ML12087A228: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/27/2012
| issue date = 03/27/2012
| title = 02/29/2012 and 03/21/2012 Summary of Public Meetings Regarding Palisades Nuclear Plant
| title = 02/29/2012 and 03/21/2012 Summary of Public Meetings Regarding Palisades Nuclear Plant
| author name = Giessner J B
| author name = Giessner J
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4
| addressee name =  
| addressee name =  

Revision as of 02:31, 29 June 2019

02/29/2012 and 03/21/2012 Summary of Public Meetings Regarding Palisades Nuclear Plant
ML12087A228
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 03/27/2012
From: Jack Giessner
Reactor Projects Region 3 Branch 4
To:
References
Download: ML12087A228 (13)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352

March 27, 2012

LICENSEE: Entergy Nuclear Operations, Inc.

FACILITY: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT

On February 29, 2012, the U.S. Nuclear Regulatory Commission (NRC) held a Public Meeting at the Beach Haven Event Center in South Haven, Michigan. The meeting was held with members of the public to discuss recent performance at the Palisades Nuclear Plant.

Discussions were held between members of the public and NRC staff regarding the events that led to the issuance of two White findings and a Yellow finding during the fourth quarter of 2011.

The NRC discussed actions performed and schedul ed to address Palisades' performance in Column 3 of the Reactor Oversight Process (ROP) Action Matrix. Enclosure 1 is a list of attendees for the meeting, and a copy of the slides used by the NRC staff during the meeting are located in ADAMS (ML12058A491). On March 21, 2012, the NRC held a public meet ing to discuss the 2011 annual assessment results for Palisades Nuclear Plant. The meeting was held at the Beach Haven Event Center in South Haven, Michigan. Enclosure 2 is a list of attendees for the meeting, and copies of the slides used by licensee and the NRC staff during the meeting are located in ADAMS (ML12080A018 and ML12074A069). The meeting was started with the NRC providing an overview of the ROP and the results of the 2011 annual assessment for Palisades Nuclear Plant. The NRC's presentation was followed by a presentation provided by the Palisades Nuclear Plant staff giving an overview of the current and proposed actions to improve performance in 2012, including a description of the major issues. In addition, Palisades' staff discussed the actions that have been accomplished, or are planning to be accomplished, to mitigate the three new substantive cross-cutting issues that were identified by the NRC during the 2011 annual assessment.

Entergy Nuclear Operations, Inc.

After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.

/RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20

Enclosures:

1. List of Meeting Attendees for the February 29, 2012, Public Meeting
2. List of Meeting Attendees for the March 21, 2012, Public Meeting

cc w/encl: Distribution via List Serve

PUBLIC MEETING PRINCIPAL ATTENDEES FEBRUARY 29, 2012 NRC attendees

C. Pederson, Acting Regional Administrator J. Uhle, Acting Deputy Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector J. Ellegood, Senior Resident Inspector R. Krsek, Kewaunee Senior Resident Inspector J. Jandovitz, Project Engineer

Members of the Public Kevin Kemps, Beyond Nuclear/Don't Waste Michigan

Thomas Asperity, Saprodani Associates

Mike Mulligan

PUBLIC MEETING PRINCIPAL ATTENDEES MARCH 21, 2012 NRC Attendees

C. Pederson, Acting Regional Administrator J. Giessner, Chief, Division of Reactor Projects, Branch 4 T. Taylor, Palisades Senior Resident Inspector A. Scarbeary, Palisades Resident Inspector J. Ellegood, Senior Resident Inspector J. Cassidy, Senior Health Physicist S. Sheldon, Senior Reactor Inspector

R. Edwards, Reactor Engineer Entergy Attendees

A. Vitale, Site Vice President D. Hamilton, General Manager Plant Operations B. Davis, Engineering Director C. Arnone, Nuclear Safety Assurance Director

Members of the Public

Kevin Kemps, Beyond Nuclear/Don't Waste Michigan Mike Mulligan

Entergy Nuclear Operations, Inc.

After the business part of the meeting ended, the NRC listened to comments and answered questions from the public.

/RA/ John B. Giessner, Branch Chief Branch 4 Division of Reactor Projects Docket Nos. 50-255 and 72-007 License No. DPR-20

Enclosures:

1. List of Meeting Attendees for the February 29, 2012, Public Meeting
2. List of Meeting Attendees for the March 21, 2012, Public Meeting

cc w/encl: Distribution via List Serve DISTRIBUTION

See next page

DOCUMENT NAME: PALISADES - PUBLIC MEETING

SUMMARY

.DOCX G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JGiessner:cs DATE 03/27/12 OFFICIAL RECORD COPY

Letter to Entergy Nuclear Operations, Inc. from J. Giessner dated March 27, 2012

SUBJECT:

SUMMARY

OF THE FEBRUARY 29, 2012, AND MARCH 21, 2012, PUBLIC MEETINGS REGARDING PALISADES NUCLEAR PLANT DISTRIBUTION

Breeda Reilly RidsNrrPMPalisades Resource

RidsNrrDorlLpl3-1 Resource

RidsNrrDirsIrib Resource

Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck

Allan Barker

Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov