ML18319A139: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier:
{{#Wiki_filter:U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:
Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location:
The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.
Webinar Type of Meeting: Category 3 Purpose of the Meeting: The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection. General Details:
General Details:
* Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
* Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
* Over 300 individuals participated in the webinar for various amounts of time.
* Over 300 individuals participated in the webinar for various amounts of time.
Line 24: Line 24:
* The public participants submitted approximately 500 questions before and during the webinar.
* The public participants submitted approximately 500 questions before and during the webinar.
* The webinar was recorded and will be placed on the NRC website for public review when it is available.
* The webinar was recorded and will be placed on the NRC website for public review when it is available.
* Answers to selected questions that were asked during the webinar will be placed on the NRC website. Summary of Presentations:
* Answers to selected questions that were asked during the webinar will be placed on the NRC website.
Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier:
Summary of Presentations:
Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location:
Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including
Webinar Type of Meeting: Category 3 Purpose of the Meeting: The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.
 
U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:
The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.
General Details:
General Details:
* Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
* Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
Line 35: Line 37:
* The public participants submitted approximately 500 questions before and during the webinar.
* The public participants submitted approximately 500 questions before and during the webinar.
* The webinar was recorded and will be placed on the NRC website for public review when 'it is available.
* The webinar was recorded and will be placed on the NRC website for public review when 'it is available.
* Answers to selected questions that were asked during the webinar will be placed on the NRC website. Summary of Presentations:
* Answers to selected questions that were asked during the webinar will be placed on the NRC website.
Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including M EETING AGENDA ADA M S Accession ML18302A351 ) Attachment 1
Summary of Presentations:
October 29, 2018 Title: San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar Date(s) and Time(s): November 08, 2018, 02:00 PM to 05:00 PM Location:
Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including
Category:
 
Purpose: Contact: Webinar This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues. The U.S. Nuclear Regulatory Commission (NRC) will host a virtual public meeting (webinar) to present preliminary observations regarding a Special Inspection at SONGS. The Special Inspection was conducted to evaluate an August 3 incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff will respond to questions about the inspection.
MEETING AGENDA ADAMS Accession ML18302A351 )
Eric Simpson 817-200-1553 eric.simpson@nrc.gov Participants:
Attachment 1
NRC Webinar: Docket No: Comments:
 
Troy Pruett, DNMS Director, Region IV Linda Howell, DNMS Deputy Director, Region IV Eric Simpson, Health Physicist, Region IV Patricia Silva, Branch Chief DSFM, NRC Staff URL https://attendee.gotowebinar.
October 29, 2018 Title:               San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar Date(s) and Time(s): November 08, 2018, 02:00 PM to 05:00 PM Location:           Webinar Category:           This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.
com/register/325663643729566723 05000206 05000361 05000362 07200041 Me e tin g Number None Password N/A Interested members of the public should register for the webinar via the internet address provided above. After registering, a confirmation email will be sent with details for joining the webinar. During the meeting, participants will be able to see and hear NRC staff on their computer or mobile device. There is also an option to join via phone bridge, but participants must register for the webinar to obtain the call-in number. Public participation will be supported in listen only mode. Meeting slides will be posted on the NRC's public meeting web page in advance. Additional information regarding the San Onofre Nuclear Generating Station Special Inspection can be found at:
Purpose:            The U.S. Nuclear Regulatory Commission (NRC) will host a virtual public meeting (webinar) to present preliminary observations regarding a Special Inspection at SONGS.
loading-misalignment.html
The Special Inspection was conducted to evaluate an August 3 incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff will respond to questions about the inspection.
Contact:            Eric Simpson 817-200-1553 eric.simpson@nrc.gov Participants:       NRC Troy Pruett, DNMS Director, Region IV Linda Howell, DNMS Deputy Director, Region IV Eric Simpson, Health Physicist, Region IV Patricia Silva, Branch Chief DSFM, NRC Staff URL                                           Meeting Number              Password Webinar:
https://attendee.gotowebinar.                 None                        N/A com/register/325663643729566723 Docket No:          05000206 05000361 05000362 07200041 Comments:            Interested members of the public should register for the webinar via the internet address provided above. After registering, a confirmation email will be sent with details for joining the webinar. During the meeting, participants will be able to see and hear NRC staff on their computer or mobile device. There is also an option to join via phone bridge, but participants must register for the webinar to obtain the call-in number. Public participation will be supported in listen only mode. Meeting slides will be posted on the NRC's public meeting web page in advance. Additional information regarding the San Onofre Nuclear Generating Station Special Inspection can be found at:
https://www.nrc.gov/reactors/operating/ops-experience/songs-spec-insp-activities-cask-loading-misalignment.html


==PUBLIC MEETING AGENDA==
==PUBLIC MEETING AGENDA==
San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar November 08, 2018, 02:00 PM to 05:00 PM Webinar Time Topic Speaker 2:00 PM -5:00 PM Opening Remarks and Introductions Troy Pruett 2:00 PM -5:00 PM NRC Presentation Troy Pruett Linda Howell Eric Simpson 2:00 PM -5:00 PM Questions and Discussions All 5:00PM Closing Remarks Troy Pruett The time of the meeting *is local to the jurisdiction where the meeting is being held. The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
 
If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. ADAMS Accession Number: ML18302A351 Distribution:
San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar November 08, 2018, 02:00 PM to 05:00 PM Webinar Time                                         Topic                                 Speaker 2:00 PM - 5:00 PM             Opening Remarks and Introductions                   Troy Pruett Troy Pruett 2:00 PM - 5:00 PM                     NRC Presentation Linda Howell Eric Simpson 2:00 PM - 5:00 PM Questions and Discussions                           All 5:00PM                                 Closing Remarks                             Troy Pruett
RidsOeManCenter Resource RldsSecyMallCenter Resource RidsEdoMailCenter Resource RldsOiMallCenter Resource RldsNmssOd Resource RldsOcaMellCenter Resource EOO_Menagers RidsRgn1MallCenter Resource RldsNmssOd Resource RldsOlgMallCenter Resource RldsOcfoMailCenter Resource RklsRgn3MallCenter Resource RldsOpaMail Resource Unda.Howell@nrc.gov Lee.Brookhart@nrc.gov Chris.Smi1b@nrc.gov John.Knunu@nrc.gov Janet.Staub@nn:.gov Michael.Laylon@nn:.gov Marlonc.Davis@nre.gov Angel.Morcno@nrc.gov R4DNMS_FCDB Name JFKatanic Office DNMS Date 10/24/2018 Kriss.Kennedy@nrc.gov Janine.Katanlc@nrc.gov RMdy.Erickacn@nn:.gov BiltMaier@:mrc.gov Victor.Dricks@nrc.gov Dan.llCtBeruuder@nrc.gov Aicla.Rivcra-Varona@nn:.gov Micbele.Burgess@nrc.gov Jcany.Wcil@nn:.go,*
 
VLDricks ORA 10/25/2018 Scott.Morris@nre.gov l!ric.Simpson@nrc.gov Jackie.Cook@mc.gov Michael Vasquez@mc.gov Emeslinl'.Clay@nrc.gov Micbael.Bloodgood@nrc.gov Polricia.Silva@nre.gov Christopher.Cook@nrc.gov David.Mclntyre@nrc.gov GMVasquez ACES 10/25/2018 OFFICIAL RECORD COPY WAMaier RSLO 10/25/2018 Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20181145 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html TWPruett DNMS 10/29/2018 PRESE N TATION SLIDES DISTRIBUTED PRIOR TO THE M EETING (ADA M S Accession M L 18312A118)
The time of the meeting *is local to the jurisdiction where the meeting is being held.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
ADAMS Accession Number: ML18302A351 Distribution:
RidsOeManCenter Resource          RldsNmssOd Resource                      RldsNmssOd Resource RldsSecyMallCenter Resource       RldsOcaMellCenter Resource               RldsOlgMallCenter Resource RidsEdoMailCenter Resource         EOO_Menagers                             RldsOcfoMailCenter Resource RldsOiMallCenter Resource         RidsRgn1MallCenter Resource               RklsRgn3MallCenter Resource RldsOpaMail Resource               Kriss.Kennedy@nrc.gov                    Scott.Morris@nre.gov Unda.Howell@nrc.gov                 Janine.Katanlc@nrc.gov                   l!ric.Simpson@nrc.gov Lee.Brookhart@nrc.gov             RMdy.Erickacn@nn:.gov                     Jackie.Cook@mc.gov Chris.Smi1b@nrc.gov                BiltMaier@:mrc.gov                       MichaelVasquez@mc.gov John.Knunu@nrc.gov                 Victor.Dricks@nrc.gov                     Emeslinl'.Clay@nrc.gov Janet.Staub@nn:.gov               Dan.llCtBeruuder@nrc.gov                 Micbael.Bloodgood@nrc.gov Michael.Laylon@nn:.gov             Aicla.Rivcra-Varona@nn:.gov               Polricia.Silva@nre.gov Marlonc.Davis@nre.gov             Micbele.Burgess@nrc.gov                   Christopher.Cook@nrc.gov Angel.Morcno@nrc.gov               Jcany.Wcil@nn:.go,*                      David.Mclntyre@nrc.gov R4DNMS_FCDB Name                JFKatanic        VLDricks                      GMVasquez                         WAMaier    TWPruett Office              DNMS              ORA                          ACES                             RSLO      DNMS Date                10/24/2018        10/25/2018                  10/25/2018                       10/25/2018 10/29/2018 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20181145 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html
 
PRESENTATION SLIDES DISTRIBUTED PRIOR TO THE MEETING (ADAMS Accession ML18312A118)
Attachment 2
Attachment 2
US.NRC United States Nuclear Regulatory Com.mission Protecting People and the Environment San Onofre Special Inspection Webinar N ovember 8, 2018 N RC Region IV, Arlington, TX Logistics
 
~~US.NRC United States Nuclear Regulatory Con:unission Protecting People and tl,e Envlronnient
US.NRC United States Nuclear Regulatory Com.mission Protecting People and the Environment San Onofre Special Inspection Webinar November 8, 2018 NRC Region IV, Arlington, TX
* W ebinar Format
 
                                        ~~ US.NRC Logistics                            United States Nuclear Regulatory Con:unission Protecting People and tl,e Envlronnient
* Webinar Format
* Back-up Bridge Line (888) 469-1677, Passcode 2471451
* Back-up Bridge Line (888) 469-1677, Passcode 2471451
* Questions and Answers 2 NR C Staff {:r~US.NRC United States Nuclear R.egulatoty Commission.
* Questions and Answers 2
 
{:r~ US.NRC NRC Staff                                      United States Nuclear R.egulatoty Commission.
Protecting People and tl,e Environnient
Protecting People and tl,e Environnient
* Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
* Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
* Patricia Silva, Branch Chief Division of Spent Fuel M anagement
* Patricia Silva, Branch Chief Division of Spent Fuel Management
* Troy Pruett, Director Region IV Division of N uclear M aterials Safety 3 W ebinar A genda *~:~US.NRC United States Nuclear Regulatory Commission Protecting People and the Environ,nent
* Troy Pruett, Director Region IV Division of Nuclear Materials Safety 3
 
                                  *~:~ US.NRC Webinar Agenda                      United States Nuclear Regulatory Commission Protecting People and the Environ,nent
* Background
* Background
* Canister Downloading Operations
* Canister Downloading Operations
Line 66: Line 83:
* Current Status
* Current Status
* Summary
* Summary
* Questions  
* Questions & Answers 4
& Answers 4
 
-Cf) LL Cf) -I ---+-ti) :E 0 §, :c *; z :::> C1) 1-Z C 0 C: .2> --== u, 0 .::::; C1) :C :::> C Transnuclear N UHO M S (.~US.NRC United States Nuclear .Regulatory C.Ommission Protecting People and the Environment 6
I
Holtec U MAX *e:~US.NRC United States Nuclear Regulatory Commission  
    ---+-
*--.. ~*----...__ Protecting People and the Environment 7
ti)
Vertically Ventilated Module (Vault) r.~US.N R C United States Nuclear Regulatory Commission  
:E 0   §,   0
~~----...........................  
                  ~ ~ .2>
-,., ... -~"'**-*----
C:
....... ----... -* Protecting People and the Environnient 8
:c *;   -0 .::::;
1] US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Spent Fuel Canister Holtec MPC Transfer Cask 9 Do w nloading:
                      -== u,
Shield Cone ~U S.NRC United States Nuclear Regulatory Commission Protecti,ig People and the Enviro11n1ent 10 Do w nloading:
-
Transporter
Cf) z  :::>
*:t*~~US.NRC United States Nuclear Regulatory Com.mission Protecting People and the Environment 11 Do w nloading:
1- Z C C1)
Vault Door C)~US.NRC United States Nuclear .R..egulatory Commission Protecling People and tlie E11vlronment 12 US.NR C United States Nuclear Regulatoty Commission Protecting People and the Environment; Downloading:
:C :::> C C1)
Alignment 13
LL Cf)
,~[~;e us.NRC Vuited Sta.tea Nuclear Regulatory Commission Protecting People and the Environment Downloading:
-
Attaching Slings 14
 
~*1;:e US.NR C United Statcs: Nucleu Regulatory Commission Protecting  
(.~ US.NRC Transnuclear NUHOMS  United States Nuclear .Regulatory C.Ommission Protecting People and the Environment 6
'People and the En.viron,nent Downloading:
 
Attaching Slings 15 Do w nloading Preparations
            *e:~US.NRC Holtec UMAX  United States Nuclear Regulatory Commission
''~'[.:e US.NR C United States Nuclear .Rcplatoty Commission. Protecting People and the Envlronrnent 16 W hat Happened on August 3rd? US.NRC United States Nuclear .Regulatoi;y Commission  
                          *-- ~*----
-----------~
                            ..
--Protecting People and tl,e Environment  
Protecting People and the Environment
--------------------*~--;' -t©J* * ---t©J-M1©rt&t$J-e-m-e--i$la-&J$HDt-l ! 't'1 l I ! !
                                                      ...__
* I -f$lfi-fl*~-m~-~-$--e-ffl-~-
7
R!sl ro R!sl cj5i [$HO R!sl o rq51 o R!sl* o KP1* cj5i I I l I I t I I I 17 W hat Happened on August 3rd? :(-:~U S.NRC United Sta1e& Nuclear Regulatory Commission Protecting People and the Environ,nent  
: r. ~ US.NR C Vertically Ventilated Module (Vault)   United States Nuclear Regulatory Commission
~-* , ,,
                                        ~~----     ...........................
* o . .-.., .. ,,, ~'"*'' sw1rc -, T W hat Happened on August 3rd? 19 W hat H appened on August 3rd? ~~~US.NRC United States Nuclear Regulatory Commission Protecting People and the Environ,nent 20 W hat Happened on August 3rd? 1~~~US.NRC United States Nuclear .Regulatory Commission
Protecting People and the Environnient
*----*----* *-------*-*--*-
                                                                              -,., ... -~"'**-*---- ....... ---- ...-*
.. _______ ......,, __ ,.. .... Protecting People and the Environment 21 Post E v ent A ctions -~US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment
8
 
US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Spent Fuel Canister Holtec MPC Transfer Cask 1]
9
 
                              ~U S.NRC Downloading: Shield Cone United States Nuclear Regulatory Commission Protecti,ig People and the Enviro11n1ent 10
 
                        *:t*~~ US.NRC Downloading: Transporter    United States Nuclear Regulatory Com.mission Protecting People and the Environment 11
 
C)~ US.NRC Downloading: Vault Door  United States Nuclear .R..egulatory Commission Protecling People and tlie E11vlronment 12
 
US.NRC United States Nuclear Regulatoty Commission Protecting People and the Environment; Downloading:
Alignment 13
 
  ,~[~;eus.NRC Vuited Sta.tea Nuclear Regulatory Commission Protecting People and the Environment Downloading:
Attaching Slings 14
 
  ~*1;: eUS.NRC United Statcs:Nucleu Regulatory Commission Protecting 'People and the En.v iron,nent Downloading:
Attaching Slings 15
 
            ''~'[.:eUS.NRC United States Nuclear .R cplatoty Commission.
Protecting People and the Envlronrnent Downloading Preparations 16
 
US.NRC What Happened on August 3rd?                                       United States Nuclear .R egulatoi;y Commission
                                                                  --                 ---------~--
Protecting People and tl,e Environment
                        ---------------
                                                            -----
        * ~   --     ;'
      -t©J* *---t©J-M1©rt&t$J-e-m-e--i$la-&J$HDt-l       ! 't' 1 l       I   !   !
* I
      -f$lfi-fl*~-m~-~-$--e-ffl-~-
R!sl ro R!sl cj5i [$HO R!sl o rq51 o R!sl* o KP1* cj5i I       I   l   I       I   t   I       I     I 17
 
:(-:~ U S.NRC What Happened on August 3rd?                                          United Sta1e& Nuclear Regulatory Commission Protecting People and the Environ,nent
                            ~-* , ,,
* o.
                                        . -
                                          ., ..
                                              . ,,, ~'"*'' sw1rc - ,
T
 
What Happened on August 3rd?
19
 
                            ~~~ US.NRC What Happened on August 3rd?  United States Nuclear Regulatory Commission Protecting People and the Environ,nent 20
 
1
                              ~~~       US.NRC What Happened on August 3rd?          *- ---*-------*-*--*- _______
United States Nuclear .Regulatory Commission
                              *----                           ..
Protecting People and the Environment
                                                                      ......,, __ ,.. ....
21
 
                                            -~ US.NRC Post Event Actions                        United States Nuclear Regulatory Commission Protecting People and the Environment
* Spent Fuel Handling Activities Suspended
* Spent Fuel Handling Activities Suspended
* N RC Inspection Activities
* NRC Inspection Activities
* San Onofre N otification to N RC
* San Onofre Notification to NRC
* Causal Evaluations
* Causal Evaluations
* Corrective Actions 22 Spent Fuel Handling Activities Suspended  
* Corrective Actions 22
~U S.NR C United States Nuclear Regulatory Commission  
 
------------
                                                  ~U S.NRC Spent Fuel Handling Activities Suspended     United States Nuclear Regulatory Commission
                                            -- ----------
Protecting People and the Environment
Protecting People and the Environment
* M PC 29 lowered into vault
* MPC 29 lowered into vault
* San Onofre suspends fuel loading
* San Onofre suspends fuel loading
* M PC 30 -Inside Transfer Cask -Seismically Restrained in Fuel Building 23 N RC Inspection Activities
* MPC 30
,~~~US.NRC United States Nuclear .Regulatory CommiSttion Protecting People and the Environnrent
  - Inside Transfer Cask
  - Seismically Restrained in Fuel Building 23
 
                                                              ,~~~ US.NRC NRC Inspection Activities                                      United States Nuclear .Regulatory CommiSttion Protecting People and the Environnrent
* August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
* August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
* August 7th: San Onofre commits to NRC review before resuming operations
* August 7th: San Onofre commits to NRC review before resuming operations
* August 17th: NRC decides to conduct Special Inspection
* August 17th: NRC decides to conduct Special Inspection
* September 10-14: NRC Special Inspection Team onsite
* September 10-14: NRC Special Inspection Team onsite
* NRC to perform inspection prior to resumption of fuel loading 24 N RC Ins p ection A ctivities
* NRC to perform inspection prior to resumption of fuel loading 24
* 2 Preliminary Escalated Findings -Failure to provide redundant drop protection
 
-Failure to report
                                                  -.~US.NRC
* 3 Preliminary Severity Level IV Violations
____ _____
-Procedures
NRC Inspection Activities                        United
-Corrective actions -Training
                                                    ,.
* M anagement Oversight W eaknesses
States.......... ---- .~* ____
-.~US.NRC United States Nuclear .Regulatory Commission
Nuclear .Regulatory
____ ,. _____ ..........  
___ ..,
----.~* ___ .., ____ **-**------*
Protecting People and the Environment Commission
Protecting People and the Environment 25 Causal Evaluations f~~~US.NRC United States Nuclear Regulatory Commission  
                                                                                          **-**------*
,----*-------
* 2 Preliminary Escalated Findings
-"'--*---.Protecting People and the Environment
  - Failure to provide redundant drop protection
* San Onofre A ppa r ent Cause E va luation
  - Failure to report
* Holtec Root Cause A nalysis
* 3 Preliminary Severity Level IV Violations
* Common Cause Evaluation 26 Root Causes
  - Procedures
* San Onofre M anagement failed to provide -Adequate procedures  
  - Corrective actions
-Adequate training to support procedure -Adequate oversight c~US.NRC United States Nuclear Regulatoty Commission Protecting People and tl,e Environn,ent 27 Corrective A ctions ?US.NRC Uni.ted States Nuclear Regulatory Commission  
  - Training
,.._,,.. ,,,.~-*-*-
* Management Oversight Weaknesses 25
...........
 
_ -.....--... *---.. -..... -* .. --....... ,,, Protecting People and the Environment
f~~~ US.NRC Causal Evaluations                      United States Nuclear Regulatory Commission
                                          ,----*-------         - "'--*-- -
                                        .Protecting People and the Environment
* San Onofre Apparent Cause Evaluation
* Holtec Root Cause Analysis
* Common Cause Evaluation 26
 
c~ US.NRC Root Causes                                 United States Nuclear Regulatoty Commission Protecting People and tl,e Environn,ent
* San Onofre Management failed to provide
  -Adequate procedures
  - Adequate training to support procedure
  -Adequate oversight 27
 
                                ?US.NRC Corrective Actions      Uni.ted States Nuclear Regulatory Commission
                        ,.._,,.. ,,,.~-*-*-........... _-.....-- ...
Protecting People and the Environment
                                                                      *--- - --
                                                                          . ..... -*.. ....... ,,,
* Training Requirements
* Training Requirements
* Procedure Enhancements
* Procedure Enhancements
* Equipment Enhancements
* Equipment Enhancements
* Oversight Improvements 28 Event Significance
* Oversight Improvements 28
~US.NRC United States Nuclear :Regulatory Commission Protecting People and the Environnient
 
* N o Actual Drop of Canister
                                            ~ US.NRC Event Significance                      United States Nuclear :Regulatory Commission Protecting People and the Environnient
* No Actual Drop of Canister
* No Radiological Release
* No Radiological Release
* Load Drop Analysis (if canister fell) 29 Next Steps US.NRC United States Nuclem: ltegulatoty Commission  
* Load Drop Analysis (if canister fell) 29
.Protecting People and the Environment
 
US.NRC Next Steps                              United States Nuclem: ltegulatoty Commission
                                        .P rotecting People and the Environment
* Issue NRC Inspection Report
* Issue NRC Inspection Report
* NRC Inspection of Causal Analyses
* NRC Inspection of Causal Analyses
* N RC Inspection of Corrective Actions 30 Summary ~US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment
* N RC Inspection of Corrective Actions 30
 
                                          ~US.NRC Summary                              United States Nuclear Regulatory Commission Protecting People and the Environment
* Could have been prevented
* Could have been prevented
* W eaknesses in management oversight
* Weaknesses in management oversight
* M ultiple failed barriers
* Multiple failed barriers
* Increased N RC oversight 31 Questions
* Increased NRC oversight 31
~~,~U S.NR C United States Nuclear .Regulatory Commission Protecting People and the Environment 32 PRESENTATION SLIDES AS PRESENTED DURING M EETING (ADA M S Accession M L 18318A064)
 
Attachment 3
          ~~,~ U S.NRC Questions  United States Nuclear .Regulatory Commission Protecting People and the Environment 32
,~us.NRc United States Nuclear Regulatoi:y Commission Protecting People and t.he Bn.,ironment San Onofre Special Inspection Webinar November 8, 2018 NRC Region IV, Arlington, TX
 
~-~us.NRc United States Nuclear RegulatoQ' Com.mission Protecting People and the E1zvironment Logistics
PRESENTATION SLIDES AS PRESENTED DURING MEETING (ADAMS Accession ML18318A064)
Attachment 3
 
