB

~ 3 2 '\ '\

<

l ',

' '-- ., ~* .) 3/4" I 21SJ142 '/ - ---<..~",_J- - - (

!T\ 21SJ141 I ---L, I 3/4" I P & ID: 205334 I } LINE 2-SJ-1229 ISOMETRIC: RH-2-3 I _.... '\.. SEE FIG. A-94 SHT. 1

,,,..

f ""') LINE 2-SJ-1249 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I ,,..\...SEE FIG. A-89 SHT.

,,,..,,..

( ~ LINE 2-SJ-1239 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM I ,,.. SEE FIG. A-92 2-SJ-1219 I ,,..

L-/ FIGURE: A-98 SHT. 1 OF 1 REV. 0

  • *
  • LINE 6-SJ-1212 )

SEE FIG. A-81 / \.

t/  ?

/~1* [2C-21-SIH-180

s~~~i~~

2" x 1* J RED. INS.

I v/

LINE 4-SJ-1294 SEE FIG. A-85 vJ- ~

'!---

2FB

. \\\~

~\.

21SJ143 2C-21-SIS-189 I 21SJ142 l'x' \\.._ - ,, ~" - - _)(

-t~M,J-3/4"

/T':. 21SJ141 I ---L, I 3/4" I P & ID: 205334 I ) LINE 2-SJ-1229 ISOMETRIC: RH-2-3 I ,,,,. ~ SEE FIG. A-94 SHT. 1

(/

PUBLIC SERVICE ELECTRIC & GAS

( ) LINE 2-SJ-1249 SALEM UNIT 2 I / \. SEE FIG. A-89 SHT.

(//

( ~ LINE 2-SJ-1239 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM I / SEE FIG. A-92 2-SJ-1219 I / FIGURE: A-98H SHT. 1 OF 1 REV. 0 I-/

  • *
  • BEND 19 20 LINE 4-SJ-1282 BEND SEE FIG. A-86 0

".!----

v 'O~

16

~1 I

~1 I

I

~1 I

..-.l_.,

3/4" 5FB

~6*

FLOW 5

21SJ136

_) LINE 2-SJ-1218 3/4")

r --{>::}-----1..;

,,> BEND - - ( SEE FIG. A-99 SHT. 2 3  ;;! 21SJ137 2* x ,._/

3/4-::(

RED. INS. I I 21 I

l... 'v... _

'\.... _.., 22

"'....) BEND (V.)

2SJ252 * ( ..

1 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1218 FIGURE: A~99 SHT. 1 OF 2 REV. 0

  • *

LINE 4-SJ-1282 SEE FIG. A-86

'!---

I I 2" I

~1 2" x RED.

I f 2C-21-SIG-72B

~

3/4"

