ML091170432: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 144: Line 144:
-The plant is in Mode 6 -Fuel Handling activities are in progress -Boron concentration in the Refueling Cavity has been determined to be less than the required Refueling Boron Concentration Which ONE of the following actions must be initiated immediately in accordance with GP-009, Refueling Cavity Fill, Refueling and Drain of the Refueling Cavity? A. Suspend core alterations since required Keff cannot be ensured; Initiate Emergency Boration in accordance with AOP-002, Emergency Boration B. Suspend core alterations since required Keff cannot be ensured; Initiate Rapid Addition of Boric Acid to RCS in accordance with OP-107.01, CVCS Boration, Dilution, and Chemistry Control C. Shut Fuel Transfer Tube Gate Valve to minimize total boration required; Initiate Emergency Boration in accordance with AOP-002, Emergency Boration D. Shut Fuel Transfer Tube Gate Valve to minimize total boration required; Initiate Rapid Addition of Boric Acid to RCS in accordance with OP-107.01, CVCS Boration, Dilution, and Chemistry Control Thursday, March 19, 2009 10:35:12 AM 67 2009A NRC SRO EXAM FINAL 68. Given the following plant conditions:  
-The plant is in Mode 6 -Fuel Handling activities are in progress -Boron concentration in the Refueling Cavity has been determined to be less than the required Refueling Boron Concentration Which ONE of the following actions must be initiated immediately in accordance with GP-009, Refueling Cavity Fill, Refueling and Drain of the Refueling Cavity? A. Suspend core alterations since required Keff cannot be ensured; Initiate Emergency Boration in accordance with AOP-002, Emergency Boration B. Suspend core alterations since required Keff cannot be ensured; Initiate Rapid Addition of Boric Acid to RCS in accordance with OP-107.01, CVCS Boration, Dilution, and Chemistry Control C. Shut Fuel Transfer Tube Gate Valve to minimize total boration required; Initiate Emergency Boration in accordance with AOP-002, Emergency Boration D. Shut Fuel Transfer Tube Gate Valve to minimize total boration required; Initiate Rapid Addition of Boric Acid to RCS in accordance with OP-107.01, CVCS Boration, Dilution, and Chemistry Control Thursday, March 19, 2009 10:35:12 AM 67 2009A NRC SRO EXAM FINAL 68. Given the following plant conditions:  
-The plant is operating at 100% power -Troubleshooting is in progress on the 1A-SA ESCW Chiller in accordance with AP-929, Troubleshooting Guide -Leads must be lifted in the Control Circuit to support the troubleshooting  
-The plant is operating at 100% power -Troubleshooting is in progress on the 1A-SA ESCW Chiller in accordance with AP-929, Troubleshooting Guide -Leads must be lifted in the Control Circuit to support the troubleshooting  
-The lead lift does not pose a risk of personnel injury or equipment damage Of the following, which are acceptable methods of documentation for the lead lift in accordance with AP-929? 1. Clearance Order (OPS-NGGC-1301, Equipment Clearance)  
-The lead lift does not pose a risk of personnel injury or equipment damage Of the following, which are acceptable methods of documentation for the lead lift in accordance with AP-929? 1. Clearance Order (OPS-NGGC-1301, Equipment Clearance)
: 2. Verification Sign-Off Sheet (OPS-NGGC-1303, Independent Verification)  
: 2. Verification Sign-Off Sheet (OPS-NGGC-1303, Independent Verification)
: 3. Component Manipulation Sign-Off Sheet (OPS-NGGC-1308, Plant Status Control) 4. Add to the Work Order Instructions at the time of lift (ADM-NGGC-01 04, Work Management Process) A. 1 and 2 8. 2 and 3 C. 3 and 4 D. 1 and 4 Thursday, March 19, 200910:35:12 AM 68 2009A NRC SRO EXAM FINAL 69. Which ONE of the following describes the Technical Specification Basis for the High Pressurizer Water Level reactor trip? A. Provides a backup trip to PZR High Pressure reactor trip and ensures that water relief through the PZR PORVs will NOT occur B. Provides primary protection for loss of load events and ensures that the PZR PORVs will NOT lift C. Provides a backup trip to PZR High Pressure reactor trip and ensures that water relief through the PZR safety valves will NOT occur D. Provides primary protection for loss of load events and ensures that the PZR safety valves will NOT lift Thursday, March 19,200910:35:12 AM 69 2009A NRC SRO EXAM FINAL 70 .. Given the following plant conditions:  
: 3. Component Manipulation Sign-Off Sheet (OPS-NGGC-1308, Plant Status Control) 4. Add to the Work Order Instructions at the time of lift (ADM-NGGC-01 04, Work Management Process) A. 1 and 2 8. 2 and 3 C. 3 and 4 D. 1 and 4 Thursday, March 19, 200910:35:12 AM 68 2009A NRC SRO EXAM FINAL 69. Which ONE of the following describes the Technical Specification Basis for the High Pressurizer Water Level reactor trip? A. Provides a backup trip to PZR High Pressure reactor trip and ensures that water relief through the PZR PORVs will NOT occur B. Provides primary protection for loss of load events and ensures that the PZR PORVs will NOT lift C. Provides a backup trip to PZR High Pressure reactor trip and ensures that water relief through the PZR safety valves will NOT occur D. Provides primary protection for loss of load events and ensures that the PZR safety valves will NOT lift Thursday, March 19,200910:35:12 AM 69 2009A NRC SRO EXAM FINAL 70 .. Given the following plant conditions:  
-The plant was operating at 100% power -A Steam Generator Tube Rupture has occurred in the '8' SG -The crew is performing the *actions in PATH-2 to isolate the '8' SG Which ONE of the following describes the actions required to minimize radiation releases in accordance with PATH-2? A. Verify the '8' SG PORV controller setpoint at 85% and place in AUTO 8. Adjustthe  
-The plant was operating at 100% power -A Steam Generator Tube Rupture has occurred in the '8' SG -The crew is performing the *actions in PATH-2 to isolate the '8' SG Which ONE of the following describes the actions required to minimize radiation releases in accordance with PATH-2? A. Verify the '8' SG PORV controller setpoint at 85% and place in AUTO 8. Adjustthe  
Line 231: Line 231:
--, H INSTRUCTIONS RESPONSE NOT OBTAINED 1...---___ ----' NOTE
--, H INSTRUCTIONS RESPONSE NOT OBTAINED 1...---___ ----' NOTE
* For initial leakage reports, where no previous leakage existed, leakage should be assumed to have changed from zero to the current value in the last hour.
* For initial leakage reports, where no previous leakage existed, leakage should be assumed to have changed from zero to the current value in the last hour.
* The monitoring requirements of Step 3 become optional if Step 10 directs performance of Attachment 9, 10, or 11. *010. PERFORM the required actions based on the following:  
* The monitoring requirements of Step 3 become optional if Step 10 directs performance of Attachment 9, 10, or 11. *010. PERFORM the required actions based on the following:
[C.S, 7] Leak Rate (gpd) in any SG + less than 5 + 5 to less than 30 + 30 to less than 75 + Greater than or equal to 75 + sustained for 1 hour Greater than or equal to 75 + Greater than or equal to 75 AND LOSS of REM-01TV-3534, Condenser Vacuum Pump Rad Monitor (Grid 2) + Greater than or equal to 150 + AOP-016 I Rate of Increase Required Action = (gpd/hr) in any SG Leakage Detected N/A =
[C.S, 7] Leak Rate (gpd) in any SG + less than 5 + 5 to less than 30 + 30 to less than 75 + Greater than or equal to 75 + sustained for 1 hour Greater than or equal to 75 + Greater than or equal to 75 AND LOSS of REM-01TV-3534, Condenser Vacuum Pump Rad Monitor (Grid 2) + Greater than or equal to 150 + AOP-016 I Rate of Increase Required Action = (gpd/hr) in any SG Leakage Detected N/A =
* Notify Chemistry to refer to CRC-804 Increased Monitoring N/A = Action Level 1 N/A = Action Level 2 Less than 30 = Action Level 3 Greater than or equal to 30 N/A = =
* Notify Chemistry to refer to CRC-804 Increased Monitoring N/A = Action Level 1 N/A = Action Level 2 Less than 30 = Action Level 3 Greater than or equal to 30 N/A = =
Line 249: Line 249:
* 0 0 0 0 (Xl 0 (Xl 0 (Xl Co L-I (Xl co (J'1 VJ lJ1 .;,.. lJ1 (J'1 (J'1 0 0 0 (Xl 0 (Xl Co 0) co '-J O'l U1 '-J (J'1 0 CXl CXl TECH SPEC UPPERUMlT o t Co 9 Co co CXl to < (') lJ1 to (J'1 CJ) "U m o @
* 0 0 0 0 (Xl 0 (Xl 0 (Xl Co L-I (Xl co (J'1 VJ lJ1 .;,.. lJ1 (J'1 (J'1 0 0 0 (Xl 0 (Xl Co 0) co '-J O'l U1 '-J (J'1 0 CXl CXl TECH SPEC UPPERUMlT o t Co 9 Co co CXl to < (') lJ1 to (J'1 CJ) "U m o @
g 43.8 m o <, I I &sect; 44.2 ffi ( 044.6 < Z CJ)m iTt 45
g 43.8 m o <, I I &sect; 44.2 ffi ( 044.6 < Z CJ)m iTt 45
* o r 45.4  
* o r 45.4
(') 0 m m < 4 5 I m :0 m .8 en en 0 0 -a **.*. , ..... '11...,4 ... .,1 r *.w."  
(') 0 m m < 4 5 I m :0 m .8 en en 0 0 -a **.*. , ..... '11...,4 ... .,1 r *.w."  
...,. C :0 em"'" >> .:1*6.2  
...,. C :0 em"'" >> .:1*6.2
:!"M :!: m. "Tt r-C;; Z o "'0 ..... , ,*,lii. "x .. : 0 " m '." .... ,'.40/). '.' (5 0 --, .. , ." .... >> z en 3: 1 I .... . I z m en 4 .4 LJ 3: a fiic hi *  
:!"M :!: m. "Tt r-C;; Z o "'0 ..... , ,*,lii. "x .. : 0 " m '." .... ,'.40/). '.' (5 0 --, .. , ." .... >> z en 3: 1 I .... . I z m en 4 .4 LJ 3: a fiic hi *  
< Nom 48.
< Nom 48.

Revision as of 23:50, 11 July 2019

Initial Exam 2009-301 Final SRO Written Exam
ML091170432
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/26/2009
From:
NRC/RGN-II
To:
References
Download: ML091170432 (109)


Text

ES-401 Site-Specific SRO Written Examination Cover Sheet Form ES-401-8 u.s. Nuclear Regulatory Commission 2009a HNP NRC Site-Specific SRO Written Examination Applicant Information Name: Date: Facility/Unit:

Region:

IVD Reactor Type: W Q CE D BW D GE D Start Time: Finish Time: Instructions Use the answer sheets provided to document your answers. Staple this cover sheet on top of the answer sheets. To pass the examination you must achieve a final grade of at least 80.00 percent overall, with 70.00 percent or better on the SRO-only items if given in conjunction with the RO exam; SRO-only exams given alone require a final grade of 80.00 percent to pass. You have 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to complete the combined examination, and 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> if you are only taking the SRO portion. Applicant Certification All work done on this examination is my own. I have neither given nor received aid. Applicant's Signature Results RO/SRO-OnlylTotal Examination Values 75 / 2.y / Points Applicant's Scores / --I --Points Applicant's Grade / --/ --Percent 2009a ILC NRC WRITTEN Name: ____________________________

__ 2009A NRC SRO EXAM FINAL Form: 0 Version: 0 1. Given the following plant conditions: -A reactor trip has just occurred from full power due to a loss of Offsite Power -The crew has entered EPP-004, Reactor Trip Response The following plant conditions currently exist: -All SG levels are 21 % and lowering -Total AFW flow to the Steam Generators is 211 KPPH -Loop Low Tavg Bistable lights are lit on TSLB 3 -Loop Low-Low Tavg Bistable lights are lit on TSLB 3 -Group 1 Condenser Steam Dumps red AND green lights are lit on SLB 1 -The BOP is directed to control temperature in accordance with EPP-004 Table 1 Which ONE of the following describes the action required in accordance with Table 1? A. Close all Main Steam Isolation Valves B. Place Steam Dumps in the Steam Pressure Mode C. Decrease AFW flow to the Steam Generators to suspend the RCS Cooldown D. Increase AFW flow to the Steam Generators to raise Steam Generator Water Levels Thursday, March 19,200910:35:01 AM 1 2009A NRC SRO EXAM FINAL 2. Given the following plant conditions:

-The plant was operating at 100% when a small break LOCA occurred -The crew tripped the Reactor and performed a manual SI -The crew is performing actions of PATH-1 The RO reports the following indications:

-FI-943, SI Flow: 0 gpm -'A' CSIP ammeter: 49 amps -'B' CSIP ammeter: 50 amps -RCS pressure:

1390 psig -SI Valves are properly aligned per PATH-1 Guide Attachment 1, Emergency Alignment Which ONE of the following describes the required operator actions for these conditions?

