ML070470561: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000324, 05000325
| docket = 05000324, 05000325
| license number = DPR-062, DPR-071
| license number = DPR-062, DPR-071
| contact person = Bailey S N , NRR/ADRO/DORL, 415-1321
| contact person = Bailey S , NRR/ADRO/DORL, 415-1321
| case reference number = TAC MD1371, TAC MD1372
| case reference number = TAC MD1371, TAC MD1372
| package number = ML063060328
| package number = ML063060328
Line 15: Line 15:
| page count = 6
| page count = 6
| project = TAC:MD1371, TAC:MD1372
| project = TAC:MD1371, TAC:MD1372
| stage = Other
| stage = Acceptance Review
}}
}}


=Text=
=Text=
{{#Wiki_filter:(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 241, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
{{#Wiki_filter:(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 241, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification  
For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows: ACTION: a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1 .a and 4.8.1.1.2.a.4 within two hours and at least once per [[estimated NRC review hours::12 hours]] thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next [[estimated NRC review hours::12 hours]] and in COLD SHUTDOWN within the following [[estimated NRC review hours::24 hours]].(3) Deleted by Amendment No. 206.D. The licensee shall fully implement and maintain in effect all provisions of the'Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
 
====4.0.2 shall====
apply.Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows: ACTION: a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1 .a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.(3) Deleted by Amendment No. 206.D. The licensee shall fully implement and maintain in effect all provisions of the'Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21 is entitled: "BSEP-04-0135/Supl.
The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21 is entitled: "BSEP-04-0135/Supl.
Response to Order EA-03-086" submitted by letter dated September 30, 2004.Renewed License No. DPR-71 Amendment No. 241 k' f I LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPD'-DAT rION (I' APPI Ir AD.ILTv LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, and LCO 3.0.8.LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable.
Response to Order EA-03-086" submitted by letter dated September 30, 2004.Renewed License No. DPR-71 Amendment No. 241 k' f I LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPD'-DAT rION (I' APPI Ir AD.ILTv LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, and LCO 3.0.8.LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable.
Action shall be initiated within 1 hour to placethe unit, as applicable, in: a. MODE 2 within 7 hours;b. MODE 3 within 13 hours; and c. MODE 4 within 37 hours.Exceptions to this Specification are stated in the individual Specifications.
Action shall be initiated within 1 hour to placethe unit, as applicable, in: a. MODE 2 within [[estimated NRC review hours::7 hours]];b. MODE 3 within [[estimated NRC review hours::13 hours]]; and c. MODE 4 within [[estimated NRC review hours::37 hours]].Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.LCO 3.0.3 is only applicable in MODES 1, 2, and 3.LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made: a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;(continued)
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.LCO 3.0.3 is only applicable in MODES 1, 2, and 3.LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made: a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;(continued)
I Brunswick Unit 1 3.0-1 Amendment No. 241 I  
I Brunswick Unit 1 3.0-1 Amendment No. 241 I  
Line 34: Line 31:
Compliance with Special Operations LCOs is optional.
Compliance with Special Operations LCOs is optional.
When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met.When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met.When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and: a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours; or b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours.At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.Brunswick Unit 1 3.0-3 Amendment No. 241 1 as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components;*
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and: a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within [[estimated NRC review hours::72 hours]]; or b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within [[estimated NRC review hours::12 hours]].At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.Brunswick Unit 1 3.0-3 Amendment No. 241 1 as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components;*
(5) Pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No. 2.(6) Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:
(5) Pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No. 2.(6) Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: 1)I Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: 1)I Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 269, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 269, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.
Renewed License No. DPR-62 Amendment No. 269 d (P I a LCO Applicability 3.0 3.0 LIMITING CONDnITION FOR OPERATION LC1 (On APPI ICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, and LCO 3.0.8.LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable.
Renewed License No. DPR-62 Amendment No. 269 d (P I a LCO Applicability 3.0 3.0 LIMITING CONDnITION FOR OPERATION LC1 (On APPI ICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, and LCO 3.0.8.LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable.
Action shall be initiated within 1 hour to place the unit, as applicable, in: a. MODE 2 within 7 hours;b. MODE 3 within 13 hours; and c. MODE 4 within 37 hours.Exceptions to this Specification are stated in the individual Specifications.
Action shall be initiated within 1 hour to place the unit, as applicable, in: a. MODE 2 within [[estimated NRC review hours::7 hours]];b. MODE 3 within [[estimated NRC review hours::13 hours]]; and c. MODE 4 within [[estimated NRC review hours::37 hours]].Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.LCO 3.0.3 is only applicable in MODES 1, 2, ard 3.LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made: a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;(continued)
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.LCO 3.0.3 is only applicable in MODES 1, 2, ard 3.LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made: a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;(continued)
I Brunswick Unit 2 3.0-1 Amendment No. 269 I LCO Applicability 3.0 3.0 LCOAPPL!CABI!ITY rcontinedr)
I Brunswick Unit 2 3.0-1 Amendment No. 269 I LCO Applicability 3.0 3.0 LCOAPPL!CABI!ITY rcontinedr)
Line 46: Line 43:
Compliance with Special Operations LCOs is optional.
Compliance with Special Operations LCOs is optional.
When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met.When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met.When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and: a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subs'ystem supported system and are able to perform their associated support function within 72 hours; or b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours.At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.Brunswick Unit 2 3.0-3 Amendment No. 269 I}}
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and: a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subs'ystem supported system and are able to perform their associated support function within [[estimated NRC review hours::72 hours]]; or b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within [[estimated NRC review hours::12 hours]].At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.Brunswick Unit 2 3.0-3 Amendment No. 269 I}}