~ 5FB FLOW 21 SJ1 36 '@. ' _) LINE 2-SJ-1218 c- --f::<I-3/4") - --(./

" "' .~i21sJ137 I > 2C-21-SIS-727

~~~~B-E_N_D - - ( SEE FIG. A-99 SHT. 2 21SJ139 2"X1"/

/*

/

0 3/4z RED. INS.

l.. ......,*\

'--~-..,.

...._ --.,\ 21 SJ254

"---\--.,.

2SJ252 V*-....;J1... BEND (V.)

\"-...._.J

( ,. P & ID; 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 2-SJ-1218 FIGURE: A-99H SHT. 1 OF 2 REV. 0

  • *
  • rr---

.1,

'x' 2SJ256

"

'T'

,.._

I LINE 14-RH-1211 SEE FIG. A-61 BEND BEND 29

~1 28 LINE 2-SJ-1218 ) - - - + - ' EL 88' P & ID: 205334, 205301 SEE FIG. A-99 SHT. 1 \ - - ISOMETRIC: RH-2-3 27 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1211 2-SJ-1218 FIGURE: A-99 SHT. 2 OF 2 REV. 0

  • * *

~ 2C-21-SIH-711

/ ~2C-21-SIS-712

/ ~ 2C-21-SN-13

~2C-21-SIS-713 ~

I LINE 14-RH-1211 SEE FIG. A-61

/2C-21-SIS-714 2C-21-SIS-715 ~

RED.

2C-21-SIS-716 ~ ""' BEND BEND 2C-21-SIS-717 2C-21-SIS-718 ~~

BEND LINE 2-SJ-1218 SEE FIG. A-99 SHT. 1 \

}_ __

J

--+--!-----' EL. 88' P & ID: 205334. 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS 2C-21-SIA- 719 SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-1211 2-SJ-1218 FIGURE: A-99H SHT. 2 OF 2 REV. 0

  • *
  • LINE 1 1/2-SJ-1242 r - /

WALL/)'-,

~EE FIG. A-101 SHT. 2

"-' (SLEEVE 4

"- 5 LINE 3-SJ-1292 SEE FIG. A-84

~1 14 13 24SJ388 24SJ16 6 EL. 81' 12 7

\_

1 1/2" x 1" RED. INS.

P & ID: 205334, 205301 ISOM,ETRIC: RH-2-3 PUBLIC SERVICE Et.ECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 1 OF 3 REV. 0

  • *
  • r, /

LINE 1 1/2-SJ-1242

""A.:EE FIG. A-101 SHT. 2 WALL))',

', (SLEEVE

' j LINE 3-SJ-1292

(' SEE FIG. A-84 r 2C-24-SIS- 798 ~1  ?- rY I 24SJ388 24SJ16 1--~----1 1--~.j.......j.~~~~EL. 81'

\__ 1 1/2" x 1" RED. INS. 3 / 4" t

24 SJlS

--tv1- _J 1

: ~ 2C-24-SIA- 799

"' '* \/24SJ14 I\

'r*

...-..l__,

3/4" P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101H SHT. 1 OF 3 REV. 0

  • *
  • 1" rr--

,l, 2SJ352 I'.'\

LT>

25 LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 3 34

~*

BEND (H.)

0

~1

,,,.__,.

BEND (H.) I 26 BEND (V.)

I I 27 Ct.

l._

'- ...,., 24SJ317 ~

18 4..-"'r--,

'."-'...)

17

( 1" BEND (V.)

P & ID: 205334, 205301 ISOMETRIC: RH-2-3

/

/ PUBLIC SERVICE ELECTRIC & GAS LINE 1 1/2-SJ-1242 ' ( SALEM UNIT 2 SEE FIG. A-101 SHT. 1 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 2 OF 3 REV. 0

  • *
  • 1" rr--

,l, 2SJ352 >:

LT>

LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 3 0

2C-24-SIS- 792 ~ 2C-24-SIS-572 2C-24-SIG-573 2C-24-SIG-574 2C-24-SIG-575

~- 2C-24-SIG- 787 BEND (H.)

2C-24-SIS-793_/

/ 2C-24-SIG-796 I

BEND (V.)

I I

l._ \' ~

2C-24-SIA-797 ~

'- "*' 24SJ317 L--\--,.

\'-.. '.J \ \_ 2C-24-:~S-790

( 1" 2C-24-SIG-789 BEND (V.)

P, & ID: 205334, 205301 ISOMETRIC: RH-2-3

/

/ PUBLIC SERVICE ELECTRIC & GAS LINE 1 1/2-SJ-1242 ' ( SALEM UNIT 2 SEE FIG. A-101 SHT. 1 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101H SHT. 2 OF 3 REV. 0

  • *
  • 1"

/f--' 41

,.L, X 24SJ315 1 1/2" X 1" 'T*

RED. INS. ~ ~21 36 LINE 27 1/2-RC-1240 SEE FIG. A-37 35 I

I

---L LINE 1 1/2~SJ-1242 SEE FIG. A-101 SHT. 2 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-101 SHT. 3 OF 3 REV. 0

  • *
  • 1"

'l---'

,.1, 4

>: 24SJ315 1 1/2" X 1" T,

~

RED. INS.

?:-- --1 LINE 27 1/2-RC-1240 SEE FIG. A-37

___- 2C-24-SIG-571

: : : . - - - 2C-SISN-11 I

I

---l_.,

LINE 1 1/2-SJ-1242 SEE FIG. A-101 SHT. 2 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1242 FIGURE: A-1 OlH SHT. 3 OF 3 REV. 0

  • *
  • LINE 1 1/2-SJ-1232 SEE FIG. A-103 SHT. 2 21

~1 20 18 17 7

16 23SJ388 8

(....._ LINE 3-SJ-1292 15 9

4 3 r

......_-+-------~ ...._SEE FIG. A-84 P & ID: 205334, 205301 1 1/2" x RED. INS.

1"_/ .1, ISOMETRIC: RH-2-3

'/ 23SJ313 I\

PUBLIC SERVICE ELECTRIC & GAS

'T' SALEM UNIT 2

,-.l___,

1" INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103 SHT. 1 OF 2 REV. 0

  • * *

~

LINE 1 1/2-SJ-1232 SEE FIG. A-103 SHT. 2

/

/

~1

~2C-23-SIA-800

(....._ LINE 3-SJ-1292

~---------~-....,,.:SEE FIG. A-84 r

P & ID: 205334, 205301 ISOMETRIC: RH-2-3 1 1 / 2 " X 1 " / ,1, RED. INS. . \' 23SJ313 PUBLIC SERVICE ELECTRIC & GAS I\

'f SALEM UNIT 2

,....-l__,

1" INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103H SHT. 1 OF 2 REV. 0

  • *
  • 1"

~

I

,17

',' 2SJ350 I\

'L(

1 1/2" x 1*

~RED.

34 INS.

35 31 36 29 LINE 27 1/2-RC-1230' 'J SEE FIG. A-38 (

28 27 24 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 y//

LINE 1 1/2-SJ-1232 \...

SEE FIG. A-1 03 SHT. 1 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103 SHT. 2 OF 2 REV. 0

  • *
  • 1" rr----

1

.1, 2C-23-SIH-875\ ',' 2SJ350 Lf I\

1 1/2" x 1*

23SJ17 \ ~RED. INS.

......

LINE 27 1/2-RC-1230 '...J SEE FIG. A-38 I

/ 2C-23-SIS-876

/ 2C-SISN-10

/ 2C-23-SIS-877

/ / 2C-23-~H-678

' / 2C-23-~S-879 p & 10: 205334. 205301

~

ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 y//

LINE 1 1/2-SJ-1232 \,__

SEE FIG. A-103 SHT. 1 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1232 FIGURE: A-103H SHT. 2 OF 2 REV. 0

  • * *
  • 16 8

1 1/2" x , ..

RED. INS.

~1 7 L -{>~}- -(

2SJ19 1"

22 17 LINE 1 1/2-SJ-1222 j SEE FIG. A-105 SHT. 2(....._ 23

......

LINE 3-SJ-1292 '.._J

.'

,.,..

r-+-..i.

/

>

SEE FIG. A-84 (

\.,/ ...-'/ 22SJ313 1" \..

p & 10: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALE.M UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105 SHT. 1 OF 2 REV. 0

  • *

2C-22-SlH-807 \

3/4" t ,. "' \\'-

---<..>~.;--'

... .

--:>~...--

1*

3/4" 22SJ14 22SJ15 1 1/2" x 1" RED. INS. 2C-22-SIS-818 \

~1 L-fvt-J

..... ....... ( 1.. 2C-22-SIA-819 ~

2SJ19

/2C-22-SIS-806 LINE 1 1/2-SJ-1222 j SEE FIG. A-105 SHT. 2 (" ..._

....

LINE 3-SJ-1292 '.J SEE FIG. A-84 (

P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105H SHT. 1 OF 2 REV. 0

  • *
  • 0

~.9n: 41

"<

40

,.

'I'-'

,l, 47

\I 2SJ346 ,\

48 1 1/2" x 1" .T, RED. INS. -----------

43

/ ..... 49 LINE 27 1/2-RC-122-;)" r

~1 42 32 SEE FIG. A-39 .

31 0

28 27 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS

..... SALEM UNIT 2

'rLINE 1 1/2-SJ~1222 INSERVICE INSPECTION DRAWING SEE FIG. A-105 SHT. 1 SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105 SHT. 2 OF 2 REV. 0

  • -.. _,,_" ,. :*._,l
  • * *

~ I/ ~ 2C-22-SIH-383 2C-22-SIG-382

/2C-22-SIS-239 2C-22-SIG-381 /

1"

'[---'

,1, B~ 2C-22-SIG-237 2SJ346 ,\

\I 1 1/2" X 1" 'T,

~ 2C-22-SIS-236 RED. INS. -----------

2C-22-SIG-235 _ // /

t' LINE 27 1/2-RC-122-;-r

~1 2C-22-SIS-234 ___,/"" ,. SEE FIG. A-39 2C-22-SIG-233

~ 2C-21-SIS-232

~ 2C-22-SIG-231

/ 2C-22-SIA-230 P & ID: 205334. 205301

/ ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

'

'ruNE 1 1/2-SJ-1222 SEE FIG. A-105 SHT. INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1222 FIGURE: A-105H SHT. 2 OF 2 REV. 0

  • *
  • 7 11 ) LINE 1 1/2-SJ-1212

,,\_SEE FIG. A-107 SHT. 2

/

) ~ /

l', 3 ----.!_,

LINE 3-SJ-1292 ' , . .) 4 12 3/4" SEE FIG. A-84 (

P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 FIGURE: A-107 SHT. 1 OF 2 REV. 0

  • *

2C-21-SIS-812 I I ) LINE 1 1/2-SJ-1212

/ 2C-21-SIA-805 I .l, ...-\_SEE -FIG. A-107 SHT. 2

(<. ..... _~..... __ 21SJ14,-_/

'"-+-..

'\.,>.I I ',' 21SJ15

/\

T

..... .....

LINE 3-SJ-1292 SEE FIG. A-84

'-..

r 3/4" \.. *

~2C-21-SIS-811 P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 FIGURE: A-107H SHT. 1 OF 2 REV. 0

  • *
  • 1" rr---

,1, ~~

2sJ348 'l I\

45 I 1/2" X 1" 'T, RED.INS. ~

40

~1 39 35 38 34A

\,

34

~

) 1" P & ID: 205334, 205301 23 ISOMETRIC: RH-2-3

/'i<" "'\...

't'-+-J.

22 /./ 21SJ13 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

~11/2" x 1" INSERVICE INSPECTION DRAWING

// / RED. INS. SAFETY INJECTION SYSTEM I 1/2-SJ-1212 LINE 1 1/2-SJ-1212 SEE FIG. A-107 SHT. 1( FIGURE: A-107 SHT. 2 OF 2 REV. 0

  • *
  • 1"

'[---'

.1-,

2SJ348 I'.'\

1 1/2" x 1* 'T' RED.INS. ~

2C-21-SIS-199 /

BEND 2C-21-SIS-194 _ /

2C-21-SIS-193 _ /

2C-21-SIA-192 / P & ID: 205334, 205301 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

~11/2"X1" INSERVICE INSPECTION DRAWING

// / RED. INS. SAFETY INJECTION SYSTEM 1 1/2-SJ-1212 LINE 1 1/2-SJ-1212 SEE FIG. A-107 SHT. 1(_ FIGURE: A-1 07H SHT. 2 OF 2 REV. 0

  • **
  • PUMP NO_ 22 24 22-PMP-LUGS-1 22-PMP-BOLTS\

(24 EACH) \ _,,__ __,...-/

22-PMP-LIG "._

(24 EACH) '\. 0 0 Oo 0 0u-------~

LINE 31-RC-1220 LINE 31-RC-1240

/-------....,_--;::---- 24-PMP-BOLTS

/ I FROM FROM 0 I

'-...__::::_

I

____ ____,_____ ~

STG 22 STG 24 (24 EACH) 0 0 ------------ 24-PMP-LIG (24 EACH)

Oo oO ~ 24-PMP-LUGS-2

~ 7 22-PMP-LUGS-31 LINE 27 1/2-RC-1240 LINE 27 1/2-RC-1220 22-PMP-LUGS-2 24-PMP-LUGS-3 TO RPV TO RPV TO RPV TO RPV LINE 27 1/2-RC-1210 21-PMP-LUGS-2 j 23-PMP-LUGS-2 j LINE 27 1/2-RC-1230

/ 23-PMP-LIG

° J.---------L / * (24 EACH)

OQ ~ 23-PMP-LUGS-3 21-PMP-BOL TS (24 EACH} 0 0 /-------....._--;::---- ~----+-----7~~, 0 23-PMP-BOL TS (24- EACH)

FROM 21-PMP-LIG, (24 EACH) ~ 0 / II I STG 21 FROM STG 23

(

I I I O" P & ID: 205301 0 '-...__::::__ ----'-----~ LINE 31-RC-1210 LINE,,__-3-1--R-C---1-2-30-+- - - - - ~._,_____ / 0 Oo oO PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'WlNG REACTOR COOLANT SYSTEM 23-PMP-LUGS-1 / REACTOR COOLANT PUMPS PUMP NO. 23 FIGURE: A-109 SHT. -1 OF 1 REV. 0

  • * *

~ 24-STG-SDUH 16-BFN-2241-1 16-BFNl:-2241-1 MAN WAY MAN WAY o*

""' MANWAY AT 90"

'--0Y

/ / 24-STG-MB90

~ 24-STG-SCSD

/~ / (BOLTING) I SHELL SECTION C x-- --- -z TRANSITION CONE """' ~ 24_STG-TCSC

~ 24-STG-SBTC MANWAY AT 270" j y

""--- 32-MSN-2241-1 32-MSNIR-2241-1

"--- 24-STG-SASB SHELL I

SECTION A 24-STG-MB270 (BOLTING)

PLAN VIEW

/

24-STG-STBSA ___,/ STUB ARREL 24-STG-TSSTB P & ID: 205301 CLASS 2 TUBE

- --

CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 24 STEAM GENERATOR NO. 24 FIGURE: B-1 SHT. 1 OF 1 REV. 0

  • 16-BFN-2231-1 SHELL SrTION D

' ~ 23-STG-SDUH l

15-BFNl:-2231-1 MANWAY MANWAY o* MANWAY AT 90"

~ / 23-STG-MB90 " - - STG-SCSD

/ (BOLTING)

I SHELL SECTION C x----- -----z TRANSITION CONE ' ~ 23-STG-TCSC

~ 23-STG-SBTC SHELL SECTION B MANWAY AT 270" J y

"'---- 32-MSN-2231-1 32-MSNIR-2231-1 I

........._ 23-STG-SASB I

SHELL SECTION A 23-STG-MB270 (BOLTING)

PLAN \llEW

/

23-STG-STBSA _ , / STUB ARREL 23-STG-TSSTB P & ID: 205301 CLASS 2 TUBE CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG REACTOR COOLANT SYSTEM

  • STEAM GENERA TOR NO. 23 STEAM GENERA TOR NO. 23 FIGURE: B-2 SHT. 1 OF 1 REV. 0

'.

  • *
  • 16-BFN-:2221-1 SHELL SECTION D

' " ' STG-SDUH l

16-BFNl:-2221-1 MANWAY MAN WAY o* I MANWAY AT 90"

~ / 22-STG-MB90 ~ 22-STG-SCSD

/ (BOLTING}

I SHELL SECTION C x----- -----z TRANSITION CONE' " ' STG-TCSC

' " ' STG- SEl TC

~ 32-MSN-2221-1 MAN WAY AT 270" J y 32-MSNIR-2221-1

~ 22-STG-SASB I

SHELL SECTION A 22-STG-MB270 (BOLTING)

PLAN VIEW

/

22-STG-STBSA ~ STUB 22-STG-TSSTB P & ID: 205301 CLASS 2 TUBE CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 22 STEAM GENERATOR NO. 22 FIGURE: B-3 SHT. 1 OF 1 REV. 0

  • *
  • 15-BFN-2211-1 15-BFN:-2211-1 SHELL SECTION D

' "'-..'-- 21-STG-SDUH MAN WAY MAN WAY o* MANWAY AT 90" I

~ [ ~-r----~

"'--- 21-STG-SCSD

/ 21-STG-MB90

/ (BOLTING}

I SHELL SECTION C x----- -----z TRANSITION CONE ' ~ 21-STG-TCSC J

SHELL SrTION B

""----- 32-MSN-2211-1 32-MSNIR-2211-1 MAN WAY AT 270" y '-- 21-STG-SASB I

SHELL SECTION A

>21-STG-MB270 (BOLTING)

PLAN \/IEW

/

21-STG-STBSA _ / STUB 21-STG-TSSTB P & ID: 205301 CLASS 2 TUBE CLASS 1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM STEAM GENERA TOR NO. 21 STEAM GENERATOR NO. 21 FIGURE: B-4 SHT. 1 OF 1 REV. 0

  • *
  • 0 2-CVCT-1 L0 =CENTER LINE OF MANWAY t--~--'-~~~~~~~~~~---i /

£ 2-CVCT-MWY-NUTS q

2-CVCT-2VS-3 2-CVCT-2VS- 7 / 2-CVCT-MWY-BOLTS 2-CVCT-2VS-6 2-CVCT-2VS-5:_

2-CVCT-2VS-1 ------


A ----------

I

' --,

---,.__ I r---1 --~-

1

/

~ 2-CVCT-2VS-8 2-CVCT-2VS-2 _ /

P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING 2-CVCT-2VS-4 CHEMICAL & VOLUME CONTROL TANK FIGURE: B-5 SHT. 1 OF I REV. 0

  • * *

~LASS 21 CLASS 3 I

2-ELHEX-2 \ 2-El.HEX-1 \

~~----------~--

+/-

/ 2-ELHEX-NU1' l

-I-

__.--:-----------------~ -----EL.=82'

\__ (NOTE: VESSEL 2-ELHEX-STUDS IN HORIZONTAL POSITION.)

P & ID: 205328 NOTE: VESSEL IS IN ROOM NEXT TO RHE AND ACCUMULATOR 23. PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING EXCESS LETDOWN HEAT EXCHANGER FIGURE: B-6 SHT. 1 OF 1 REV. 0

  • *
  • VENT VENT VENT VENT I'-' ---! ---! ---!

- - - - - - - 2" EXEMPT-----

(TYP.)

21-HT-1 " "


Lo I

- - - - 2" EXEMPT------@

(TYP.)

NO. 21 NO. 23 NO. 24 NO. 22 21-HT-2 ~ 1-------i 1-------1 / 22-HT-2

- - - - - - 1"" EXEMPT------

(TYP.)

I 21WR66 23WR66 I I 24WR66 22WR66 I

~--f><] [><}--~ EL. 110'

~--t><J [><}--~

TO RC TO RC TO RC TO RC DRAIN TANK DRAIN TANK DRAIN TANK DRAIN TANK P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING HEAD TANKS FIGURE: 8- 7 SHT. 1 OF 1 REV. 0

  • *
  • CLASS 21 CLASS 3 2-UJEX-1 \

l / 1" BOL,NG (EXE"PT)

-I-

_.-----------------~~ ------EL.=88' (NOTE: VESSEL IS IN HORIZONTAL POSITION.)

P & ID: 205328 NOTE: VESSEL IS IN ROOM EAST OF THE WEST STAIRWELL PUBLIC. SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG LETDOWN HEAT EXCHANGER FIGURE: B-8 SHT. 1 OF 1 REV. 0

  • *
  • 2-RCF-.SVS TH_RU 8VS ~ / 2-RCF-9VS THRU 12VS 2*

Lo TOP VIEW 2* - n______ ri ~ 2-RCF-,~

I I r-----i / VESSEL SUPPORTS

/ (SEE TOP VIEW)

  • P & ID: 205328 PUBLIC SERVICE ELECTRIC & GAS 3/4" SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT FILTER FIGURE: 8-9 SHT. 1 OF 1 REV. 0

.. ***--- _________________ __,

  • * **

OUT IN SHELL A 2-RHE-1 J T VESSEL SUPPORT WELDS CANNOT BE EXAMINED DUE TO LIMITED ACCESS.

2-RHE-2 2-RHE-3

!I \ 2-RHE-4 SHELL B 2-RHE-5 J 2-RHE-6 2-RHE-7

!I \ 2-RHE-8

\

SHELL C J I J 2-RHE-11 JI \ 2-RHE-13 P & ID: 205328

~

2-RHE-9 2-RHE-10 I 2-RHE-12 PUBLIC SERVICE ELECTRIC &: GAS I

IN NOTE: VESSEL IS IN ROOM OUT SALEM UNIT 2 NEXT TO ACCUMULATOR INSERVICE INSPECTION DRAWING NO. 24. REGENERATIVE HEAT EXCHANGER FIGURE: 8-10 SHT. 1 OF 1 REV. 0

    • *
  • 1
    • ,t t

NO. 21 CLASSJ CLASS 2 ------------

1--.---=----------=----l~ 21-RHRHEX-1

~ 21-RHRHEX-2VS INLET (FRONT)


-.:: \\ouTLET (BACK) 11, j~ ~

21-RHRHEX-IN -

---~-'--------------------1--

VESSEL SUPPORT 21-RHRHEX-OUT

- - - - - - - RHRHEX-2 P & ID: 205332 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RHR HEAT EXCHANGER 21

.

FIGURE: B-11 SHT. 1 OF 1 REV:

. 0


**-*-"-"""

  • *
  • NO. 22 CLASS 3 CLASS 2 ------------

1--~-__;=-----------=-----l ~ 22-RHRHEX-1 22-RHRHEX-1VS ~ ~ 22-RHRHEX-2VS INLET (FRONT}

.....

\\ouTLET (BACK) l lJ j~ ~

22-RHRHEX-IN -

--l---'--------------------1 ---

~

VESSEL SUPPORT 22-RHRHEX-OUT 22-RHRHEX-2 P & ID: 205332 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RHR HEAT EXCHANGER 22 FIGURE: B-12 SHT. 1 OF 1 REV. 0

  • *
  • FLOW 1 STEAM EL. GENERATOR

\ 24

\_14° x 16" RED.

11 12 10 2PL-1 THRU 8

/

/

s THRU 18

~---<: /

PENETRATION 8 .__.,.,.

130'

<l.7

\I 24BF57 1\

LT>

....--.I._,,

1" 8PL-1 THRU 8 /

B P & ID: 205302 ISOMETRIC: SGF-2-3 7PL-1,-2------

7 PUBUC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2241, 14-BF-2241 FIGURE: 8-13 SHT. 1 OF 1 REV. 0

  • *

\__ 24 14" x 16" RED.

24BF22

~2-FWH-24-22

/ (3PS-1 THRU 4)

T-21-17 (3PS-5) 2-FWH-24-24 1s6M~~p~.* 205302 SGF 3

~

~ 2-FWH-2

~ (5PR) 4-23 PUBLIC SERVICE SALEM ~~WT~IC & GAS T-21-17 (5PS)

BOILER FE~gTl~N DRAWING INSERVICE INSP STEAM GEN YSTEM 16-BF-22 ERATOR FEED FIGURE: B-13 H41, 14-BF-224 SHT. 1 OF 1 REV.

1 o

  • *

~LUGS

~ 15PL-11 THRU 18 15PL-9,-10 23BF22 1

CLASS 3 15PL-1 3PL-1,-2\CLASS 2 3

PENETRATION 7

~"/"

,,,,.- ~LUGS

,J., --,\ 2BF59 23BF57 X LT>

/

EL. 100' ,,---Y<i---L_,,_\,'l...(3/4"

---0 1" 16-BF-2231

,J.7

  • s

'-~~____.,._..,.__~---'~ EL. 97'

~6PL-1 2BF60~\

LT>

---L- THRU 4 1*

P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2231, 14-BF-2231 FIGURE: 8-14 SHT. 1 OF 1 REV. 0

  • *