Trip ALL RCPs Verify Alternate Miniflow Valves are: A. Immediately SHUT B. Immediately OPEN C. When FI-943 exceeds 200 gpm SHUT D. When FI-943 exceeds 200 gpm OPEN Thursday, March 19,200910:35:01 AM 2 2009A NRC SRO EXAM FINAL 3. Given the following plant conditions: -A large break LOCA has occurred ..; ALB-004-2-4, Refueling Water Storage Tank 2/4 Low Low Level, annunciator was received several minutes ago -RWST level indicates 20% -All required automatic actions have occurred as designed Which ONE of the following describes the manual action(s) that must be taken by the operator to properly align the 'A' RHR pump for continued core cooling in accordance with EPP-010, Transfer to Cold Leg Recirculation?

A. SHUT 1SI-322, RWST to RHR pump suction valve B. OPEN 1 SI-340, Low Head SI to Cold Leg injection valve C. SHUT 1 RH-25 and 1 RH-63, RHR Discharge to CSIP suction valves D. OPEN 1SI-300 and 1SI-310, CNMT Sump to RHR pump suction valves Thursday, March 19, 2009 10:35:01 AM 3 2009A NRC SRO EXAM FINAL 4. Given the following plant conditions:

-The plant is operating at 100% power -The PRZ Level Control Selector Switch is selected to 459/460 The following conditions are observed:

-Actual Pressurizer level is trending DOWN -VCT level is trending UP -Auto Makeup is NOT in progress -RCS temperature and pressure are stable Which ONE of the following describes the event in progress?

A. RCS leak outside CNMT downstream of FCV-122, Charging Flow Control Valve B. FCV-122, Charging Flow Control Valve, has failed SHUT C. L T-460, Pressurizer Level, is failing LOW D. L T-460, Pressurizer Level, is failing HIGH Thursday, March 19,200910:35:01 AM 4 2009A NRC SRO EXAM FINAL 5. Given the following plant conditions:

-The plant is in Mode 5 -'A' RHR pump is in operation for Shutdown Cooling -'8' RHR pump is secured while packing is adjusted on 1 RH-40, RHR Pump '8' Hot Leg Suction Valve -1 RH-40 is SHUT for packing adjustment

-PT-402, RCS Wide Range Pressure, has failed HIGH The following occur: -'A' RHR Pump trips on overcurrent

-The crew has entered AOP-020, Loss of RCS Inventory or RHR While Shutdown Which ONE of the following is the action to be taken outside of the MCR to establish remote operating capability for 1 RH-40 and what is the effect of this action in accordance with AOP-020? A. The Test Switch for PT-402 must be placed in TEST Applies '8' train interlocks to 1 RH-40 8. The Test Switch for PT-402 must be placed in TEST Defeats the pressure interlock for 1 RH-40 C. 1 RH-40 must be connected to its alternate power supply Applies '8' train interlocks to 1 RH-40 D. 1 RH-40 must be connected to its alternate power supply Defeats the pressure interlock for 1 RH-40 Thursday, March 19, 200910:35:02 AM 5 2009A NRC SRO EXAM FINAL 6. Given the following plant conditions:

-The plant is operating at 100% power -At 1530, the crew entered AOP-018, RCP Abnormal Conditions, due to increasing RCP temperatures

-The following RCP temperatures are observed:

Time A Mtr Brg Temp B Mtr Brg Temp C Mtr Brg Temp 1531 168°F 172°F 171°F 1533 170°F 184°F 171°F 1535 172°F 18rF 172°F 1537 172°F 192°F 172°F 1539 173°F 206°F 172°F 1541 173°F 231°F 173°F Which ONE of the following is the EARLIEST time that the reactor is required to be tripped AND the additional operator action(s) required after the reactor trip, in accordance with AOP-018? A. 1537 B. 1537 C. 1541 D. 1541 Additional Action(s)

Stop ALL RCPs Stop ONLY the 'B' RCP Stop ALL RCPs Stop ONLY the 'B' RCP Thursday, March 19, 2009 10:35:02 AM 6 2009A NRC SRO EXAM FINAL 7. Given the following plant conditions:

-The plant is operating at 100% power -Pressurizer Pressure is 2050 psig and stable -The crew enters AOP-019, Malfunction of RCS Pressure Control -PK-444A, Pressurizer Pressure Master Controller, is placed in MANUAL Which ONE of the following describes the action required to return pressure to 2235 psig using PK-444A? A. Lower the output B. Raise the output C. Lower the setpoint D. Raise the setpoint Thursday, March 19, 2009 10:35:02 AM 7 2009A NRC SRO EXAM FINAL 8. Given the following plant conditions:

-The plant is operating at 51 % power and ramping up to 100% following an outage -The crew enters AOP-018, RCP Abnormal Conditions

-'B' RCP vibrations exceed AOP-018, Attachment 1 trip limits -A Reactor trip is attempted but the Reactor trip breakers fail to open -The crew has entered FRP-S.1, Response to Nuclear Power Generation

/ ATWS Given the current plant status, which ONE of the following action(s) is required to comply with FRP-S.1? A. Immediately trip the 'B' RCP B. Trip the 'B' RCP immediately after FRP-S.1 immediate actions are completed C. Continue operating ALL RCPs until power is <48% and then trip 'B' RCP D. Continue operating ALL RCPs until power is <5% and then trip 'B' RCP Thursday, March 19, 2009 10:35:02 AM 8 2009A NRC SRO EXAM FINAL 9. Given the following plant condition's:

-'8' Steam Generator has been identified as Ruptured and Isolated in accordance with PATH-2 -'A' and 'C' Steam Generators are intact and were used for cooldown -All RCPs are tripped -The crew is evaluating SI Termination Criteria in PATH-2 -8 Steam GeneratorPressure reads 1050psig -'A' Loop Wide Range That (TI-413) reads 505°F -'8' Loop Wide Range Thot (TI-423) reads 525°F -'C' Loop Wide Range That (TI-433) reads 500°F -RCS Wide Range Pressure (PI-402) reads 1435 psig -RCS Wide Range Pressure (PI-403) reads 1385 psig Which ONE of the following is the value for RCS subcooling when calculated in accordance with the' User's Guide? D. 8rF Thursday, March 19, 2009 10:35:02 AM 9 2009A NRC SRO EXAM FINAL 10. Given the following plant conditions:

-The plant is operating at 100% power -OWP-ESF-01 is in place for CNMT Pressure Channel III Subsequently, Instrument Bus S-II is lost. Which ONE of the following describes the status of the Channel II CNMT HI-3 Pressure Bistable light on TSLB-4 and the CNMT Spray Actuation Signal (CSAS)? TSLB-4 CNMT HI-3 CSAS A. illuminated actuated B. illuminated NOT actuated C. extinguished actuated D. extinguished NOT actuated Thursday, March 19, 2009 10:35:02 AM 10 2009A NRC SRO EXAM FINAL 11. Given the following plant conditions:

-The plant is operating at 100% power The following has just occurred:

-The 12SVDC Emergency Bus DP-1A-SA has been de-energized due to a fire -All 12SVDC Batteries and Battery Chargers are undamaged Which ONE of the following describes the status of the CHANNEL I UPS TROUBLE alarm (ALB-01S-2-S) and the reason? The alarm is: A. clear because AC input to the 7.S kVA UPS is still available.

B. clear because DC input to the 7.S kVA UPS is still available.

C. lit because DC input to the 7.S kVA UPS has been lost. D. lit because AC output from the 7.S kVA UPS has been lost. Thursday, March 19, 200910:35:02 AM 11 2009A NRC SRO EXAM FINAL 12. Given the following plant conditions:

-The plant is operating at 100% power -'A' Train equipment is in service -NSW flow and pressure are decreasing

-BOTH ESW Trains received automatic start signals -The crew is performing actions of AOP-022, Loss of Service Water The following conditions are observed:

-1A-SA ESW Pump trips upon starting Which ONE of the following describes the required actions in accordance with AOP-022? A. Immediately START the 'B' CSIP and then STOP the 'A' CSIP B. Immediately STOP the 'A' CSIP and then isolate letdown C. START the 'B' CSIP and then STOP the 'A' CSIP, ONLY if 'A' ESW flow is lost for> ONE minute D. STOP the 'A' CSIP and then isolate letdown, ONLY if 'A' ESW flow is lost for> ONE minute Thursday, March 19,200910:35:02 AM 12 2009A NRC SRO EXAM FINAL 13. Given the following plant conditions:

-The plant is operating at 100% power -The Compressed Air System (CAS) Control Panel is in Sequence 1 -A loss of Auxiliary Bus 10 has occurred -'A' EDG is carrying Bus 1A-SA -A leak is in progress on the Instrument Air system that is causing pressure to lower -The crew enters AOP-017, Loss of Instrument Air -No operator actions have been taken As Instrument Air pressure continues to lower, which ONE of the following describes the order that Air Compressors will start and what determines this start order? Compressor Start Order Reason A. B then C CAS Sequence 1 controlling B. B then C Local Pressure switches controlling C. C then B CAS Sequence 1 controlling D. C then B Local Pressure switches controlling Thursday, March 19, 2009 10:35:02 AM 13 2009A NRC SRO EXAM FINAL 14. Given the following plant conditions:

-The plant is operating at 50% power -'A' Train equipment is in service except for Charging -'B' CSIP is in service for routine testing, 'A' CSIP is in standby -The crew has entered AOP-028, Grid Instability, due to switchyard voltage oscillations (Breaker 105 SA, Emergency Bus A-SA to Aux Bus 0 Tie) (Breaker 125 SB, Emergency Bus B-SB to Aux Bus E Tie) Which ONE of the following lists the action(s) required to be taken FIRST to transfer the 6.9kVemergency buses in accordance with AOP-028? A. Start the A-SA EDG, parallel with Offsite Power to power the 1A-SA Safety Bus, then open breaker 105 B. Start the B-SB EDG, parallel with Offsite Power to power the 1 B-SB Safety Bus, then open breaker 125 C. Open breaker 105 to initiate automatic starting and loading of the A-SA EDG D. Open breaker 125 to initiate automatic starting and loading of the B-SB EDG Thursday, March 19,200910:35:02 AM 14 2009A NRC SRO EXAM FINAL 15. Given the following plant conditions:

-Reactor Trip and Safety Injection have occurred from 100% power -PZR level is off scale low -Containment Radiation Monitors are at normal values -Auxiliary Building Radiation Monitors are in alarm -The crew is implementing EPP-013, LOCA Outside Containment

-The leak has been isolated by shutting 1 SI-340, Low Head SI Train 'A' to Cold Leg Valve Which ONE of the following describes the parameter used to determine that the break was isolated and which RHR pump(s) must now be secured in accordance with EPP-013? Parameter Used RHR Pump Operation A. RCS Pressure Increasing Stop ONL Y 'A' RHR Pump B. RCS Pressure Increasing Stop 'A' and 'B' RHR Pumps C. RCS Subcooling Increasing Stop ONLY 'A' RHR Pump D. RCS Subcooling Increasing Stop 'A' and 'B' RHR Pumps Thursday, March 19, 2009 10:35:02 AM 15 2009A NRC SRO EXAM FINAL 16. Given the following plant conditions: -A Reactor Trip and Safety Injection have occurred -AFW flow cannot be established

-All SG NR levels are off-scale low -The crew enters FRP-H.1, Response to Loss of Secondary Heat Sink, from PATH-1 -RCS Pressure is 100 psig and stable -RCS Temperature is 335°F and trending down slowly -Intact SG pressures are 475 psig and trending down slowly -The RHR pumps are injecting into the RCS in the ECCS Mode Which ONE of the following describes the required implementation of plant emergency operating procedures and the basis? A. Remain in FRP-H.1 because all SG NR levels are off-scale low B. Remain in FRP-H.1 because no AFW flow is available C. Return to PATH-1 because RCS Pressure is less than Intact SG Pressure D. Return to PATH-1 because RCS Temperature is less than 350°F Thursday, March 19, 200910:35:03AM 16 2009A NRC SRO EXAM FINAL 17. Given the following plant conditions:

-A LOCA has occurred -Multiple failures have resulted in a transition to EPP-012, Loss of Emergency Coolant Recirculation

-'A' and 'B' RHR pumps are operating but incapable of cold leg recirc Which ONE of the following describes how plant operation is affected when the SI Suction Auto Switchover is reset in accordance with EPP-012? A. Allows securing one CSIP and realigning CSIP flow to the Charging Line B. Allows securing one RHR Pump AND one CSIP to establish one Train of SI flow C. Prevents RHR Pump Miniflow Isolation Valves cycling open/shut automatically D. Prevents CSIP Alternate Miniflow Isolation Valves cycling open/shut automatically Thursday, March 19,200910:35:03 AM 17 2009A NRC SRO EXAM FINAL 18. Given the following plant conditions:

