ML18193A064: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18193A064 | | number = ML18193A064 | ||
| issue date = 07/12/2018 | | issue date = 07/12/2018 | ||
| title = | | title = Figure 9.3-1, Flow Diagram Compressed Air System. | ||
| author name = | | author name = | ||
| author affiliation = Arizona Nuclear Power Project | | author affiliation = Arizona Nuclear Power Project | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:I I I I l I I I I I I I I I I I I I | {{#Wiki_filter:I I PSL I | ||
I l AIR AFTERCOOLER I Sl MOISTURE SEPARATOR PC I SERVICE AIR HEADER I PRIORITY CONTROL VALVE I TO TURBINE I | |||
DECK AREA I | |||
TO TURBINE AT I DT AREA MEZZANINE AIR I | |||
RECEIVER INSTRUMENT AIR HEADER I | |||
I I | |||
I Y TO MAIN CONDENSER INSTRUMENT AIR I AIR COMPRESSOR PRE-FILTERS TO AUXILIARYBOILER AREA TO ESSENTIAL TO FEEDWATER VALVES DT III INTAKE AIR SPRAY POND A K | |||
FILTER D l 47 M | |||
Ul TO TURBINE LAYDOWN AREA I | |||
Y. IC IL 0 TO WATER TREATMENT TO CHEMICAL Z | |||
AREA LAB AREA 4 | |||
K AIR AFTERCOOLER IU I 8 MOISTURE SEPARATOR 0 TO INSTRUMENT REPAIR 0 ROOM TO AUXILIARYBUILDING I SERVICE AIR HEADER I ill 77 LC l TO CONTAINMENT TO ESSENTIAL SERVICE AIR I SPRAY POND 8 LC TO TURBINE I BUILDING DT AREAS I TO CONDENSATE TO RADWASTE BUILDING AIR c L RECEIVER POLISHING DEMINERALIZER OC I I | |||
I Y. TO CIRC WATER INTAKE STRUCTURE TO DIESEL GENERATOR BUILDING I | |||
TO TURBINE TRIP RELAY I AIR COMPRESSOR I | |||
DT TO PLANT COOLING WATER TO CONTROL BUILDING INTAKE AIR I FILTER I | |||
I Y. VENT TO ATMOSPHERE TO SHOP & WAREHOUSE I | |||
INSTRUMENT AIR DR VERS TO SWITCHYARD AREA I AIR AFTERCOOLER TO AUXILIARYBOILER TO TURBINE a MOISTURE SEPARATOR BUILDING AREAS I | |||
I I TO CHEMICAL STORAGE AREA I | |||
I I TO COOLING TO ESSENTIAL TOWER SPRAY POND A I | |||
L DT AIR C I A-A + ICIA-B TO FUEL BUILDING RECEIVER S S TO RADWASTE Y. A/S BUILDING Arizona Nuclear Power Project OCI IC Palo Verde Nuclear Generating Station AIR COMPRESSOR INTAKE AIR FILTER DT 9IDCFM FC TO PRESSURIZER SPRAY CONTROL VALVES TO CONTROL BUILDING TO DIESEL G E N 6 UI LD I NG TO PLANT CW PUMP PIT TO COOLING TOWER TO ESSENTIAL SPRAY POND B Units 1,2 & 8 FLOW DIAGRAM COMPRESSED AIR SYSTEM INSTRUMENT AIR FILTERS Y. Figure 9.3-1 10407-7 I 4 3FE"335}} |
Latest revision as of 20:33, 20 October 2019
ML18193A064 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 07/12/2018 |
From: | Arizona Nuclear Power Project |
To: | Office of Nuclear Reactor Regulation |
References | |
9.3-1 | |
Download: ML18193A064 (1) | |
Text
I I PSL I
I l AIR AFTERCOOLER I Sl MOISTURE SEPARATOR PC I SERVICE AIR HEADER I PRIORITY CONTROL VALVE I TO TURBINE I
DECK AREA I
TO TURBINE AT I DT AREA MEZZANINE AIR I
RECEIVER INSTRUMENT AIR HEADER I
I I
I Y TO MAIN CONDENSER INSTRUMENT AIR I AIR COMPRESSOR PRE-FILTERS TO AUXILIARYBOILER AREA TO ESSENTIAL TO FEEDWATER VALVES DT III INTAKE AIR SPRAY POND A K
FILTER D l 47 M
Ul TO TURBINE LAYDOWN AREA I
Y. IC IL 0 TO WATER TREATMENT TO CHEMICAL Z
AREA LAB AREA 4
K AIR AFTERCOOLER IU I 8 MOISTURE SEPARATOR 0 TO INSTRUMENT REPAIR 0 ROOM TO AUXILIARYBUILDING I SERVICE AIR HEADER I ill 77 LC l TO CONTAINMENT TO ESSENTIAL SERVICE AIR I SPRAY POND 8 LC TO TURBINE I BUILDING DT AREAS I TO CONDENSATE TO RADWASTE BUILDING AIR c L RECEIVER POLISHING DEMINERALIZER OC I I
I Y. TO CIRC WATER INTAKE STRUCTURE TO DIESEL GENERATOR BUILDING I
TO TURBINE TRIP RELAY I AIR COMPRESSOR I
DT TO PLANT COOLING WATER TO CONTROL BUILDING INTAKE AIR I FILTER I
I Y. VENT TO ATMOSPHERE TO SHOP & WAREHOUSE I
INSTRUMENT AIR DR VERS TO SWITCHYARD AREA I AIR AFTERCOOLER TO AUXILIARYBOILER TO TURBINE a MOISTURE SEPARATOR BUILDING AREAS I
I I TO CHEMICAL STORAGE AREA I
I I TO COOLING TO ESSENTIAL TOWER SPRAY POND A I
L DT AIR C I A-A + ICIA-B TO FUEL BUILDING RECEIVER S S TO RADWASTE Y. A/S BUILDING Arizona Nuclear Power Project OCI IC Palo Verde Nuclear Generating Station AIR COMPRESSOR INTAKE AIR FILTER DT 9IDCFM FC TO PRESSURIZER SPRAY CONTROL VALVES TO CONTROL BUILDING TO DIESEL G E N 6 UI LD I NG TO PLANT CW PUMP PIT TO COOLING TOWER TO ESSENTIAL SPRAY POND B Units 1,2 & 8 FLOW DIAGRAM COMPRESSED AIR SYSTEM INSTRUMENT AIR FILTERS Y. Figure 9.3-1 10407-7 I 4 3FE"335