{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 April 10, 2018 MEETING  
 
April 10, 2018 MEETING  


==SUMMARY==
==SUMMARY==


LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.  
LICENSEE:       DOMINION NUCLEAR CONNECTICUT, INC.
 
FACILITY:       MILLSTONE POWER STATION
FACILITY: MILLSTONE POWER STATION  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING  
OF PUBLIC MEETING On April 4, 2018, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) met with the Connecticut Nuclear Energy Advisory Council (NEAC) at the Waterford Public Library in Waterford, Connecticut. The NRC conducted the meeting to discuss its assessment of the safety performance at Millstone Power Station for 2017.
 
A notice of the NRC and NEAC meeting was issued on March 22, 2018, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18081A266.
On April 4, 2018, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) met with the Connecticut Nuclear Energy Advisory Council (NEAC) at the Waterford Public Library in Waterford, Connecticut. The NRC conducted the meeting to discuss its assessment of the safety performance at Millstone Power Station for 2017.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
 
The NRC discussed its assessment of the safety performance of Millstone Power Station for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession Number ML18058A050). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:
A notice of the NRC and NEAC meeting was issued on March 22, 2018, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18081A266. ADAMS is accessible from the NRC Web page at:
https://www.nrc.gov/reactors/operating/oversight.html.
http://www.nrc.gov/reading-rm/adams.html. The NRC discussed its assessment of the safety performance of Millstone Power Station for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession Number ML18058A050). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:
Members of NEAC attended the meeting and were offered the opportunity to question the NRC regarding Dominions performance and the role of the agency in ensuring safe plant operations.
 
                                                      /RA/
https://www.nrc.gov/reactors/operating/oversight.html. Members of NEAC attended the meeting and were offered the opportunity to question the NRC regarding Dominion's performance and the role of the agency in ensuring safe plant operations.  
Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects
 
          /RA/     Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING dated April 10, 2018  
OF PUBLIC MEETING dated April 10, 2018 DISTRIBUTION: (via email)
 
DSchroeder, DRP TSetzer, DRP MHenrion, DRP MRossi, DRP JFuller, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI RidsNrrPMMillstone Resource DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2018 Annual Assessment Meetings\Millstone\Millstone 2018 AAM Meeting Summary.docx ADAMS Accession Number: ML18101A042 SUNSI Review Non-Sensitive                           Publicly Available Sensitive                                Non-Publicly Available OFFICE         RI/DRP             RI/DRP NAME           TSetzer           DSchroeder DATE           4/10/18           4/10/18 OFFICIAL RECORD COPY}}
DISTRIBUTION: (via email)
DSchroeder, DRP  
 
TSetzer, DRP MHenrion, DRP MRossi, DRP JFuller, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI RidsNrrPMMillstone Resource  
 
DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2018 Annual Assessment Meetings\Millstone\Millstone 2018 AAM Meeting Summary.docx ADAMS Accession Number: ML18101A042 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE   RI/DRP RI/DRP   NAME TSetzer DSchroeder   DATE 4/10/18 4/10/18 OFFICIAL RECORD COPY}}

Latest revision as of 10:24, 21 October 2019

Summary of Annual Assessment Meeting for Millstone Power Station Held on 4/4/18
ML18101A042
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/10/2018
From: Daniel Schroeder
Reactor Projects Branch 2
To:
Schroeder D
References
Download: ML18101A042 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSLYVANIA 19406-2713 April 10, 2018 MEETING

SUMMARY

LICENSEE: DOMINION NUCLEAR CONNECTICUT, INC.

FACILITY: MILLSTONE POWER STATION

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 4, 2018, at 6:00 p.m., the U.S. Nuclear Regulatory Commission (NRC) met with the Connecticut Nuclear Energy Advisory Council (NEAC) at the Waterford Public Library in Waterford, Connecticut. The NRC conducted the meeting to discuss its assessment of the safety performance at Millstone Power Station for 2017.

A notice of the NRC and NEAC meeting was issued on March 22, 2018, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML18081A266.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC discussed its assessment of the safety performance of Millstone Power Station for the period of January 1 through December 31, 2017, as documented in our letter dated February 28, 2018 (ADAMS Accession Number ML18058A050). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:

https://www.nrc.gov/reactors/operating/oversight.html.

Members of NEAC attended the meeting and were offered the opportunity to question the NRC regarding Dominions performance and the role of the agency in ensuring safe plant operations.

/RA/

Daniel L. Schroeder, Chief Projects Branch 2 Division of Reactor Projects

SUBJECT:

SUMMARY

OF PUBLIC MEETING dated April 10, 2018 DISTRIBUTION: (via email)

DSchroeder, DRP TSetzer, DRP MHenrion, DRP MRossi, DRP JFuller, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI RidsNrrPMMillstone Resource DOC NAME: G:\DRP\BRANCH2\Site Visits, Briefings, Meetings\2018 Annual Assessment Meetings\Millstone\Millstone 2018 AAM Meeting Summary.docx ADAMS Accession Number: ML18101A042 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer DSchroeder DATE 4/10/18 4/10/18 OFFICIAL RECORD COPY