-The crew is performing EPP-015, Uncontrolled Depressurization of All Steam Generators

-Containment pressure is 4.1 psig and rising -'A' SG level is 10% and lowering -'8' SG level is 52% and stable -'c' SG level is 30% and stable -RCS Hot Leg temperatures are lowering -RCS Cooldown Rate is 90°F/hr Which ONE of the following describes the MINIMUM required AFW flow rate for these conditions? . A. 12.5 KPPH to each SG 8. 12.5 KPPH to 'A' and 'c' SGs, no minimum required to '8' SG C. 12.5 KPPH to 'A' SG, no minimum required to '8' and 'c' SGs D. 210 KPPH total AFW to all SGs, no minimum required to each SG March 19, 2009 10:35:03 AM 18 2009A NRC SRO EXAM FINAL 19. Given the following plant conditions:

.,. The plant is operating at 75% power -NI Gain Adjustment is in progress -N-41 has been completed and the BOP is performing adjustment on N-42 The following conditions are observed: -T avg is increasing

-Tref remains constant -Pressurizer pressure and level are increasing

-Control Rods are stepping Assuming NO operator action has occurred, which ONE of the following describes the event in progress and the required operator action? Event Required Operator Action A. Inadvertant dilution Manually trip the Reactor and Transition to PATH-1 B. Inadvertant dilution Remain at power and Emergency Borate the RCS C. Continuous rod withdrawal Manually trip the Reactor and Transition to PATH-1 D. Continuous rod withdrawal Remain at power and EmergencyBorate the RCS Thursday, March 19, 2009 10:35:03 AM 19 2009A NRC SRO EXAM FINAL 20. Given the following plant conditions:

-Control bank '0' group 2 rod F-10 dropped partially into the core due to a blown movable gripper fuse -The condition has been repaired and the fuse replaced -Actions per AOP-001, Malfunction of Rod Control and Indication System, are in progress to recover the misaligned rod -The lift coil disconnect switches for all control bank '0' rods except for F-1 0 are open -ALB-013-7-1, Rod Control Urgent Alarm, is received when the operator starts to withdraw rod F-10 Which ONE of the following describes the Rod Control Power Cabinet that is producing the Rod Control Urgent Alarm and the cause of this alarm? Power Cabinet Cause A. 1BD Phase Failure B. 1BD Regulation Failure C. 2BD Phase Failure D. 2BD Regulation Failure Thursday, March 19, 2009 10:35:03 AM 20 2009A NRC SRO EXAM FINAL 21. Given the following plant conditions:

-The plant is EOL and operating at 95% power -The crew has entered AOP-038, Rapid Downpower

-Reactor power must be reduced to 65% -A rapid addition of Boric Acid to the RCS will be performed using 1 CS-278, Emergency Boric Acid Addition valve Which ONE of the following identifies the gallons of Boric Acid required for the power reduction in accordance with AOP-038? (Reference provided)

A. 392 B. 565 C. 630 D. 695 Thursday, March 19,200910:35:03 AM 21 2009A NRC SRO EXAM FINAL 22. Given the following plant conditions:

-The compensating voltage on Intermediate Range (IR) channel NI-35 is set too HIGH -A plant shutdown is in progress in accordance with GP-006, Normal Plant Shutdown From Power Operation To Hot Standby (Mode 1 to Mode 3) Which ONE of the following describes the effect on NI-35 indication AND the effect on SR NI operation as power decreases into the Source Range? A. NI-35 will indicate LOWER than NI-36; Both SR Nls will automatically energize B. NI-35 will indicate LOWER than NI-36; Both SR Nls must be manually energized C. NI-35 will indicate HIGHER than NI-36; Both SR Nls will automatically energize D. NI-35 will indicate HIGHER than NI-36; Both SR Nls must be manually energized Thursday, March 19, 200910:35:03 AM 22 2009A NRC SRO EXAM FINAL 23. Given the following plant conditions:

-The plant is operating at 100% power -Rad monitor REM-01TV-3534, Condenser Vacuum Pump is under clearance

-'8' SG has a known 4 gpd tube leak -AOP-016, Excessive Primary Plant Leakage, is in progress Chemistry reports '8' SG tube leakage has increased and provides the following data: Time Leak Rate 0200 48 gpd 0300 76 gpd 0400 77 gpd 0500 78 gpd 0600 85 gpd 0700 126 gpd 0800 158 gpd Which ONE of the following describes the LATEST time by which the plant must be in Mode 3 in accordance with AOP-016? (Reference provided)

A. Today at 0900 B. Today at 1000 C. Today at 1400 D. Tomorrow at 0400 Thursday, March 19,200910:35:03 AM 23 2009A NRC SRO EXAM FINAL 24. Given the following plant conditions:

-The crew is performing FRP-C.1, Response To Inadequate Core Cooling -Both CSIPs are running -SI flow indication is 0 gpm -1 SI-3 and 1 SI-4, BIT Outlet Valves will not OPEN from the MCB -The RO has been directed to establish another high head injection flow path Which ONE of the following describes which valve will be operated preferentially to establish this flow path in accordance with FRP-C.1 and the actions required to supply control power to that valve? A. 1SI-52, Alt High Head SI To Cold Leg; Direct operators locally to shut control power breakers in the field B. 1SI-52, Alt High Head SI To Cold Leg; Turn on valve control power at the Main Control Board C. 1SI-86, High Head SI To Hot Leg; Direct operators locally to shut control power breakers in the field D. 1SI-86, High Head SI To Hot Leg; Turn on valve control power at the Main Control Board Thursday, March 19,200910:35:08 AM 24 2009A NRC SRO EXAM FINAL 25. Given the following plant conditions:

-The plant is operating at 100% power -'A' Train Safety Equipment is in service The following radiation monitors go into HIGH Alarm on the RM-11: -RM-1RR-3595, Volume Control Tank Rm -RM-1RR-3599A, Charging Pump 1A Rm -RM-1 RR-3601, Letdown Hx Vlv Gallery Which ONE of the following identifies the procedure that must be entered? A. AOP-008, Accidental Release of Liquid Waste B. AOP-009, Accidental Release of Waste Gas C. AOP-016, Excessive Primary Plant Leakage D. AOP-032, High RCS Activity Thursday, March 19, 2009 10:35:08 AM 25 2009A NRC SRO EXAM FINAL 26. Given the following plant conditions: -A LOCA has occurred -RCS pressure is 1100 psig and stable -Containment pressure is 5 psig and stable -The crew is performing actions contained in EPP-009, Post LOCA Cooldown and Depressurization Which ONE of the following describes the method that will be used to perform the cooldown of the RCS? Perform the cooldown using ... A. S/G PORVs at less than 100°F per hour. B. S/G PORVs at the maximum achievable rate. C. Condenser steam dumps at less than 100°F per hour. D. Condenser steam dumps at maximum achievable rate. Thursday, March 19, 2009 10:35:08 AM 26 2009A NRC SRO EXAM FINAL 27. Given the following plant conditions:

-The crew is performing EPP-007, Natural Circulation Cooldown With Steam Void In Vessel Without RVLlS Current plant conditions are: -RCS pressure is 1600 psig -All hot leg temperatures are 449°F and stable -Pressurizer level is 30% -Letdown flow is 60 GPM -Total RCP Seal Return Flow is 8 GPM -Total RCP Seal Injection Flow is 27 GPM -An RCS depressurization to 800 psig is about to be performed Which ONE of the following describes what charging flow should be adjusted to prior to starting the depressurization and the reason for making this adjustment?

Charging Flow Reason A. 41 GPM to accommodate void growth B. 41 GPM to allow accurate monitoring of void growth C. 33 GPM to accommodate void growth D. 33 GPM to allow accurate monitoring of void growth Thursday, March 19,200910:35:08 AM 27 2009A NRC SRO EXAM FINAL 28. Given the following plant conditions:

-GP-001, Reactor Coolant System Fill and Vent Mode 5, is in progress -The crew is preparing to start the first RCP Which ONE of the following sets of plant conditions meets the requirements for starting the first RCP in accordance with OP-100, Reactor Coolant System? RCS pressure # 1 Seal # 1 Seal Leakoff Flow A. 350 psig 220 psid 0.1 gpm B. 330 psig 205 psid 0.5 gpm C. 310 psig 190 psid 0.9 gpm D. 290 psig 175 psid 1.3 gpm Thursday, March 19,200910:35:08 AM 28 2009A NRC SRO EXAM FINAL 29. Given the following plant conditions:

-The plant is operating at 100% power -A manual blend to the RWST is being performed in accordance with OP-107.01, CVCS Boration, Dilution, and Chemistry Control -All other systems are in automatic The following annunciators alarm: -ALB-007 3, VCT High-Low Level -ALB-007 5, Computer Alarm Chem & Vol Systems -ALB-006-8-3, Boric Acid Auto Make-Up Signal Blocked Plant Computer provides the following information:

ERFIS 10 LCS0115 LCS0112 ZCS0241 Description VCT Level VCT Level FCV115A Letdown to VCT Divert Value and Trend 14% and lowering 86% and rising RHT Which ONE of the following identifies the failing indicator and the status of Emergency Makeup from the RWST (assuming NO operator action)? Failing indicator Emergency Makeup Status A. LT-115 failing LOW Available B. LT-115 failing LOW Unavailable C. LT-112 failing HIGH Available D. LT-112 failing HIGH Unavailable Thursday, March 19,200910:35:08 AM 29 2009A NRC SRO EXAM FINAL 30. Given the following plant conditions: . -The plant is operating at 100% power near the end of core life -An RCS alternate dilution is in progress -During the alternate dilution, an inadvertent Safety Injection occurs Following the SI actuation, the alternate dilution will. .. A. continue to fill the VCT until the total makeup water batch counter reaches zero. B. continue to fill the VCT until VCT level reaches 40%. C. stop due to an automatic flow deviation caused by the RMUW pumps deenergizing.

D. stop due to an automatic flow deviation caused by the closure of FCV-114A (1CS-155, Makeup to VCT). Thursday.

March 19.200910:35:08 AM 30 2009A NRC SRO EXAM FINAL 31. Given the following plant conditions:

-The plant is in Mode 5 -The RCS is in solid plant operation

-'A' Train equipment is in service -'A' Train RHR is aligned for Shutdown Cooling -PCV-145 (1CS-38), Letdown Pressure Control Valve, is in AUTO Which ONE of the following will result in an increase in RCS pressure?

A. Output fails to 100% on HC-142.1 (1 CS-28), RHR Letdown Controller B. Output fails to 100% on PK-145.1 (1 CS-38), Letdown Pressure Controller C. Instrument Air is lost to HCV-142 (1CS-28), RHR Letdown Control Valve D. Instrument Air is lost to PCV-145 (1CS-38), Letdown Pressure Control Valve Thursday, March 19, 2009 10:35:09 AM 31 2009A NRC SRO EXAM FINAL 32. Given the following plant conditions: -A plant cooldown is in progress in accordance with GP-007, Normal Plant Cooldown Mode 3 to Mode 5 In accordance with GP-007, prior to decreasing to less than or equal to __ oF, one CSIP must be de-energized.

Thursday, March 19,200910:35:09 AM 32 2009A NRC SRO EXAM FINAL 33. Given the following plant conditions:

-An inadvertent SI has occurred -PATH-1 is in progress -The RO notes that a PRZ PORV lifts correctly to reduce RCS pressure Subsequently, the RO notes the following:

-The PORV indicates shut but it is suspected of having failed to fully reseat -PRT pressure indicates 54 psig Which ONE of the following describes the expected PORV Tailpipe Temperature if the Pressurizer PORV has failed to fully reseat? PORV Tailpipe Temperature will be approximately equal to ... A. Pressurizer temperature.

B. Containment temperature C. Saturation Temperature for PRT pressure D. Saturation Temperature for Containment pressure Thursday, March 19,200910:35:09 AM 33 2009A NRC SRO EXAM FINAL 34. Given the following plant conditions:

-The plant is operating at 100% power -ALB-009-8-1, Pressurizer Relief Tank High-Low Level Press Or Temp, is in alarm -PRT pressure indicates 9 psig -PRT temperature indicates 101°F -PRT level indicates 74% Which ONE of the following describes the required action for this alarm in accordance with the Annunciator Panel Procedure and OP-100, Reactor Coolant System? A. Drain the PRT to the Waste Hold Tank B. Drain the PRT to the Reactor Coolant Drain Tank c. Vent the PRT to the Waste Gas Vent Header D. Vent the PRT to the Reactor Coolant Drain Tank Thursday, March 19,200910:35:09 AM 34 2009A NRC SRO EXAM FINAL 35. Given the following plant conditions:

-The plant is operating at 100% power -Excess Letdown is in service in preparation for removing Normal Letdown from service The RO observes the following indications:

-Reactor Power has increased

-Control Bank '0' Rods begin to step Which ONE of the following CCW leak locations would result in these indications and what direction of rod motion is expected?