,~ us.NRc United States Nuclear Regulatoi:y Commission Protecting People and t.he Bn.,ironment San Onofre Special Inspection Webinar November 8, 2018 NRC Region IV, Arlington, TX
 
                                    ~-~ us.NRc Logistics                            United States Nuclear RegulatoQ' Com.mission Protecting People and the E1zvironment
* Webinar Format
* Webinar Format
* Back-up Bridge Line (888) 469-1677, Passcode 2471451
* Back-up Bridge Line (888) 469-1677, Passcode 2471451
* Questions and Answers 2 N RC Staff -,~us.NRC United States Nuclear Regulatory Commission  
* Questions and Answers 2
---------*------*------*
 
                                                    -,~us.NRC NRC Staff                                      United States Nuclear Regulatory Commission
                                                --------- *------*------*
Protecting People and the Environment
Protecting People and the Environment
* Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
* Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
* Patricia Silva, Branch Chief Division of Spent Fuel M anagement
* Patricia Silva, Branch Chief Division of Spent Fuel Management
* Troy Pruett, Director Region IV Division of N uclear M aterials Safety 3 W ebinar Agenda X U S.NRC United States Nuclear Regulatory Commission  
* Troy Pruett, Director Region IV Division of Nuclear Materials Safety 3
-~.~~.--*-.. -------*-A*-*U-*------
 
-~---~--Protecting People and the En.vironment
XU S.NRC Webinar Agenda                    United States Nuclear Regulatory Commission
                                              -~.~~.- - *-.. - - -----*-A*-*U-*-------~---~--
Protecting People and the En.vironment
* Background
* Background
* Canister Downloading Operations
* Canister Downloading Operations
Line 168: Line 275:
* Current Status
* Current Status
* Summary
* Summary
* Questions  
* Questions & Answers 4
& Answers 4 ISFSI Layout Design Holtec UMAX Design '***-"?US.NRC United States Nuclear Regulatory Commission  
 
*-------~ ---------*-* ~-----*-*-*----.. Protecting People and the Environment r-,._n_r1f-i k~ \\_ f ..... ~r .]]: r-::~i;i:.i-...  
                                                                      '**-"?US.NRC ISFSI Layout                                                          United States Nuclear Regulatory Commission
\\. .... p L \i, ..... ; . __ ,,. ~. =-----_r
                                                                      *---- ---~ --------- *-* ~- ---- *- *-*----
* 1 ._ : "'k t-t l .~ --*: \\i ~-_ I r'I f I I I --i-~a I I -,-----r-1 f*---t 5 Transnuclear N UHO M S -'~US.NRC United States Nuclear Regulatory Com.mission  
Protecting People and the Environment
*-*----Protecting People and the Environment 6
                                                                                                                  ..
Holtec U M A X <~US.NRC United States Nuclear Regulatory Commission Protetting People and the Environment 7
Design r-, ._n_r1f-i L        \\i,. ......~r. .]]:
Vertically Ventilated M odule (Vault) /:::}:,e US.NRC United States Nuclear Regulatory Commiss ion Protecting People and the Environment 8
k~\\_f. . .
~US.NRC United States Nuclear Regulatory Commission Protecting People and the En.vironment Spent Fuel Canister Holtec MPC Transfer Cask 9 Downloading:
pr-::~i;i:.i-...
Shield Cone -~ r:e US.N R C United States Nuclear Regulatory Commission  
                                                                    ;.
-----------Protecting People and the Environment 10 Downloading:
__,,.   ~.   =----             ~              -
Transporter
_r
:t~~US.NR C Uniwd States Nuclear Regulatory C-ommission Protecting  
* 1 ._ : "'k t-tl .~   --*: \\i               ~- _
'People and the EnFironment 11 Downloading:
Holtec UMAX                                    If  r'II I
Vault Door ':~-~US.NRC United States Nuclear Regulatory Commission  
Design
-------~ ~---~ -*------Protecting People and the Environment 12 US.NRC United States Nuclear Regulatory Com.mission.
                                        -,-
Protecting People and the Environment Down loading: Alignment 13
I I
'-.~US.NR C United States Nuclear Regulatory Commission  
                                                  -
---------*-----**---------Protecting People and the Environment Downloading:
                                                      -i-~a----r-       I 1 f*---                   t                                   5
Attaching Slings 14 c~US.NR C United States Nuclear Regulatory Commission Protecting People and the Environment Downloading:
 
Attaching Slings 15 Do w nloading Preparations
                          -'~US.NRC Transnuclear NUHOMS United States Nuclear Regulatory Com.mission
*~~US.NR C United States :Nuclear B.cgulatory Commission  
                    *-*----
--------* Protecting  
Protecting People and the Environment 6
.People and the Environment 16
 
+-' en :J C) :::, <( C 0 -c Cl) C Cl) c.. c.. ro I I I W hat Happened on August 3rd? (~~US.NRC United States Nuclear Regulatory Conu:nis:sion Protecting People and the Environment , * -t' * ~~.,c , ', J '" ... SVtlTCt, LF, U< T cc1*s,\10 RIGHT UFj eoav c,,:.) eo::*.*s soo1,,r 011L Y ii ~.
            <~ US.NRC Holtec UMAX  United States Nuclear Regulatory Commission Protetting People and the Environment 7
W hat Happened on August 3rd? 19 What Happened on August 3rd? r us.NR c United States Nuclear Regulatory Com.mission
 
...........----
                                    /:::}:,e     US.NRC Vertically Ventilated Module (Vault)    United States Nuclear Regulatory Commission Protecting People and the Environment 8
............. _, __ .. ____ , _____ .,.. ___ . ______ ... ... Protecting People and the Environment 20 What Happened on August 3rd? c--~US.NRC United States Nuclear Regulatory Commission Protecting People and the EnPironni.ent 21 Post E v ent Actions z~~US.NRC United States Nuclear Regulatory Commission  
 
-*---,-----.-~-----~ ------------* Protecting  
        ~ US.NRC United States Nuclear Regulatory Commission Protecting People and the En.vironment Spent Fuel Canister Holtec MPC Transfer Cask 9
'People and the Environnient
 
                        -~ r:e US.NR C Downloading: Shield Cone  United States Nuclear Regulatory Commission
                                                    -----------
Protecting People and the Environment 10
 
:t~~ US.NRC Downloading: Transporter  Uniwd States Nuclear Regulatory C-ommission Protecting 'People and the EnFironment 11
 
                        ':~-~ US.NRC Downloading: Vault Door  United States Nuclear Regulatory Commission
                          -             ----- -~ ~
                                                - --~- *-- ----
Protecting People and the Environment 12
 
US.NRC United States Nuclear Regulatory Com.mission.
Protecting People and the Environment Down loading:
Alignment 13
 
  '-.~       US.NRC United States Nuclear Regulatory Commission
    ------- --*-----**---------
Protecting People and the Environment Downloading:
Attaching Slings 14
 
c~ US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Downloading:
Attaching Slings 15
 
            *~ ~ US.NRC United States :Nuclear B.cgulatory Commission
              -- - --- --*
Protecting .P eople and the Environment Downloading Preparations 16
 
+-'
en
:J C)
:::,
<(
C 0
I
-c Cl)
I C
Cl) c..
c..
ro I
 
(~~ US.NRC What Happened on August 3rd?                                                            United States Nuclear Regulatory Conu:nis:sion Protecting People and the Environment
                                      , * - t' * ~~.,c , ', J '" ~ ... SVtlTCt, LF, ~ U< T       cc1*s,\10             RIGHT   UFj eoav c,,:.)         eo::*.*s           soo1,,r 011L Y ii             ~ .
 