Revision as of 05:02, 13 July 2019

Tech Spec Pages for Amendments 241 and 269 to Adopt TSTF-372
ML070470561
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/15/2007
From:
NRC/NRR/ADRO/DORL/LPLII-2
To:
Bailey S , NRR/ADRO/DORL, 415-1321
Shared Package
ML063060328 List:
References
TAC MD1371, TAC MD1372
Download: ML070470561 (6)


Text

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 241, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 203.(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b (b) Effective July 1, 1982, through July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows: ACTION: a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1 .a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> and in COLD SHUTDOWN within the following 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.(3) Deleted by Amendment No. 206.D. The licensee shall fully implement and maintain in effect all provisions of the'Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21 is entitled: "BSEP-04-0135/Supl.

Response to Order EA-03-086" submitted by letter dated September 30, 2004.Renewed License No. DPR-71 Amendment No. 241 k' f I LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPD'-DAT rION (I' APPI Ir AD.ILTv LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, and LCO 3.0.8.LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable.

Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to placethe unit, as applicable, in: a. MODE 2 within 7 hours0.292 days <br />0.0417 weeks <br />0.00959 months <br />;b. MODE 3 within 13 hours0.542 days <br />0.0774 weeks <br />0.0178 months <br />; and c. MODE 4 within 37 hours1.542 days <br />0.22 weeks <br />0.0507 months <br />.Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.LCO 3.0.3 is only applicable in MODES 1, 2, and 3.LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made: a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;(continued)

I Brunswick Unit 1 3.0-1 Amendment No. 241 I

.,. ( ,. a LCO Applicability 3.01 3.0 L.C APPLIABILITY (continued)

LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations.

Unless otherwise specified, all other TS requirements remain unchanged.

Compliance with Special Operations LCOs is optional.

When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met.When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.

LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and: a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br />; or b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.Brunswick Unit 1 3.0-3 Amendment No. 241 1 as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;(4) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source, and special nuclear materials without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components;*

(5) Pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of Brunswick Steam Electric Plant, Unit Nos. 1 and 2, and H. B. Robinson Steam Electric Plant, Unit No. 2.(6) Carolina Power & Light Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Safety Evaluation Report dated November 22, 1977, as supplemented April 1979, June 11, 1980, December 30, 1986, December 6, 1989, July 28, 1993, and February 10, 1994 respectively, subject to the following provision:

The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: 1)I Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 269, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

Renewed License No. DPR-62 Amendment No. 269 d (P I a LCO Applicability 3.0 3.0 LIMITING CONDnITION FOR OPERATION LC1 (On APPI ICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7, and LCO 3.0.8.LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable.

Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in: a. MODE 2 within 7 hours0.292 days <br />0.0417 weeks <br />0.00959 months <br />;b. MODE 3 within 13 hours0.542 days <br />0.0774 weeks <br />0.0178 months <br />; and c. MODE 4 within 37 hours1.542 days <br />0.22 weeks <br />0.0507 months <br />.Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.LCO 3.0.3 is only applicable in MODES 1, 2, ard 3.LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made: a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;(continued)

I Brunswick Unit 2 3.0-1 Amendment No. 269 I LCO Applicability 3.0 3.0 LCOAPPL!CABI!ITY rcontinedr)

LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations.

Unless otherwise specified, all other TS requirements remain unchanged.

Compliance with Special Operations LCOs is optional.

When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met.When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.

LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and: a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subs'ystem supported system and are able to perform their associated support function within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br />; or b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.Brunswick Unit 2 3.0-3 Amendment No. 269 I