EL. 130' CLASS3 CLASS 2 T-21-17 (10PS-5) 2-FWH-23-18 ~*

/

9PS J

,PENETRATION 7

/

~'l 2-FWH-23-21 / / <.

(10PS-1 Tl*lRU 4-) ,.L, --:> -.,.\ 2BF59

,-.__,_.,.,___~ L-*\,7....(3/4"

/

23BF57 :\ .EL1QQ'.

\ T-21-17 LT>

(12PS)

<.L7 2BF60 X LT>

/ , _ FWS-23-19

...-.G 1*

P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVVlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2231, 14-BF-2231 FIGURE: B-14H SHT. 1 OF 1 REV. 0

  • *
  • r 14" RED.

x 16" STEAM GENERATOR 22 11PL-11 THRU 18~

1lPL-9,-10~

THRU 8 3PL-1 THRU P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVVlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2221, 14-BF-2221 FIGURE: 8-'16 SHT. 1 OF 1 REV. 0


------------------------'

  • . ,'
  • r14" RED.

x STEAM 16" GENERATOR 22

>....-


z 16-BF-2221 "-, \_ 2-FWH-22-18 PENETRATION 6 "-"- (SPS-1 THRU 4)

,L, 3PS-2/

\/

1\ 228F57

'r,

,.-G 1"

P & ID: 205302 ISOMETRIC: SGF-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

  • INSERVICE INSPECTION DRA\lilNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2221, 14-BF-2221 FIGURE: B-16H SHT. 1 OF 1 REV. 0
  • *

~11PL-13 THRU 20 12

...-------11 PL-11, -12 EL. 130' 11PL-3 THRU ~

11PL-1,-2 11 9 8 P & ID: 205302 ISOMETRIC: SGF 3 PUBLIC SERVICE ELECTRIC & GAS x 14" SALEM UNIT 2 RED. ELL.

INSERVICE INSPECTION DRAWlNG BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2211, 14-BF-2211 FIGURE: B-17 SHT. 1 OF 1 REV. 0

  • *
  • STEAM

/RED.

14" x 16" EL. 144-' / 14PS GENERATOR 21

,. FLOW/

'----l-1--- ------- S- 22

.--- (13PS)

/ 2-FWH-21-19 TRUNNIONS EL. 130' 4"'

5 ~

I 21BF22 P & ID: 205302 ISOMETRIC: SGF-2-3

\ _ 16" x 14" PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 RED. ELL.

INSERVICE INSPECTION DRAWING BOILER FEED SYSTEM STEAM GENERATOR FEED 16-BF-2211, 14-BF-2211 FIGURE: B-17H SHT. 1 OF 1 REV. 0

  • *
  • 7

(, /8-CS-2215 LINE 8-CS-2227 ' '-....J SEE FIG. B- 79 SHT. 1 (

~1 1 1/4<<-....

6 LINE 8-RH-2215 SEE FIG. B- 75 P & ID: 205334, 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG CONTAINMENT SPRAY SYSTEM 6-RH-2215. 8-CS-2215 FIGURE: B-18 SHT. 1 OF 2 REV. 0

  • * *

~...... / 8-CS-2215 LINE 8-CS-2227 ' '...._.J /

SEE FIG. 8- 79 SHT. 1 (

~1 1 1/4(<.,

2P-CSH-310 (2PR)

/

/~/4"

~~ I I

8"TEE/l~ ...---v LINE 8--RH-2215 SEE FIG. 8- 75 P & ID: 205334, 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CONTAINMENT SPRAY SYSTEM 8-RH-2215, 8-CS-2215 FIGURE: 8-18H SHT. 1 OF 2 REV. 0

  • *
  • 1 1/4° I'-'

I 12 11

~.10

) LINE 8-CS-2229

_,.."'\. SEE FIG. 8-96 SHT. 2 8

8-CS-2225 /

CONTAINMENT

{

/

--- ' \

SPRAY HEADER I ',

J___ 'rJ LINE 8~RH-2225 SEE FIG. B-74 20 I I LINE 8-RH-2225 I 1...-- SEE FIG. B- 74 22CS48 19 8-CS-2225 ~ 18 NO. 44 P & ID: 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-.3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-RH-2225, 8-CS-2225 FIGURE: B-18 SHT. 2 OF 2 REV. 0

  • *

---r--

1

) LINE 8-CS-2229

_,.."\_ SEE FIG. B-96 SHT. 2 CONTAINMENT

{ /

--- ' l SPRAY HEADER r 2-CSH-2 I',

I

........!...._,

LINE 8-RH-2225

',)

( LINE 8-RH-2225 SEE FIG. B- 7 4 I I I 1..--- SEE FIG. B- 74 22CS48 8-CS-2225 _ / /ANCHOR

/,,-2_,

_..

\_"'7' l PENETRATION NO. 44 P & ID: 205335 ISOMETRIC: RH-2-2, CS-2-2, CS-2-3

/ / \..' --.,_>

PUBLIC SERVICE ELECTRIC & GAS ANCHOR~~'- ,,,,.,

SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-RH-2225, 8-CS-2225 FIGURE: B-18H SHT. 2 OF 2 REV. 0

  • * *

) LINE 8-CV-2201 g _.... ...- \. SEE FIG. 8-20 SHT. 2 6

~1 SA FROM NO. 2 REFUELING WATER (-

STORAGE TANK

' ' 5 I

l '

'y \

L--\o---,

2SJ306 ',"-.. 2 SJ 1 FROM NO. 2

';Y3/4" REFUELING WATER STORAGE TANK P & ID: 205328. 205.334 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 IN SERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: B-20 SHT. 1 OF .3 REV. 0

  • *
  • j LINE 8-CV-2201

,,, \.. SEE FIG. B- 20 SHT. 2

.,.. /

~i

/2A-SISN-105 & 105A FROM NO. 2 REFUELING WATER~

STORAGE TANK

' '

I l ...,' \

  • -\~'Z_ 2SJ1 2SJ306 '..J FROM NO. 2

( 3/4" REFUELING WATER STORAGE TANK P & ID: 205328, 205334 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: B-20H SHT. 1 OF 3 REV. 0

I ---

  • *
  • LINE 8-CV-2201 SEE FIG. 8-20 SHT. 3

~

I I

4" rr-- 8" x 8" x 4"

\ )\'  : / R E D . TEE LINE 6-CV-2211 SEE FIG. 8-24

  • .\. \.

LINE 6-CV-2212 j SEE FIG. 8-23 ( ' ,

......

......

2CV49/,,.->

or-+-.J.

,>.I

( v I

I I

2 11 ~

~ ~8" x 8" x 6" RED. TEE

/

LINE 8-CV-2201 ( '

SEE FIG. 8-20 SHT. 1 P & ID: 205328, 205334 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 SHT. 2 OF 3 REV. 0

  • *
  • LINE SEE 8-C V-2201 FIG.,........._,

B-20 k H 3 T 2A -CVCH 427 I

I / r (18PR) -

4A-CVCG-427A

.I 0--

, / 8" x 8" x 4" I/ RED. TEE

/

LINE 8-CV \.. _,

SEE FIG B- 2201 \..

.. -20 SHT. 1 p & ID*

ISOMETRIC* 205328. 205334

. CV-2-2

  • RH 2 SALEM U~~~T~IC & GAS PUBLIC SERVICE E INSERVICE CHEMICAL & VOINSPECTION DRA'MNG LUME CON FIGURE* B 8-CV-2201 TROL SYSTEM

. -20H SHT. 2 OF 3 REV. O

  • *
  • 1'(<',

'-JI\

/L -7, 2CV43 L .lo

/ SLEEVE  :

I I

I ) LINE 8-RH-2225

....-"\_ SEE FIG. 8-74 22SJ45 /'<'

36 ~:t-j, 6" x 8"

~RED.

\

2SJ114'\.Z..._j

( LINE 6-CV-2201 SEE FIG. B-25 .

3/4"

'I'-'

21 20

'

';JUNE 8-CV-2201 P & ID: 205328, 205334 SEE FIG. 8-20 SHT. 2 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 SHT. 3 OF 3 REV. 0

  • **

(30PR-2) 2A-CVCG-482 (30PR-1)

~* \

~

LINE 8-RH-2225

./ SEE FIG. B-74 22SJ45 /..,-

r-+-.;,,.

I v 6" x 8"

~RED.

\

2sJ114\~;:,_..,.)

( LINE 6-CV-2201 SEE FIG. B-25 2A-CVCH-435 _ /

(22PR)

'

'ruNE 8-CV-2201 P & ID: 205328, 205334 SEE FIG. B-20 SHT. 2 ISOMETRIC: CV-2-2, RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 8-CV-2201 FIGURE: 8-20 H SHT. 3 OF 3 REV. 0

  • *
  • 3/4"

~

I 3/4" ) ,1,

'"'\ \' 2CY361 2CV25~-\~.( /\

LT' 3/4" CAP (J.,

.....

TEMPORARY STRAINER TSS-6 10 EL. 89' -


,- 8" x 8" x 6"

/ +-"

('- I /,.-

' /

RED. TEE c, -

---..........

LINE 8-CV-2201 SEE FIG. 8-20 SHT. 2

_/

NO. 22 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CY-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAW1NG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2212 FIGURE: B-23 SHT. 1 OF 1 REV. 0

____ _ _ _ J

  • *

' 3/4"

'[----'

/ I

),

'x' I\

2CV361

'r' 3/4" CAP (J...._

......

TEMPORARY STRAINER TSS-6 i EL. 89' =

---, 8" x 8" x 6" y

~ V RED. TEE ~ ,,,.-'\._

,.....-1-,

(/LINE 8-CV-2201

( I I/ SEE FIG. 8-20 SHT. 2

" _ /;,.....

NO. 22 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & 'voLUME CONTROL SYSTEM 6-CV-2212 FIGURE: B-23H SHT. 1 OF 1 REV. 0

  • *
  • 3/4"

'I'-'

I 3/4")

y'\

2CV25~-\:.z.._

~1 3/4" CAP (J...._

......

TEMPORARY STRAINER TSS-6 10


.-

EL. 89' - 8" x 8" x 6" RED. TEE ~

,.-+-, (....-LINE 8-CV-2201

( I '_,, SEE FIG. B-20 SHT. 2

' _ //,.-

NO. 21 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2211 FIGURE: 8-24 SHT. 1 OF 1 REV. 0

  • *

/, (4PR-1) 3/4"

'!'--'

I 3/4") ,1,

,.....,,.\ \' 2CV356

""-""-., I\

2CV259 '-"' 'r' 3/4" CAP (J.'

'

TEMPORARY STRAINER TSS-6 c;i

~\..*y EL. 89' I 8" x 8" x 6" )~

RED. TEE ~ ,,-"\._

,...+-, t _,,.LINE 8-CV-2201

( I '_,, SEE FIG. 8-20 SHT. 2

" _ //_,-

NO. 21 CHARGING SAFETY INJECTION PUMP P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2211 FIGURE: B-24H SHT. 1 OF 1 REV. 0

  • * *

) LINE 4-SJ-2211

..--'\_SEE FIG. 8-86 SHT. 2

/

/ '

LINE 4-SJ-2210 SEE FIG. 8-86 SHT. 2 LINE 8-CV-2201 SEE FIG. 8-20. SHT. 3 ~

(',

......

......

.......

5 a*

RED.

P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2201 FIGURE: 8-25 SHT. 1 OF 1 REV. 0

  • * *

) LINE 4-SJ-2211

_...\..SEE FIG. B-86 SHT. 2

/

/

LINE 4-SJ-2210 SEE FIG. B-86 SHT. 2 x 6"

)>9Y RED.

~ 2A-SIG-199 LINE 8-CV-2201 (3PR)

SEE FIG. B-20 SHT. 3 s*

RED.

P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 6-CV-2201 FIGURE: B-25H SHT. 1 OF 1 REV. 0

  • *
  • SUPPORT LUGS-""

~RANCH CONNECTIONS I . ~

A SUPPORT STRUCTURES r z

~ I

~----L-L--~~~~~~~/

,

4- 2 A / ,,.-- LINE 6-lvtS-2246 D De/

/ SEE FIG. 8-38 A = 34-MS-2241-2 B = 34-MS-2241-4/8-MS-2245 C = 34-MS-2241-4/6-MS-224-6 D = 34-MS-2241-4/8-MS-224-4 00 E = 34-MS-2241-4/8-MS-224-3 F = 34-MS-2241-4/8-MS-2242 G = 34-MS-2241-4/8-lvlS-2241 LINE 8-MS-2242 / LINE B-MS-2244 / ,...~-...'\ ,,,-- LINE 6-MS-2247 I< = 34-MS-2241-4/6-MS-224-7 SEE FIG. B-38 LINE 8-MS-2241~

SEE FIG. B-38 LINE 8-MS-2243 ~

SEE FIG. B-38 ""'

I I

\ ...... _

K

./

\-"

I SEE FIG. B-4-2 AA = 34-MS-2241-2PL-17 THRU 2PL-20 BB = 34~MS-2241-2PL-13 THRU 2PL-16 CC = 34-MS-2241-2PL- 7 THRU 2PL-10 DD = 34-MS-2241-2PL-3 THRU 2PL-6 SEE FIG. B-38 ""' 1 = 34-MS-2241-2PL-21 2 = 34-MS-224-1-2PL-12 3 = 34-MS-224-1-2PL-11 4 = 34-MS-2241-2PL-2 5 = 34-MS-2241-2PL-1 Z = 34-MS-224-1-TO VALVE 24MS167 Ls* BRANCH CONNECTION J '...-..____ LINE 8-MS-2245 SEE FIG. B-38

~RT CIRCUMFERENTIAL WELD 5

\ / J STRUCTlJRES P & ID: 205303 SUPPORT LUGS~ ISOMETRIC: MS-2-3 NOTE:

PUBLIC SERVICE ELECTRIC & GAS SEE FIG. B-30 SHT. 1 & 2 SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM MAIN STEAM HEADER 32-MS-224-1, 34-MS-2241 FIGURE: B-26 SHT. 1 OF 1 REV. 0

  • *
  • I SUPPORT LUGS~

SUPPORT STRUCTURES 1

/SUPPORT LUG CIRCUMFERENTIAL\

WELD 4 2 /'

A

/ - UNE B-*s-ms SEE FIG. 8-39 I z 0

/

AA a a a

[ ] [ ] \

A= 34-MS-2231-2 F D B B = 34-MS-2231-3/8-MS-2235 C = 34-MS-2231-3/6-MS-2236 LINE 6-MS-2231 / D = 34-MS-2231-3/8-MS-2233 SEE FIG. B-43 SHT. 1 E = 34-MS-2231-3/8-MS-2234

~LINE 6-MS-2237 F = 34-MS-2231-3/8-MS-2231 LINE B-MS-2231 / LINE 8-MS-2233 / /--...-' SEE FIG. 8-42 G = 34-MS-2231-318-MS-2232 SEE FIG. B-39 SEE FIG. B-39 / K '>\ H = 34-MS-2231-3f6-MS-2231 0 0 LINE B-MS-2232~ LINE 8-MS-2234~

I

\....__/

/

K = 34-MS-2231-3/6-MS-2237 AA= 34-MS-2231-2PL-17 THRU 2PL-20 BB = 34-MS-2231-2PL-13 THRU 2PL-16 CC = 34-MS-2231-2PL- 7 THRU 2PL-10 SEE FIG. 8-39 "' SEE FIG. 8-39 "' DD = 34-MS-2231-2PL-3 THRU 2PL-6 1 = 34-MS-2231-2PL-21 2 = 34-MS-2231-2PL-12 3 = 34-MS-2231-2PL-11 4 = 34-MS-2231-2PL-2 5 = 34-MS-2231-2PL-1 Z = 34-MS-2231-TO VALVE 23MS167 0

\

~SUPPORT 3" BRANCH~ 5 3 CONNECTION 1" BRANCH STRUCTURES P & ID: 205303 CONNECTIONS \SUPPORT L U G S / ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS NOTE: SALEM UNIT 2 SEE FIG. 8-31 SHTS. 1 & 2 INSERVICE INSPECTION DRA\MNG MAIN STIEAM SYSTEM MAIN STEAM HEADER 34-MS-2231 FIGURE: 8-27 SHT. 1 OF 1 REV. 0

  • *
  • r 1" BRANCH CONNECTIONS CIRCUMFERENTIAL\

I SUPPORT LUGS~

SUPPORT STRUCTURES WELD 4 2

""'~

\ ~

A

~~i ~;;"~~~~22"" c:J // D \ LINE 6-MS-2226

\SEE FIG. B- 40 0 0 aa LINE 8-MS-2224 _ /

SEE FIG. B-40 ,,,.- .....

Ur /

A = 34-MS-2221-2 B = 34-MS-2221-2/8-MS-2225 C = 34-MS-2221-2/6-MS-2226 D = 34-MS-2221-2/8-MS-2224 E = 34-MS-2221-2/8-MS-2223 F = 34-MS-2221-2/8-MS-2222 G = 34-MS-2221-2/8-MS-2221 0 LINE 8-MS-2221 ~

SEE FIG. B-40 "\.

LINE 8-MS-2223 " '

SEE FIG. B-40 "\.

I l

\.,__

-

K \

  • ,../--LINE 6-MS-2227 SEE FIG. El-42 K = 34-MS-2221-2/6-MS-2227 AA = 34-MS-2221-2PL-17 THRU 2PL-20 BB = 34-MS-2221-2PL-13 THRU 2PL-16 CC = 34-MS-2221-2PL-7 THRU 2PL-10 DD = 34-MS-2221-2PL-3 THRU 2PL-6 1 = 34-MS-2221-2PL-21 Orln:-1 Q o-2 = 34-MS-2221-2PL-12 3 = 34-MS-2221-2PL-11 4 = 34-MS-2221-2PL-2 5 = 34-MS-2221-2PL-1 Z = 34-MS-2221-TO VALVE 22MS167 o~ 0 1,:-1 t L_J ~ ~ /LINE B-MS-2225 SEE FIG 8-4-0 3" CONNEC~ 1.. BRANCH CONNECTIONS

\

5 SUPPORT LUGS_//

3~ 1 ......_' - - SUPPORT LUG SUPPORT STRUCTURES P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS NOTE: SALEM UNIT 2 SEE FIG. B-32 SHTS. 1 & 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM MAIN STEAM HEADER 34-MS-2221 FIGURE: 8-28 SHT. 1 OF 1 REV. 0

  • *
  • I SUPPORT LUGS~

SUPPORT STRUCTURES 3" BRANCH CONNECTION.\

[

CIRCUMFERENTIAL WELD 4- 2

/

1 ~ SUPPORT LUG I

z

[] [J 0

..-~~~~~~~~-'-~~A~__,

I \LINE 5-MS-"'5 SEE FIG. 8-41 a cJ AA A = 34-MS-2211-2 B = 34-MS-2211-1/8-MS-2215 C = 34-MS-2211-1/6-MS-2216 D = 34-MS-2211-1/8-MS-2213

/ / E = 34-MS-2211-1/8-MS-2214

__,,/ ____,/' F = 34-MS-2211-1/8-MS-2211 LINE 8-MS-2211 LINE 8-MS-2213 ,,.---. G = 34-MS-2211-1/8-MS-2212 0

SEE FIG. B-41 SEE FIG. 8-41 \ H = 32-MS-2211-1-6-MS-2211 I K \ K = 34-MS-2211-1/6-MS-2217 I / AA = 34-MS-2211-2PL-17 THRU 2PL-20

\ /'-. 88 = 34-MS-2211-2PL-13 THRU ZPL-16 LINE 8-MS-2212 ~ LINE 8-MS-2214 ~ '-- "-LINE 6-MS-2217 CC = 34-MS-2211-2PL-7 THRU 2PL-10 SEE FIG. 8-41 ' SEE FIG. B-41 ' SEE FIG. 8-42 DD = 34-MS-2211-2PL-3 THRU 2PL-6

\_LINE 6-MS-2211 1 = 34-MS-2211-2PL-21 SEE FIG. 8-45 2 = 34-MS-2211-2PL--12 Q6-M~

3 34-MS-2211-2PL-11 4 34-MS-2211-2PL-2 5 34-MS-2211-2PL-1 Z 34-MS-2231-TO VALVE 21MS167 0

I LINE

~

SEE FIG. B-41

'

\£ CONNECTIONS 5

\SUPPORT LUGS/

3

~SUPPORT STRUCTURES P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS NOTE: SALEM UNIT 2 SEE FIG. 8-33 SHTS. 1 & 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM MAIN STEAM HEADER 34-MS-2211 FIGURE: 8-29 SHT. 1 OF 1 REV. 0

_J

  • * *

<J_7 5LU-I - -5LU-O \' 24-MS189 I\

5 "T' 5PL-1-2~

3LU-I 3 /

/ t'f..

6 3LU-O ~,

~2PL-1 2LD -2LD-I

/ 8 P L - 3 THRU 10 x

~8PR A /

.---\1" 1 1/+"

2

/RED.

32" 30" I '<

PLUG EL. 165'

'("-+-.>.

1

>-J 24MS2 LINE 32-MS-224-1 STEAM SEE FIG. B-30 SHT. 2 ; , 1 1/4-"

PLUG A /

.---\1" GENERATOR NO. 24

...... 9 I '<

'("-+-"

  • V 9LD-I- -9LD-O EL. 130' P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-224-1, 30-MS-2241 FIGURE: 8-30 SHT. 1 OF 2 REV. 0
  • *

~

<"17

/ \' 24MS189

" / 24-MSR-2

<r' (3PR-1)

/

. 32" x 30" 1 1/4-"

~RED.

PLUG *EL. 166' STEAM LINE 32-MS-224-1 SEE FIG. 8-30 SHT. 2!, GENERATOR NO. 24

......

'

24-MSLS-9 /

S-209/

(10PS-1,-2)

'------ 24-MSR-8

@ P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM 32-MS-224-1, 30-MS-2241 FIGURE: 8-30H SHT. 1 OF 2 REV. 0

  • *
  • 1"

~

LINE 34-MS-2241

~ SEE FIG. B-38 I /

/

/

2PL-1 THRU 3 /

PENETRATION 4

/

/

/

<...__ ___ /

/

/

/

L-----.....

' ' ..___.,.. /

/

'y LINE 30-MS-2241 SEE FIG. B-30 SHT. 1 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2241 FIGURE: B-30 SHT. 2 OF 2 REV. 0

  • * *

,. LINE 34-MS-2241

~ SEE FIG. 8-38

,; {

I /

/

"(r*

\ 24-MSR-10 24-MSLS-17~

PA-209 *

(1PS-3 THRU 12)

~ PENETRATION 4-

/

/

,,,.,,,. 7* ,,.,,. 1

,,. I ,,....- I

/_../ l

' '

/

>

/

/

/

/

'-;J LINE 30-MS-2241 SEE FIG. B-30 SHT. 1 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2241 FIGURE: B-30H SHT. 2 OF 2 REV. 0

  • *
  • 1 1/4" PLUG

.............__8PL-1,-2

/ 8 P L - 3 THRU 10 2LD -5LU-O 1 1/4. 5 PLUG - - - - - 5PL-1,-2 EL. 166' 1

STEAM ....____ SPL-11,-12 1 1/4" GENERATOR NO. 23 PLUG

/ 5 P L - 3 THRU 10 9LD 9LD-I 10LU-I

/

1 1/4" PLUG

. ....-\.

'"'

r-+-.:J.

' 1

>/ 23MS2

' ~LINE

. '1" 32-MS-2231 23MS3

  • SEE FIG. B-31 SHT. 2 I y'

....-\_

\....;,,-t-~

.-/-~

1,'\.. " ,A/ 23MS4 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 32-MS-2231, 30-MS-2231 FIGURE: 8-31 SHT. 1 OF 2 REV. 0

  • *
  • 23-MSR-21 1..

Q '-<"'

7

~* ~< 23MS1/8 23-MSR-3 LT>

1 1/4" PLUG

/ 23-MSR-B 1 1/4" PLUG EL. 166' STEAM GENERATOR NO. 23 MSH-203~

2'-MSR~5~ S-209 (10PS-1.-2)

/

/(. 1 1/4"

~-

1 1/4" PLUG PLUG 11

A / \.. 23-MSLS--9

.>-/

tY r-+-.:i..

23MS2 \ ' (-1 LINE 32-MS-2231 11" SEE FIG. B-31 SHT. 2 A / \..

!Y r-+-..:..

..A/ 23MS4 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2231, 30-MS-2231 FIGURE: 8-31H SHT. 1 OF 2 REV. 0

  • *
  • LINE 30-MS-2231 SEE FIG. B-31 SHT.

LINE

~ SEE FIG.

34-MS-2231 1PS-1 B-39 r PENETRATION 3 1" ,,;

,,;

/

/,__,->/\

"'-1 GUIDE ,.. - : : : - - MS-2231-2/6-MS-2231

<,._...--?

/ ' \ ..... ._)LINE 6-MS-2231

{ SEE FIG. B-43 SHT. 1 I ' \__

I ', ->

L...._ 1PS-2 ,,,,,

~ ,,;

v

'

2PL-1 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVJCE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2231, 32-MS-2231 FIGURE: 8-31 SHT. 2 OF 2 REV. 0

  • *
  • LINE 30-MS-2231 SEE FIG. B-31 SHT. LINE 34-MS-2231 SEE FIG. B-39

,.; -\

,.;

£ PENETRATION 3

.........'>

1"

<:.__,, "'--\ R-210

-.. _)LINE 6-MS-2231

( SEE FIG. B-43 SHT.

/ "'\. "--__,..>

l..

-~

v.,,..

~

PA-209 (lPS-3 THRU 12) 1 1/4" PLUG l 23-*SR-10