What Happened on August 3rd?
19
 
rus.NRc              __ ____ _____ ______
What Happened on August 3rd? ...........----
United      States
                                            . . . ....... _,Nuclear
                                                                ..
Protecting People and the Environment Regulatory
                                                                      ,         ___
                                                                              .,.. Com.mission
                                                                                      .     ... ...
20
 
c--~ US.NRC What Happened on August 3rd?  United States Nuclear Regulatory Commission Protecting People and the EnPironni.e nt 21
 
z~~ US.NRC Post Event Actions                          United States Nuclear Regulatory Commission
                                            -*---,- ----.- ~-----~ ------- -----*
Protecting 'People and the Environnient
* Spent Fuel Handling Activities Suspended
* Spent Fuel Handling Activities Suspended
* NRC Inspection Activities
* NRC Inspection Activities
* San Onofre N otification to N RC
* San Onofre Notification to NRC
* Causal Evaluations
* Causal Evaluations
* Corrective Actions 22
* Corrective Actions 22
._z uS.NRC United States Nuclear Regulatory Commission  
 
-------*---*-* Protecting People and the Environment Spent Fuel Handling Activities Suspended
                                              ._ z uS.NRC Spent Fuel Handling Activities Suspended      United States Nuclear Regulatory Commission
                                                                    --- --- -*---*-
* Protecting People and the Environment
* MPC 29 lowered into vault
* MPC 29 lowered into vault
* San Onofre suspends fuel loading
* San Onofre suspends fuel loading
* MPC 30 -Inside Transfer Cask -Seismically Restrained in Fuel Building 23 N RC Inspection Activities US.NRC United States Nuclear Regulatory Commission Protecting l'eople and the Environment
* MPC 30
  - Inside Transfer Cask
    - Seismically Restrained in Fuel Building 23
 
US.NRC NRC Inspection Activities                                      United States Nuclear Regulatory Commission Protecting l'eople and the Environment
* August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
* August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
* August 7th: San Onofre commits to NRC review before resuming operations
* August 7th: San Onofre commits to NRC review before resuming operations
* August 17th: NRC decides to conduct Special Inspection
* August 17th: NRC decides to conduct Special Inspection
* September 10-14: NRC Special Inspection Team onsite
* September 10-14: NRC Special Inspection Team onsite
* NRC to perform inspection prior to resumption of fuel loading 24 N RC Inspection Acti v ities
* NRC to perform inspection prior to resumption of fuel loading 24
* 2 Preliminary Escalated Findings -Failure to provide redundant drop protection
 
-Failure to report
                                                  ~~         US.NRC NRC Inspection Activities                          United States Nu.clear Regulatory Commission
* 3 Preliminary Severity Level IV Violations
                                                    ---*- -**~-----------*6___________ . ,.__,...
-Procedures
Protecting People and the EnPironment
-Corrective actions -Training
* 2 Preliminary Escalated Findings
* M anagement Oversight Weaknesses
  - Failure to provide redundant drop protection
~~US.NRC United States Nu.clear Regulatory Commission  
  - Failure to report
---*--**~-----------*6 ___________ ..,. __ , ... Protecting People and the EnPironment j 25 Causal Evaluations e:~~US.NRC United States Nuclear Regulatory Commission Protecting  
* 3 Preliminary Severity Level IV Violations
&deg;People and the Environnrent
  - Procedures
  - Corrective actions
  - Training
* Management Oversight Weaknesses                j 25
 
e:~~ US.NRC Causal Evaluations                      United States Nuclear Regulatory Commission Protecting &deg;People and the Environnrent
* San Onofre Apparent Cause Evaluation
* San Onofre Apparent Cause Evaluation
* Holtec Root Cause Analysis
* Holtec Root Cause Analysis
* Comm , on Cause E v aluation 26 Root Causes
* Comm,on Cause Evaluation 26
* San Onofre M anagement failed to provide -Adequate procedures  
 
-Adequate training to support procedure  
c~ US.NRC Root Causes                                 United States Nuclear Regulatory Commission Protecting People and the Environnaent
-Adequate oversight c~US.NRC United States Nuclear Regulatory Commission Protecting People and the Environnaent 27 Correcti v e Actions C~>~US.NRC United States Nuclear Regulatory Commission  
* San Onofre Management failed to provide
-*---*----,-----,-.....-
  - Adequate procedures
.... -~ ... --Protecting People and the En.1*ironnient
  - Adequate training to support procedure
  - Adequate oversight 27
 
C~>~ US.NRC Corrective Actions        United States Nuclear Regulatory Commission
                          -*---*----,-----,-.....-.... -~ --
                                                        ...
Protecting People and the En.1*ironnient
* Training Requirements
* Training Requirements
* Procedure Enhancements
* Procedure Enhancements
* Equipment Enhancements
* Equipment Enhancements
* Oversight Improvements 28 Event Significance US.NRC United States Nuclear :Regulatory Commission Protecting People and the Environment
* Oversight Improvements 28
* N o Actual Drop of Canister
 
* N o Radiological Release
US.NRC Event Significance                      United States Nuclear :Regulatory Commission Protecting People and the Environment
* Load Drop Analysis (if canister fell) 29 N e x t Steps c~US.NRC 'United States Nuclear Regulatory Commission  
* No Actual Drop of Canister
---.. -----.. *--*-----*-*--Protecting People and the Environment
* No Radiological Release
* Issue N RC Inspection Report
* Load Drop Analysis (if canister fell) 29
* N RC Inspection of Causal Analyses
 
* N RC Inspection of Corrective Actions 30 Summa ry ~~US.NRC United States Nuclear Regulatory Conu:nissj.on Protecting People and the Environnient
c~ US.NRC Next Steps                              'United States Nuclear Regulatory Commission
                                        --- . -----. *--*----- *- *- -
Protecting People and the Environment
* Issue NRC Inspection Report
* NRC Inspection of Causal Analyses
* NRC Inspection of Corrective Actions 30
 
                                    ~~ US.NRC Summary                              United States Nuclear Regulatory Conu:nissj.on Protecting People and the Environnient
* Could have been prevented
* Could have been prevented
* Weaknesses in management oversight
* Weaknesses in management oversight
* M ultiple failed barriers
* Multiple failed barriers
* Increased N RC oversight 31 Questions i US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment 32 Shims ,~~US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment 33 Shims US.NR C United States Nuclear Regulatory Commission Protecting People and the Environnaent Orig.inal Desian: M achined Slots Design Change: Standoffs Pins 34 Radiation Levels on the ISFSI Pad N Closure Lid~ 7 TS limit on Lid = 0.4 mR/hr TS limit on Outlet Vent = 1.8 mR/hr 6 OUTLET AIR VENT 3 <-"~U S.NRC United States Nuclear Regulatory Com.mission Protecting People and the Environment Survey Results found by the NRC: Lids: 0.015 -0.018 mR/hr Outlet Vents: 0.12 -0.24 mR/hr INLET AIR VENT Canister #29 levels in Gamma Lid: 0.015 mR/hr Outlet Vent: 0.12 mR/hr 35 Aging M anagement Plan ~~US.NRC United States Nuclear Regulatory Com.mission Protecting People and the Environnrent
* Increased NRC oversight 31
 
i US.NRC Questions United States Nuclear Regulatory Commission Protecting People and the Environment 32
 
      ,~~ US.NRC Shims United States Nuclear Regulatory Commission Protecting People and the Environment 33
 
US.NRC Shims                                        United States Nuclear Regulatory Commission Protecting People and the Environnaent Orig.inal Desian: Machined Slots Design Change: Standoffs Pins 34
 
                                                                <-"~ U S.NRC Radiation Levels on the ISFSI Pad                            United States Nuclear Regulatory Com.mission Protecting People and the Environment Survey Results found by the NRC:
N                              Lids: 0.015 - 0.018 mR/hr 6              Outlet Vents: 0.12 - 0.24 mR/hr Closure Lid ~                      OUTLET AIR VENT INLET AIR 7                                      VENT 3
Canister #29 levels in Gamma Lid: 0.015 mR/hr TS limit on Lid = 0.4 mR/hr                      Outlet Vent: 0.12 mR/hr TS limit on Outlet Vent = 1.8 mR/hr 35
 
