James J. Bittner Vice President and General Manager BWXT Nuclear Operations Group, Inc.
P.O. Box 785 Lynchburg, VA 24505-0785
SUBJECT:
BWXT NUCLEAR OPERATIONS GROUP, INC. - LYNCHBURG INSPECTION SCHEDULE FOR CALENDAR YEAR 2025
Dear James Bittner:
Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the BWXT Nuclear Operations Group, Inc. - Lynchburg facility in calendar year 2025. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.
Please note that any regional initiative or reactive inspections are not included in the schedule.
If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Noel Pitoniak at (404) 997-4634 with any questions or concerns you may have regarding this letter or the inspection schedule.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07000027 License No. SNM-42
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV June 27, 2024 Taylor, Cynthia signing on behalf of Michel, Eric on 06/27/24
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DFFI RII/DFFI RII/DFFI NAME C. Oelstrom T. Vukovinsky E. Michel DATE 6/27/2024 6/27/2024 6/27/2024
Enclosure 2025 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR BWXT NUCLEAR OPERATIONS GROUP, INC. - LYNCHBURG Dates Number of Inspectors Description/Inspection Procedures (IPs)
February 10 - 14 2
Physical Security 1 (Various IPs)
March 3 - 7 2
Material Control and Accounting (MC&A) 1 (Various IPs)
March 24 - 28 3
Nuclear Criticality Safety 1 (IP 88015)
MC&A Observation (Various IPs)
April 4 - 11 1
Physical Security 2 (Various IPs)
April 28 - May 2 2
Operational Safety 1 (IP 88020)
June 6 - 13 2
Physical Security 3 (Various IPs)
June 23 - 27 3
Radiation Protection (88030)
Transportation (86740)
August 4 - 8 2
Nuclear Criticality Safety 2 (IP 88015)
September 8 - 12 2
MC&A 2 (Various IPs)
October 6 - 10 2
Operational Safety 2 (IP 88020)
Plant Modifications (IP 88070)
TBD 3
Emergency Exercise (IP 88051)