'

1~ 23-MSLS-17 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAIMNG MAIN STEAM SYSTEM 34-MS-2231, 32-MS-2231 FIGURE: 8-31H SHT. 2 OF 2 REV. 0

  • *

SAPL-1,-2 ~

""j

~ . 1 1/4" PLUG LINE 32-MS-2221 SEE FIG. B-32 SHT. 2 )

0 r . . . . . . .......

~1 1 1/4" PLUG 8

~ /

_..,\1" STEAM GENERATOR NO. 22 I'<'

8LD-I - -8LD-O r-r-.i.

.>./ 22MS4 fy T'--1--.i.

,.>.I

).., ,... *22MS5 1,. "

1 1/4" PLUG

/ 7 P L - 3 THRU 10

/ 7PL-11,-12 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG MAIN STEAM SYSTEM 32-MS-2221, 30-MS-2221 FIGURE: 8-32 SHT. 1 OF 2 REV. 0

  • * *

. / 22-tvlSR-3 (3PR-2) 1 1 /4" 1" PLUG ~

,1.,

'x' 22MS189

~!T\

f 22~MSR-4

~ MSH-202

~ 22-MSR-5 LINE 32-MS-2221 SEE FIG. B-32 SHT. 21 ...................

1PLUG 1/4" ""=ij

"'-

'

,,,\1" STEAM GENERATOR NO. 22 I y /

f"--f--...1

-"/ 22MS4

~ 22-MSR-8

'

I'<"

_,...,

T"--1--.l.

\./ *22MS5 1" \_

1 1/4" PLUG P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'WING MAIN STEAM SYSTEM 32-MS-2221, 30-MS-2221 FIGURE: 8-32H SHT. 1 OF 2 REV. 0

  • * *

) LINE 34-MS-2221

...- "\_SEE FIG. B .....

/

/

/

/

L.

/

-

---"7 I /

I /

I --.._ / LINE 30-MS-2221 L-- --./

SEE FIG. B-32 SHT.

P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'vlilNG MAIN STEAM SYSTEM 34--MS-2221, 32-MS-2221 FIGURE: 8-32 SHT. 2 OF 2 REV. 0

  • * *

) LINE 34-MS-2221

....-"'\_SEE FIG. B-40

.....

/

r 0

(~5~ i THRU 9) r- /"\ PENETRATION 2

/ 1 / \

// I // \.__

/ ~GUIDE ~~?

/

/

/

/

/

LINE 30-MS-2221 SEE FIG. 8-32 SHT.

P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG MAIN STEAM SYSTEM 34-MS-2221, 32-MS-2221 FIGURE: B-32H SHT. 2 OF 2 REV. 0

  • *
  • 1"

.......,,.

<.J.7

'/ 21MS189

.!T':.

I I

2PL-1~

2LD-I - -2LD-O 2 -5LU-I 1 1/4" 32" x 30" 5 EL. 166' PLUG RED. ~5PL-1.-2 1 / 5 P L - 3 THRU 10 STEAM GENERATOR NO. 21 9LD-O- - 9LD-I 1 1/4" PLUG ,,,

10LU-I

) 1"

'

/'<" .....-\..,

.

-r-+-.l.

.,>.j 21MS2

) ,. ......

' ...... 1..,

/Y ......

-r-+-.i.

.,>.j 21MS4 'rJ LINE 32-MS-2211 SEE FIG. 8-33 SHT. 2 P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2211, 30-MS-2211 FIGURE: 8-33 SHT. 1 OF 2 REV. 0

  • *
  • 1" 21-MSR-2 ..___,,........

~ (3PR-1) ~ \~7Z1MS1B9

~, !T\ f.21-MSR-3 I (3PR-2)

I 1 1/4" PLUG 21-MSLS-1 EL. 166' STEAM GENERATOR NO. 21 * .MSH-2~1~ 1 1/4" PLUG

./S-209 21-MSR-5___..,/ 1 1/4" (10PS-1,-2)

PLUG '/ / 21-MSLS-9

) 1"

' ,....\_

I'< / , 1/4"

'C'--f-.:J.

PLUG

..A/ 21MS2

) 1"

' ,....\_

I'<

't"-+-.l.

..A/ 21MS4 'rJ LINE 32-MS-2211 SEE FIG. B-33 SHT. 2 P & JD: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

© INSERVICE INSPECTION DRA\MNG MAIN STEAM SYSTEM 32-MS-2211, 30-MS-2211 FIGURE: 8-33H SHT. 1 OF 2 REV. 0

  • *
  • LINE 30-MS-2211 SEE Fl G. B-33 SHT. 1rl' LINE 34-MS-2211

...-~SEE FIG. 8-41

.....

'

/

? 1((,

/ LINE 6-MS-2211

/

SEE FIG. B-45

<' - - - - - 7

/

I'-'

PENETRATION 1 //

I L-~--....

............ /

'-""

"'-- 32-MS-2211-3./6-MS-2211

/

2LD-0 2PL-1 ~HRU 3/

P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2211. .32-MS-2211 FIGURE: B-33 SHT. 2 OF 2 REV. 0

    • ----- __J
  • *
  • LINE 30-MS-2211 SEE FIG. B-33 SHT. 1r<' LINE 34--MS-2211

,.....:\SEE FIG. 8-41

...... .....

/

1(<_

/ LINE 6-MS-2211 '

/

<------7 SEE FIG. 8-45

/

I'-'

PENETRATION 1 / I

/

L-~--...

' ' /

PA:09//

(1PS-3 THRU 12)

MSG-209 (1PR)

P & ID: 205303 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSEIWICE INSPECTION DRAWING MAIN STEAM SYSTEM 34-MS-2211. 32-MS-2211 FIGURE: B-33H SHT. 2 OF 2 REV. 0

  • *
  • 24-MS15\7 2FB ~3 2

© 24MS13\7 2FB~3 2

24MS11 2FB 3

2 LINE 6-MS-2247 SEE FIG. B-42 LINE 32-MS-224-1 (,,-

,,,

~ 3<-MS-2241

,.34-MS-2241 8-MS-2241 8-MS-2242 8-MS-2243 8-MS-2244 8-MS-2245

. SEE FIG. B-30 SHT. 2 6-MS-2246 P & ID: 205303 NOTE: © LINE 8-MS-2241 SEE FIG. B-26 LINE 8-MS-2244 SEE FIG. 8-26 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 24 MANIFOLD SEE FIG. 8-26( LINE 8-MS-2242 SEE FIG. B-26 LINE 8-MS-2245 SEE FIG. 8-26 SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG

© LINE 8-MS-2243 SEE FIG. B-26 © LINE 6-MS-2246 SEE FIG. 8-26 MAIN STEAM SYSTEM MAIN STEAM RELIEF

+SEE ABOVE FIGURE: 8-38 SHT. 1 OF 1 REV. 0

  • * *

©

24MS15V x 24~1510 2FB __6_

© 24MS13.z 2FB=

' ~ 1"1SS-224 MSH-224T MSSN-24 24MS146) (3PR) 2FB_

© 24MS11 2FB=

z 24MS12&

\ MSS-220 (2PS-3,-4) 2FB =

LINE 5-MS-224 7 SEE FIG. 8-42

\ MSS-216 (2PS-1,-2)

>1<34-MS-2241 34-MS-2241 8-MS-2241

.,,, 8-MS-2242 8-MS-2243 LINE 32-MS-2241 SEE FIG. B-30 SHT. 2 t"" 8-MS-2244 8-MS-2245 6-MS-2246 P & ID: 205303 NOTE: © LINE 8-MS-2241 SEE FIG. B- 26 LINE 8-MS-2244 SEE FIG. B-26 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 24 MANIFOLD SEE FIG. B-26. LINE 8-MS-2242 SEE FIG. 8-26 Ll\\IE 8-MS-2245 SEE FIG. B-26 SALEM UNIT 2 INSERVICE INSPECTION DRA~NG

© LINE 8-MS-2243 SEE FIG. 8-26

© LINE 6-MS-2246 SEE FIG. B-26 MAIN STEAM SYSTEM MAIN STEAM RELIEF

  • SEE ABOVE FIGURE: B-38H SHT. 1 OF 1 REV. 0
  • * *

© 23MS10 23MS9

© 2 23MS14 V 2FB ~3

2 23MS13A(1 2FB1*.3

© 2 23Ms12V 2FB~3 0 I 2 ~

LINE 6-MS-2237 SEE. FIG. B-42

  • 34-MS-2231 8-MS-2231 8-MS-2232

'V,,,.,,,."' 8-MS-2233 8-MS-2234 LINE 32-MS-2231 \_

8-MS-2235 SEE FIG. 8-31 SHT. 2 6-MS-2236 P & ID: 205303 NOTE:

0 LINE 8-MS-2231 SEE FIG. B-27 LINE 8-MS-2234 SEE FIG. 8-27 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO.

23 MANIFOLD SEE FIG. B-27.

LINE 8-MS-2232 SEE FIG. B-27 LINE 8-MS-2235 SEE FIG. 8-27 SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG LINE 8-MS-2233 SEE FIG. B-27

© LINE 6-MS-2236 SEE FIG. 8-27 MAIN STEAM SYSTEM MAIN STEAM RELIEF

¥SEE ABOVE FIGURE: 8-39 SHT. 1 OF 1 REV. 0

  • * *

© 23MS10 f 23MS9 z

23MS15~ *

© 2FB-=-

~ MSS-223 23MS14z 2FB=

MSH-223T MSSN-23 23MS136J (4PR) 2FB=

© 23MS12z 2FB=

© I 23MS118

~

ZFB= LIN~-MS-2237 SEE FIG. B-42 MSS-219 (3PS-3,-4)

~ MSS-215 (3PS-1,-2)

><34-MS-2231 8-MS-2231 8-MS-2232

/

\,,;,,,.,,,. 8-MS-2233 8-MS-2234 LINE 32-MS-2231 \.._ 8-MS-2235 SEE FIG. 8-31 SHT. 2 6-MS-2236 P & ID: 205303 NOTE:

LINE 8-MS-2231 SEE FIG. B-27 LINE 8-MS-2234 SEE FIG. B- 27 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO.

23 MANIFOLD SEE FIG. B-27.

© LINE 8-MS-2232 SEE FIG. B-27 LINE B-MS-2235 SEE FIG. 8-27 SALEM UNIT 2 INSERVICE INSPECTION DRAV11NG .

LINE 8-MS-2233 SEE FIG. B-27

© LINE 6-MS-2236 SEE FIG. 8-27 MAIN STEAM SYSTEM MAIN STEAM RELIEF

  • SEE ABOVE FIGURE: 8-39H SHT. 1 OF 1 REV. 0
  • * *

©

22MS15V 2FB ~3 2

© 22MS13V ~

2FB ~3 2 22MS14 ,,ci 2FB £~3 2

22MS11 V I*

2FB~3 ~

LINE 6-MS-2227 2 22M S1 2 Jci SEE FIG. B-42 2FB ~3 2

1

~ 34-MS-2221

>t<34-MS-2221 8-MS-2221 8-MS-2222

)... ............ 8-MS-2223 LINE 32-MS-2221 , \_ 8-MS-2224-SEE FIG. 8-32 SHT. 2 8-MS-2225 6-MS-2226 P & ID: 205303 NOTE: ISOMETRIC: MS-2-3 FOR ENLARGED DETAIL OF NO. 22 © LINE 8-MS-2221 SEE FIG. B-28 LINE 8-MS-2224 SEE FIG. 8-28 MANIFOLD SEE FIG. B-28. PUBLIC SERVICE ELECTRIC & GAS LINE 8-MS-2222 SEE FIG. 8-28 LINE 8-MS-2225 SEE FIG. 8-28 SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG

© LINE 8-MS-2223 SEE FIG. 8-28

© LINE 6-MS-'2226 SEE FIG. 8-28 MAIN STEAM SYSTEM MAIN STEAM RELIEF

+SEE ABOVE FIGURE: 8-40 SHT. 1 OF 1 REV. 0

  • * *

©

22MS15 V 2F8 _,6._

© ~ MSS-222 22MS13z 2FB=

MSH-222T MSSN-22 22MS14Lfl (3PR) 2FB=

22MS11 2FB=

z 22MS12Lfl

~

I NE 6-MS-2227 EE FIG. B-42.

2F8 =

\ MSS-218 (2PS-1,-2)

>t<34-MS-2221 8-MS-2221 8-MS-2222

)... .......... 8-MS-2223 LINE 32-MS-2221 , \. 8-MS-2224-SEE FIG. 8-32 SHT. 2 8-MS-2225 6-MS-2226 P & ID: 205303 NOTE: ISOMETRIC: MS-2-3 FOR ENLARGED DETAIL OF NO. 22 © LINE 8-MS-2221 SEE flG. B-25 LINE 8-MS-2224 SEE FIG. 8-28 MANIFOLD SEE FIG. 8-28. PUBLIC SERVICE ELECTRIC & GAS LINE 8-MS-2222 SEE FIG. 8-28 LINE 8-MS-2225 SEE FIG. 8-28 SALEM UNIT 2 INSERVICE INSPECTION DRA\IVlNG

© LINE 8-MS-2223 SEE FIG. 8-28

© LINE 6-MS-2226 SEE FIG. 8-28 MAIN STEAM SYSTEM MAIN STEAM RELIEF

  • SEE ABOVE FIGURE: 8-40H SHT. 1 OF 1 REV. 0
  • *

© 21MS10 21MS9

21MS15 ,ci.3

~

CD 2 2F8 2

21MS14\J 2F8 ~3 2

21MS12 \J 2FB ~3 I 2 ~

LINE 6-MS-2217 SEE FIG. 8-4-2

  • .34-MS-2211

~

8-MS-2211 8-MS-2212

/

,; 8-MS-221.3 LINE 32-MS-2211 '\,./ 34-*S-2211 8-MS-2214-SEE FIG. B-33 SHT. 2 \_ 8-MS-2215 6-MS-2216 P & ID: 20530.3 NOTE: 0 LINE 8-MS-2211 SEE FIG. B-29 LINE 8-MS-2214 SEE FIG. 8- 29 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 21 MANIFOLD SEE FIG. B-29. © LINE 8-MS-2212 SEE FIG. B-29 LINE B-MS-2215 SEE FIG. 8-29 SALEM UNIT 2 INSERVICE INSPECTION DRAWING LINE 8-MS-2213 SEE FIG. B-29

© LINE 6-MS-'2216 SEE FIG. 8-29 MAIN STEAM SYSTEM MAIN STEAM RELIEF

+SEE ABOVE FIGURE: 8-4-1 SHT. 1 OF 1 REV. 0

  • *
  • 21MS10 f 21MS9 z

21MS15s 2FB-=-

21MS14 2FB=

z 21MS13s

~ MSS-221 MSH-221T MSSN-21 (3PR) 2FEl =

@

21MS12 2FB=

z 21MS11lf1 I

~

~

2FB= LINE 6-MS-2217 SEE FIG. B-42

/

MSS-217 (2PS-3,-4)

~MSS-213(2PS-1,-2)

  • 34-MS-2211 8-MS-2211 8-MS-2212

,,,."" 8-MS-2213 LINE 32-MS-2211 v"" 8-MS-2214 8-MS-2215 SEE FIG. B-33 SHT. 2 \_

6-MS-2216 P & ID: 205303 NOTE: 0 LINE 8-MS-2211 SEE FIG. B-29 LINE 8-MS-2214 SEE FIG. B- 29 ISOMETRIC: MS-2-3 PUBLIC SERVICE ELECTRIC & GAS FOR ENLARGED DETAIL OF NO. 21 MANIFOLD SEE FIG. 8-29. © LINE 8-MS-2212 SEE FIG. B-29 LINE 8-MS-2215 SEE FIG .. B-29 SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG LINE 8-MS-2213 SEE FIG. B-29

© LINE 6-MS-2216 SEE FIG. B~29 MAIN STEAM SYSTEM MAIN STEAM RELIEF

  • SEE ABOVE FIGURE: B-41H SHT. 1 OF 1 REV. 0
  • *
  • LINE 34-MS-2241 ~ LINE 34-MS-2221 ~

SEE FIG. B-.38 _,,."" SEE FIG. B- 40 _,,""

. (,,,. . . (fl /

~(""

1

~ ~1 < ~1 2 2 LINE 6-MS-2247 LINE 6-MS-2227 LINE 34-MS-2231 ~ LINE 34-MS-2211 ~

SEE FIG. B-39 _,,. _,, SEE FIG. B-41 _,,""

't_,,.,,,.(JI /

~(""

1

~ ~1 < ~

  • 6-MS-2247 6-MS-2237 6-MS-2227 6-MS-2217 2 2 P & ID: 205303 ISOMETRIC: MS-2-3 LINE 6-MS-2237 LINE 6-MS-2217 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAVv1NG MAIN STEAM SYSTEM MAIN STEAM HEADER
  • SEE ABOVE FIGURE: B-42 SHT. 1 OF 1 REV. 0
  • *
  • LINE 32-MS-2231 SEE FIG. B-31 SHT. 2 'i'--

.,_~ry..'Oj;ji

.6Y.,.. ,..,- 1A 7-~y:.--

(_,..,- / * - - - - -............

2 3/4" WELDED CAP P & ID: 205303

/ ISOMETRIC: MS-2-2 LINE 6-MS-2231 \..... _,,

SEE FIG. 8-43 SHT. 2* \. PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43 SHT. 1 OF 2 REV. 0

  • *
  • LINE 32-MS-2231 / 2-MSALS-H12 SEE FIG. B-31 SHT. 2  ?-

~s...-

\\x_JOJd') ...- / 2-MSAH-107

(._. .- J

'2.-;_..,.,... ...- 1-+-+-+-+-----... (3PR)

I 2-MSALS-13 2-MSALS-14 23MS45 I/ 2-MSALS-H11

,.

~

\ ~

',' 23MS191

' .........

,,

LT.l BEND (H.) 2-MSAH-108

'..J 2-MSALS-13 (6PR) 2-MSAH-110 _ / / 2-MSAG-150 (10PR)

/ NO ID

//2-MSALS-8 2-~SALS-H7

{,

.. ..y...-

o/

~

3/4" WELDED CAP 2-MSAA-111

' (14PS)

"'--- 2-MSAG-151 (15PR-1) 2-MSAS-112 P & ID: 205303

/ ISOMETRIC: MS-2-2

' (15PR-2)

LINE 6-MS-2231 \ ../

SEE FIG. B-43 SHT. 2 \. "-2-MSAG-113 PUBLIC SERVICE ELECTRIC & GAS (15PS-1 THRU 8) SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 FIGURE: B-43H SHT. 1 OF 2 REV. 0

  • *
  • BEND (H.)

17PS-1 THRU 8 \

~..._o/ l LINE 6-MS-2231

/ , _..."\._SEE FIG. B-43 SHT.

BEND (H.)

THRU 16 32 6" TEE

~

TO NO. 23 AUXILIARY }.. /

FEED PUMP TURBINE \._...

.

~y

~y FLOOR EL.

P & ID: 205303 ISOMETRIC: MS-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 BEND (V.)

JNSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 6-MS-2231 0 FIGURE: B-43 SHT. 2 OF 2 REV. 0

  • * *

/ 2-MSALS-H6 2-MSALS-H5 / (16PS-1,-2) 2-MSAG-115 ~~ BEND (H.)

(16PS-3,-4) ~""' / 2-MSAS-114

/ (15PR-3)

~\-rJ)Y' ) LINE 6-MS-2231

/ J _,.'\_SEE FIG. B-43 SHT. 1 BEND (H.)

0 ~ 2A-MSASN-154 2-MSALS-54 ~

2-MSALS-5 2A-MSASN-155 & 156~ /

(20PS) (31PR) '-.....

6" TEE

~

-~ 2-MSAS-124 2-MSALS-1 TO NO. 23 AUXILIARY \.. _,. (32PS-1 THRU 4)

FEED PUMP TURBINE \__,.

.

sy

~y

~ 2-MSAS-119 (23PR)

~ 25PS-1 THRU FLOOR EL. 100' ~~* ~~

2A-MSASN-152 - - -

'~

P & ID: 205303 ISOMETRIC: MS-2-2 sy PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

~

BEND (V.)

\ 2-MSAG-123 INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM AUXILIARY MAIN STEAM 0 \ 2A-MSASN-153 6-MS-2231 FIGURE: B-43H SHT. 2 OF 2 REV. 0

  • *
  • FLOW 4

3 21MS45 2

lA

-') LiNE 32-MS-2211

~ ,,- _,. )l SEE FIG. 8-33 SHT. 2

/

11 6" TEE ,,.,,. /.~s'?--

~ ,,. A' ~SI'

<<.-~ \,-1.{'"'s P & ID: 205303 ISOMETRIC: MS-2-2 23 PUBLIC SERVICE ELECTRIC &: GAS 6"TEE~ SALEM UNIT 2 I ,_,..,,.

.../ INSERVICE INSPECTION DRAWING

/

/ MAIN STEAM SYSTEM

_,..LINE 6-MS-2231 AUXILIARY MAIN STEAM SEE FIG. B-43 SHT. 6-MS-2211 FIGURE: B-45 SHT. 1 OF 1 REV. 0

  • *
  • FLOW 5 4 2-MSAH-102~

(8PR-1) 2-MSAS-103 """"'- "

(8PR-2) ""-.... 2-MSAH-101 (5PR) 1A ~ 2-MSALS-12

~ 2-MSALS-H14 .

1

/

,...,...1

,...

LINE 32-MS-2211 SEE FIG. 8-33 SHT. 2 11 6" TEE ,... ,,,(fv~

2-MSALS-H13 \

(13APS-1 THRU 8) ~ ~

,... ..... ,,,"\i'-~I"

,...-J.s 12 ~~'\....""'i' 2-MSALS-11 ~. 6'" CAP 1*

~

. .,jY ,1, r  !;"'

'CJ 15 16 16A

'.' 21MS191 3/4'" CAP "

160 'T*

/ . 2-MSAS-105

/,1MS46 2-MSAS-1D4

.~

17 o/

2-MSALS-H8

/ (21PS-1 THRU 8) 2-MSALS-9

~1 p & ID: 205303 ISOMETRIC: MS-2-2 23 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 6" Tff---............ I ,,,/

~J..,...

,... ,... INSERVICE INSPECTION DRAWING MAIN STEAM SYSTEM

~ SEE FIG. 8-43 SHT. 1 6-MS-2211 FIGURE: B-45H SHT. 1 OF 1 REV. 0

  • *
  • 3/4"

~

I WELDOLET CAP LINE 6-PR-2204 '\V lPS-1 THRU 4 SEE FIG. B-50 /

~

I l_ r 12-PR-2201 /6-PR-2204 LINE 6-PR-22~' ..... ,

SEE FIG. B-51 *~

I/,, 12-PR-2201/6-PR-2201

_,.."-..._

~ ~~ ,,.. '...J l 1 L/Y _,.. ( LINE 6-PR-2201

'-... V SEE FIG. 8-53

.....

.....

't::~ ,,..-.. .

12-PR-2201/6-PR-2203 --------. VY'

.*V '...J

( LINE 6-PR-2205 ii. SEE FIG. B-49

_/ 2 12-PR-2201 /6-PR-2205 EL. 130' I \

r---llf-=1

  • 3 P &: ID: 205301 tt 3A ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS

..... SALEM UNIT 2

(LINE 12-PR-2201 SEE FIG. B-46 SHT. 2 INSERVICE INSPECTION DRA'MNG REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: B-46 SHT. 1 OF 2 REV. 0

  • *
  • 3/4"

~

I WELDOLET CAP

- - - - - PRG-66 m

-- ') 3/4" t::Y- ~'

LINE 6-PR-2204 SEE FIG. B-50 m

'I'-'

I ~ 2-PRG-1B l.__ 12-PR-2201 /6-PR-2204 LINE 6-PR-22~' ..... , I 12-PR-2201/6-PR-2201 SEE FIG.~ 'C:: I . . . . . . . . - . . . . . ..J l

. ',

t::Y _. . ( LINE 6-PR-2201 SEE FIG. 8-53

...........

't::: ..-.. .

l:Y',..... '"(LINE 6-PR-2205 SEE FIG. B-49 I0~2C-PRA-224 EL. 130' /- \ (2PS-1,-2)

L___] ~

P &: ID: 205301 ISOMETRIC: RC-2-3

..... PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

(LINE 12-PR-2201 SEE FIG. 8-46 SHT. 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: 8-46H SHT. 1 OF 2 REV. 0

  • *
  • _)

LINE 12-PR-2201 SEE FIG. B-46 SHT. NO. 2 PRESSURIZER RELIEF TANK Ct. "f-' 13

~'n*I BEND (V.)

~ 3B 3C 3D' 3E 4-.1n~

~*

~1 12 11 7

8 BEND (H.)

C-\

v P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201 FIGURE: B-46 SHT. 2 OF 2 REV. 0

  • *

/

LINE 12-PR-2201 SEE FIG. B-46 SHT. 1 4.

~I

'l'-'

NO. 2 PRESSURIZER RELIEF TANK L-112 (14PR-1)

/

/ 2C-PRSN-405 & 405A BEND (V.)

~In~

~1

- - - - - - - 2C-PRSN-406 & 406A 2C-PRS-109

~* (12PR-1)

/ 2C-PRSN-400 " - - - 2C-PRS-108 (llPR-1)

/ 2C-PRSN-401

" - - - 2C-PRS-107 (lOPR-2)

BEND (V.)

.....____ ~ 2C-PRS-106

"'-- (lOPR-1) 2C-PRSN-402 _ . . // """ 2C-PRS-105

~ (9PR-2) 2C-PRH-101 _ /

2C-PRA-104 (SPR)

\END (H.)

~

v \

.

2C-PRS-102 (7PR) 2C-PRS-103 (8PR) P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 12-PR-2201


*----===============-----=-------,---------------L.:.F:IG=U~R:E:~B--_:46:H~SH~T~._:2:._:0~F~2:._::R:EV:*~O:_j

  • *
  • CLASS 2 FLOW..-~

~

2PR3 2 T

I

,.-..t__,

LINE 6-PR-1203 SEE FIG. A-19 3

LINE 12-PR-2201 SEE FIG. B-46 SHT. 1 I I

---1.__, 6 5

BEND P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM CONTAINMENT PRESSURIZER RELIEF 6-PR-2205 FIGURE: 8-49 SHT. 1 OF 1 REV. 0

  • *
  • PLATFORM EL. 151'

_,/'

2-PRG-51 _ , / '

2-PRG-1 (2PR) 2-PRSN-2

~~(4PR-1) 2C-PRH-212 2-PRSN-50

~

2-PRSN-49

'I'-' ~ ~ 2-PRSN-4B

/

