| | issue date = 04/09/2019 | | | issue date = 04/09/2019 |
| | title = 2019 Schedule Confirmation for Turkey Point | | | title = 2019 Schedule Confirmation for Turkey Point |
| | author name = McCoy G | | | author name = Mccoy G |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
| | addressee name = Nazar M | | | addressee name = Nazar M |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 9, 2019 Mano Nazar Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd. |
| | Juno Beach, FL 33408 |
| | |
| | ==SUBJECT:== |
| | CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR TURKEY POINT 3 & 4 NUCLEAR PLANTS |
| | |
| | ==Dear Mr. Nazar:== |
| | |
| | In a letter dated October 30, 2018, your staff provided an updated response to Regulatory Issue Summary 2018-02 and requested we reschedule initial operator license examinations for the Turkey Point 3 & 4 Nuclear Plants. Based on your letter, previous Regulatory Issue Summary responses, and requests received from other Region II facilities, we have scheduled the requested examinations as follows: |
| | 2020 2021 Plant / Station Week of Applicants Week of Applicants Turkey Point 3 & 4 N/A N/A 3/22 12 Scheduled dates for examinations that were requested beyond calendar year 2021 will be communicated separately. |
| | On-site validation of the examinations is typically scheduled to occur with approximately four weeks between the validation week and the examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter. |
| | We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. |
| | If the number of applicants is reduced to less than ten (10), please inform us as this will impact the examination schedule. |
| | |
| | M. Nazar 2 A supplementary letter will be sent to each stations training department director approximately 210 days prior to the initial examination. The letter will provide the director with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Gerald J. McCoy, Chief, Operations Branch I, at 404-997-4551. |
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. |
| | Sincerely, |
| | /RA/ |
| | Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 cc: Distribution via Listserv |
| | |
| | _ML 19099A291_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DXB2 GJM1 NAME DBACON GMCCOY DATE 4/ 8 /2019 4/ 9 /2019 E-MAIL COPY? YES NO YES NO}} |
|
---|
Category:Letter
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report ML24291A2882024-10-24024 October 2024 Westinghouse Topical Report - Request for Withholding Information from Public Disclosure L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000250/LER-2024-002-01, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 2024-09-25
[Table view] Category:License-Operator
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML23191A8622023-07-10010 July 2023 301 Exam ADAMS 2B Administrative Items L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations ML22237A2022022-08-25025 August 2022 Notification of Licensed Operator Initial Examination 05000250/2023301, and 05000251/2023301 L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21160A2282021-06-0909 June 2021 301 ADAMS 2B ML21160A2642021-06-0909 June 2021 301 ADAMS 2A-2 ML21160A2702021-06-0909 June 2021 301 ADAMS 2A-3 ML21123A3022021-05-0303 May 2021 301 Exam Report Items - RO as Given Written Exam ML21123A3032021-05-0303 May 2021 301 Exam Report Items - SRO as Given Written Exam ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML19275G9532019-10-0202 October 2019 Exam Administrative Items (ADAMS-2D) ML19199A1702019-07-17017 July 2019 Operator Licensing Examination Approval 05000250/2019302 and 05000251/2019302 L-2019-108, NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 NRC Regulatory Issue Summary 2019-02: Preparation and Scheduling of Operator Licensing Examinations ML19108A2572019-04-18018 April 2019 301 ADAMS 2D Exam Admin Items - Normal Release ML19099A2912019-04-0909 April 2019 2019 Schedule Confirmation for Turkey Point ML19072A2502019-01-26026 January 2019 Tp 2019301 Post Exam Comments ADAMS-1B ML19004A3722019-01-0303 January 2019 Operating Licensing Examination Approval Letter 05000250/2019301 and 05000251/2019301 L-2018-202, NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations2018-10-30030 October 2018 NRC Regulatory Issue Summary 2018-02-Revised Response Preparation and Scheduling of Operator Licensing Examinations ML18240A4272018-08-28028 August 2018 301 Exam Draft Items 2A - Delay Release 2 Yrs ML18137A4252018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Yrs ML18137A4292018-05-17017 May 2018 Tp 2017-301 Exam Administrative Items (ADAMS-2D) ML17349A2092017-12-15015 December 2017 251/2017-301 Post-Exam Comments ML17349A1882017-12-15015 December 2017 05000250/2017301 and 05000251/2017301 Final SRO Written Exam - Delay Release 2 Yrs ML17349A1722017-12-15015 December 2017 05000250,251/2017-301 Final RO Written Exam - Delay Release 2 Yrs ML17298B2882017-10-20020 October 2017 Operator Licensing Written Examination Approval 05000250/2017301 and 05000251/2017301 L-2017-131, Preparation and Scheduling of Operator Licensing Examinations-Updated Response2017-07-28028 July 2017 Preparation and Scheduling of Operator Licensing Examinations-Updated Response ML17191B4822017-07-10010 July 2017 Exan Final Itens 2B - Delay Release 2 Yrs ML17191B4832017-07-10010 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17065A3262017-03-0303 March 2017 Notification of Licensed Operator Initial Examination 05000250/2017301 and 05000251/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16271A0802016-09-27027 September 2016 301 Final RO Written Exam ML16271A0832016-09-27027 September 2016 301 Final SRO Written Exam ML16271A0852016-09-27027 September 2016 301 Post Exam Comments ML15119A4912015-04-29029 April 2015 Initial Exam 2015-301 Draft Sim In-Plant JPMs ML15119A5372015-04-29029 April 2015 Initial Exam 2015-301 General Correspondence ML15119A5342015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative JPMs ML15119A5262015-04-29029 April 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15119A5192015-04-29029 April 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15119A4992015-04-29029 April 2015 Initial Exam 2015-301 Final Administrative Documents ML15119A4972015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15119A4832015-04-29029 April 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15119A4782015-04-29029 April 2015 Initial Exam 2015-301 Draft SRO Written Examination ML15119A4692015-04-29029 April 2015 Initial Exam 2015-301 Draft RO Written Exam ML15119A4672015-04-29029 April 2015 Initial Exam 2015-301 Draft Administrative Documents ML15068A0352015-03-0909 March 2015 Initial Exam 2015-301 Final SRO Written Exam ML15068A0312015-03-0909 March 2015 Initial Exam 2015-301 Final RO Written Exam L-2014-103, Preparation and Scheduling of Operator Licensing Examinations2014-05-14014 May 2014 Preparation and Scheduling of Operator Licensing Examinations ML13156A1042013-06-0505 June 2013 Initial Exam 2013-301 Final Administrative JPMs ML13156A0292013-06-0505 June 2013 Initial Exam 2013-301 Draft Administrative Documents 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 9, 2019 Mano Nazar Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR TURKEY POINT 3 & 4 NUCLEAR PLANTS
Dear Mr. Nazar:
In a letter dated October 30, 2018, your staff provided an updated response to Regulatory Issue Summary 2018-02 and requested we reschedule initial operator license examinations for the Turkey Point 3 & 4 Nuclear Plants. Based on your letter, previous Regulatory Issue Summary responses, and requests received from other Region II facilities, we have scheduled the requested examinations as follows:
2020 2021 Plant / Station Week of Applicants Week of Applicants Turkey Point 3 & 4 N/A N/A 3/22 12 Scheduled dates for examinations that were requested beyond calendar year 2021 will be communicated separately.
On-site validation of the examinations is typically scheduled to occur with approximately four weeks between the validation week and the examination. If you have a need to change the dates of your scheduled exams from those listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10), please inform us as this will impact the examination schedule.
M. Nazar 2 A supplementary letter will be sent to each stations training department director approximately 210 days prior to the initial examination. The letter will provide the director with the chief examiners name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Gerald J. McCoy, Chief, Operations Branch I, at 404-997-4551.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and your response (if any), will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41 cc: Distribution via Listserv
_ML 19099A291_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE DXB2 GJM1 NAME DBACON GMCCOY DATE 4/ 8 /2019 4/ 9 /2019 E-MAIL COPY? YES NO YES NO