CCW Leak Rod Direction A. Seal Water Heat Exchanger IN B. Seal Water Heat Exchanger OUT C. Excess Letdown Heat Exchanger IN D. Excess Letdown Heat Exchanger OUT Thursday, March 19,200910:35:09 AM 35 2009A NRC SRO EXAM FINAL 36. Given the following plant conditions:

-The plant is operating at 100% power -'A' CCW pump is running -'B' CCW pump is in standby The following occurs: -'A' CCW trips on overcurrent

-Breaker 105, Emergency Bus A-SA to Aux Bus D Tie, trips open on fault Which ONE of the following describes the response of the 'B' CCW Pump? A. Will NOT auto start. Must be started manually B. Will auto start directly from a sequenced safeguards signal C. Will auto start directly from low pressure in the CCW header D. Will auto start directly from the electrical trip of the 'A' CCW pump Thursday, March 19,200910:35:09 AM 36 2009A NRC SRO EXAM FINAL 37. Given the following plant conditions:

-The plant is operating at 100% power -Multiple annunciators alarm in the MCR -The BOP announces that all MSIVs have shut -The USCG directs a manual reactor trip -The RO announces that 1 CS-11, Letdown Isolation valve and 1 MS-72, MS Line 'c' to TDAFW have lost power Which ONE of the following Pressurizer PORV indications is lost and what Technical Specification action is required due to this event? A. 1 RC-114 (PCV-444B SB) Close the associated block valve and remove power B. 1RC-114 (PCV-444B SB) Close the associated block valve with power maintained C. 1RC-118 (PCV-44SA SA) Close the associated block valve and remove power D. 1RC-118 (PCV-445A SA) Close the associated block valve with power maintained Thursday, March 19,200910:35:09 AM 37 2009A NRC SRO EXAM FINAL 38. Given the following plant conditions:

-The plant is operating at 90% power -Pressurizer pressure is 2235 psig -RCS average temperature is 58rF -AFD is indicating

+ 4% Which ONE of the following will cause the OT 11 T trip setpoint to LOWER? A. Increasing AFD to +15% B. Decreasing power to 88% C. Increasing pressure to 2250 psig D. Decreasing temperature to 585°F Thursday, March 19, 2009 10:35:09 AM 38 2009A NRC SRO EXAM FINAL 39. Which ONE of the following Reactor trips has the primary function of assuring fuel integrity by limiting the allowable heat generation rate (kW/ft) in accordance with Technical Specification bases? A. Overpower Delta T (OPI::.T)

B. Power Range High Flux Trip C. Low Primary Coolant Flow Trip D. Overtemperature Delta T (OT I::. T) Thursday, March 19, 2009 10:35:09 AM 39 2009A NRC SRO EXAM FINAL 40. Given the following plant conditions: -A LOCA has occurred -RCS pressure is 400 psig and stable -CNMT pressure is 15.1 psig and lowering During performance of PATH-1 Guide Attachment 6, the BOP identifies the following:

-ALL four fans in the 'A' Train CNMT Fan Coolers are in HIGH SPEED Which ONE of the following describes the required condition of the fans for 'A' Train of CNMT Fan Coolers and the effect of this failure on CNMT if NOT corrected?

A. One fan per unit running in SLOW SPEED; The 'A' Train Post-Accident Dampers will NOT OPEN resulting in INADEQUATE mixing of the CNMT atmosphere B. One fan per unit running in SLOW SPEED; The 'A' Train fans will overload under higher density atmospheric conditions resulting in HIGHER CNMT pressure C. One fan per unit running in HIGH SPEED; The 'A' Train fans will overload under higher density atmospheric conditions resulting in higher CNMT pressure D. One fan per unit running in HIGH SPEED; The 'A' Train Post-Accident Dampers will NOT OPEN resulting in INADEQUATE mixing of the CNMT atmosphere Thursday, March 19,200910:35:09 AM 40 2009A NRC SRO EXAM FINAL 41. Given the following plant conditions:

-The plant is operating at 100% power -The breaker to MCC 1A34-SA has tripped OPEN Due to this malfunction, which ONE of the following components has lost power? A. CRDM Cooling Fan E-80A B. Primary Shield Cooling Fan S-2A-SA C. CNMT Fan Cooler AH-3A-SA D. RX Support Cooling Fan S-4A-SA Thursday, March 19, 200910:35:09 AM 41 2009A NRC SRO EXAM FINAL 42. Given the following plant conditions:

-The plant is operating at 100% power -'A' Containment Spray Pump is running on recirculation per OST -1118, Containment Spray Operability Train A Quarterly Interval Modes 1-4 Current Conditions: -A small break LOCA occurs in Containment

-The crew performs a manual Reactor Trip and SI -Containment pressure is 3.8 psig and rising Which ONE of the following describes the 'A' Containment Spray System response to the conditions that have developed?

A. The 'A' Containment Spray Pump has been tripped by the Sequencer B. The 'A' Containment Spray Pump has been tripped by the Containment Phase A Isolation (T) signal C. The 'A' Containment Spray Pump will continue to run and the spray header isolation valve will open if Containment pressure exceeds 10 psig D. The 'A' Containment Spray Pump will continue to run, but the spray header isolation valve will NOT open if Containment pressure exceeds 10 psig Thursday, March 19,200910:35:10 AM 42 2009A NRC SRO EXAM FINAL 43. Given the following plant conditions: -A Large Break LOCA has occurred -Containment Spray actuated automatically

-'N Containment Spray pump breaker tripped open on start -'B' Containment Spray pump is running -The crew has completed the actions of PATH-1 and transitioned to EPP-010, Transfer To Cold Leg Recirculation Current plant condictions:

-RWST Level is 23% -Containment Spray Additive Tank level is 3.5% Which one of the following describes the expected status of the Containment Sump Recirculation Valves (1CT-102 and 1CT-105) and the Chemical Addition Isolation Valves (1CT-12 and 1CT-11)? NOTE: Assume no operator action has taken place. A. BOTH trains of Containment Sump Recirculation Valves OPEN; Chemical Addition Isolation Valves OPEN B. BOTH trains of Containment Sump Recirculation Valves OPEN; Chemical Addition Isolation Valves SHUT C. ONLY 'B' Train of Containment Sump Recirculation Valve OPEN; Chemical Addition Isolation Valves OPEN D. ONLY 'B' Train of Containment Sump Recirculation Valve OPEN; Chemical Addition Isolation Valves SHUT Thursday, March 19, 2009 10:35:10 AM 43 2009A NRC SRO EXAM FINAL 44. Given the following plant conditions:

-GP-007, Normal Plant Cooldown, is in progress -RCS Cold Leg Temperature is 255°F -The BOP has been directed to establish the required cooldown rate using Condenser Steam Dumps Currently, in accordance with Technical Specifications, a maximum cooldown of (1) of in anyone hour period is allowed based on limiting the (2) stresses on the Reactor Vessel Inner Wall. A. (1) 30 (2) tensile B. (1) 30 (2) compressive C. (1)50 (2) tensile D. (1) 50 (2) compressive Thursday, March 19,200910:35:10 AM 44 2009A NRC SRO EXAM FINAL 45. Given the following plant conditions: -A reactor trip has just occurred from full power The following plant conditions currently exist: -RCS Tavg is slowly increasing

-All SG levels are 28% and* slowly decreasing

-Loop Low Tavg Bistable lights are lit on TSLB 3 -Loop Low-Low Tavg Bistable lights are NOT lit on TSLB 3 -The crew has entered EPP-004, Reactor Trip Response Which ONE of the following describes the status of the Main Feedwater system and the action required to stabilize and maintain Steam Generator level in accordance with EPP-004? A. ONLY Main Feed Reg Valves auto shut; Adjust MDAFW FCVs to control level B. ONLY Main Feed Reg Valves auto shut; Adjust Main Feed Reg Bypass Valves to control level C. Main Feed Reg AND Main Feed Reg Bypass Valves auto shut; Adjust MDAFW FCVs to control level D. Main Feed Reg AND Main Feed Reg Bypass Valves auto shut; Adjust Main Feed Reg Bypass Valves to control level Thursday, March 19,200910:35:10 AM 45 2009A NRC SRO EXAM FINAL 46. Given the following plant conditions:

-Reactor Trip and Safety Injection have occurred from 100% power -The crew is implementing PATH-1 -Containment pressure is 3.7 psig -'A' SG pressure is 1100 psig -'8' SG pressure is 880 psig -'C' SG pressure is 990 psig -80 KPPH AFW Flow exists to each SG Which ONE of the following describes the status of AFW Isolation signal and the action(s) required?

A. AFW Isolation signal is NOT required; maintain SG Water Levels between 25% and 50%. 8. AFW Isolation signal is NOT required; maintain SG Water Levels between 40% and 50%. C. AFW Isolation signal is required for the '8' SG; manually isolate AFW Flow to '8' SG. D. AFW Isolation signal is required for the '8' and 'C' SGs; manually isolate AFW Flow to '8' and 'C' SGs. Thursday.

March 19. 200910:35:10AM 46 2009A NRC SRO EXAM FINAL 47. Given the following plant conditions:

-The plant is operating at 35% power -The 6.9 KV Aux buses are being supplied by the UATs -Breaker 52-7 is open for inspection by transmission personnel Breaker 52-9 has just tripped open on a fault. If a Generator Lockout occurs, a bus transfer to the SUT ... A. will automatically occur immediately AND the Safety Buses will remain energized from Offsite Power. . B. will automatically occur after 30 seconds AND the Safety Buses will remain energized from Offsite Power. C. will NOT occur automatically AND the Safety Buses will be reenergized from the EDGs within 10 seconds. D. will NOT occur automatically AND the Safety Buses will be reenergized from the EDGs ONLY after 10 seconds. Thursday, March 19,200910:35:10 AM 47 2009A NRC SRO EXAM FINAL 48. Which ONE of the following answers the statement below regarding power to the Reactor Trip Breakers?

Each Reactor Trip Breaker undervoltage (UV) coil is powered by (1) Each shunt coil is powered by (2) A. (1) SSPS (2) SSPS B. (1) SSPS (2) DC Vital bus C. (1) DC Vital bus (2) SSPS D. (1) DC Vital bus (2) DC Vital bus Thursday, March 19, 2009 10:35:10 AM 48 2009A NRC SRO EXAM FINAL 49. Given the following plant conditions:

-The plant is operating at 100% power -A loss of DC Bus 1A-SA occurs Which ONE of the following answers the statement below describing the effects on the 'A' EDG? The EDG Output breaker (1) closed from the MCB. The Governor and Generator Excitation circuits will be (2) A. (1) can be (2) unaffected B. (1) can be (2) deenergized C. (1) can NOT be (2) unaffected D. (1) can NOT be (2) deenergized Thursday, March 19, 2009 10:35:10 AM 49 2009A NRC SRO EXAM FINAL 50. Given the following plant conditions:

-The plant is operating at 25% power -'A' EDG is operating in parallel with the grid for surveillence testing -A loss of off-site power occurs Which ONE of the following describes the response of the 'A' EDG output breaker and the mode in which the EDG will be running after the event? NOTE: Assume no operator action has taken place. EDG Output Breaker EDG Mode A. Remains closed Droop mode 8. Remains closed Isochronous mode C. Opens and then recloses Droop mode D. Opens and then reeloses Isochronous mode ( Thursday, March 19,200910:35:10 AM 50 2009A NRC SRO EXAM FINAL 51. The Main Control Room receives the following reports from the field: -Specific gravity of the fuel oil in both Fuel Oil Day Tanks is .835 -'A' EDG Fuel Oil Day Tank indicated level is 47% -'N EDG Fuel Oil Storage Tank indicates 90,000 gallons -'B' EDG Fuel Oil Day Tank indicated level is 42% -'B' EDG Fuel Oil Storage Tank indicates 110,000 gallons Which ONE of the following is the current OPERABILITY status of the Emergency Diesel Generators? (Reference provided)

'A'EDG 'B'EDG A. OPERABLE OPERABLE B. OPERABLE INOPERABLE C. INOPERABLE OPERABLE D. INOPERABLE INOPERABLE Thursday.

March 19.200910:35:10 AM 51 2009A NRC SRO EXAM FINAL 52. Given the following plant conditions:

-Control Room Ventilation is in a normal lineup with 'A' Train fans in operation

-Power is lost to the 'B' Train North MCR Emergency Outside Air Intake (OAI) Radiation Monitor, RM-3505B2SB Which ONE of the following describes the status of the Control Room Isolation Signal and the action required by Technical Specifications?

A Control Room Isolation Signal. .. A. has NOT occurred; maintain the respective OAI isolated.

