{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 9, 2019 Mano Nazar Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
 
==SUBJECT:==
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR TURKEY POINT 3 & 4 NUCLEAR PLANTS
 
==Dear Mr. Nazar:==
 
In a letter dated October 30, 2018, your staff provided an updated response to Regulatory Issue Summary 2018-02 and requested we reschedule initial operator license examinations for the Turkey Point 3 & 4 Nuclear Plants. Based on your letter, previous Regulatory Issue Summary responses, and requests received from other Region II facilities, we have scheduled the requested examinations as follows:
2020                              2021 Plant / Station Week of        Applicants        Week of        Applicants Turkey Point 3 & 4      N/A              N/A              3/22              12 Scheduled dates for examinations that were requested beyond calendar year 2021 will be communicated separately.
On-site validation of the examinations is typically scheduled to occur with approximately four weeks between the validation week and the examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10), please inform us as this will impact the examination schedule.
 
M. Nazar                                      2 A supplementary letter will be sent to each stations training department director approximately 210 days prior to the initial examination. The letter will provide the director with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Gerald J. McCoy, Chief, Operations Branch I, at 404-997-4551.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
                                              /RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 cc: Distribution via Listserv
 
_ML    19099A291_      SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE              RII:DRS      RII:DRS SIGNATURE              DXB2          GJM1 NAME                DBACON      GMCCOY DATE                4/ 8 /2019    4/ 9 /2019 E-MAIL COPY?      YES      NO  YES      NO}}

Latest revision as of 21:44, 19 October 2019

2019 Schedule Confirmation for Turkey Point
ML19099A291
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/09/2019
From: Gerald Mccoy
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
Download: ML19099A291 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 9, 2019 Mano Nazar Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR TURKEY POINT 3 & 4 NUCLEAR PLANTS

Dear Mr. Nazar:

In a letter dated October 30, 2018, your staff provided an updated response to Regulatory Issue Summary 2018-02 and requested we reschedule initial operator license examinations for the Turkey Point 3 & 4 Nuclear Plants. Based on your letter, previous Regulatory Issue Summary responses, and requests received from other Region II facilities, we have scheduled the requested examinations as follows:

2020 2021 Plant / Station Week of Applicants Week of Applicants Turkey Point 3 & 4 N/A N/A 3/22 12 Scheduled dates for examinations that were requested beyond calendar year 2021 will be communicated separately.

On-site validation of the examinations is typically scheduled to occur with approximately four weeks between the validation week and the examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.

If the number of applicants is reduced to less than ten (10), please inform us as this will impact the examination schedule.

M. Nazar 2 A supplementary letter will be sent to each stations training department director approximately 210 days prior to the initial examination. The letter will provide the director with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Gerald J. McCoy, Chief, Operations Branch I, at 404-997-4551.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 cc: Distribution via Listserv

_ML 19099A291_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DXB2 GJM1 NAME DBACON GMCCOY DATE 4/ 8 /2019 4/ 9 /2019 E-MAIL COPY? YES NO YES NO