~~~ ~t ~2-PRSN-J C~P:!i)-213 PR

-2201 N 43 _,/'

2-PRG-42 / ~

2-PRS 2-

.//

'l /t-/t--c-r-:

'-...._/_/-i::.+-

-~~:~~:.

B-4' SHT. 1: END 9

--l_. 2-PRSN-4 ./

& ID* 205301 p . RC-2-3 ISOMETRIC:

2-PRSN-46RSN-47 2-P ------.=--::E~LECTRIC & GAS PUBLIC S~RA~~~ UNIT 2_ __

PECTION DRA'MNG INSEE~~i5tg00LAN~

R NT PRESSU 1 i~~T~~LIEF CONTAINME 6-PR-22050F 1 REV. 0 FIGURE: B-49H SHT. 1

  • *
  • 2 2PR4 LINE 6-PR-1204 _) I SEE FIG. A-18 ( ' , I

'I PLATFORM EL. 151' BENO BENO~-------

5 6

45" (V.)

LINE 12-PR-2201 P & ID: 205301 I SEE FIG. B-46 SHT. ISOMETRIC: RC-2-3 I


L., PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2204 FIGURE: B-50 SHT. 1 OF 1 REV. 0

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.l..__ _ _ _ _ _ _ _ _ _ _ _ _ _ __,

---**----*--****-------------*--------*

  • *
  • 2-CPRA-146A ~ yJY CLASS 2

~

2-PRSN-8 \

PLATFORM EL. 151' 2-PRSN-37 " " '

2-PRG-9 ~ ""'

2-PRSN-36 ~ "' BENDD_ _-i::\-__....18--t=t~

~2C-PRH-211 (2PR)

~ 2-PRSN-10 2-PRSN-35 /

45" (V.)

LINE 12-PR-2201 P & ID: 205301 I SEE FIG. 8-46 SHT. ISOMETRIC: RC-2-3 I

---l_, PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2204 FIGURE: B-50H SHT. I OF I REV. 0

  • *
  • CLASS 2 CLASS 1

-.

I

--- ---

_J LINE 6-PR-1205 SEE FIG. A-17 3

_6PS~

9 10 P & ID: 205301 0~ 11 ISOMETRIC: RC-2-3

~5* (V.)

PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 LINE 12-PR-2201 INSERVICE INSPECTION DRAWING I SEE FIG. B-46 SHT. 1 REACTOR COOLANT SYSTEM I PRESSURIZER RELIEF

..--G 6-PR-2203 FIGURE: B-51 SHT. 1 OF 1 REV. 0

  • *
  • E:;_

~!<:

~*

2-PRG-26 ~

CLASS 2 2_:PRSN-25~ /CLAsS1 2PR5

-,-

_ _ _ _ _ J1 LINE 6-PR-1205 )_ __

SEE FIG. A-17 (

2-PRG-27 ~

2-PRSN-28~

PT-5_/

2-PRG-29 J

2-PRSN-32

~ ~

~PT-6 2-PRSN-33

\

PT-7~ 2-PRG-30

~ 2C-PRH-210 (7PR)

P & ID: 205301 0: ISOMETRIC: RC-2-3

.

45 (V.) PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 2-PRSN-34 /

LINE 12-PR-2201 INSERVICE INSPECTION DRA'MNG I SEE FIG. 8-46 SHT. 1 REACTOR COOLANT SYSTEM I . PRESSURIZER RELIEF


L, 6-PR-2203 FIGURE: 8-51 H SHT. 1 OF 1 REV. 0

  • *
  • CLASS 2 LINE 3-PR-1207 )_

SEE FIG. A-24 [ -

~

- -1>4- - -1 2PR1 I I

3" x 6"

~RED.

f - \PLATFORM EL. 151' I I. .I I 05 P & ID: 205301 ISOMETRIC: RC-2-3 EL. 143' PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 LINE 6-PR-2201 SEE FIG. B-53 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2202 FIGURE: 8-52 SHT. 1 OF 1 REV. 0

  • *
  • CLASS 2 LINE 3-PR-1207 SEE FIG. A-24 t ~-t><J- -

- - -

2PR1

-1 I

I 3" x 6"

~RED..

/ ""'\PLATFORM EL. 151' I 1 I__]

2-PRSN-65 2-PRSN-64

/PT-12

/ ~

~L_~~~~=~~~-13;:::'.~~--1:::8--~~~~~~..__,~

/

2C-PRH-208 (3PR) j [b/ 2-PRSN-63

,,,,,,,- PT-1 2

~*~

-~~~~~~~~~~---e.r~..-/"

- - - - PRSN-62

~1 rn P & ID: 205301

/ 6" TEE ISOMETRIC: RC-2-3 EL. 143'

(---- ---1 LINE 6-PR-2201 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 SEE FIG. 8-53 INSERVICE INSPECTION DRA\MNG REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2202 FIGURE: B-52H SHT. 1 OF 1 REV. 0 1.:i ~ : .*.~:..:i ::'.., *.

  • *
  • CLASS *1 CLASS 21 i ----{>:::}-----_)LINE 3-PR-1206 2

PR 2

\ SEE FIG. A-20 3

SA 58 LINE 6-PR-2202 SEE FIG. 8-52 I'-' 6 6" TEE I LINE 12-PR-2201 SEE FIG. 8-46 SHT. 1 I

I 12 11 \! 9 I 45' (H.) 10 P & ID: 205301

\ 45* (H.: ISOMETRIC: RC-2-3

..--L PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 9Ps-1 n-rnu 3 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM PRESSURIZER RELIEF 6-PR-2201, 3-PR-2201 FIGURE: 8-53 SHT. 1 OF 1 REV. 0

  • * . I
  • CLASS1 I

---1><}-------( LINE 3-PR-1206 SEE FIG. A-20 Ir 2PR2

.

PLATFORM EL 151' 2-PRSN-17 J ~2C-PRH-207 LINE 6-PR-2202 SEE FIG. 8- 52 2 2 LINE 1 -~~4i ~~T.

SEE FIG.

1 I 2-PRSN-57 2-PRSN-55 ~/ ----t==t------e:J--~45* (H.) -PRSN-59 I

...--L.,.

2-PRSN-56 45' (H.) j PT-14 2

p & ID: 20530~3 ISOMETRIC: RC-2 ELECTRIC & GAS I 2C-PRH-214 2-PRSN-58 PUBLIC S~A~~~ UNIT 2 (1 OPR)

CT/ON DRAWING INSERVICE INSPgLANT SYSTEM REACTOR u~?zrn RELIEF PRESS PR-2201 6-PR-2201, 3-1 OF 1 REV. 0 FIGURE: 8-53H SHT.

  • * *

) LINE 14-RH-2214 14" TEE ~,......,......,......,...... "'\. SEE FIG. B-55

......

j

......

......

LINE 14-RH-2212 SEE FIG. 8-56 t,...... ~

....

-'

---~

y--

5 LINE 14-SJ-2224 SEE FIG.

22RH8 ,

.,,,.' ,, P & ID: 205332

...... v ISOMETRIC: RH-2-2 LINE 8-RH-2226 ( /

SEE FIG. 8-61 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2224 FIGURE: 8-54 SHT. 1 OF 1 REV. 0

  • * *

. ) LINE 14-RH-2214 14" TEE ~ _,.. _,.. _,..-'\ SEE 'FIG. 8-55

......

......

j

......

......

LINE 14-RH-2212 SEE FIG. B-56

'c_,.. E;

....

_J

---~

)P 2-RHRH-22-5 ~ 22RH4 (4PR) ""

LINE 14-SJ-222 4 SEE FIG. 8-65 r<, 3/4" I'-'

'

3/4" I'-'

I I

~~-/11PS-1 THRU 4 I

l.__'Y\ 2RH78 ~

  • - . ,:,:_ ';)

22RH8, P & ID: 205332

......

'

.

,A I I

ISOMETRIC: RH-2-2 LINE 8-RH-2226 SEE FIG. 8-61 t_,.. PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2224 FIGURE: B-54H SHT. 1 OF 1 REV. 0

  • *
  • LINE 14-SJ-2214~ 3/4" SEE FIG. 8-65 'f--

......

...... ,1,

\/

,\21RH30

'f /\

.... .... .... I LINE 14-RH-2212 \"" I SEE FIG. 8-56 I

)

/'¥""/ 6 LINE 14-RH-2224 SEE FIG. 8-54 t _..;./;;RH4 45* (V.)

' '

9 *>

_j-:>

45* (H.) '(_.J 2RH77 Tt-jRU 4 I

' I '

.>. I

_..

  • 22RH8 LINE 8-RH-2216\""

SEE FIG. 8-63 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2214 FIGURE: 8-55 SHT. 1 OF 1 REV. 0

'------------*-------------------------------------------------...1.-.---------------1

  • *
  • 2-RHRH-21-6 ~

LINE 14-SJ-2214~ 3/4" (lPR) ""' SEE FIG. B-65 '/-----

......

' ' ,1,

\/

,\21RH30

'(

/

/

/ I LINE 14-RH-2212 t:._,, I I

SEE FIG. B-56

)

/'¥"'/

'f'-+-.i.

LINE 14-RH-2224 SEE FIG. B-54 t _,,*'"-' 22RH4 45* (V.)

2-RHRH-21-7 _ /

45* (H.)

I

' I '

,A/

_,, v 22RH8 LINE 8-RH-2216 t:._,,

SEE FIG. B-63 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 14-RH-2214 FIGURE: B-55H SHT. 1 OF 1 REV. 0

  • *
  • 6 5 f -.,\ 2RH64 I L-'\-;,_f *

~1

~LUGSNO

&If--( 3" 4A

/j'

<.- '/

I l-...._

8PS-1 --......,.-'

/

-..

~8PS-2

_,-' 1 1/2"

'/--"

ID.

I CLASS 2 CLASS 11,-::{_1 ~~2.-.,-,~

LINE 14-RH-1211 L-SEE FIG. A-61 ( 2RH2 1(!' , I 13  :.'_\_, I 2RH63 \"- ...J 14 16 THIS SECTION OF PIPING 23 LOCATED IN PIPE CHASE.

) LINE 14-RH-2214

_, "\._ SEE Fl G. 8-55

~,/

24 1" - - 14" TEE 29 I I P & ID: 205332

,.-.l_, ISOMETRIC: RH-2-2, RH-2-3 LINE 14-RH-2224 SEE FIG. 8-54 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

, 2SJ70

_...,_,,

\ .... ...._J INSERVICE INSPECTION DRAWING 14" x RESIDUAL HEAT REMOVAL SYSTEM RED. ( LINE 12-SJ-2269 14-RH-2212 SEE FIG. 8-67 FIGURE: B-56 SHT. 1 OF 1 REV. 0

  • * *

~ 2C-21-RHS-8

/ r-. (6PR)

[' .....

I I~\,.~~H64

\ ,,_..)

~1

  • ( 3/4_,,.7

_.., ~ _.., j PENETRATION NO. 9

/

t. .....

/

/

>

<.,.1 /

I 1 1/2"

~1~-r 3" L-...._ .......,.,.., _.., ~

i'l; I

~

-,--

J 2P-21-RHH-10 2RH49\'

(11PR-1) /\

'T, I CLASS 2

/ /2P-21-RHH-11

/ (11PR-2) CLASS 11

~ 2P-21-RHG-12 LINE 14-RH-1211L-SEE FIG. A-61 ( 2RH2 2C-21-RHH- 7 1) (2PR)

, ..,., I L--lt--7 I 2RH63 \'-- ..J 2-RHRH-22-36 ~

(20PR) ""'

THIS SECTION OF PIPING LOCATED IN PIPE CHASE.

\ 2-RHRA-22-31 ------.._,,--_...._ _

l 2-RHRH-22-46

~~*~~ EL. 65'

-RHRH-21-5 l LINE 14-RH-2214 (19PR) 8PR) _..,'\_SEE FIG. 8-55

~//

\ I'-...._ 14" TEE .

I r--------------1 I P & ID: 205332

.---l_, ISOMETRIC: RH-2-2, RH-2-3 LINE 14-RH-2224 SEE FIG. 8-54 PUBLIC SERVICE ELECTRIC & GAS

.~ SALEM UNIT 2 o/ , 2SJ70

-.Irr--,

14"X12"~ '."- ....... ...) INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM RED. ( LINE 12-SJ-2269 14-RH-2212 SEE FIG. 8-67 FIGURE: 8-56H SHT. 1 OF 1 REV. 0


. ----------.. -----. --------------*----------'----------------1

  • *
  • 3

~1 5 ~**

~~

2RH20

) LINE 8-RH-2216

,,,. \_SEE FIG. 8-63

\-'j

,,,"'v LINE 12-RH-2252("" '\_

2y 1~,.~ SEE FIG. B-68 "'--- 12" X 8" I~'. RED.

A., "

...

,,,. ..... .....

LINE 8-RH-2273 SEE FIG. 8-59 t"" 'y LINE 8-RH-2273 SEE FIG. 8-59 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2274 FIGURE: B-58 SHT. 1 OF 1 REV. 0

  • -----'------*---*--------'
  • *
  • 2-RHRH-21-23 (4PR)

/

~. ) LINE 8-RH-2216 2RH20 W~ \/...-\._SEE FIG. B-63

'>..-v LINE 12-RH-225;c: ...- "\.

A.fY SEE FIG. B-68 "'--- 12" X 8" Y RED.

LINE 8-RH-2273 SEE FIG. B-59 t...- ..... 'y LINE 8-RH-2273 SEE FIG. B-59 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2274

\ FIGURE: B-58H SHT. 1 OF 1 REV. 0

..... ****-**------'

  • LINE 8-RH-2216 21RH10,*V"'

,,.,

or-+-~

~ SEE FIG. B-63

/ v 21RH14 ,*Y'""' LINE 8-RH-2274

\,. ;..-,+-* _,,~SEE FIG. 8-58 3/4" LINE 8-RH-2216 \. * /

r---

SEE FIG. 8-63 / 1 12

/I I 7

6 LINE 8-RH-2226 )

~

LINE 8-RH-2226 SEE FIG. 8-61 (', , SEE FIG. B-61

"'r\

L-"r-.,

Iv' 22RH14 \...._ _,,.J.7izRH10 1

P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2273 FIGURE: 8-59 SHT. 1 OF 1 REV. 0

  • *
  • LINE 8-RH-2216 21RH10/.,...-

>_ SEE FIG. B-63

/

,,..,

,..-+-""

v 21RH14 /.,,.,,.,. LINE 8-RH-2274

\.... ;;.-,+-* _,.,..:{_SEE FIG. 8-58 3/4"'

LINE 8-RH-2216 \.. * /

I--'

SEE FIG. B-63 / I 2-RHRH-21-24 /

(14PR)

LINE 8-RH-2226 ) LINE

,, .,,,. ~SEE 8-RH-2226 SEE FIG. B-61 ("....._ FIG. B-61

'y\

&.-~-,.

22RH14 '*"- _,...>.ti2RH10

~2-RHRH-22-21 P & ID: 205332 ISOMETRIC: RH-2-2 (3PR-1)

PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2273 FIGURE: B-59H SHT. 1 OF 1 REV. 0

  • *
  • TO REFUELING STORAGE TANK

'!'---'

I EL. 55' 7

6

/) (J I'

j LINE 12-RH-2252

(',SEE FIG. B-68 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2253 FIGURE: B-60 SHT. 1 OF 1 REV. 0

  • *
  • TO REFUELING STORAGE TANK r--

1 2-RHRA-22-25 /

(3PS-1 THRU 9) j LINE 12-RH-2252

(',SEE Fl,G. B-68 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2253 FIGURE: B-60H SHT. 1 OF 1 REV. 0


****- ----------------------------------------------------1..----------------'

  • *
  • 14" x 8" RED. ~

31

" " 22 21 / /

RESIDUAL HEAT LINE 8-RH-2225 C.""30 LINE 8-SJ-'2262 ( " "

EXCHANGER SEE FIG. 8- 74 SEE FIG. B-70 NO. 22 39 20 29 LINE 12-RH-2252 )

SEE FIG. B-68 ,,,-'\.

40

"("" 45 44

/

) LINE 14-RH-2224

_,,,"\.._ SEE FIG. 8-54 v o,1' 3/4"

~ 22RH8 I

P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS

....,,.'