B. has NOT occurred; place MCR Ventilation in recirculation with ALL OAls isolated.

C. has occurred; maintain the respective OAI isolated.

D. has occurred; maintain MCR Ventilation in recirculation with ALL OAls isolated.

Thursday, March 19, 2009 10:35:10 AM 52 2009A NRC SRO EXAM FINAL 53. Following a Reactor Trip and Safety Injection Actuation, which ONE of the following sets of components are directly supplied by the Emergency Service Water system? A. CSIP Oil Coolers EDG Jacket Water Heat Exchangers Containment Fan Coil Units (AH-37,-38,-39)

B. CSIP Oil Coolers CCW Heat Exchangers Containment Fan Coolers (AH-1,-2,-3,-4)

C. RHR Heat Exchangers CCW Heat Exchangers AFW Pump Emergency Makeup D. RCP Bearing Oil Coolers EDG Jacket Water Heat Exchangers Containment Fan Coolers (AH-1,-2,-3,-4)

Thursday, March 19, 2009 10:35:11 AM 53 2009A NRC SRO EXAM FINAL 54. Given the following plant conditions:

-The Reactor is at 3% power -Main Feed Reg Valve Bypasses are controlling SG Level in AUTO -GP-005, Power Operation Mode 2 to Mode 1 is in progress Current Plant Conditions:

-Instrument Air (IA) Pressure begins lowering due to a leak and cannot be stabilized Which ONE of the following describes the action required in accordance with AOP-017, Loss of Instrument Air and at what MINIMUM pressure this action is required?

Action Required IA Pressure A. Trip the Reactor and Perform PATH-1 60 psig B. Trip the Reactor and Perform PATH-1 35 psig C. Initiate AFW flow to maintain Steam Generator levels 60 psig D. Initiate AFW flow to maintain Steam Generator levels 35 psig Thursday, March 19, 2009 10:35:11 AM 54 2009A NRC SRO EXAM FINAL 55. Following a Containment Isolation Phase 'A' signal, which one of the following sampling pathways can be un isolated without resetting the Phase A signal? A. RHR loops B. RCS Hot Legs C. Pressurizer Liquid Space D. Safety Injection Accumulators Thursday, March 19,200910:35:.11 AM 55 2009A NRC SRO EXAM FINAL 56. Which ONE of the following describes the power supplies to the Rod Drive Motor Generator (MG) sets and the breakers that would be locally tripped first during an ATWS in accordance with the local operator aid? ROMG Power Supplies Breakers A. 102 and 1E2 MG set motor breakers B. 102 and 1E2 MG set generator output breakers C. 103 and 1E3 MG set motor breakers O. 103 and 1E3 MG set generator output breakers Thursday, March 19, 2009 10:35:11 AM 56 2009A NRC SRO EXAM FINAL 57. Given the following plant conditions:

-Following a rapid power reduction from 100% power, the plant is stabilized at 40% power -Pressurizer level is 47% and decreasing

-RCS pressure is 2275 psig and decreasing

-RCS Tavg is at Tref Based on these conditions Pressurizer Reference level should be (1) AND Pressurizer Backup Heaters should be (2) A. (1) 25 (2) energized B. (1) 25 (2) de-energized C. (1) 39 (2) energized D. (1) 39 (2) de-energized Thursday, March 19,200910:35:11 AM 57 2009A NRC SRO EXAM FINAL 58. Given the following plant conditions:

-A reactor startup is in progress in accordance with GP-004, Reactor Startup -The Reactor Operator is currently withdrawing Control Bank 'C' rods Which ONE of the following is the indicated rod height on the Control Bank 'C' Step Counters at which Control Bank '0' rods are expected to begin withdrawing and what is the expected rod speed? A. B. C. o. Control Bank 'C' Step Counter Indication 103 Steps 103 Steps 128 Steps 128 Steps Thursday, March 19,200910:35:11 AM Control Bank '0' Rod Speed 48SPM 64SPM 48SPM 64SPM 58 2009A NRC SRO EXAM FINAL 59. Given the following plant conditions:

-The plant was operating at 100% power The following occurs: -The crew has entered AOP-001, Malfunction of Rod Control and Indication System, for a dropped rod -Control Bank '0' Rod H-2 is currently at 0 steps -ALL other Control Bank '0' Rods are currently indicating 218 steps -The dropped control rod cannot be recovered within the time constraints in Technical Specifications Which ONE of the following describes the effect on AFO for the channel NEAREST the dropped rod and the concern with this rod configuration?

A. AFO will be MORE negative; Rod recovery will result in localized power peaking B. AFO will be MORE negative; Technical Specification LCO for Shutdown Margin will not be met C. AFO will be LESS negative; Rod recovery will result in localized power peaking O. AFO will be LESS negative; Technical Specification LCO for Shutdown Margin will not be met Thursday, March 19, 200910:35:11 AM 59 2009A NRC SRO EXAM FINAL 60. Given the following plant conditions:

-EPP-004, Reactor Trip Response, has been entered following a reactor trip -The crew is verifying Natural Circulation conditions as a result of a loss of power to all RCPs -Five (5) core exit thermocouples have been identified as failed but no additional actions have been taken to address these thermocouples Which ONE of the following describes the expected indication on the RVLlS Plasma Display for the failed thermocouples and the expected effect, if any, on RCS subcooling as indicated on ERFIS? Expected Indication Subcooling Indication MORE subcooling than actual SAME subcooling as actual LESS subcooling than actual SAME subcooling as actual Thursday, March 19, 2009 10:35:11 AM 60 2009A NRC SRO EXAM FINAL 61. Given the following plant conditions:

-The plant is in Mode 5 with the RCS loops filled -Train 'B' RHR is OPERABLE and in operation

-Train 'A' RHR pump tripped on overcurrent Which ONE of the following identifies the SG water level that must be maintained in accordance with T.S. 3.4.1.4.1, RCS Cold Shutdown -Loops Filled? A. Wide Range (WR) water level greater than 57% in at least ONE SG B. Wide Range (WR) water level greater than 57% in at least TWO SGs C. Narrow Range (NR) water level greater than 30% in at least ONE SG D. Narrow Range (NR) water level greater than 30% in at least TWO SGs Thursday, March 19, 200910:35:11 AM 61 2009A NRC SRO EXAM FINAL 62. Given the following plant conditions:

-The plant is operating at 100% power -A leak has developed in the DEH system -DEH fluid pressure 1725 psig and decreasing

-DEH reservoir level is lowering The following indications are received:

-ALB-020-4-2B, EH Fluid Low Press, is in alarm -ALB-020-4-4A, EH RSVR Low Level, is in alarm -ALB-020-4-4B, EH RSVR Low-Low Level, is in alarm -The LFT LOCKOUT relay on Generator Protective Relay Panel 1A has tripped Which ONE of the following describes the automatic operation of the standby DEH Pump if DEH fluid pressure and reservoir level continue to lower? The standby DEH Pump ... A. will start when DEH fluid pressure lowers to 1450 psig. B.. will start when DEH fluid pressure lowers to 1500 psig. C. was prevented from starting when the LFT LOCKOUT relay tripped. D. was prevented from starting when the EH RSVR Low-Low Level annunciator alarmed. Thursday, March 19, 2009 10:35: 11 AM 62 2009A NRC SRO EXAM FINAL 6B. Given the following plant conditions: -A Release of Waste Gas Decay Tank 'J' is in progress in accordance with OP-120.07, Waste Gas Processing Which ONE of the following Radiation Monitors will initiate an automatic isolation of the Waste Gas Release? A. RM-3546, Stack 5 PIG B. RM-3546-1, Stack 5 WRGM C. RM-3547, Stack 5A PIG D. RM-3547-1, Stack5A WRGM Thursday, March 19,200910:35:11 AM 63 2009A NRC SRO EXAM FINAL 64. Given the following plant conditions: -A rupture in the Instrument Air system has occurred -Instrument Air header pressure is 85 psig and lowering slowly Which ONE of the following describes the status of 1SA-506, Instrument Air from Service Air Isolation Valve, and the status of ALB-002-8-1, Instrument Air Low Pressure Alarm? 1SA-506 Alarm status A. OPEN Lit B. OPEN NOT Lit C. CLOSED Lit D. CLOSED NOT Lit Thursday, March 19,200910:35:12 AM 64 2009A NRC SRO EXAM FINAL 65. Given the following plant conditions:

-An Ultra Violet Detector has failed in the Diesel Generator Building resulting in ALB-030-8-1, Fire Detection System Fire, going into alarm Which ONE of the following describes the type of sprinkler system in the Diesel Generator Building and the status of the sprinkler system deluge valve in response to this condition?

Sprinkler Type Sprinkler Deluge Valve status A. Multicycle Actuated B. Multicycle NOT Actuated C. Wet Pipe Actuated D. Wet Pipe NOT Actuated Thursday, March 19, 2009 10:35: 12 AM 65 2009A NRC SRO EXAM FINAL 66. Given the following plant conditions:

-AOP-004, Remote Shutdown, is in progress due to a fire in the MCR -You have been directed to isolate the SI Accumulators Which ONE of the following describes the required RCS pressure range to isolate the SI Accumulators in accordance with AOP-004 and where the SI Accumulator Discharge Valves controls are located? RCS Pressure Range Location A. 900-1000 psig Auxiliary Control Panel B. 900-1000 psig Auxiliary Transfer Panels C. 1900-1950psig Auxiliary Control Panel D. 1900-1950 psig Auxiliary Transfer Panels Thursday, March 19,200910:35:12 AM 66 2009A NRC SRO EXAM FINAL 67. Given the following plant conditions:

-The plant is in Mode 6 -Fuel Handling activities are in progress -Boron concentration in the Refueling Cavity has been determined to be less than the required Refueling Boron Concentration Which ONE of the following actions must be initiated immediately in accordance with GP-009, Refueling Cavity Fill, Refueling and Drain of the Refueling Cavity? A. Suspend core alterations since required Keff cannot be ensured; Initiate Emergency Boration in accordance with AOP-002, Emergency Boration B. Suspend core alterations since required Keff cannot be ensured; Initiate Rapid Addition of Boric Acid to RCS in accordance with OP-107.01, CVCS Boration, Dilution, and Chemistry Control C. Shut Fuel Transfer Tube Gate Valve to minimize total boration required; Initiate Emergency Boration in accordance with AOP-002, Emergency Boration D. Shut Fuel Transfer Tube Gate Valve to minimize total boration required; Initiate Rapid Addition of Boric Acid to RCS in accordance with OP-107.01, CVCS Boration, Dilution, and Chemistry Control Thursday, March 19, 2009 10:35:12 AM 67 2009A NRC SRO EXAM FINAL 68. Given the following plant conditions:

-The plant is operating at 100% power -Troubleshooting is in progress on the 1A-SA ESCW Chiller in accordance with AP-929, Troubleshooting Guide -Leads must be lifted in the Control Circuit to support the troubleshooting

-The lead lift does not pose a risk of personnel injury or equipment damage Of the following, which are acceptable methods of documentation for the lead lift in accordance with AP-929? 1. Clearance Order (OPS-NGGC-1301, Equipment Clearance)

2. Verification Sign-Off Sheet (OPS-NGGC-1303, Independent Verification)
3. Component Manipulation Sign-Off Sheet (OPS-NGGC-1308, Plant Status Control) 4. Add to the Work Order Instructions at the time of lift (ADM-NGGC-01 04, Work Management Process) A. 1 and 2 8. 2 and 3 C. 3 and 4 D. 1 and 4 Thursday, March 19, 200910:35:12 AM 68 2009A NRC SRO EXAM FINAL 69. Which ONE of the following describes the Technical Specification Basis for the High Pressurizer Water Level reactor trip? A. Provides a backup trip to PZR High Pressure reactor trip and ensures that water relief through the PZR PORVs will NOT occur B. Provides primary protection for loss of load events and ensures that the PZR PORVs will NOT lift C. Provides a backup trip to PZR High Pressure reactor trip and ensures that water relief through the PZR safety valves will NOT occur D. Provides primary protection for loss of load events and ensures that the PZR safety valves will NOT lift Thursday, March 19,200910:35:12 AM 69 2009A NRC SRO EXAM FINAL 70 .. Given the following plant conditions:

-The plant was operating at 100% power -A Steam Generator Tube Rupture has occurred in the '8' SG -The crew is performing the *actions in PATH-2 to isolate the '8' SG Which ONE of the following describes the actions required to minimize radiation releases in accordance with PATH-2? A. Verify the '8' SG PORV controller setpoint at 85% and place in AUTO 8. Adjustthe

'8' SG PORV controller setpoint to 88% and place in AUTO C. Place the '8' SG PORV controller in MANUAL and control pressure at 1107 psig D. Place the '8' SG PORV controller in MANUAL and control pressure at 1145psig Thursday, March 19,200910:35:12 AM 70 2009A NRC SRO EXAM FINAL 71. A Source Check is being performed on the Plant Vent Stack Wide Range Gas Monitor, (RM-3509-1-SA) . The activity measured by the channel is lower than required when the source is exposed. Which ONE of the following describes the expected indication for this condition?

