ML18193A064

From kanterella
Jump to navigation Jump to search
Figure 9.3-1, Flow Diagram Compressed Air System.
ML18193A064
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/12/2018
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
9.3-1
Download: ML18193A064 (1)


Text

I I PSL I

I l AIR AFTERCOOLER I Sl MOISTURE SEPARATOR PC I SERVICE AIR HEADER I PRIORITY CONTROL VALVE I TO TURBINE I

DECK AREA I

TO TURBINE AT I DT AREA MEZZANINE AIR I

RECEIVER INSTRUMENT AIR HEADER I

I I

I Y TO MAIN CONDENSER INSTRUMENT AIR I AIR COMPRESSOR PRE-FILTERS TO AUXILIARYBOILER AREA TO ESSENTIAL TO FEEDWATER VALVES DT III INTAKE AIR SPRAY POND A K

FILTER D l 47 M

Ul TO TURBINE LAYDOWN AREA I

Y. IC IL 0 TO WATER TREATMENT TO CHEMICAL Z

AREA LAB AREA 4

K AIR AFTERCOOLER IU I 8 MOISTURE SEPARATOR 0 TO INSTRUMENT REPAIR 0 ROOM TO AUXILIARYBUILDING I SERVICE AIR HEADER I ill 77 LC l TO CONTAINMENT TO ESSENTIAL SERVICE AIR I SPRAY POND 8 LC TO TURBINE I BUILDING DT AREAS I TO CONDENSATE TO RADWASTE BUILDING AIR c L RECEIVER POLISHING DEMINERALIZER OC I I

I Y. TO CIRC WATER INTAKE STRUCTURE TO DIESEL GENERATOR BUILDING I

TO TURBINE TRIP RELAY I AIR COMPRESSOR I

DT TO PLANT COOLING WATER TO CONTROL BUILDING INTAKE AIR I FILTER I

I Y. VENT TO ATMOSPHERE TO SHOP & WAREHOUSE I

INSTRUMENT AIR DR VERS TO SWITCHYARD AREA I AIR AFTERCOOLER TO AUXILIARYBOILER TO TURBINE a MOISTURE SEPARATOR BUILDING AREAS I

I I TO CHEMICAL STORAGE AREA I

I I TO COOLING TO ESSENTIAL TOWER SPRAY POND A I

L DT AIR C I A-A + ICIA-B TO FUEL BUILDING RECEIVER S S TO RADWASTE Y. A/S BUILDING Arizona Nuclear Power Project OCI IC Palo Verde Nuclear Generating Station AIR COMPRESSOR INTAKE AIR FILTER DT 9IDCFM FC TO PRESSURIZER SPRAY CONTROL VALVES TO CONTROL BUILDING TO DIESEL G E N 6 UI LD I NG TO PLANT CW PUMP PIT TO COOLING TOWER TO ESSENTIAL SPRAY POND B Units 1,2 & 8 FLOW DIAGRAM COMPRESSED AIR SYSTEM INSTRUMENT AIR FILTERS Y. Figure 9.3-1 10407-7 I 4 3FE"335