SALEM UNIT- 2

' '--~-..,

22RH12 '-"', INSERVICE INSPECTION DRAWING YLINE 8-RH-2273 RESIDUAL HEAT* REMOVAL SYSTEM SEE FIG. B-59 8-RH-2226 FIGURE: 8-61 SHT. 1 OF 1 REV. 0

-**------**--*--**"-----------------__,..._:_----------------.....J.------------~

  • *
  • 22R~ /(37PR) 2-RHRH-22-16 RESIDUAL HEAT EXCHANGER LINE 8-RH-2225 SEE FIG. 8- 74 C./ /0 LINE 8-SJ-2262 SEE FIG. 8- 70 r/ /

NO. 22

~ 8" x 14" LINE 12-RH-2252 )

RED.

I SEE FIG. B-68 /"'\.

2-RHRH-22-11 ~

(15PR) 3/4"

/

~2-RHRS-22-45 (40PS-1 THRU 4)

) LINE 14-RH-2224 o,1'

/

/"'\_SEE FIG. 8-54 ¥ 3/4" r---

1

~ 2-RHRH-22-7 P & ID: 205332 (2PR-1)

~ ISOMETRIC: RH-2-2 22RH10 2-RHRG-22-7 PUBLIC SERVICE ELECTRIC & GAS

......

......\

(2PR-2)

SALEM UNIT 2 22RH~2'\~.i:._, INSERVICE INSPECTION DRA'MNG rJLINE 8-RH-2273 RESIDUAL HEAT REMOVAL SYSTEM SEE FIG. B-59 8-RH-2226 FIGURE: B-61H SHT. 1 OF 1 REV. 0

  • *
  • 27 21RH44 /y-

/  :\... :,,.-,....-*

19 LINE 8-RH-221;c_.,,,.

SEE FIG. 8- 75 26 0 3/4' \_ v I 29 RESIDUAL HEAT ~

EXCHANGER I-' 3" NO. 21 LINE 8-SJ-2252!

SEE FIG. 8- 72

..... ......

25

) LINE 14-RH-2214

.,,,. ' \ SEE FIG. 8- 55

/

/

Q 12~* 38

~11PL-1.-2 21RH8

. . . ~/4" LINE 8-RH-2274 )

SEE FIG. 8-58 ('-.._,,.,

L-~-7 39?

2RH20 \A......_

.......

/

5 /

'..,.*, 21RH12 L-.Jr-,. LINE 12-RH-2252(.,,,.

'*' SEE FIG. 8-68 8 'rJLINE 8-RH-2273 SEE FIG. 8-59 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2216 FIGURE: B-63 SHT. 1 OF 1 REV. 0

- - - - - - - - - = = - - - - - - - - - - - - - - - - - - - - - - - - 1 . __ _ _ _ _ _ __ 1

  • *
  • 0 21RH44 ,*'<"

/  :\...;:,..-,+-*

LINE 8-RH-221~.,,,.

3/4" \_

  • SEE FIG. 8- 75

[---

~1 LINE 8-SJ-225~

SEE FIG. 8- 72

......

......

\ LINE 14-RH-2214

/"\..SEE FIG. B-55

/

/

21RH8

~

3FB ~

~ \ ~ {2PR-1) 2-RHRH-21-10

-...

  • 21RH12

""!_\_, 2-RHRG-21-10 21RH19~ (39PS-1 2-RHRS-21-44 THRU 4)

\"- (2PR-2)

'rLINE 8-RH-2273 2-RHRH-21-11 / SEE FIG. 8-59 (8PR) P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2216 FIGURE: B-63H SHT. 1 OF 1 REV. 0

  • *
  • 21SJ44 22SJ44 1 1

~

~ 3/4"

~

3/4"

>--i :

~- /.....>I I

/

/ ,..,,.,..,,. I LINE 14-RH-2214

< _..,,.-1 I

"' I PENETRATION I ,..,,.,..,,.

,0 NO. 30 v~

PENETRATION I _..,,.,..,,.

NO. 31 v~ 4-5' (V.)

7 8 'Jtr 45" (V.)

......

......

'r 9 10 '\... ...........

LINE 14--RH-2214 \. LINE 14-RH-2214-SEE FIG. 8-55 SEE FIG. B-55

,.,.. ,.,..

,.,.. ' 'yLINE 14-RH-2224 LINE 14-RH-2224 \ : / SEE FIG. B-54 LINE 14-RH-2224 SEE FIG. 8-54 P & ID: 205334-ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTE~

14-RH-2224 14-RH-2214-FIGURE: 8-65 SHT. 1 OF 1 REV. 0

  • *

/

LINE 14-RH-2214

< _.,.,. .,

/

"' I PENETRA TlON I ..,.,.

NO . .30 v~

-RHRH-21-.3

~

PENETRATION NO. 31 45" (V.} 10PR) 2-RHRH-22-1 J 45* (V.)

~

(4PR) 2-RHRH-21-1 (8PR-1)

~/ LINE 14--RH-2214~(...

/ ..... .....

'(LINE 14-RH-2214-2-RHRH-21-2 SEE FIG. 8-*55 SEE FIG. 8-55 (8PR-2) 2-RHRH-22-3 \

(11PR) 2-RHRH-22-2 /

(9PR}

' ,,,. ,,,.

/

,,,.

2-RHRH-22-4 (14PR)

" 'rJLINE 14-RH-2224 LINE 14-RH-2224-LINE 14-RH-2224 SEE FIG. B-54 t,; SEE flG. B-54 P & ID: 205.334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 14-RH-2224-14-RH-2214 FIGURE: 8-65H SHT. 1 OF 1 REV. 0

  • *
  • LINE 14-RH-2212 LINE 14-RH-2212 ) ~ SEE FIG. B-56 SEE FIG. B-56 ( ' ...._

...... /

...... /

'</

12" x RED.

3PL-1,-2\

P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG SAFETY INJECTION SYSTEM 12-RH-2269 FIGURE: 8-67 SHT. 1 OF 1 REV. 0

______

  • *
  • Lll~E 14-RH-2212 LINE 14-RH-2212 ) ~ SEE FIG. 8-56 SEE FIG. B-56 ('...._

...... /

...... /

'<"'

2SJ70 12" x 14" ~

RED.

A I

T"-+-.;J.

\...*-\I 2sJ1 60 3/4"\.._

P & ID: 205.334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG SAFETY INJECTION SYSTEM 12-RH-2269 FIGURE: B-57H SHT. 1 OF 1 REV. 0

  • * *

..._,\ 2RH47

& . - ..... - , .

. .- .,. .-;>

___ PENETRATION 7 NO. 16

,_ ___ r "

/22PS-1,-2

, FLOOR EL. 78' 41

\"--....._..J (3/4"

..... s 43 2RH26 ,* .

LINE 12-RH-1251\...-...-_...:;/-

SEE FIG. A-62 \_ CLASS 1 CLASS 2 THIS PORTION OF PIPING LOCATED IN 3/4" PIPE CHASE. r---

1 FLOOR EL. 55'

~~*~-x r~f x 8"

~

LINE 8-RH-2216 17~ LINE 8-RH-2274) SEE FIG. 8-63 32

/ \

SEE FIG. 8-58 ('....._

......

~

1 8" x 12" RED.

5PL-1 THRU

} LINE 8-RH-2226

, ,,. \._SEE FIG. 8-61 I .-/-~

!.-,,;.*' 22RH19 P & ID: 205332 ISOMETRIC: RH-2-2, RH-2-3 12" x 12" PUBLIC SERVICE ELECTRIC & GAS RED. TEE SALEM UNIT 2 LINE 8-RH-2253 SEE FIG. 8-60 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 12-RH-2252 FIGURE: B-68 SHT. 1 OF 1 REV. 0

  • *
  • 0

38PS-4

~2-RHRA-22~30 . 'y \

  • 2RH47

'--.lr-7

/ ---

....- , PENETRATION NO. 16

"" - - - 7 2C-23-RHH-1 \ ~* v-....,.....J

\ )._ 38PS-3

~~ 38PS-1,-2 (42PR) \ I (3/4" FLOOR EL. 78 ' / \

~ ---

2RH.2_6/J

'v--- ZP-23-RHG-12

.... / --------- (38PR)

LINE 12-RH6~251 t....-~:S*l 2P-23-RHH-9 SEE FIG. A- CLASS 2 (35PR-2) 2P-23-RHR-10

/(35PR-1)

THIS PORTION OF PIPING LOCATED IN 3/4" PIPE CHASE. °I'--'

I FLOOR EL. 55' 12" x 12" x 8"

/

l RED. TEE 6

~SEE

. LINE 8-RH-221 ZP-23-RHH-11 LINE .8-RH-2274)

FIG. 8-63 (33PR)

/

SEE FIG. 8-5 8 !'-........_

ELBOW" 2RH22 ' \

2-RHRS-22-22~

'-....

~8" x RED.

12" 0

""-2PS 3/4"(- -t>::}-

LINE

~ SEE FIG.

8-RH-2226 8-61

~

I

  • I'<" ""

2 I ;.-lz2RH19

/ -RHRH-22723 f.... v 2-RHRH-22-2 4 p & ID: 20533~H-2-3 (13PR) /I ISOMETRIC: RH-2-2, 12" x 12" x 8" ____,,/' I

--L ......{(-~

.,. PUBLIC SERVICE ELETCTR21 (: & GAS RED. TEE 3 SALEM UNI LINE 8-RH-225 .

SEE FIG. B-60 ON DRAW1NG INSERVICE INSP~i~OVAL SYSTEM RESIDUAL H~;H_

2252 12 SHT. 1 OF 1 REV. 0 .

FIGURE: 8-68H

  • *
  • LINE 6-SJ-1262 SEE FIG. A-67 SHT. 1~ 3/4"

'-.... , 22SJ49 "'i'-2 1/2"

°7_\_, Ir~

/' I

~ 16 CLASS 2 9

FLOOR EL. 55' LINE 8-RH-2226 3/4" SEE FIG. 8-61

!'-" ......

I ............ '(

P & ID: 205.334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAIMNG SAFETY INJECTION SYSTEM B-RH-2262 FIGURE: 8- 70 SHT. 1 OF 1 REV. 0

  • *
  • LINE 6-SJ-1262 SEE FIG. A-67 SHT. 1()' 3/4"

' ' , 22SJ49 '[--2 1/2"

~-\-, I~

~', I CLASS2 /

2P-22-SIH-30 /

(15PR) ~

FLOOR EL. 64' (13PR)

LINE 8-RH-2226 3/4" 2-RHRH-22-8 SEE FIG. B-61 r-' ......

(3PR) 3/4" I ............ '(

\

~

3/4" \

\ \

\ \ 2-RHRH-22-17

\ ....... --..) (1PR) 2FB ~ (

)\ 22SJ46

\.. -+-,

22SJ47'L< v

< I I"" ;>$ ..

2-RHRH-22-19/ 14 (5PR) 114" P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM B-RH-2262 FIGURE: 8- 70H SHT. 1 OF 1 REV. 0 L _ _ _____ -

  • *
  • 2 1/2" ' 3/4"

~

I ~i 3/4"

/!'---'

22 I 21SJ49 I

/ y/\

, ~o,,19A LINE 8-SJ-1252 \..-,,.-CLASS 2 ~

SEE FIG. A-69 SHT. 1 \.. CLASS 1 0

FLOOR EL. 55'

~12 I

..--L 3/4" FLOW 8-RH-2216

~

LINE 3 2 / SEE FIG. B-63

/y

' I '

/',/ 21RH1B

' '!uNE 8-RH-2216 SEE FIG. B-63 P & ID: 205334-ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG SAFETY INJECTION SYSTEM 8-RH-2252 FIGURE: 8- 72 SHT. 1 OF 1 REV. 0

  • * *

~ 2P-21-SIH-18

/ (19PR-1)

/

/

2 1/2" ' 3/4"

~ ~

~i 2P-21-SIH-17 &: 17A

(~P~ ~ I 3/4"

~

I LINE B-SJ-1252

/

).,./CLASS 2 Yr'\

21SJ49 /'

,

SEE FIG. A-69 SHT. 1 t___ , CLASS 1 2-RHRH-21~19 1---rr>-~i--'--'FL~O~O~R'-'='EL~.~5~5~* ( (8PR) 2-RHRH-21-18 2-RHRH-21-20)

~

I 3/4"

/

/

~6FB

/

/r I (5PR}

!'-" 3 I 4"

---r----

I (9PR) 21 SJ4 7 i{ j:, FLOW

-;r }J 21SJ46

-.. ., / ;1X LINE 8-RH-2216

,*... '1J 3/4" \... / SEE FIG. 8-63

' I '

/ / 21RH1B

'

'ruNE B-RH-2216 SEE FIG. 8-63 P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-RH-2252 FIGURE: 8- 72H SHT. 1 OF 1 REV. 0

  • *
  • LINE 8-RH-2225 SEE FIG. B-18 SHT. 2

~

I I

I EL. 84'

!'--'

I LINE 8-RH-2226 1 SEE FIG. B-61 I

..-.L..

13

~THIS PORTION ENCLOSED LINE 8-CV-2201 t,,.

SEE FIG. B-20 SHT. 3 22SJ45 IN RUPTURE SEAL CABINET. P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG RESIDUAL HEAT REMOVAL SYSTEM B-RH-2225 FIGURE: 8-74 SHT. 1 OF 1 REV. 0

  • *
  • LINE 8-RH-2225 SEE FIG. B-18 SHT. 2 f-'

I I

I 2A-RHRG-250 \

(8PR) 2A-RHRG-251\

(9PR)

~

I LINE 8-RH-2226 SEE' FIG. 8-61 I

..-.I._.,

~ 2-RHRH-22-13 (1PR) 22SJ45

~THIS PORTION ENCLOSED IN RUPTURE SEAL CABINET. P & JD: 205334 LINE B-CV-2201 t_.... ISOMETRIC: RH-2-2 SEE FIG. B-20 SHT. 3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 JNSERVICE INSPECTION DRA'MNG RESIDUAL HEAT REMOVAL SYSTEM B-RH-2225 FIGURE: 8- 74H SHT. 1 OF 1 REV. 0

  • * *

/ 12 UNC e-Re-2'"5 )

SEE FIG. B-1 B SHT. *1 ( ' ,

~r 11

'

10 21

,........__,.

I LINE 8-RH-2216 SEE FIG. B-63 I

,-.l._..

'...JUNE 8-SJ-2208

( SEE FIG. B-86 SHT. 3 P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2215 FIGURE: 8- 75 SHT. 1 OF 1 REV. 0

  • *

~

~ ~

I 2A-RHRG-246 (16PR-2) ""

LINE 8-RH-2215 SEE FIG. 8-1 B SHT.

. ~ 2A-SIG-248A

/ (9PR}

---L 3/4"

/ 2-RHRA-24-26 "l'---

1 LINE 8-RH-2216 SEE FIG. B-63

~ '.....)LINE 8-SJ-2208

( SEE FIG. B-86 SHT. 3

~ 2-RHRH-21-21 (2PR)

P & ID: 205332 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING RESIDUAL HEAT REMOVAL SYSTEM 8-RH-2215 FIGURE: 8-75H SHT. 1 OF 1 REV. 0

  • * *
  • ov

~ 6-SJ-2203 1 ~1 LINE 4-SJ-2201'(_ '

SEE FIG. B-80 1A BORON INJECTION TANK NO. 2 4

~1 3

6-SJ-2204 4" x 6" P & ID: 205334

/ ISOMETRIC: RH-2-3

/RED.

1 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 rJ LINE 4-SJ-2212 INSERVICE INSPECTION DRAWING

,

--L.

SEE FIG. 8-84 SHT. 2 SAFETY INJECTION SYSTEM 6-SJ-2203 6-SJ-2204 FIGURE: 8-77 SHT. 1 OF 1 REV. 0

  • *
  • 16 18 15 17 LINE 8-CS-2227 LINE 5-CS-2215 SEE FIG. 8- 79 SHT.

_...\ SEE FIG. B-18 SHT. 1

.....

..........

6 31 30 29 FLOW I

I

""'<.__ P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 TO CS PUMP PUBLIC SERVICE ELECTRIC & GAS 21 23 SALEM UNIT 2 INSERVICE INSPECTION DRA\lilNG CONTAINMENT SPRAY SYSTEM 8-CS-2227 FIGURE: 8- 79 SHT. 1 OF 2 REV. 0

  • *
  • 2-CSG-122 ~ 0 2-CSG-124 ~

2-.CSG-126 ~ "'>..

2-CSG-128 ~

2-CSG-130 ~ "-......

2-CSG-132 ~

2-CSG-134 ~ "-......

2-CSG-136 ~

2-CSG-138 ~

LINE 8-CS-2227 LINE 8-CS-2215 2-CSA-140 ~ SEE FiG. 8-79 SHT.

.,....\ SEE FIG. B-18 SHT. 1

......

............

/ 2P-CSG-311 2-CSG-100 ~ /2-CSA-14-9 2-CSG-102 ~

2-CSS-104 ~ "... /

2-CSG-108

~ ,,,,,,.-- 2-CSG-110

/ / 2-CSH-112 FLOW I

I

""'(_ P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 TO CS PUMP PUBLIC SERVICE ELECTRIC & GAS 21 SALEM UNIT 2

........._,_

'- ~ 2-CSS-116*

~ 2-CSG-118 INSERVICE INSPECTION DRA'MNG

~ 2-CSG-120 CONTAINMENT SPRAY SYSTEM 8-CS-2227 FIGURE: B- 79H SHT. 1 OF 2 REV. 0

  • *

/------ ....

I \

I I I I

....

'

..:::---,

/ /-") PENETRATION NO. 43 3/4"

,.

',' ',

~

~-

/

( 3/4"

,...__,.

I I

PLUG 7 ' ' />_,.......-LUGS L-1 I ' v/ I t_-.... I

'ruNE 8-CS-2227 SEE FIG. 8- 79 SHT.

1" P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-CS-2227 FIGURE: 8- 79 SHT. 2 OF 2 REV. 0

  • *

/


'

I \

I I I I

"' '

'

/-::."') PENETRATION NO. 43 3/4"

~ ', ~ANCHOR I-' ,.

"-'! ~~

ANCHOR

""--,I

')

'\

'

', '.

v/

).

3/4"

---r-.---

I I

I PLUG

'- \. I

......_

'-'""


'ILINE 8-CS-2227 SEE FIG. B- 79 SHT.

1" P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-CS-2227 FIGURE: B- 79H SHT. 2 OF 2 REV. 0

  • *
  • 6" x RED.

3/4" LINE 6-SJ-2203 CAP SEE FIG. B- 77 rri 1 1/4" I

'I---'

I

~ri:/

¥ 5

~J 6 3/4" EL. 84'

'I---' 8 7 I

LINE 4-SJ-1295)

SEE FIG. A-84 ( ' , 2SJ13 CLASS 1 / 17 CLASS 2 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

'~LINE 4-SJ-1293 SEE FIG. A-84 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-2201 FIGURE: 8-80 SHT. 1 OF 1 REV. 0

  • *
  • 6" x RED.