A. The Check Source (CIS) button on the RM-11 console flashes B. The Check Source (CIS) button on the RM-23 module flashes C. The symbol (**) is presented on the RM-11 screen indicating Channel Check Source Failed D. The symbol (**) is presented on the RM-23 module indicating Channel Check Source Failed Thursday, March 19, 2009 10:35:12 AM 71 2009A NRC SRO EXAM FINAL 72. Given the following plant conditions: -A Refueling Outage is in progress -You have been assigned a task in the RCA and are preparing to sign on to the Operations RWP -The survey map records the radiation levels as 1050 mRem/hour in the general area Which ONE of the following describes the classification of this area and the MINIMUM approval authority?

Area Classification Individual Approving Entry A. Very High Radiation Area Plant General Manager B. Very High Radiation Area Radiation Control Supervisor C. Locked High Radiation Area Plant General Manager D. Locked High Radiation Area Radiation Control Supervisor Thursday, March 19,200910:35:12 AM 72 2009A NRC SRO EXAM FINAL 73. Given the following plant conditions:

-The crew is performing EPP-009, Post LOCA Cooldown and Depressurization, due' to a small break LOCA -The crew has initiated a cooldown to Cold Shutdown -The first CSIP has been secured and the crew is evaluating RCS Pressure response -The USCG has asked if "RCS pressure is stable or decreasing" The following is observed:

Time 1400 1402 1404 1406 RCS Temperature (OF) 435 433 431 429 RCS Pressure (psig) 462 460 458 456 Which ONE of the following describes the correct response for this event in accordance with the EOP User's Guide? A. STABLE because the crew is controlling the ReS pressure decrease B. STABLE because RCS subcooling is increasing C. DECREASING even though RCS subcooling is increasing D. DECREASING because the crew cannot control the RCS pressure decrease Thursday, March 19, 2009 10:35:12 AM 73 2009A NRC SRO EXAM FINAL 74. Given the following plant conditions:

-The plant is operating at 100% power -A loss of MCB annunciators has occurred and the crew has entered AOP-037, Loss of Main Control Room Annunciators

-The USCO has determined that the following ALBs are lost -ALB-001, Containment Spray & Accumulator System -ALB-002, Emergency Service Normal Service Water System -ALB-003, Miscellaneous Systems "' ALB-004, RHR/RWST System Which ONE of the following describes the Technical Specification implications and required action for loss of these ALBs? A. The CNMT Sump Level and Flow Monitoring Alarm is Inoperable; Begin logging CNMT Sump Level and determining Flow manually within 10 minutes B. The CNMT Sump Level and Flow Monitoring Alarm is Inoperable; Begin logging CNMT Sump Level and determining Flow manually within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C. The Main and Aux Reservoir Level and Temperature Alarms are Inoperable; Begin logging Temperature and Level for both Reservoirs within 10 minutes D. The Main and Aux Reservoir Level and Temperature Alarms are Inoperable; Begin logging Temperature and Level for both Reservoirs within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Thursday, March 19,200910:35:12 AM 74 2009A NRC SRO EXAM FINAL 75. Given the following plant conditions:

-The plant is operating in Mode 5 -The RCS is in solid plant operation

-Both Trains of RHR are aligned in the Shutdown Cooling Mode -A large RCS leak has developed

-The crew has aligned flow through the BIT with 'A' CSIP in service as directed by AOP-020, Loss Of RCS Inventory Or Residual Heat Removal While Shutdown -Core Exit Thermocouples continue to rise -RCS water level continues to lower Which ONE of the following is the action required by AOP-020 to mitigate the event? A. Start the 'B' CSIP with flow through 1SI-3 and 1SI-4, BIT Outlet Valves B. Start the 'B' CSIP with flow through 1 SI-52, Alternate High Head SI to Cold Leg Valve C. Align 'A' RHR Pump for Low Head SI with flow through 1 SI-340, Low Head SI Train A to Cold Leg Valve D. Align 'A' RHR Pump for Low Head SI with flow through 1 SI-359, Low Head SI Trains to Hot Leg Valve Thursday, March 19,200910:35:13 AM 75 2009A NRC SRO EXAM FINAL 76. Given the following plant conditions:

-Plant is in Mode 6 -Refueling Cavity Level is at 23' 6" -80th trains of RHR are in service for Shutdown Cooling -'8' EDG is under clearance for scheduled maintenance Current Conditions: -A Loss of Offsite Power has occurred -'A' EDG has started and the 'A' Sequencer has reached Load 810ck 9 Which ONE of the following describes the MINIMUM action required to comply with the RHR Limiting Condition for Operation and the basis of this LCO? A. Start the 'A' RHR Pump AND restore power to the '8' RHR Pump; Ensures that sufficient cooling capacity is available to maintain the RCS below 200°F B. Start the 'A' RHR Pump AND restore power to the '8' RHR Pump; Ensures that sufficient cooling capacity is available to maintain the RCS below 140°F C. Start the 'A' RHR Pump ONLY; Ensures that sufficient cooling capacity is available to maintain the RCS below 200°F D. Start the 'A' RHR Pump ONLY; Ensures that sufficient cooling capacity is available to maintain the RCS below 140°F Thursday, March 19, 2009 10:35:13 AM 76 2009A NRC SRO EXAM FINAL 77. Given the following plant conditions:

-The plant is operating at 100% power Current conditions:

-BOTH Main Feedwater pumps have tripped -The RO has reported that the reactor has failed to trip and cannot be tripped from the MCB .;. FRP-S.1, Response to Nuclear Power Generation/ATWS, has been entered -The BOP has tripped the Main Turbine -Emergency Boration has been established

-The RO has reported that Pressurizer pressure is 2385 psig and rising Which ONE of the following lists the action required in FRP-S.1 and the basis for that action? A. Verify Normal Pressurizer Spray Valves are open; To prevent lifting the Pressurizer Safety Valves B. Verify Normal Spray Valves are open; To ensure sufficient Boration flow C. Verify Pressurizer PORVs and block valves are open; To prevent lifting the Pressurizer Safety Valves D. Verify Pressurizer PORVs and block valves are open; To ensure sufficient Boration flow Thursday, March 19,200910:35:13 AM 77 2009A NRC SRO EXAM FINAL 78. Given the following plant conditions:

-The plant is operating at 100% power -A Station Blackout occurs -The crew has just entered EPP-001, Loss of AC Power to 1A-SA and 1 B-SB Buses The Outside AO reports the following annunciators locally: -Trip Low Press Lube Oil at the 'A' ECP -Trip Vibration at the 'A' ECP -Loss Of Both Gen Pot CKS Trip at the 'B' ECP -Trip Low Press Jacket Water at the 'B' ECP Which EDG will the crew start per EPP-001 to restore power to an emergency bus and, assuming a successful start, what procedure will the crew transition to? A. Start the 'A' EDG; Transition to PATH-1 B. Start the 'A' EDG; Transition to EPP-004, Reactor Trip Response C. Start the 'B' EDG; Transition to PATH-1 D. Start the 'B' EDG Transition to EPP-004, Reactor Trip Response Thursday, March 19, 200910:35:14 AM 78 2009A NRC SRO EXAM FINAL 79. Given the following plant conditions:

-The plant is operating at 100% power -The Instrument Bus S-IV Inverter failed at 1330 -Instrument Bus S-IV was reenergized from its alternate source at 1430 Which ONE of the following identifies the required action of Technical Specifications for the failed Inverter?

Energize Instrument Bus S-IV from its Inverter connected to its: Source Required by: A AC. Bus 1330 tomorrow B. AC. Bus 2130 today C.

Bus 1330 tomorrow D. D.C. Bus 2130 today Thursday, March 19,200910:35:14 AM 79 2009A NRC SRO EXAM FINAL 80. Given the following plant conditions:

-The plant is in Mode 3 -The 'A' MDAFW Pump is under clearance for motor replacement -A loss of DP-1B-SB occurs -The crew enters AOP-025, Loss of One Emergency AC Bus (6.9KV) or One Emergency DC Bus (125V) Which ONE of the following describes the operation of the TDAFW Pump if a start signal occurs and the action required by Technical Specifications as a result of the plant conditions?

The TDAFW Pump will: Technical Specifications Action A. start and continue to run place the plant in Mode 4 in*? hours B. start and continue to run maintain Mode 3 C. start and trip on overspeed place the plant in Mode 4 in ? hours D. start and trip on overspeed maintain Mode 3 Thursday, March 19,200910:35:14 AM 80 2009A NRC SRO EXAM FINAL 81. Given the following plant conditions:

-The plant is operating at 47% power -Method reports a large disturbance occurring on the grid -Efforts are in progress to stabilize the grid -The crew enters AOP-028, Grid Instability The following conditions are observed:

Time Grid Frequency (Hz) _ 0107 59.6 0110 59.2 0113 58.9 0116 58.7 0119 58.5 0121 58.3 Which ONE of the following describes the EARLIEST time that the Reactor must be tripped in accordance with AOP-028 and what is the basis for that Reactor Trip? A. 0118; . Continued operation in this condition could lead to high temperatures in the generator and subsequent insulation degradation B. 0121; Continued operation in this condition could lead to high temperatures in the generator and subsequent insulation degradation C. 0118; Provides reactor core protection against DNB as a result of underfrequency on more than one RCP D. 0121; Provides reactor core protection against DNB as a result of underfrequency on more than one RCP Thursday, March 19, 2009 10:35:14 AM 81 2009A NRC SRO EXAM FINAL 82. Given the following plant conditions:

-The plant is operating at 100% power The following occur -A major fire is reported in the 'A' Transfer panel -The fire brigade is fighting the fire using water and the fire continues to burn -The RO reports that the 'A' Group of PZR Backup Heaters is cycling ON and OFF -The crew enters FPP-002, Fire Emergency, and AOP-036, Safe Shutdown Following A Fire -The USCG is evaluating if a normal plant shutdown can be achieved with at least one train of equipment using normal plant procedures Which ONE of the following describes the action that will be taken with regards to AOP-036 (and it's subset procedures) and the action required for the 'A' Group of PZR Backup Heaters in accordance with FPP-002? A. Exit AOP-036 to procedure and step in effect OPEN the feeder breaker to Bus 1A 1 B. . Exit AOP-036 to procedure and step in effect Rack out the breaker for the 'A' Group of PZR Backup Heaters c. Remain in AOP-036 OPEN the feeder breaker to Bus 1A1 D. Remain in AOP-036 Rack out the breaker for the 'A' Group of PZR Backup Heaters Thursday, March 19, 2009 10:35:14 AM 82 2009A NRC SRO EXAM FINAL 83. Given the following plant conditions:

-The plant is operating at 100% power -The crew has noted indications that an RCS leak is in progress and has entered AOP-016, Excessive Primary Plant Leakage The following alarms and indications are observed:

-Plant Vent Stack #1 WRGM Effluent is alarming at 4.8E4 uCi/sec and rising -Charging Pump 1 B Room Area Radiation monitor alarming at 1200 times normal and rising -GFFD is in alarm and has increased by 80,000 CPM over the last 20 minutes -1RM-1CR-3589-SA, CNMT HI Range Accident Monitor, is alarming at 14.7 R/hr and rising -1RM-1CR-3590-SB, CNMT HI Range Accident Monitor, is alarming at 18.4 R/hr and -rising Which ONE of the following is the EAL classification to be declared for this event? (Reference provided)

A. EAL 2-1-1 B. EAL 2-1-2 C. EAL 2-1-3 D. EAL 2-1-4 Thursday, March 19,200910:35:14 AM 83 2009A NRC SRO EXAM FINAL 84. Given the following plant conditions:

-The plant is operating at 100% power -A LOCA occurs -FRP-P.1, Response to Imminent Pressurized Thermal Shock, is in progress Thirty (30) minutes after the initiating event, the following conditions are observed:

-RCS pressure has lowered to 600 psig and is now stable -Tcolds have lowered to 220°F and are now stable -Containment pressure is 12.3 psig and slowly rising Which ONE of the following identifies requirements for this event in accordance with FRP-P.1? Soak Requirement Subsequent Cooldown Limit A. Soak required < 50°F in any 60 minute period B. Soak required < 100°F in any 60 minute period C. Soak NOT required < 50°F in any 60 minute period D. Soak NOT required < 100°F in any 60 minute period Thursday, March 19,200910:35:14 AM 84 2009A NRC SRO EXAM FINAL 85. Given the following plant conditions:

-The USCO is evaluating FRPs for implementation.

