ML19002A178: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 01/08/2019 | | issue date = 01/08/2019 | ||
| title = Letter to CT Terry, Acceptance of Request to Amend Chapter 10, Decommissioning-Enterprise Project Identifier L-2018-LLA-0312 | | title = Letter to CT Terry, Acceptance of Request to Amend Chapter 10, Decommissioning-Enterprise Project Identifier L-2018-LLA-0312 | ||
| author name = Baker M | | author name = Baker M | ||
| author affiliation = NRC/NMSS/DFCSE/FLB | | author affiliation = NRC/NMSS/DFCSE/FLB | ||
| addressee name = Terry C | | addressee name = Terry C | ||
| addressee affiliation = BWXT Nuclear Operations Group, Inc | | addressee affiliation = BWXT Nuclear Operations Group, Inc | ||
| docket = 07000027 | | docket = 07000027 | ||
| license number = SNM-0042 | | license number = SNM-0042 | ||
| contact person = Baker M | | contact person = Baker M | ||
| case reference number = EPID L-2018-LLA-0312 | | case reference number = EPID L-2018-LLA-0312 | ||
| document type = Letter | | document type = Letter | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:January 08, 2019 Mr. Chris Terry, Manager Licensing and Safety Analysis BWXT Nuclear Operations Group, Inc. | ||
P.O. Box 785 Lynchburg, VA 24505-0785 | |||
Code of Federal Regulations}} | ==SUBJECT:== | ||
ACCEPTANCE OF REQUEST TO AMEND CHAPTER 10, DECOMMISSIONING - | |||
ENTERPRISE PROJECT IDENTIFIER L-2018-LLA-0312 | |||
==Dear Mr. Terry:== | |||
The U.S. Nuclear Regulatory Commission (NRC) staff has received your submittal dated November 2, 2018 (Agencywide Documents Access and Management System [ADAMS] | |||
Accession Number ML18320A140), transmitted by letter 18-061. | |||
The incoming cover letter will be publically available after separation from the enclosures. The enclosures will not be publically available. | |||
We have completed our acceptance review of your submittal and have identified no administrative omissions or deficiencies that would prevent us from proceeding with a detailed review. Your submittal has been assigned Enterprise Project Identifier (EPID) | |||
L-2018-LLA-0312. Please reference this EPID number and Docket Number 70-27 in any future correspondence associated with this request. | |||
Please note that the NRC staffs technical review of your submittal may identify issues that require additional information. Based on our preliminary evaluation and projection of current review schedules, we anticipate completing our formal review by the end of May, 2019. This date could change depending on the findings of our technical review, urgent assignments, or other factors. We will promptly communicate any significant changes to this schedule. In addition, the NRC staff estimates that completing the review of your submittal will require up to 60 staff hours, which corresponds to about $15,780.00 ($263.00/hr). | |||
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
C. Terry 2 If you have any questions regarding this communication, please contact me at 301-415-7119 or by email at Merritt.Baker@nrc.gov. | |||
Sincerely, | |||
/RA/ | |||
Merritt N. Baker, Senior Project Manager Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-27 License No. SNM-42 | |||
C. Terry 3 | |||
==SUBJECT:== | |||
ACCEPTANCE OF REQUEST TO AMEND CHAPTER 10, DECOMMISSIONING - | |||
ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2018-LLA-0312 DATED: January 08, 2019 DISTRIBUTION: FCSE r/f TNaquin,FFLB KKline, DUWP MFlores, DUWP Accession Number: ML19002A178 *via email OFFICE FFLB FFLB FFLB FFLB NAME MNBaker TBrockington JZimmerman MNBaker DATE 01/02/2019 01/07/2019 01/07/2019 01/08/2019 OFFICIAL RECORD COPY}} |
Latest revision as of 07:33, 20 October 2019
ML19002A178 | |
Person / Time | |
---|---|
Site: | BWX Technologies |
Issue date: | 01/08/2019 |
From: | Merritt Baker NRC/NMSS/DFCSE/FLB |
To: | Terry C BWXT |
Baker M | |
References | |
EPID L-2018-LLA-0312 | |
Download: ML19002A178 (2) | |
Text
January 08, 2019 Mr. Chris Terry, Manager Licensing and Safety Analysis BWXT Nuclear Operations Group, Inc.
P.O. Box 785 Lynchburg, VA 24505-0785
SUBJECT:
ACCEPTANCE OF REQUEST TO AMEND CHAPTER 10, DECOMMISSIONING -
ENTERPRISE PROJECT IDENTIFIER L-2018-LLA-0312
Dear Mr. Terry:
The U.S. Nuclear Regulatory Commission (NRC) staff has received your submittal dated November 2, 2018 (Agencywide Documents Access and Management System [ADAMS]
Accession Number ML18320A140), transmitted by letter 18-061.
The incoming cover letter will be publically available after separation from the enclosures. The enclosures will not be publically available.
We have completed our acceptance review of your submittal and have identified no administrative omissions or deficiencies that would prevent us from proceeding with a detailed review. Your submittal has been assigned Enterprise Project Identifier (EPID)
L-2018-LLA-0312. Please reference this EPID number and Docket Number 70-27 in any future correspondence associated with this request.
Please note that the NRC staffs technical review of your submittal may identify issues that require additional information. Based on our preliminary evaluation and projection of current review schedules, we anticipate completing our formal review by the end of May, 2019. This date could change depending on the findings of our technical review, urgent assignments, or other factors. We will promptly communicate any significant changes to this schedule. In addition, the NRC staff estimates that completing the review of your submittal will require up to 60 staff hours, which corresponds to about $15,780.00 ($263.00/hr).
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
C. Terry 2 If you have any questions regarding this communication, please contact me at 301-415-7119 or by email at Merritt.Baker@nrc.gov.
Sincerely,
/RA/
Merritt N. Baker, Senior Project Manager Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-27 License No. SNM-42
C. Terry 3
SUBJECT:
ACCEPTANCE OF REQUEST TO AMEND CHAPTER 10, DECOMMISSIONING -
ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2018-LLA-0312 DATED: January 08, 2019 DISTRIBUTION: FCSE r/f TNaquin,FFLB KKline, DUWP MFlores, DUWP Accession Number: ML19002A178 *via email OFFICE FFLB FFLB FFLB FFLB NAME MNBaker TBrockington JZimmerman MNBaker DATE 01/02/2019 01/07/2019 01/07/2019 01/08/2019 OFFICIAL RECORD COPY