ML102920103: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 12/10/2009 | | issue date = 12/10/2009 | ||
| title = Subject: Emailing: !Request #9_NRC SIT Question#3 Information.Docx Attachments: !Request #24_NRC SIT Question#18 Information.Docx; !Request #9 NRC SIT Question#3 Information.Docx | | title = Subject: Emailing: !Request #9_NRC SIT Question#3 Information.Docx Attachments: !Request #24_NRC SIT Question#18 Information.Docx; !Request #9 NRC SIT Question#3 Information.Docx | ||
| author name = Lake L | | author name = Lake L | ||
| author affiliation = NRC/RGN-II/DRS/EB3 | | author affiliation = NRC/RGN-II/DRS/EB3 | ||
| addressee name = Naus D | | addressee name = Naus D | ||
| addressee affiliation = - No Known Affiliation | | addressee affiliation = - No Known Affiliation | ||
| docket = 05000302 | | docket = 05000302 |
Revision as of 03:48, 11 July 2019
ML102920103 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 12/10/2009 |
From: | Lake L NRC/RGN-II/DRS/EB3 |
To: | Naus D - No Known Affiliation |
References | |
FOIA/PA-2010-0116 | |
Download: ML102920103 (6) | |
Text
Lake, Louis From: Sent: To:
Subject:
Attachments:
Lake, Louis 1_ýýThursday, December 10, 2009 8:42 AM Dan naus Emailing:
!Request #9_NRC SIT Question#3 Information.docx
!Request #24_NRC SIT Question#18 Information.docx;
!Request #9_NRC SIT Question#3 Information.docx t_ .71 /L2 Attached is a re sponse to Question #9 for your review.Lou The message is ready to be sent with the following file or link attachments:
!Request #9_NRC SIT Question#3 Information.docx Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments.
Check your e-mail security settings to determine how attachments are handled.1 911(90 License Request# 24, NRC SIT Question#18 Information 18 What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)?
Provide inspection procedures and including qualification of personnel information?
Enclosed in this folder in response to the above question [Note: Since the IWL rules went into effect in 2001 there have only been 2 IWL examinations performed (5 year requirement)]:
Breakdown of the "IWE/IWL -Examination History" Folder: Folder: RF011 -IWE Sub Folder: RFO11 Examination Files: RFO-11 IWE Examination.pdf Sub Folder: RFO11 Personnel Sub Folder: RFO11 Procedures Folder: RF012 -IWE-IWL Sub Folder: RF012 IWE-IWL Examination Files: CR3_2001_IWEIWLEXAMVol 1.pdf Files: CR3_2001_IWEIWLEXAMVol 2.pdf Sub Folder: RF012 Personnel Sub Folder: RF012 Procedures Folder: RF014- IWE Sub Folder: RF014 IWE Examination Files: 2005 Containment Inspection Program Summary.doc Files: wo 702983-16 for IWE prior to ILRT 2005.pdf Sub Folder: RF014 Personnel Sub Folder: RF014 Procedures Folder: RF015 -IWE-IWL Sub Folder: R15 IWE-IWL Examination Files: R15 IWE-IWL Results.xls 4-Files: R15 WO 681043-08
-Liner-Containment Inspection.pdf Files: R15 WO 681043-08
-Liner Inspection (supplement 1).pdf Files: R15 WO 681043-08
-Liner UT lnspection.pdf Sub Folder: RF015 Personnel Sub Folder: RF015 Procedures Breakdown of the "IWL -Tendon Surveillance History" Folder: 6th Surveillance:
General Contents:
Pages 1-57, Work Request, general documents, parts lists.Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages 115 -end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf: General Contents:
Pages (All), PSC 2 0 th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
7th Surveillance:
File: WR 368426-1_7th-Surv.pdf:
General Contents:
Pages 1-47, Work Request, general documents, parts lists.Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages51-113, PSC Equipment lists and calibration certifications.
Pages 114- 184, Misc. personnel information and certifications.
File: 7TH TENDON SURVEL TEST REPT.pdf: General Contents:
Pages 1-56, PSC 251h Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.8th Surveillance:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
General Contents:
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.Pages 5-61, PSC Final Report for the 3 0 th Year Containment IWL Inspection, 301h Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages61-463, Final Report App. A -PSC field data sheets.Pages 464-475, Final Report App. B -Testing Laboratory results.Pages 476-489, Final Report App. C -PSC Nonconformance reports.Pages 490-491, Final Report App. D -Field Changes Pages 492-523, Final Report App. E -PSC Calibration records.Pages 524-770, Final Report App. F -PSC Inservice Inspection Manual (procedures)
Pages 771-End, Final Report App. G -PSC Calibration verification reports.
Pages 48-50, FPC Evaluation of the 7 th Surveillance (page 49 relates to evaluation of the tendon force measurements)
Pages51-113, PSC Equipment lists and calibration certifications.
Pages 114- 184, Misc. personnel information and certifications.
File: 7TH TENDON SURVEL TEST REPT.pdf: General Contents:
Pages 1-56, PSC 25th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 27-30 relate to the tendon lift-off and detensioning, pages 33, 35-39 relate to the tendon retensioning.)
Page 56-End, Calculation S01-0019, Preparation of Tendon Force Curves for the 7 th Tendon Surveillance at CR3.8th Surveillance:
File: 8TH TENDON SURVEL TEST REPT- Original.pdf:
General Contents:
Pages 2-4, PEF Evaluation and acceptance of PSC Tendon Surveillance Results.Pages 5-61, PSC Final Report for the 30th Year Containment IWL Inspection, 30th Year Tendon Surveillance (pages 45-49, Section 8.0 relates to tendon lift-off and re-stressing, pages 52-53, Section 10.0 relates to tendon re-stressing, pages 68-69, testing conclusions)
Pages61-463, Final Report App. A -PSC field data sheets.Pages 464-475, Final Report App. B -Testing Laboratory results.Pages 476-489, Final Report App. C -PSC Nonconformance reports.Pages 490-491, Final Report App. D -Field Changes Pages 492-523, Final Report App. E -PSC Calibration records.Pages 524-770, Final Report App. F -PSC Inservice Inspection Manual (procedures)
Pages 771-End, Final Report App. G -PSC Calibration verification reports.
.-.~ 4.Request #9, NRC SIT Question#3 Information
- 3. Was there any analysis of why re-tensioning was required in past tendon surveillance activities (done at that time of surveillance testing)?Response:
There was no analysis performed during past surveillance testing years in which tendons were re-tensioned.
Additional information in response to the above question:
See License Request No. 24- NRC SIT Question#
18 folder, under sub-folder: "IWL -Tendon Surveillance History" for information, discussions and actions taken related to tendon lift-off testing and re-tensioning.
Below shows the breakdown of the information contained in that folder and highlights specific areas related to the tendon lift-off testing and re-tensioning.
Breakdown of the "IWL -Tendon Surveillance History" Folder: 6th Surveillance:
General Contents: Pages 1-57, Work Request, general documents, parts lists.Pages 58-59, Surveillance Plan Pages 60-82, PSC Equipment lists and calibration certifications Pages83-114, FPC Evaluation of the 6 th Surveillance (Section 5.0 relates to evaluation of the tendon lift-off testing and potential cause discussions)
Pages 115 -end, FPC Surveillance Procedure SP-182, Rev. 13 File: 6TH TENDON SURVEL TEST REPT.pdf: General Contents: Pages (All), PSC 20th Year Surveillance of the Post-Tensioning System at the Crystal River Nuclear Plant Unit 3 -Final Report. (Pages 34-39 relate to the tendon lift-off and detensioning, pages 42-45 relate to the tendon retensioning.)
7th Surveillance:
File: WR 368426-1_7th-Surv.pdf:
General Contents: Pages 1-47, Work Request, general documents, parts lists.