                                                                ~~ US.NRC Aging Management Plan                                          United States Nuclear Regulatory Com.mission Protecting People and the Environnrent
* Required upon license renewal
* Required upon license renewal
* Tracks Degradation of Structures, Systems, and Components  
* Tracks Degradation of Structures, Systems, and Components
-Concrete -Steel -Stainless Steel
  - Concrete
* Some licensees have performed Aging M anagement Inspections  
  - Steel
-No breaches of the canisters have been identified  
  - Stainless Steel
-No chloride induced stress corrosion cracking has been identified
* Some licensees have performed Aging Management Inspections
* California Costal Commission Commitment 36 Canister Drop analysis -~US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment
  - No breaches of the canisters have been identified
  - No chloride induced stress corrosion cracking has been identified
* California Costal Commission Commitment 36
 
                                                -~ US.NRC Canister Drop analysis                          United States Nuclear Regulatory Commission Protecting People and the Environment
* San Onofre provided preliminary analysis
* San Onofre provided preliminary analysis
* Analysis under N RC review
* Analysis under NRC review
* San Onofre preliminary results: no loss of containment 37 Unresol v ed Item ~:~US.NRC United States Nuclear Regulatory Com.mission  
* San Onofre preliminary results: no loss of containment 37
-------*----*--Protecting People and the Environnaent
 
* Last N RC Inspection report (2017-001) documented an Unresolved Item
                                                    ~:~ US.NRC Unresolved Item                                      United States Nuclear Regulatory Com.mission
* Licensee has modified loading operations to address N RC concern 38
                                                                        ---- ---*-- --*--
*/~us.NR C United States Nuclear Regulatory Commission  
Protecting People and the Environnaent
--------*----------*----*--Seismic and Flooding Protecting People and the Environni.ent
* Last NRC Inspection report (2017-001) documented an Unresolved Item
* Both ISFSI systems at San Onofre are evaluated for: ,, -Design Base Earthquake  
* Licensee has modified loading operations to address NRC concern 38
-Maximum flood height and flood velocity (Tsunami) 39}}
 
                                              */~ * --us.NRC Seismic and Flooding                          United States Nuclear Regulatory Commission
                                                ----- ---       --------*- ---*--
Protecting People and the Environni.e nt
* Both ISFSI systems at San Onofre are evaluated for:
                        ,,
  - Design Base Earthquake
  - Maximum flood height and flood velocity (Tsunami) 39}}

Revision as of 11:34, 20 October 2019

Public Meeting Summary, Special Inspection Webinar
ML18319A139
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/14/2018
From:
NRC Region 4
To:
References
Download: ML18319A139 (79)


Text

U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:

The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.

General Details:

  • Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
  • Over 300 individuals participated in the webinar for various amounts of time.
  • The meeting started at 2 pm CST and ended at approximately 5 pm CST.
  • Three staff members gave a formal presentation that lasted approximately 30 minutes; after the presentation, the NRC answered questions for approximately 2Y2 hours.
  • The public participants submitted approximately 500 questions before and during the webinar.
  • The webinar was recorded and will be placed on the NRC website for public review when it is available.
  • Answers to selected questions that were asked during the webinar will be placed on the NRC website.

Summary of Presentations:

Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including

U.S. Nuclear Regulatory Commission Public Meeting Summary November 14, 2018 Title: San Onofre Nuclear Generating Station Special Inspection Webinar Meeting Identifier: Webinar #769-161-763 Date of Meeting: Thursday, November 8, 2018 Location: Webinar Type of Meeting: Category 3 Purpose of the Meeting:

The NRC hosted a virtual public meeting (webinar) to present preliminary observations regarding a special inspection at San Onofre Nuclear Generating Station. The special inspection was conducted to evaluate the August 3, 2018, incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff responded to questions about the inspection.

General Details:

  • Three NRC staff members participated in the webinar; approximately 10 staff members supported the webinar.
  • Over 300 individuals participated in the webinar for various amounts of time.
  • The meeting started at 2 pm CST and ended at approximately 5 pm CST.
  • Three staff members gave a formal presentation that lasted approximately 30 minutes; after the presentation, the NRC answered questions for approximately 2Y2 hours.
  • The public participants submitted approximately 500 questions before and during the webinar.
  • The webinar was recorded and will be placed on the NRC website for public review when 'it is available.
  • Answers to selected questions that were asked during the webinar will be placed on the NRC website.

Summary of Presentations:

Three NRC staff members formally presented the details of the special inspection that was conducted at the San Onofre Nuclear Generating Station site from September 10-14, 2018. The formal presentation included a summary of the incident, including

MEETING AGENDA ADAMS Accession ML18302A351 )

Attachment 1

October 29, 2018 Title: San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar Date(s) and Time(s): November 08, 2018, 02:00 PM to 05:00 PM Location: Webinar Category: This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.

Purpose: The U.S. Nuclear Regulatory Commission (NRC) will host a virtual public meeting (webinar) to present preliminary observations regarding a Special Inspection at SONGS.

The Special Inspection was conducted to evaluate an August 3 incident involving a loaded spent fuel storage canister that was misaligned and became stuck on a flange while being lowered into a storage vault. Following the NRC's presentation, staff will respond to questions about the inspection.

Contact: Eric Simpson 817-200-1553 eric.simpson@nrc.gov Participants: NRC Troy Pruett, DNMS Director, Region IV Linda Howell, DNMS Deputy Director, Region IV Eric Simpson, Health Physicist, Region IV Patricia Silva, Branch Chief DSFM, NRC Staff URL Meeting Number Password Webinar:

https://attendee.gotowebinar. None N/A com/register/325663643729566723 Docket No: 05000206 05000361 05000362 07200041 Comments: Interested members of the public should register for the webinar via the internet address provided above. After registering, a confirmation email will be sent with details for joining the webinar. During the meeting, participants will be able to see and hear NRC staff on their computer or mobile device. There is also an option to join via phone bridge, but participants must register for the webinar to obtain the call-in number. Public participation will be supported in listen only mode. Meeting slides will be posted on the NRC's public meeting web page in advance. Additional information regarding the San Onofre Nuclear Generating Station Special Inspection can be found at:

https://www.nrc.gov/reactors/operating/ops-experience/songs-spec-insp-activities-cask-loading-misalignment.html

PUBLIC MEETING AGENDA

San Onofre Nuclear Generating Station (SONGS) Special Inspection Webinar November 08, 2018, 02:00 PM to 05:00 PM Webinar Time Topic Speaker 2:00 PM - 5:00 PM Opening Remarks and Introductions Troy Pruett Troy Pruett 2:00 PM - 5:00 PM NRC Presentation Linda Howell Eric Simpson 2:00 PM - 5:00 PM Questions and Discussions All 5:00PM Closing Remarks Troy Pruett

The time of the meeting *is local to the jurisdiction where the meeting is being held.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

ADAMS Accession Number: ML18302A351 Distribution:

RidsOeManCenter Resource RldsNmssOd Resource RldsNmssOd Resource RldsSecyMallCenter Resource RldsOcaMellCenter Resource RldsOlgMallCenter Resource RidsEdoMailCenter Resource EOO_Menagers RldsOcfoMailCenter Resource RldsOiMallCenter Resource RidsRgn1MallCenter Resource RklsRgn3MallCenter Resource RldsOpaMail Resource Kriss.Kennedy@nrc.gov Scott.Morris@nre.gov Unda.Howell@nrc.gov Janine.Katanlc@nrc.gov l!ric.Simpson@nrc.gov Lee.Brookhart@nrc.gov RMdy.Erickacn@nn:.gov Jackie.Cook@mc.gov Chris.Smi1b@nrc.gov BiltMaier@:mrc.gov MichaelVasquez@mc.gov John.Knunu@nrc.gov Victor.Dricks@nrc.gov Emeslinl'.Clay@nrc.gov Janet.Staub@nn:.gov Dan.llCtBeruuder@nrc.gov Micbael.Bloodgood@nrc.gov Michael.Laylon@nn:.gov Aicla.Rivcra-Varona@nn:.gov Polricia.Silva@nre.gov Marlonc.Davis@nre.gov Micbele.Burgess@nrc.gov Christopher.Cook@nrc.gov Angel.Morcno@nrc.gov Jcany.Wcil@nn:.go,* David.Mclntyre@nrc.gov R4DNMS_FCDB Name JFKatanic VLDricks GMVasquez WAMaier TWPruett Office DNMS ORA ACES RSLO DNMS Date 10/24/2018 10/25/2018 10/25/2018 10/25/2018 10/29/2018 OFFICIAL RECORD COPY Link to meeting details: https://www.nrc.gov/pmns/mtg?do=details&Code=20181145 Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html

PRESENTATION SLIDES DISTRIBUTED PRIOR TO THE MEETING (ADAMS Accession ML18312A118)

Attachment 2

US.NRC United States Nuclear Regulatory Com.mission Protecting People and the Environment San Onofre Special Inspection Webinar November 8, 2018 NRC Region IV, Arlington, TX

~~ US.NRC Logistics United States Nuclear Regulatory Con:unission Protecting People and tl,e Envlronnient

  • Webinar Format
  • Back-up Bridge Line (888) 469-1677, Passcode 2471451
  • Questions and Answers 2

{:r~ US.NRC NRC Staff United States Nuclear R.egulatoty Commission.

Protecting People and tl,e Environnient

  • Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
  • Troy Pruett, Director Region IV Division of Nuclear Materials Safety 3
  • ~:~ US.NRC Webinar Agenda United States Nuclear Regulatory Commission Protecting People and the Environ,nent
  • Background
  • Canister Downloading Operations
  • Inspection Team Findings
  • Current Status
  • Summary
  • Questions & Answers 4

I

---+-

ti)

E 0 §, 0

~ ~ .2>

C:

c *; -0 .::::;

-== u,

-

Cf) z  :::>

1- Z C C1)

C :::> C C1)

LL Cf)

-

(.~ US.NRC Transnuclear NUHOMS United States Nuclear .Regulatory C.Ommission Protecting People and the Environment 6

  • e:~US.NRC Holtec UMAX United States Nuclear Regulatory Commission
  • -- ~*----

..

Protecting People and the Environment

...__

7

r. ~ US.NR C Vertically Ventilated Module (Vault) United States Nuclear Regulatory Commission

~~---- ...........................

Protecting People and the Environnient

-,., ... -~"'**-*---- ....... ---- ...-*

8

US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Spent Fuel Canister Holtec MPC Transfer Cask 1]

9

~U S.NRC Downloading: Shield Cone United States Nuclear Regulatory Commission Protecti,ig People and the Enviro11n1ent 10

  • t*~~ US.NRC Downloading: Transporter United States Nuclear Regulatory Com.mission Protecting People and the Environment 11

C)~ US.NRC Downloading: Vault Door United States Nuclear .R..egulatory Commission Protecling People and tlie E11vlronment 12

US.NRC United States Nuclear Regulatoty Commission Protecting People and the Environment; Downloading:

Alignment 13

,~[~;eus.NRC Vuited Sta.tea Nuclear Regulatory Commission Protecting People and the Environment Downloading:

Attaching Slings 14

~*1;: eUS.NRC United Statcs:Nucleu Regulatory Commission Protecting 'People and the En.v iron,nent Downloading:

Attaching Slings 15

~'[.:eUS.NRC United States Nuclear .R cplatoty Commission.

Protecting People and the Envlronrnent Downloading Preparations 16

US.NRC What Happened on August 3rd? United States Nuclear .R egulatoi;y Commission

-- ---------~--

Protecting People and tl,e Environment



  • ~ --  ;'

-t©J* *---t©J-M1©rt&t$J-e-m-e--i$la-&J$HDt-l  ! 't' 1 l I  !  !

  • I

-f$lfi-fl*~-m~-~-$--e-ffl-~-

R!sl ro R!sl cj5i [$HO R!sl o rq51 o R!sl* o KP1* cj5i I I l I I t I I I 17

(-:~ U S.NRC What Happened on August 3rd? United Sta1e& Nuclear Regulatory Commission Protecting People and the Environ,nent

~-* , ,,

  • o.

. -

., ..

. ,,, ~'"* sw1rc - ,

T

What Happened on August 3rd?

19

~~~ US.NRC What Happened on August 3rd? United States Nuclear Regulatory Commission Protecting People and the Environ,nent 20

1

~~~ US.NRC What Happened on August 3rd? *- ---* *-------*-*--*- _______

United States Nuclear .Regulatory Commission

  • ---- ..

Protecting People and the Environment

......,, __ ,.. ....

21

-~ US.NRC Post Event Actions United States Nuclear Regulatory Commission Protecting People and the Environment

  • Spent Fuel Handling Activities Suspended
  • NRC Inspection Activities
  • San Onofre Notification to NRC
  • Causal Evaluations
  • Corrective Actions 22

~U S.NRC Spent Fuel Handling Activities Suspended United States Nuclear Regulatory Commission

-- ----------

Protecting People and the Environment

  • MPC 29 lowered into vault
  • San Onofre suspends fuel loading

- Inside Transfer Cask

- Seismically Restrained in Fuel Building 23

,~~~ US.NRC NRC Inspection Activities United States Nuclear .Regulatory CommiSttion Protecting People and the Environnrent

  • August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
  • August 7th: San Onofre commits to NRC review before resuming operations
  • August 17th: NRC decides to conduct Special Inspection
  • September 10-14: NRC Special Inspection Team onsite
  • NRC to perform inspection prior to resumption of fuel loading 24

-.~US.NRC

____ _____

NRC Inspection Activities United

,.

States.......... ---- .~* ____

Nuclear .Regulatory

___ ..,

Protecting People and the Environment Commission

    • -**------*
  • 2 Preliminary Escalated Findings

- Failure to provide redundant drop protection

- Failure to report

- Procedures

- Corrective actions

- Training

  • Management Oversight Weaknesses 25

f~~~ US.NRC Causal Evaluations United States Nuclear Regulatory Commission

,----*------- - "'--*-- -

.Protecting People and the Environment

  • San Onofre Apparent Cause Evaluation
  • Holtec Root Cause Analysis
  • Common Cause Evaluation 26

c~ US.NRC Root Causes United States Nuclear Regulatoty Commission Protecting People and tl,e Environn,ent

  • San Onofre Management failed to provide

-Adequate procedures

- Adequate training to support procedure

-Adequate oversight 27

?US.NRC Corrective Actions Uni.ted States Nuclear Regulatory Commission

,.._,,.. ,,,.~-*-*-........... _-.....-- ...

Protecting People and the Environment

  • --- - --

. ..... -*.. ....... ,,,

  • Training Requirements
  • Procedure Enhancements
  • Equipment Enhancements
  • Oversight Improvements 28

~ US.NRC Event Significance United States Nuclear :Regulatory Commission Protecting People and the Environnient

  • No Actual Drop of Canister
  • No Radiological Release
  • Load Drop Analysis (if canister fell) 29

US.NRC Next Steps United States Nuclem: ltegulatoty Commission

.P rotecting People and the Environment

  • Issue NRC Inspection Report
  • NRC Inspection of Causal Analyses
  • N RC Inspection of Corrective Actions 30

~US.NRC Summary United States Nuclear Regulatory Commission Protecting People and the Environment

  • Could have been prevented
  • Weaknesses in management oversight
  • Multiple failed barriers
  • Increased NRC oversight 31

~~,~ U S.NRC Questions United States Nuclear .Regulatory Commission Protecting People and the Environment 32

PRESENTATION SLIDES AS PRESENTED DURING MEETING (ADAMS Accession ML18318A064)

Attachment 3

,~ us.NRc United States Nuclear Regulatoi:y Commission Protecting People and t.he Bn.,ironment San Onofre Special Inspection Webinar November 8, 2018 NRC Region IV, Arlington, TX

~-~ us.NRc Logistics United States Nuclear RegulatoQ' Com.mission Protecting People and the E1zvironment

  • Webinar Format
  • Back-up Bridge Line (888) 469-1677, Passcode 2471451
  • Questions and Answers 2

-,~us.NRC NRC Staff United States Nuclear Regulatory Commission


*------*------*

Protecting People and the Environment

  • Eric Simpson, Special Inspection Team Leader Region IV Fuel Cycle and Decommissioning Branch
  • Troy Pruett, Director Region IV Division of Nuclear Materials Safety 3

XU S.NRC Webinar Agenda United States Nuclear Regulatory Commission

-~.~~.- - *-.. - - -----*-A*-*U-*-------~---~--

Protecting People and the En.vironment

  • Background
  • Canister Downloading Operations
  • Inspection Team Findings
  • Current Status
  • Summary
  • Questions & Answers 4

'**-"?US.NRC ISFSI Layout United States Nuclear Regulatory Commission

  • ---- ---~ --------- *-* ~- ---- *- *-*----

Protecting People and the Environment

..

