| issue date = 01/07/2010
| issue date = 01/07/2010
| title = Submittal of IST Relief for Pumps and Valves - Third Ten-Year Interval
| title = Submittal of IST Relief for Pumps and Valves - Third Ten-Year Interval
| author name = Chawla M L
| author name = Chawla M
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Hassoun A I
| addressee name = Hassoun A
| addressee affiliation = Detroit Edison
| addressee affiliation = Detroit Edison
| docket = 05000341
| docket = 05000341
| license number = NPF-043
| license number = NPF-043
| contact person = Chawla M L, NRR/DORL, 415-8371
| contact person = Chawla M, NRR/DORL, 415-8371
| case reference number = TAC ME2548, TAC ME2549, TAC ME2550, TAC ME2551, TAC ME2552, TAC ME2553, TAC ME2554, TAC ME2555, TAC ME2556, TAC ME2557, TAC ME2558, TAC ME2559
| case reference number = TAC ME2548, TAC ME2549, TAC ME2550, TAC ME2551, TAC ME2552, TAC ME2553, TAC ME2554, TAC ME2555, TAC ME2556, TAC ME2557, TAC ME2558, TAC ME2559
| document type = E-Mail
| document type = E-Mail

Revision as of 08:11, 11 July 2019

Submittal of IST Relief for Pumps and Valves - Third Ten-Year Interval
ML101760333
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/07/2010
From: Mahesh Chawla
Plant Licensing Branch III
To: Hassoun A
Detroit Edison
Chawla M, NRR/DORL, 415-8371
References
TAC ME2548, TAC ME2549, TAC ME2550, TAC ME2551, TAC ME2552, TAC ME2553, TAC ME2554, TAC ME2555, TAC ME2556, TAC ME2557, TAC ME2558, TAC ME2559
Download: ML101760333 (2)


Text

From: Chawla, Mahesh Sent: Thursday, January 07, 2010 4:15 PM To: 'Alan I Hassoun' Cc: Lake, Russell; McMurtray, Anthony; Pascarelli, Robert

Subject:

Fermi 2 - Submittal of IST Relief Requests for Pumps and Valves - Third Ten-year Interval - ME 2548 - ME 2559 On November 3, 2009, Detroit Edison submitted the above Relief Requests (RRs). The NRC staff would need additional information to complete the review of PRR-006 and PRR-009. Due to the short turnaround time for these two relief requests, please arrange a teleconference with your staff by Monday, January 11, 2009 to discuss the following information:

RAI PRR-006-001 Under 'Reason for Request', Paragraph 2 states "[t]he calibration cardinal point of 24 feet bounds readings obtained for pump surveillance testing." Please elaborate on why this is true.

RAI PRR-006-002 Under 'Reason for Request', Paragraph 2 states "[t]he As Left tolerance at 24 feet for this instrument is 0.79%." Please discuss the significance and purpose of this information.

RAI PRR-006-003 Under 'Proposed Alternative and Basis for Use, Paragraph 10, discuss why the low DISPR reading of 32 psi is bounding. (A high DISPR reading would yield a higher error.)

RAI PRR-009-001 Please discuss how the RHRSW pump optimum flow tolerance of +/-100 gpm was determined and why the associated MOV cannot be manually throttled.

RAI PRR-009-002 Please elaborate on why limited access to necessary transmitter pipe connections makes installation of M&TE for flow measurement of CCHVAC Chilled Water not practical.

RAI PRR-009-003 FERMI 2 proposes to utilize a more conservative differential pressure acceptance criteria range for testing of the CCHVAC Chilled Water Pumps. In accordance with NUREG 1482, revision 1, section 5.3, "-the licensee may make a corresponding adjustment to acceptance criteria to compensate for the uncertainty-" Please describe the effect of the proposed differential pressure acceptance criteria range adjustment on uncertainty.

RAI PRR-009-004 NUREG 1482, revision 1, section 5.3 states "[f]or a tolerance greater than the allowed percent (which may be necessary depending on the precision of the instrument), the licensee-may perform and document an evaluation to justify a greater tolerance." For each of the three pumps proposed (RHRSW, EECW MU, CCHVAC Chilled Water) the discussion states that the proposed tolerances as the best achievable. Please provide a justification for the greater tolerance for each group of pumps, i.e. why does the increased tolerance provide an acceptable level of quality and safety or why would compliance with the requirements not provide a compensating increase in the level of quality and safety?

RAI PRR-009-005 Please describe how this testing was performed during the second IST interval.

Mahesh Chawla Phone: 301-415-8371 Fax: 301-415-1222

mahesh.chawla@nrc.gov E-mail Properties Mail Envelope Properties (CD3FA229DEC5EE40AC7F4DB3383B18CB6984DFE762)

Subject:

Fermi 2 - Submittal of IST Relief Requests for Pumps and Valves - Third Ten-year Interval - ME 2548 - ME 2559 Sent Date: 1/7/2010 4:15:20 PM Received Date: 1/7/2010 4:15:00 PM From: Chawla, Mahesh

Created By: Mahesh.Chawla@nrc.gov

Recipients:

hassouna@dteenergy.com ('Alan I Hassoun')

Tracking Status: None Russell.Lake@nrc.gov (Lake, Russell)

Tracking Status: None Anthony.McMurtray@nrc.gov (McMurtray, Anthony)

Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert) Tracking Status: None

Post Office:

HQCLSTR01.nrc.gov

Files Size Date & Time

MESSAGE 13000 1/7/2010

Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False

Sensitivity: olNormal Recipients received: