ML23089A384

From kanterella
Jump to navigation Jump to search
BWXT Nuclear Operations Group, Inc - Material Control and Accounting Program Inspection Report 07000027/2023401
ML23089A384
Person / Time
Site: BWX Technologies
Issue date: 03/31/2023
From:
NRC/RGN-II/DFFI
To: Bittner J
BWXT
References
IR 2023401
Download: ML23089A384 (3)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION March 31, 2023 Mr. James J. Bittner Vice President and General Manager BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505-0785

SUBJECT:

BWXT NUCLEAR OPERATIONS GROUP, INC. - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 07000027/2023401

Dear Mr. Bittner:

On March 2, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at BWXT Nuclear Operations Group, Inc. and discussed the results of this inspection with Mr. Rich Freudenberger and other members of your staff. The results of this inspection are documented in the enclosed report.

No violations of more than minor significance were identified during this inspection.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Enclosure(s) transmitted herewith contain(s) SUNSI. When separated from enclosure(s), this transmittal document is decontrolled.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION J. Bittner 2 The enclosed report contains security-related information, so the enclosed report will not be made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains security-related information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Signed by Michel, Eric on 03/31/23 Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07000027 License No. SNM-42

Enclosure:

As stated cc w/o encl: Distribution via LISTSERV OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML23089A384 (Cover letter)

Cover Letter Only: x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available OFFICE RII/DFFI RII/DFFI HQ/MCAB NAME M. Romano E. Michel G. Tuttle DATE 3/28/2023 3/31/2023 3/28/2023