-Containment pressure is 0.8 psig -The following Steam Generator conditions exist: -'A' SG Pressure = 1175 psig -'A' SG Level = 79% -'B' SG Pressure = 1235 psig -'B' SG Level = 65% -'C' SG Pressure = 1100 psig -'C' SG Level = 23% Which ONE of the following identifies the FRP that must be addressed first in accordance with EOP-CSFST, Critical Safety Function Status Trees? A. FRP-H.2, Response to Steam Generator Overpressure B. FRP-H.3, Response to Steam Generator High Level C. FRP-H.4, Response to Loss of Normal Steam Release Capability D. FRP-H.5 Response to Steam Generator Low Level Thursday, March 19, 2009 10:35:14 AM 85 2009A NRC SRO EXAM FINAL 86. Given the following plant conditions:

-An Inadvertent Safety Injection has occurred from 100% Reactor Power The following conditions exist: -The crew is terminating Safety Injection

-The RO has SHUT 1SI-4, BIT Outlet Valve -1 SI-3, BIT Outlet Valve, will NOT SHUT from the MeB Which ONE of the following describes the procedure that will be in progress at the time Safety Injection flow is terminated and the preferential actioh required for 1 SI-3 in accordance with the EOP-User's Guide? A. EPP-008, SI Termination; Locally SHUT 1 SI-3, BIT Outlet Valve B. EPP-008, SI Termination; Locally SHUT 1SI-1 and 1SI-2, BIT Inlet Valves C. PATH-1; Locally SHUT 1 SI-3, BIT Outlet Valve D. PATH-1; Locally SHUT 1 SI-1 and 1 BIT Inlet Valves Thursday, March 19,200910:35:14 AM 86 2009A NRC SRO EXAM FINAL 87. Given the following plant conditions:

-The plant is operating at 100% power -Reactor Engineering is performing a flux map -OWP-RP-02 is in place for PT-456, Pressurizer Pressure Channel II, due to a failed bistable -Repair of PT-456 will not be completed for another 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> I&C reports the following:

-Due to errors in the MST during the last performance, the bistables for N-43 are set higher than the allowable values of Technical Specifications

-N-43 repairs will take 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Which ONE of the following describes the action that must be completed for these conditions in accordance with OWP-RP and Technical Specifications?

A. Bypass N-43 until repairs are completed on PT-456 B. Stabilize power at less than 75% within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> C. Trip the bistables for N-43 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> D. Place the plant in Mode 3 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> Thursday, March 19,200910:35:14 AM 87 2009A NRC SRO EXAM FINAL 88. Given the following plant conditions:

-The plant is operating at 100% power The following indications are received:

-Pressurizer level is lowering -RCS pressure is lowering -Charging flow is increasing

-RCS Tavg is lowering -Turbine first stage pressure has lowered 25 psig and is stable -Electrical output has lowered 30 MW and is stable -A field operator reports that a Safety Valve is lifting on the 'A' SG Which ONE of the following describes the procedure required to mitigate this event and the Power Range High Flux Trip Setpoints required to allow continued operation in accordance with Technical Specifications?

Procedure to be entered Power Range High Flux Trip Setpoints A. AOP-015, Secondary Load Rejection 33% B. AOP-015;*

Secondary Load Rejection 50% C. Enter AOP-038, Rapid Down Power 33% D. Enter AOP-038, Rapid Down Power 50% Thursday, March 19, 2009 10:35:14 AM. 88 2009A NRC SRO EXAM FINAL 89. Given the following plant conditions:

-FRP-J.1, Response to High CNMT Pressure, is in progress -'A' CNMT Spray Pump is under clearance for motor replacement

-'A' ESW Booster Pump is running -The breaker for 1 B2-SB has tripped and cannot be reclosed -1 SW-116, AH-2&3 SW Return Orifice Bypass Isol, is OPEN Which ONE of the following describes the action required by FRP-J.1 and the basis for this action? A. Notify Chemistry to sample ONLY the A-SA ESW Return Header; Activity may have entered the A train of ESW from CNMT B. Notify Chemistry to sample BOTH A-SA and B-SB ESW Return Headers; Activity may have entered BOTH trains of ESW from CNMT C. Shut the ESW isolation valves to ONLY A-SA CNMT Fan Coolers; To prevent activity from entering the 'A' train of ESW from CNMT D. Shut the ESW isolation valves to BOTH A-SA and B-SB CNMT Fan Coolers; To prevent activity from entering any train of ESW from CNMT Thursday, March 19, 2009 10:35:15 AM 89 2009A NRC SRO EXAM FINAL 90. The crew has transitioned to PATH-1, Entry Point C and is presently evaluating the RHR System capable of Cold Leg Recirculation.

The following conditions exist: -Offsite Power has been lost -'B' EDG immediately tripped -CNMT Pressure is 17 psig and rising -CNMT High Range Rad Monitors are in alarm -CNMT Wide Range Sump Level is reading 211 inches -ALB-001-2-3, Spray Pump A Autostart Fail/Override, is in alarm -ALB-001-2-4, Spray Pump A O/C Trip or Close Circuit Trouble, is in alarm Which ONE of the following is the required procedure transition and when will a transition back to PATH-1 be allowed? A. FRP-J.1, Response to High CNMT Pressure; After completion of required actions even if the Orange Path still exists B. FRP-J.1, Response to High CNMT Pressure; ONLY after the condition causing the Orange Path has been corrected C. FRP-J.2, Response to Containment Flooding; After completion of required actions even if the Orange Path still exists D. FRP-J.2, Response to Containment Flooding; ONLY after the condition causing the Orange Path has been corrected Thursday, March 19,200910:35:15 AM 90 2009A NRC SRO EXAM FINAL 91. Given the following plant conditions:

-'B' MDAFW Pump is under clearance for motor replacement

-Unit tripped from an Inadvertent Safety Injection

-Offsite Power was subsequently lost -'A' EDG failed to start -The TDAFW Pump tripped on overs peed -FRP-H.1, Response to Loss of Secondary Heat Sink, is in progress -RCS Bleed and Feed has been initiated The following conditions exist: -Secondary Heat Sink has been established by restoring the TDAFW Pump -RCS Bleed and Feed is being terminated -1 RC-118, Pressurizer PORV (PCV-44SA-SA), can NOT be closed *Which ONE of the following identifies the correct procedure transistion to be implemented?

A. PATH-1 Entry Point C B. PATH-1 at the step that transitioned to FRP-H.1 C. EPP-008, SI Termination D. EPP-009, Post LOCA Cooldown and Depressurization Thursday, March 19, 2009 10:35:15 AM 91 2009A NRC SRO EXAM FINAL 92. Given the following plant conditions:

-On Feb 1, at 0600, a plant shutdown, for refueling, was initiated from 100% power -The Reactor was shutdown at 2000 on the same day -CCW heat exchanger outlet temperature is currently 97.4°F Which ONE of the following indicates the MINIMUM numberof hours after shutdown before fuel movement in the Reactor Vessel may begin in accordance with PLP-114, Relocated Technical Specifications and Design Basis Requirements? (Reference provided)

A. 104 hours0.0012 days <br />0.0289 hours <br />1.719577e-4 weeks <br />3.9572e-5 months <br /> B. 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> C. 152 hours0.00176 days <br />0.0422 hours <br />2.513228e-4 weeks <br />5.7836e-5 months <br /> D. 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br /> Thursday, March 19,200910:35:15 AM 92 2009A NRC SRO EXAM FINAL 93. Given the following plant conditions:

-The plant is in Mode 3 -During slave relay testing 1 ED-164, RCDT Vent IRC Isolation, failed to shut automatically

> -1 ED-164 also failed to shut remotely from the MCR -1 ED-161, RCDT Vent ORC Isolation, operated as expected -Maintenance reports that repair of 1 ED-164 will take approximately 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> Which ONE of the following is required in order to comply with Technical Specifications and what is the limiting operational concern for this failure? A. Shut AND then remove fuses for 1 ED-161; Potential to damage the #2 RCP seals 8. Shut AND then remove fuses for 1 ED-161; Potential to damage the #3 RCP seals C. Shut 1 ED-161, fuses for 1 ED-161 do NOT need to be removed; Potential to damage the #2 RCP seals D. Shut 1ED-161, fuses for 1ED-161 do NOT need to be removed; Potential to damage the #3 RCP seals Thursday, March 19,200910:35:15 AM 93 2009A NRC SRO EXAM FINAL 94. Given the following plant conditions:

-The plant is in Mode 6 with refueling in progress Current plant conditions are: -Fuel movement has stopped due to a problem with the gripper tube top limit switch on the Manipulator

-The Main Control Room has been informed that initial troubleshooting is in progress on the Manipulator

-The troubleshooting team desires to operate TS-3, Bridge Left Interlock Bypass, in order to move the bridge while the gripper tube is not at the top limit Which ONE of the following describes the approval and concurrence, if any, required for this action in accordance with FHP-020, Refueling Operations?

A. The SSO must approve. NO concurrence is required.

B. The SSO must approve with concurrence of Reactor Engineering.

C. The SRO-Fuel Handling must approve. NO concurrence is required.

D. The SRO-Fuel Handling must approve with the concurrence of the SSO. Thursday, March 19,200910:35:15 AM 94 2009A NRC SRO EXAM FINAL 95. Given the following plant conditions:

-'A' ESW Header is under clearance.

-1SW-39, Normal SW Supply to Header A, has been determined to have seat leakage and must be manually shut Which ONE of the following identifies the MINIMUM permission level that is required to operate 1 SW-39 manually and what must be accomplished to restore the valve to an OPERABLE status? Permission To restore operability A. SSO restore power ONLY B. SSO restore power AND stroke the valve electrically C. USCG restore power ONLY D. USCG restore power AND stroke the valve electrically Thursday, March 19,200910:35:15 AM 95 2009A NRC SRO EXAM FINAL 96. Per Technical Specifications, at 100 percent power, shutdown margin must be verified by in order to protect against a ____ _ A. performing a calculation using OST-1036, Shutdown Margin Calculation Modes 1-5; steam line break B. checking rods above rod insertion limits using OST-1021 , Daily Surveillance Requirements Mode 1, 2; dilution accident C. performing a calculation using OST-1036, Shutdown Margin Calculation Modes 1-5; dilution accident D. checking rods above rod insertion limits using OST-1021 , Daily Surveillance Requirements Mode 1, 2; steam line break Thursday, March 19,200910:35:15 AM -96 2009A NRC SRO EXAM FINAL 97. Given the following plant conditions:

-A General Emergency has been declared -All Emergency Response facilities are activated

-A non-licensed operator must be dispatched from the Operations Support Center to an area with an identified radiation field of 110 Rem/hour in order to isolate the pathway for a large release to the environment

-The operator will be in the area for approximately 15 minutes -All of the available operators have volunteered and are fully aware of the risks involved Which ONE of the following is the preferred operator to perform the task in accordance with PEP-330, Radiological Consequences?

A. Operator A is 24 years old and has once received a single acute dose of 25 Rem TEDE B. Operator B is 52 years old and has once received a single acute dose of 30 Rem TEDE C. Operator C is 29 years old and has received a cumulative dose of 15 Rem TEDE D. Operator 0 is 49 years old and has received a cumulative dose of 20 Rem TEDE Thursday, March 19,200910:35:15 AM 97 2009A NRC SRO EXAM FINAL 98. Given the following plant conditions:

-The plant is in Mode 6 with core offload in progress -A fuel assembly has just been unlatched in the Containment upender -The Fuel Handling SRO has reported that Refueling Cavity Level is rapidly lowering -The crew has entered and is implementing AOP-031, Loss of Refueling Cavity Integrity

-The USCG has directed the fuel assembly be returned to the Reactor Vessel Prior to relatching the assembly, the following occurs: -ALL CNMT Ventilation Isolation radiation monitors have just gone into alarm -HP reports radiation levels on the manipulator crane of 162 mRlhr and increasing In accordance with AOP-031, what action must be taken in Containment?

A. Place the fuel assembly in the Reactor Vessel and evacuate ONLY unnecessary personnel B. Leave the fuel assembly in the upender and evacuate ONLY unnecessary personnel C. Place the fuel assembly in the Reactor Vessel and then evacuate ALL personnel D. Leave the fuel assembly in the upender and evacuate ALL personnel Thursday, March 19,200910:35:15 AM 98 2009A NRC SRO EXAM FINAL 99. Given the following plant conditions:

0815 Site Area Emergency declared 0829 State and County officials notified 0848 SEC upgraded declaration to a General Emergency 0855 A release to offsite is confirmed to be in progress Which ONE of the following is the NEXT notification that is required lAW PEP-230, Control Room Operations?

When A. 0903 State and County B. 0910 State and County C. 0915 NRC D. 0929 NRC Thursday, March 19,200910:35:15 AM 99 2009A NRC SRO EXAM FINAL 100. Given the following plant conditions:

-The plant is operating at 97% power -AOP-001, Malfunction of Rod Control and Indication System is being implemented for a suspected misaligned rod -Rod H2 is misaligned from it's bank by 6 steps -OST-1039, Calculation of Quadrant Power Tilt Ratio, has been completed

-The QPTR has been determined to be 1.07 Which ONE of the following describes the expected alarm for the above conditions, AND the MINIMUM Thermal Power reduction that must be performed in the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in accordance with Technical Specifications?