3/4" LINE 6-SJ-2203 CAP SEE FIG. B- 77

'T1 1 1/4" I

'I'---'

I 3/4"

~----~ EL. 84'

'[---'

I 2P-2-SIS-7 ~ ~

0 J

LINE 4-SJ-1295 c;:'

SEE FIG. A-84 ~ ..._ 2SJ13 CLASS 1/

CLASS 2

~ 2P-2-SIS-6 P & ID: 205334

/ CLASS 2 ISOMETRIC: RH-'2-3

/CLASS 1 PUBLIC SERVICE ELECTRIC & GAS

'r LINE 4-SJ-1293 SEE FIG. A-84 SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-2201 FIGURE: B-80H SHT. 1 OF 1 REV. 0

--*-*-***-*---*- .. _ __J__ _ _ _ _ _ _ _ _ _ _ _ _ ___,

  • *
  • 1/4" 0

3/4"

'[----'

I I

3/4" 1---:::}---(3/4" 13/ t 22SJ37

12 8

2 1/2" x NO. 22 SAFETY IN.l:CTION PUMP~i RED.

P & ID: 205334 7 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I

I INSERVlCE INSPECTION DRAWING

..-.L SAFETY INJECTION SYSTEM 1" 4-SJ-2206 2 1/2-SJ-2206 FIGURE:, 8-82 SHT. 1 OF 1 REV. 0

  • * *

/ 2P-21-SIS-20

/ 2P-21-SIG-19

/ 2P-21-SIA-19 3/4"

'!--'

I I

CLASS 2

~

3/4" _,, 22SJ40 r---- /

LINE 4-SJ-2209

,1, LINE 4-SJ-1282 \"" SEE FIG. 8-83

'.' 22SJ38 SEE FIG. A-86 I\

'r*

) r -:-vi-

.~ '* -(3/4" 3/4" II 22SJ37 r----

fj 1 1

3/4" /

3/4" / 2A-SIG-284 2A-SIS-182 ~

2 1/2" x RED.

/ 2A-SIG-181 22SJ34 P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3

/T-181

  • PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 I

I INSERVICE INSPECTION DRA'MNG

---L SAFETY INJECTION SYSTEM 1" 4-SJ-2206 2 1/2-SJ-2206 FIGURE: 8-82H SHT. 1 OF 1 REV. 0

  • *
  • 3/4" LINE 4-SJ-1294 j SEE FIG. A-85 r, ...... [ - ' 1 1/4" I [-' LINE 4-SJ-2206 I SEE FIG. B-82 ,..... .:\_

I I

J

~1

(

LINE 4-SJ-2205 SEE FIG. 8-81 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECm1c & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-2209 FIGURE: 8-83 SHT. 1 OF 1 REV. 0

  • *
  • 3/4" LINE 4-SJ-1294 j SEE FIG. A-85 r-.... ...... [--'

I 1 1/4" LINE 4-SJ-2206

[--'

I SEE FIG. 8-82 ....-.:\..

I I

~1 LINE 4-SJ-2205 SEE FIG. 8-81 P & ID: 205334 ISOMETRIC: RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG SAFETY INJECTION SYSTEM 4-SJ-2209 FIGURE: 8-83H SHT. 1 OF 1 REV. 0


*------*- . . **-. -**-~--------------------.--L..-------------.,...1

  • *
  • LINE 4-SJ-2202 SEE FIG. B-84 SHT. 2 !-....

(

~1 7

~6

'

P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 I

,..

,--l.._.,

/

PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 LINE 4-CV-2257 \-' ~

SEE FIG. 8-88 SHT. 1 \

INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-2202 FIGURE: 8-84 SHT. 1 OF 2 REV. 0

  • * *

'-.._ ~ 2A-SIS-226

..........__ 2A-SIG-225

'-.._ ~ 2A-SIG-224

'< ..........__ 2A-SIG-223

.' ..........__ 2A-SIG-222

'-.._ ~ 2A-SIG-221

..........__ 2A-SIA-220

~ 2A-SIG-219

~ 2A-SIG-218

'-.... ~ 2A-SIG-217 ,,__.

1" LINE 4-SJ-2202

'-.._ ..........__ 2A-SIG-216 SEE FIG. B-84 SHT. I

..........__ 2A-SIG-215 I

'-.... ~ 2A-SIG-214

..........__ 2A-SIG-213

,.

2A-SIH-209 _ _ / t

~

p & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 I

.---.l._.,

PUBLIC SERVICE ELECTRIC &. GAS 1" SALEM UNIT 2

'\. .........

LINE 4-CV-2257 \.

SEE FIG. 8-88 SHT. 1 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-2202 FIGURE: B-84H SHT. 1 OF 2 REV. O

. ----------------~

  • *
  • 4-SJ-2202~

28 29

~1 LINE 6-SJ-2204 BElllD SEE FIG. 8- 77

............

'y LINE 4-SJ-2202 SEE FIG. 8-84 SHT.

I 4-SJ-2212 I

I I

I I

/

4" x 6" ECC. RED.

6 I....

15

......_,

, ..

,.

,......_..

5 I I

(

~

1~/4':r/ j 4-SJ-2212

~v. <oVj P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS 4-SJ-2212 SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-2212 4-SJ-2202 FIGURE: 8-84 SHT. 2 OF 2 REV. 0

  • *
  • 4-SJ-2202 ~

/ 2P-2-SIG-16

~1 LINE 6-SJ-2204 BEND SEE FIG. 8- 77

,....,.___,.

r 1" CAP -

I

~1 I

'y LINE 4-SJ-2202 SEE FIG. 8-84 SHT.

  • -SJ-2212 I I 4" x 6" I.._ / ECC. RED.

/"°" 2P-4-SIS-12 ,..

,....,.___,., .

I~

I 0

P & ID: 205334 ISOMETRIC: RH-2-2, RH-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 4-SJ-2212 4-SJ-2202 FIGURE: B-84H SHT. 2 OF 2 REV. 0

  • * *

/

--- 2PR25 PENETRATION NO. 60 P & ID: 205301 ISOMETRIC: RC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING REACTOR COOLANT SYSTEM 6-RC-2250 FIGURE: B-85 SHT. 1 OF 1 REV. 0

  • *
  • LINE 6-SJ-2208 SEE FIG. 8-86 SHT.

~~*

I 8"

RED.

x ~

4 5 5 6

~1 '

' 'rLINE 6-SJ-2210 SEE FIG. B-86 SHT. 2 4

I

..-.<._...

3/4" NO. 21 SAFETY INJECTION~

PUMP SUCTION x 4" ECC. RED.

P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ-2207, 6-SJ-2207 4-SJ-2207 FIGURE: B-86 SHT. 1 OF 3 REV. 0

  • *
  • LINE 6-SJ-2208 SEE FIG. 8-86 SHT.

0 8" x 6"

~

R E / 2A-SIS-167

~1 3/4(!. ...._

0 2A-SIS-165 ~

2A-SIA-164 CLASS 2 I /

~

3/4"

~SJ30 I '..J NO.

3/4" (

P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG SAFETY INJECTION SYSTEM 8-SJ-2207, 6-SJ-2207 4-SJ-2207 FIGURE: B-86H SHT. 1 OF 3 REV. 0

  • --*-- *-----------'----- - - - - - - - - - - - '
  • *
  • 3/4" 9 8 7

~

I I

,--l_,

3/4-"

LINE 6-SJ-2207 SEE FIG. B-86 SHT.

32 28

.4--SJ-2211 ~J113

\,. ..........

LINE 6-CV-2201 \_ P & ID: 205334-SEE FIG. B-25 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG SAFETY INJECTION SYSTEM 6-SJ-2210 4-SJ-2211, 4-SJ-2210 FIGURE: B-86 SHT. 2 OF 3 REV. 0

  • *

~ 2A-SIS-192 2A-SIG-194 ~ "'-..,.

2A-SIG-195 ~ "'-..,. / / 2A-SIG-191 2A-SIH-190 2A-SIG-196 ~ "'-..,.

I

.----l__,,

2A-SIVE-108, 7 f 3/4"

'!'---'

I 3/4" LINE 6-SJ-2207 SEE FIG. 8-86 SHT. 1 ii 6" x 4" RED. ~

4-SJ-2211 ~J113

\.. ..........

LINE 6-CV-2201 \., P & ID: 205334 SEE FIG. B-25 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 6-SJ-2210 4-SJ-2211, 4-SJ-2210 FIGURE: B-86H SHT. 2 OF 3 REV. 0

  • * *

.....

15 '~LINE 8-SJ-2207 LINE 8~RH-2215 ) SEE FIG. B-86 SHT.

SEE FIG. B-75 (....,,

.....

12 NO. 22 SAFETY INJECTION~

PUMP SUCTION x 4" ECC. RED.

P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM B-SJ-2208, 6-SJ-2208 4-SJ-2208 FIGURE: 8-86 SHT. 3 OF 3 REV. 0 *

  • * *

......

8" x LINE 8-RH-2215 )

RED. 'rJ LINE 8-SJ-2207 SEE FIG. 8-86 SHT.

SEE FIG. B-75 (-....

......


L 3/4" ':} 3/4"

'-.........._.. 2A-SIS-169 NO. 22 SAFETY INJECTION~

PUMP SUCTION ~6"X4" ECC. RED.

P & ID: 205334 ISOMETRIC: RH-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING SAFETY INJECTION SYSTEM 8-SJ- 2208, 6-SJ- 2208 4-SJ-2208 FIGURE: B-86H SHT. 3 OF 3 REV. 0

  • *
  • LINE 3-CV-2258 SEE FIG. B-87 SHT.

/~ 2A-CVCS-428

/

LINE 3-CV-2260 SEE FIG. B-88 SHT. 2

~

I I I ~

I 3/4" I

LINE 3-CV-2257 SEE FIG. B-88 SHT.

~

~1 ! B,,,,E_N_D_ _ _ __.

BEND LINE 3-CV-2259 14 . \ SEE FIG. B-88 SHT.

.... ,,,

>/~

3/4" P & ID: 205328 ISOMETRIC: CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS NO. 23 RECIPROCATING SALEM UNIT 2 CHARGING PUMP INSERVICE INSPECTION DRAWJNG CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2258 FIGURE: 8-87 SHT. 1 OF 2 REV. 0

  • *
  • LINE 3-CV-2258 SEE FIG. B-87 SHT.

/~ 2A-CVCS-428

/

.LINE 3-CV-2260 SEE FIG. 8-88 SHT. 2

~

I

\ .~

LINE 3-CV-2257 SEE FIG. B-88 SHT. 1

~1  ! \_ 3/4" 2A-CVCS-451

'l'-' \ 2A-CVCG-411

~1 !B ~-EN_D

_ _ _ __. ~ 2A-CVCA-454 BEND

~ 2A-CVCS-414

~ 2A-CVCVE-34JA

/ / 2A-CVCH-W3 LINE 3-CV-2259 .

/ 2A-CVCA-404 __...~ SEE FIG. 8-88 SHT.

.....

3/4"

>/~

"I

~; P & ID: 205328 ISOMETRIC: CV-2-2, CV-2-3 2A-CVCG-401

~Q,,,

"Z_............ ~

PUBLIC SERVICE ELECTRIC & GAS NO. 23 RECIPROCATING SALEM UNIT 2 CHARGING PUMP INSERVICE INSPECTION DRAWJNG CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2258

  • FIGURE: 8-87H SHT. 1 OF 2 REV. 0
  • *
  • LINE 2-CV-2257 SHT. 1 SEE FIG. B-97

)!'

52 LINE 3-CV-2255 SEE FIG. B-95 SHT. (!....._

58 42

'45]

~3"X2"

~*

59 RED.

~/

48 47 LINE 2-CV-2213 SEE FIG. B-98 C ' '---- 3" RED.

x 2" 49 34 35 46 36 37 3/4"

['---'

I 38

~J P & ID: 205328 ISOMETRIC: CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

..... INSERVICE INSPECTION DRAWING

...._~INE CHEMICAL & VOLUME CONTROL SYSTEM

. 3-CV-2258 3-CV-2258 FIGURE: B-87 SHT. 2 OF Z REV. 0 SEE FIG. 8-87 SHT.

  • *
  • R- 248950-6 ~

2A-CVCS-514 ~ ~

2A-CVCS-513 ~ ~

t:~

~

2A-CVCG-512 ~ ~ -...

ZA-CVCG-511 ~ ~ '...

,...,,----R-248950-5 ZA-CVCG-510 ~ ~ LINE 3-CV-2251 LINE 2-CV-22547 SEE FIG. B-89 SHT. 1 SEE FIG. B-97/

2A--:CVCG-509 ~ ~

2A-CVCG-508 ~

2A-CV~G-507 ~ ~

~

~

LINE 3-CV-2255 2A-CVCG-506 ~ ~ SEE FIG. B-95 SHT.  ;-<....,

2A-CVCG-505 ~ ~

2A-CVCG-504- ~ ~

2A-CVCG-503 ~ ~

2A-CVCS-502 ~ ~

,... ....

R-24-8950-3 r.JCf_--+-+-----+-+--'

LINE 2-CV-2213 SEE FIG. 8-98 \

~~

R-248950-8 /'-.....,,

2A-CVCG-486 ZA-CVCS-461 ~

~~

l___ 2A-CVCS-445 ~ ~

3/4"

["--" / R-248950-1

~0:

y

/

I 2A-CVCS-440 /

~1 P & ID: 205328 ISOMETRIC: CV-2-2, CV-2-3

/ ~Si~

2A-CVCG-434~ .Q._ \ ~, PUBLIC SERVICE ELECTRIC & GAS

~

SALEM UNIT 2

..... INSERVICE INSPECTION DRAWING

'~INE 3-CV-2258 CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2258 FIGURE: B-B7H SHT. 2 OF 2 REV. 0 SEE FIG. B-87 SHT. 1

  • * *

) LINE 2-CV-2212 LINE 4- SJ- 2202 SEE FIG. B-84 SHT. 1 r<, ......

,,.,\_SEE FIG. 8-102 SHT. 1 LINE 4-CV-2258 SEE FIG. B-88 SHT. 2 2

~1 19 18 ~ii

~ I I

NO. 22 CHARGING

~

3-CV-2257 \

SAFETY INJECTION PUMP 14 4-CV-2257 3/4"

"'f-..-- '-..........._ 4" x*3" 1

~-RED. 20 9 3 10 I 4 3 x 3"

--L 5 RED.

LINE 3-CV-2258 SEE FIG. 8-87 SHT. 1 g / . 3-CV-2259 P & ID: 205328 ISOMETRIC: CV-2-2 LINE 3-CV-2258 PUBLIC SERVICE ELECTRIC & GAS SEE FIG. 8-87 SHT. \-<......_ SALEM UNIT 2

......

.......

INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LINE 3-CV-2258 \...-_.,"" 4-CV-2257 SEE FIG. 8-87 SHT. 1 \-. 3-CV-2259, 3-CV-2257 FIGURE: 8-88 SHT. 1 OF 2 REV. 0

  • *
  • LINE 4-SJ-2202 SEE FIG. 8-84 SHT.

) LINE 2-CV-2212

...- \.SEE FIG. 8-102 SHT.

Ii LINE 4-CV-2258 SEE FIG. 8-88 SHT. 2

~i

{ 2A-cvcs-421 yJY I, / 4-CV-2257 ~.  : ,,I

~ 2A-CVCG-458 L

~

NO. 22 CHARGING 3-CV-2257 \ 2A-CVCG-449 SAFETY INJECTION PUMP 3/4"

~ ~4"'X3" 4-CV-2257

~ 2A-CVCS-410 I ~RED.

°""" ~ 2A-CVCA-453

~ 2A-CVCG-413 I 3"

..-L RED.

LINE 3-CV-2258 SEE FIG. 8-87 SHT.

P & ID: 205328 ISOMETRIC: CV-2-2 LINE 3-CV-2258 SEE FIG. 8-87 SHT. 1!, ......

PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

......

INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM LINE 3-CV-2258 °"V,,,...- 4-CV-2257 SEE FIG. 8-87 SHT. 1 \... 3-CV-2259, 3-CV-2257 FIGURE: 8-88H SHT. 1 OF 2 REV. 0

  • *
  • 4-CV-2258 \

18 19 20 I


L LINE 4-CV-2257

) LINE 2-CV-2218 SEE FIG. B-88 SHT. 1

...-\_SEE FIG. B-101

~1 NO. 21 CHARGING SAFETY INJECTION PUMP 14 3/4"

~ ~4"X3" I

~RED.

9 3 10 4

I

--L ~ 3-CV-2260 LINE 3-CV-2258 P & ID: 205328 SEE FIG. 8-87 SHT.

ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 4-CV-2258 3-CV-2260 FIGURE: B-88 SHT. 2 OF 2 REV. D

  • *
  • 4-CV-2258 \

2A-CVCG-605 ~

I


L LINE 4-CV-2257

) LINE 2-CV-2218 SEE FIG. 8-88 SHT. 1

_.,.'\..SEE FIG. B-101

~i y

" " - - 2A-CVCG-459 NO. 21 CHARGING SAFETY INJECTION PUMP 3/4"

-r-----

1 I

---L LINE 3-CV-2258 2A-CVCS-422A ~ 3 -CV- 2260 SEE FIG. B-87 SHT. P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 4-CV-2258 3-CV-2260 FIGURE: B-88H SHT. 2 OF 2 REV. 0

  • *
  • LINE 3-CV-2251 SEE FIG. B-89 SHT. 2 13 14 3/4"

~

I Cf.

10~

~i 9

~1 6

5 r pr

~~D~

......

3"

) LINE 2-CV-2216

...-\_SEE FIG. 8-100 P & ID: 205328 ISOMETRIC: CV-2-2, CV-2-3

'(1 LINE PUBLIC SERVICE ELECTRIC & GAS LINE 2-~V-2215

,>

SEE FIG. 8-99 t_.... y"<:>¥

...... 3-CV-2258 SEE FIG. B-87 SHT. 2 SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: 8-89 SHT.. 1 OF 2 REV. 0

  • *

2A-CVCS-490 ~

~ ~

~ 2A-CVCG-494 R-248950-20"" ""'

~ 2A-CVCG-492 2A-CVCG-491

.3/4"

--r---

1

~1

~~DX

!

3" .

~1

) LINE 2-CV-2216

....-"\SEE FIG. B-100

......

T P & ID: 205328 ISOMETRIC: CV-2-2, CV-2-.3 PUBLIC SERVICE ELECTRIC & GAS

. . . . . . ,,oY '--;LINE 3-CV-2258 LINE 2-CV-2215 SEE FIG. B-99

'c 7 SEE FIG. B-87 SHT. 2 SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: B-B9H SHT.

  • 1 OF 2 REV. 0
  • *
  • LINE CV-2-2224~

SEE FIG. 8-91

.....

LINE CV-2-2234~

SEE FIG. 8-92

.....

  • 1~"P 21v*

I

~

3/4" P & ID: 205328 ISOMETRIC: CV-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS

\....-// SALEM UNIT 2 LINE 3-CV-2251 I__

SEE FIG. 8-89 SHT. 1 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: 8-89 SHT. 2 OF 2 REV. 0

  • *
  • LINE CV-2-2244 SEE FIG. B-90 ,.!_

LINE CV-2-2224~

'

SEE FIG. B-91

.....

LINE CV-2-2234~ / 2P-CVCG-908 SEE FIG. B-92

..... 2P-CVCG-907

/ *~ 2P-CVCS-906 CJ* /

2A-CVCS-500 ---......____

2A-CVCS-499 ---......____ -..........

2A-CVCG-498 ~ -..........