Design r-, ._n_r1f-i L \\i,. ......~r. .]]:

k~\\_f. . .

pr-::~i;i:.i-...

.

__,,. ~. =---- ~ -

_r

  • 1 ._ : "'k t-tl .~ --*: \\i ~- _

Holtec UMAX If r'II I

Design

-,-

I I

-

-i-~a----r- I 1 f*--- t 5

-'~US.NRC Transnuclear NUHOMS United States Nuclear Regulatory Com.mission

  • -*----

Protecting People and the Environment 6

<~ US.NRC Holtec UMAX United States Nuclear Regulatory Commission Protetting People and the Environment 7

/:::}:,e US.NRC Vertically Ventilated Module (Vault) United States Nuclear Regulatory Commission Protecting People and the Environment 8

~ US.NRC United States Nuclear Regulatory Commission Protecting People and the En.vironment Spent Fuel Canister Holtec MPC Transfer Cask 9

-~ r:e US.NR C Downloading: Shield Cone United States Nuclear Regulatory Commission


Protecting People and the Environment 10

t~~ US.NRC Downloading: Transporter Uniwd States Nuclear Regulatory C-ommission Protecting 'People and the EnFironment 11

':~-~ US.NRC Downloading: Vault Door United States Nuclear Regulatory Commission

- ----- -~ ~

- --~- *-- ----

Protecting People and the Environment 12

US.NRC United States Nuclear Regulatory Com.mission.

Protecting People and the Environment Down loading:

Alignment 13

'-.~ US.NRC United States Nuclear Regulatory Commission


--*-----**---------

Protecting People and the Environment Downloading:

Attaching Slings 14

c~ US.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Downloading:

Attaching Slings 15

  • ~ ~ US.NRC United States :Nuclear B.cgulatory Commission

-- - --- --*

Protecting .P eople and the Environment Downloading Preparations 16

+-'

en

J C)
,

<(

C 0

I

-c Cl)

I C

Cl) c..

c..

ro I

(~~ US.NRC What Happened on August 3rd? United States Nuclear Regulatory Conu:nis:sion Protecting People and the Environment

, * - t' * ~~.,c , ', J '" ~ ... SVtlTCt, LF, ~ U< T cc1*s,\10 RIGHT UFj eoav c,,:.) eo::*.*s soo1,,r 011L Y ii ~ .

What Happened on August 3rd?

19

rus.NRc __ ____ _____ ______

What Happened on August 3rd? ...........----

United States

. . . ....... _,Nuclear

..

Protecting People and the Environment Regulatory

, ___

.,.. Com.mission

. ... ...

20

c--~ US.NRC What Happened on August 3rd? United States Nuclear Regulatory Commission Protecting People and the EnPironni.e nt 21

z~~ US.NRC Post Event Actions United States Nuclear Regulatory Commission

-*---,- ----.- ~-----~ ------- -----*

Protecting 'People and the Environnient

  • Spent Fuel Handling Activities Suspended
  • NRC Inspection Activities
  • San Onofre Notification to NRC
  • Causal Evaluations
  • Corrective Actions 22

._ z uS.NRC Spent Fuel Handling Activities Suspended United States Nuclear Regulatory Commission

--- --- -*---*-

  • Protecting People and the Environment
  • MPC 29 lowered into vault
  • San Onofre suspends fuel loading

- Inside Transfer Cask

- Seismically Restrained in Fuel Building 23

US.NRC NRC Inspection Activities United States Nuclear Regulatory Commission Protecting l'eople and the Environment

  • August 5th: NRC Region IV informally notified of Misalignment Event and initiates daily oversight communications
  • August 7th: San Onofre commits to NRC review before resuming operations
  • August 17th: NRC decides to conduct Special Inspection
  • September 10-14: NRC Special Inspection Team onsite
  • NRC to perform inspection prior to resumption of fuel loading 24

~~ US.NRC NRC Inspection Activities United States Nu.clear Regulatory Commission

---*- -**~-----------*6___________ . ,.__,...

Protecting People and the EnPironment

  • 2 Preliminary Escalated Findings

- Failure to provide redundant drop protection

- Failure to report

- Procedures

- Corrective actions

- Training

  • Management Oversight Weaknesses j 25

e:~~ US.NRC Causal Evaluations United States Nuclear Regulatory Commission Protecting °People and the Environnrent

  • San Onofre Apparent Cause Evaluation
  • Holtec Root Cause Analysis
  • Comm,on Cause Evaluation 26

c~ US.NRC Root Causes United States Nuclear Regulatory Commission Protecting People and the Environnaent

  • San Onofre Management failed to provide

- Adequate procedures

- Adequate training to support procedure

- Adequate oversight 27

C~>~ US.NRC Corrective Actions United States Nuclear Regulatory Commission

-*---*----,-----,-.....-.... -~ --

...

Protecting People and the En.1*ironnient

  • Training Requirements
  • Procedure Enhancements
  • Equipment Enhancements
  • Oversight Improvements 28

US.NRC Event Significance United States Nuclear :Regulatory Commission Protecting People and the Environment

  • No Actual Drop of Canister
  • No Radiological Release
  • Load Drop Analysis (if canister fell) 29

c~ US.NRC Next Steps 'United States Nuclear Regulatory Commission

--- . -----. *--*----- *- *- -

Protecting People and the Environment

  • Issue NRC Inspection Report
  • NRC Inspection of Causal Analyses
  • NRC Inspection of Corrective Actions 30

~~ US.NRC Summary United States Nuclear Regulatory Conu:nissj.on Protecting People and the Environnient

  • Could have been prevented
  • Weaknesses in management oversight
  • Multiple failed barriers
  • Increased NRC oversight 31

i US.NRC Questions United States Nuclear Regulatory Commission Protecting People and the Environment 32

,~~ US.NRC Shims United States Nuclear Regulatory Commission Protecting People and the Environment 33

US.NRC Shims United States Nuclear Regulatory Commission Protecting People and the Environnaent Orig.inal Desian: Machined Slots Design Change: Standoffs Pins 34

<-"~ U S.NRC Radiation Levels on the ISFSI Pad United States Nuclear Regulatory Com.mission Protecting People and the Environment Survey Results found by the NRC:

N Lids: 0.015 - 0.018 mR/hr 6 Outlet Vents: 0.12 - 0.24 mR/hr Closure Lid ~ OUTLET AIR VENT INLET AIR 7 VENT 3

Canister #29 levels in Gamma Lid: 0.015 mR/hr TS limit on Lid = 0.4 mR/hr Outlet Vent: 0.12 mR/hr TS limit on Outlet Vent = 1.8 mR/hr 35

~~ US.NRC Aging Management Plan United States Nuclear Regulatory Com.mission Protecting People and the Environnrent

  • Tracks Degradation of Structures, Systems, and Components

- Concrete

- Steel

- Stainless Steel

- No breaches of the canisters have been identified

- No chloride induced stress corrosion cracking has been identified

-~ US.NRC Canister Drop analysis United States Nuclear Regulatory Commission Protecting People and the Environment

  • San Onofre provided preliminary analysis
  • Analysis under NRC review
  • San Onofre preliminary results: no loss of containment 37

~:~ US.NRC Unresolved Item United States Nuclear Regulatory Com.mission


---*-- --*--

Protecting People and the Environnaent

  • Last NRC Inspection report (2017-001) documented an Unresolved Item
  • Licensee has modified loading operations to address NRC concern 38
  • /~ * --us.NRC Seismic and Flooding United States Nuclear Regulatory Commission

--- --------*- ---*--

Protecting People and the Environni.e nt

  • Both ISFSI systems at San Onofre are evaluated for:

,,

- Design Base Earthquake

- Maximum flood height and flood velocity (Tsunami) 39