A. ALB-13-5.;3, Power Range Upper Detector High Flux DEV Or Auto Defeat; Reduce Thermal Power to 76% 8. ALB-13-5-3, Power Range Upper Detector High Flux DEV Or Auto Defeat; Reduce Thermal Power to 79% C. ALB-13-8-5, Computer Alarm Rod DEV/SEQ NIS PWR Range Tilts; Reduce Thermal Power to 76% D. ALB-13-8-5, Computer Alarm Rod DEV/SEQ NIS PWR Range Tilts; Reduce Thermal Power to 79% You have completed the test! . Thursday, March 19, 2009 10:35:16 AM 100 ANSWER KEY REPORT for 2009A NRC SRO EXAM FINAL Test Form: 0 2009A NRC RO 1 1.00 MCS A 2 2009A NRC RO 2 1.00 MCS A 3 2009A NRC RO 3 1.00 MCS A 4 2009A NRC RO 4 1.00 MCS B 5 2009A NRC RO 5 1.00 MCS B 6 2009A NRC RO 6 1.00 MCS B 7 2009A NRC RO 7 1.00 MCS A 8 2009A NRC RO 8 1.00 MCS D 9 2009A NRC RO 9 1.00 MCS C 10 2009A NRC RO 10 1.00 MCS D 11 2009A NRC RO 11 1.00 MCS C 12 2009A NRC RO 12 1.00 MCS* D 13 2009A NRC RO 13 1.00 MCS D 14 2009A NRC RO 14 1.00 MCS C 15 2009A NRC RO 15 1.00 MCS A 16 2009A NRC RO 16 1.00 MCS C 17 2009ANRCRO 17 1.00 MCS D 18 2009ANRCRO 18 1.00 MCS B 19 2009ANRCRO 19 1.00 MCS C 20 2009A NRC RO 20 1.00 MCS B 21 2009A NRC RO 21 1.00 MCS C 22 2009A NRC RO 22 1.00 MCS A 23 2009A NRC RO 23 1.00 MCS A 24 2009A NRC RO 24 1.00 MCS B 25 2009A NRC RO 25 1.00 MCS D 26 2009A NRC RO 26 1.00 MCS A 27 2009A NRC RO 27 1.00 MCS B 28 2009A NRC RO 28 1.00 MCS B 29 2009A NRC RO 29 1.00 MCS D 30 2009A NRC RO 30 1.00 MCS C 31 2009A NRC RO 31 1.00 MCS C 32 2009A NRC RO 32 1.00 MCS B 33 2009A NRC RO 33 1.00 MCS C 34 2009A NRC RO 34 1.00 MCS C 35 2009A NRC RO 35 1.00 MCS A 36 2009A NRC RO 36 1.00 MCS C 37 2009A NRC RO 37 1.00 MCS A 38 2009A NRC RO 38 1.00 MCS A 39 2009A NRC RO 39 1.00 MCS A 40 2009A NRC RO 40 1.00 MCS B 41 2009A NRC RO 41 1.00 MCS C 42 2009A NRC RO 42 1.00 MCS B 43 2009A NRC RO 43 1.00 MCS C 44 2009A NRC RO 44 1.00 MCS C 45 2009A NRC RO 45 1.00 MCS B 46 2009A NRC RO 46 1.00 MCS C Monday, April 27, 2009 10:48:35 AM 1 ANSWER KEY REPORT for 2009A NRC SRO EXAM FINAL Test Form: 0 47 2009A NRC RO 47 1.00 MCS C 48 2009A NRC RO 48 1.00 MCS B 49 2009A NRC RO 49 1.00 MCS D 50 2009A NRC RO 50 1.00 MCS D 51 2009A NRC RO 51 1.00 MCS C 52 2009A NRC RO 52 1.00 MCS C 53 2009A NRC RO 53 1.00 MCS B 54 2009A NRC RO 54 1.00 MCS B 55 2009A NRC RO 55 1.00 MCS A 56 2009A NRC RO 56 1.00 MCS B 57 2009A NRC RO 57 1.00 MCS C 58 2009A NRC RO 58 1.00 MCS C 59 2009A NRC RO 59 1.00 MCS A 60 2009A NRC RO 60 1.00 MCS B 61 2009A NRC RO 61 1.00 MCS D 62 2009A NRC RO 62 1.00 MCS C 63 2009A NRC RO 63 1.00 MCS A 64 2009A NRC RO 64 1.00 MCS D 65 2009A NRC RO 65 1.00 MCS B 66 2009A NRC RO 66 1.00 MCS B 67 2009A NRC RO 67 1.00 MCS A 68 2009A NRC RO 68 1.00 MCS B 69 2009A NRC RO 69 1.00 MCS C 70 2009A NRC RO 70 1.00 MCS B 71 2009A NRC RO 71 1.00 MCS C 72 2009A NRC RO 72 1.00 MCS D 73 2009A NRC RO 73 1.00 MCS B 74 2009A NRC RO 74 1.00 MCS A 75 2009A NRC RO 75 1.00 MCS C 76 2009A NRC SRO 1 1.00 MCS D 77 2009A NRC SRO 2 1.00 MCS D 78 2009A NRC SRO 3 1.00 MCS A 79 2009A NRC SRO 4 1.00 MCS C 80 2009A NRC SRO 5 1.00 MCS D 81 2009A NRC SRO 6 1.00 MCS A 82 2009A NRC SRO 7 1.00 MCS C 83 2009A NRC SRO 8 1.00 MCS C "?. 0 84 2009A NRC SRO 9 1.00 MCS A 85 2009A NRC SRO 10 1.00 MCS A 86 2009A NRC SRO 11 1.00 MCS C 87 3009A nR* 8R:O 12 1.00 Meg D . o .. ,*ttul 88 2009ANRC SRO 13 1.00 MCS D 89 2009A NRC SRO 14 1.00 MCS B 90 2009ANRC SRO 15 1.00 MCS A 91 2009ANRC SRO 16 1.00 MCS A 92 2009A NRC SRO 17 1.00 MCS C Monday, April 27, 2009 10:48:36 AM 2 ANSWER KEY REPORT for 2009A NRC SRO EXAM FINAL Test Form: 0 93 2009ANRC SRO 18 1.00 MCS A 94 2009ANRC SRO 19 1.00 MCS D 95 2009A NRC SRO 20 1.00 MCS D 96 2009ANRC SRO 21 1.00 MCS D 97 2009A NRC SRO 22 1.00 MCS D 98 2009A NRC SRO 23 1.00 MCS D 99 2009A NRC SRO 24 1.00 MCS A 100 2009A NRC SRO 25 1.00 MCS B SECTION 1 ( 100 items) 100.00 Monday, April 27, 200910:48:36 AM 3 RAPID DOWNPOWER Attachment 2 Sheet 1 of 1 Gallons of Boric AcidlTarget Rod Height Required for Power Reduction NOTE

  • This Attachment serves as a reactivity plan. [C.3]
  • This table applies to Cycle 15 only.
  • Target rod heights correspond to the lower (target) power level in each row.
  • Gallons of boric acid in the table are for 10% power reduction increments.

These are additive for power reductions of greater than 10%. Example: A power reduction from 90% to 60% at BOL would require [180 gal + 171 gal +163 gal = 514 gal]

  • For purposes of this procedure, 5% increments can be obtained by dividing by two.
  • As used in this table, the following times in core life are assumed: BOl (0 ::;; EFPD 161.) (3000 MWD/MTU) MOl(161 < EFPD :<; 333) (10,000 MWD/MTU) EOl (333 < EFPD :<; 527) (17,000 MWD/MTU) Power Target Gallons of Boric Acid Required for Power Reduction level Rod (%) Height BOl MOL EOl (0 Bank) o EFPD ::;;161 161 < EFPD 333 333 < EFPD ::;; 527 100 to 90 206 206 266 303 90 to 80 194 180 207 196 80 to 70 183 171 191 196 70 to 60 171 163 174 173 60 to 50 159 154 157 182 50 to 40 147 1.55 166 191 40 to 30 135 155 158 207 30 to 20 124 165 167 240 20 to 10 112 165 176 289 --END OF ATTACHMENT 2--AOP-038 I Rev. 18 I Page 20 of23 EXCESSIVE PRIMARY PLANT LEAKAGE Attachment 1 Sheet 6 of 7 __________________

____________________

--, H INSTRUCTIONS RESPONSE NOT OBTAINED 1...---___ ----' NOTE

  • For initial leakage reports, where no previous leakage existed, leakage should be assumed to have changed from zero to the current value in the last hour.
  • The monitoring requirements of Step 3 become optional if Step 10 directs performance of Attachment 9, 10, or 11. *010. PERFORM the required actions based on the following:

[C.S, 7] Leak Rate (gpd) in any SG + less than 5 + 5 to less than 30 + 30 to less than 75 + Greater than or equal to 75 + sustained for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Greater than or equal to 75 + Greater than or equal to 75 AND LOSS of REM-01TV-3534, Condenser Vacuum Pump Rad Monitor (Grid 2) + Greater than or equal to 150 + AOP-016 I Rate of Increase Required Action = (gpd/hr) in any SG Leakage Detected N/A =

  • Notify Chemistry to refer to CRC-804 Increased Monitoring N/A = Action Level 1 N/A = Action Level 2 Less than 30 = Action Level 3 Greater than or equal to 30 N/A = =
  • Perform Attachment 9
  • Perform Attachment 10
  • Perform Attachment 11
  • Be in Mode 3 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
  • Verify sustained rate of change above 30 gpd/hr (not followed by a decrease -spike)
  • Perform Attachment 11
  • Reduce power to 50% within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
  • Be in Mode 3 within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> total time)
  • Perform Attachment 11
  • Be in Mode 3 in less than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
  • Perform Attachment 11
  • Be in Mode 3 in less than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Less than 30 =
  • Be in Mode 5 within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> (36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> total) Rev. 39 I Page 19 of 115 iECHSPEC LOWERUMrT 0
  • 0 0 0 0 (Xl 0 (Xl 0 (Xl Co L-I (Xl co (J'1 VJ lJ1 .;,.. lJ1 (J'1 (J'1 0 0 0 (Xl 0 (Xl Co 0) co '-J O'l U1 '-J (J'1 0 CXl CXl TECH SPEC UPPERUMlT o t Co 9 Co co CXl to < (') lJ1 to (J'1 CJ) "U m o @

g 43.8 m o <, I I § 44.2 ffi ( 044.6 < Z CJ)m iTt 45

  • o r 45.4

(') 0 m m < 4 5 I m :0 m .8 en en 0 0 -a **.*. , ..... '11...,4 ... .,1 r *.w."

...,. C :0 em"'" >> .:1*6.2

!"M :!: m. "Tt r-C;; Z o "'0 ..... , ,*,lii. "x .. : 0 " m '." .... ,'.40/). '.' (5 0 --, .. , ." .... >> z en 3: 1 I .... . I z m en 4 .4 LJ 3: a fiic hi *

< Nom 48.

Itll 0 Q r An 0 0:0 ...... m " I I I I I I II I I I I I I I I * (,-

Refueling Operations Attachment 2 Sheet 1 of 3 1.0 OPERATIONAL REQUIREMENTS

-DECAY TIME 1.1 The reactor shall be subcritical for a minimum period of time as determined by Table A. APPLICABILITY:

During movement of irradiated fuel in the reactor vessel. ACTION: With the reactor subcritical for a time less than determined by Table A, suspend all operations involving movement of irradiated fuel in the reactor vessel. Fuel movement in the reactor vessel may continue provided the minimum decay time is greater than the time shown on Table A. 2.0 /SURVEILLANCE REQUIREMENTS 2.1 The reactor shall be determined to have been subcritical for a m1n1mum period of time as determined using Table A by verification of the date and'time of subcriticality prior to movement of irradiated fuel in the reactor vessel. 2.2 CCW temperature shall be monitored every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during the movement of fuel in the reactor vessel to ensure the temperature used to determine decay time is not exceeded.

Table A Time from Reactor Subcritical (Hours) Effective CCW Temperature (oF) 100 96.9 120 99.3 144 101.7 168 103.8 192 105.6 216 107.2 240 108.6 NOTE 1: -Linear interpolation between listed points is acceptable.

NOTE 2: -These delay times are applicable to end of cycle full core off-loads only. A mid-cycle core off-load assumes two CCW and Fuel Pool Cooling trains available and does NOT require compliance with these. limits. NOTE 3: -Effective CCW temperature refers to actual CCW heat exchanger outlet temperature plus SoF. NOTE 4: -The table assumes the core off-load duration is 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> or greater. Spent Fuel Pool Cooling analysis assumes full core off-load occurs no sooner than the earliest allowed time to start core off-load after reactor subcritical (based on CCW temperature) plus 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. PLP-1l4 Rev. 18 Page 8 of 26