ML23256A009

From kanterella
Jump to navigation Jump to search
BWXT Nuclear Operations Group, Inc. – Lynchburg Inspection Schedule for Calendar Year 2024
ML23256A009
Person / Time
Site: BWX Technologies
Issue date: 09/14/2023
From: Eric Michel
NRC/RGN-II
To: Bittner J
BWXT
References
Download: ML23256A009 (1)


Text

James J. Bittner Vice President and General Manager BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505-0785

SUBJECT:

BWXT NUCLEAR OPERATIONS GROUP, INC. - LYNCHBURG INSPECTION SCHEDULE FOR CALENDAR YEAR 2024

Dear Mr. Bittner:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the BWXT Nuclear Operations Group, Inc. - Lynchburg facility in calendar year 2024. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or reactive inspections are not included in the schedule.

If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Nick Peterka at (404) 997-4556 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07000027 License No. SNM-42

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV September 14, 2023 Signed by Michel, Eric on 09/14/23

ML23256A009 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DFFI RII/DFFI RII/DFFI RII/DFFI NAME T. Vukovinsky N. Peterka J. Rivera Ortiz E. Michel DATE 09/13/2023 09/13/2023 09/13/2023 09/14/2023

Enclosure 2024 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR BWXT NUCLEAR OPERATIONS GROUP, INC. - LYNCHBURG Dates Number of Inspectors Description/Inspection Procedures (IPs)

February 12 - 16 2

Physical Security 1 (Various IPs)

February 26 - March 1 2

Material Control and Accounting (MC&A) 1 (Various IPs)

March 11 - 15 2

Nuclear Criticality Safety 1 (IP 88015)

April 29 - May 3 2

Operational Safety 1 (IP 88020)

June 10 - 14 2

Fire Protection (IP 88055)

Emergency Preparedness (IP 88045)

July 22 - 26 2

Nuclear Criticality Safety 2 (IP 88015)

August 5 - 9 3

Physical Security 2 (Various IPs)

August 12 - 16 2

MC&A 2 (Various IPs)

September 23 - 27 3

Plant Modifications - Triennial (IP 88072)

November 21 - 25 3

Operational Safety 2 (IP 88020)