I 2A-CVCG-496 ~ ~

3/4" P & ID: 205328 ISOMETRIC:. CV.-2-2, CV-2-3 PUBLIC SERVICE ELECTRIC & GAS

\,,// SALEM UNIT 2 LINE 3-CV-2251 \..

SEE FIG. B-89 SHT. 1 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2251 FIGURE: B-89H SHT. 2 OF 2 REV. 0

  • *
  • CLASS 1 r

LINE 2-CV-1243 SEE FIG. A-111 SHT.

I 2" x , ..

RED. INS.

--(1" 2" x 1" 11 L l E D . INS.

26 12 10'-.,\

"--~- ..

24CV98 '"- 9

.,~

7 6 14 LINE 3-CV-2251 SEE FIG. 8-89 SHT. 2 I

...--l_...

P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2244 FIGURE: 8-90 SHT. 1 OF 1 REV. 0

  • *
  • r r LINE 2-CV-1243 CLASS 1 SEE FIG. A-111 SHT.

2" x , ..

RED. INS.

--(1"

'\.<,..,' ..1:1NE 3-CV-2251

~ SEE FIG. B-89 SHT. 2 I

~

P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 IN SERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2244 FIGURE: B-90H SHT. 1 OF 1 REV. 0 L _ _ _ __

-

  • *
  • LINE 2-CV-1223 j SEE FIG. A-112 SHT. 1 ( " ' ,

2" x , ..

Sz::D71NS

\ '- 7 22CV98* .'~ ~

5 6~

10

~* I'-'

I I

LINE 3-CV-2251 SEE FIG.* 8-89 SHT. 2 I

I

---L P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2224 FIGURE: 8-91 SHT. 1 OF 1 REV. 0

  • *
  • LINE 2-CV-1223 j SEE FIG. A-112 SHT. 1 ( ' ,

x z::D7 2" 1" 22CV98 '.'--, ,c-,

............... ~OJr

~ )$'< / 2P-CVCS-937 R-248950-15 LINE 3-CV-2251 SEE FIG. B-89 SHT. 2 I

I

,-L P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2224 FIGURE: 8-91H SHT. 1 OF 1 REV. 0

  • *
  • LINE 2-CV-1232 SEE FIG. A-110 r\'

\

~

CLASS 2 2" x ,.. 11 RED. INS~

8 2" x 1"

~RED71NS I'

I ~ .......

.., \

I 4 - ... - ,


l_, 23CV98 \A........_ ~7 3/4" 6 5

~~

Q

~* I-' P & ID: 205328 ISOMETRIC: CV-2-3 I

I LINE 3-CV-2251 PUBLIC SERVICE ELECTRIC & GAS SEE FIG. 8-89 SHT. 2 SALEM UNIT 2 I

I INSERVICE INSPECTION DRAWING


L- CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2234 FIGURE: B-92 SHT. 1 OF 1 REV. 0

  • *
  • LINE 2-CV-1232 SEE FIG. A-110 r\'

\

~

CLASS 2 2* x 1" RED. INS~

/ANCHOR

---L KGUIDE 1"

.5 PENETRATION

£-7 I

<

.>

26 ~

. 2" x 1" J-----RED71NS l

I',

I '- ' I'\

I "-"",-z ~ 2P-CVCS-940

---L 23CV98 v , /

3/4" ~~ / 2P-CVCS-93S C(

~*~ P & ID: 205328 ISOMETRIC: CV-2-3 I

I I LINE 3-CV-2251 PUBLIC SERVICE ELECTRIC & GAS SEE FIG. 8-89 SHT. 2 SALEM UNIT 2 I

I INSERVICE INSPECTION DRAWING

---L CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2234 FIGURE: B-92H SHT. 1 OF 1 REV. 0

  • * *

/

LINE 2-CV-1213 SEE FIG. A-113 r\'

\

21CV99

~

CLASS 2 2* x 1" 11 RED. INS~

9 8 2" x 1*

~RED7*1NS I*',

I ' *

'(\

I "'--'T-..,

_.--.L 21CV98 '*"- ....._ ~7 3/4" 6 5

~~

P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS LINE 3-CV-2251 SALEM UNIT 2 SEE FIG. 8-89 SHT. 2 I

I INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM

---L 2-CV-2214 FIGURE: B-93 SHT. 1 OF 1 REV. 0

  • *
  • LINE 2-CV-1213 SEE FIG. A-113 ry'

\

21CV99

~

CLASS 2 2" x 1" RED. INS~

/ANCHOR

~

1" KGUIDE

.f

.;e-7  ?

PENETRATION / ..>

26 ~

2'" x 1*

i----RED71NS l

I',

I ' ...,,,

I "-'\--:, / 2P-CVCS-941

--L 21CV98 * '- /

3/4" ~ _,,,,,---- 2P-CVCS-939

~~/

P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS LINE 3-CV-2251 SALEM UNIT 2 SEE FIG. 8-89 SHT. 2 I

I INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM

--L 2-CV-2214 FIGURE: B-93H SHT. 1 OF 1 REV. 0

  • *
  • NO. 2 REGEN. HX.

LINE 2-CV-1275 SEE FIG. A-15 SHT. 1 r<,

x 3" x 2" LINE 3-CV-1231 RED. TEE SEE FIG. A-13 ; . ,

' ., LINE 3-CV-1241

' SEE FIG. A-12 2CV79 8~

CLASS 2 P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2253 2-CV-2253 FIGURE: 8-94 SHT. 1 OF 1 REV. 0

  • *
  • NO. 2 REGEN. HX.

CLASS 1 LINE 2-CV-1275 SEE FIG. A-15 SHT.

I ~*

x 3" x 2" RED. TEE LINE 3-CV-1231 SEE FIG. A-13 !-.... ......

...... LINE 3-CV-1241

' SEE FIG. A-12

/ \

/

~

CLASS 2 2C-CVCS-505 _ /

P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2253 2-CV-2253 FIGURE: B-94H SHT. 1 OF 1 REV. 0

  • *
  • TO NO. 2 REGEN. HX. r'-..._

3/4" )

(',

3/4'{<,

~o~'

~.....

.'rJ LINE 3-CV-2258 SEE FIG. B-87 SHT. 2 5

~ 6 J-~V-2256 /

P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2256 3-CV-2255 FIGURE: B-95 SHT. 1 OF 1 REV. 0

  • *

2CV69

/ 3/4'('(,

3/4';)..,

/ 2P-CVCA-920

~. . . . . . . . . . . . .

~LINE 3-CV-2258 SEE FIG. 8-87 SHT. 2 R-248950-12 2CV72 / 2-CVCGLS-248950-14

/ 2P-CVCG-918 2CV71

/

~/ ~

2P-CVCS-919 _ / /

3-CV-2256 P & ID: 205328 ISOMETRIC: CV-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTElvl 3-CV-2256 3-CV-2255 FIGURE: 8-95H SHT. 1 OF 1 REV. 0

  • *
  • 15 17 14,;-...-------1-'

16 16 LINE 8-CS-2229 SEE FIG. B-96 SHT. 2 25 7

6 0

' fY TO CS PUMP 22 P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\hilNG CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: B-96 SHT. 1 OF 2 REV. 0

  • *
  • 2-CSG-135 ~

2-CSG-137 ~ '--....

2-CSA-139 ~

LINE 8-CS-2229 2-CSG-119 ~ SEE FIG. B-96 SHT. 2 2-CSG-121 ~ ~

2-CSG-123 ~ ~

~2-CSG-141 2-CSG-125 ~ ~

2-CSG-142 2-CSG-127 ~ ~

2-CSG-129 ~ ~

2-CSG-131 ~ ~

2-CSG-1'.33 ~ ~

0

' fY TO CS PUMP 22 P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: B-96H SHT. 1 OF 2 REV_ 0

  • * *

~*

!, '

LINE 8-CS-2225

' '.......J SEE FIG. 8-18 SHT. 2 (

32 31 27 ~*

FLOW LINE 8-CS-2229 \,_........-

SEE FIG. 8-96 SHT. 1 \_

P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: 8-96 SHT. 2 OF 2 REV. 0

  • *
  • 2-CSSN-180 ~

r<., '

LINE 8-CS-2225 ',~ 1"

,....,.,---2-CSG-107 SEE FIG. 8-18 SHT. 2

~ ~2-CSG-109

~ 2-CSH-111 2-css~115 ~

2-CSG-117 ~ ~

FLOW LINE 8-CS-2229 '\._......-

SEE FIG. 8-95 SHT. 1 \..

P & ID: 205335 ISOMETRIC: CS-2-2, CS-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CONTAINMENT SPRAY SYSTEM 8-CS-2229 FIGURE: 8-95H SHT. 2 OF 2 REV. 0

  • *
  • FLOW 21

'\.. .......... 22 _JNO. 21 SEAL WATER 24 \_

LINE 3-CV-2258 * \_,_ INJECTION FILTER SEE FIG. 8-87 SHT. 2 23 P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA\MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2254 FIGURE: B-97 SHT. 1 OF 1 REV. 0

  • *
  • 3* x RED.

FLOW

\.... ............ _)NO. 21 SEAL WATER LINE 3-CV-2258 , \_ -1 INJECTION FILTER SEE FIG. 8-87 SHT. 2 P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONIBOL SYSTEM 2-CV-2254 FIGURE: B-97H -SHT. 1 OF 1 REV. 0

  • * *

) LINE 3"'-CV-2258

..- \.SEE FIG. B-87 SHT. 2

---~

'9"7 P & ID: 205328 ISOMETRIC: CV-2-2 NO. 22 SEAL WATER PUBLIC SERVICE ELECTRIC & GAS INJECTION FILTER SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2213 FIGURE: B-98 SHT. 1 OF 1 REV. 0

  • *
  • 3" x 2" RED. '\ ) LINE 3-CV-2258

...- '.\_SEE FIG. B-87 SHT. 2

~

/~3/4" "I 2A-CVCG-3B4 2A-CVCG-385 ~'

I I P & ID: 205328 ISOMETRIC: CV-2-2

~

NO. 22 SEAL WATER PUBLIC SERVICE ELECTRIC & GAS INJECTION FILTER SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2213 FIGURE: B-98H SHT. 1 OF 1 REV. 0

r----

  • * *

) LINE 3-CV-2251

__.,"\_SEE FIG. B-89 SHT. 1

~ 2" x 3/4" RED. INS.

NO. 22 SEAL WATER INJECTION FILTER I-'

P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2215 FIGURE: B-99 SHT. 1 OF 1 REV. 0

  • ----------*---------------------------------------------------------'-----------------1
  • * *

) LINE 3-CV-2251

...-\_SEE FIG. B-89 SHT. 1 y::

~ 2A-CVCH-375

~2" x 3/4" RED. INS.

NO. 22 SEAL WATER INJECTION FILTER

'!'-'

P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2215 FIGURE: 8-99H SHT. 1 OF 1 REV. 0

  • -*****--------------------~---------------------------~---------------'
  • *
  • LINE 3-CV-2251 \, _....

SEE FIG. B-89 SHT. 1 \_

P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2216 FIGURE: B-100 SHT. 1 OF 1 REV. 0

  • *
  • LINE 3-CV-2251 \.-"

SEE FIG. 8-89 SHT. 1 I,_

P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

  • INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2216 FIGURE: 8-100H SHT. 1 OF 1 REV. 0

--- -----------~

  • *
  • 2 3" x 2" .___,,,/ 2

/

~3-CY-2210 RED. /

/

/

/

/

2" x /

/

/ /

RED.

_, -~ ~-

s_--1' *, ., . . , . , .

<...../

4,.

.

'SP':

~ 2-CY-2218 LINE 4-CV-2258 SEE FIG. 8-88 SHT. 2 I 2 yY

..-.l_...

~2-CV-2219 9

10 16 0

P & ID: 205328 17 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS

./ . SALEM UNIT 2 c_,,. LINE 2-CV-2217 SEE FIG. 8-102 SHT. INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2210 2-CV-2218, 2-CY-2219 FIGURE: 8-101 SHT. 1 OF 1 REV. 0

___

  • * *

./"'-' 1

,,,,,- L~

~ 2A-CVCS-425

/

3" x /

/

/ /

RED. / /

/ /

/ /

/ /

/ /

2" x /

/

/

J

/

s_..,. ,,,

/

RED.

_, .~ _,,- <

~

~ 2A-CVCG-=O LINE 4-CV-2258 SEE FIG. 8-88 SHT. 2 I

---L

r. 2-CV-2218 2CV136

~2-CV-2219 P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2

'\. ............

\,._ LINE 2-CV-2217 SEE FIG. B-1 02 SHT. INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2210 2-CV-2218, 2-CV-2219 FIGURE: B-101H SHT. 1 OF 1 REV. 0

  • *
  • 0 2

3" x 2" _ /

RED.

2" x 3"_/

/

RED. /

s_..,<..._,/ ,,,.,,./'

/

~---~ .,,If'-

2CV137 4' 8

3

~ 2-CV-2212

~

9

~

LINE 4-CV-2257 SEE FIG. 8-88 SHT. 1 I

...--L 2-CV-2217 LINE 2-CV-2217 2-CV-2217 SEE FIG. 8-102 SHT. 2 15 LINE 2-CV-2219

/ SEE FIG. 8-101 16 1---

1 I

I I x 3/4" I RED. INS.

~

3/4" P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 17 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 3-CV-2211 2-CV-2212, 2-CV-2217 FIGURE: B-102 SHT. 1 OF 3 REV. 0

  • 0

,/"-/ 1

,,.,,. L~

/ >

,,..::::.-------- 2A-CVCS-424A 3"X2"~

RED.

2"X3"~

RED.

" . cf,.-

~

2CV137 ~

i LINE 4-CV-2257 SEE FIG. 8-88 SHT. 1 I

---L r 2-CV-2212

~ 2-CV-2217 LINE 2-CV-2217 2-CV-2217 SEE FIG. B-102 SHT. 2 LINE 2-CV-2219

/ SEE FIG. B-101 1----

1 I

I

~2" x 3/4"

~1 I

\ ,._L, l

RED. INS.

P & ID: 205328 3/4" ISOMETRIC: CV-2-2

~ 2A-CVCG-409 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRA'MNG CHEMICAL & VOLUME CONTROL SYSTEM 2A-CVCA-456 3-CV-2211 2A-CVCS-4S2j 2-CV-2212, 2-CV-2217 FIGURE: B-102H SHT. 1 OF 3 REV. 0

  • * *

'

'~LINE 2-CV-2217 SEE FIG. B-102 SHT. 3 FLOW.

P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS LINE 2-CV-2217 SALEM UNIT 2 SEE FIG. 8-102 SHT.

INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102 SHT. 2 OF 3 REV. 0

  • *
  • 2A- eves- no ~

2A-CVCG- 766 ~ "......

2A-CVCG- 764 ~* "......

'

.2A-CVCG- 762 ~ * '~LINE 2-CV-2217 SEE FIG. 8-102 SHT. 3 FLOW 2A-CVCG- 758 ~

2A-CVCG-460 ~ ~

2A-CVCS-443 ~~

?

2A-CVCS-436 / /

2A-CVCS-432 _ / '

/ 2A-CVCS-429 P & ID: 205328

~ ISOMETRIC: CV-2-2

~/ / ~

le PUBLIC SERVICE ELECTRIC & GAS LINE 2-CV-2217 ' 2A-CVCS-431 SALEM UNIT 2 SEE FIG. 8-102 SHT.

INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102H SHT. 2 OF 3 REV. 0

  • *
  • LINE 2-CV-2217 SEE FIG. B-102 SHT. 2 r-2-...._

/

/

s _.. ., ,...,..'/

/

"""'- <.._,,.,,.

41 P & ID: 205328 52 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102 SHT. 3 OF 3 REV. 0

  • *
  • LINE 2-CV-2217 SEE FIG. 8-102 SHT. 2!,

/

,,,,}. .

/

s:~

,,,,,,.- < ,,,..

2A-CVCA:98 2A-CVCG-302 J 2A-CVCG-305 2A-CVCG-309

/

/ / 2A-CVCG-310

/ 2A-CVCH-261

/ 2A-CVCG-320 2A-CVCG-321 ~ ~

2A-CVCG-322A 2CV139 P & ID: 205328 ISOMETRIC: CV-2-2 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING CHEMICAL & VOLUME CONTROL SYSTEM 2-CV-2217 FIGURE: B-102H SHT. 3 OF 3 REV. 0

..,,

!'*

I

/;,.

  • *
  • *
  • 6"

~

\

\

~

CLASS 2 5

~1 P & ID: 205331 ISOMETRIC: CC-2-3 CLASS 2 / ' ' ; ) 6" CLASS 3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM 6-CC-2201 FIGURE: 8-113 SHT. 1 OF 1 REV. 0

  • *
  • 6"
-.!

\

\

~

CLASS 2 I ANCHOR

(, ~~ _ "7 PENETRATION NO. 32

/

. ,5/// /~~ 2P-CCS-328 GUIDE J\,.'

~1

_,.,,- 2P-CCS-327 A

./ / 2P-CCS-327 P & ID: 205331 CLAss2/

CLASS 3

'r 6" ISOMETRIC: CC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM 6-CC-2201 FIGURE: B-113H SHT. 1 OF 1 REV. 0

  • 3/4"

"]--.--

'

2 p

~1

~

7

~

I 6" c--- \

,..-1--'

3/4"

,-,l__..

3/4"

~ \

~

CLASS 3 P & ID: 205331 ISOMETRIC: CC-2-3 PUBLIC SERVlCE ELECTRIC & GAS SALEM UNIT 2.

INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM

  • 5-cc~2202 **

FIGURE: 8-114 SHT. 1 OF 1 REV. 0

  • ------------------*------*---------------------L---------------'
  • *
  • 3/4"

-r--

1 ANCHOR l, . __ >

-0 -:7 PENETRATION NO. 33 z=.,,j,,.. , .

UIDE

~1 2C-CCS-269 \

CLASS 2 CLASS 3 \

I

..-c..

6" t--- \

,.-lJ 3/4" 3/4"

~\

CLASS 3 ~

6" P & ID: 205331 ISOMETRIC: CC-2-3 PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWING COMPONENT COOLING SYSTEM 6-CC-2202 FIGURE: B-114H SHT. 1 OF 1 REV. 0

  • *J

,I

'

o*

I D

---90" D MANWAY UPPER HEAD 2-BIT-C ___.,/"

,.,,. 2 1/2" STUDS-2-BIT-STUD SHELL

./ 16 - 2 1/2" NUTS P & ID: 205.334 LOWER HEAD PUBLIC SERVICE ELECTRIC & GAS SALEM UNIT 2 INSERVICE INSPECTION DRAWlNG D D BORON INJECTION TANK.

I 2-BIT-1 FIGURE: B-119 SHT. 1 OF 1 REV. 0

.

L_*-_-_------------------------..,.,,-=~~~...:.~*.~n:'!ri::rr~"C.t::=.:...c:::::::.:..~-:- *.":l:o::tr.r.:-...a=nrn':"'.tr..:*:r:::i;::o.-::1:**~~~-.-:-..:..=:-::::z-.:::-m_:.~~.....:---?.r:r.!'"1Cr?'7?;:n=x=:r:-'.:i..:1~:7=*=-n=-====*-::::r:~-*:*..